Loading...
HomeMy WebLinkAboutSR_HEX_Report_Jefferson_Highlands_220412_v1DEPARTMENT OF COMMUNITY AND ECONOMIC DEVELOPMENT Project Location Map SR_HEX_Report_Jefferson_Highlands_220412_v1 A. REPORT TO THE HEARING EXAMINER Hearing Date: April 12, 2022 Project File Number: PR21-000425 Project Name: Jefferson Highlands Unit Lot Subdivision Land Use File Number: LUA21-000391, PP, SA-H, CUP-H, ECF, MOD Project Manager: Clark H. Close, Senior Planner Owner/Applicant: Anita and Timothy Woo, 12906 NE 25th Pl, Bellevue, WA 98005 Contact: Briana Bennington, Encompass Engineering & Surveying, Inc., 165 NE Juniper St, Suite 201, Issaquah, WA 98027 Project Location: 1518 Jefferson Ave NE (APN 7227801555) 1524/1526 Jefferson Ave NE (APN 7227801560) 1513/1515 Kirkland Ave NE (APN 7227801485) Project Summary: The applicant is requesting Preliminary Plat, Unit Lot Subdivision, Site Plan Review, Conditional Use Permit, Street Modification Approval, and Con currence with the Sunset Area Planned Action EIS for 18 townhomes. The subject site consists of three (3) separate adjacent tax parcels in the Highlands Community Planning Area at 1518 Jefferson Ave NE, 1524/1526 Jefferson Ave NE and 1513/1515 Kirkland Ave NE. The project site is located in the Residential -14 (R-14) zoning district and the Residential High Density (HD) land use designation. The applicant is proposing to demolish the existing structures and subdivide into 18 unit lots and four (4) tracts. The townhouses are organized in three (3) six-unit blocks; six (6) units are proposed along Kirkland Ave NE and 12 units are proposed along Jefferson Ave NE. The units along Jefferson Ave NE would include detached garages and the units along Kirkland Ave NE would include attached garages located beneath the second floor living space. The applicant is requesting a conditional use permit to increase the maximum wall plat height up to 32 feet to allow for three-story high buildings with rooftop terraces. The proposed project would result in a net density of 18.2 du/ac. Two (2) of the 18 unit lots would be affordable under density bonus review. The units are proposed to be between 1,900 and 2,600 s f. Access to the units is proposed via a 16-foot-wide temporary alley on Kirkland Ave NE (8 feet of the temporary access is located off-site to the south) and a new 16-foot-wide alley located between the proposed new townhomes. All 22 significant onsite trees are proposed to be removed. Site Area: 0.99 acres NE 15th St Kirkland Ave NE Jefferson Ave NE City of Renton Department of Community & Economic Development Jefferson Highlands Unit Lot Subdivision Staff Report to the Hearing Examiner LUA21-000391, PP, SA-H, CUP-H, ECF, MOD Report of April 12, 2022 Page 2 of 39 SR_HEX_Report_Jefferson_Highlands_220412_v1 B. EXHIBITS: Exhibits 1-19: As shown in the Environmental Review Committee (ERC) Report Exhibit 20: Staff Report to the Hearing Examiner Exhibit 21: Re-Notice of Application and Public Hearing Exhibit 22: Concurrence Memo Determination with the Sunset Area Planned Action EIS Decision Exhibit 23: Jefferson Highlands Hearing Examiner Decision (LUA19 -000163) Exhibit 24: Street Modification Request Exhibit 25: Neighborhood Meeting Materials Exhibit 26: Draft Deed of Dedication (Alley) Exhibit 27: Draft Ingress/Egress & Utilities Easement Exhibit 28: Renton School District Response Letter Exhibit 29: Hazardous Materials Management Statement Exhibit 30: Certificate of Articles of Incorporation Exhibit 31: Declaration of Covenants, Conditions and Restrictions Exhibit 32: CI-159 Minimum Dimensions for Open Space C. GENERAL INFORMATION: 1. Owner(s) of Record: Anita and Timothy Woo, 12906 NE 25th Pl, Bellevue, WA 98005 2. Zoning Classification: Residential-14 (R-14) 3. Comprehensive Plan Land Use Designation: Residential High Density (RHD) 4. Existing Site Use: Two (2) duplexes, single-family home, detached garage, carport, and a couple of small outbuildings . 5. Critical Areas: Regulated slopes 6. Neighborhood Characteristics: a. North: Residential High Density (RHD) Comprehensive Plan Land Use Designation; Residential- 14 (R-14) zone b. East: Residential High Density (RHD) Comprehensive Plan Land Use Designation; Residential Multi-Family (RMF) zone c. South: Residential High Density (RHD) Comprehensive Plan Land Use Designation; Residential- 14 (R-14) zone d. West: Residential High Density (RHD) Comprehensive Plan Land Use Designation; Residential - 14 (R-14) zone 7. Site Area: 0.99 acres D. HISTORICAL/BACKGROUND: City of Renton Department of Community & Economic Development Jefferson Highlands Unit Lot Subdivision Staff Report to the Hearing Examiner LUA21-000391, PP, SA-H, CUP-H, ECF, MOD Report of April 12, 2022 Page 3 of 39 SR_HEX_Report_Jefferson_Highlands_220412_v1 Action Land Use File No. Ordinance No. Date Comprehensive Plan N/A 5758 06/22/2015 Zoning N/A 5758 06/22/2015 Annexation (Epstein) A-46-001 1246 04/16/1946 Preliminary Plat, Unit Lot Subdivision, Administrative Site Plan, Administrative Conditional Use, Environmental (SEPA) Review, Street Modification (Jefferson Highlands) LUA19-000163 N/A 10/21/2019 E. PUBLIC SERVICES: 1. Existing Utilities a. Water: Water service will be provided by the City of Renton. There is a new 12-inch City water main being installed in Jefferson Avenue NE that will deliver a maximum total flow capacity of 2,500 gallons per minute (gpm). There is an existing 10-inch City water main located in Kirkland Ave NE that can deliver a maximum total flow capacity of 2,500 gpm. b. Sewer: Sewer service is provided by the City of Renton. There is an existing 8-inch concrete gravity wastewater main located in Jefferson Ave NE. There is an existing 8-inch concrete gravity wastewater main located in Kirkland Ave NE. c. Surface/Storm Water: There are 12-inch stormwater mains located in Jefferson Ave NE. Runoff from the existing site includes two (2) duplexes where no stormwater infrastructure currently exists onsite. 2. Streets: Jefferson Avenue NE is a Residential Access Street with an existing right-of-way (ROW) width of 50 feet as measured using the King County Assessor’s Map. Kirkland Avenue NE is a Residential Access Street with an existing ROW width of 60 feet as measured using the King County Assessor’s Map. There is an existing sidewalk located on both sides of the development. 3. Fire Protection: Renton Regional Fire Authority (RRFA) F. APPLICABLE SECTIONS OF THE RENTON MUNICIPAL CODE: 1. Chapter 2 Land Use Districts a. Section 4-2-020: Purpose and Intent of Zoning Districts b. Section 4-2-060: Zoning Use Table – Uses Allowed in the Zoning Designations c. Section 4-2-110: Residential Development Standards d. Section 4-2-115: Residential Design and Open Space Standards 2. Chapter 3 Environmental Regulations and Overlay Districts a. Section 4-3-050: Critical Area Regulations 3. Chapter 4 City-Wide Property Development Standards 4. Chapter 6 Streets and Utility Standards a. Section 4-6-060: Street Standards 5. Chapter 7 Subdivision Regulations City of Renton Department of Community & Economic Development Jefferson Highlands Unit Lot Subdivision Staff Report to the Hearing Examiner LUA21-000391, PP, SA-H, CUP-H, ECF, MOD Report of April 12, 2022 Page 4 of 39 SR_HEX_Report_Jefferson_Highlands_220412_v1 6. Chapter 9 Permits – Specific a. Section 4-9-030: Conditional Use Permits b. Section 4-9-200: Master Plan and Site Plan Review c. Section 4-9-250: Variances, Waivers, Modifications, and Alternates d. Section 4-9-065: Density Bonus Review 7. Chapter 11 Definitions G. APPLICABLE SECTIONS OF THE COMPREHENSIVE PLAN: 1. Land Use Element H. FINDINGS OF FACT (FOF): 1. The Planning Division of the City of Renton accepted the above master application for review on October 29, 2021 and determined the application complete on December 13, 2021. The project was re-noticed on February 15, 2022 once it was determined that the subject site is located in the Sunset Area Planned Action Area EIS Boundary and the applicant requested concurrence with the Sunset Area Planned Action EIS (Exhibit 21). The project complies with the 120-day review period once concurrence with the Sunset Area Planned Action EIS was confirmed and the project was renoticed. 2. On October 21, 2019, the applicant received preliminary plat, unit lot subdivision, site plan, conditional use, and street modification approval for Jefferson Highlands 13 townhomes located at 1513-1515 Kirkland Ave NE, Renton, WA 98056 and 1524-1526 Jefferson Ave NE, Renton, WA 98056 (LUA19-000163; Exhibit 23). The previously approved Jefferson Highlands project is set to expire on April 21, 2025. The previous land use decision would be vacated by the applicant with the issuance of a new land use decision to prevent two approvals on the some of the same property. 3. A virtual neighborhood public meeting was held on October 6, 2021 via Microsoft Teams. No members of the public attending the meeing or provided comments and questions : See Exhibit 25. 4. The project site is located 1518 Jefferson Ave NE (APN 7227801555), 1524/1526 Jefferson Ave NE (APN 7227801560) and 1513/1515 Kirkland Ave NE (APN 7227801485). 5. The project site is currently developed with two (2) duplexes, a single-family home, a detached garage, a carport, and six (6) small outbuildings. 6. Access to the site would be provided via a 16-foot-wide shared temporary alley along the south end of 1513/1515 Kirkland Ave NE (8 feet of the temporary access is located off-site on parcel 7227801490) and a new 16-foot-wide alley located between proposed townhome Lots 1-6 and Lots 7-12 and along the eastern portion of Lots 13-18 with temporary access located offsite on parcel 7227801490. 7. The property is located within the Residential High Density (RHD) Comprehensive Plan land use designation. 8. The site is located within the Residential-14 (R-14) zoning classification. 9. There are approximately 22 significant trees located on-site, of which the applicant is proposing to remove and replace all onsite significant trees. 10. The site is mapped with regulated slopes (less than 25%) near the southern most portion of the project site. City of Renton Department of Community & Economic Development Jefferson Highlands Unit Lot Subdivision Staff Report to the Hearing Examiner LUA21-000391, PP, SA-H, CUP-H, ECF, MOD Report of April 12, 2022 Page 5 of 39 SR_HEX_Report_Jefferson_Highlands_220412_v1 11. Approximately 650 cubic yards of material would be cut on-site and approximately 1,550 cubic yards of fill is proposed to be brought into the site. 12. The applicant is proposing to begin construction in the summer/fall 2022 and end in winter 2023. 13. Staff received no public comment letter(s). 14. No other public or agency comments were received. 15. Pursuant to the City of Renton's Environmental Ordinance and SEPA (RCW 43.21C, 1971 as amended), on March 14, 2022 the Environmental Review Committee determined that the project proposal was consistent with the Sunset Area Planned Action Ordinance and Envi ronmental Impact Statement (EIS) (Exhibit 22). 16. Representatives from various city departments have reviewed the application materials to identify and address issues raised by the proposed development. These comments are contained in the official file, and the essence of the comments has been incorporated into the appropriate sections of this report and the Departmental Recommendation at the end of this report. 17. Comprehensive Plan Compliance: The site is designated Residential High Density (RHD) on the City’s Comprehensive Plan Map. Residential High Density unit types are designed to incorporate features from both single-family and multifamily developments, support cost-efficient housing, facilitate infill development, have close access to transit service, and efficiently use urban services and infrastructure. The proposal is compliant with the following development standards if all conditions of approval are met: Compliance Comprehensive Plan Analysis ✓ Goal L-H: Plan for high-quality residential growth that supports transit by providing urban densities, promotes efficient land utilization, promotes good health and physical activity, builds social connections, and creates stable neighborhoods by incorporating both built amenities and natural features. ✓ Goal L-I: Utilize multiple strategies to accommodate residential growth, including: • Development of new multi-family and mixed-use in the City Center and in the Residential High Density and Commercial Mixed Use designations, and • Infill development on vacant and underutilized land in established neighborhoods and multi-family areas. ✓ Policy L-32: Emphasize the use of open ponding and detention, vegetated swales, rain gardens, clean roof run-off, right-of-way landscape strips, open space, and stormwater management techniques that mimic natural systems, maximize water quality and infiltration where appropriate, and which will not endanger groundwater quality. ✓ Goal L-BB: Maintain a high quality of life as Renton grows by ensuring that new development is designed to be functional and attractive. ✓ Goal L-FF: Strengthen the visual identity of Renton and its Community Planning Areas and neighborhoods through quality design and development. ✓ Policy L-48: Address privacy and quality of life for existing residents by considering scale and context in infill project design. ✓ Policy L-50: Respond to specific site conditions such as topography, natural features, and solar access to encourage energy savings and recognize the unique features of the site through the design of subdivisions and new buildings. City of Renton Department of Community & Economic Development Jefferson Highlands Unit Lot Subdivision Staff Report to the Hearing Examiner LUA21-000391, PP, SA-H, CUP-H, ECF, MOD Report of April 12, 2022 Page 6 of 39 SR_HEX_Report_Jefferson_Highlands_220412_v1 ✓ Policy L-51: Include human-scale features such as pedestrian pathways, quality landscaping, and public spaces that have discernible edges, entries, and borders to create a distinctive sense of place in neighborhoods, commercial areas, and centers. ✓ Policy L-55: Preserve natural landforms, vegetation, distinctive stands of trees, natural slopes, and scenic areas that contribute to the City’s identity, preserve property values, and visually define the community and neighborhoods. 18. Zoning Development Standard Compliance: The purpose of the Residential-14 Zone (R-14) is to encourage development, and redevelopment, of residential neighborhoods that provide a mix of detached and attached dwelling structures organized and designed to combine characteristics of both typical single - family and small-scale multi-family developments. Structure size is intended to be limited in terms of bulk and scale so that the various unit types allowed in the zone are compatible with one another and can be integrated together into a quality neighborhood. Project features are encouraged, such as yards for private use, common open spaces, and landscaped areas that enhance a neighborhood and foster a sense of community. Civic and limited commercial uses may be allowed when they support the purpose of the designation. The proposal is compliant with the fol lowing development standards, as outlined in RMC 4 -2- 110.A, if all conditions of approval are met: Compliance R-14 Zone Develop Standards and Analysis Compliant if condition of approval is met Density: The density range permitted in the R-14 zone is a minimum 7.0 up to a maximum of 14.0 dwelling units per net acre. Net density is calculated after the deduction of sensitive areas, areas intended for public right-of-way, and private access easements. Individual unit lots are exempt from the maximum net de nsity requirements, however the density of the parent site shall not exceed the maximum net density of the zone. Bonus density is permitted in the R-14 zone, up to a maximum of 18 dwelling units per net acre, provided one bonus market-rate dwelling unit may be granted for each affordable dwelling unit constructed on site above the maximum density permitted. All projects must construct at least two (2) affordable dwelling units. Staff Comment: After the deduction of the required 339 square feet of right-of-way (ROW) dedication from Jefferson Ave NE from the 43,332 square foot gross site area, the proposal results in a net site area of 42,993 square feet or 0.987 net acres. The proposal for 18 units on the 0.987 net acre site would result in a net density of 1 8.2 dwelling units per net acre (18 units / 0.987 acres = 18.24 du/ac), which would comply with the maximum 18 du/ac permitted via the density bonus requirements rounded down to the nearest whole number. For the project to qualify for bonus density and comply with RMC 4-9-065, two (2) units proposed above 14 du/ac would be designated as affordable. To ensure that the affordable unit remains affordable over time, the applicant shall record an agreement in a form approved by the City with the King County Recorder’s Office requiring that the affordable housing unit remain affordable for fifty (50) years or the life of the development, whichever is less. This agreement shall be a covenant running with the land, bi nding on the assigns, heirs and successors of the applicant to the satisfaction of the City Attorney. Staff recommends, as a condition of approval, that a draft affordable housing affordability covenant and use agreement be submitted to the Current Planning Project Manager for review and approval by the Planning Project Manager and the City Attorney prior to civil construction permit issuance. In addition, the applicant shall identify the third-party with an agreement in principle to assist with monitoring the project’s compliance with the affordable housing City of Renton Department of Community & Economic Development Jefferson Highlands Unit Lot Subdivision Staff Report to the Hearing Examiner LUA21-000391, PP, SA-H, CUP-H, ECF, MOD Report of April 12, 2022 Page 7 of 39 SR_HEX_Report_Jefferson_Highlands_220412_v1 requirements prior to building permit issuance for the affected units. Such affordability agreements shall be recorded prior to Temporary Certificate of Occupancy. ✓ Lot Dimensions: The minimum lot size permitted in the R-14 zone is 3,000 sq. ft. for detached dwellings. There is no minimum lot size for attached dwellings. A minimum lot width of 30 feet is required (40 feet for corner lots) and a minimum lot depth of 60 feet is required. Individual unit lots created for townhouses are not required to comply with the minimum lot size, minimum lot width, and minimum lot depth requirements of the underlying zoning designation, however the whole parent site shall comply with all development standards as though it were a standalone lot. The following table identifies the proposed approximate dimensions for Unit Lots 1-18, Tracts A-D, and parent lot: Proposed Lot Lot Size (sq. ft.) Lot Width (feet) Lot Depth (feet) Unit Lot 1 1,395 21.39 65.21 Unit Lot 2 1,064 16.32 65.19 Unit Lot 3 1,063 16.30 65.17 Unit Lot 4 1,062 16.30 65.15 Unit Lot 5 1,062 16.31 65.12 Unit Lot 6 1,403 21.53 65.12 Unit Lot 7 2,043 21.49 94.92 Unit Lot 8 1,548 16.31 94.92 Unit Lot 9 1,548 16.31 94.91 Unit Lot 10 1,548 16.31 94.91 Unit Lot 11 1,548 16.31 94.91 Unit Lot 12 2,033 21.42 94.90 Unit Lot 13 2,036 21.46 94.90 Unit Lot 14 1,548 16.31 94.90 Unit Lot 15 1,547 16.31 94.90 Unit Lot 16 1,547 16.31 19.89 Unit Lot 17 1,547 16.30 94.89 Unit Lot 18 2,365 24.90 94.88 Tract A (Private Access/Drainage) 2,205 N/A N/A Tract B (Common Open Space/Utility) 3,166 N/A N/A City of Renton Department of Community & Economic Development Jefferson Highlands Unit Lot Subdivision Staff Report to the Hearing Examiner LUA21-000391, PP, SA-H, CUP-H, ECF, MOD Report of April 12, 2022 Page 8 of 39 SR_HEX_Report_Jefferson_Highlands_220412_v1 Tract C (Pedestrian Access) 590 N/A N/A Tract D (Common Open Space/Utility 7,466 N/A N/A Parent Site 43,332 220 236.46 Staff Comment: The individual unit lots are not required to comply with the minimum lot size, width, and depth requirements of the R -14 zone. The new proposed lot lines outline the building footprint of the individual townhome units with a small private yard area on each unit lot. Unit Lots 7-18 contain detached garages off the public alley . The parent site meets the minimum lot size, width and depth requirements of the R-14 zone, as shown in the table above. ✓ Setbacks: The required setbacks in the R-14 zone are as follows: front yard is 15 feet except when all access is taken from an alley then 10 feet, side yard is 4 feet for detached units, for attached units the side yard is 0 feet for the attached sides and 4 feet for the unattached sides, secondary front yard (applies to corner lots) is 15 feet, and the rear yard is 10 feet. In a unit lot subdivision, the setback requirements apply to the parent site, but would not apply to the individual unit lots. Staff Comment: The proposed 18 townhomes and 12 detached garages, as shown on the submitted preliminary plat map (Exhibit 4), would meet or exceed all the required R-14 zone setback areas from the property lines of the parent site. Compliant if condition of approval is met Building Standards: The R-14 zone has a maximum building coverage of 65% and a maximum impervious surface coverage of 80%. Individual unit lots created for townhouses are not required to comply with the maximum building coverage and maximum impervious surface area limitations of the underlying zoning designation, however the whole parent site shall comply with such standards as though it were a standalone lot. In the R-14 zone, a maximum building height of 3 stories with a wall plate height of 24 feet is permitted and an increase up to 32 feet may be requested subject to conditional use permit approval. Roofs with a pitch equal to or greater than 4:12 may project an additional six (6) vertical feet from the maximum wall plate height. If the height of wall plates on a building are less than the states maximum the roof may project higher to account for the difference, yet the combined height of both features shall not exceed the combined maximums. Common rooftop features, such as chimneys, may project an additional four (4) vertical feet from the roof surface. Non -exempt vertical projections (e.g., roofs pitched less than 4:12, decks, railings, etc.) may extend up to six (6) vertical feet above the maximum wall plate height if the projection is stepped back one-and-a-half (1.5) horizontal feet from each minimum building setback line for each one (1) vertical foot above th e maximum wall plate height. Deck enclosures (i.e., railings) located above the maximum wall plate height and not stepped back would be required to be constructed of transparent tempered glass or its equivalent, as determined by the Administrator. Wall plates supporting a primary roof surface that has only one (1) sloping plane (e.g., shed roof) may exceed the stated maximum if the average of wall plate heights is equal or less than the maximum wall plate height allowed. Staff Comment: The proposed townhomes and detached garages would have a total City of Renton Department of Community & Economic Development Jefferson Highlands Unit Lot Subdivision Staff Report to the Hearing Examiner LUA21-000391, PP, SA-H, CUP-H, ECF, MOD Report of April 12, 2022 Page 9 of 39 SR_HEX_Report_Jefferson_Highlands_220412_v1 footprint of 16,253 square feet, which would result in a total building coverage of 3 8 percent (38%) on the 43,332 square foot parent project site, which is less than the 65 percent (65%) maximum permitted on the p arent site. The project proposal would result in the development of approximately 2 8,763 square feet of impervious surfaces, which would result in a total impervious surface cover of 6 6 percent (66%) on the 43,332 square foot parent project site, which is less than the 80 percent (80%) maximum permitted on the parent site. The proposed townhomes would have a total of three (3) stories and a maximum wall plate height of 32 feet, the applicant has requested a conditional use permit for the increased wall plate height from 24 feet up to 32 feet with a nontransparent parapet with a height of 36-8” and a stair enclosure above the wall plate height of 42 feet. The applicant is proposing flat roofs that would not qualify for the additional six (6) vertical feet from the maximum wall plate height unless additional step backs are provided. As required by code, the topmost surface of roofs pitched less than 4:12 and rooftop decks are required to be below the maximum wall plate height unless such surfaces are stepped back one and one-half (1.5) horizontal feet from each minimum building setback line for each one vertical foot above the maximum wall plate height, in which case they may extend up to six (6) vertical feet above the maximum wall plate height. The applicable setbacks from the parent site proposed are approximately five feet (5’) from the side yard (one additional horizontal foot from the minimum building side setback line) from the north properties and an approximate eight and one-half feet (8 ½’) from the side yard (four and one-half feet (4.5) additional horizontal feet from the minimum building side setback line) from the furthest property to the south. As proposed, the building parapet on Lots 6 and 7 would not be allowed to extend up to six (6) vertical feet above the maximum wall plate height without increasing the side yard setback from the parent lot. In addition, the stair enclosures would not comply with allowed vertical projections at 10 feet above the maximum wall plate height. Therefore, staff recommends as a condition of approval that the applicant submit revised building elevations that comply with the maximum wall plate height and allowed vertical projections for wall plates under the conditional use permit. See further discussion and recommended condition of approval below under FOF 21, Conditional Use Permit Analysis). ✓ Maximum Number of Units per Building: In the R-14 zone, no more than six (6) units per building are permitted. Staff Comment: There are three (3) 6-unit buildings proposed on the project site. Therefore, none of the proposed buildings would have more than six (6) units per building. Compliant if condition of approval is met Landscaping: The City’s landscape regulations (RMC 4-4-070) require a 10-foot landscape strip along all public street frontages. Additional minimum planting strip widths between the curb and sidewalk are established according to the street development standards of RMC 4-6-060. Street trees and, at a minimum, groundcover, are to be located in this area when present. Street trees and, at a minimum, groundcover shall be planted within planting strips pursuant to ground cover standards (subsection L2), provided there shall be a minimum of one street tree planted per lot. Trees shall be selected from the City’s Approved Street Tree List based on the width of the planting strip and the presence or lack of overhead power lines . Street trees shall have a minimum caliper of two inches (2"), and be planted pursuant to the standards City of Renton Department of Community & Economic Development Jefferson Highlands Unit Lot Subdivision Staff Report to the Hearing Examiner LUA21-000391, PP, SA-H, CUP-H, ECF, MOD Report of April 12, 2022 Page 10 of 39 SR_HEX_Report_Jefferson_Highlands_220412_v1 promulgated by the City, which may require root barriers, structured soils, or other measures to help prevent tree roots from damaging infrastructure. Street trees shall be planted in the center of the planting strip between the curb and the sidewalk at the following intervals; provided, that, where right-of-way is constrained, irregular intervals and slight increases or decreases may be permitted or required. Generally, the following spacing is required: i. Small-sized maturing trees: thirty feet (30') on center; ii. Medium-sized maturing trees: forty feet (40') on center; and iii. Large-sized maturing trees: fifty feet (50') on center. Where there is insufficient right-of-way space or no public frontage, street trees are required in the front yard subject to approval of the Administrator. Staff Comment: The applicant submitted a Conceptual Tree Retention and Landscape Plan, prepared by Varley Varley Varley (dated September 2021; Exhibit 7) with the project application materials. Frontage improvements on Jefferson Ave NE were constructed with NE 16th St/Jefferson Ave NE Stormwater Green Connection Capital improvement Project (CIP) COR Project #SWP-27-4016 and WTR-27-4016. The CIP included new curb/gutter, street restoration, pervious sidewalks, bioretention cells and stormwater conveyance systems. A 12 foot (12’) wide bioretention planter strip is proposed between the concrete curb and concrete sidewalk along Kirkland Ave NE frontages in order to meet the City’s complete street standards and the Sunset Area Surface Water Master Plan (Exhibit 10). See FOF 23, Compliance with Subdivision Regulations: Streets and FOF 24, Modification Analysis for the further discussion on Kirkland Ave NE property frontage improvements. The proposed landscape planters would include the planting of four (4) street trees (Eastern redbud) and up to six (6) different shrubs and groundcover (common rush, slough sedge, spiraea, dwarf redtwig dogwood, red flowering currant, and kinnikinnik). There are two (2) driveway curb cuts on Kirkland Ave NE that are proposed to be removed and replaced with a 16-foot-wide shared temporary access driveway for ingress and egress at the southeast corner of the project site (half of the temporary access width is proposed to be located off-site to the abutting property to the south – APN 7227801490). Landscaping would be required to be installed prior to temporary certificate of occupancy for the proposed buildings. The 10-foot onsite landscape strip, located at the back of sidewalk on J efferson Ave NE and Kirkland Ave NE, would be comprised largely of Persian ironwood, Japanese maple, euonymus, fountain grass, rhododendron, big leaf hydrangea, nandina, redleaf barberry, and feather reed grass. The 10-foot onsite landscape strip s would be included as part of Tract D (an approximately 31-foot-wide common open space/utility tract) or Tract B (an approximate 27-foot wide common open space/utility tract). Ten feet (10') of on-site landscaping is required along all public street frontages, with the exception of areas for required walkways and driveways and those zones with building setbacks less than ten feet (10'). This requirement applies to lots and tracts alike and thus the first 10 feet of the common open space/utility tracts, from the back of sidewalk, would be required to include a mix of trees, shrubs, and ground cover to comply with landscape regulations. A final detail landscape plan would be submitted and reviewed for landscape code compliance at civil construction permi t submittal. The site also contains two (2) additional tracts (Tracts A and C) located at the center of the development for private access/drainage and pedestrian access, respectively . Improvements within these tracts include frontage and roadway improvements, access and circulation, and pedestrian sidewalks for pedestrian connections through the development. City of Renton Department of Community & Economic Development Jefferson Highlands Unit Lot Subdivision Staff Report to the Hearing Examiner LUA21-000391, PP, SA-H, CUP-H, ECF, MOD Report of April 12, 2022 Page 11 of 39 SR_HEX_Report_Jefferson_Highlands_220412_v1 As proposed, Tracts A-D would be required to be maintained by the subdivisions’ Homeowners Association. As such, staff recommends, as a condition of a pproval, that the applicant create a Homeowners’ Association (“HOA”) that maintains all improvements and landscaping in the common open space tracts and any and all other common improvements. A Certificate of Articles of Incorporation for Jefferson Highlands Home Owner’s Association and a Declaration of Covenants, Conditions and Restrictions for Jefferson Highlands Unit Lot Subdivision were submitted with the application (Exhibits 30 and 31). The HOA documents shall be submitted to, and approved by, the Current Planning Project Manager prior to recording of the Unit Lot Subdivision. Such documents shall be recorded concurrently with the Unit Lot Subdivision. Compliant if condition of approval is met Tree Retention: The City’s adopted Tree Retention and Land Clearing Regulations (4-4- 130) require the retention of at least twenty percent (20%) of trees in a residential development. Significant trees shall be retained in the following priority order: Priority One: Landmark trees; significant trees that form a continuous canopy; significant trees on slopes greater than twenty percent (20%); significant trees adjacent to critical areas and their associated buffers; and significant trees over sixty feet (60') in height or greater than eighteen inches (18") caliper. Priority Two: Healthy tree groupings whose associated undergrowth can be preserved; other significant native evergreen or deciduous trees; and other significant non - native trees. Priority Three: Alders and cottonwoods shall be retained when all other trees have been evaluated for retention and are not able to be retained, unless the alders and/or cottonwoods are used as part of an approved enhancement project within a critical area or its buffer. A minimum tree density shall be maintained on each residentially zoned lot. Lots developed with detached single-family dwelling units in the R-14 zone are exempt from the minimum tree density requirements. For multi -family development, the minimum tree density is four (4) significant trees for every five thousand (5,000) square feet. The tree density may consist of existing trees, replacement trees, trees required pursuant to RMC 4-4-070.F.1, Street Frontage Landscaping Required, or a combination. Staff Comment: The applicant submitted a Landscape and Tree Retention Plan, prepared by Varley Varley Varley, dated September 2021 (Exhibit 7) and an Arborist Report, prepared by Varley Varley Varley, dated September 6, 2021 (Exhibit 8) with the project application materials. According to the submitted Arborist Report, there are 22 significant onsite trees, of those six (6) were found to be in “poor” or dangerous condition, nine (9) were found to be in “ok” health, and seven (7) were found to be in “good” condition. Based on the submitted subdivision layout, three (3) trees were found to be in the proposed alley and one (1) was found in the temporary private access easement tract. After allowed tree deductions, the applicant would be required to retain two (2) trees. Per RMC 4-4-130.H.1.e, when the required number of protected trees cannot be retained, replacement trees, with at least a two-inch (2") caliper or an evergreen at least six feet (6') tall, shall be planted at a rate of twelve (12) caliper inches of new trees to replace each protected tree removed. In-lieu of retaining two (2) existing trees, the applicant is proposing to replant the site with 37 onsite trees based on the landscape City of Renton Department of Community & Economic Development Jefferson Highlands Unit Lot Subdivision Staff Report to the Hearing Examiner LUA21-000391, PP, SA-H, CUP-H, ECF, MOD Report of April 12, 2022 Page 12 of 39 SR_HEX_Report_Jefferson_Highlands_220412_v1 plan and plant schedule: 4 bloodgood Japanese maple, 3 vine maple, 6 Japanese snowbell, 11 Persian ironwood, 4 ‘Imperial’ honeylocust, and 9 serviceberry – ‘autumn brilliance’. According to the submitted landscape plan, the replacement trees would exceed the minimum tree density requirement. However, the proposed site layout would allow for the potential to retain up to five (5) trees in ok to good health if the stormwater improvements were designed to accommodate up to two (2) of the trees located along the street frontages, specifically trees 1-3 (6” DBH), 10 (14” DBH), or 17 (8,8” DBH). Therefore, staff recommend s as a condition of approval that the applicant submit a revised tree retention and replacement plan that demonstrates compliance with minimum tree retention requirement or trees in the replacement plan (up to 24”) shall be comparable to the mature tree species that are proposed to be removed. A final detailed landscape plan would be required to be submitted and approved prior to issuance of a civil construction permit. ✓ Parking: Parking regulations require that a minimum of two parking spaces be provided for each detached dwelling. Parking regulations require that a minimum of 2 per dwelling unit, however, 1 per dwelling unit may be permitted for 1 bedroom or less dwelling units. Tandem parking is allowed . For unit lot subdivisions, the number of parking spaces required for attached dwellings zone may be averaged and dispersed among unit lots or within the parent site; however, at least one parking space shall be provided within each unit lot. Driveway cuts are required to be a minimum of 5 feet from property lines and new driveways may be a maximum of 16 feet in width at the property line. Maximum driveway slopes shall not exceed fifteen percent (15%); provided, that drive ways exceeding eight percent (8%) shall provide slotted drains at the lower end with positive drainage discharge to restrict runoff from entering the garage/residence or crossing any public sidewalk. A parking stall shall be a minimum of twenty feet (20') in length and shall be a minimum of nine feet (9') in width measured from a right angle to the stall sides. Staff Comment: The applicant submitted a design review package with floor and roof plans, project renderings, and building elevations, prepared by KNIT, dated October 26, 2021 (Exhibits 16 and 17) for the proposed townhome units. According to the submitted floor plans, each of the townhome units would have between three (3) and four (4) bedrooms, which would require a minimum of two (2) parking spaces per dwelling unit. The applicant is proposing to provide all required parking on each unit lot as opposed to averaging the spaces throughout the development. One (1) parking space would be provided within the designated garage space for each unit and one (1) uncovered space would be provided in tandem parking within the rear yards off the public alley. As proposed, the single car garage and the onsite driveway parking area w ould meet the minimum parking requirements for each unit lot. ✓ Bicycle Parking: Bicycle parking regulations require that a minimum of one-half (0.5) bicycle parking space be provided per one attached dwelling. Staff Comment: One-half (0.5) bicycle parking space per one (1) dwelling unit is required for projects with more than five (5) dwelling units. For attached dwellings, spaces within the dwelling units or on balconies do not count toward the bicycle parking requirement. However, designated bicycle parking spaces within individual garages can count toward the minimum requirement. City of Renton Department of Community & Economic Development Jefferson Highlands Unit Lot Subdivision Staff Report to the Hearing Examiner LUA21-000391, PP, SA-H, CUP-H, ECF, MOD Report of April 12, 2022 Page 13 of 39 SR_HEX_Report_Jefferson_Highlands_220412_v1 Based on the proposal for 18 townhome units, a total of nine (9) bicycle parking spaces are required. The applicant is proposing to provide wall mounted bicycle parking within the garage space of each unit (Exhibit 16). Therefore, the proposed 18 wall mounted bicycle parking spaces within each garage would comply with the minimum bicycle parking standard. Compliant if condition of approval is met Fences and Retaining Walls: In any residential district, the maximum height of any fence, hedge or retaining wall shall be seventy two inches (72"). Except in the front yard and side yard along a street setback where the fence shall not exceed forty eight inches (48") in height. There shall be a minimum three-foot (3') landscaped setback at the base of retaining walls abutting public rights-of-way. Staff Comment: All existing site fencing is proposed to be removed. A small rockery is proposed along the southern parent lot. Staff recommends as a condition of approval that the applicant submit a revised landscape plan that demonstrates compliance with the fence and retaining wall regulations for review and approval by the Current Planning Project Manager at the time of civil construction permit application. Compliance not yet demonstrated Refuse and Recyclables: A minimum of one and one-half (1-1/2) square feet per dwelling unit in multi-family residences shall be provided for recyclables deposit areas, except where the development is participating in a City-sponsored program in which individual recycling bins are used for curbside collection. A minimum of three (3) square feet per dwelling unit shall be provided for refuse deposit areas. A total minimum area of eighty (80) square feet shall be provided for refuse and recyclables deposit areas. Multi-family residences using thirty-five (35) gallon garbage carts or smaller, when allowed, must meet all of the following requirements: a. Storage Space: Storage space for carts must be provided either within the garage or outside. i. Storage within a garage must be appropriately sized to accommodate both vehicles and refuse and recycling carts. Storage space for carts must measure at least two feet by six feet (2’ x 6’) floor area and sixty inches (60”) high. This space must be identified on floor plans. ii. Storage located outside must measure at least two feet by six feet (2’ x 6’) in size and be located on the same lot as the dwelling in a side or rear yard. b. Screening: Outdoor storage must be adequately screened from public view, made of wood, masonry, or ornamental metal. c. Pick-Up Location: Space for carts to be placed on garbage pick -up day must be sufficient to accommodate the number of carts expected to be serviced on pick -up day. There shall be a direct connection constructed of a smooth surface that allows carts to be smoothly rolled to the street or other specified pick -up location. d. Parking Space Obstruction Prohibited: Refuse and recycle carts may not obstruct a required parking space at any time. e. Storage in Required Parking Space Prohibited: Refuse and recycle carts may not be stored in the minimum required parking spaces. Staff Comment: Based on the proposal for 18 multi-family dwelling units on the project site, a total of 27 square feet of recyclable deposit areas would be required and 54 City of Renton Department of Community & Economic Development Jefferson Highlands Unit Lot Subdivision Staff Report to the Hearing Examiner LUA21-000391, PP, SA-H, CUP-H, ECF, MOD Report of April 12, 2022 Page 14 of 39 SR_HEX_Report_Jefferson_Highlands_220412_v1 square feet of refuse area would be required, for a total minimum area of 81 square feet. The applicant has shown a trash and recycling storage area on the submitted floor plans and each unit lot would have individual trash containers (Exhibit 16). As proposed, it appears that the proposed location of the trash and recycling storage areas within the garages would not allow for the minimum required storage for both vehicles and refuse and recycling carts. Further compliance with the requirement for refuse and recyclables in RMC 4-4-090 would be verified at the time construction or building permit review. See further discussion below under FOF 19, Design Standards: Dumpster/Trash/Recycling Collection Area. Lighting: Exterior lighting shall be provided in order to enhance visibility and security while accenting key architectural elements and landscape features. Guidelines: Lighting that is appropriate to the architectural character of the neighborhood and of a human scale shall be provided. Lighting shall be minimal where possible to achieve the desired purpose. Light spillover for all lighting, as well as single source lighting of large areas shall be avoided. Standards: a. Lighting shall be limited to illumination of surfaces intended for pedestrians, vehicles, or key architectural features. b. Street lighting on residential access streets and limited residential access streets is required. Lighting facilities and fixtures shall be located outside publi c right-of-way unless owned, operated and maintained by a power utility franchise. Street lights shall be no taller than sixteen feet (16') and placed at regular intervals of no more than two hundred feet (200') on internal roadways and installed in accord ance with chapter 4-6 RMC. c. Lighting for residential access streets, limited residential access streets, alleyways, common greens, and parks shall be low intensity. Lighting for common greens and parks shall be downlighting. d. All exterior house lighting shall be downlighting or placed beneath building eaves to prevent light projecting upward. e. If alley lights are mounted on a garage, they shall be no higher than eight feet (8') above ground and directed away from adjacent backyards and structures. f. Sidewalks and pathways not otherwise illuminated by street lighting shall be lit with ornamental downlighting fixtures that shall not exceed twelve feet (12') in height. Staff Comment: The applicant submitted an Illumination Plan, prepared by Transpo Group, dated October 2021 (Exhibit 14) and Illumination Lighting Calculation Summary, prepared by Lighting Analysis, Inc., dated October 8, 2021 (Exhibit 15) with the project application materials. The applicant is proposing six (6) pedestrian luminaire pole and fixtures at 14 feet (14’) mounting per the luminaire pole schedule and according to current city standards 116.1, 119, 120, and 121. Three (3) luminaire poles would be installed on both Jefferson Ave NE and Kirkland Ave NE. Residential streets shall have minimum light levels of 0.8 foot-candle within the intersections and 0.3 foot-candle along the sidewalks at a six to one (6:1) uniformity ratio per RMC 4-6-060.I.3. The applicant is proposing a 0.30 minimum light level and a 5.90 uniformi ty ratio on Kirkland Ave NE and a 0.32 minimum light level and a 4.31 uniformity ratio on Jefferson Ave NE. Final lighting plans would be reviewed at the time of construction utility permit. City of Renton Department of Community & Economic Development Jefferson Highlands Unit Lot Subdivision Staff Report to the Hearing Examiner LUA21-000391, PP, SA-H, CUP-H, ECF, MOD Report of April 12, 2022 Page 15 of 39 SR_HEX_Report_Jefferson_Highlands_220412_v1 An exterior architectural lighting plan for each dwelling unit was not provided with the application; therefore, staff recommends, as a condition of approval, that a n architectural lighting plan shall be provided at the time of building permit review for review and approval by the Current Planning Project Manager . To ensure safety and avoid excessive brightness, pedestrian scale lighting should be provided on the primary entries of each unit, rear elevations facing the alley, as well as along the interior pedestrian walkways as necessary to provide sufficient ligh ting for pedestrian safety but shall also be designed to minimize light spill and glare onto adjoining properties. 19. Design Standards: Residential Design and Open Space Standards (RMC 4-2-115) are applicable in the R-14 zone. The Standards implement policies established in the Land Use Element of the Comprehensive Plan , enhance quality of life by encouraging new residential development to produce beautiful neighborhoods of well-designed homes, and to mitigate adverse impacts of density for the neighborhood and the surrounding community. Compliance with Site Design Standards must be demonstrated prior to approval of the subdivision. These standards are divided into three (3) areas: site design, open pace, and residential design. Compliance with Residential Design Standards would be verified prior to issuance of the bui lding permit for the new single-family homes. The proposal is consistent with the following design standards, unless noted otherwise: Compliance Design Standards R-14 and Analysis Compliant if condition of approval is met Lot Configuration: Developments of more than four (4) structures shall incorporate a variety of home sizes, lot sizes, and unit clusters. Dwellings shall be arranged to ensure privacy so that side yards abut other side yards (or rights-of-way) and do not abut front or back yards. Lots accessed by easements or pipestems shall be prohibited. Staff Comment: The proposal includes five (5) structures - three (3) multifamily townhome structures with six (6) units per structure and two (2) detached garage structures for 12 of the townhome units. The individual unit lots range in size from 1,062 square feet to 2,365 square feet with an average unit lot size of 1,550 square feet. As proposed, the building footprints for each townhome are all roughly the same size at 40’ long by approximately 16’-4” wide. More specifically the unit lots have the following lot widths (six (6) corner unit lots at 16’-4 ¾” and 12 interior unit lot at 16’-3 5/8”). Small amounts of variation in unit lot dimensions and unit lot sizes lends itself to only allow for similar home sizes. To create more variation in townhome size, as viewed from the public streets, staff recommends as a condition of approval that more variation in corner and interior individual unit lot widths be applied to the unit lot subdivision to create a greater variety of home sizes between the townhome structures. A revised preliminary plat plan shall be provided at the time of building permit review for review and approval by the Current Planning Project Manager. ✓ Lots shall be configured to achieve both of the following: 1. The location of stormwater infiltration LID facilities is optimized, consistent with the Surface Water Design Manual. Building and property line setbacks are specified in the Surface Water Design Manual for infiltration facilities. 2. Soils with good infiltration potential for stormwater management are preserved to the maximum extent practicable as defined by the Surface Water Design Manual. City of Renton Department of Community & Economic Development Jefferson Highlands Unit Lot Subdivision Staff Report to the Hearing Examiner LUA21-000391, PP, SA-H, CUP-H, ECF, MOD Report of April 12, 2022 Page 16 of 39 SR_HEX_Report_Jefferson_Highlands_220412_v1 Staff Comment: The proposed development is required to comply with the current version of the City of Renton Surface Water Design Manual (RSWDM). Compliance not yet demonstrated Garages: Garages may be attached or detached. Shared garages are also allowed, provided the regulations of RMC 4-4-080 are met. Carports are not allowed. One of the following is required: 1. The front porch projects in front of the garage a minimum of five feet (5’), and is a minimum of twelve feet (12’) wide, or 2. The garage is detached and set back from the front of the house and/or porch at least six feet (6'). Additionally, all of the following is required: 1. Garage design shall be of similar design to the homes, and 2. If sides of the garage are visible from streets, sidewalks, pathways, trails, or other homes, architectural details shall be incorporated in the desi gn. If shared garages are allowed, they may share the structure with other homes and all of the following is required: 1. Each unit has garage space assigned to it, and 2. The garage is not to be located further than one hundred sixty feet (160') from any of the housing units to which it is assigned, and 3. The garage shall not exceed forty four feet (44') in width, and shall maintain an eight foot (8') separation from any dwellings. Staff Comment: The garages of Units 1-6 would be attached beneath the second floor living space and the garages of Units 7-18 would be detached and set back approximately 8’-7 3/8” from the townhomes on Jefferson Ave NE. All garages would be accessed from the north/south public alley, located at the rear of the center of the unit lot subdivision. The garage designs are similar to that of the townhomes. Compliance for this standard would be verified at the time of building permit review. N/A Standards for Parks: For developments that are less than ten (10) net acres: No park is required, but is allowed. For developments that are greater than ten (10) net acres: A minimum of one one- half (.5) acre park, in addition to the common open space requirement, is required. Staff Comment: Not applicable, the project site is less than 10 acres in area. Compliant if condition of approval is met Standards for Common Open Space: Developments of three (3) or fewer dwelling units: No requirement to provide common open space. Developments of four (4) or more units: Required to provide common open space as outlined below. Above ground drainage faciliti es (i.e., ponds, swales, ditches, rain gardens, etc.) shall not be counted towards the common open space requirement. 1. For each unit in the development, three hundred fifty (350) square feet of common open space shall be provided. 2. Open space shall be designed as a park, common green, pea-patch, pocket park, or pedestrian entry easement in the development and shall include picnic areas, space for recreational activities, and other activities as appropriate. City of Renton Department of Community & Economic Development Jefferson Highlands Unit Lot Subdivision Staff Report to the Hearing Examiner LUA21-000391, PP, SA-H, CUP-H, ECF, MOD Report of April 12, 2022 Page 17 of 39 SR_HEX_Report_Jefferson_Highlands_220412_v1 3. Open space shall be located in a highly visible area and be easily accessible to the neighborhood. 4. Open space(s) shall be contiguous to the majority of the dwellings in the development and accessible to all dwellings. For sites one (1) acre or smaller in size, open space(s) shall be no less than thirty feet (30') in any dimension. For sites larger than one (1) acre in size, open space(s) shall be no less than forty feet (40’) in any dimension. For all sites, allow for variation, open space(s) of less than the minimum dimensions (thirty feet (30’) or forty feet (40’), as applicable) are allowed; provided that when all of a site’s open spaces are averaged the applicable dimension requirement is met (Exhibit 32). 5. A pedestrian entry easement can be counted as open space if it has a minimum width of twenty feet (20') and within that twenty feet (20’) a minimum five feet (5') of sidewalk is provided. 6. Pea-patches shall be at least one thousand (1,000) square feet in si ze with individual plots that measure at least ten feet by ten feet (10' x 10'). Additionally, the pea-patch shall include a tool shed and a common area with space for compost bins. Water shall be provided to the pea-patch. Fencing that meets the standards for front yard fencing shall surround the pea-patch with a one foot (1') landscape area on the outside of the fence. This area is to be landscaped with flowers, plants, and/or shrubs. 7. Grass-crete or other pervious surfaces may be used in the common open space for the purpose of meeting the one hundred fifty feet (150') distance requirement for emergency vehicle access but shall not be used for personal vehicle access or to meet off-street parking requirements. 8. Common open space areas shall have a maximum slope of five percent (5%). 9. Obstructions, such as retaining walls and fences, shall not be placed in common open spaces. Staff Comment: Based on the proposal for 18 townhome units, a total of 6,300 square feet of common open space would be required. Landsc aped common open space, totaling 7,466 square feet is proposed within two (2) common open space/utility tracts (Tracts D) located along the public street frontages. The proposed common open green spaces of Tract D would comply with the required 30-foot of open space in any direction. No above ground drainage facilities (i.e., ponds, swales, ditches, rain gardens, etc.) are proposed within the common open space requirement. A total of nine (9) 3’x8’x2’ galvanized pea patch planter or approximately 24 square feet each in surface area are proposed. One-half of each planter would be available to each unit. Together, the greater pea patch areas (planter, bench, crushed rock and screened off area, would have a combined area over 1,000 square feet across all three (3) pea patch areas. Additionally, the pea-patch must include a water, fencing with a one-foot (1') landscape area on the outside of the fence, landscaping with flowers, plants, and/or shrubs a tool shed, and a common area with space for compost bins. The 3’ x 8’ galvanized planter beds would be required to be upsized in order to comply with the individual plot measurement of 10’ x 10’ as required by code. Therefore, staff recommends as a condition of approval that the applicant submit additional information with the civil construction permit application demonstrating the project’s compliance with the pea - patch common open space requirements for review and approval by the Current Planning Project Manager. City of Renton Department of Community & Economic Development Jefferson Highlands Unit Lot Subdivision Staff Report to the Hearing Examiner LUA21-000391, PP, SA-H, CUP-H, ECF, MOD Report of April 12, 2022 Page 18 of 39 SR_HEX_Report_Jefferson_Highlands_220412_v1 In addition, code requires that open space shall include picnic areas, space for recreational activities, and other activities as appropriate. The project proposal does not include picnic areas or other recreational activities. Therefore, staff recommends as a condition of approval that the applicant include and show required picnic areas, space for recreational activities, and other activities as appropriate within the common open space for review and approval by the Current Planning Project Manager at the time of civil construction permit. In addition, the applicant shall demonstrate compliance with the common open space areas maximum slope of five percent (5%) requirement at the time of civil construction permit application. ✓ Standards for Private Yards: Developments of four (4) or more dwelling units: Each ground-related dwelling shall have a private yard that is at least two hundred fifty (250) square feet in size with no dimension less than eight feet (8') in width. An additional two hundred fifty (250) square feet of open space per unit shall be added to the required amount of common open space for each unit that is not ground related. Staff Comment: Each individual unit lot includes private open space. Each unit lot would have private yard areas, balconies off the second story, and rooftop terraces with private open space on top of each of the proposed primary structures. The ground related private yard areas have a depth of eight feet (8’) on Jefferson Ave NE; however, the units on Kirkland Ave NE (Units 1-6) have private yard areas that are less than two hundred fifty (250) square feet in size with dimension less than eight feet (8') in width. The proposing balconies and rooftop terraces for each of the townhome units would meet open space guidelines to count towards the private yard areas and to achieve the two hundred fifty (250) square feet of open space per unit. Under compliance with the standards for private yards and open space guidelines, the proposed private yard areas plus the proposed balconies would comply with the two hundred fifty (250) square feet of private yard. ✓ Sidewalks, Pathways, and Pedestrian Easements: All of the following are required: 1. Sidewalks shall be provided throughout the neighborhood. The sidewalk may disconnect from the road, provided it continues in a logical route throughout the development. Permeable pavement sidewalks shall be used where feasible, consistent with the Surface Water Desi n Manual. 2. Front yards shall have entry walks that are a minimum width of three feet (3') and a maximum width of four feet (4'). 3. Pathways shall be used to connect common parks, green areas, and pocket parks to residential access streets, limited residential access streets, or other pedestrian connections. They may be used to provide access to homes and common open space. They shall be a minimum three feet (3') in width and made of paved asphalt, concrete, or porous material such as: porous paving stones, crushed gravel with soil stabilizers, or paving blocks with planted joints. Sidewalks or pathways for parks and green spaces shall be located at the edge of the common space to allow a larger usable green and easy access to homes. 4. Pedestrian Easement Plantings: Shall be planted with plants and trees. Trees are required along all pedestrian easements to provide shade and spaced twenty feet (20') on center. Shrubs shall be planted in at least fifteen percent (15%) of the easement and shall be spaced no further than thirty six in ches (36") on center. City of Renton Department of Community & Economic Development Jefferson Highlands Unit Lot Subdivision Staff Report to the Hearing Examiner LUA21-000391, PP, SA-H, CUP-H, ECF, MOD Report of April 12, 2022 Page 19 of 39 SR_HEX_Report_Jefferson_Highlands_220412_v1 5. For all homes that do not front on a residential access street, limited residential access street, a park, or a common green: Pedestrian entry easements that are at least fifteen feet (15') wide plus a five-foot (5') sidewalk shall be provided. Staff Comment: The proposed units would front either Jefferson Ave NE or Kirkland Ave NE and would include direct pedestrian connections to the public sidewalk from the front door of each unit via a five-foot (5’) wide concrete sidewalk. In addition, the applicant is proposing one (1) additional east/west five-foot (5’) wide concrete sidewalk from Jefferson Ave NE to the public alley and from the public alley to Kirkland Ave NE through the middle of the development. The centralized walkway would connect common open spaces located along each public street frontage and provide adequate pedestrian connection from the guest parking area to the primary entry of each unit. Compliance not yet demonstrated Primary Entry: Both of the following are required: 1. The entry shall take access from and face a street, park, common green, pocket park, pedestrian easement, or open space, and 2. The entry shall include a porch or stoop with a minimum depth of five feet (5') and minimum height twelve inches (12") above grade. Exception: in cases where accessibility (ADA) is a priority, an accessible route may be taken from a front driveway. Staff Comment: The primary entries for Units 1-6 would be oriented towards Kirkland Ave NE and the primary entries for Units 7-18 would be oriented towards Jefferson Ave NE. Each entry must include a porch or stoop with a minimum depth of five feet (5') and shall be a minimum height of twelve inches (12") above grade. Further compliance for this standard would be verified at the time of building permit review. ✓ Façade Modulation: Both of the following are required: 1. The primary building elevation oriented toward the street or common green shall have at least one articulation or change in plane of at least two feet (2') in depth; and 2. A minimum one side articulation that measures at least one foot (1') in depth shall occur for all façades facing streets or public spaces. Staff Comment: The primary building elevations include modulation and articulations throughout the units and are oriented toward the street. Each building includes a 4- hour fire wall that projects four feet (4’) beyond the face of the units . The end units include at least one foot (1') side articulation above the ground level. Compliance not yet demonstrated Windows and Doors: All of the following are required: 1. Primary windows shall be proportioned vertically, rather than horizontally, and 2. Vertical windows may be combined together to create a larger window area, and 3. All doors shall be made of wood, fiberglass, metal, or glass and trimmed with three and one-half inches (3 1/2") minimum head and jamb trim around the door, and 4. Screen doors are permitted, and City of Renton Department of Community & Economic Development Jefferson Highlands Unit Lot Subdivision Staff Report to the Hearing Examiner LUA21-000391, PP, SA-H, CUP-H, ECF, MOD Report of April 12, 2022 Page 20 of 39 SR_HEX_Report_Jefferson_Highlands_220412_v1 5. Primary entry doors shall face a street, park, common green, pocket park, or pedestrian easement and shall be paneled or have inset windows, and 6. Sliding glass doors are not permitted along a frontage elevation or an elevation facing a pedestrian easement. Staff Comment: The proposed elevations include primary windows that are proportioned vertically. All primary doors would have inset vertical glass reveals that would face a public street. It is unclear, based on the information submitted, whether three and one-half inches (3 1/2") trim is proposed around all doors. Further compliance for this standard would be verified at the time of building permit review. Compliant if condition of approval is met Scale, Bulk, and Character: All of the following are required: 1. The primary building form shall be the dominating form and elements such as porches, principal dormers, or other significant features shall not dominate, and 2. Primary porch plate heights shall be one story. Stacked porches are allowed, and 3. To differentiate the same models and elevations, different colors shall be used, and 4. For single-family dwellings, no more than two (2) of the same model and elevation shall be built on the same block frontage and the same model and elevation shall not be abutting. Staff Comment: The primary building form is the dominating form and no porches would exceed one story. A color palette coded to the exterior elevations was provided with the submitted application materials (Exhibit 17). The color palette included a color and material legend for stucco, James Hardie artisan shiplap siding system, Bridger steel shiplap panel system, aluminum window system with insulated glazing, James Hardie reveal panel system with recess trim and countersunk fasteners in Arcade White (SW- 7100), Coming Up Roses (SW-6585), Honey Bees (SW-9018), Fun Yellow (SW-6908), Chartreuse (SW-73), Scanda (SW-6529), and Kismet (SW-6830) colors. See recommended condition for applicant to provide a materials board and color palette, coded to the exterior building elevations, to the Current Planning Project Manager for review and approval at the time of building permit review under FOF 19, Design Standards: Materials and Color. Compliance not yet demonstrated Roofs: Both of the following are required: 1. A variety of roofing colors shall be used within the development and all roof material shall be fire retardant; and 2. Single-family residential subdivisions shall use a variety of roof forms appropriate to the style of the home. Staff Comment: The applicant is proposing flat rooftop terraces for the primary units and flat rooftops for the detached garages. Further compliance for all roof material to be fire retardant would be verified at the time of building permit review. N/A Eaves: The following is required: Eaves shall be at least twelve inches (12") with horizontal fascia or fascia gutter at least five inches (5") deep on the face of all eaves. Staff Comment: The building’s modern architecture does not include eaves or fascia. City of Renton Department of Community & Economic Development Jefferson Highlands Unit Lot Subdivision Staff Report to the Hearing Examiner LUA21-000391, PP, SA-H, CUP-H, ECF, MOD Report of April 12, 2022 Page 21 of 39 SR_HEX_Report_Jefferson_Highlands_220412_v1 Compliant if condition of approval is met Architectural Detailing: All of the following are required: 1. Three and one-half inches (3 1/2") minimum trim surrounds all windows and details all doors, and 2. At least one of the following architectural details shall be provided on each home: shutters, knee braces, flower boxes, or columns, and 3. Where siding is used, metal corner clips or corner boards shall be used and shall be at minimum two and one-half inches (2 1/2") in width and painted. If shutters are used, they shall be proportioned to the window size to simulate the ability to cover them, and 4. If columns are used, they shall be round, fluted, or strongly related to the home's architectural style. Six inches by six inches (6" x 6") posts may be allowed if chamfered and/or banded. Exposed four inches by four inches (4" x 4") and six inches by six inches (6" x 6") posts are prohibited. Staff Comment: Staff was unable to verify whether the required three and one -half inches (3 ½”) minimum trim would be provided around all windows and doors. In addition, staff was unable to verify the presence of one of the following architectural details: shutters, knee bracers, flower boxes, or columns. Therefore, staff recommends, as a condition of approval that the applicant either submit revised elevations providing the required three and one-half inches (3 1/2") minimum trim surrounding all windows and doors and one of the following architectural details: shutters, knee braces, flower boxes, or columns. Alternatively, the applicant may submit a modification request to vary from any of these standards. The revised elevations or modification request shall be submitted to the Current Planning Project Manager for review and approval at the time of building permit review. Compliant if condition of approval is met Materials and Color: All of the following are required: 1. Acceptable exterior wall materials are: wood, cement fiberboard, stucco, stone, and standard sized brick three and one-half inches by seven and one- half inches (3 1/2" x 7 1/2") or three and five eighths inches by seven and fiv e- eighths inches (3 5/8" x 7 5/8"). Simulated stone, wood, stone, or brick may be used to detail homes, and 2. When more than one material is used, changes in a vertical wall, such as from wood to brick, shall wrap the corners no less than twenty four inches (24"). The material change shall occur at an internal corner or a logical transition such as aligning with a window edge or chimney. Material transition shall not occur at an exterior corner, and 3. Multiple colors on buildings shall be provided. Muted deepe r tones, as opposed to vibrant primary colors, shall be the dominant colors. Color palettes for all new structures, coded to the home elevations, shall be submitted for approval. 4. Gutters and downspouts shall be integrated into the color scheme of the home and be painted, or of an integral color, to match the trim color. Staff Comment: A fully detailed materials board and corresponding elevation drawings were not submitted with the application materials; therefore, staff is unable to verify City of Renton Department of Community & Economic Development Jefferson Highlands Unit Lot Subdivision Staff Report to the Hearing Examiner LUA21-000391, PP, SA-H, CUP-H, ECF, MOD Report of April 12, 2022 Page 22 of 39 SR_HEX_Report_Jefferson_Highlands_220412_v1 compliance with this requirement. Staff recommends, as a condition of approval that a materials board and color palette coded to each building elevation, be provided to the Current Planning Project Manager for review and approval at the time of building permit review. Compliance not yet demonstrated Mail and Newspapers: All of the following are required: 1. Mailboxes shall be clustered and located so as to serve the needs of USPS while not adversely affecting the privacy of residents; 2. Mailboxes shall be lockable consistent with USPS standard; 3. Mailboxes shall be architecturally enhanced with materials and det ails typical of the home's architecture; and 4. Newspaper boxes shall be of a design that reflects the character of the home. Staff Comment: Compliance with this requirement would be verified at the time of civil construction review. N/A Hot Tubs, Pools, and Mechanical Equipment: Hot tubs and pools shall only be located in back yards and designed to minimize sight and sound impacts to adjoining property. Pool heaters and pumps shall be screened from view and sound insulated. Pool equipment must comply with codes regarding fencing. Staff Comment: Not applicable, no hot tubs or pools are proposed. Compliant if condition of approval is met Utilities: Utility boxes that are not located in alleyways or away from public gathering spaces shall be screened with landscaping or berms. Staff Comment: Utility box locations were not shown on the conceptual landscape plan. Staff recommends, as a condition of approval that the applicant submit a detailed landscape plan with utility box locations and any utility boxes th at are visible to the public shall be screened with berms and/or landscaping. The final detailed landscape plan shall be reviewed and approved by the Current Planning Project Manager prior to civil construction permit approval. ✓ Dumpster/Trash/Recycling Collection Area: Both of the following are required: 1. Trash and recycling containers shall be located so that they have minimal impact on residents and their neighbors and so that they are not visible to the general public; and 2. A screened enclosure in which to keep containers shall be provided or garages shall be built with adequate space to keep containers. Screened enclosures shall not be located within front yards. Staff Comment: All units would have individual trash containers. A trash enclosure location was included in the first floor plan within the garage space of each unit. The day-to-day storage location within the garage spaces would have minimal impact on residents and their neighbors and would not be visible to the public except on trash collection day. 20. Critical Areas: Project sites which contain critical areas are required to comply with the Critical Areas Regulations (RMC 4-3-050). A Geotechnical Engineering Report, prepared by The Riley Group, Inc., dated April 6, 2018 (revised September 1, 2021; Exhibits 11 and 12), were submitted with the Jefferson Highlands City of Renton Department of Community & Economic Development Jefferson Highlands Unit Lot Subdivision Staff Report to the Hearing Examiner LUA21-000391, PP, SA-H, CUP-H, ECF, MOD Report of April 12, 2022 Page 23 of 39 SR_HEX_Report_Jefferson_Highlands_220412_v1 Unit Lot Subdivision application materials. Per the submitted reports, no evidence of critical areas were identified on the project site. 21. Conditional Use Analysis: A conditional use permit is being requested to increase the maximum wall plate height of the proposed townhomes from 24 feet up to 32 feet, as required by RMC 4-2-110.A. The proposal is compliant with the following conditional use criteria, pursuant to RMC 4 -9-030.D. Therefore, staff recommends approval of the requested Conditional Use Permit. Compliance Conditional Use Criteria and Analysis ✓ a. Comprehensive Plan: The proposed height increase shall be compatible with the general purpose, goals, objectives and standards of the Comprehensive Plan, the zoning regulations and any other plan, program, map or regulation of the City. Staff Comment: See FOF 17 for Comprehensive Plan and zoning regulation compliance. ✓ b. Effect on Abutting and Adjacent Properties: Building heights shall not result in substantial or undue adverse effects on adjacent and abutting property. When a building in excess of the maximum height is proposed adjacent to or abutting a lot with a maximum height less than the subject property, increased setbacks and/or step-backs may be appropriate to reduce adverse effects on adjacent or abutting property. Staff Comment: The applicant is proposing to construct three-story townhome units on the project site. In order to achieve the desired ceiling heights within the townhomes, the applicant is requesting a conditional use permit to increase the maximum wall plate height from 24 feet up to 32 feet with a parapet height of 36-8” and a stair enclosure height of 42 feet. The project site is bounded on the west and east by two (2) public streets, Jefferson Ave NE and Kirkland Ave NE, respectively. The project site is located within the Residential-14 (R-14) zone and near the Residential Multi-Family (RMF) and Center Village Zone (CV) zoned properties. The R-14 zone allows increases to the maximum wall plate height from 24 feet, up to 32 feet, with a conditional use permit. The RMF zone allows maximum wall plate heights of 32 feet and the CV zone permits a maximum height of 50 feet, except 70 feet for vertically mixed -use buildings (commercial and residential). The project site is located at the edge of an R -14 zone, adjacent to an RMF zoned parcels located on the east side of Kirkland Ave NE, placing the project site in a transitional area with regards to the height of structures and intensity of uses. In addition, the proposed townhomes include increased front yard setbacks from Jefferson Ave NE and Kirkland Ave NE, which would reduce the bulk and scale of the proposed structures along the public street frontages. The proposed townhomes would comply with the density bonus requirements of the R -14 zone as well as other development standards. This transition area is well-suited to allow an increase in the maximum wall plate height to facilitate the massing changes dictated by the development standards permitted by the nearby zones, namely RMF and CV. Therefore, it is not anticipated that the proposed building height would result in any substantial or undue adverse effects on adjacent or abutting properties. Compliant if condition of approval is met c. Bulk and Scale: Upper floor step-backs, varied tower heights with separation, and/or other architectural methods shall be integrated into the design to provide a human-scaled building edge along the street with access to sky views. Bulk reduction methods such as varied building geometry, variety in materials, texture, pattern or color, architectural rooftop elements, and/or other techniques shall be provided. City of Renton Department of Community & Economic Development Jefferson Highlands Unit Lot Subdivision Staff Report to the Hearing Examiner LUA21-000391, PP, SA-H, CUP-H, ECF, MOD Report of April 12, 2022 Page 24 of 39 SR_HEX_Report_Jefferson_Highlands_220412_v1 Staff Comment: As previously discussed above, the proposed townhomes along Jefferson Ave NE and Kirkland Ave NE include increased front yard setbacks from the public street, which tends to reduce the bulk and scale of buildings. The property is located across the street or just west of RMF and CV zoned properties and the Meadow Crest Early Learning Center is less than 500 feet to the north. The project site is in an area that is characterized by single-family and multi-family development and is evolving and transitioning from less intense single -family and duplex uses to more intense commercial and mixed-uses. The proposed townhomes are consistent with the anticipated transition. The proposed building design (Exhibit 17) includes architectural elements that further assist in reducing the scale and bulk of the proposed structures, including balconies, building material changes, and color palette variations. It is anticipated that the proposed design and the proposed yard setbacks contribute to reducing the overall bulk and scale of the proposed structures. However, all 18 units appear very similar or uniform in design from the public street and greater architectural building design could further reduce the bulk and scale of the townhomes. Therefore, staff recommends, as a condition of approval that the applicant submit revised street or front facing elevations that include variation in unit heights, greater variety in materials used amongst the units, and/or other techniques so that each unit in the development does not look nearly identical the abutting unit. The final building elevations would be reviewed and approved by the Current Planning Project Manager prior to building permit approval. Compliance with this condition of approval would further add variety to the proposed structure rooflines as seen from the public right-of-way, which would further serve to reduce the apparent bulk and scale of the proposed buildings. As conditioned, it is anticipated that the requested 32-foot maximum wall plate height would be compatible with the bulk and scale of the immediate neighborhood and the greater Highlands Community Planning Area as it continues to redevelop and would not adversely affect surrounding uses in the neighborhood. ✓ d. Light and Glare: Building(s) shall be designed so that light and glare impacts upon streets, public facilities, and public open spaces are minimized. Staff Comment: The proposed 32-foot maximum wall plate height is not anticipated to generate additional light or glare impacts over the standard 24-foot height permitted in the R-14 zone. See also FOF 22, Site Plan Review: Lighting. Compliant if condition of approval is met e. Shade and Shadow: Building(s) shall be designed so that shade and shadow impacts on adjacent shadow-sensitive uses (e.g., residential, outdoor restaurants, open spaces, and pedestrian areas) are minimized. Staff Comment: The proposed structures would be separated from abutting uses by either a public street, common open space tract, public alley, or a shared temporary access easement. The applicant proposes an approximate five-foot (5’) side yard setback from the north properties and an approximate eight and one-half foot (8 ½’) side yard setback from the furthest property to the south. These proposed side yard setbacks exceed the minimum four-foot (4’) setback required by code. However, it is unclear, based on the information submitted, whether the proposed increased setbacks would adequately minimize shade and shadow impacts on adjacent shadow-sensitive residential uses. Therefore, staff is recommending as a condition of approval that the applicant complete a sun study that shows shade and shadow throughout various times of the year (June, September, and December) to ensure buildings are designed to City of Renton Department of Community & Economic Development Jefferson Highlands Unit Lot Subdivision Staff Report to the Hearing Examiner LUA21-000391, PP, SA-H, CUP-H, ECF, MOD Report of April 12, 2022 Page 25 of 39 SR_HEX_Report_Jefferson_Highlands_220412_v1 minimize shade and shadow impacts on adjacent residential uses. The sun study shall be reviewed and approved by the Current Planning Project Manager prior to building permit approval. 22. Site Plan Review: Pursuant to RMC 4-9-200.B, Site Plan Review is required for development in the R-14 zoning classification and for unit lot subdivisions when it is not exempt from Environmental (SEPA) Review. For Master Plan applications compliance with the review criteria for Site Plans are analyzed at a general level of detail to ensure nothing would pre clude the development of the Site Plan. Given Site Plan applications are evaluated for compliance with the specific requirements of the RMC 4 -9-200.E.3 the following table contains project elements intended to comply with level of detail needed for both th e Master and Site Plan requests: Compliance Site Plan Criteria and Analysis Compliant if conditions of approval are met a. Comprehensive Plan Compliance and consistency. Staff Comment: See previous discussion under FOF 17, Comprehensive Plan Analysis. Compliant if conditions of approval are met b. Zoning Compliance and Consistency. Staff Comment: See discussion under FOF 18, Zoning Development Standard Compliance. Compliant if conditions of approval are met c. Design Regulation Compliance and Consistency. Staff Comment: See discussion under FOF 19, Design Standards. ✓ d. Planned action ordinance and Development agreement Compliance and Consistency. Staff Comment: The proposal was reviewed by the City’s Environmental Review Committee and determined to be consistent with the Sunset Area Planned Action Ordinance and EIS (Exhibits 1, 2, 3, and 22). Compliant if condition of approval is met e. Off-site Impacts. Structures: Restricting overscale structures and overconcentration of development on a particular portion of the site. Staff Comment: The proposed development would include the construction of 1 8 townhome units in three (3) buildings on the project site. The proposed townhomes would have three (3) stories and a maximum wall plate height of 32 feet. The proposed structures have been sited such that two (2) of the buildings would front on Jefferson Ave NE and one (1) building would front on Kirkland Ave NE. The proposed structures are located near more intense uses, such as Meadow Crest Early Learning Center and RMF and CV zoned properties to the east. The proposal would not result in an overconcentration of development on a particular portion of the project site. Circulation: Providing desirable transitions and linkages between uses, streets, walkways and adjacent properties. Staff Comment: The proposal includes pedestrian walkways from the townhome units to both public sidewalks that would remain or be reconstructed in Jefferson Ave NE and City of Renton Department of Community & Economic Development Jefferson Highlands Unit Lot Subdivision Staff Report to the Hearing Examiner LUA21-000391, PP, SA-H, CUP-H, ECF, MOD Report of April 12, 2022 Page 26 of 39 SR_HEX_Report_Jefferson_Highlands_220412_v1 constructed in Kirkland Ave NE. In addition, the proposal includes a shared temporary access driveway a public alley through roughly the middle of the site. Together these roadways would provide vehicle access to all 18 townhome units. The temporary access driveway and a portion of the public alley are proposed to function with the approved Emerald Highlands Unit Lot Subdivision (LUA20 -000077). The 16-foot-wide temporary alley, perpendicular to Kirkland Ave NE, includes an equal split of the 16-foot-wide temporary alley (eight-foot (8’) wide on the subject property and eight-foot (8’) wide on the neighboring property to the south (1509/1507 Kirkland Ave NE - APN 7227801490; Exhibit 5). However, a large majority (13 feet) of the proposed 16-foot-wide public alley that is proposed to serve Units 14-18 is anticipated by the applicant to be located offsite as part of the Emerald Highlands Unit Lot Subdivision. Emerald Highlands Unit Lot Subdivision received Hearing Examiner approval on May 29, 2020. According to King County Department of Assessments, this property has since been sold by the Genesis Homes, LLC, the original owner/applicant of the Emerald Highlands Unit Lot Subdivision (sold on September 9, 2021). The applicant has not made in clear if the new owners of 1509/1507 Kirkland Ave NE are still moving forward with the development of Emerald Highlands Unit Lot Subdivision or if they are interested in recording the temporary alley access easement and the proposed ingress/egress & utility easement (Exhibit 27). However, an equal alley split from NE 16th St to NE 13th St must be provided from property owners and developers along Jefferson Ave NE and Kirkland Ave NE to provide circulation and maintain equity as part of the redevelopment of these 20 parcels. Therefore, staff recommends as a condition of approval, that the applicant increase the identified three-foot (3’) portion of the public alley to a minimum dedication of eight feet (8’) from the property line of parcel no. 7227801555 and center the remainder of the 16-foot-wide public alley on the centerline of the other two properties (parcel nos. 7227801485 and 7227801560). Any additional alley space needed to ensure minimum fire access requirements are met would be required to be placed in a temporary public access easement (up to six feet (6’)). A revised detailed preliminary plat plan would be required to be submitted and approved prior to issuance of a civil construction permit. Utilities, Loading and Storage Areas: Locating, designing and screening storage areas, utilities, rooftop equipment, loading areas, and refuse and recyclables to minimize views from surrounding properties. Locate utilities underground consistent with RMC 4-6-090. Staff Comment: The proposed townhomes would not include loading and storage areas that require screening. The applicant did not provide sufficient details of roof or surface mounted equipment and/or screening identified for such equipment with the land use application. Therefore, staff recommends as a condition of approval, the applicant submit a separate detailed utility and landscape plan set identifying the location and screening provided for all surface and roof top utility/mechanical equipment required for each townhome. The surface mounted utility plan shall include cross-section details and screening measures consistent with the overall design of the development with the civil construction permit application. The applicant shall work with franchise utilities to ensure, as practical, utility boxes are l ocated out of public ROW view, active common open spaces, and they shall not displace required landscaping areas. The utility and landscape plan set shall be reviewed and approved by the Current Planning Project Manager prior to permit issuance. See also discussion under FOF 18, Zoning Development Standard Compliance: Landscaping. City of Renton Department of Community & Economic Development Jefferson Highlands Unit Lot Subdivision Staff Report to the Hearing Examiner LUA21-000391, PP, SA-H, CUP-H, ECF, MOD Report of April 12, 2022 Page 27 of 39 SR_HEX_Report_Jefferson_Highlands_220412_v1 Views: Recognizing the public benefit and desirability of maintaining visual accessibility to attractive natural features. Staff Comment: It is not anticipated that the proposed townhomes would impact any views of the surrounding properties. Landscaping: Using landscaping to provide transitions between development and surrounding properties to reduce noise and glare, maintain privacy, and generally enhance the appearance of the project. Staff Comment: See discussion under FOF 18, Zoning Development Standard Compliance: Landscaping. Lighting: Designing and/or placing exterior lighting and glazing in order to avoid excessive brightness or glare to adjacent properties and streets. Staff Comment: Outside of the street light illumination lighting plans, an in terior pedestrian lighting plan was not provided with the application. As a result, staff is recommending that a pedestrian lighting plan be provided at the time of civil construction permit to ensure safety but also designed to minimize light spill and glare onto adjoining properties. See discussion and condition under FOF 18, Zoning Development Standard Compliance: Lighting. Compliant if condition of approval is met f. On-site Impacts. Structure Placement: Provisions for privacy and noise reduction by building placement, spacing and orientation. Staff Comment: Common open space areas have been sited throughout the development, which would provide privacy and buffer some of the noise either entering or leaving the project site. Structure Scale: Consideration of the scale of proposed structures in relation to natural characteristics, views and vistas, site amenities, sunlight, prevailing winds, and pedestrian and vehicle needs. Staff Comment: The proposed development includes five (5) separate structures on the project site. The townhome units are proposed to be setback approximately 33 feet from Jefferson Ave NE right-of-way and approximately 28 feet from Kirkland Ave NE right-of- way to the 4-hour fire wall that projects four feet (4’) beyond the face of the units. The detached garages would be located off the alley approximately 20 feet (20’) to the face of the structure and would be screened by the townhomes from the public streets. The density, placement and orientation of the buildings, increased front yard setbacks from the public streets, splitting up of the structures into multiple buildings, enhanced landscaping, and increased common open space contribute to managing the scale of the proposed 18 units in relation to natural characteristics, views and vistas, site amenities, sunlight, prevailing winds, and pedestrian and vehicle needs. Natural Features: Protection of the natural landscape by retaining existing vegetation and soils, using topography to reduce undue cutting and filling, and limiting impervious surfaces. Staff Comment: The site slopes generally to the east with an overall elevation difference of approximately eight feet (8’), which would limit undue grading on and around the project site (Exhibits 6, 11, and 12). The proposal includes approximately 650 cubic yards City of Renton Department of Community & Economic Development Jefferson Highlands Unit Lot Subdivision Staff Report to the Hearing Examiner LUA21-000391, PP, SA-H, CUP-H, ECF, MOD Report of April 12, 2022 Page 28 of 39 SR_HEX_Report_Jefferson_Highlands_220412_v1 of excavation and approximately 1,550 cubic yards of fill onsite. Grading and clearing of the project site are proposed to accommodate the buildings, parking areas, driveways, and the access road improvements. See discussion and condition under FOF 18, Zoning Development Standard Compliance: Tree Retention that the applicant submit a revised tree retention and replacement plan that demonstrates compliance with minimum tree retention requirement or trees in the replacement plan (up to 24”) be comparable to the mature tree species that are proposed to be removed onsite. Compliance with this condition of approval would increase protection of the natural landscape by retaining existing vegetation and soils or replace natural features. Reducing Parking Impervious Areas: Design parking areas to minimize impervious surfaces, including but not limited to: (1) breaking up parking areas and directing stormwater flows to multiple low impact development features such as bioretention areas; (2) locating parking near trees to provide storm water uptake; (3) retaining or adding vegetation to parking areas; (4) placing existing parking that exceeds maximum parking ratios in permeable pavement designed consistent with the Surface Water Design Manual in RMC 4-6-030; and (5) using other low impact development techniques consistent with RMC 4-6-030. Staff Comment: On-site unit parking would be located in the townhome garages. Three (3) guest parking spaces would be located within Tract A. On-street parking would be available on Jefferson Ave NE or Kirkland Ave NE. Landscaping: Use of landscaping to soften the appearance of parking areas, to provide shade and privacy where needed, to define and enhance open spaces, and generally to enhance the appearance of the project. Landscaping also includes the design and protection of planting areas so that they are less susceptible to damage from vehicles or pedestrian movements. Staff Comment: Landscaping is proposed to soften the appearance of parking areas and to provide shade and privacy where needed (Exhibit 7). See also discussion under FOF 18, Zoning Development Standard Compliance: Landscaping. g. Access and Circulation. Location and Consolidation: Providing access points on side streets or frontage streets rather than directly onto arterial streets and consolidation of ingress and egress points on the site and, when feasible, with adjacent properties. Staff Comment: The combination of the shared temporary access driveway and the public alley would provide vehicular access to all of the proposed townhome units. None of the townhomes would take direct driveway access off of the surrounding public streets, thereby reducing the number of curb cuts generated by the project to a single access. Internal Circulation: Promoting safety and efficiency of the internal circulation system, including the location, design and dimensions of vehicular and pedestrian access points, drives, parking, turnarounds, walkways, bikeways, and emergency access ways. Staff Comment: The townhome units would provide direct pedestrian connections from right-of-ways to each unit and to common open spaces throughout the project site. The proposed concrete sidewalks would provide a safe and efficient pedestrian circulation system. A combination of a shared temporary access driveway and the public alley City of Renton Department of Community & Economic Development Jefferson Highlands Unit Lot Subdivision Staff Report to the Hearing Examiner LUA21-000391, PP, SA-H, CUP-H, ECF, MOD Report of April 12, 2022 Page 29 of 39 SR_HEX_Report_Jefferson_Highlands_220412_v1 would provide vehicular access through the project site. None of the townhomes would directly access off a public right-of-way, thereby providing a safe and efficient vehicular circulation pattern. Loading and Delivery: Separating loading and delivery areas from parking and pedestrian areas. Staff Comment: Not applicable, no separate loading and delivery areas are required for townhomes. Transit and Bicycles: Providing transit, carpools and bicycle facilities and access. Staff Comment: Access to SR 900 (NE Sunset Blvd) is approximately a quarter of a mile to the south. An active bus stop is located adjacent to the former Greater Highlands Shopping Center located at 2806 NE Sunset Blvd. This stop is a very active bus stop and is anticipated to serve more riders due to the Solera development under construction at the former Greater Highlands Shopping Center. See also discussion under FOF 18, Zoning Development Standard Compliance: Bicycle parking. Pedestrians: Providing safe and attractive pedestrian connections between parking areas, buildings, public sidewalks and adjacent properties. Staff Comment: See previous discussion above under Access and Circulation. Compliant if condition of approval is met h. Open Space: Incorporating open spaces to serve as distinctive project focal points and to provide adequate areas for passive and active recreation by the occupants/users of the site. Staff Comment: The project is proposing common open spaces between the sidewalk and the unit lots within the multi -purpose Tracts B and D. These tracts would include ten feet (10') of on-site landscaping required along all public street frontages, an underground dispersion trench, a pea patch, lawn, crushed rock, a bench, and other plat required landscaping. Three (3) separate pea patch areas are programmed to serve six (6) townhome units each within the common open space tracts. Per RMC 4-2-115.E.2, all common open space areas shall be designed to accommodate both active and passive recreational opportunities and be visible and open to the street. The common open space, as proposed, is broken up by pea patch areas which consequently interrupts the common open space and prevents active recreational uses. In addition, code requires that open space shall include picnic areas, space for recreational activities, and other activities as appropriate. Staff recommended a condition for applicant to include and show required picnic areas, space for recreational activities, and other activities as appropriate within the common open space at the time of civil construction permit. See discussion and condition under FOF 19, Design Standards: Standards for Common Open Space. ✓ i. Views and Public Access: When possible, providing view corridors to shorelines and Mt. Rainier, and incorporating public access to shorelines. Staff Comment: The proposed structure would not block view corridors to shorelines or Mt. Rainier. The public access to shorelines requirement is not applicable to the proposal. City of Renton Department of Community & Economic Development Jefferson Highlands Unit Lot Subdivision Staff Report to the Hearing Examiner LUA21-000391, PP, SA-H, CUP-H, ECF, MOD Report of April 12, 2022 Page 30 of 39 SR_HEX_Report_Jefferson_Highlands_220412_v1 ✓ j. Natural Systems: Arranging project elements to protect existing natural systems where applicable. Staff Comment: The proposed project does not contain any sensitive areas, viable trees, or natural systems on the project site. ✓ k. Services and Infrastructure: Making available public services and facilities to accommodate the proposed use: Police and Fire. Staff Comment: Police and Renton Fire Authority staff indicated that sufficient resources exist to furnish services to the proposed development if the applicant provides Code required improvements and fees. A Fire Impact Fee, currently assessed at $964.53 per attached dwelling unit would be applicable to the proposal. The fee in effect at the time of building permit issuance would be assessed for this project. Credit will be granted for the removal of the existing homes. Water and Sewer. Staff Comment: Water service is provided by the City of Renton. The site is in the Highlands service area in the 565 hydraulic pressure zone. There is a new 12-inch City water main being installed in Jefferson Avenue NE that would deliver a maximum total flow capacity of 2,500 gallons per minute (gpm). There is an existing 10-inch City water main located in Kirkland Ave NE (see Water plan no. W -1878) that can deliver a maximum total flow capacity of 2,500 gpm. The approximate static water pressure is 82 psi at the elevation of 376 feet. There are three (3) existing ¾-inch domestic water meters, one meter for each the three (3) residences on the properties. The location and number of hydrants will be determined by the Fire Authority based on the final fire flow demand and final site plan. A hydrant is required within 50 feet of the building’s fire sprinkler system fire department connection (FDC). Based on the fire flow demand of 2,500 gpm, three (3) hydrants would be required within 300 feet of the buildings fronting both streets. The City of Renton, Surface Water Utility, is constructing stormwater, water, and sidewalk improvements along Jefferson Avenue NE. The project is estimated to be completed in 2022. The remaining project work includes final overlay, plantings, fences, and miscellaneous work. The Applicant would be required to restore these improvements for the installation of infrastructure needed to support the proposed townhomes, including providing full street width restoration from the north property line to the south property line on Jefferson Ave NE. On Kirkland Avenue NE, the Applicant would be required to provide half street width restoration. The SDC fee for water is based on the size of the new domestic water to serve the project. The current water fee for a single 1-inch meter is $4,500.00 per meter and the water service installation charges for each proposed domestic water service is $2,875.00 for every 1-inch water service line. Final determination of applicable fees would be made after the water meter size has been determined. A credit for the water system redevelopment fee would be issued for the existing water service to be cut can capped as part of the project. SDC fees are assessed and payable at permit issuance. See also Development Engineering Memo dated January 13, 2022 for applicable water fees (Exhibit 19). Sewer service is provided by the City of Renton. There is an existing 8-inch concrete gravity wastewater main located in Jefferson Avenue NE (see City plan no. S -1114). City of Renton Department of Community & Economic Development Jefferson Highlands Unit Lot Subdivision Staff Report to the Hearing Examiner LUA21-000391, PP, SA-H, CUP-H, ECF, MOD Report of April 12, 2022 Page 31 of 39 SR_HEX_Report_Jefferson_Highlands_220412_v1 There is an existing 8-inch concrete gravity wastewater main located in Kirkland Avenue NE (see City plan no. S-1114). The sewer main in Jefferson Ave NE would be required to be extended to the full southern extent of the property. A new manhole would be required to be installed at t he end of the mainline and the existing manhole may need to be replaced depending on the condition. In addition, a separate side sewer would be required for each unit and all new sewer stubs must be a minimum of six inches (6”) and must run at a slope of at least two percent (2%) to the main. SDC fee for sewer is based on the size of the new domestic water to serve the project. The current sewer fee for a 1-inch meter is $3,500.00 per meter. A redevelopment credit of the wastewater system development charges would be applied to the meter(s) to existing homes, if applicable, if they are abandoned and capped at the main line. SDC fees are payable at construction permit issuance. Drainage. Staff Comment: The applicant submitted a Preliminary Technical Information Report, prepared by Encompass Engineering & Surveying, Inc. (dated September 24, 2021; Exhibit 9) with the application. The development is subject to Full Drainage Review in accordance with the current City of Renton Surface Water Design Manual (RSWDM). Per the Flow Control Application Map , the project site is within the Peak Rate Flow Control Standard area and contained within the East Lake Washington Drainage Basin. In this area, flow control facilities are required to match the existing conditions 2-, 10-, and 100-year peak-rate runoff from the site. The applicant is proposing a combination of full infiltration beds and a BioClean Linear Modular Wetland filtration device to provide the required water quality and flow controls for the final developed surface areas. Full Infiltration of rooftop area is proposed for the site in the form of Gravel Filled Trenches for Full Infiltration Beds per Appendix C.2.2.3. Per the Geotechnical Report, the site is underlain with silty sand and requires a 30-foot-long section per 1,000 square feet of rooftop area infiltrated. A total of 406 linear feet of trenching or 812 square feet of total infiltration area is required to fully infiltrate the tributary area. All work proposed outside of the applicant’s property would require a permanent drainage easement to be provided to the City and a temporary construction easement prior to any permits being issued. The infiltration trench sizing and design of the proposed B iopod system, enhanced water quality treatment, and on-site BMPs would be reviewed for compliance with the adopted City of Renton Surface Water Design Manual. Surface water system development fee is $0.84 per square foot of new impervious surface, but not less than $2,100.00. Stormwater SDC fees are payable prior to issuance of the construction permit. Transportation. Staff Comment: Access to the site is proposed via a combination of a shared temporary access driveway and a new public alley. See further discussion under FOF 23, Subdivision Regulations and Analysis: Access and Streets. Increased traffic created by the development would be mitigated by payment of transportation impact fees. The current rate of transportation impact fee is assessed a t $6,717.10 per dwelling. Payment of the transportation impact fee is applicable on the City of Renton Department of Community & Economic Development Jefferson Highlands Unit Lot Subdivision Staff Report to the Hearing Examiner LUA21-000391, PP, SA-H, CUP-H, ECF, MOD Report of April 12, 2022 Page 32 of 39 SR_HEX_Report_Jefferson_Highlands_220412_v1 construction of the development at the time of building permit issuance. A credit would be given for any existing homes. N/A l. Phasing: The applicant is not requesting any additional phasing. ✓ m. Stormwater: Providing optimal locations of stormwater infiltrating low impact development facilities. Avoiding placement of buildings or impervious areas on soils with infiltration capability to the maximum extent prac ticable. Staff Comment: See previous discussion above under Drainage. 23. Compliance with Subdivision Regulations : RMC 4-7 Provides review criteria for the subdivisions. The proposal is consistent with the following subdivision regulations if all conditions of approval are complied with: Compliance Subdivision Regulations and Analysis Compliant if condition of approval is met Unit Lot Subdivision: Unit lot subdivisions are permitted in the R -10, R-14, RMF, and CV zone for new townhome development. The whole parent site shall comply with all development standards as though it were a stand alone lot. Prior to the recording of the plat, the applicant shall provide final covenants, declarations and restrictions in a form satisfactory to the City Attorney, and shall record the document with the King County Recorder. All common open space and facilities, private utility infrastructure, exterior building facades and roofs, and other physical improvements to the land, as determined by the Administrator, shall be maintained in perpetuity by the homeowners’ association, unless otherwise agreed to by the City. The covenants, declarations and restrictions shall provide authority for the City, after providing reasonable written notice to the homeowners’ association and opportunity to perform required maintenance, to recover any costs incurred by the City to maintain private infrastructure or common areas due to a failure of the homeowners’ association to adequately maintain privately owned improvements. In order to ensure that the City can recover its costs for performing required maintenance, the City may file a lien against the property or accept other appropriate security approved by the City. Staff Comment: See discussion regarding parent site compliance under FOF 1 8, Zoning Development Standard Compliance: Lot Dimensions, Setbacks, and Building Standards. In addition, see discussion regarding maintenance of common open space and common improvements, as well as the condition of approval requiring establishment of a homeowners’ association, under FOF 18, Zoning Development Standard Compliance: Landscaping. Compliant if condition of approval is met Access: The parent site shall have direct vehicular access to a public street. Each unit lot shall have direct vehicular access to either a public or private roadway. Unit lot drives may be constructed to serve unit lot subdivisions. Each unit lot drive may serve up to nine (9) unit lots. Each unit lot drive shall be accessed by a public street. The paved roadway shall be a minimum of sixteen feet (16') wide; the Renton Regional Fire Authority may require the paved roadway to be up to twenty feet (20') wide. Except for points of ingress/egress, curbs shall be installed along the perimeter of the City of Renton Department of Community & Economic Development Jefferson Highlands Unit Lot Subdivision Staff Report to the Hearing Examiner LUA21-000391, PP, SA-H, CUP-H, ECF, MOD Report of April 12, 2022 Page 33 of 39 SR_HEX_Report_Jefferson_Highlands_220412_v1 roadway. There shall be an eight foot (8') wide landscaping strip between the curb and a five foot (5') wide sidewalk along one side of the unit lot drive. Alleys may be used for vehicular access, but are not to be considered as the primary access for emergency or Fire Department concerns. Alleys require a minimum right -of- way width of 16 feet and a minimum pavement width of 12 feet in residential zones. The maximum width of single loaded garage driveways shall not exceed nine feet (9') and double loaded garage driveways shall not exceed sixteen feet (16'). Staff Comment: The proposed project includes the following improvements: a shared temporary access driveway easement along a portion of the south property line and a new north/south public alley near the middle of the development (behind the structures). Only the public alley behind the units would be required to be dedicated as public ROW. The shared temporary driveway would be permitted as an access easement. Eight feet of the temporary access driveway would be located off -site to the south on parcel no. 7227801490. The shared temporary access driveway easement would connect the public alley to Kirkland Ave NE at the southeast corner of the development. See discussion and condition under FOF 22, Site Plan Review: Circulation that the applicant provide a minimum ROW alley dedication of eight feet (8’) from the property line of parcel no. 7227801555 and center the remainder of the 16 -foot-wide public alley (on the northern portion of the site) o n the centerline of the other two properties (parcel nos. 7227801485 and 7227801560). Together, the proposed shared temporary access driveway easement and the revised public alley and private access easement would function as roadway access for all lots. Furthermore, staff recommends, as a condition of approval that all access easements be privately owned and maintained by a Homeowners Association. The applicant shall record a note on the face of the plat that executes a shared maintenance agreement for equ al ownership and maintenance responsibilities for all improvements in the access easements. A draft version of the shared maintenance agreement shall be submitted for review and approval by the Current Planning Project Manager prior to plat recording. N/A Blocks: Blocks shall be deep enough to allow two tiers of lots. Staff Comment: Not applicable, no new blocks would be created. ✓ Streets: The proposed street system shall extend and create connections between existing streets per the Street Standards outlined in RMC 4-6-060 Street Standards. Staff Comment: All vehicular access to the project would be from Kirkland Ave NE via a 16-foot-wide shared temporary access driveway from Kirkland Ave NE. Eight feet (8’) of the east/west 16-foot wide shared temporary access driveway would be located off -site to the south in an off-site access/utility easement on parcel no. 7227801490. Once inside the development, primary access to the unit garages would be provided via a north/south public alley. As previously described, a portion of the public alley is proposed to be located off-site to the east in an ingress/egress & utility easement (Exhibit 27). The proposed ingress/egress & utility easement is on the same parcel as the shared temporary access driveway. See discussion under FOF 22, Site Plan Review: Circulation. Jefferson Ave NE and Kirkland Ave NE are both classified as residential access streets. To meet the City’s complete street standards for Jefferson Ave NE the minimum ROW is 53 feet. Therefore, dedication of one and one-half (1-1/2) feet of ROW fronting the site would be required. Per City code 4-6-060, half street improvements shall include a pavement width of 26 feet (13 feet from centerline), a 0.5 -foot curb, an 8-foot City of Renton Department of Community & Economic Development Jefferson Highlands Unit Lot Subdivision Staff Report to the Hearing Examiner LUA21-000391, PP, SA-H, CUP-H, ECF, MOD Report of April 12, 2022 Page 34 of 39 SR_HEX_Report_Jefferson_Highlands_220412_v1 bioretention planter strip, a 5-foot sidewalk, street trees and storm drainage improvements. To meet the City’s complete street standards and the Sunset Area Surface Water Master Plan for Kirkland Ave NE, half street improvements would be required to include a pavement width of 26 feet (13 feet from centerline), a 0.5 -foot curb, a 12-foot bioretention planter strip, an 8-foot sidewalk, street trees and storm drainage improvements. The applicant is requesting a street modification for cross section changes to Kirkland Ave NE along the property frontage. The street modification request includes frontage improvements for 28 feet of pavement width, 0.5-foot vertical curb, 12-foot bioretention planter strip, 5-foot-wide sidewalk, with 1-foot clear width from the back of sidewalk to the edge of the ROW. The street modification request includes no ROW dedication along Kirkland Ave NE. See further discussion under FOF 24, Modification Analysis. According to the Trip Generation Summary, prepared by Transpo Group, dated October 25, 2021 (Exhibit 13), the proposed development would generate approximately 92 net new weekday daily trips with five (5) occurring during the weekday AM peak hour (2 inbound and 3 outbound) and seven (7) occurring during the weekday PM peak hour (4 inbound and 3 outbound). The proposed project passes the City of Renton Traffic Concurrency Test per RMC 4-6-070.D (Exhibit 18). ✓ Relationship to Existing Uses: The proposed project is compatible with existing surrounding uses. Staff Comment: The proposed unit lots would meet the requirements for a unit lot subdivision and would be compatible with the R-14 zoning development standards if all conditions of approval are complied with. All lots are rectangular in shape and would take direct access via a public alley and an ingress, egress easement (Exhibits 4, 10, 26, and 27). 24. Modification Analysis: Pursuant to Renton Municipal Code (RMC) 4-9-250.D, the applicant is requesting a Modification from RMC 4-6-060.F.2, Minimum Design Standards for Public Streets and Alleys for Kirkland Ave NE a Residential Access street. The applicant is proposing to construct an 11 -foot wide travel lane measured from the center of the existing 60-foot wide right-of-way, a 0.5-foot vertical curb, a 12-foot wide bioretention planter strip, a 5-foot wide sidewalk, with a 1-foot clear width from back of sidewalk to edge of the right-of-way (Exhibit 24). Compliance Street Modification Criteria and Analysis ✓ a. Substantially implements the policy direction of the policies and objectives of the Comprehensive Plan Land Use Element and the Community Design Element and the proposed modification is the minimum adjustment necessary to implement these policies and objectives. Staff Comment: To meet the City’s complete street standards and the Sunset Area Surface Water Master Plan for Kirkland Ave NE, a residential access street, half street improvements include a pavement width of 26 feet (13 feet from centerline), a 0.5 -foot curb, a 12-foot bioretention planter strip, an 8-foot sidewalk, street trees and storm drainage improvements. No right-of-way (ROW) dedication is required along Kirkland Ave NE. The applicant contends that the street standards and the Sunset Area Surface Water Master Plan for Kirkland Ave NE would not fit within the existing ROW width. The applicant states that a deviation is requested to allow a travel lane of 11 ½ feet (measured from centerline), a standard 0.5-foot-wide curb, a standard bioretention planter strip of 12 feet, and a reduced 5-foot-wide sidewalk with a 1-foot clear width City of Renton Department of Community & Economic Development Jefferson Highlands Unit Lot Subdivision Staff Report to the Hearing Examiner LUA21-000391, PP, SA-H, CUP-H, ECF, MOD Report of April 12, 2022 Page 35 of 39 SR_HEX_Report_Jefferson_Highlands_220412_v1 from the back of sidewalk to the edge of the ROW (Exhibit 10). These improvements would fit within the current 60 feet of ROW for Kirkland Ave NE, without the requirement of additional ROW dedication. Therefore, to meet the City’s complete street standards and the Sunset Area Surface Water Master Plan for Kirkland Ave NE, a residential access street, half street improvements shall include a pavement width of 28 feet, a 0.5-foot-wide curb, a 12-foot-wide bioretention planter strip, a 5-foot-wide sidewalk, 1-foot of clear space at the back of walk, street trees and storm drainage improvements, as shown in the street cross section of the preliminary civil engineering plans (Exhibit 10). The Comprehensive Plan’s Land Use Element has applicable policies listed under a separate section labeled Promoting a Safe, Healthy, and Attractive Community. These policies address walkable neighborhoods, safety, and shared uses. The intent of the se policies is to promote new development with walkable places that support grid and flexible grid street and pathway patterns, and are visually attractive, safe, and healthy environments. The street modification as noted above is consistent with these poli cy guidelines. See also FOF 17, Comprehensive Plan Analysis. ✓ b. Will meet the objectives and safety, function, appearance, environmental protection and maintainability intended by the Code requirements, based upon sound engineering judgment. Staff Comment: The City’s Public Works Transportation and Community and Economic Development sections have reviewed the street cross section along Kirkland Ave NE and the surrounding area and have determined that a modified Residential Green Access street section is more suitable for the portion of Kirkland Ave NE adjacent to the site. The modified street section must fit within the existing right -of-way width of 60 feet. The roadway width shall remain 28 feet wide and shall consist of two (2) 10 -foot travel lanes, an 8-foot wide parallel parking lane (including the 0.5-foot wide vertical curb), a 12-foot wide biorention planter strip on the west side of the roadwa y, a 0.5-foot wide vertical curb, an 8-foot wide biorention planter strip on the east side of the roadway, 5 - foot wide sidewalks along both sides of the roadway, and one-foot (1’) between back of sidewalk and ROW on both sides of the road section. As a result, no ROW dedication would be required along Kirkland Ave NE to construct the required road section. This existing roadway width would meet the transportation needs of the surrounding area and tie-in to the existing improvements already installed along the east side of Kirkland Ave NE. The identified roadway section along Kirkland Ave NE, would provide the required separation between the vehicular and pedestrian travel ways as required by the code. Approval of the modified street cross section would resul t in a consistent design for street improvements along Kirkland Ave. NE. ✓ c. Will not create substantial adverse impacts to other property(ies) in the vicinity . Staff Comment: The modified street section is consistent with the surrounding neighborhood, would increase pedestrian safety, and would not create substantial adverse impacts to other properties in the vicinity. ✓ d. Conforms to the intent and purpose of the Code; and Staff Comment: See comments under criterion ‘b’. ✓ e. Can be shown to be justified and required for the use and situation intended. Staff Comment: See comments under criterion ‘b’. City of Renton Department of Community & Economic Development Jefferson Highlands Unit Lot Subdivision Staff Report to the Hearing Examiner LUA21-000391, PP, SA-H, CUP-H, ECF, MOD Report of April 12, 2022 Page 36 of 39 SR_HEX_Report_Jefferson_Highlands_220412_v1 25. Availability and Impact on Public Services: Compliance Availability and Impact on Public Services Analysis ✓ Schools: It is anticipated that the Renton School District can accommodate any additional students generated by this proposal at the following schools: Sierra Heights Elementary, McKnight Middle School and Hazen High School (Exhibit 28). Any new elementary or high school students from the proposed development would be bussed to their respective elementary or high schools. All middle school students are within walking distance of the middle school. The bus stop for Sierra Heights Elementary School is located at the corner of Jefferson Ave NE & NE 13th St. Students would walk south along the recently completed sidewalks on Jefferson Ave NE until they reach NE 13th St. Students attending McKnight Middle School would walk to school, approximately 0.38 miles from the project site. Middle school students would walk north along the new sidewalks on Jefferson Ave NE and west along the new sidewalks on NE 16th St where they would reach the school at the southwest corner of NE 16th St and Harrington Ave NE. The bus stop for students attending Hazen High School is located at the corner of NE 16th St and Kirkland Ave NE. Students would walk along new or existing sidewalks on Kirkland Ave NE until they reach NE 16th St. The proposed project includes the installation of street frontage improvements along Jefferson Ave NE and Kirkland Ave NE frontages, including sidewalks. A School Impact Fee, based on new multi family dwelling, will be required in order to mitigate the proposal’s potential impacts to the Renton School District. T he fee is calculated and payable to the City as specified by the Renton Municipal Code at the time of building permit issuance. Currently the fee is assessed at $4,737.00 per multi family dwelling unit. ✓ Parks: A Park Impact Fee would be required for the future townhomes. The current Park Impact Fee is $1,977.62 (for 5 or more units). The fee in effect at the time of building permit issuance is applicable to this project and is payable at the time of building permit issuance. I. CONCLUSIONS: 1. The subject site is located in the Residential High Density (RHD) Comprehensive Plan designation and complies with the goals and policies establ ished with this designation, see FOF 17. 2. The subject site is located in the Residential-14 (R-14) zoning designation and complies with the zoning and development standards established with this designation provided the applicant complies with City Code and conditions of approval, see FOF 18. 3. The proposed unit lot subdivision complies with the Residential Design and Open Space Standards provided the applicant complies with City Code and conditions of approval, see FOF 19. 4. The proposed unit lot subdivision complies with the Critical Areas Regulations provided the applicant complies with City Code and conditions of approval, see FOF 20. 5. The proposed unit lot subdivision complies with the Conditional Use Permit criteria provided the applicant complies with City Code and conditions of approval, see FOF 21. 6. The proposed unit lot subdivision complies with the Site Plan Review criteria provided the applicant complies with City Code and conditions of approval, see FOF 22. City of Renton Department of Community & Economic Development Jefferson Highlands Unit Lot Subdivision Staff Report to the Hearing Examiner LUA21-000391, PP, SA-H, CUP-H, ECF, MOD Report of April 12, 2022 Page 37 of 39 SR_HEX_Report_Jefferson_Highlands_220412_v1 7. The proposed unit lot subdivision complies with the subdivision regulations as established by City Code and state law provided all advisory notes and conditions are complied with, see FOF 23. 8. The proposed unit lot subdivision complies with the street standards as modified in FOF 24 and as established by City Code, provided the project complies with all advisory notes and conditions of approval contained herein, see FOF 23. 9. The proposed project complies with the Modification criteria provided the applicant complies with City Code and conditions of approval, see FOF 24. 10. There are safe walking routes to the s chool bus stop, see FOF 25. 11. There are adequate public services and facilities to accommodate the proposed unit lot subdivision, see FOF 25. 12. Key features, which are integral to this project include a single curb cut, balconies and rooftop terrace for each townhome unit. As provided in the project rendering and color building elevations with the application, buildings would be constructed of high-quality materials, expansive glazing, diverse amounts of colors, and a broad level of cladding systems. The plat plan includes programmed and accessible open space commensurate with the scale of the development. J. RECOMMENDATION: Staff recommends approval of the Jefferson Highlands Unit Lot Subdivision Unit Lot Subdivision, Administrative Site Plan, Administrative Conditional Use, and Street Modification , File No. LUA21-000391, PP, SA-H, CUP-H, ECF, MOD, as depicted in the Preliminary Plat Plan (Exhibit 4), subject to the following conditions: 1. Draft affordable housing affordability covenant and use agreement shall be submitted to the Current Planning Project Manager for review and approval by the Planning Project Manage r and the City Attorney prior to civil construction permit issuance. In addition, the applicant shall identify the third -party with an agreement in principle to assist with monitoring the project’s compliance with the affordable housing requirements prior to building permit issuance for the affected units. Such affordability agreements shall be recorded prior to Temporary Certificate of Occupancy. 2. The applicant shall submit revised building elevations that comply with the maximum wall plate height and allowed vertical projections for wall plates under the conditional use permit. 3. The applicant shall create a Homeowners’ Association (“HOA”) that maintains all improvements and landscaping in the common open space tracts and any and all other common improvements. The HOA documents shall be submitted to, and approved by, the Current Planning Project Manager prior to recording of the Unit Lot Subdivision. Such documents shall be recorded concurrently with the Unit Lot Subdivision. 4. The applicant shall submit a revised tree retention and replacement plan that demonstrates compliance with minimum tree retention requirement or trees in the replacement plan (up to 24”) shall be comparable to the mature tree species that are proposed to be removed. A final detailed landscape plan would be required to be submitted and approved prior to issuance of a civil construction permit. 5. The applicant shall submit a revised landscape plan that demonstrates compliance with the fence and retaining wall regulations for review and approval by the Current Planning Project Manager at the time of civil construction permit application. 6. An architectural lighting plan shall be provided at the time of building permit review for review and approval by the Current Planning Project Manager. To ensure safety and avoid excessive brightness pedestrian scale lighting should be provided on the primary entries of each unit, rear elevations facing the City of Renton Department of Community & Economic Development Jefferson Highlands Unit Lot Subdivision Staff Report to the Hearing Examiner LUA21-000391, PP, SA-H, CUP-H, ECF, MOD Report of April 12, 2022 Page 38 of 39 SR_HEX_Report_Jefferson_Highlands_220412_v1 alley, as well as along the interior pedestrian walkways as necessary to provide sufficient lighting for pedestrian safety but shall also be designed to minimize light spill and glare onto adjoining pro perties. 7. More variation in corner and interior individual unit lot widths be applied to the unit lot subdivision to create a greater variety of home sizes between the townhome structures. A revised preliminary plat plan shall be provided at the time of building permit review for review and approval by the Current Planning Project Manager. 8. The applicant shall submit additional information with the civil construction permit application demonstrating the project’s compliance with the pea-patch common open space requirements for review and approval by the Current Planning Project Manager. 9. The applicant shall include and show required picnic areas, space for recreational activities, and other activities as appropriate within the common open space for review and approval by the Current Planning Project Manager at the time of civil construction permit. In addition, the applicant shall demonstrate compliance with the common open space areas maximum slope of five percent (5%) requirement at the time of civil construction permit application. The final detailed landscape plan shall be reviewed and approved by the Current Planning Project Manager prior to civil construction permit approval. 10. The applicant shall either submit revised elevations providing the required three and one -half inches (3 1/2") minimum trim surrounding all windows and doors and one of the following architectural details: shutters, knee braces, flower boxes, or columns. Alternatively, the applicant may submit a modification request to vary from any of these standards. The revised elevations or modification request shall be submitted to the Current Planning Project Manager for review and approval at the time of building permit review. 11. The applicant shall provide a materials board and color palette, coded to the exterior building elevations, to the Current Planning Project Manager for review and approval at the time of building permit review. 12. The applicant shall submit a detailed landscape plan with utility box locations and any utility boxes that are visible to the public shall be screened with berms and/or landscaping. The final detailed landscape plan shall be reviewed and approved by the Current Planning Project Manager prior to civil construction permit approval. 13. The applicant shall submit revised street or front facing elevations that include variation in unit heights, greater variety in materials used amongst the units, and/or other techniques so that each uni t in the development does not look nearly identical the abutting unit. The final building elevations shall be reviewed and approved by the Current Planning Project Manager prior to building permit approval. 14. The applicant shall complete a sun study that shows shade and shadow throughout various times of the year (June, September, and December) to ensure bui ldings are designed to minimize shade and shadow impacts on adjacent residential uses. The sun study shall be reviewed and approved by the Current Planning Project Manager prior to building permit approval. 15. The applicant shall increase the identified three-foot (3’) portion of the public alley to a minimum dedication of eight feet (8’) from the property line of parcel no. 7227801555 and center the remainder of the 16-foot-wide public alley on the centerline of the other two properties (parcel nos. 7227801485 and 7227801560). Any additional alley space needed to ensure minimum fire access requirements are met would be required to be placed in a temporary public access easement (up to six feet (6’)). A revised detailed preliminary plat plan would be required to be submitted and approved prior to issuance of a civil construction permit. 16. The applicant shall submit a separate detailed utility and landscape plan set identifying the location and screening provided for all surface and roof top utility/mechanical equi pment required for each townhome. The surface mounted utility plan shall include cross -section details and screening measures consistent with the overall design of the development with the civil construction permit application . The City of Renton Department of Community & Economic Development Jefferson Highlands Unit Lot Subdivision Staff Report to the Hearing Examiner LUA21-000391, PP, SA-H, CUP-H, ECF, MOD Report of April 12, 2022 Page 39 of 39 SR_HEX_Report_Jefferson_Highlands_220412_v1 applicant shall work with franchise utilities to ensure, as practical, utility boxes are located out of public ROW view, active common open spaces, and they shall not displace required landscaping areas. The utility and landscape plan set shall be reviewed and approved by the Current Planning Project Manager prior to permit issuance. 17. All access easements be privately owned and maintained by a Homeowners Association. The applicant shall record a note on the face of the plat that executes a shared maintenance agreement for equal ownership and maintenance responsibilities for all improvements in the access easements. A draft versio n of the shared maintenance agreement shall be submitted for review and approval by the Current Planning Project Manager prior to plat recording. CITY OF RENTON DEPARTMENT OF COMMUNITY AND ECONOMIC DEVELOPMENT STAFF REPORT TO THE HEARING EXAMINER EXHIBITS Project Name: Jefferson Highlands Unit Lot Subdivision Land Use File Number: LUA21-000391, PP, SA-H, CUP-H, ECF, MOD Date of Hearing April 12, 2022 Staff Contact Clark H. Close Senior Planner Project Contact/Applicant Briana Bennington Encompass Engineering & Surveying, Inc. 165 NE Juniper St, Suite 201, Issaquah, WA 98027 Project Location 1518 Jefferson Ave NE (APN 7227801555), 1524/1526 Jefferson Ave NE (APN 7227801560), and 1513/1515 Kirkland Ave NE (APN 7227801485) The following exhibits are included with the Staff Report to the Hearing Examiner: Exhibits 1-19: As shown in the Environmental Review Committee (ERC) Report Exhibit 20: Staff Report to the Hearing Examiner Exhibit 21: Re-Notice of Application and Public Hearing Exhibit 22: Concurrence Memo Determination with the Sunset Area Planned Action EIS Decision Exhibit 23: Jefferson Highlands Hearing Examiner Decision (LUA19 -000163) Exhibit 24: Street Modification Request Exhibit 25: Neighborhood Meeting Materials Exhibit 26: Draft Deed of Dedication (Alley) Exhibit 27: Draft Ingress/Egress & Utilities Easement Exhibit 28: Renton School District Response Letter Exhibit 29: Hazardous Materials Management Statement Exhibit 30: Certificate of Articles of Incorporation Exhibit 31: Declaration of Covenants, Conditions and Restrictions