Loading...
HomeMy WebLinkAboutCM_Construction Mitigation Description_220318_v1.pdfMaple Highlands Preliminary Plat Construction Mitigation Proposed construction dates: Summer 2022 – Winter 2023 Hours and days of operation: Per RMC 4-4-030C(3b), multi-family construction activities near residential areas shall be restricted to the hours between seven o’clock (7:00) a.m. and eight o’clock (8:00) p.m., Monday through Friday. Work on Saturdays shall be restricted to the hours between nine o’clock (9:00) a.m. and eight o’clock (8:00) p.m. No work shall be permitted on Sundays. Proposed Haul Routes: Proposed haul route will be SE 156th Avenue SE/SE 142nd Place/154th Place SE to SR 169 to I-405. Measures to be implemented to minimize dust, traffic, and transportation impacts, erosion, mud, noise, and other noxious characteristics: In dry weather. water trucks shall be used to settle dust. In wet weather, best- management-practices including silt fence, interceptor swales, and settling pond shall be implemented per the 2017 City of Renton Surface Water Design Manual. Any special hours proposed for construction or hauling: None proposed. Preliminary traffic control plan: Will be provided prior to civil construction permit.