Loading...
HomeMy WebLinkAboutRS_Brotherton_Cadillac_Drainage_Technical_Information_Report_220131_v1.pdf Brotherton Buick-GMC Cadillac Dealership Technical Information Report Prepared for: Brotherton Cadillac 215 SW 12th Street Renton, WA 98057 Contact: Brad Brotherton Phone: (425) 336-1089 Prepared by: Sitts & Hill Engineers, Inc. 4815 Center Street Tacoma, Washington 98409 Contact: Don Davis, P.E. Phone: (253) 474-9449 January 2022 S&H Job Number 19,480 Brotherton Buick-GMC Cadillac Dealership Technical Information Report Prepared for: Brotherton Cadillac 215 SW 12th Street Renton, WA 98057 Contact: Brad Brotherton Phone: (425) 336-1089 Prepared by: Sitts & Hill Engineers, Inc. 4815 Center Street Tacoma, Washington 98409 Contact: Don Davis, P.E. Phone: (253) 474-9449 IN COMPLIANCE WITH CITY OF RENTON STANDARDS January 2022 S&H Job Number 19,480 PRELIMINARY BROTHERTON CADILLAC DEALERSHIP TECHNICAL INFORMATION REPORT i TABLE OF CONTENTS 1.0 PROJECT OVERVIEW .............................................................................................................. 3 1.1 Scope ............................................................................................................................................................... 3 1.2 Existing Conditions ........................................................................................................................................ 4 1.3 Proposed Conditions ..................................................................................................................................... 5 2.0 Conditions and Requirements Summary .............................................................................. 7 2.1 Discussion of Core and Special Requirements ......................................................................................... 7 2.1.1 Core Requirement #1: Discharge at the Natural Location ................................................................ 7 2.1.2 Core Requirement #2: Off-site Analysis .............................................................................................. 7 2.1.3 Core Requirement #3: Flow Control ..................................................................................................... 7 2.1.4 Core Requirement #4: Conveyance System ....................................................................................... 7 2.1.5 Core Requirement #5: Erosion and Sediment Control ...................................................................... 7 2.1.6 Core Requirement #6: Maintenance and Operations ........................................................................ 7 2.1.7 Core Requirement #7: Financial Guarantees and Liability ............................................................... 7 2.1.8 Core Requirement #8: Water Quality ................................................................................................... 8 2.1.9 Core Requirement #9: On-site BMPs ................................................................................................... 8 2.1.10 Special Requirement #1: Other Adopted Area-Specific Requirements ........................................ 9 2.1.11 Special Requirement #2: Flood Hazard Area Delineation .............................................................. 9 2.1.12 Special Requirement #3: Flood Protection Facilities ..................................................................... 10 2.1.13 Special Requirement #4: Source Control ........................................................................................ 10 2.1.14 Special Requirement #5: Oil Control ................................................................................................ 10 2.1.15 Special Requirement #6: Aquifer Protection Areas ....................................................................... 10 3.0 OFF-SITE ANALYSIS .............................................................................................................. 13 3.1 Define and Map the Study Area ................................................................................................................. 13 3.2 Resource Review ......................................................................................................................................... 18 3.3 Field Inspection ............................................................................................................................................ 18 3.4 Drainage System Description and Problem Descriptions ...................................................................... 18 3.5 Mitigation of Existing or Potential Problems ............................................................................................. 18 4.0 FLOW CONTROL, LID, AND WATER QUALITY FACILITY ANALYSIS AND DESIGN ..... 19 4.1 Existing Site Hydrology ............................................................................................................................... 19 4.2 Developed Site Hydrology .......................................................................................................................... 19 4.3 Performance Standards .............................................................................................................................. 19 4.4 Flow Control System .................................................................................................................................... 19 4.4.1 Flow Control Exemptions Check ......................................................................................................... 19 4.4.2 Flow Control Area .................................................................................................................................. 19 4.4.3 Flow Control Area Requirements and Exceptions ........................................................................... 19 4.4.4 Identify Applicable Flow Control BMPs per Core Requirement #9 ................................................ 20 4.5 Water Quality ................................................................................................................................................ 20 5.0 CONVEYANCE SYSTEM ANALYSIS AND DESIGN ............................................................ 22 BROTHERTON CADILLAC DEALERSHIP TECHNICAL INFORMATION REPORT ii 6.0 SPECIAL REPORTS AND STUDIES ...................................................................................... 23 7.0 OTHER PERMITS .................................................................................................................... 24 8.0 CSWPPP ANALYSIS AND DESIGN ....................................................................................... 25 9.0 BOND QUANTITIES and R/D FACILITY SUMMARIES ........................................................ 26 9.1 Bond Quantities ............................................................................................................................................ 26 9.2 Facility Summaries ....................................................................................................................................... 26 10.0 OPERATIONS AND MAINTENANCE MANUAL .................................................................. 27 10.1 Purpose ....................................................................................................................................................... 27 10.2 Permanent Facilities Description ............................................................................................................. 27 10.3 Discussion of Maintenance....................................................................................................................... 27 10.4 Maintenance Frequency ........................................................................................................................... 28 10.5 Annual Cost Estimate ................................................................................................................................ 28 TABLE OF APPENDICES A.1 TIR Worksheet A.2 Bond Quantity Worksheet A.3 Existing and Proposed Surface Coverage Exhibits A.4 Site Historical Aerial Photography A.5 Stormwater Engineering Calculations A.6 Geotechnical Engineering Report A.7 WWHM Reports BROTHERTON CADILLAC DEALERSHIP TECHNICAL INFORMATION REPORT 3 1.0 PROJECT OVERVIEW 1.1 Scope This Technical Information Report (TIR) addresses improvements associated with the proposed building located at 201 SW 12th Street, Renton, WA (Parcel Nos. 3340402780, 3340402805, 3340402880, and 3340402925). Please see Figure 1 for the Site Location Map. This construction is proposed to serve as a stand-alone Cadillac automotive dealership for Brotherton Cadillac. The new dealership will replace existing residential development with driveway connection s to SW 12th Street and the neighboring Brotherton Buick-GMC dealership via the SW 13th Street former right of way. This Technical Information Report has been prepared in accordance with the 2017 City of Renton Stormwater Design Manual (SWDM). A copy of the TIR Worksheet, which provides basic information about the scope of this project, is included with this report in Appendix A.1. BROTHERTON CADILLAC DEALERSHIP TECHNICAL INFORMATION REPORT 4 Figure 1 – Site Location Map 1.2 Existing Conditions The subject site is located on four parcels, zoned as Commercial Arterial (CA), with a combined area of 1.21 acres of developed land. The site, as depicted on the topographical survey, is relatively flat. The original dealership was graded with depressions to direct stormwater into on-site catch basins. The privately owned stormwater system extends upstream to the east, collecting stormwater runoff from two more parking areas to the east and north of the subject property before discharging into the system of the neighboring automotive dealership . The existing site consists of residential development. Based on historical aerial photographs and the King County Assessor’s Website, the site appeared to be residential housing as early as 1951. One of the residential lots was emptied between May of 2013 and July of 2014. Another was replaced with parking BROTHERTON CADILLAC DEALERSHIP TECHNICAL INFORMATION REPORT 5 between May of 2017 and May of 2018 and replaced with a fenced, gravel parking area. See Appendix A.4, which includes a series of aerial photographs dating back to July, 1990. Upon a visual examination of existing site conditions, stormwater runoff is either collected in a private catch basin located on Parcel 3340402880, flows onto the neighboring Brotherton Cadillac automotive dealership, or flows onto SW 12th St or SW 13th St to be collected by a public catch basin. Stormwater collected in the private catch basin, or that flows onto the neighboring dealership, is conveyed through an existing private stormwater system that discharges into the public stormwater system on the southwest corner of the dealership. Based upon a review of available information from the City of Renton, we are not aware of any capacity problems with the existing drainage facilities adjacent to this area. The City of Renton’s Public Works Maps combined with King County GIS together indicate the site is not located within or near any critical areas. In addition, it is located within the Peak Rate Flow Control Standard Zone. 1.3 Proposed Conditions The purpose of site improvements for this project is to create a new stand-alone automotive dealership for Brotherton Cadillac. The project proposes grading, paving, and drainage (water quality facilities, detention, and conveyance piping) improvements for on-site areas. See Table 1 for a description of existing and proposed surface conditions. Over 50% of the stormwater generated on-site will be from a pollution-generating surface in a commercial area and thus stormwater runoff generated will be subject to enhanced basic water quality treatment before being conveyed to the conveyance system located within the City’s right-of-way. Treatment will be provided by a Contech Stormfilter. All proposed surfacing on-site is considered new or replaced impervious surface. Please see Appendix A.5 for the sub-basin exhibit as it outlines the tributary area for each catch basin. Please see Appendix A.3 for Existing and Proposed Surface Coverage Exhibits. BROTHERTON CADILLAC DEALERSHIP TECHNICAL INFORMATION REPORT 6 Table 1. Existing and Developed Condition Description Description On-site Off-site Total Existing Conditions Total Project Area (ft2) 51,657 6,669 57,936 Existing hard surface (ft2) 22,287 4,933 27,220 Existing landscaping/lawn area (ft2) 28,980 1,736 30,716 Total Project Area (ft2) 51,657 6,669 57,936 Amount of new hard surface (ft2) 22,287 725 23,012 Amount of new pollution generating hard surface (PGHS) (ft 2) 16,872 405 17,277 Amount of replaced hard surface (ft2) 21,267 4,560 25,827 Amount of replaced PGHS (ft2) 14,480 5,186 19,666 Amount of new plus replaced hard surface (ft2) 43,554 5,285 48,839 Amount of new plus replaced PGHS (ft2) 31,352 5,591 36,943 Amount of existing hard surfaces converted to vegetation/landscaping (ft 2) 1058 373 1,431 Amount of Land Disturbed (ft2) 51,657 6,669 57,936 Native Vegetation to Pasture (acres) 0 0 0 Existing vegetation area to remain (ft2) 2,488 146 2,634 Existing hard surface to remain unaltered (ft 2) 0 0 0 Value of proposed improvements ($) TBD 0 TBD Amount to be Graded/Approx. CUT (C.Y.) TBD 0 TBD BROTHERTON CADILLAC DEALERSHIP TECHNICAL INFORMATION REPORT 7 2.0 CONDITIONS AND REQUIREMENTS SUMMARY 2.1 Discussion of Core and Special Requirements This is a Commercial Arterial (CA) project that adds more than 2,000 square feet of new and replaced impervious surface. Therefore, the project is subject to a full drainage review and must satisfy all core requirements (1-9) and all special requirements (1-6) of the 2017 City of Renton Stormwater Design Manual (SWDM). See “Figure 2 – Drainage Review Flow Chart” at the end of this Section. Below is a description of each core requirement and how the project proposes to satisfy each requirement. 2.1.1 Core Requirement #1: Discharge at the Natural Location This requirement will be met by discharging stormwater to the existing private stormwater network, which ultimately discharges into Black River. 2.1.2 Core Requirement #2: Off-site Analysis The Off-Site Analysis included in Section 3.0 of this TIR will satisfy this Core Requirement. 2.1.3 Core Requirement #3: Flow Control Please see Section 4.0 for a discussion of flow control for the project. The project proposes work within the Peak Rate Flow Control Standards (Existing Site Conditions) Area. The project must match the developed peak discharge rates to the existing site conditions peak discharge rates for the 2-, 10-, and 100-year return periods. Existing flow volumes will be matched through the use of a storage vault and variable speed pump station. 2.1.4 Core Requirement #4: Conveyance System Please see Section 5.0 of this TIR for the conveyance system analysis and design. This project proposes to create a new stormwater system that will service stormwater that falls on -site. Stormwater from upstream that will be flowing through the site will bypass storage and treatment before discharging into the existing downstream system in conjunction with stormwater treated on-site. 2.1.5 Core Requirement #5: Erosion and Sediment Control A temporary Erosion and Sediment Control Plan (TESC) will be prepared and included in the construction plan set. Additionally, a CSWPPP under a separate cover, will be provided to satisfy this requirement. 2.1.6 Core Requirement #6: Maintenance and Operations Please see Section 10.0 of this TIR for the Operations and Maintenance Manual, prepared to satisfy this Core Requirement. Brotherton Cadillac will be responsible for maintenance and operation of the proposed on-site stormwater facilities upon completion. The City of Renton will continue to be responsible for operation and maintenance of stormwater systems in the right-of-way. 2.1.7 Core Requirement #7: Financial Guarantees and Liability We anticipate that Brotherton Cadillac will be required to provide a Construction Bond to the City of Renton prior to issuance of the permit. The contractor/owner will be responsible for all erosion and maintenance liabilities during construction. BROTHERTON CADILLAC DEALERSHIP TECHNICAL INFORMATION REPORT 8 2.1.8 Core Requirement #8: Water Quality Please see Section 4.0 for a discussion of water quality for the project. Water quality treatment will be provided by a Contech Stormfilter using METALRX media cartridges. 2.1.9 Core Requirement #9: On-site BMPs Target surfaces subject to Core Requirement #9 On-site BMPs include replaced impervious surfaces, already mitigated with an approved on-site BMP. This site qualifies for the Large Lot BMP Requirements per 1.2.9.2.2 of the City of Renton SWDM, since it is larger than 22,000 square feet. These requirements state that all proposed pervious surfaces must implement the soil amendment BMP and roof downspout connections must be perforated pipe connections. The soil amendment BMP will be implemented for every pervious service affected by construction. The downspout BMP does not apply to the proposed project as infiltration is not recommended on this site, per the geotechnical report in Section 6.0. In addition, these requirements require the consideration of the following BMPs: full dispersion, full infiltration, limited infiltration, bioretention, permeable pavement, basic dispersion, reduce d impervious surface credit, native growth retention credit, tree retention credit. None of the listed BMPs are feasible for implementation on the project site. Therefore, Core Requirement #9 will be not be implemented. The remainder of this section contains a discussion of infeasibility for each BMP. Full Dispersion – The application of this BMP depends on the sheet flow of runoff t hrough an area of native vegetation. The project site does not contain any native vegetation area (e.g., forested) in the existing or proposed condition. Therefore, full dispersion is infeasible for this project. Full Infiltration – Per Section C.2.2.2 of the Manual, full infiltration requires that “Existing soils must be coarse sands or cobbles or medium sands and cannot be comprised of fill materials where the infiltration device will be located.” Site soils meet this requirement , except for the top layer of soil. However, the groundwater level renders infiltration on-site infeasible, as infiltration would have to occur in a silt material. These conditions are described in the Geotechnical Engineering Report prepared by Migizi Group, Inc. (dated July 8, 2021) for the proposed project. This report shows test pit logs with four distinct soil horizons, none of which provide viable infiltration due to either the groundwater level or material. The Geotechnical Engineer does not find that site soils will support Full or Limited infiltration (see section 3.4 Infiltration Conditions of the Migizi report). Therefore, full infiltration is infeasible for this project. Limited Infiltration – The infeasibility criteria for limited infiltration are the same as those for full infiltration except that appropriate soils may be fine sands, loamy sands, sandy loams, or loams. Note that Section C.2.3.2 of the Manual states “Silt and clay loams, and cemented t ill (hardpan) are not suitable for limited infiltration systems.” Site soils meet this requirement, except for the top layer of soil. However, the groundwater level renders infiltration on-site infeasible, as infiltration would have to occur in a silt material. The Geotechnical Engineer does not find that site soils will support Full or Limited infiltration (see section 3.4 Infiltration Conditions of the Migizi report). Therefore, limited infiltration is infeasible for this project. BROTHERTON CADILLAC DEALERSHIP TECHNICAL INFORMATION REPORT 9 Bioretention – This project is underlain by soil that makes infiltration impractical, as such a bioretention facility is infeasible. Permeable Pavement – The soil under a permeable pavement section must provide adequate treatment for groundwater protection. The underlying soi ls should also infiltrate for this surfacing to be durable and effective. The requirements for adequate treatment are a minimum organic content of 1.0% and a minimum cation exchange capacity of 8 milliequivalents per 100 grams. The uppermost soil layer on the project site is made up of fill material and does not meet these requirements. Again, the depth to groundwater renders BMPs that rely on infiltration ineffective . Permeable Pavement is infeasible for this project. Basic Dispersion – The implementation of basic dispersion limits the area of impervious surface that can run off to a dispersion structure to 700 square feet per structure. The proposed construction will be adding over 16,500 square feet, which would require 24 separate flow dispersion structures. It is also required for the dispersed stormwater to flow over a vegetated surface, but there are no existing or proposed vegetated surfaces near the proposed development. Such a flowpath cannot be provided on the project site without a drastic reduction in the number of parking stalls and vehicle paths. We see basic dispersion as infeasible to the project. Reduced Impervious Surface Credit – This BMP presents four possible methods of impervious surface reduction: restricted footprint, wheel strip driveways, minimum disturbance foundation, and open grid decking over pervious surface. The restricted footprint method requires less than 4,000 square feet of impervious area, which is not feasible for the proposed use of the site as a n automotive dealership. A wheel strip driveway is not applicable for a commercial parking lot. A minimum disturbance foundation is not feasible for an automotive workshop. Open grid decking over a pervious surface is also not applicable to a parking lot. The reduced impervious surface credit is infeasible for this project. Native Growth Retention Credit – The existing condition of the site does not contain any native growth. Therefore, the native growth retention credit is infeasible for this project. Tree Retention Credit – The existing condition of the site contains approximately 20 trees that will all be removed by the current owner as a condition of the lease agreement . Therefore, the tree retention credit is infeasible for this project. 2.1.10 Special Requirement #1: Other Adopted Area-Specific Requirements N/A. The project site is not in a designated critical drainage area or in an area included in an adopted master drainage plan, basin plan, salmon conservation plan, stormwater compliance plan, flood hazard management plan, lake management plan, or shared facility drainage plan. 2.1.11 Special Requirement #2: Flood Hazard Area Delineation N/A. Per the FEMA floodplain map at the end of this Section, Figure 3, the project site lies within Zone X which is defined as “areas determined to be outside 500-year floodplain” and therefore flood-related delineation on the project site is not required. BROTHERTON CADILLAC DEALERSHIP TECHNICAL INFORMATION REPORT 10 2.1.12 Special Requirement #3: Flood Protection Facilities N/A. This project does not propose to rely on an existing flood protection facility nor does it modify or construct a new flood protection facility. 2.1.13 Special Requirement #4: Source Control Brotherton shall implement Operational and Structural Source Control BMPs that includes the maintenance of stormwater drainage and treatment systems as described in the Operations and Maintenance Manual, included in Section 10.0 of this report. 2.1.14 Special Requirement #5: Oil Control This project does not propose to develop a high-use site as defined by City of Renton SWDM; therefore, this Special Requirement is not applicable. 2.1.15 Special Requirement #6: Aquifer Protection Areas This project is not located within an Aquifer Protection Area per King County GIS. BROTHERTON CADILLAC DEALERSHIP TECHNICAL INFORMATION REPORT 11 Figure 2 – Drainage Review Flow Chart BROTHERTON CADILLAC DEALERSHIP TECHNICAL INFORMATION REPORT 12 Figure 3 – FEMA Map BROTHERTON CADILLAC DEALERSHIP TECHNICAL INFORMATION REPORT 13 3.0 OFF-SITE ANALYSIS Per City of Renton SWDM Section 1.2.2, this project must provide an off-site analysis report that assesses potential off-site drainage and water quality impacts associated with the redevelopment of the project site. The level of analysis required depends on the specific site and downstream conditions. In accordance with Section 1.2.2.1, a Level 1 Downstream Analysis has been performed. 3.1 Define and Map the Study Area Based on the current topographic survey and our observations of the site, the site is mostly tributary to an existing, private conveyance system. Those portions of the site that do not discharge to the existing, private conveyance system are tributary to an existing City conveyance system. The project does not propose any significant improvements to the existing conveyance elements on-site. Downstream of the project discharge locations, according to City of Renton GIS, stormwater is conveyed west, into, and through, the neighboring Brotherton Cadillac automotive dealership stormwater system. The conveyance continues southward until it reaches Interstate 405 (I405). Before intersecting I405, stormwater flows into a catch basin on the north side and is diverted to the west. The pipe daylights and discharges the stormwater to flow over the surface before being collected in another City stormwater conveyance pipe on the south side of the existing Good Chevrolet, INC Chevrolet dealer. Stormwater then flows in another enclosed system under Lind Ave. SW before again daylighting and being discharged to run along the north side of I405. Stormwater continues flowing over the surface north of I405 before sheet flowing onto SW 13th St and being collected in a City catch basin. The pipe network downstream of this catch basin ultimately discharges into Black River. A topographic site map is featured in Figure 5 of this Report. Figure 4 - Downstream Flow Path BROTHERTON CADILLAC DEALERSHIP TECHNICAL INFORMATION REPORT 14 BROTHERTON CADILLAC DEALERSHIP TECHNICAL INFORMATION REPORT 15 BROTHERTON CADILLAC DEALERSHIP TECHNICAL INFORMATION REPORT 16 BROTHERTON CADILLAC DEALERSHIP TECHNICAL INFORMATION REPORT 17 Figure 5 – Topographic Survey BROTHERTON CADILLAC DEALERSHIP TECHNICAL INFORMATION REPORT 18 3.2 Resource Review A thorough review of the resources provided by the City of Renton Maps, as outlined on page 2-11 of the SWDM, has been completed for the study area. Research conducted on 1/17/2022 has shown that there are not any adopted basin plans available for the study area. According to the FEMA Map presented in Figure 3 of this report, the project site lies within Zone X, which is defined as areas outside the 500-year floodplain. The site is located within the Duwamish – Green River Watershed, the Black River Basin, and the Springbrook Creek Sub Basin. Based on the City of Renton GIS, the project area has not been defined as a sensitive area. To our knowledge, there have not been any reported road drainage problems associated with the roads surrounding the site. It was also found that the site does not have a migrating river study, a 303d listing, or an adopted stormwater compliance plan available. Please see Section 4.0 for a discussion of water quality for the project. A geotechnical report completed by Migizi Group can be found in Appendix A.6. 3.3 Field Inspection During field inspections, the system appeared to be working sufficiently with no obvi ous clogs or flooding. We do not anticipate any future problems with the proposed stormwater system. The proposed conveyance system has more catch basins: therefore each individual catch basin will have a smaller tributary area. Stormwater flows are expected to increase due to an increase in impervious surface, and will be handled by a pump station and supplementary detention system to match existing discharge into the existing downstream system. Please see Section A.5 for the modeled areas in the predeveloped and mitigated scenarios. Since it has been determined that there are no anticipated stormwater problems associated with this project, Level 2 and Level 3 downstream analyses are not required. No problems were found related to constrictions, capacity deficiencies, flooding, scouring, overtopping hazards, sedimentation or erosion, aquatic organisms or their habitation . Land use associated with the study area includes commercial/residential land applications, such as several automotive dealerships and the residential lots to the east of the site. In addition, the study area includes utilities and roadways. Existing impervious surfaces located within the study area include commercial businesses, compacted gravel access, paved parking lots, paved driveways, and the paved public right-of-way. Based on existing site topography, stormwater runoff is captured within the City’s right-of-way where it is collected by a storm conveyance system and discharged to the Black River. 3.4 Drainage System Description and Problem Descriptions No drainage system problems were observed during the field inspection. 3.5 Mitigation of Existing or Potential Problems The proposed project area does not have any existing or anticipated drainage problems as outlined in Section 1.2.2.1 of the City of Renton SWDM. BROTHERTON CADILLAC DEALERSHIP TECHNICAL INFORMATION REPORT 19 4.0 FLOW CONTROL, LID, AND WATER QUALITY FACILITY ANALYSIS AND DESIGN 4.1 Existing Site Hydrology The site currently has four residence, two sheds, shared lawn surfacing, and a large parking area composed of both crushed rock surfacing and asphalt cement pavement. Stormwater that does not infiltrate into the lawn, sheetflows off-site primarily onto either SW 12th St or SW 13th St. Run-off can flow onto the nearby existing Brotherton Cadillac dealership, although the site is graded in such a way that this is unlikely. From SW 12th St or SW 13th St, stormwater flows into City stormwater conveyance facilities. 4.2 Developed Site Hydrology The proposed site will be comprised of primaril y asphalt pavement surfacing and roof area. There will be landscaped islands around the perimeter of the site, with approximately 4,872 sf of landscaping. Stormwater on-site will be collected and conveyed into an on -site storage facility after treatment. The project does not propose to alter the downstream flow path and will maintain discharge to the natural location. 4.3 Performance Standards The site is within a Peak Rate Flow Control Standards (Existing Site Conditions) Area, which requires matching the existing site conditions 2-, 10-, and 100- year peak flows. The predeveloped site is comprised of asphalt pavement, rooftop surfacing, lawn, and crushed rock surfacing. The proposed site conditions include a significantly higher quantity of impervious surface than the existing conditions. In areas where conveyance features are required, they have been designed in accordance with Section 1.2.4 of the SWDM. The proposed private conveyance elements include conveyance piping from the new asphalt surfacing to a Contech Stormfilter before it is detained. Stormwater from the new roof will be conveyed directly to the detention facility. Enhanced basic water quality treatment is required for stormwater that falls on, or runs off of, pollution-generating surfaces on-site such as the parking lot. 4.4 Flow Control System Flow control is required for this project. Stormwater discharging from the site will be controlled by a pump station. 4.4.1 Flow Control Exemptions Check The project site is not exempt from flow control. See Section 2.1.3 of this report for further discussion. 4.4.2 Flow Control Area The site falls within a Peak Rate Flow Control Standard – Match Existing Area, based on the Flow Control Application Map provided by the City of Renton (Figure 6 of this TIR). 4.4.3 Flow Control Area Requirements and Exceptions Peak Rate Flow Control Standard – Match Existing – Areas must match existing site conditions 2-,10-, and 100-year peak rate runoff for areas draining to constructed (man -made) or highly modified drainage BROTHERTON CADILLAC DEALERSHIP TECHNICAL INFORMATION REPORT 20 systems so as to not create a downstream flooding problem. Per Section 1.2.3.1.A, Exception 1, of the SWDM, the target surfaces subject to the Peak Rate Flow Control Standard Areas facility requirements will generate more than a 0.15-cfs increase in the existing site conditions peak flows. Therefore, this project proposes a pump station and supplementary detention system to serve as a flow control facility. 4.4.4 Identify Applicable Flow Control BMPs per Core Requirement #9 Please see Section 2.1.9 of this report for an evaluation of Flow Control BMPs per Core Requirement #9. 4.5 Water Quality As mentioned in Section 4.3, the project proposes t o satisfy the enhanced water quality requirement by installing a Contech Stormfilter. BROTHERTON CADILLAC DEALERSHIP TECHNICAL INFORMATION REPORT 21 Figure 6- City of Renton Flow Control Application Map BROTHERTON CADILLAC DEALERSHIP TECHNICAL INFORMATION REPORT 22 5.0 CONVEYANCE SYSTEM ANALYSIS AND DESIGN Proposed conveyance elements include conveyance piping to connect the new roof surface with the existing stormwater system on-site. The proposed conveyance systems will be developed prior to, and included with, the civil permit construction application. BROTHERTON CADILLAC DEALERSHIP TECHNICAL INFORMATION REPORT 23 6.0 SPECIAL REPORTS AND STUDIES We are not aware of any site characteristics that are particularly sensitive to stormwater runoff. A geotechnical report by Migizi Group can be found in Appendix A.6 of this report. BROTHERTON CADILLAC DEALERSHIP TECHNICAL INFORMATION REPORT 24 7.0 OTHER PERMITS We anticipate that a Right-of-Way Use permit, Land Use Master Application, Civil Construction Permit, Building Permit, and an Environmental Review Permit (SEPA) will be required. BROTHERTON CADILLAC DEALERSHIP TECHNICAL INFORMATION REPORT 25 8.0 CSWPPP ANALYSIS AND DESIGN The Construction Stormwater Pollution Prevention Plan report will be included with the Civil Construction Permit application. BROTHERTON CADILLAC DEALERSHIP TECHNICAL INFORMATION REPORT 26 9.0 BOND QUANTITIES AND R/D FACILITY SUMMARIES 9.1 Bond Quantities See Appendix A.2 for a copy of the City of Renton bond report . 9.2 Facility Summaries This project proposes to implement a Contech CDS hydrodynamic separator, Contech Stormfilter, Oldcastle StormCapture water detention, and conveyance piping. BROTHERTON CADILLAC DEALERSHIP TECHNICAL INFORMATION REPORT 27 10.0 OPERATIONS AND MAINTENANCE MANUAL 10.1 Purpose The purpose of this manual is to provide guidelines fo r maintaining the storm drainage system as a part of the construction for the new Brotherton Cadillac building. The site address is 201 SW 12th Street, Renton, WA 98057. Storm utility improvements that have been proposed as a part of the project include: o Contech CDS hydrodynamic separator o Contech Stormfilter CB o Oldcastle StormCapture o Storm Drainage Piping o Catch Basins o Pump Station Each portion of the system has to be maintained in good working condition for th e system to function properly. Operations and Maintenance of the private drainage systems will be the responsibility of the Owner, Brotherton. Brad Brotherton is the contact person at Brotherton. His contact information is: Brad Brotherton Brotherton Cadillac 215 Southwest 12th Street Renton, WA 98057 Phone: (425) 336-1089 The City of Renton will continue to be responsible for the Operation and Maintenance of public improvements. 10.2 Permanent Facilities Description Conveyance piping will convey stormwater from the new rooftop and paved surfaces to the existing stormwater facilities on-site. The project does not propose to alter downstream flow paths and will maintain ultimate discharge to the Black River. A Contech CDS hydrodynamic separator and Contech Stormfilter will provide water quality treatment. Oldcastle StormCapture will store stormwater so it can be discharged at a controlled rate by the proposed pump station. 10.3 Discussion of Maintenance Any buildup of sediment, debris, vegetation, or trash that impedes the catch basins will reduce the storm system capacity. As a result, care must be taken to keep all inlets clear of debris. BROTHERTON CADILLAC DEALERSHIP TECHNICAL INFORMATION REPORT 28 The applicable maintenance checklists and excerpts from the 2017 SWDM have been included with the Operations and Maintenance Manual for review during routine maintenance inspections. 10.4 Maintenance Frequency Following construction of the project, the storm drainage system shall be inspected and maintained according to their respective maintenance checklists included at the end of this manual. Facilities will be inspected annually, or after every significant storm event where the precipitation is greater than or equal to one inch in 24 hours When deficiencies are noted, the problems are to be corrected as soon as possible. Any spill of hazardous material (e.g. fuel, lubricant, herbicide, etc.) shall be cleaned up immediately and shall be reported to the Division of Emergency Management (1-800-523-5044). Contaminated material will be disposed of properly. Any questions about the existence of a problem should be directed to a Professional Engineer. 10.5 Annual Cost Estimate Annual maintenance costs for the proposed stormwater conveyance system is expected to increase the costs of maintaining the private stormwater system by $1 for every linear foot of new piping, $500 for each CDS, $500 for every Stormfilter catch basin, $500 per pump station, and $300 for each StormCapture unit. Approximately 800 linear feet of proposed pipe, one CDS, one Stormfilter catch basin, one pump station, and 6 StormCapture units will have an annual cost of maintenance of $4,100. BROTHERTON CADILLAC DEALERSHIP TECHNICAL INFORMATION REPORT 29 Cover Sheet for Inspection Forms Name of Inspector: _____________________________________________________________ Date of Inspection: _____________________________________________________________ Number of Sheets Attached: _____________________________________________________________ Inspector’s Signature: _____________________________________________________________ BROTHERTON CADILLAC DEALERSHIP TECHNICAL INFORMATION REPORT 30 Maintenance Log Action Taken Name Date How Procedure Was Performed Problems Encountered Additional Actions Recommended BROTHERTON CADILLAC DEALERSHIP TECHNICAL INFORMATION REPORT 31 A.1 TIR Worksheet BROTHERTON CADILLAC DEALERSHIP TECHNICAL INFORMATION REPORT 32 BROTHERTON CADILLAC DEALERSHIP TECHNICAL INFORMATION REPORT 33 BROTHERTON CADILLAC DEALERSHIP TECHNICAL INFORMATION REPORT 34 BROTHERTON CADILLAC DEALERSHIP TECHNICAL INFORMATION REPORT 35 BROTHERTON CADILLAC DEALERSHIP TECHNICAL INFORMATION REPORT 36 BROTHERTON CADILLAC DEALERSHIP TECHNICAL INFORMATION REPORT 37 BROTHERTON CADILLAC DEALERSHIP TECHNICAL INFORMATION REPORT 38 A.2 Bond Quantity Worksheet BROTHERTON CADILLAC DEALERSHIP TECHNICAL INFORMATION REPORT 39 A.3 Existing and Proposed Surface Coverage Exhibits BROTHERTON CADILLAC DEALERSHIP TECHNICAL INFORMATION REPORT 40 BROTHERTON CADILLAC DEALERSHIP TECHNICAL INFORMATION REPORT 41 BROTHERTON CADILLAC DEALERSHIP TECHNICAL INFORMATION REPORT 42 A.4 Site Historical Aerial Photography BROTHERTON CADILLAC DEALERSHIP TECHNICAL INFORMATION REPORT 43 BROTHERTON CADILLAC DEALERSHIP TECHNICAL INFORMATION REPORT 44 BROTHERTON CADILLAC DEALERSHIP TECHNICAL INFORMATION REPORT 45 BROTHERTON CADILLAC DEALERSHIP TECHNICAL INFORMATION REPORT 46 BROTHERTON CADILLAC DEALERSHIP TECHNICAL INFORMATION REPORT 47 BROTHERTON CADILLAC DEALERSHIP TECHNICAL INFORMATION REPORT 48 BROTHERTON CADILLAC DEALERSHIP TECHNICAL INFORMATION REPORT 49 BROTHERTON CADILLAC DEALERSHIP TECHNICAL INFORMATION REPORT 50 BROTHERTON CADILLAC DEALERSHIP TECHNICAL INFORMATION REPORT 51 BROTHERTON CADILLAC DEALERSHIP TECHNICAL INFORMATION REPORT 52 BROTHERTON CADILLAC DEALERSHIP TECHNICAL INFORMATION REPORT 53 BROTHERTON CADILLAC DEALERSHIP TECHNICAL INFORMATION REPORT 54 BROTHERTON CADILLAC DEALERSHIP TECHNICAL INFORMATION REPORT 55 BROTHERTON CADILLAC DEALERSHIP TECHNICAL INFORMATION REPORT 56 BROTHERTON CADILLAC DEALERSHIP TECHNICAL INFORMATION REPORT 57 A.5 Stormwater Engineering Calculations Flow Control This project is in a location subject to meeting the Peak Rate Flow Control Standard, as described in Section 4.4. Therefore, we have prepared the following calculations to determine if flow control will be required for this project. As previously mentioned, the site is predominantly currently covered by lawn and several small structures. The site presently discharges offsite to the west. There is presently no treatment or flow control in this system. Flow control will be required, to be installed in this system to match the existing discharge rate for the 2-, 10-, and 100-year storm peak flow rates. Predeveloped Conditions: Based on aerial photographs, included in Section A.4, the site had previously, and is currently, a residential location. The eastern residences appear to have been replaced with parking between May of 2013 and May of 2018. Areas of the replaced residential space used for stormwater design were acquired from aerial photographs taken in May of 2010 as they are clear enough to use for approximate surface areas. Spaces that appear to have remained largely unchanged had their areas gathered from survey data of the site. See the following excerpt from WWHM indicating the assumptions used in the “Predeveloped” Condition: BROTHERTON CADILLAC DEALERSHIP TECHNICAL INFORMATION REPORT 58 Mitigated Conditions: The mitigated site coverage is comprised of asphalt pavement parking and the rooftop of the proposed structure with sidewalks and landscaping along the perimeter of the site and proposed automotive dealership. See the following excerpt from WWHM indicating the assumptions used in the “Mitigated” Condition: Flow Frequency Results: The flow frequency table included on the following page indicates that the peak stormwater runoff from the developed site will increase by more than 0.15cfs for the 100-year storm condition. As the flow is expected to change by more than 0.15cfs, and more than 5,000 square feet of new and replaced impervious surface are proposed, a flow control structure will be necessary. It is proposed to use a pump station for flow control, and to maintain connection with the existing downstream facilities. Excess flow will be detained in Contech clamshell storage vaults. Water Quality More than 5,000 square feet of impervious surface is being installed or replaced during this project, therefore water quality treatment is required. Water quality treatment flows calculated by WWHM are shown below. The proposed rooftop was not included in the water quality calculations as it is considered to not be a pollution-generating surface and will bypass the treatment structure. It was, however, included in the calculations for detention requirements. Treatment flows did not change with, or without, the inclusion of the roof surface. A five-cartridge Contech METALRX Stormfilter with 18” BROTHERTON CADILLAC DEALERSHIP TECHNICAL INFORMATION REPORT 59 cartridges will be used as an on-line treatment structure. Five 18” cartridges will be required to handle the on-line treatment flow, as each cartridge has a capacity of 7.5gpm, or 0.0167cfs. BROTHERTON CADILLAC DEALERSHIP TECHNICAL INFORMATION REPORT 60 BROTHERTON CADILLAC DEALERSHIP TECHNICAL INFORMATION REPORT 61 BROTHERTON CADILLAC DEALERSHIP TECHNICAL INFORMATION REPORT 62 A.6 Geotechnical Engineering Report BROTHERTON CADILLAC DEALERSHIP TECHNICAL INFORMATION REPORT 63 A.7 WWHM Reports