Loading...
HomeMy WebLinkAboutC_Final Notice April 6, 2022 Harold Duncanson Duncanson Company, Inc. 145 SW 155th St Burien, WA 98166 SUBJECT: "Final” Notice Elma Short Plat / LUA18-000691 Dear Mr. Duncanson: The Planning Division of the City of Renton has determined that the above subject application is expired. According to RMC 4-8-100C.4 – Expiration of Complete Land Use Applications, the application submitted on November 29, 2018 has been inactive for ninety (90) days or more and an administrative decision has not been made and/or has not been reviewed by the Hearing Examiner in a public hearing. According to our records, an "On-Hold" notification (enclosed) was mailed on January 2, 2019, stating additional information was necessary in order to continue processing the submitted application. As of the date of this letter, the requested information has not been received. Therefore, this is your final notice, if the City of Renton Planning Division does not receive a written request to continue processing the application and the requested information within six (6) months of the date of this letter the application shall be null and void. If you have any questions, please contact me at jding@rentonwa.gov (425) 430-6598. Sincerely, Jill Ding Senior Planner Enclosed: "On-Hold" Letter– dated: January 2, 2019 cc: James and Leslie Belmondo / Owner(s) Mark Woodbridge, Pacific Bridge, LLC / Applicant January 2, 2019 Harold Duncanson Duncanson Company, Inc. 145 SW 155th St Burien, WA 98166 SUBJECT: "On Hold" Notice Elma Short Plat / LUA18-000691 SHPL-A Dear Mr. Duncanson: The Planning Division of the City of Renton accepted the above master application for review on November 29, 2018. During our review, staff has determined that additional information is necessary in order to proceed further. The following will need to be corrected and submitted before March 29, 2019 so that we may continue the review of the above subject application: 1. Per RMC 4-7-200B, drainage facilities are required to be within tracts. 2. Per RMC 4-4-070H stormwater facilities are required to be landscaped with a 15-foot wide landscape strip around the perimeter of the tract (this requirement has been applied to above ground and below ground stormwater facilities. We would be willing to modify this requirement if the stormwater facility were located below the shared driveway). 3. The shared driveway should be relocated to the north end of the project site, adjacent to the recreation tract constructed as part of the abutting subdivision. This would reduce potential conflicts between the new homes associated with the Elma Short Plat and any kids playing on the abutting playground. Once the applicant has reviewed the above comments and amended necessary plan sets and studies to bring the project closer to compliance with Renton Municipal Code, the applicant shall submit electronic copies of the any modified plan sheets and studies in compliance with the City’s electronic plan review standards , which may be found on the City’s website at the following link: https://edocs.rentonwa.gov/Documents/1/doc/940235/Page1.aspx. At this time, the review of your project has been placed “on hold” pending receipt of the requested information. Please contact me at (425) 430-6598 or jding@rentonwa.gov if you have any questions. Sincerely, Jill Ding Senior Planner cc: James and Leslie Belmondo/ Owner(s) Mark Woodbridge, Pacific Bridge, LLC / Applicant Horacio Dofredo / Party of Record