Loading...
HomeMy WebLinkAboutEx29_Hazardous Materials Management Statement Western Washington Division Eastern Washington Division 165 NE Juniper St., Ste 201, Issaquah, WA 98027 407 Swiftwater Blvd, Cle Elum, WA 98922 Phone: (425) 392-0250 Phone: (509) 674-7433 www.EncompassES.net Date: September 27th, 2021 To: City of Renton, Department of Community and Economic Development From: Encompass Engineering & Surveying on behalf of Anita Woo Re: Hazardous Materials Management Statement for the Jefferson Highlands Unit Lot Subdivision _____________________________________________________________________________________ APPLICANT Anita Woo 12906 NE 25th Place Bellevue, WA 98005 anitatwoo@yahoo.com 206-372-9008 SITE ADDRESS 1518 Jefferson Avenue NE, 1524/1526 Jefferson Avenue NE & 1513/1515 Kirkland Avenue NE Renton, WA 98056 HAZARDOUS MATERIALS MANAGEMENT STATEMENT To Whom It May Concern, I, the undersigned property owner of Parcel No. 722780-1560, 722780-1485, 722780-1555, understand that the City has requested a Hazard Materials Management Statement. This letter addresses that requirement but may need to be updated by the contractor once one has been chosen for the project. 1. Fueling of Construction Vehicles and Storage of Hazardous Materials: It is anticipated that Track hoes, back hoes, dozers, vibratory rollers and loaders may all be present on site at some point during construction. It is not anticipated that Construction vehicles will need to be refueled while on site. Gas-powered hand-held construction equipment such as chain saws and cut-off saws may require refueling during the construction process. If emergency refueling of larger equipment is needed, it may be accomplished using portable fuel tanks carried in the pickup bed of the construction foreman’s truck or by the contractor’s service truck. Care will be taken at all time during refueling to ensure that no fuel is spilled. In an emergency, fuel spill containment kits will be available to limit any unintended fuel spills and the Department of Ecology will be contacted in case of a spill. Gas -powered hand-held construction equipment will be refueled using portable gas containers meeting current DOE standards. Said gas containers will typically be stored in the bed of the construction foreman’s truck or within an approved location within a construction equipment shed. It is not anticipated that any other Hazardous materials, with the possible