Loading...
HomeMy WebLinkAboutMFP22001001.pdfDEPARTMENT OF COMMUNITY AND ECONOMIC DEVELOPMENT Major Franchise Permit: MFP22001001 IVR Number: 22001001 Permit Information Permit Name: Comcast Cable Franchise Permit Address/Location:03/01/2022Application Date:0923059211Parcel Number: 559 UNION AVE NE Permit Type:04/04/2022Issue Date:Franchise Permit Work Class:04/04/2023Expiration Date:Major Utility Job Number: 605370Franchise Type:Cable Description: Comcast proposes to delash and relash 96ct fiber 531'. Replace 96ct fiber in existing underground for 843'. Restoration per City of Renton standards. Contacts Name Address PhoneTypeBilling Ashley Kiehn 4610 Tacoma Avenue Sumner, WA 98390 Applicant Andrew Parker Comcast 410 Valley Ave NW, Suite 12 Bldg C Puyallup, WA 98371 B: (253) 225-0596Applicant Carissa Morris Sefnco Communications Applicant Rhonda Resnik Comcast 410 Valley Ave NW, Suite 12, Bldg C Puyallup, WA 98371 B: (253) 864-4246Applicant Tom Donnelly Comcast Business Communications 1701 Jfk Blvd, 32nd Floor Philadelphia, PA 19103 B: (215) 286-7347 C: (215) 286-7557 Contact Scott Nall SEFNCO Communications Inc 2904 4th Ave NE Puyallup, WA 98372 B: (877) 385-2903 C: (253) 444-9057 Contractor Business License Number: 41108Construction Contractor: SEFNCCI850QD CITY OF RENTON ROW 1055 S Grady Way Renton, WA 98057-3232 Owner Laurie Dietz Comcast - Billing 1701 John F. Kennedy Blvd. Philadelphia, PA 19103 H: (425) 741-5733Specialized Billing X General Conditions & Signature Permission is hereby given for the work described on this permit according to the conditions hereon and according to the approved plans and specifications pertaining thereto, subject to compliance with the Ordinance of the City of Renton. Ÿ This permit and plans must be posted at the job site at all times.Ÿ I hereby certify that no work is to be done except as described above and in approved plans, and that work is to conform to Renton Trench Restoration and Street Overlay Requirements. Ÿ Call 425.430.7203 or go to: https://permitting.rentonwa.gov one working day in advance to schedule an inspections and for ANY work in the Right of Way. Ÿ Call 8 1 1 to locate underground utilities at least two full business days prior to any excavation.Ÿ In accordance with RCW 19.122.033(4) the permit holder is required to contact (Williams Northwest Pipeline at 425.868.1010) (Olympic Pipeline at 206.510.0575) (Puget Sound Energy at 425.375.3397) to request a consultation with the transmission pipeline company prior to performing any construction or excavation activities. This requirement to consult with the transmission pipeline company is in addition to the requirement to Call before You Dig as required in RCW 19.122. Ÿ (Date)(Signature) Page 1 of 1THIS PERMIT AND PLANS MUST BE POSTED AT THE JOB SITE AT ALL TIMES DEPARTMENT OF COMMUNITY AND ECONOMIC DEVELOPMENT Page 1 of 1 | Published: 1/2/2019 Planning Division | 1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425-430-7200 Email: franchisepermits@rentonwa.gov Website: rentonwa.gov FRANCHISE PERMIT APPLICATION Published: 1/2/2019 TO THE APPLICANT: Submit an electronic copy of the plans with the Franchise Permit Application and the Site Specific Traffic Control Application to franchisepermits@rentonwa.gov. Permit cost is $630.00. Inspection fee for trenching more than 60 lineal feet or installation of 6 or more poles will be billed at $60.00 per hour. Franchise Agency: Franchise Job Number: Phone: Contact Name: Email: Job Site Address: Project Name: Description of Work: Please check all that apply: ☐ New Construction ☐ Repair/Relocate ☐ Underground ☐ Overhead ☐ Sidewalk ☐ Street ☐ Open Trench ☐ Bore # of feet: Contractor Name: Phone: State Contractors License #: City of Renton Business License #: “I certify that I am the owner or applicant’s authorized agent and do hereby agree to abide to the terms and conditions set forth under this permit and shall comply with the City of Renton’s Trench Restoration and Street Overlay Requirements. ” Signature Date INSPECTIONS SHALL BE REQUESTED 24 HOURS PRIOR TO COMMENCEMENT OF ALL WORK BY CALLING THE INSPECTION LINE AT 425-430-7203 OR BY GOING TO MYBUILDINGPERMIT.COM Jobs are required to be called in for job start, re-inspection and project final. Re-inspection fees are billed at $125/hour. All Pre-Construction meetings shall be scheduled at a maximum of 14 days prior to the job start date. Plan Review/Development Engineering Date Approved as submitted Pre-Construction Meeting required Site Construction Inspector Date Approved with comments or redlines Camera inspection of utilities required Development Engineering Manager Date SEFNCO Communications, Inc. SEFNCC1850QD BLO29666 Comcast Cable Communications Management, LLC 253 235-7406 owen_shackett@comcast.comCody Shackett JB0000605370 559 Union Ave NE Comcast proposes to delash/relash 96ct fiber ~531'; Replace 96ct fiber in existing underground ~843'; Proof & dig 96ct fiber if necessary. 11/17/2021 559 Union Ave NE MFP22001001 Scott Warlick 4/4/2022 Note: The Applicant is responsible for compliance with all codes and regulations, whether or not described in this document. DEPARTMENT OF PUBLIC WORKS Page 1 of 3 | Published: 10/27/2021 Transportation Division | 1055 South Grady Way, 5th Floor | Renton, WA 98057 | 425-430-7380 Website: rentonwa.gov TRAFFIC CONTROL PLAN APPLICATION Published: 10/27/2021 TRAFFIC CONTROL PLAN (TCP) MUST BE SUBMITTED TO PUBLIC WORKS TRANSPORTATION DIVISION FOR REVIEW/APPROVAL AT LEAST FIVE (5) WORKING DAYS BEFORE THE DATE OF WORK. The City of Renton requires any contractor, firm, corporation, or other public/private agency to prepare a traffic control plan (TCP) and obtain city's approval of that plan when construction, repair, or maintenance work is to be conducted within the city's right-of-way. 1. Fill out the Traffic Control Plan (TCP) Application form and prepare required submittal documents. 2. The following items are all required for submittal of the TCP Application: ☐Electronic Copy of the TCP Application ☐Electronic Copy of the TCP Layout, on 11” X 17” paper size format, which shall: Include map(s) showing the location of the project and work area. Be legible lettering and clear, contrasting, symbols of viewing or printing. Must indicate street names, and north arrow and scale. Types of plans required: o Work hour plan – show all mobility impacts during construction hours. o Non-work plan - show all mobility impacts after work hours when limited or no work is happening in the right-of-way (ROW), if applicable. o Changing construction phases – show construction sequence and each construction phase change even if the traffic control is not modified, if applicable. o Pedestrian access/detour plan, if applicable. - Shall conform to the Washington State Traffic Control Flagger Certification handbook, by the Evergreen Safety Council. 3. Submit Application via email to TCP@rentonwa.gov with the subject line “TCP Application – [Project Name].” Project Name: Permit #: Site Address: Work Date: From _____________ To _____________ Work Time: Start ______________ End ______________ Construction Company: Contact Name: Phone/Cell: _________________________ Business Address: City/State: Zip: Description of Work: Approval By: _________________________________________________ Date:____________________ Transportation Engineering 559 Union Ave NE - JB0000605370 559 Union Ave NE 3/14/2022 4/18/2022 9 AM 3 PM SEFNCO Communications Carissa Morris 253-313-2057 4610 Tacoma Ave Sumner, WA 98390 Comcast proposes to delash/relash 96ct fiber ~531'; Replace 96ct fiber in existing underground ~843'; Proof & dig 96ct fiber if necessary. MFP22001001 Monday - Friday Scott Warlick CED 3/21/2022 Note: The Applicant is responsible for compliance with all codes and regulations, whether or not described in this document. Page 2 of 3 | Published: 10/27/2021 PERMIT HOLDER AGREES TO ALL THE FOLLOWING:  Must have approved Traffic Control Plan (TCP) prior to commencing the work.  Maintain existing pedestrian access. The work on pedestrian facilities, shall be limited to one corner at a time, with the least possible inconvenience or delay to pedestrians.  WORK TIME begins when any street or travel lane is fully or partially closed. This includes set up within the traveled way.  Comply with all traffic regulations of the City of Renton and the State of Washington.  Prepare a traffic control plan and obtain City approval of that plan. That plan shall be implemented for all street and lane closures, and the plan shall be performed in compliance with the Manual on Uniform Traffic Control Devices.  Notify emergency services (253-852-2121) twenty-four (24) hours before any street or lane closures.  Contractor or entity must call Renton School District (425-204-4455) or any public/private agency, including public transit, to be affected by a temporary lane or road closure a minimum of five business days (excluding weekends and holidays) prior to starting any work.  Contractor or entity must notify King County Metro in writing at construction.coord@kingcounty.gov a minimum of five business days (excluding weekends and holidays) prior to starting any work impacting bus stops, a temporary lane or road closure. Work requiring removing a bus shelter or sign requires notification in writing a minimum of 30 business days (excluding weekends and holidays). Please call King County Metro at 206-477-1140 with any questions.  Any lane or street closures not in conformance with the approved traffic control plan and/or without notification of emergency services may result in receiving a citation for violation of R.C.W. 47.36.200 Signs or Flaggers at thoroughfare work sites and R.C.W. 9A.36.050 Reckless Endangerment, and other applicable State and City codes.  Indemnify and hold harmless the City of Renton from any and all claims, actions, and judgments, including all costs of defense and attorney’s fees incurred in defending against same, arising from and related to implementation of the approved traffic control plans including claims arising from towing of private vehicles and the acts of the Permit Holder’s agents and employees.  The City of Renton shall be entitled, in its reasonable discretion, to settle claims prior to suit or judgment, and in such event shall indemnify and hold harmless the City for any such claims paid, including the City’s reasonable attorney’s fees and litigation costs incurred resulting from such claim.  In the event any claim or suit is brought against City within the scope of this Agreement, Permit Holder will pay for legal counsel chosen by the City to defend against same.  Flagger and sign placement are subject to revision by the City Inspector on site, if needed to address traffic or pedestrian safety or travel.  All permit conditions shall be met. NOTES:  Total road closure lasting more than twenty-four (24) hours is subject to the approval by the City Council.  Work Zone Traffic Control shall be in accordance with the Manual on Uniform Traffic Control Devices (MUTCD) and shown by a traffic control plan layout or reference to WSDOT.  Approved Temporary Traffic Control Plan must be at the work site during work hours.  Complete assistance and accommodation shall be provided to all kinds of pedestrian traffic when sidewalk or walkway is impeded to safely redirect pedestrians around a work zone.  Signage shall be used to warn motorcyclists/bicyclists of the potential hazards on any uneven surfaced or slippery road conditions during work and non-work hours.  Any vehicle, equipment, barricade, or portable tow-away sign used within the work area must display a company logo or any legally acceptable sign showing the company name, address, and telephone number at a conspicuous place on the vehicle or equipment. Note: The Applicant is responsible for compliance with all codes and regulations, whether or not described in this document. Page 3 of 3 | Published: 10/27/2021  In the case of Temporary No Parking Zones, all the following apply in addition to previous:  Contractor must complete form to show limits of Temporary No Parking Zone identifying barricade locations for vacate parking or curb lane usage.  Contractor must post notice of dates and time of Temporary No Parking Zone with at least two signs per block seventy-two (72) hours in advance of effective date and time.  The cover sheet of this Traffic Control Plan form must be attached to each Temporary No Parking Sign on the project site.  Temporary traffic control devices must be removed immediately when work is done or no construction activities are going on. If deemed abandoned, City crews will remove and store them at the City’s maintenance shop (3555 NE 2nd Street). I certify that the information on this application and within the submittal documents are accurate to the best of my knowledge and I acknowledge all the requirements on this application. Applicant’s Signature Date Applicant’s Name (Print) 2/15/2022 Carissa Morris EOPEOPEOPEOPEOPEOPEOPEOPSW SW SW SW SW SW SW SW SWSWSWSWSW FL FL FL FL FL FL FL FLEOPEOPEOPEOP SW SW SW SW SW SW FL FL FL FL FL FL FL FL FL FL FL FL FL FL FL FL FL FL FL FL FL FL FL FL EOP EOPEOPEOPEOPEOPEOP EOPEOPEOPEOPFLFLFLFLFLFLFLFLFLFLFLFLFLFLFLSW SW SW SW SW SW SW SW SWSWSWSWSWSWSWSWSWSW←DRIVEWAY→←DRIVEWAY→←DRIVEWAY→←DRIVEWAY→←DRIVEWAY→←DRIVEWAY→←DRIVEWAY→←DRIVEWAY→←DRIVEWAY→←SIDEWALK →←SIDEWALK →←SIDEWALK → ←SIDEWALK →←SIDEWALK →UNION AVE NEUNION AVE NETACOMA AVE NEPOLE-1POLE-2POLE-3POLE-4POLE-5AAAAAAAAAA 152'112'64'140'P←DRIVEWAY→←DRIVEWAY→←DRIVEWAY→NE 6TH STNE 6TH STR/WR/WR/WR/W R/W R/WR/WR/WR/WR/WR/WR/WR/WR/WR/W R/W R/W R/W R/W R/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/W←DRIVEWAY→←DRIVEWAY→6 3 'NREVISIONSDATEDESCRIPTIONINITIALTEMPORARY TRAFFICCONTROL PLANTRAFFIC CONTROL PLAN-15CONSTRUCTION TCP NOTES:1. MAINTAIN DRIVEWAY ACCESS AT ALL TIMES2. SIDEWALK ARE EITHER OPEN OR NOT OPEN. A SIDEWALK IS CLOSED IF A MINIMUM 4' PATH CANNOT BE MAINTAINED MEASURED FROM PROPERTY LINE, OR 5.5' IF CREATED FROM FACE OFCURB. (PEDESTRIAN PATH PROVIDED WHERE REQUIRED) AND WILL BE MONITORED BY A SPOTTER TO INSURE FLOW AND SAFETY DURING WORK UNLESS OTHERWISE NOTED.SPOTTER IS NOT TOTRAFFIC CONTROL.3.NO EXCEPTION TAKEN- CONTRACTOR IS RESPONSIBLE FOR ADA COMPLIANCE4.ALL CONTROL SET-UP, SIGN SPACING AND PROCEDURES WILL CONFORM TO SPECIFICATIONS STATED IN THE FEDERAL MANUAL ON UNIFORMED TRAFFIC CONTROL DEVICES (M.U.T.C.D).5.CITIES AND VARIOUS MUNICIPALITIES MAY HAVE ALSO ADOPTED SPECIALIZED GUIDELINES FOR TRAFFIC CONTROL WITHIN THEIR JURISDICTION. IT IS THE RESPONSIBILITY OF THE ON-SITE TRAFFIC CONTROL PERSONAL TO SEE IF AND ANY SPECIAL CONDITIONS EXIST6.FLAGGERS SHALL BE USED IN ACCORDANCE WITH WAC 468-95-302.7.IF ONLY ONE LANE IS OPEN IN A DIRECTION,THAT LANE SHALL BE A MINIMUM OF 11' WIDE,UNLESS SPOTTER/FLAGGERS ARE USED,IN WHICH CASE THE LANE CAN BE A MINIMUM OF 10'.8.ALL ROW WORK MUST YIELD TO SCHOOL TRANSIT, EMPLOYEES AND CHILDREN. WHILE PASSENGER LOADING/UNLOADING, STOPPED OR SLOWING: CEASE WORK, YIELD. WHEN SCHOOL TRANSIT, AND/OR PEDESTRIANS, DEPART:COMMENCE WORK.ADVANCED WARNING SIGN SPACINGROAD TYPESPEEDDISTANCE BETWEEN ADVANCEDWARNING SIGNSABCDFREEWAYS & EXPRESSWAYS55/75 MPH1500 ±1500 ±1500 ±1500 ±RURAL HIGHWAYS60/65 MPH800 ±800 ±800 ±800 ±RURAL ROADS45/55 MPH500 ±500 ±500 ±500 ±RURAL ROADS & URBAN ARTERIAL35/40 MPH350 ±350 ±350 ±N/ARURAL ROADS, RESIDENTIAL &BUSINESS DISTRICTS25/30 MPH200 ± (2)200 ± (2)200 ± (2)N/AURBAN STREETS25 MPH ORLESS100 ± (2)100 ± (2)100 ± (2)N/A(1) ALL SPACING MAY BE ADJUSTED TO ACCOMMODATE INTERCHANGE RAMPS,AT-GRADE INTERSECTIONS, AND DRIVEWAYS.(2) THIS SPACING MAY BE REDUCED IN URBAN AREAS TO FIT ROADWAY CONDITIONS.LONGITUDINAL BUFFER SPACE =BSPEED (MPH)2025303540455055606570DISTANCE (FT)115155200250305360425495570645730TAPER LENGTH IN FEET=L (FEET)LANEWIDTH(FEET)POSTED SPEED LIMIT (MPH)2530354045505560657010105150205270450500550---11115160225295495550605660--121251802453205406006607207808401Know what'sbelow.CallR 81148 HOURS BEFORE YOU DIGUNDERGROUND SERVICE ALERTCALL TOLL FREEDIGALERTbefore you dig.559 UNION AVE NE 559 UNION AVE NE RENTON, WA JB# 605370REVISIONSDATEDESCRIPTIONINITIAL COMCASTSHEETOFDATE:EXCEPT AS MAY BE OTHERWISE PROVIDED BY CONTRACT,THESE DRAWINGS AND SPECIFICATIONS SHALL REMAIN THEPROPERTY OF SEFNCO COMMUNICATION, INC. BOTH BEINGISSUED IN STRICT CONFIDENCE AND SHALL NOT BEREPRODUCED, COPIED, OR USED FOR ANY PURPOSEWITHOUT SPECIFIC WRITTEN PERMISSION.SITE NAME:SCALELOCATION ADDRESS: COMCAST JOB NUMBER: STAMPDRAWN BY:SEFNCOCOMMUNICATIONSCCF11/9/2021FLAGGERFLAGGERFLAGGERCBA ROADWORKAHEADBEPREPAREDTO STOPLIMITSPEEDR2-130CBAROADWORKAHEADBEPREPAREDTO STOPLIMITSPEEDR2-130C B A ROADWORKAHEADBEPREPAREDTO STOPLIMITSPEEDR2-130CBAROADWORKAHEADBEPREPAREDTO STOPLIMITSPEEDR2-130SPOTTERDIRECTION OF AERIAL WORKSLOW ROLLING WORK ZONEWORKZONE Morgan DavidsonID: D231N2TCS# 012798EXPIRES: 5/2025 MFP22001001 EOPEOPEOPEOPSWSWSWSW SW SW SW SW SW SW SW SWSWSWSW FL FL FL FL FL FLEOPEOPEOPEOP SW SW SW SW SW SW SW FL FL FL FL FL FL FL FL FL FL FL FL FL FL FL FL FL FL FL FL FL FL EOP EOPEOPEOPEOPEOPEOPEOPEOPFLFLFLFLFLFLFLEOPEOPEOPEOPSWSWSWSWSWSWSWSWSWSWSWSWSWSWSWSWSW SW SW SW SW SW SWSWSWSWSWSWSWSW SW EOP EOP EOP EOP←DRIVEWAY→←DRIVEWAY→←DRIVEWAY→←DRIVEWAY→←DRIVEWAY→←DRIVEWAY→←DRIVEWAY→←DRIVEWAY→←DRIVEWAY→←DRIVEWAY→←DRIVEWAY→←DRIVEWAY→←DRIVEWAY→←DRIVEWAY←DRIVEWAY→←DRIVEWAY→←DRIVEWAY→→SIDEWALK →←SIDEWALK →←SIDEWALK →←SIDEWALK →←SIDEWALK →←SIDEWALK →←SIDEWALK →NE 5TH CTUNION AVE NEUNION AVE NETACOMA AVE NEPOLE-1POLE-2POLE-3POLE-4POLE-5AAAAAAAAAA 152'112'64'140'PP205'151'NE 6TH STR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/W R/W R/W R/W R/W R/W R/WR/WR/WR/WR/WR/WR/WR/WR/WR/W63 'NREVISIONSDATEDESCRIPTIONINITIALTEMPORARY TRAFFICCONTROL PLANTRAFFIC CONTROL PLAN-25CONSTRUCTION TCP NOTES:1. MAINTAIN DRIVEWAY ACCESS AT ALL TIMES2. SIDEWALK ARE EITHER OPEN OR NOT OPEN. A SIDEWALK IS CLOSED IF A MINIMUM 4' PATH CANNOT BE MAINTAINED MEASURED FROM PROPERTY LINE, OR 5.5' IF CREATED FROM FACE OFCURB. (PEDESTRIAN PATH PROVIDED WHERE REQUIRED) AND WILL BE MONITORED BY A SPOTTER TO INSURE FLOW AND SAFETY DURING WORK UNLESS OTHERWISE NOTED.SPOTTER IS NOT TOTRAFFIC CONTROL.3.NO EXCEPTION TAKEN- CONTRACTOR IS RESPONSIBLE FOR ADA COMPLIANCE4.ALL CONTROL SET-UP, SIGN SPACING AND PROCEDURES WILL CONFORM TO SPECIFICATIONS STATED IN THE FEDERAL MANUAL ON UNIFORMED TRAFFIC CONTROL DEVICES (M.U.T.C.D).5.CITIES AND VARIOUS MUNICIPALITIES MAY HAVE ALSO ADOPTED SPECIALIZED GUIDELINES FOR TRAFFIC CONTROL WITHIN THEIR JURISDICTION. IT IS THE RESPONSIBILITY OF THE ON-SITE TRAFFIC CONTROL PERSONAL TO SEE IF AND ANY SPECIAL CONDITIONS EXIST6.FLAGGERS SHALL BE USED IN ACCORDANCE WITH WAC 468-95-302.7.IF ONLY ONE LANE IS OPEN IN A DIRECTION,THAT LANE SHALL BE A MINIMUM OF 11' WIDE,UNLESS SPOTTER/FLAGGERS ARE USED,IN WHICH CASE THE LANE CAN BE A MINIMUM OF 10'.8.ALL ROW WORK MUST YIELD TO SCHOOL TRANSIT, EMPLOYEES AND CHILDREN. WHILE PASSENGER LOADING/UNLOADING, STOPPED OR SLOWING: CEASE WORK, YIELD. WHEN SCHOOL TRANSIT, AND/OR PEDESTRIANS, DEPART:COMMENCE WORK.ADVANCED WARNING SIGN SPACINGROAD TYPESPEEDDISTANCE BETWEEN ADVANCEDWARNING SIGNSABCDFREEWAYS & EXPRESSWAYS55/75 MPH1500 ±1500 ±1500 ±1500 ±RURAL HIGHWAYS60/65 MPH800 ±800 ±800 ±800 ±RURAL ROADS45/55 MPH500 ±500 ±500 ±500 ±RURAL ROADS & URBAN ARTERIAL35/40 MPH350 ±350 ±350 ±N/ARURAL ROADS, RESIDENTIAL &BUSINESS DISTRICTS25/30 MPH200 ± (2)200 ± (2)200 ± (2)N/AURBAN STREETS25 MPH ORLESS100 ± (2)100 ± (2)100 ± (2)N/A(1) ALL SPACING MAY BE ADJUSTED TO ACCOMMODATE INTERCHANGE RAMPS,AT-GRADE INTERSECTIONS, AND DRIVEWAYS.(2) THIS SPACING MAY BE REDUCED IN URBAN AREAS TO FIT ROADWAY CONDITIONS.LONGITUDINAL BUFFER SPACE =BSPEED (MPH)2025303540455055606570DISTANCE (FT)115155200250305360425495570645730TAPER LENGTH IN FEET=L (FEET)LANEWIDTH(FEET)POSTED SPEED LIMIT (MPH)2530354045505560657010105150205270450500550---11115160225295495550605660--121251802453205406006607207808402Know what'sbelow.CallR 81148 HOURS BEFORE YOU DIGUNDERGROUND SERVICE ALERTCALL TOLL FREEDIGALERTbefore you dig.559 UNION AVE NE 559 UNION AVE NE RENTON, WA JB# 605370REVISIONSDATEDESCRIPTIONINITIAL COMCASTSHEETOFDATE:EXCEPT AS MAY BE OTHERWISE PROVIDED BY CONTRACT,THESE DRAWINGS AND SPECIFICATIONS SHALL REMAIN THEPROPERTY OF SEFNCO COMMUNICATION, INC. BOTH BEINGISSUED IN STRICT CONFIDENCE AND SHALL NOT BEREPRODUCED, COPIED, OR USED FOR ANY PURPOSEWITHOUT SPECIFIC WRITTEN PERMISSION.SITE NAME:SCALELOCATION ADDRESS: COMCAST JOB NUMBER: STAMPDRAWN BY:SEFNCOCOMMUNICATIONSCCF11/9/2021SPOTTERDIRECTION OF AERIAL WORK SLOW ROLLING WORK ZONE NOTE:THIS TCP LAYOUT IS TYPICAL FORAERIAL/UNDERGROUND WORK ON UNIONAVE NE, U.N.O.. SPOTTERS TO MOVE ASNEEDED WITH SLOW ROLLING WORKZONE.WORKZONEFLAGGERFLAGGERFLAGGERLIMITSPEEDR2-130C B A ROADWORKAHEADBEPREPAREDTO STOPLIMITSPEEDR2-130CBAROADWORKAHEADBEPREPAREDTO STOPLIMITSPEEDR2-130CBA ROADWORKAHEADBEPREPAREDTO STOP Morgan DavidsonID: D231N2TCS# 012798EXPIRES: 5/2025 MFP22001001 EOPEOPEOPEOPEOPEOPEOPEOPEOPSWSWSWSWSWSW SW SW SW SW SW EOPEOPSW SW SW SW SW SW SW FL FL FL FL FL FL FL FL FL FL FL FL FL FL FL FL EOPEOPEOPEOPEOPEOPFLFLFLFLFLFLFLEOPEOPEOPEOPSWSWSWSWSWSWSWSWSWSWSWEOPEOPSWSW SWSWSWSWSWSWSWSWSWSWSWSWSWSW SW SW SW SWSWSWSWSWSW EOP←DRIVEWAY→←DRIVEWAY→←DRIVEWAY→←DRIVEWAY→←DRIVEWAY→←DRIVEWAY→←DRIVEWAY→←DRIVEWAY→←DRIVEWAY→←DRIVEWAY→←DRIVEWAY→←DRIVEWAY→←DRIVEWAY→←DRIVEWAY→←DRIVEWAY→←DRIVEWAY→←DRIVEWAY→←DRIVEWAY→←DRIVEWAY→←SIDEWALK →←SIDEWALK →←SIDEWALK → ←SIDEWALK →←SIDEWALK →←SIDEWALK →←SIDEWALK →←SIDEWALK →←SIDEWALK →NE 5TH CTNE 5TH PLUNION AVE NEPOLE-1POLE-3POLE-4POLE-5AAAAAAAAAA 152'112'64'140'PP205'151'NE 6TH STR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/W R/W R/W R/W R/WR/WR/WR/WR/WR/WR/WR/W6 3 'NREVISIONSDATEDESCRIPTIONINITIALTEMPORARY TRAFFICCONTROL PLANTRAFFIC CONTROL PLAN-35CONSTRUCTION TCP NOTES:1. MAINTAIN DRIVEWAY ACCESS AT ALL TIMES2. SIDEWALK ARE EITHER OPEN OR NOT OPEN. A SIDEWALK IS CLOSED IF A MINIMUM 4' PATH CANNOT BE MAINTAINED MEASURED FROM PROPERTY LINE, OR 5.5' IF CREATED FROM FACE OFCURB. (PEDESTRIAN PATH PROVIDED WHERE REQUIRED) AND WILL BE MONITORED BY A SPOTTER TO INSURE FLOW AND SAFETY DURING WORK UNLESS OTHERWISE NOTED.SPOTTER IS NOT TOTRAFFIC CONTROL.3.NO EXCEPTION TAKEN- CONTRACTOR IS RESPONSIBLE FOR ADA COMPLIANCE4.ALL CONTROL SET-UP, SIGN SPACING AND PROCEDURES WILL CONFORM TO SPECIFICATIONS STATED IN THE FEDERAL MANUAL ON UNIFORMED TRAFFIC CONTROL DEVICES (M.U.T.C.D).5.CITIES AND VARIOUS MUNICIPALITIES MAY HAVE ALSO ADOPTED SPECIALIZED GUIDELINES FOR TRAFFIC CONTROL WITHIN THEIR JURISDICTION. IT IS THE RESPONSIBILITY OF THE ON-SITE TRAFFIC CONTROL PERSONAL TO SEE IF AND ANY SPECIAL CONDITIONS EXIST6.FLAGGERS SHALL BE USED IN ACCORDANCE WITH WAC 468-95-302.7.IF ONLY ONE LANE IS OPEN IN A DIRECTION,THAT LANE SHALL BE A MINIMUM OF 11' WIDE,UNLESS SPOTTER/FLAGGERS ARE USED,IN WHICH CASE THE LANE CAN BE A MINIMUM OF 10'.8.ALL ROW WORK MUST YIELD TO SCHOOL TRANSIT, EMPLOYEES AND CHILDREN. WHILE PASSENGER LOADING/UNLOADING, STOPPED OR SLOWING: CEASE WORK, YIELD. WHEN SCHOOL TRANSIT, AND/OR PEDESTRIANS, DEPART:COMMENCE WORK.ADVANCED WARNING SIGN SPACINGROAD TYPESPEEDDISTANCE BETWEEN ADVANCEDWARNING SIGNSABCDFREEWAYS & EXPRESSWAYS55/75 MPH1500 ±1500 ±1500 ±1500 ±RURAL HIGHWAYS60/65 MPH800 ±800 ±800 ±800 ±RURAL ROADS45/55 MPH500 ±500 ±500 ±500 ±RURAL ROADS & URBAN ARTERIAL35/40 MPH350 ±350 ±350 ±N/ARURAL ROADS, RESIDENTIAL &BUSINESS DISTRICTS25/30 MPH200 ± (2)200 ± (2)200 ± (2)N/AURBAN STREETS25 MPH ORLESS100 ± (2)100 ± (2)100 ± (2)N/A(1) ALL SPACING MAY BE ADJUSTED TO ACCOMMODATE INTERCHANGE RAMPS,AT-GRADE INTERSECTIONS, AND DRIVEWAYS.(2) THIS SPACING MAY BE REDUCED IN URBAN AREAS TO FIT ROADWAY CONDITIONS.LONGITUDINAL BUFFER SPACE =BSPEED (MPH)2025303540455055606570DISTANCE (FT)115155200250305360425495570645730TAPER LENGTH IN FEET=L (FEET)LANEWIDTH(FEET)POSTED SPEED LIMIT (MPH)2530354045505560657010105150205270450500550---11115160225295495550605660--121251802453205406006607207808403Know what'sbelow.CallR 81148 HOURS BEFORE YOU DIGUNDERGROUND SERVICE ALERTCALL TOLL FREEDIGALERTbefore you dig.559 UNION AVE NE 559 UNION AVE NE RENTON, WA JB# 605370REVISIONSDATEDESCRIPTIONINITIAL COMCASTSHEETOFDATE:EXCEPT AS MAY BE OTHERWISE PROVIDED BY CONTRACT,THESE DRAWINGS AND SPECIFICATIONS SHALL REMAIN THEPROPERTY OF SEFNCO COMMUNICATION, INC. BOTH BEINGISSUED IN STRICT CONFIDENCE AND SHALL NOT BEREPRODUCED, COPIED, OR USED FOR ANY PURPOSEWITHOUT SPECIFIC WRITTEN PERMISSION.SITE NAME:SCALELOCATION ADDRESS: COMCAST JOB NUMBER: STAMPDRAWN BY:SEFNCOCOMMUNICATIONSCCF11/9/2021CBAROADWORKAHEADBEPREPAREDTO STOPLIMITSPEEDR2-130SPOTTERNOTE:THIS TCP LAYOUT IS TYPICAL FORAERIAL/UNDERGROUND WORK ON UNIONAVE NE, U.N.O.. SPOTTERS TO MOVE ASNEEDED WITH SLOW ROLLING WORKZONE.WORKZONECBAROADWORKAHEAD BEPREPAREDTO STOP LIMIT SPEED R2-1 30FLAGGER FLAGGERCBA ROADWORKAHEADBEPREPAREDTO STOPLIMITSPEEDR2-130C B A ROADWORKAHEADBEPREPAREDTO STOPLIMITSPEEDR2-130FLAGGER Morgan DavidsonID: D231N2TCS# 012798EXPIRES: 5/2025 MFP22001001 EOPEOPEOPEOPEOPEOPEOPEOPSWSWSWSWSW SW SW SW SW SWSWSWSWSWSWSW SWFLFLFLFLFLFLFLFLFLFLFLFL FL FL FL FL FL FL FL FL FL FL FL FL EOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOPSWSWSWSWSWSWSWSWSWSWSWSWSWSWEOPEOPSWSWSW SW SWSWSWSWSWSWSWSWSWSWSWSWSWSWSW SW SW SWSWSWSWSW←DRIVEWAY→←DRIVEWAY→←DRIVEWAY→←DRIVEWAY→←DRIVEWAY→←DRIVEWAY→←DRIVEWAY→←DRIVEWAY→←DRIVEWAY→←DRIVEWAY→←DRIVEWAY→←DRIVEWAY→←DRIVEWAY→←DRIVEWAY→←DRIVEWAY→←SIDEWALK →←SIDEWALK →←SIDEWALK → ←SIDEWALK →←SIDEWALK →←SIDEWALK →←SIDEWALK →←SIDEWALK →←SIDEWALK →←SIDEWALK →NE 5TH CTNE 5TH PLUNION AVE NEPOLE-3POLE-4POLE-5AAAA 140'PPP205'151'R/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/W R/W R/W R/W R/W63'NREVISIONSDATEDESCRIPTIONINITIALTEMPORARY TRAFFICCONTROL PLANTRAFFIC CONTROL PLAN-45CONSTRUCTION TCP NOTES:1. MAINTAIN DRIVEWAY ACCESS AT ALL TIMES2. SIDEWALK ARE EITHER OPEN OR NOT OPEN. A SIDEWALK IS CLOSED IF A MINIMUM 4' PATH CANNOT BE MAINTAINED MEASURED FROM PROPERTY LINE, OR 5.5' IF CREATED FROM FACE OFCURB. (PEDESTRIAN PATH PROVIDED WHERE REQUIRED) AND WILL BE MONITORED BY A SPOTTER TO INSURE FLOW AND SAFETY DURING WORK UNLESS OTHERWISE NOTED.SPOTTER IS NOT TOTRAFFIC CONTROL.3.NO EXCEPTION TAKEN- CONTRACTOR IS RESPONSIBLE FOR ADA COMPLIANCE4.ALL CONTROL SET-UP, SIGN SPACING AND PROCEDURES WILL CONFORM TO SPECIFICATIONS STATED IN THE FEDERAL MANUAL ON UNIFORMED TRAFFIC CONTROL DEVICES (M.U.T.C.D).5.CITIES AND VARIOUS MUNICIPALITIES MAY HAVE ALSO ADOPTED SPECIALIZED GUIDELINES FOR TRAFFIC CONTROL WITHIN THEIR JURISDICTION. IT IS THE RESPONSIBILITY OF THE ON-SITE TRAFFIC CONTROL PERSONAL TO SEE IF AND ANY SPECIAL CONDITIONS EXIST6.FLAGGERS SHALL BE USED IN ACCORDANCE WITH WAC 468-95-302.7.IF ONLY ONE LANE IS OPEN IN A DIRECTION,THAT LANE SHALL BE A MINIMUM OF 11' WIDE,UNLESS SPOTTER/FLAGGERS ARE USED,IN WHICH CASE THE LANE CAN BE A MINIMUM OF 10'.8.ALL ROW WORK MUST YIELD TO SCHOOL TRANSIT, EMPLOYEES AND CHILDREN. WHILE PASSENGER LOADING/UNLOADING, STOPPED OR SLOWING: CEASE WORK, YIELD. WHEN SCHOOL TRANSIT, AND/OR PEDESTRIANS, DEPART:COMMENCE WORK.ADVANCED WARNING SIGN SPACINGROAD TYPESPEEDDISTANCE BETWEEN ADVANCEDWARNING SIGNSABCDFREEWAYS & EXPRESSWAYS55/75 MPH1500 ±1500 ±1500 ±1500 ±RURAL HIGHWAYS60/65 MPH800 ±800 ±800 ±800 ±RURAL ROADS45/55 MPH500 ±500 ±500 ±500 ±RURAL ROADS & URBAN ARTERIAL35/40 MPH350 ±350 ±350 ±N/ARURAL ROADS, RESIDENTIAL &BUSINESS DISTRICTS25/30 MPH200 ± (2)200 ± (2)200 ± (2)N/AURBAN STREETS25 MPH ORLESS100 ± (2)100 ± (2)100 ± (2)N/A(1) ALL SPACING MAY BE ADJUSTED TO ACCOMMODATE INTERCHANGE RAMPS,AT-GRADE INTERSECTIONS, AND DRIVEWAYS.(2) THIS SPACING MAY BE REDUCED IN URBAN AREAS TO FIT ROADWAY CONDITIONS.LONGITUDINAL BUFFER SPACE =BSPEED (MPH)2025303540455055606570DISTANCE (FT)115155200250305360425495570645730TAPER LENGTH IN FEET=L (FEET)LANEWIDTH(FEET)POSTED SPEED LIMIT (MPH)2530354045505560657010105150205270450500550---11115160225295495550605660--121251802453205406006607207808404NOTE:THIS TCP LAYOUT IS TYPICAL FORUNDERGROUND WORK ON NE 5TH CT,U.N.O.. SPOTTERS AND FLAGGERS TOMOVE AS NEEDED WITH SLOW ROLLINGWORK ZONE.Know what'sbelow.CallR 81148 HOURS BEFORE YOU DIGUNDERGROUND SERVICE ALERTCALL TOLL FREEDIGALERTbefore you dig.559 UNION AVE NE 559 UNION AVE NE RENTON, WA JB# 605370REVISIONSDATEDESCRIPTIONINITIAL COMCASTSHEETOFDATE:EXCEPT AS MAY BE OTHERWISE PROVIDED BY CONTRACT,THESE DRAWINGS AND SPECIFICATIONS SHALL REMAIN THEPROPERTY OF SEFNCO COMMUNICATION, INC. BOTH BEINGISSUED IN STRICT CONFIDENCE AND SHALL NOT BEREPRODUCED, COPIED, OR USED FOR ANY PURPOSEWITHOUT SPECIFIC WRITTEN PERMISSION.SITE NAME:SCALELOCATION ADDRESS: COMCAST JOB NUMBER: STAMPDRAWN BY:SEFNCOCOMMUNICATIONSCCF11/9/2021WORKZONEWORKVEHICLEDIRECTION OF U/G WORKSPOTTERCBAROADWORKAHEAD BEPREPAREDTO STOP LIMIT SPEED R2-1 30 C B A ROADWORKAHEADBEPREPAREDTO STOPLIMITSPEEDR2-130CBA ROADWORKAHEADBEPREPAREDTO STOPLIMITSPEEDR2-130CBAROADWORKAHEADBEPREPAREDTO STOPLIMITSPEEDR2-130FLAGGERFLAGGERFLAGGER Morgan DavidsonID: D231N2TCS# 012798EXPIRES: 5/2025 MFP22001001 EOPEOPEOPEOP EOP EOP EOPEOPEOPEOPEOP EOP EOPEOPEOPEOPSWSWSWSWSWSWSWSWSWSW SWSWSWSWSWSWSWSWSW EOPEOPEOPEOPSWSWSWSWSWSWSWSWSWSWSWSWSWSWSWSWSWSWSWSWSWSWSWSWSWSWSWSW FOCFOCFOCFOCFOCFOC ←DRIVEWAY→←DRIVEWAY→←DRIVEWAY→←DRIVEWAY→←DRIVEWAY→←DRIVEWAY→←DRIVEWAY→←DRIVEWAY→←DRIVEWAY→←DRIVEWAY→←DRIVEWAY→←DRIVEWAY→←DRIVEWAY→←DRIVEWAY→←DRIVEWAY→←DRIVEWAY→←DRIVEWAY→← D R I V EW A Y←DRIVEWAY→←DRIVEWAY→←DRIVEWAY→←DRIVEWAY→←DRIVEWAY→←SIDEWALK →←SIDEWALK → ←SIDEWALK →←SIDEWALK →←SIDEWALK →←SIDEWALK →NE 5TH CTNE 6TH STVASHON PL NEVASHON PL NENE 5TH CTNE 5TH CTANACORTES CT NEPPPPPP151'117'74'73'135'83'R/WR/W R/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/W←DRIVEWAY→NREVISIONSDATEDESCRIPTIONINITIALTEMPORARY TRAFFICCONTROL PLANTRAFFIC CONTROL PLAN-5 5CONSTRUCTION TCP NOTES:1. MAINTAIN DRIVEWAY ACCESS AT ALL TIMES2. SIDEWALK ARE EITHER OPEN OR NOT OPEN. A SIDEWALK IS CLOSED IF A MINIMUM 4' PATH CANNOT BE MAINTAINED MEASURED FROM PROPERTY LINE, OR 5.5' IF CREATED FROM FACE OFCURB. (PEDESTRIAN PATH PROVIDED WHERE REQUIRED) AND WILL BE MONITORED BY A SPOTTER TO INSURE FLOW AND SAFETY DURING WORK UNLESS OTHERWISE NOTED.SPOTTER IS NOT TOTRAFFIC CONTROL.3.NO EXCEPTION TAKEN- CONTRACTOR IS RESPONSIBLE FOR ADA COMPLIANCE4.ALL CONTROL SET-UP, SIGN SPACING AND PROCEDURES WILL CONFORM TO SPECIFICATIONS STATED IN THE FEDERAL MANUAL ON UNIFORMED TRAFFIC CONTROL DEVICES (M.U.T.C.D).5.CITIES AND VARIOUS MUNICIPALITIES MAY HAVE ALSO ADOPTED SPECIALIZED GUIDELINES FOR TRAFFIC CONTROL WITHIN THEIR JURISDICTION. IT IS THE RESPONSIBILITY OF THE ON-SITE TRAFFIC CONTROL PERSONAL TO SEE IF AND ANY SPECIAL CONDITIONS EXIST6.FLAGGERS SHALL BE USED IN ACCORDANCE WITH WAC 468-95-302.7.IF ONLY ONE LANE IS OPEN IN A DIRECTION,THAT LANE SHALL BE A MINIMUM OF 11' WIDE,UNLESS SPOTTER/FLAGGERS ARE USED,IN WHICH CASE THE LANE CAN BE A MINIMUM OF 10'.8.ALL ROW WORK MUST YIELD TO SCHOOL TRANSIT, EMPLOYEES AND CHILDREN. WHILE PASSENGER LOADING/UNLOADING, STOPPED OR SLOWING: CEASE WORK, YIELD. WHEN SCHOOL TRANSIT, AND/OR PEDESTRIANS, DEPART:COMMENCE WORK.ADVANCED WARNING SIGN SPACINGROAD TYPESPEEDDISTANCE BETWEEN ADVANCEDWARNING SIGNSABCDFREEWAYS & EXPRESSWAYS55/75 MPH1500 ±1500 ±1500 ±1500 ±RURAL HIGHWAYS60/65 MPH800 ±800 ±800 ±800 ±RURAL ROADS45/55 MPH500 ±500 ±500 ±500 ±RURAL ROADS & URBAN ARTERIAL35/40 MPH350 ±350 ±350 ±N/ARURAL ROADS, RESIDENTIAL &BUSINESS DISTRICTS25/30 MPH200 ± (2)200 ± (2)200 ± (2)N/AURBAN STREETS25 MPH ORLESS100 ± (2)100 ± (2)100 ± (2)N/A(1) ALL SPACING MAY BE ADJUSTED TO ACCOMMODATE INTERCHANGE RAMPS,AT-GRADE INTERSECTIONS, AND DRIVEWAYS.(2) THIS SPACING MAY BE REDUCED IN URBAN AREAS TO FIT ROADWAY CONDITIONS.LONGITUDINAL BUFFER SPACE =BSPEED (MPH)2025303540455055606570DISTANCE (FT)115155200250305360425495570645730TAPER LENGTH IN FEET=L (FEET)LANEWIDTH(FEET)POSTED SPEED LIMIT (MPH)2530354045505560657010105150205270450500550---11115160225295495550605660--121251802453205406006607207808405Know what'sbelow.CallR 81148 HOURS BEFORE YOU DIGUNDERGROUND SERVICE ALERTCALL TOLL FREEDIGALERTbefore you dig.559 UNION AVE NE 559 UNION AVE NE RENTON, WA JB# 605370REVISIONSDATEDESCRIPTIONINITIAL COMCASTSHEETOFDATE:EXCEPT AS MAY BE OTHERWISE PROVIDED BY CONTRACT,THESE DRAWINGS AND SPECIFICATIONS SHALL REMAIN THEPROPERTY OF SEFNCO COMMUNICATION, INC. BOTH BEINGISSUED IN STRICT CONFIDENCE AND SHALL NOT BEREPRODUCED, COPIED, OR USED FOR ANY PURPOSEWITHOUT SPECIFIC WRITTEN PERMISSION.SITE NAME:SCALELOCATION ADDRESS: COMCAST JOB NUMBER: STAMPDRAWN BY:SEFNCOCOMMUNICATIONSCCF11/9/2021WORKVEHICLECBA ROADWORKAHEADBEPREPAREDTO STOPLIMITSPEEDR2-130C B A ROADWORKAHEADBEPREPAREDTO STOPLIMITSPEEDR2-130FLAGGERFLAGGERCBAROADWORKAHEAD BEPREPAREDTO STOP LIMIT SPEED R2-1 30SPOTTERWORKZONEFLAGGER Morgan DavidsonID: D231N2TCS# 012798EXPIRES: 5/2025 MFP22001001 SEFNCOCOMMUNICATIONSPROPOSED AERIAL AND UNDERGROUND FIBER INSTALLATIONCOMCAST559 UNION AVE NE559 UNION AVE NEJB# 605370MFP22001001This permit is for Major construction work in the ROW and will be billed at an additional$60/HR for inspections. After hours and weekend work will be billed at $125/HRPOTHOLE ALL EXISTING UTILITIESRESTORATION PER CITY OF RENTON STANDARDS POLE-1POLE-2POLE-3POLE-4POLE-5PP P P PPP P 559 UNION AVE NE 559 UNION AVE NE RENTON, WA JB# 605370REVISIONSDATEDESCRIPTIONINITIAL COMCASTSHEETOFDATE:EXCEPT AS MAY BE OTHERWISE PROVIDED BY CONTRACT,THESE DRAWINGS AND SPECIFICATIONS SHALL REMAIN THEPROPERTY OF SEFNCO COMMUNICATION, INC. BOTH BEINGISSUED IN STRICT CONFIDENCE AND SHALL NOT BEREPRODUCED, COPIED, OR USED FOR ANY PURPOSEWITHOUT SPECIFIC WRITTEN PERMISSION.SITE NAME:SCALELOCATION ADDRESS: COMCAST JOB NUMBER: STAMPDRAWN BY:SEFNCOCOMMUNICATIONSCCF11/9/2021VICINITY MAP603 TACOMA AVENECONSTRUCTION SUPERVISORSEFNCOCONTACTSPG#SHEET INDEX1COVER SHEET2VICINITY MAP, CONTACTS & SHEET INDEX3GENERAL NOTES4LEGEND5-6SITE-PLAN7TYPICAL DETAILS7N/AN/ADESCRIPTION OF WORKTOTALDELASH / RELASH 96 CT FIBER.531LFREPLACE 96 CT FIBER IN EXISTING UNDERGROUND.843LFPROOF AND DIG 96 CT FIBER IF NECESSARY.0LFTOTAL:1374LFVICINITY MAP BEGIN600 VASHON PL NEENDPERMITTING2STACY PENNEWELL4610 TACOMA AVESUMNER, WA 98390PHONE:253-457-0628EMAIL: SPENNEWELL@SEFNCO.COMASHLEY KIEHN4610 TACOMA AVESUMNER, WA 98390PHONE:253-999-2271EMAIL: ASKIEHN@SEFNCO.COMANTHONY BRENNAN4610 TACOMA AVESUMNER, WA 98390PHONE:253-545-1810EMAIL: ANBRENNAN@SEFNCO.COMMFP22001001 559 UNION AVE NE 559 UNION AVE NE RENTON, WA JB# 605370REVISIONSDATEDESCRIPTIONINITIAL COMCASTSHEETOFDATE:EXCEPT AS MAY BE OTHERWISE PROVIDED BY CONTRACT,THESE DRAWINGS AND SPECIFICATIONS SHALL REMAIN THEPROPERTY OF SEFNCO COMMUNICATION, INC. BOTH BEINGISSUED IN STRICT CONFIDENCE AND SHALL NOT BEREPRODUCED, COPIED, OR USED FOR ANY PURPOSEWITHOUT SPECIFIC WRITTEN PERMISSION.SITE NAME:SCALELOCATION ADDRESS: COMCAST JOB NUMBER: STAMPDRAWN BY:SEFNCOCOMMUNICATIONSCCF11/9/20217N/AN/AGENERAL NOTESRENTON1.ALL METHODS AND MATERIALS SPECIFICATION SHALL MEET ALL CITY OF RENTON STANDARDS.2.ALL RENTON STANDARD DETAIL DRAWINGS CAN BE FOUND AT THE FOLLOWING WEBSITE:https://edocs.rentonwa.gov/Documents/Browse.aspx?startid=13637033.ALL ASPHALT REPAIR TO BE DONE IN ACCORDANCE WITH RENTON STANDARDS. SEE RENTON STANDARD DETAIL -SECTION F 110.0-110.2.4.ALL SIDEWALK REPAIR TO BE DONE IN ACCORDANCE WITH RENTON STANDARDS. SEE RENTON STANDARD DETAIL- SECTION F 102.0.5.ALL CURB AND GUTTER REPAIR TO BE DONE IN ACCORDANCE WITH RENTON STANDARDS. SEE RENTONSTANDARD DETAIL - SECTION F 103.0.6.UTILITY LOCATIONS SHOWN ON THIS PLAN ARE BASED ON DOCUMENT RESEARCH AND FIELD EVALUATION. THEINFORMATION MAY NOT BE ACCURATE OR COMPLETE. IT IS THE CONTRACTOR'S RESPONSIBILITY TO PHYSICALLYLOCATE AND VERIFY LOCATION AND DEPTH OF ALL UTILITIES WITHIN THE CONSTRUCTION PATH. ALLINSTALLATIONS MUST COMPLY WITH MINIMUM HORIZONTAL AND VERTICAL CLEARANCES FROM UTILITIES.3THE LOCATIONS OF UTILITIES SHOWN ON THESE DRAWING ARE ONLY APPROXIMATE. SEFNCO HEREBY DISCLAIMS ANYRESPONSIBILITY TO THIRD PARTIES FOR THE ACCURACY OF THIS INFORMATION. PERSONS WORKING IN THE AREACOVERED BY THIS DRAWING MUST CONTACT THE STATEWIDE CALL-BEFORE-YOU-DIG SYSTEM TO ASCERTAIN THELOCATION OF UNDERGROUND UTILITIES PRIOR TO PERFORMING ANY EXCAVATION.1.ALL MATERIALS, WORKMANSHIP, AND CONSTRUCTION OF UTILITY IMPROVEMENTS SHALL MEET OR EXCEEDSITE WORK STANDARDS AND THE STANDARDS AND SPECIFICATIONS SET FORTH IN THE LOCAL JURISDICTIONREGULATIONS AND APPLICABLE STATE AND FEDERAL REGULATIONS. WHERE THERE IS CONFLICT BETWEENTHESE PLANS AND THE SPECIFICATIONS, OR ANY APPLICABLE STANDARDS, THE HIGHER QUALITY STANDARDSHALL APPLY. ALL WORK WITHIN PUBLIC R.O.W. OR EASEMENTS MAY REQUIRE INSPECTED AND APPROVED BYTHE LOCAL JURISDICTION INSPECTOR. INSPECTION SERVICES AND CONSTRUCTION CERTIFICATION TO BEPROVIDED BY DESIGNEE OF PROJECT SPONSOR/OWNER.2.THE CONTRACTOR IS SPECIFICALLY CAUTIONED THAT THE LOCATION AND/OR ELEVATION OF EXISTINGUTILITIES, AS SHOWN ON THESE PLANS, IS BASED ON RECORDS OF THE VARIOUS UTILITY COMPANIES AND,WHERE POSSIBLE, MEASUREMENTS TAKEN IN THE FIELD. THE INFORMATION IS NOT TO BE RELIED UPON ASBEING EXACT OR COMPLETE. THE CONTRACTOR MUST CALL THE LOCAL UTILITY LOCATION CENTER AT LEAST 48HOURS BEFORE ANY EXCAVATION TO REQUEST EXACT FIELD LOCATIONS OF EXISTING UTILITIES. THECONTRACTOR SHALL VERIFY PERTINENT LOCATIONS AND ELEVATIONS, ESPECIALLY AT THE CONNECTIONPOINTS AND AT POTENTIAL UTILITY CONFLICTS. IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR TORELOCATE ALL EXISTING UTILITIES THAT CONFLICT WITH THE PROPOSED IMPROVEMENTS SHOWN ON THESEPLANS.3.THE CONTRACTOR SHALL BE RESPONSIBLE FOR OBTAINING ALL NECESSARY PERMITS FROM ALL APPLICABLEAGENCIES. THE CONTRACTOR SHALL NOTIFY THE LOCAL JURISDICTION INSPECTOR AT LEAST 48 HOURS PRIORTO THE START OF ANY EARTH DISTURBING ACTIVITY OR CONSTRUCTION ON ANY AND ALL PUBLICIMPROVEMENTS IF REQUIRED.4.THE CONTRACTOR SHALL COORDINATE AND COOPERATE WITH THE LOCAL JURISDICTION AND ALL UTILITYCOMPANIES WITH REGARD TO RELOCATIONS OR ADJUSTMENTS OF EXISTING UTILITIES DURINGCONSTRUCTION, TO ASSURE THAT THE WORK IS ACCOMPLISHED IN A TIMELY FASHION, AND WITH A MINIMUMDISRUPTION OF SERVICE. THE CONTRACTOR SHALL BE RESPONSIBLE FOR CONTACTING ALL PARTIESAFFECTED BY ANY DISRUPTION OF ANY UTILITY SERVICE.5.THE CONTRACTOR SHALL HAVE ONE (1) SIGNED COPY OF THE APPROVED PLANS, ONE (1) COPY OF THEAPPROPRIATE STANDARDS AND SPECIFICATIONS, AND ONE (1) COPY OF ANY PERMITS AND EXTENSIONAGREEMENTS NEEDED FOR THE JOB ON-SITE AT ALL TIMES.6.THE CONTRACTOR SHALL BE RESPONSIBLE FOR ALL ASPECTS OF SAFETY INCLUDING, BUT NOT LIMITED TO:EXCAVATION, TRENCHING, SHORING, TRAFFIC CONTROL, AND SECURITY.7.IF, DURING THE CONSTRUCTION PROCESS, CONDITIONS ARE ENCOUNTERED BY THE CONTRACTOR, HISSUBCONTRACTORS, OR OTHER AFFECTED PARTIES WHICH COULD INDICATE A SITUATION THAT IS NOTIDENTIFIED IN THE PLANS OR SPECIFICATIONS, THE CONTRACTOR SHALL CONTACT THE ENGINEERIMMEDIATELY.8.ALL REFERENCES TO ANY PUBLISHED STANDARDS SHALL REFER TO THE LATEST REVISION OF SAID STANDARD,UNLESS SPECIFICALLY STATED OTHERWISE.9.FOR WORK AFFECTING PUBLIC ROADWAYS OR IF REQUIRED BY THE LOCAL JURISDICTION, THE CONTRACTORSHALL SUBMIT A TRAFFIC CONTROL AND PHASING PLAN IN ACCORDANCE WITH M.U.T.C.D. FOR APPROVAL.PRIOR TO ANY CONSTRUCTION ACTIVITIES WITHIN OR AFFECTING THE RIGHT-OF-WAY, THE CONTRACTOR SHALLBE RESPONSIBLE FOR PROVIDING ANY AND ALL TRAFFIC CONTROL DEVICES AS MAY BE REQUIRED BY SAIDPLANS. PRIOR TO INSTALLATION A PRECONSTRUCTION CONFERENCE SHALL BE HELD WITH LOCALJURISDICTION.10.THE CONTRACTOR IS RESPONSIBLE FOR PROVIDING ALL LABOR AND MATERIALS NECESSARY FOR THECOMPLETION OF THE INTENDED IMPROVEMENTS SHOWN ON THESE DRAWINGS OR DESIGNATED TO BEPROVIDED, INSTALLED, CONSTRUCTED, REMOVED OR RELOCATED UNLESS SPECIFICALLY NOTED OTHERWISE.11.PER AGENCY STANDARDS THE CONTRACTOR SHALL BE RESPONSIBLE FOR KEEPING ROADWAYS FREE ANDCLEAR OF ALL CONSTRUCTION DEBRIS AND DIRT TRACKED FROM THE SITE.12.THE CONTRACTOR SHALL BE RESPONSIBLE FOR RECORDING RECORD INFORMATION ON A SET OF RECORDDRAWINGS KEPT AT THE CONSTRUCTION SITE AND AVAILABLE TO THE LOCAL JURISDICTION INSPECTOR AT ALLTIMES.13.DIMENSIONS FOR LAYOUT AND CONSTRUCTION ARE NOT TO BE SCALED FROM ANY DRAWING. FOR ADDITIONALINFORMATION CONTACT THE ENGINEER FOR CLARIFICATION AND NOTE ON THE RECORD DRAWINGS.14.ALL EROSION AND SEDIMENT CONTROL (E.S.C.) MEASURES SHALL BE INSTALLED AT THE LIMITS OFCONSTRUCTION PRIOR TO GROUND DISTURBING ACTIVITY. ALL E.S.C. MEASURES SHALL BE MAINTAINED INGOOD REPAIR BY THE CONTRACTOR UNTIL SUCH TIME AS THE ENTIRE DISTURBED AREAS ARE STABILIZED WITHHARD SURFACE OR LANDSCAPING.15.ALL WORK WITHIN THE PUBLIC RIGHT-OF-WAY IS SUBJECT TO THE JURISDICTION OF THE LOCAL JURISDICTIONENGINEERING DEPARTMENT STANDARD DETAILS AND SPECIFICATIONS.16.ALL CONSTRUCTION OPERATIONS, INCLUDING THE WARMING UP, REPAIR, ARRIVAL, DEPARTURE OR RUNNINGOF TRUCKS, EARTH MOVING EQUIPMENT, CONSTRUCTION EQUIPMENT AND ANY OTHER ASSOCIATEDEQUIPMENT SHALL GENERALLY BE LIMITED TO THE TIME PERIOD APPROVED BY THE LOCAL JURISDICTION.17.CALL THE "CALL BEFORE YOU DIG" NUMBER 48HRS IN ADVANCE AT 1-800-424-5555 PRIOR TO DIGGING.MFP22001001 559 UNION AVE NE 559 UNION AVE NE RENTON, WA JB# 605370REVISIONSDATEDESCRIPTIONINITIAL COMCASTSHEETOFDATE:EXCEPT AS MAY BE OTHERWISE PROVIDED BY CONTRACT,THESE DRAWINGS AND SPECIFICATIONS SHALL REMAIN THEPROPERTY OF SEFNCO COMMUNICATION, INC. BOTH BEINGISSUED IN STRICT CONFIDENCE AND SHALL NOT BEREPRODUCED, COPIED, OR USED FOR ANY PURPOSEWITHOUT SPECIFIC WRITTEN PERMISSION.SITE NAME:SCALELOCATION ADDRESS: COMCAST JOB NUMBER: STAMPDRAWN BY:SEFNCOCOMMUNICATIONSCCF11/9/20217N/AN/ALEGEND 4LEGENDTELECOMMUNICATIONSANITARY SEWERGAS LINEWATERSTORM DRAINRECYCLED WATERELECTRICALRAILROADRIGHT OF WAYDITCH LINECENTER LINEEDGE OF PAVEMENTFACE OF CURBPROPERTY LINELIP OF GUTTERGUARDRAILFENCESDSDWWSSSSGGEETTR/WLIPD/LEOPFOCRWRWTRENCHDIRECT BOREDBDBPROPOSED AERIAL OVERLASH AAPROPOSEDBASE LAYERSEXISTING UTILITIESEXISTING UTILITIES SYMBOLS POWER HANDHOLEPOWER MANHOLEPOWER CABINETSTREET LIGHT HANDHOLEPOWER SIDEWALK GUY SEWER CLEANOUTSTORM CATCH BASIN STORM MANHOLEWATER VALVEWATER METERTELECOM MANHOLETELECOM HANDHOLETELECOM CABINETTRAFFIC SIGNAL MANHOLETRAFFIC CABINETTRAFFIC SIGNAL PEDESTALPOWER VAULTSTREET LIGHT POLETRAFFIC SIGNAL VAULTTRAFFIC SIGNAL HANDHOLESIGN POSTPARKING METERCATV MANHOLECATV HANDHOLEPOWER PEDESTALGAS METERTEST VALVETRAFFIC LOOP DETECTORCATV PEDESTALBOLLARDWATER MANHOLETRAFFIC SIGNAL POLEPOWER GUYTRAFFIC DETECTORADA RAMPPEDESTAL(UNKNOWN UTILITY)MANHOLECULVERTFIRE HYDRANTGAS VALVE(UNKNOWN UTILITY)POWER ANCHORPOWER POLESEWER MANHOLETELECOM POLETELECOM PEDESTALPROPOSED VAULTPROPOSED PEDESTALPROPOSED MANHOLEPROPOSED SIDEWALK ANCHOR & GUYPROPOSED SYMBOLS ADA RAMP COMPLIANCEPEXISTING COMCAST VAULTEXISTING COMCAST SPLICEEXISTING COMCAST ANCHOREXISTING COMCAST GUYEXISTING COMCAST MANHOLEEXISTING COMCAST SIDEWALK ANCHOR & GUYP=VLP=GAS TEST POINTGAS MANHOLEPOWER UNKNOWN STORM CLEANOUTSTORM DRAIN VALVESTORM DRAIN UNKNOWN WATER UNKNOWNWATER WELLWATER PUMPWATER VAULTWATER RESERVOIRPPPPPP?PSLSLTSTSTSTSTSTSCCCTTTP=??TTSSSCSDD?DCDWWWWWVW?WELLPUMPGGGTLTLSEWER CATCH BASIN SSWATER SAMPLING STATIONOTHER UNKNOWNSTORM ACCESS POINTSEWER VALVESSEWER VAULT SSSEWER UNKNOWN S?SUB STATIONTRANSIT STOPSTORM DRAIN VAULT SDTREE PROPOSED RISEREXISTING COMCAST SYMBOLS BORE PITPROOF/PULLEXISTING COMCAST PEDPEXISTING COMCAST POLE W/ NEW RISERFMHMHBUILDING OUTLINEFLFOG LINEBUSSTOPTRENCHPSPLICE CASEPROPOSED AERIAL STORAGEEXISTING AERIAL STORAGE0'0'POTHOLESWSIDEWALK LINEPROPOSED AERIAL STRAND AAMFP22001001 EOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOPSWSWSWSWSWSWSWSW SW SW SW SW SW SW SW SW SW FL FL FL FLEOPEOPEOP SW SW SW SW SW SW SW FL FL FL FL FL FL FL FL FL FL FL FL FL FL FL FL FL FL FL FL EOP EOPEOPEOPEOPEOPEOPEOPEOPEOPEOPFLFLFLFLFLFLFLFLFLFLEOPEOPEOPSWSWSWSWSWSWSWSWEOPEOPSWSW SWSWSWSWSWSWSWSWSWSWSWSWSWSW SW SW SW SW SW SWSWSWSWSWSWSWSW EOP EOP EOP EOP←DRIVEWAY→←DRIVEWAY→←DRIVEWAY→←DRIVEWAY→←DRIVEWAY→←DRIVEWAY→←DRIVEWAY→←DRIVEWAY→←DRIVEWAY→←DRIVEWAY→←DRIVEWAY→←DRIVEWAY→←DRIVEWAY→←DRIVEWAY→←DRIVEWAY→←DRIVEWAY→←DRIVEWAY→←DRIVEWAY→←DRIVEWAY→←DRIVEWAY→←DRIVEWAY→←DRIVEWAY→←DRIVEWAY→←DRIVEWAY→←SIDEWALK →←SIDEWALK →←SIDEWALK →←SIDEWALK → ←SIDEWALK →←SIDEWALK →←SIDEWALK →←SIDEWALK →←SIDEWALK →←SIDEWALK →NE 5TH CTNE 5TH PLUNION AVE NEUNION AVE NETACOMA AVE NEPOLE-1POLE-2POLE-3POLE-4POLE-5AAAAAAAAAA 152'112'64'140'PP205'NE 6TH STNE 6TH STR/WR/WR/W R/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/W R/W R/W R/W R/W R/W R/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/W63 ' 559 UNION AVE NE 559 UNION AVE NE RENTON, WA JB# 605370REVISIONSDATEDESCRIPTIONINITIAL COMCASTSHEETOFDATE:EXCEPT AS MAY BE OTHERWISE PROVIDED BY CONTRACT,THESE DRAWINGS AND SPECIFICATIONS SHALL REMAIN THEPROPERTY OF SEFNCO COMMUNICATION, INC. BOTH BEINGISSUED IN STRICT CONFIDENCE AND SHALL NOT BEREPRODUCED, COPIED, OR USED FOR ANY PURPOSEWITHOUT SPECIFIC WRITTEN PERMISSION.SITE NAME:SCALELOCATION ADDRESS: COMCAST JOB NUMBER: STAMPDRAWN BY:SEFNCOCOMMUNICATIONSCCF11/9/2021N7SITE PLAN - 1 EXISTING PEDESTALSCOPE OF WORK125Know what'sbelow.CallR81148 HOURS BEFORE YOU DIGUNDERGROUND SERVICE ALERTCALL TOLL FREEDIGALERTbefore you dig.DELASH / RELASH FIBER. SEEDETAIL ON SHEET 6 OF 6.30'22'12'60'44'21'10'16'41'31'NEW STRAND OF 0.875 COAXON THESE TWO SPANS.3REPLACE FIBER IN EXISTINGUNDERGROUND. PROOF ANDDIG IF NECESSARY.411133224412'MFP22001001 EOPEOPEOPEOP EOP EOP EOPEOPEOPEOPEOP EOP EOPEOPEOPEOPSWSWSWSWSWSWSWSWSW SWSWSWSWSWSWSWSWSW EOPEOPEOPEOPSWSWSWSWSWSWSWSWSWSWSWSWSWSWSWSWSWSWSWSWSWSWSWSWSWSWSW FOCFOCFOCFOCFOCFOCFOCFOCFOC FOCFOC←DRIVEWAY→←DRIVEWAY→←DRIVEWAY→←DRIVEWAY→←DRIVEWAY→←DRIVEWAY→←DRIVEWAY→←DRIVEWAY→←DRIVEWAY→←DRIVEWAY→←DRIVEWAY→←DRIVEWAY→←DRIVEWAY→←DRIVEWAY→←DRIVEWAY→←DRIVEWAY→←DRIVEWAY→←DRIVEWAY→←DRIVEWAY→←DRIVEWAY→←DRIVEWAY→←DRIVEWAY→←SIDEWALK →←SIDEWALK → ←SIDEWALK →←SIDEWALK →←SIDEWALK →←SIDEWALK →NE 5TH CTNE 6TH STVASHON PL NEVASHON PL NENE 5TH CTNE 5TH CTANACORTES CT NEPPPPPP151'117'74'73'135'83'R/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/W←DRIVEWAY→559 UNION AVE NE 559 UNION AVE NE RENTON, WA JB# 605370REVISIONSDATEDESCRIPTIONINITIAL COMCASTSHEETOFDATE:EXCEPT AS MAY BE OTHERWISE PROVIDED BY CONTRACT,THESE DRAWINGS AND SPECIFICATIONS SHALL REMAIN THEPROPERTY OF SEFNCO COMMUNICATION, INC. BOTH BEINGISSUED IN STRICT CONFIDENCE AND SHALL NOT BEREPRODUCED, COPIED, OR USED FOR ANY PURPOSEWITHOUT SPECIFIC WRITTEN PERMISSION.SITE NAME:SCALELOCATION ADDRESS: COMCAST JOB NUMBER: STAMPDRAWN BY:SEFNCOCOMMUNICATIONSCCF11/9/2021N7SITE PLAN - 2 EXISTING PEDESTALSCOPE OF WORK126Know what'sbelow.CallR81148 HOURS BEFORE YOU DIGUNDERGROUND SERVICE ALERTCALL TOLL FREEDIGALERTbefore you dig.REPLACE FIBER IN EXISTINGUNDERGROUND. PROOF ANDDIG IF NECESSARY.222222111111160'35'18'MFP22001001 7REVISIONSDATEDESCRIPTIONINITIALTYPICAL DETAILS 559 UNION AVE NE 559 UNION AVE NE RENTON, WA JB# 605370REVISIONSDATEDESCRIPTIONINITIAL COMCASTSHEETOFDATE:EXCEPT AS MAY BE OTHERWISE PROVIDED BY CONTRACT,THESE DRAWINGS AND SPECIFICATIONS SHALL REMAIN THEPROPERTY OF SEFNCO COMMUNICATION, INC. BOTH BEINGISSUED IN STRICT CONFIDENCE AND SHALL NOT BEREPRODUCED, COPIED, OR USED FOR ANY PURPOSEWITHOUT SPECIFIC WRITTEN PERMISSION.SITE NAME:SCALELOCATION ADDRESS: COMCAST JOB NUMBER: STAMPDRAWN BY:SEFNCOCOMMUNICATIONSCCF11/9/2021NTS7TYPICAL DETAILS AERIAL TYPICALSKnow what'sbelow.CallR81148 HOURS BEFORE YOU DIGUNDERGROUND SERVICE ALERTCALL TOLL FREEDIGALERTbefore you dig.MFP22001001 SEFNCO COMMUNICATIONS 4610 TACOMA AVE SUMNER WA, 98390 February 15, 2022 To whom it may concern: City of Renton 1055 South Grady Way Renton, WA 98057 RE: Aerial Variance Request for JB0000605370 To whom it may concern, SEFNCO Communications has been contracted to design and engineer this project on behalf of Comcast Cablevision. Comcast is applying for a variance request in order to upgrade their existing facilities. Comcast proposes to delash/relash 96ct fiber ~531’; Replace 96ct fiber in existing underground ~843’; Proof & dig 96ct fiber if necessary, at 559 Union Ave NE, Renton. Comcast is requesting that the City of Renton approve this variance request based on the fact that the requirements for undergrounding this proposed over-lash will not cause substantial adverse impacts to other person or entities in the immediate area and will cause undue hardship. 1. Installation of undergrounding facilities will increase the total cost of construction roughly 15-25 times the amount of an aerial over-lash on the existing Comcast strand. 2. Potential damage to underground facilities will be increased. 3. Over-lash will not cause substantial adverse impact to other persons or entities in the immediate area. Over-lashing the cable will be accomplished in a few days, and the residents will not notice any impact. Comcast will clean up the over-lashed spans as necessary and identify and remove any existing dead cables along this route. 4. The variance is necessary to prevent and undue hardship due to the increased construction costs if forced to install the proposed extension underground. 5. The granting of the variance will not be materially detrimental to the public welfare because Comcast does agree to underground the cable system, but they are waiving the obligation into the future when all other utilities are underground to prevent an undue hardship against Comcast currently. Upon the granting of the Variance, Comcast will coordinate construction and traffic control as per your requirements. Comcast and their contractors want to cooperate at the highest level and agree to adhere to all provisions and requirements set forth by the City of Renton to insure safe installation and maintenance of the proposed facilities. If you have any further questions regarding this project please contact Stacy Pennewell at 253-457-0628. Thank you for your consideration in this matter. Carissa Morris Carissa Morris Permit Coordinator SEFNCO Communications, Inc. o 253 313-2057 | e carmorris@sefnco.com Attachments: 1. Application for ROW permit 2. 11” x 17” Site plan 3. 11” x 17” Design plan 4. Traffic Control Plan March 28, 2022 Carissa Morris Sefnco Communication Inc. 4610 Tacoma Avenue, Sumner WA 98390 Via Email: carmorris@sefnco.com SUBJECT: Request for Undergrounding Exemption (JB#605370, MFP22001001, 559 Union Ave NE) Dear Ms. Morris: The City of Renton has reviewed your request to grant Comcast an exemption from Renton Municipal Code (RMC) 4-6-090(C) which states that all new electrical or communication facilities shall be required to be installed underground, pursuant to the standards of the section of RMC. Comcast proposes to have Sefnco Communications Inc overlash new coax for a total of approximately 528 lineal feet to existing Puget Sound Energy (PSE) poles along NE 6th St and Union Ave NE within the City. See the enclosed Site Plan showing the proposed overlashing limits. ANALYSIS: The City has considered the request for an exemption from RMC 4-6-090. Ordinance 5720 grants Comcast, the right to install fiber optic cable and related appurtenances under, along, over, below, through and across the streets, avenues and alleys of City of Renton within the right-of-way of Renton. Section 3.4 of the franchise ordinance states that if all of the distribution lines all the wireline service providers, such as telecommunications service providers, as defined in RCW 35.99.010, a utility service provider or a Cable Operator (collectively “Service Providers”) in any portion of the Franchise Area are underground, Grantee shall place its Cable System’s distribution cables underground within that area; provided that such underground locations are actually capable of accommodating Grantee’s cable and other equipment without technical degradation of the Cable Systems’ signal quality. The proposal would utilize existing poles with other attached franchisee communication facilities and overlash to the existing Comcast aerial path. As minimum vertical height clearance of 15’-6” would need to be provided for, any existing obsolete cable will need to be removed; staff recommends these as conditions of approval. Therefore, the City is granting an exemption with conditions, per the Comcast franchise agreement which allows new overhead facilities to be placed overhead provided there are other similar providers overhead as well. Comcast is required to obtain all necessary private utility easements for work on private property. DECISION: The requested exemption from underground utility installation requirements RMC4-6-090 (C) as requested by the applicant is approved with conditions subject to the conditions below as the request complies with the Comcast Franchise Agreement. Comcast Job JB#605370 Page 2 of 2 March 28, 2022 Conditions of Approval: 1. Any existing height violations within the Project Reach must be resolved at the time of construction. New aerial lines within the Project Reach must have a minimum vertical clearance of 15’-6”. 2. Any abandoned or unused lines within the Project Reach must be removed at the time that construction is taking place. 3. A traffic control plan must be separately submitted to the City, and no construction may take place until the City has approved a traffic control plan. 4. The new aerial fiber lines within the Project Reach must be converted to underground facilities in the future, at the Applicant’s cost, when any one of the following events occurs: (1) any other utilities are undergrounded within the Project Reach, (2) a joint use trench is proposed by a franchisee within the Project Reach, in which case the Applicant shall participate in the joint use trench installation for the purpose of undergrounding its aerial lines, or (3) a conduit is made available within the Project Reach that will accommodate the aerial lines. The new aerial lines must be undergrounded within one year, or approved otherwise by the City of Renton Community and Economic Development Administrator or designee, from the first event triggering the requirement to underground the aerial lines. This decision to approve the exemption with conditions is subject to a fourteen (14) day appeal period from the date of this letter per RMC 4-8-110. Any appeals of the administrative decision must be filed with the City Clerk, along with the required appeal fee, by 5:00 pm, April 11, 2022. Due to the ongoing state of emergency enacted by Governor’s Proclamation 20-05, the City Clerk’s Office is working remotely. For that reason, appeals must be submitted electronically to the City Clerk at cityclerk@rentonwa.gov or delivered to City Hall 1st floor Lobby Hub only on Tuesdays and/or Wednesdays. The appeal fee, normally due at the time an appeal is submitted, will be collected at a future date if your appeal is submitted electronically. Appeals to the Hearing Examiner are governed by RMC 4-8-110 and additional information regarding the appeal process may be obtained from the City Clerk’s Office, cityclerk@rentonwa.gov. Sincerely, Brianne Bannwarth, PE Development Engineering Manager cc: C.E. “Chip” Vincent, CED Administrator Vanessa Dolbee, Planning Director Justin Johnson, Construction Manager Scott Warlick, Engineering Specialist III Holly Powers, Permit Technician Franchise Permits Enclosures: Site Plan EOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOPSWSWSWSWSWSWSWSW SW SW SW SW SW SW SW SW SW FL FL FL FLEOPEOPEOP SW SW SW SW SW SW SW FL FL FL FL FL FL FL FL FL FL FL FL FL FL FL FL FL FL FL FL EOP EOPEOPEOPEOPEOPEOPEOPEOPEOPEOPFLFLFLFLFLFLFLFLFLFLEOPEOPEOPSWSWSWSWSWSWSWSWEOPEOPSWSW SWSWSWSWSWSWSWSWSWSWSWSWSWSW SW SW SW SW SW SWSWSWSWSWSWSWSW EOP EOP EOP EOP←DRIVEWAY→←DRIVEWAY→←DRIVEWAY→←DRIVEWAY→←DRIVEWAY→←DRIVEWAY→←DRIVEWAY→←DRIVEWAY→←DRIVEWAY→←DRIVEWAY→←DRIVEWAY→←DRIVEWAY→←DRIVEWAY→←DRIVEWAY→←DRIVEWAY→←DRIVEWAY→←DRIVEWAY→←DRIVEWAY→←DRIVEWAY→←DRIVEWAY→←DRIVEWAY→←DRIVEWAY→←DRIVEWAY→←DRIVEWAY→←SIDEWALK →←SIDEWALK →←SIDEWALK →←SIDEWALK → ←SIDEWALK →←SIDEWALK →←SIDEWALK →←SIDEWALK →←SIDEWALK →←SIDEWALK →NE 5TH CTNE 5TH PLUNION AVE NEUNION AVE NETACOMA AVE NEPOLE-1POLE-2POLE-3POLE-4POLE-5AAAAAAAAAA 152'112'64'140'PP205'NE 6TH STNE 6TH STR/WR/WR/W R/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/W R/W R/W R/W R/W R/W R/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/W63 ' 559 UNION AVE NE 559 UNION AVE NE RENTON, WA JB# 605370REVISIONSDATEDESCRIPTIONINITIAL COMCASTSHEETOFDATE:EXCEPT AS MAY BE OTHERWISE PROVIDED BY CONTRACT,THESE DRAWINGS AND SPECIFICATIONS SHALL REMAIN THEPROPERTY OF SEFNCO COMMUNICATION, INC. BOTH BEINGISSUED IN STRICT CONFIDENCE AND SHALL NOT BEREPRODUCED, COPIED, OR USED FOR ANY PURPOSEWITHOUT SPECIFIC WRITTEN PERMISSION.SITE NAME:SCALELOCATION ADDRESS: COMCAST JOB NUMBER: STAMPDRAWN BY:SEFNCOCOMMUNICATIONSCCF11/9/2021N7SITE PLAN - 1 EXISTING PEDESTALSCOPE OF WORK125Know what'sbelow.CallR81148 HOURS BEFORE YOU DIGUNDERGROUND SERVICE ALERTCALL TOLL FREEDIGALERTbefore you dig.DELASH / RELASH FIBER. SEEDETAIL ON SHEET 6 OF 6.30'22'12'60'44'21'10'16'41'31'NEW STRAND OF 0.875 COAXON THESE TWO SPANS.3REPLACE FIBER IN EXISTINGUNDERGROUND. PROOF ANDDIG IF NECESSARY.411133224412'MFP22001001 DEPARTMENT OF COMMUNITY AND ECONOMIC DEVELOPMENT Conditions for Permit MFP22001001 Engineering 1 Any existing height violations within the Project Reach must be resolved at the time of construction. New aerial lines within the Project Reach must have a minimum vertical clearance of 15'-6". 2 A traffic control plan must be separately submitted to the City, and no construction may take place until the City has approved a traffic control plan. 3 Any abandoned or unused lines within the Project Reach must be removed at the time that construction is taking place. 4 The new aerial fiber lines within the Project Reach must be converted to underground facilities in the future, at the Applicant’s cost, when any one of the following events occurs: (1) any other utilities are undergrounded within the Project Reach, (2) a joint use trench is proposed by a franchisee within the Project Reach, in which case the Applicant shall participate in the joint use trench installation for the purpose of undergrounding its aerial lines, or (3) a conduit is made available within the Project Reach that will accommodate the aerial lines. The new aerial lines must be undergrounded within one year, or approved otherwise by the City of Renton Community and Economic Development Administrator or designee, from the first event triggering the requirement to underground the aerial lines. Page 1 of 1