Loading...
HomeMy WebLinkAbout20160674E002 Bethany Corner 2022-03-30 FR 028.pdf Kirkland | Tacoma | Mount Vernon 425-827-7701| www.aesgeo.com Date Mailed: Principal / PM: Matthew A. Miller, P.E. This document is considered a DRAFT until signed or initialed by an AESI Principal or Project Manager Page 1 of 2 v.7.20 FIELD REPORT Date Project Name Project No. Report No. 2022-03-30 Bethany Corner 20160674E002 028 Location Municipality AESI Project Manager AESI Field Rep See Below Renton Matthew A. Miller, P.E. Alex Ybarra, Staff Geologist Permit No. Client/Owner Attn Requested By See Below Mark Seek (Tiger Mountain Homes) Mark Seek Contractor Engineer/Architect General Contractor Paving Contractor Weather D.R. Strong Tiger Mountain Homes / Mark Becker Blacktop / Joe Cloudy, 60’s THE FOLLOWING WAS NOTED: AESI was onsite part time in order to observe ADU building foundation subgrade. Upon arrival we met with Mark Seek of Tiger Mountain Homes. Lot 3 ADU Building Foundation Subgrade, Permit #B21005526: Prior to our arrival the contractor excavated for ADU building foundation subgrade for Lot 3 at address 10964 SE 165th St (Fig 1). Subgrade had been over-excavated in such a manner to remove the black, organic rich material until native silty sand with some gravel was exposed. We were informed that this subgrade would have approximately 1’ thick of 2X4” quarry spalls placed and compacted at the bottom followed by approximately 3’ thick of 1 ¼” minus recycle concrete as to achieve their design grade. AESI observed some loose material which had not been removed from the excavations. AESI recommends removing the loose soils prior to quarry spall placement. AESI observed and assessed the subgrade with a ½” diameter steel soil probe. In our opinion the subgrade will be suitable for allowable soil bearing pressure of 1,500 psf as per the approved plans once the loose soils are removed and the spalls/1 ¼” minus recycle concrete have been placed/compacted. Lot 4 ADU Building Foundation Subgrade, Permit #B2200077: Prior to our arrival the contractor excavated for ADU building foundation subgrade for Lot 4 at address 10958 SE 165th St (Fig 2). Subgrade had been over-excavated in such a manner to remove the black, organic rich material until native silty sand with some gravel was exposed. We were informed that this subgrade would have approximately 1’ thick of 2X4” quarry spalls placed and compacted at the bottom followed by approximately 3’ thick of 1 ¼” minus recycle concrete as to achieve their design grade. AESI observed some loose material which had not been removed from the excavations. AESI recommends removing the loose soils prior to quarry spall placement. AESI observed and assessed the subgrade with a ½” diameter steel soil probe. In our opinion the subgrade will be suitable for allowable soil bearing pressure of 1,500 psf as per the approved plans once the loose soils are removed and the spalls/1 ¼” minus recycle concrete have been placed/compacted. AESI departed in the PM and will return 3/31/2022 in order to observe Lot 5 ADU building foundation subgrade. Date Project Name Project No. Report No. 2022-03-30 Bethany Corner 20160674E002 028 Page 2 of 2 FIELD REPORT Figure 1: Photo of Lot 3 ADU building foundation subgrade. Figure 2: Photo of Lot 4 ADU building foundation subgrade.