HomeMy WebLinkAboutAPPROVED_Civil Construction Plans_220311_v4SOLERA
CIVIL CONSTRUCTION PERMIT
RENTON, WASHINGTON
CITY OF
RENTON
IN COMPLIANCE WITH CITY OF RENTON STANDARDSTED-40-4178SOLERA
2842 NE SUNSET BLVDRENTON, WA 98056SOLERA LUA20-000305C21-001020PR18-0003331601 5th Avenue, Suite 1600
Seattle, WA 98101
206.622.5822
www.kpff.com
R
Call 811two business daysbefore you dig
NW 1/4 OF THE NW 1/4 AND THE NE 1/4 OF THE NW 1/4 SECTION 9, TOWNSHIP 23 NORTH, RANGE 05 EAST, W.M.
COVER SHEETCOVER SHEET
R-417801
03/11/2022
SURFACE WATER UTILITY
JFarah 04/01/2022
WASTEWATER UTILITY
JStowell 04/04/2022
REGIONAL FIRE AUTHORITY
cthomas 04/04/2022
APPROVED
DEVELOPMENT ENGINEERING
msippo 04/07/2022
WATER UTILITY
agafour 04/07/2022
SOLERA
CIVIL CONSTRUCTION PERMIT
RENTON, WASHINGTON
CITY OF
RENTON
IN COMPLIANCE WITH CITY OF RENTON STANDARDSTED-40-4178SOLERA
2842 NE SUNSET BLVDRENTON, WA 98056SOLERA LUA20-000305C21-001020PR18-0003331601 5th Avenue, Suite 1600
Seattle, WA 98101
206.622.5822
www.kpff.com
R
Call 811two business daysbefore you dig
NW 1/4 OF THE NW 1/4 AND THE NE 1/4 OF THE NW 1/4 SECTION 9, TOWNSHIP 23 NORTH, RANGE 05 EAST, W.M.
SHEET INDEX
R-417802
CIVIL SHEET INDEX
SHEET NOSHEET TITLE SHEET X OF 144
C0.00 COVER SHEET 1
C0.01 SHEET INDEX 2
C0.10 NOTES 3
C0.11 NOTES 4
C0.12 CONDITIONS OF APPROVAL FROM HEARING EXAMINER 5
C0.13 CONDITIONS OF APPROVAL FROM HEARING EXAMINER 6
C1.00 DEMOLITION PLAN 7
C1.01 DEMOLITION PLAN 8
C2.00 HORIZONTAL CONTROL PLAN ROADWAY CENTERLINES & BUILDING B9
C2.01 HORIZONTAL CONTROL PLAN ROADWAY CENTERLINES & BUILDING A10
C2.10 HORIZONTAL CONTROL PLAN 11
C2.11 HORIZONTAL CONTROL PLAN 12
C2.12 HORIZONTAL CONTROL PLAN 13
C2.13 HORIZONTAL CONTROL PLAN 14
C2.14 HORIZONTAL CONTROL PLAN 15
C3.00 TESC PLAN 16
C3.10 TESC DETAILS 17
C3.11 TESC DETAILS 18
C3.12 TESC DETAILS 19
C4.00 GRADING PLAN - BLOCK C 20
C4.01 GRADING PLAN - BLOCK D 21
C4.02 GRADING PLAN 22
C4.03 GRADING PLAN 23
C4.04 GRADING PLAN 24
C4.05 GRADING PLAN 25
C4.06 GRADING PLAN 26
C4.07 GRADING PLAN 27
C4.08 GRADING PLAN 28
C4.09 GRADING PLAN 29
C4.10 GRADING PLAN 30
C4.11 GRADING PLAN 31
C4.12 GRADING PLAN 32
C4.13 GRADING PLAN 33
C4.14 GRADING PLAN 34
C4.20 CURB RAMP AND DRIVEWAY DETAILS 35
C4.21 CURB RAMP AND DRIVEWAY DETAILS 36
C4.22 CURB RAMP AND DRIVEWAY DETAILS 37
C4.23 CURB RAMP AND DRIVEWAY DETAILS 38
C4.24 CURB RAMP AND DRIVEWAY DETAILS 39
C4.25 CURB RAMP AND DRIVEWAY DETAILS 40
C4.26 CURB RAMP AND DRIVEWAY DETAILS 41
C4.27 CURB RAMP AND DRIVEWAY DETAILS 42
C4.28 CURB RAMP AND DRIVEWAY DETAILS 43
C4.29 CURB RAMP AND DRIVEWAY DETAILS 44
C4.30 CURB RAMP AND DRIVEWAY DETAILS 45
C4.31 CURB RAMP AND DRIVEWAY DETAILS 46
C4.40 JOINTING PLAN 47
C4.41 JOINTING PLAN 48
C4.42 JOINTING PLAN AND DETAILS 49
C4.43 JOINTING DETAILS 50
C5.00 ROAD AND STORM DRAINAGE OVERVIEW 51
C5.10 GRADING AND STORM DRAINAGE JEFFERSON AVENUE NE PLAN AND PROFILE52
C5.11 GRADING AND STORM DRAINAGE JEFFERSON AVENUE NE PLAN AND PROFILE53
C5.12 GRADING AND STORM DRAINAGE JEFFERSON AVENUE NE PLAN AND PROFILE54
C5.13 GRADING AND STORM DRAINAGE NE 11TH STREET PLAN AND PROFILE55
C5.14 GRADING AND STORM DRAINAGE NE 11TH STREET PLAN AND PROFILE56
C5.15 GRADING AND STORM DRAINAGE NE SUNSET BOULEVARD PLAN AND PROFILE57
C5.16 GRADING AND STORM DRAINAGE NE SUNSET BOULEVARD PLAN AND PROFILE58
C5.17 GRADING AND STORM DRAINAGE NE SUNSET BOULEVARD PLAN AND PROFILE59
C5.18 GRADING AND STORM DRAINAGE HARRINGTON PLACE NE PLAN AND PROFILE60
C5.19 GRADING AND STORM DRAINAGE NE 12TH STREET PLAN AND PROFILE61
C5.20 GRADING AND STORM DRAINAGE KIRKLAND AVENUE NE PLAN AND PROFILE62
C5.30 STORM DRAINAGE PLAN 63
C5.31 STORM DRAINAGE PROFILE 64
C5.40 ROAD SECTIONS 65
C5.41 ROAD SECTIONS 66
C5.42 ROAD DETAILS 67
C5.43 ROAD DETAILS 68
C5.44 ROAD DETAILS 69
C5.50 STORM DRAINAGE DETAILS 70
C5.51 STORM DRAINAGE DETAILS 71
C5.52 STORM DRAINAGE DETAILS 72
C5.53 STORM DRAINAGE DETAILS 73
C5.60 STORMWATER CHAMBER SYSTEM LAYOUT 74
C5.61 STORMWATER CHAMBER SYSTEM DETAILS 75
C5.62 STORMWATER CHAMBER SYSTEM DETAILS 76
C6.00 COMPOSITE UTILITY PLAN 77
C6.01 SURFACE MOUNTED UTILITY PLAN 78
C6.02 WATER AND SEWER PLAN OVERVIEW 79
C6.03 FIRE PROTECTION PLAN 80
C6.10 WATER AND SEWER JEFFERSON AVENUE NE PLAN AND PROFILE 81
C6.11 WATER AND SEWER JEFFERSON AVENUE NE PLAN AND PROFILE 82
C6.12 WATER AND SEWER JEFFERSON AVENUE NE PLAN AND PROFILE 83
C6.13 WATER AND SEWER NE 11TH STREET PLAN AND PROFILE 84
C6.14 WATER AND SEWER NE 11TH STREET PLAN AND PROFILE 85
C6.15 WATER AND SEWER HARRINGTON PL NE PLAN AND PROFILE 86
C6.16 WATER AND SEWER KIRKLAND AVE NE PLAN 87
C6.17 ENLARGED WATER PLANS 88
C6.18 ENLARGED WATER PLANS 89
C6.30 WATER UTILITY NOTES AND SPECIFICATIONS 90
C6.31 WATER AND SEWER DETAILS 91
C6.32 WATER AND SEWER DETAILS 92
C6.33 WATER AND SEWER DETAILS 93
C6.34 WATER AND SEWER DETAILS 94
C6.35 WATER AND SEWER DETAILS 95
L1.0 SITE PLAN OVERVIEW & OPEN SPACE PLAN 96
L1.1 OPEN SPACE PLAN 97
L1.2 OPEN SPACE PLAN- COURTYARDS 98
L1.3 PEDESTRIAN-ORIENTED SPACE PLAN 99
L1.4 PEDESTRIAN-ORIENTED SPACE PLAN 100
L1.5 FENCING PLAN 101
L2.0 TREE RETENTION PLAN 102
L2.1 TREE INVENTORY- ON-SITE 103
L2.2 TREE INVENTORY- OFF-SITE 104
L2.3 TREE RETENTION & REPLACEMENT PLAN 105
L3.0 PARKING LOT & PERIMETER LANDSCAPE 106
L3.1 PARKING LOT & PERIMETER LANDSCAPE 107
L4.0 PLANTING PLAN- TREES & LARGE SHRUBS 108
L4.1 PLANTING PLAN- TREES & LARGE SHRUBS 109
L4.2 PLANTING PLAN- TREES & LARGE SHRUBS 110
L4.3 PLANTING PLAN- TREES & LARGE SHRUBS 111
L4.4 PLANTING PLAN - TREES & LARGE SHRUBS 112
L4.5 PLANTING PLAN - TREES & LARGE SHRUBS 113
L4.6 PLANTING PLAN- UNDERSTORY 114
L4.7 PLANTING PLAN- UNDERSTORY 115
L4.8 PLANTING PLAN- UNDERSTORY 116
L4.9 PLANTING PLAN- UNDERSTORY 117
L4.10 PLANTING PLAN- UNDERSTORY 118
L4.11 PLANTING PLAN- UNDERSTORY 119
L4.12 PLANT SCHEDULE & NOTES 120
L5.0 PLANTING SPECIFICATIONS 121
L5.1 BIORETENTION SOIL SPECIFICATIONS 122
L5.2 PLANTING DETAILS 123
L6.0 FURNISHING DETAILS 124
L6.1 DESIGN ELEMENTS & DETAILS 125
L6.2 DESIGN ELEMENTS & DETAILS 126
L6.3 DESIGN ELEMENTS & MATERIALS - COURTYARD 127
L6.4 DESIGN ELEMENTS & MATERIALS - COURTYARD 128
L6.5 DETAILS 129
L7.0 IRRIGATION SPECIFICATIONS 131
PM-01 PAVEMENT MARKING & SIGNING PLAN 132
PM-02 PAVEMENT MARKING & SIGNING PLAN 133
PM-03 PAVEMENT MARKING & SIGNING PLAN 134
PM-04 PAVEMENT MARKING & SIGNING DETAILS 135
PM-05 PAVEMENT MARKING & SIGNING DETAILS 136
IL-1 ILLUMINATION PLAN 137
IL-2 ILLUMINATION PLAN 138
IL-3 ILLUMINATION PLAN 139
IL-4 ILLUMINATION PLAN 140
IL-5 ILLUMINATION DETAILS 141
IL-6 ILLUMINATION DETAILS 142
EA1.00 SITE LIGHTING PLAN 143
EA1.01 SITE PHOTOMETRICS PLAN 144
03/11/2022
DEVELOPMENT ENGINEERING
msippo 04/07/2022
·
·
”
CITY OF
RENTON
IN COMPLIANCE WITH CITY OF RENTON STANDARDSTED-40-4178SOLERA
2842 NE SUNSET BLVDRENTON, WA 98056SOLERA LUA20-000305C21-001020PR18-0003331601 5th Avenue, Suite 1600
Seattle, WA 98101
206.622.5822
www.kpff.com
R
Call 811two business daysbefore you dig
NW 1/4 OF THE NW 1/4 AND THE NE 1/4 OF THE NW 1/4 SECTION 9, TOWNSHIP 23 NORTH, RANGE 05 EAST, W.M.
NOTES
R-417803
03/11/2022
DEVELOPMENT ENGINEERING
msippo 04/07/2022
CITY OF
RENTON
IN COMPLIANCE WITH CITY OF RENTON STANDARDSTED-40-4178SOLERA
2842 NE SUNSET BLVDRENTON, WA 98056SOLERA LUA20-000305C21-001020PR18-0003331601 5th Avenue, Suite 1600
Seattle, WA 98101
206.622.5822
www.kpff.com
R
Call 811two business daysbefore you dig
NW 1/4 OF THE NW 1/4 AND THE NE 1/4 OF THE NW 1/4 SECTION 9, TOWNSHIP 23 NORTH, RANGE 05 EAST, W.M.
NOTES
R-417804
03/11/2022
DEVELOPMENT ENGINEERING
msippo 04/07/2022
CONDITIONS OF APPROVAL FROM HEARING EXAMINER
R-417805
CITY OF
RENTON
IN COMPLIANCE WITH CITY OF RENTON STANDARDSTED-40-4178SOLERA
2842 NE SUNSET BLVDRENTON, WA 98056SOLERA LUA20-000305C21-001020PR18-0003331601 5th Avenue, Suite 1600
Seattle, WA 98101
206.622.5822
www.kpff.com
R
Call 811two business daysbefore you dig
NW 1/4 OF THE NW 1/4 AND THE NE 1/4 OF THE NW 1/4 SECTION 9, TOWNSHIP 23 NORTH, RANGE 05 EAST, W.M.
03/11/2022
DEVELOPMENT ENGINEERING
msippo 04/07/2022
CONDITIONS OF APPROVAL FROM HEARING EXAMINER
R-417806
CITY OF
RENTON
IN COMPLIANCE WITH CITY OF RENTON STANDARDSTED-40-4178SOLERA
2842 NE SUNSET BLVDRENTON, WA 98056SOLERA LUA20-000305C21-001020PR18-0003331601 5th Avenue, Suite 1600
Seattle, WA 98101
206.622.5822
www.kpff.com
R
Call 811two business daysbefore you dig
NW 1/4 OF THE NW 1/4 AND THE NE 1/4 OF THE NW 1/4 SECTION 9, TOWNSHIP 23 NORTH, RANGE 05 EAST, W.M.
03/11/2022
DEVELOPMENT ENGINEERING
msippo 04/07/2022
BLOCK 3
9CORRECTED PLAT
OFRENTON H
IGHLANDS
NO
.
2V.
57
/
PGS
.9
2
-
9
8 BLOCK
3
9CORRECTED PLAT
OFRENTON H
IGHLANDS
NO
.
2V.
57
/
PGS
.
9
2
-
9
8 BLOCK 4
0CORRECTED PLAT
OFRENTON H
IGHLANDS
NO
.
2V.
5
7
/
PGS
.9
2
-9
8LOT
1C.O
.R
.
LOT
L
INE
REV
IS
IONLLA
003
-82REC. NO
.
8
2
042
1
9003LOT
2C.O
.R
.
LOT
L
INE
REV
IS
IONLLA 00
3
-8
2REC. NO
.
8
204
2
1
900
3LOT 2C.O
.R
.
LOT
L
INE
REV
IS
IONLLA
0
03
-
82REC. NO
.
82
0
4
219
0
03 PARCEL C
LOT
4LOT5
CITY OF
RENTON
IN COMPLIANCE WITH CITY OF RENTON STANDARDSTED-40-4178SOLERA
2842 NE SUNSET BLVDRENTON, WA 98056SOLERA LUA20-000305C21-001020PR18-0003331601 5th Avenue, Suite 1600
Seattle, WA 98101
206.622.5822
www.kpff.com
R
Call 811two business daysbefore you dig
NW 1/4 OF THE NW 1/4 AND THE NE 1/4 OF THE NW 1/4 SECTION 9, TOWNSHIP 23 NORTH, RANGE 05 EAST, W.M.
DEMOLITION PLAN
03/11/2022
DEVELOPMENT ENGINEERING
msippo 04/07/2022
BLOCK
4
3CORRECTED PLAT
OFRENTON H
IGHLANDS
NO
.
2V.
57
/
PGS
.
9
2
-
9
8
BLOCK
39CORRECTED PLAT
OFRENTON H
IGHLANDS
NO
.
2V.57
/
PGS
.
92
-
98 PARCEL
B
CITY OF
RENTON
IN COMPLIANCE WITH CITY OF RENTON STANDARDSTED-40-4178SOLERA
2842 NE SUNSET BLVDRENTON, WA 98056SOLERA LUA20-000305C21-001020PR18-0003331601 5th Avenue, Suite 1600
Seattle, WA 98101
206.622.5822
www.kpff.com
R
Call 811two business daysbefore you dig
NW 1/4 OF THE NW 1/4 AND THE NE 1/4 OF THE NW 1/4 SECTION 9, TOWNSHIP 23 NORTH, RANGE 05 EAST, W.M.
DEMOLITION PLAN
03/11/2022
DEVELOPMENT ENGINEERING
msippo 04/07/2022
211
H
A
CITY OF
RENTON
IN COMPLIANCE WITH CITY OF RENTON STANDARDSTED-40-4178SOLERA
2842 NE SUNSET BLVDRENTON, WA 98056SOLERA LUA20-000305C21-001020PR18-0003331601 5th Avenue, Suite 1600
Seattle, WA 98101
206.622.5822
www.kpff.com
R
Call 811two business daysbefore you dig
NW 1/4 OF THE NW 1/4 AND THE NE 1/4 OF THE NW 1/4 SECTION 9, TOWNSHIP 23 NORTH, RANGE 05 EAST, W.M.
HORIZONTAL CONTROL PLAN
ROAD CENTERLINES & BUILDING B
R-417809
X
03/11/2022
DEVELOPMENT ENGINEERING
msippo 04/07/2022
K
J
22
1
CITY OF
RENTON
IN COMPLIANCE WITH CITY OF RENTON STANDARDSTED-40-4178SOLERA
2842 NE SUNSET BLVDRENTON, WA 98056SOLERA LUA20-000305C21-001020PR18-0003331601 5th Avenue, Suite 1600
Seattle, WA 98101
206.622.5822
www.kpff.com
R
Call 811two business daysbefore you dig
NW 1/4 OF THE NW 1/4 AND THE NE 1/4 OF THE NW 1/4 SECTION 9, TOWNSHIP 23 NORTH, RANGE 05 EAST, W.M.
HORIZONTAL CONTROL PLAN
ROADWAY CENTERLINES & BUILDING A
R-417810
X
03/11/2022
DEVELOPMENT ENGINEERING
msippo 04/07/2022
BLOCK 4
0CORRECTED PLAT
OFRENTON H
IGHLANDS
NO
.
2V.
5
7
/
PGS
.9
2
-9
8LOT
1C.O
.R
.
LOT
L
INE
REV
IS
IONLLA
0
03
-
82REC. NO
.
82
0
4219
0
03LOT
2C.O
.R
.
LOT
L
INE
REV
IS
IONLLA 003
-8
2REC. NO
.
8
2042
1
900
3LOT
2C.O
.R
.
LOT
L
INE
REV
IS
IONLLA
003
-82REC. NO
.
8
2
042
1
9
003 PARCEL CLOT5CITY OF
RENTON
IN COMPLIANCE WITH CITY OF RENTON STANDARDSTED-40-4178SOLERA
2842 NE SUNSET BLVDRENTON, WA 98056SOLERA LUA20-000305C21-001020PR18-0003331601 5th Avenue, Suite 1600
Seattle, WA 98101
206.622.5822
www.kpff.com
R
Call 811two business daysbefore you dig
NW 1/4 OF THE NW 1/4 AND THE NE 1/4 OF THE NW 1/4 SECTION 9, TOWNSHIP 23 NORTH, RANGE 05 EAST, W.M.
HORIZONTAL CONTROL PLAN
R-417811
03/11/2022
DEVELOPMENT ENGINEERING
msippo 04/07/2022
CITY OF
RENTON
IN COMPLIANCE WITH CITY OF RENTON STANDARDSTED-40-4178SOLERA
2842 NE SUNSET BLVDRENTON, WA 98056SOLERA LUA20-000305C21-001020PR18-0003331601 5th Avenue, Suite 1600
Seattle, WA 98101
206.622.5822
www.kpff.com
R
Call 811two business daysbefore you dig
NW 1/4 OF THE NW 1/4 AND THE NE 1/4 OF THE NW 1/4 SECTION 9, TOWNSHIP 23 NORTH, RANGE 05 EAST, W.M.
HORIZONTAL CONTROL PLAN
R-417812
03/11/2022
DEVELOPMENT ENGINEERING
msippo 04/07/2022
CITY OF
RENTON
IN COMPLIANCE WITH CITY OF RENTON STANDARDSTED-40-4178SOLERA
2842 NE SUNSET BLVDRENTON, WA 98056SOLERA LUA20-000305C21-001020PR18-0003331601 5th Avenue, Suite 1600
Seattle, WA 98101
206.622.5822
www.kpff.com
R
Call 811two business daysbefore you dig
NW 1/4 OF THE NW 1/4 AND THE NE 1/4 OF THE NW 1/4 SECTION 9, TOWNSHIP 23 NORTH, RANGE 05 EAST, W.M.
HORIZONTAL CONTROL PLAN
R-417813
03/11/2022
DEVELOPMENT ENGINEERING
msippo 04/07/2022
CITY OF
RENTON
IN COMPLIANCE WITH CITY OF RENTON STANDARDSTED-40-4178SOLERA
2842 NE SUNSET BLVDRENTON, WA 98056SOLERA LUA20-000305C21-001020PR18-0003331601 5th Avenue, Suite 1600
Seattle, WA 98101
206.622.5822
www.kpff.com
R
Call 811two business daysbefore you dig
NW 1/4 OF THE NW 1/4 AND THE NE 1/4 OF THE NW 1/4 SECTION 9, TOWNSHIP 23 NORTH, RANGE 05 EAST, W.M.
HORIZONTAL CONTROL PLAN
R-417814
03/11/2022
DEVELOPMENT ENGINEERING
msippo 04/07/2022
CITY OF
RENTON
IN COMPLIANCE WITH CITY OF RENTON STANDARDSTED-40-4178SOLERA
2842 NE SUNSET BLVDRENTON, WA 98056SOLERA LUA20-000305C21-001020PR18-0003331601 5th Avenue, Suite 1600
Seattle, WA 98101
206.622.5822
www.kpff.com
R
Call 811two business daysbefore you dig
NW 1/4 OF THE NW 1/4 AND THE NE 1/4 OF THE NW 1/4 SECTION 9, TOWNSHIP 23 NORTH, RANGE 05 EAST, W.M.
HORIZONTAL CONTROL PLAN
R-417815
03/11/2022
DEVELOPMENT ENGINEERING
msippo 04/07/2022
CITY OF
RENTON
IN COMPLIANCE WITH CITY OF RENTON STANDARDSTED-40-4178SOLERA
2842 NE SUNSET BLVDRENTON, WA 98056SOLERA LUA20-000305C21-001020PR18-0003331601 5th Avenue, Suite 1600
Seattle, WA 98101
206.622.5822
www.kpff.com
R
Call 811two business daysbefore you dig
NW 1/4 OF THE NW 1/4 AND THE NE 1/4 OF THE NW 1/4 SECTION 9, TOWNSHIP 23 NORTH, RANGE 05 EAST, W.M.
TESC PLAN
R-417816
FOR REFERENCE ONLY
REFER TO EARLY CLEAR AND GRADE PERMIT
C21-003938
03/11/2022
DEVELOPMENT ENGINEERING
msippo 04/07/2022
CITY OF
RENTON
IN COMPLIANCE WITH CITY OF RENTON STANDARDSTED-40-4178SOLERA
2842 NE SUNSET BLVDRENTON, WA 98056SOLERA LUA20-000305C21-001020PR18-0003331601 5th Avenue, Suite 1600
Seattle, WA 98101
206.622.5822
www.kpff.com
R
Call 811two business daysbefore you dig
NW 1/4 OF THE NW 1/4 AND THE NE 1/4 OF THE NW 1/4 SECTION 9, TOWNSHIP 23 NORTH, RANGE 05 EAST, W.M.
TESC DETAILS
R-417817
FOR REFERENCE ONLY
REFER TO EARLY CLEAR AND GRADE PERMIT
C21-003938
03/11/2022
DEVELOPMENT ENGINEERING
msippo 04/07/2022
CITY OF
RENTON
IN COMPLIANCE WITH CITY OF RENTON STANDARDSTED-40-4178SOLERA
2842 NE SUNSET BLVDRENTON, WA 98056SOLERA LUA20-000305C21-001020PR18-0003331601 5th Avenue, Suite 1600
Seattle, WA 98101
206.622.5822
www.kpff.com
R
Call 811two business daysbefore you dig
NW 1/4 OF THE NW 1/4 AND THE NE 1/4 OF THE NW 1/4 SECTION 9, TOWNSHIP 23 NORTH, RANGE 05 EAST, W.M.
TESC DETAILS
R-417818
FOR REFERENCE ONLY
REFER TO EARLY CLEAR AND GRADE PERMIT
C21-003938
03/11/2022
DEVELOPMENT ENGINEERING
msippo 04/07/2022
CITY OF
RENTON
IN COMPLIANCE WITH CITY OF RENTON STANDARDSTED-40-4178SOLERA
2842 NE SUNSET BLVDRENTON, WA 98056SOLERA LUA20-000305C21-001020PR18-0003331601 5th Avenue, Suite 1600
Seattle, WA 98101
206.622.5822
www.kpff.com
R
Call 811two business daysbefore you dig
NW 1/4 OF THE NW 1/4 AND THE NE 1/4 OF THE NW 1/4 SECTION 9, TOWNSHIP 23 NORTH, RANGE 05 EAST, W.M.
TESC DETAILS
R-417819
FOR REFERENCE ONLY
REFER TO EARLY CLEAR AND GRADE PERMIT
C21-003938
03/11/2022
DEVELOPMENT ENGINEERING
msippo 04/07/2022
CITY OF
RENTON
IN COMPLIANCE WITH CITY OF RENTON STANDARDSTED-40-4178SOLERA
2842 NE SUNSET BLVDRENTON, WA 98056SOLERA LUA20-000305C21-001020PR18-0003331601 5th Avenue, Suite 1600
Seattle, WA 98101
206.622.5822
www.kpff.com
R
Call 811two business daysbefore you dig
NW 1/4 OF THE NW 1/4 AND THE NE 1/4 OF THE NW 1/4 SECTION 9, TOWNSHIP 23 NORTH, RANGE 05 EAST, W.M.
GRADING PLAN - BLOCK C
R-417820
03/11/2022
DEVELOPMENT ENGINEERING
msippo 04/07/2022
NE 12TH
ST
HARRINGTON PL NE
CITY OF
RENTON
IN COMPLIANCE WITH CITY OF RENTON STANDARDSTED-40-4178SOLERA
2842 NE SUNSET BLVDRENTON, WA 98056SOLERA LUA20-000305C21-001020PR18-0003331601 5th Avenue, Suite 1600
Seattle, WA 98101
206.622.5822
www.kpff.com
R
Call 811two business daysbefore you dig
NW 1/4 OF THE NW 1/4 AND THE NE 1/4 OF THE NW 1/4 SECTION 9, TOWNSHIP 23 NORTH, RANGE 05 EAST, W.M.
GRADING PLAN - BLOCK D
R-417821
03/11/2022
DEVELOPMENT ENGINEERING
msippo 04/07/2022
CITY OF
RENTON
IN COMPLIANCE WITH CITY OF RENTON STANDARDSTED-40-4178SOLERA
2842 NE SUNSET BLVDRENTON, WA 98056SOLERA LUA20-000305C21-001020PR18-0003331601 5th Avenue, Suite 1600
Seattle, WA 98101
206.622.5822
www.kpff.com
R
Call 811two business daysbefore you dig
NW 1/4 OF THE NW 1/4 AND THE NE 1/4 OF THE NW 1/4 SECTION 9, TOWNSHIP 23 NORTH, RANGE 05 EAST, W.M.
R-417822
GRADING PLAN
04/05/2022
DEVELOPMENT ENGINEERING
msippo 04/11/2022
CITY OF
RENTON
IN COMPLIANCE WITH CITY OF RENTON STANDARDSTED-40-4178SOLERA
2842 NE SUNSET BLVDRENTON, WA 98056SOLERA LUA20-000305C21-001020PR18-0003331601 5th Avenue, Suite 1600
Seattle, WA 98101
206.622.5822
www.kpff.com
R
Call 811two business daysbefore you dig
NW 1/4 OF THE NW 1/4 AND THE NE 1/4 OF THE NW 1/4 SECTION 9, TOWNSHIP 23 NORTH, RANGE 05 EAST, W.M.
GRADING PLAN
R-417823
04/05/2022
DEVELOPMENT ENGINEERING
msippo 04/11/2022
CITY OF
RENTON
IN COMPLIANCE WITH CITY OF RENTON STANDARDSTED-40-4178SOLERA
2842 NE SUNSET BLVDRENTON, WA 98056SOLERA LUA20-000305C21-001020PR18-0003331601 5th Avenue, Suite 1600
Seattle, WA 98101
206.622.5822
www.kpff.com
R
Call 811two business daysbefore you dig
NW 1/4 OF THE NW 1/4 AND THE NE 1/4 OF THE NW 1/4 SECTION 9, TOWNSHIP 23 NORTH, RANGE 05 EAST, W.M.
GRADING PLAN
R-417824
03/11/2022
DEVELOPMENT ENGINEERING
msippo 04/07/2022
CITY OF
RENTON
IN COMPLIANCE WITH CITY OF RENTON STANDARDSTED-40-4178SOLERA
2842 NE SUNSET BLVDRENTON, WA 98056SOLERA LUA20-000305C21-001020PR18-0003331601 5th Avenue, Suite 1600
Seattle, WA 98101
206.622.5822
www.kpff.com
R
Call 811two business daysbefore you dig
NW 1/4 OF THE NW 1/4 AND THE NE 1/4 OF THE NW 1/4 SECTION 9, TOWNSHIP 23 NORTH, RANGE 05 EAST, W.M.
GRADING PLAN
R-417825
03/11/2022
DEVELOPMENT ENGINEERING
msippo 04/07/2022
CITY OF
RENTON
IN COMPLIANCE WITH CITY OF RENTON STANDARDSTED-40-4178SOLERA
2842 NE SUNSET BLVDRENTON, WA 98056SOLERA LUA20-000305C21-001020PR18-0003331601 5th Avenue, Suite 1600
Seattle, WA 98101
206.622.5822
www.kpff.com
R
Call 811two business daysbefore you dig
NW 1/4 OF THE NW 1/4 AND THE NE 1/4 OF THE NW 1/4 SECTION 9, TOWNSHIP 23 NORTH, RANGE 05 EAST, W.M.
GRADING PLAN
R-417826
03/11/2022
DEVELOPMENT ENGINEERING
msippo 04/07/2022
CITY OF
RENTON
IN COMPLIANCE WITH CITY OF RENTON STANDARDSTED-40-4178SOLERA
2842 NE SUNSET BLVDRENTON, WA 98056SOLERA LUA20-000305C21-001020PR18-0003331601 5th Avenue, Suite 1600
Seattle, WA 98101
206.622.5822
www.kpff.com
R
Call 811two business daysbefore you dig
NW 1/4 OF THE NW 1/4 AND THE NE 1/4 OF THE NW 1/4 SECTION 9, TOWNSHIP 23 NORTH, RANGE 05 EAST, W.M.
GRADING PLAN
R-417827
03/11/2022
DEVELOPMENT ENGINEERING
msippo 04/07/2022
NE 10TH STCITY OF
RENTON
IN COMPLIANCE WITH CITY OF RENTON STANDARDSTED-40-4178SOLERA
2842 NE SUNSET BLVDRENTON, WA 98056SOLERA LUA20-000305C21-001020PR18-0003331601 5th Avenue, Suite 1600
Seattle, WA 98101
206.622.5822
www.kpff.com
R
Call 811two business daysbefore you dig
NW 1/4 OF THE NW 1/4 AND THE NE 1/4 OF THE NW 1/4 SECTION 9, TOWNSHIP 23 NORTH, RANGE 05 EAST, W.M.
GRADING PLAN
R-417828
03/11/2022
DEVELOPMENT ENGINEERING
msippo 04/07/2022
CITY OF
RENTON
IN COMPLIANCE WITH CITY OF RENTON STANDARDSTED-40-4178SOLERA
2842 NE SUNSET BLVDRENTON, WA 98056SOLERA LUA20-000305C21-001020PR18-0003331601 5th Avenue, Suite 1600
Seattle, WA 98101
206.622.5822
www.kpff.com
R
Call 811two business daysbefore you dig
NW 1/4 OF THE NW 1/4 AND THE NE 1/4 OF THE NW 1/4 SECTION 9, TOWNSHIP 23 NORTH, RANGE 05 EAST, W.M.
GRADING PLAN
R-417829
03/11/2022
DEVELOPMENT ENGINEERING
msippo 04/07/2022
NE SUNSET BLVD
CITY OF
RENTON
IN COMPLIANCE WITH CITY OF RENTON STANDARDSTED-40-4178SOLERA
2842 NE SUNSET BLVDRENTON, WA 98056SOLERA LUA20-000305C21-001020PR18-0003331601 5th Avenue, Suite 1600
Seattle, WA 98101
206.622.5822
www.kpff.com
R
Call 811two business daysbefore you dig
NW 1/4 OF THE NW 1/4 AND THE NE 1/4 OF THE NW 1/4 SECTION 9, TOWNSHIP 23 NORTH, RANGE 05 EAST, W.M.
GRADING PLAN
R-417830
03/11/2022
DEVELOPMENT ENGINEERING
msippo 04/07/2022
CITY OF
RENTON
IN COMPLIANCE WITH CITY OF RENTON STANDARDSTED-40-4178SOLERA
2842 NE SUNSET BLVDRENTON, WA 98056SOLERA LUA20-000305C21-001020PR18-0003331601 5th Avenue, Suite 1600
Seattle, WA 98101
206.622.5822
www.kpff.com
R
Call 811two business daysbefore you dig
NW 1/4 OF THE NW 1/4 AND THE NE 1/4 OF THE NW 1/4 SECTION 9, TOWNSHIP 23 NORTH, RANGE 05 EAST, W.M.
GRADING PLAN
R-417831
03/11/2022
DEVELOPMENT ENGINEERING
msippo 04/07/2022
CITY OF
RENTON
IN COMPLIANCE WITH CITY OF RENTON STANDARDSTED-40-4178SOLERA
2842 NE SUNSET BLVDRENTON, WA 98056SOLERA LUA20-000305C21-001020PR18-0003331601 5th Avenue, Suite 1600
Seattle, WA 98101
206.622.5822
www.kpff.com
R
Call 811two business daysbefore you dig
NW 1/4 OF THE NW 1/4 AND THE NE 1/4 OF THE NW 1/4 SECTION 9, TOWNSHIP 23 NORTH, RANGE 05 EAST, W.M.
GRADING PLAN
R-417832
03/11/2022
DEVELOPMENT ENGINEERING
msippo 04/07/2022
NE SUNSET BLVD
CITY OF
RENTON
IN COMPLIANCE WITH CITY OF RENTON STANDARDSTED-40-4178SOLERA
2842 NE SUNSET BLVDRENTON, WA 98056SOLERA LUA20-000305C21-001020PR18-0003331601 5th Avenue, Suite 1600
Seattle, WA 98101
206.622.5822
www.kpff.com
R
Call 811two business daysbefore you dig
NW 1/4 OF THE NW 1/4 AND THE NE 1/4 OF THE NW 1/4 SECTION 9, TOWNSHIP 23 NORTH, RANGE 05 EAST, W.M.
GRADING PLAN
R-417833
03/11/2022
DEVELOPMENT ENGINEERING
msippo 04/07/2022
KIRKLAND AVE NECITY OF
RENTON
IN COMPLIANCE WITH CITY OF RENTON STANDARDSTED-40-4178SOLERA
2842 NE SUNSET BLVDRENTON, WA 98056SOLERA LUA20-000305C21-001020PR18-0003331601 5th Avenue, Suite 1600
Seattle, WA 98101
206.622.5822
www.kpff.com
R
Call 811two business daysbefore you dig
NW 1/4 OF THE NW 1/4 AND THE NE 1/4 OF THE NW 1/4 SECTION 9, TOWNSHIP 23 NORTH, RANGE 05 EAST, W.M.
GRADING PLAN
R-417834
03/11/2022
DEVELOPMENT ENGINEERING
msippo 04/07/2022
CITY OF
RENTON
IN COMPLIANCE WITH CITY OF RENTON STANDARDSTED-40-4178SOLERA
2842 NE SUNSET BLVDRENTON, WA 98056SOLERA LUA20-000305C21-001020PR18-0003331601 5th Avenue, Suite 1600
Seattle, WA 98101
206.622.5822
www.kpff.com
R
Call 811two business daysbefore you dig
NW 1/4 OF THE NW 1/4 AND THE NE 1/4 OF THE NW 1/4 SECTION 9, TOWNSHIP 23 NORTH, RANGE 05 EAST, W.M.
CURB RAMP AND DRIVEWAY DETAILS
R-417835
03/11/2022
DEVELOPMENT ENGINEERING
msippo 04/07/2022
CITY OF
RENTON
IN COMPLIANCE WITH CITY OF RENTON STANDARDSTED-40-4178SOLERA
2842 NE SUNSET BLVDRENTON, WA 98056SOLERA LUA20-000305C21-001020PR18-0003331601 5th Avenue, Suite 1600
Seattle, WA 98101
206.622.5822
www.kpff.com
R
Call 811two business daysbefore you dig
NW 1/4 OF THE NW 1/4 AND THE NE 1/4 OF THE NW 1/4 SECTION 9, TOWNSHIP 23 NORTH, RANGE 05 EAST, W.M.
CURB RAMP AND DRIVEWAY DETAILS
R-417836
03/11/2022
DEVELOPMENT ENGINEERING
msippo 04/07/2022
CITY OF
RENTON
IN COMPLIANCE WITH CITY OF RENTON STANDARDSTED-40-4178SOLERA
2842 NE SUNSET BLVDRENTON, WA 98056SOLERA LUA20-000305C21-001020PR18-0003331601 5th Avenue, Suite 1600
Seattle, WA 98101
206.622.5822
www.kpff.com
R
Call 811two business daysbefore you dig
NW 1/4 OF THE NW 1/4 AND THE NE 1/4 OF THE NW 1/4 SECTION 9, TOWNSHIP 23 NORTH, RANGE 05 EAST, W.M.
CURB RAMP AND DRIVEWAY DETAILS
R-417837
03/11/2022
DEVELOPMENT ENGINEERING
msippo 04/07/2022
CITY OF
RENTON
IN COMPLIANCE WITH CITY OF RENTON STANDARDSTED-40-4178SOLERA
2842 NE SUNSET BLVDRENTON, WA 98056SOLERA LUA20-000305C21-001020PR18-0003331601 5th Avenue, Suite 1600
Seattle, WA 98101
206.622.5822
www.kpff.com
R
Call 811two business daysbefore you dig
NW 1/4 OF THE NW 1/4 AND THE NE 1/4 OF THE NW 1/4 SECTION 9, TOWNSHIP 23 NORTH, RANGE 05 EAST, W.M.
CURB RAMP AND DRIVEWAY DETAILS
R-417838
03/11/2022
DEVELOPMENT ENGINEERING
msippo 04/07/2022
CITY OF
RENTON
IN COMPLIANCE WITH CITY OF RENTON STANDARDSTED-40-4178SOLERA
2842 NE SUNSET BLVDRENTON, WA 98056SOLERA LUA20-000305C21-001020PR18-0003331601 5th Avenue, Suite 1600
Seattle, WA 98101
206.622.5822
www.kpff.com
R
Call 811two business daysbefore you dig
NW 1/4 OF THE NW 1/4 AND THE NE 1/4 OF THE NW 1/4 SECTION 9, TOWNSHIP 23 NORTH, RANGE 05 EAST, W.M.
CURB RAMP AND DRIVEWAY DETAILS
R-417839
03/11/2022
DEVELOPMENT ENGINEERING
msippo 04/07/2022
CITY OF
RENTON
IN COMPLIANCE WITH CITY OF RENTON STANDARDSTED-40-4178SOLERA
2842 NE SUNSET BLVDRENTON, WA 98056SOLERA LUA20-000305C21-001020PR18-0003331601 5th Avenue, Suite 1600
Seattle, WA 98101
206.622.5822
www.kpff.com
R
Call 811two business daysbefore you dig
NW 1/4 OF THE NW 1/4 AND THE NE 1/4 OF THE NW 1/4 SECTION 9, TOWNSHIP 23 NORTH, RANGE 05 EAST, W.M.
CURB RAMP AND DRIVEWAY DETAILS
R-417840
03/11/2022
DEVELOPMENT ENGINEERING
msippo 04/07/2022
CITY OF
RENTON
IN COMPLIANCE WITH CITY OF RENTON STANDARDSTED-40-4178SOLERA
2842 NE SUNSET BLVDRENTON, WA 98056SOLERA LUA20-000305C21-001020PR18-0003331601 5th Avenue, Suite 1600
Seattle, WA 98101
206.622.5822
www.kpff.com
R
Call 811two business daysbefore you dig
NW 1/4 OF THE NW 1/4 AND THE NE 1/4 OF THE NW 1/4 SECTION 9, TOWNSHIP 23 NORTH, RANGE 05 EAST, W.M.
CURB RAMP AND DRIVEWAY DETAILS
R-417841
03/11/2022
DEVELOPMENT ENGINEERING
msippo 04/07/2022
CITY OF
RENTON
IN COMPLIANCE WITH CITY OF RENTON STANDARDSTED-40-4178SOLERA
2842 NE SUNSET BLVDRENTON, WA 98056SOLERA LUA20-000305C21-001020PR18-0003331601 5th Avenue, Suite 1600
Seattle, WA 98101
206.622.5822
www.kpff.com
R
Call 811two business daysbefore you dig
NW 1/4 OF THE NW 1/4 AND THE NE 1/4 OF THE NW 1/4 SECTION 9, TOWNSHIP 23 NORTH, RANGE 05 EAST, W.M.
CURB RAMP AND DRIVEWAY DETAILS
R-417842
03/11/2022
DEVELOPMENT ENGINEERING
msippo 04/07/2022
CITY OF
RENTON
IN COMPLIANCE WITH CITY OF RENTON STANDARDSTED-40-4178SOLERA
2842 NE SUNSET BLVDRENTON, WA 98056SOLERA LUA20-000305C21-001020PR18-0003331601 5th Avenue, Suite 1600
Seattle, WA 98101
206.622.5822
www.kpff.com
R
Call 811two business daysbefore you dig
NW 1/4 OF THE NW 1/4 AND THE NE 1/4 OF THE NW 1/4 SECTION 9, TOWNSHIP 23 NORTH, RANGE 05 EAST, W.M.
CURB RAMP AND DRIVEWAY DETAILS
R-417843
03/11/2022
DEVELOPMENT ENGINEERING
msippo 04/07/2022
CITY OF
RENTON
IN COMPLIANCE WITH CITY OF RENTON STANDARDSTED-40-4178SOLERA
2842 NE SUNSET BLVDRENTON, WA 98056SOLERA LUA20-000305C21-001020PR18-0003331601 5th Avenue, Suite 1600
Seattle, WA 98101
206.622.5822
www.kpff.com
R
Call 811two business daysbefore you dig
NW 1/4 OF THE NW 1/4 AND THE NE 1/4 OF THE NW 1/4 SECTION 9, TOWNSHIP 23 NORTH, RANGE 05 EAST, W.M.
CURB RAMP AND DRIVEWAY DETAILS
R-417844
03/11/2022
DEVELOPMENT ENGINEERING
msippo 04/07/2022
CITY OF
RENTON
IN COMPLIANCE WITH CITY OF RENTON STANDARDSTED-40-4178SOLERA
2842 NE SUNSET BLVDRENTON, WA 98056SOLERA LUA20-000305C21-001020PR18-0003331601 5th Avenue, Suite 1600
Seattle, WA 98101
206.622.5822
www.kpff.com
R
Call 811two business daysbefore you dig
NW 1/4 OF THE NW 1/4 AND THE NE 1/4 OF THE NW 1/4 SECTION 9, TOWNSHIP 23 NORTH, RANGE 05 EAST, W.M.
CURB RAMP AND DRIVEWAY DETAILS
R-417845
03/11/2022
DEVELOPMENT ENGINEERING
msippo 04/07/2022
CITY OF
RENTON
IN COMPLIANCE WITH CITY OF RENTON STANDARDSTED-40-4178SOLERA
2842 NE SUNSET BLVDRENTON, WA 98056SOLERA LUA20-000305C21-001020PR18-0003331601 5th Avenue, Suite 1600
Seattle, WA 98101
206.622.5822
www.kpff.com
R
Call 811two business daysbefore you dig
NW 1/4 OF THE NW 1/4 AND THE NE 1/4 OF THE NW 1/4 SECTION 9, TOWNSHIP 23 NORTH, RANGE 05 EAST, W.M.
CURB RAMP AND DRIVEWAY DETAILS
R-417846
03/11/2022
DEVELOPMENT ENGINEERING
msippo 04/07/2022
CITY OF
RENTON
IN COMPLIANCE WITH CITY OF RENTON STANDARDSTED-40-4178SOLERA
2842 NE SUNSET BLVDRENTON, WA 98056SOLERA LUA20-000305C21-001020PR18-0003331601 5th Avenue, Suite 1600
Seattle, WA 98101
206.622.5822
www.kpff.com
R
Call 811two business daysbefore you dig
NW 1/4 OF THE NW 1/4 AND THE NE 1/4 OF THE NW 1/4 SECTION 9, TOWNSHIP 23 NORTH, RANGE 05 EAST, W.M.
JOINTING PLAN
R-417847
03/11/2022
DEVELOPMENT ENGINEERING
msippo 04/07/2022
CITY OF
RENTON
IN COMPLIANCE WITH CITY OF RENTON STANDARDSTED-40-4178SOLERA
2842 NE SUNSET BLVDRENTON, WA 98056SOLERA LUA20-000305C21-001020PR18-0003331601 5th Avenue, Suite 1600
Seattle, WA 98101
206.622.5822
www.kpff.com
R
Call 811two business daysbefore you dig
NW 1/4 OF THE NW 1/4 AND THE NE 1/4 OF THE NW 1/4 SECTION 9, TOWNSHIP 23 NORTH, RANGE 05 EAST, W.M.
JOINTING PLAN
R-417848
03/11/2022
DEVELOPMENT ENGINEERING
msippo 04/07/2022
CITY OF
RENTON
IN COMPLIANCE WITH CITY OF RENTON STANDARDSTED-40-4178SOLERA
2842 NE SUNSET BLVDRENTON, WA 98056SOLERA LUA20-000305C21-001020PR18-0003331601 5th Avenue, Suite 1600
Seattle, WA 98101
206.622.5822
www.kpff.com
R
Call 811two business daysbefore you dig
NW 1/4 OF THE NW 1/4 AND THE NE 1/4 OF THE NW 1/4 SECTION 9, TOWNSHIP 23 NORTH, RANGE 05 EAST, W.M.
JOINTING PLAN AND DETAILS
R-417849
03/11/2022
DEVELOPMENT ENGINEERING
msippo 04/07/2022
CITY OF
RENTON
IN COMPLIANCE WITH CITY OF RENTON STANDARDSTED-40-4178SOLERA
2842 NE SUNSET BLVDRENTON, WA 98056SOLERA LUA20-000305C21-001020PR18-0003331601 5th Avenue, Suite 1600
Seattle, WA 98101
206.622.5822
www.kpff.com
R
Call 811two business daysbefore you dig
NW 1/4 OF THE NW 1/4 AND THE NE 1/4 OF THE NW 1/4 SECTION 9, TOWNSHIP 23 NORTH, RANGE 05 EAST, W.M.
JOINTING DETAILS
R-417850
1' -
0
"
FACE OF
CURB
1' - 0" (TYP.)4" R
ISOLATION
PAD
USUAL
JOINT
TRACK
LESS
THAN
4' - 0"RECTANGULAR FRAME
ISOLATION JOINT ~
3/4" PREMOLDED
JOINT FILLER
4' - 0" OR MORE
FACE OF
CURB
RECTANGULAR
FRAME
1'
-
0
"
CIRCULAR
FRAME
1' - 0"CIRCULAR
FRAME
PAVEMENT
JOINT (TYP.)
ISOLATION JOINT ~
3/4" PREMOLDED
JOINT FILLER
1' - 0"USUAL
JOINT
TRACK
CIRCULAR
FRAME
PAVEMENT JOINT (TYP.)
ISOLATION JOINT ~
3/4" PREMOLDED
JOINT FILLER
FACE OF CURB
RECTANGULAR FRAME
(COMBINATION INLET SHOWN)1' - 0"CIRCULAR
FRAME
1'
-
0
"
PAVEMENT JOINT (TYP.)
CIRCULAR
FRAME
ADJUSTED PAVEMENT
JOINT
LESS
THAN
4' - 0"
4' - 0"
OR LESS
4' - 0"
OR MORE 4' - 0"OR MORE4' - 0"OR LESS1' -
0
"
FACE OF
CURB
PAVEMENT JOINT
4' - 0"
OR MORE
LESS
THAN
4' - 0"
FACE OF CURB
ALL CONDITIONS ARE SHOWN IN PLAN VIEW.
(SHOULDER USE ONLY)6' - 0" MIN.PAVEMENT JOINT
PAVEMENT JOINT PAVEMENT
JOINT (TYP.)
PAVEMENT JOINT (TYP.)
FACE OF CURB
EDGE OF SHOULDER
ISOLATION JOINT ~
3/4" PREMOLDED
JOINT FILLER
ISOLATION JOINT ~
3/4" PREMOLDED
JOINT FILLER
ISOLATION JOINT ~
3/4" PREMOLDED
JOINT FILLER
ISOLATION JOINT ~
3/4" PREMOLDED
JOINT FILLER
ISOLATION JOINT ~
3/4" PREMOLDED
JOINT FILLER
ISOLATION JOINT ~
3/4" PREMOLDED
JOINT FILLER
ISOLATION JOINT ~
3/4" PREMOLDED
JOINT FILLER
ISOLATION JOINT ~
3/4" PREMOLDED
JOINT FILLER
TIE BAR ~ # 5 BAR, 30" LONG
SPACING = 6" O.C.
TIE BAR ~ # 5 BAR,
30" LONG
SPACING = 6" O.C.
ADJUSTED PAVEMENT
JOINT (TYP.)
PAVEMENT
JOINT
USUAL JOINT
TRACK (TYP.)
TIE BAR ~
# 5 BAR, 30" LONG
SPACING = 6" O.C.
TIE BAR ~
# 5 BAR, 30" LONG
SPACING = 6" O.C.
03/11/2022
DEVELOPMENT ENGINEERING
msippo 04/07/2022
CITY OF
RENTON
IN COMPLIANCE WITH CITY OF RENTON STANDARDSTED-40-4178SOLERA
2842 NE SUNSET BLVDRENTON, WA 98056SOLERA LUA20-000305C21-001020PR18-0003331601 5th Avenue, Suite 1600
Seattle, WA 98101
206.622.5822
www.kpff.com
R
Call 811two business daysbefore you dig
NW 1/4 OF THE NW 1/4 AND THE NE 1/4 OF THE NW 1/4 SECTION 9, TOWNSHIP 23 NORTH, RANGE 05 EAST, W.M.
ROAD AND STORM DRAINAGE OVERVIEW
R-417851
03/11/2022
SURFACE WATER UTILITY
JFarah 04/01/2022
DEVELOPMENT ENGINEERING
msippo 04/07/2022
CITY OF
RENTON
IN COMPLIANCE WITH CITY OF RENTON STANDARDSTED-40-4178SOLERA
2842 NE SUNSET BLVDRENTON, WA 98056SOLERA LUA20-000305C21-001020PR18-0003331601 5th Avenue, Suite 1600
Seattle, WA 98101
206.622.5822
www.kpff.com
R
Call 811two business daysbefore you dig
NW 1/4 OF THE NW 1/4 AND THE NE 1/4 OF THE NW 1/4 SECTION 9, TOWNSHIP 23 NORTH, RANGE 05 EAST, W.M.
GRADING AND STORM DRAINAGE
JEFFERSON AVENUE NE PLAN AND PROFILE
R-417852
03/11/2022
SURFACE WATER UTILITY
JFarah 04/01/2022
DEVELOPMENT ENGINEERING
msippo 04/07/2022
CITY OF
RENTON
IN COMPLIANCE WITH CITY OF RENTON STANDARDSTED-40-4178SOLERA
2842 NE SUNSET BLVDRENTON, WA 98056SOLERA LUA20-000305C21-001020PR18-0003331601 5th Avenue, Suite 1600
Seattle, WA 98101
206.622.5822
www.kpff.com
R
Call 811two business daysbefore you dig
NW 1/4 OF THE NW 1/4 AND THE NE 1/4 OF THE NW 1/4 SECTION 9, TOWNSHIP 23 NORTH, RANGE 05 EAST, W.M.
GRADING AND STORM DRAINAGE
JEFFERSON AVENUE NE PLAN AND PROFILE
R-417853
03/11/2022
SURFACE WATER UTILITY
JFarah 04/01/2022
DEVELOPMENT ENGINEERING
msippo 04/07/2022
CITY OF
RENTON
IN COMPLIANCE WITH CITY OF RENTON STANDARDSTED-40-4178SOLERA
2842 NE SUNSET BLVDRENTON, WA 98056SOLERA LUA20-000305C21-001020PR18-0003331601 5th Avenue, Suite 1600
Seattle, WA 98101
206.622.5822
www.kpff.com
R
Call 811two business daysbefore you dig
NW 1/4 OF THE NW 1/4 AND THE NE 1/4 OF THE NW 1/4 SECTION 9, TOWNSHIP 23 NORTH, RANGE 05 EAST, W.M.
GRADING AND STORM DRAINAGE
JEFFERSON AVENUE NE PLAN AND PROFILE
R-417854
03/11/2022
SURFACE WATER UTILITY
JFarah 04/01/2022
DEVELOPMENT ENGINEERING
msippo 04/07/2022
CITY OF
RENTON
IN COMPLIANCE WITH CITY OF RENTON STANDARDSTED-40-4178SOLERA
2842 NE SUNSET BLVDRENTON, WA 98056SOLERA LUA20-000305C21-001020PR18-0003331601 5th Avenue, Suite 1600
Seattle, WA 98101
206.622.5822
www.kpff.com
R
Call 811two business daysbefore you dig
NW 1/4 OF THE NW 1/4 AND THE NE 1/4 OF THE NW 1/4 SECTION 9, TOWNSHIP 23 NORTH, RANGE 05 EAST, W.M.
GRADING AND STORM DRAINAGE
NE 11TH STREET PLAN AND PROFILE
R-417855
03/11/2022
SURFACE WATER UTILITY
JFarah 04/01/2022
DEVELOPMENT ENGINEERING
msippo 04/07/2022
CITY OF
RENTON
IN COMPLIANCE WITH CITY OF RENTON STANDARDSTED-40-4178SOLERA
2842 NE SUNSET BLVDRENTON, WA 98056SOLERA LUA20-000305C21-001020PR18-0003331601 5th Avenue, Suite 1600
Seattle, WA 98101
206.622.5822
www.kpff.com
R
Call 811two business daysbefore you dig
NW 1/4 OF THE NW 1/4 AND THE NE 1/4 OF THE NW 1/4 SECTION 9, TOWNSHIP 23 NORTH, RANGE 05 EAST, W.M.
GRADING AND STORM DRAINAGE
NE 11TH STREET PLAN AND PROFILE
R-417856
03/11/2022
SURFACE WATER UTILITY
JFarah 04/01/2022
DEVELOPMENT ENGINEERING
msippo 04/07/2022
CITY OF
RENTON
IN COMPLIANCE WITH CITY OF RENTON STANDARDSTED-40-4178SOLERA
2842 NE SUNSET BLVDRENTON, WA 98056SOLERA LUA20-000305C21-001020PR18-0003331601 5th Avenue, Suite 1600
Seattle, WA 98101
206.622.5822
www.kpff.com
R
Call 811two business daysbefore you dig
NW 1/4 OF THE NW 1/4 AND THE NE 1/4 OF THE NW 1/4 SECTION 9, TOWNSHIP 23 NORTH, RANGE 05 EAST, W.M.
GRADING AND STORM DRAINAGE
NE SUNSET BOULEVARD PLAN AND PROFILE
R-417857
03/11/2022
SURFACE WATER UTILITY
JFarah 04/01/2022
DEVELOPMENT ENGINEERING
msippo 04/07/2022
NE SUNSET BLVD
CITY OF
RENTON
IN COMPLIANCE WITH CITY OF RENTON STANDARDSTED-40-4178SOLERA
2842 NE SUNSET BLVDRENTON, WA 98056SOLERA LUA20-000305C21-001020PR18-0003331601 5th Avenue, Suite 1600
Seattle, WA 98101
206.622.5822
www.kpff.com
R
Call 811two business daysbefore you dig
NW 1/4 OF THE NW 1/4 AND THE NE 1/4 OF THE NW 1/4 SECTION 9, TOWNSHIP 23 NORTH, RANGE 05 EAST, W.M.
GRADING AND STORM DRAINAGE
NE SUNSET BOULEVARD PLAN AND PROFILE
R-417858
03/11/2022
SURFACE WATER UTILITY
JFarah 04/01/2022
DEVELOPMENT ENGINEERING
msippo 04/07/2022
CITY OF
RENTON
IN COMPLIANCE WITH CITY OF RENTON STANDARDSTED-40-4178SOLERA
2842 NE SUNSET BLVDRENTON, WA 98056SOLERA LUA20-000305C21-001020PR18-0003331601 5th Avenue, Suite 1600
Seattle, WA 98101
206.622.5822
www.kpff.com
R
Call 811two business daysbefore you dig
NW 1/4 OF THE NW 1/4 AND THE NE 1/4 OF THE NW 1/4 SECTION 9, TOWNSHIP 23 NORTH, RANGE 05 EAST, W.M.
GRADING AND STORM DRAINAGE
NE SUNSET BOULEVARD PLAN AND PROFILE
R-417859
03/11/2022
SURFACE WATER UTILITY
JFarah 04/01/2022
DEVELOPMENT ENGINEERING
msippo 04/07/2022
CITY OF
RENTON
IN COMPLIANCE WITH CITY OF RENTON STANDARDSTED-40-4178SOLERA
2842 NE SUNSET BLVDRENTON, WA 98056SOLERA LUA20-000305C21-001020PR18-0003331601 5th Avenue, Suite 1600
Seattle, WA 98101
206.622.5822
www.kpff.com
R
Call 811two business daysbefore you dig
NW 1/4 OF THE NW 1/4 AND THE NE 1/4 OF THE NW 1/4 SECTION 9, TOWNSHIP 23 NORTH, RANGE 05 EAST, W.M.
GRADING AND STORM DRAINAGE
HARRINGTON PLACE NE PLAN AND PROFILE
R-417860
03/11/2022
condition of
approval:
provide future storm
stub connection
SURFACE WATER UTILITY
JFarah 04/01/2022
DEVELOPMENT ENGINEERING
msippo 04/07/2022
CITY OF
RENTON
IN COMPLIANCE WITH CITY OF RENTON STANDARDSTED-40-4178SOLERA
2842 NE SUNSET BLVDRENTON, WA 98056SOLERA LUA20-000305C21-001020PR18-0003331601 5th Avenue, Suite 1600
Seattle, WA 98101
206.622.5822
www.kpff.com
R
Call 811two business daysbefore you dig
NW 1/4 OF THE NW 1/4 AND THE NE 1/4 OF THE NW 1/4 SECTION 9, TOWNSHIP 23 NORTH, RANGE 05 EAST, W.M.
GRADING AND STORM DRAINAGE
NE 12TH STREET PLAN AND PROFILE
R-417861
03/11/2022
SURFACE WATER UTILITY
JFarah 04/01/2022
DEVELOPMENT ENGINEERING
msippo 04/07/2022
CITY OF
RENTON
IN COMPLIANCE WITH CITY OF RENTON STANDARDSTED-40-4178SOLERA
2842 NE SUNSET BLVDRENTON, WA 98056SOLERA LUA20-000305C21-001020PR18-0003331601 5th Avenue, Suite 1600
Seattle, WA 98101
206.622.5822
www.kpff.com
R
Call 811two business daysbefore you dig
NW 1/4 OF THE NW 1/4 AND THE NE 1/4 OF THE NW 1/4 SECTION 9, TOWNSHIP 23 NORTH, RANGE 05 EAST, W.M.
GRADING AND STORM DRAINAGE
KIRKLAND AVENUE NE PLAN AND PROFILE
R-417862
03/11/2022
SURFACE WATER UTILITY
JFarah 04/01/2022
DEVELOPMENT ENGINEERING
msippo 04/07/2022
NE 10TH STCITY OF
RENTON
IN COMPLIANCE WITH CITY OF RENTON STANDARDSTED-40-4178SOLERA
2842 NE SUNSET BLVDRENTON, WA 98056SOLERA LUA20-000305C21-001020PR18-0003331601 5th Avenue, Suite 1600
Seattle, WA 98101
206.622.5822
www.kpff.com
R
Call 811two business daysbefore you dig
NW 1/4 OF THE NW 1/4 AND THE NE 1/4 OF THE NW 1/4 SECTION 9, TOWNSHIP 23 NORTH, RANGE 05 EAST, W.M.
STORM DRAINAGE PLAN
R-417863
03/11/2022
SURFACE WATER UTILITY
JFarah 04/01/2022
DEVELOPMENT ENGINEERING
msippo 04/07/2022
CITY OF
RENTON
IN COMPLIANCE WITH CITY OF RENTON STANDARDSTED-40-4178SOLERA
2842 NE SUNSET BLVDRENTON, WA 98056SOLERA LUA20-000305C21-001020PR18-0003331601 5th Avenue, Suite 1600
Seattle, WA 98101
206.622.5822
www.kpff.com
R
Call 811two business daysbefore you dig
NW 1/4 OF THE NW 1/4 AND THE NE 1/4 OF THE NW 1/4 SECTION 9, TOWNSHIP 23 NORTH, RANGE 05 EAST, W.M.
STORM DRAINAGE PROFILE
R-417864
03/11/2022
SURFACE WATER UTILITY
JFarah 04/01/2022
DEVELOPMENT ENGINEERING
msippo 04/07/2022
CITY OF
RENTON
IN COMPLIANCE WITH CITY OF RENTON STANDARDSTED-40-4178SOLERA
2842 NE SUNSET BLVDRENTON, WA 98056SOLERA LUA20-000305C21-001020PR18-0003331601 5th Avenue, Suite 1600
Seattle, WA 98101
206.622.5822
www.kpff.com
R
Call 811two business daysbefore you dig
NW 1/4 OF THE NW 1/4 AND THE NE 1/4 OF THE NW 1/4 SECTION 9, TOWNSHIP 23 NORTH, RANGE 05 EAST, W.M.
ROAD SECTIONS
R-417865
03/11/2022
DEVELOPMENT ENGINEERING
msippo 04/07/2022
CITY OF
RENTON
IN COMPLIANCE WITH CITY OF RENTON STANDARDSTED-40-4178SOLERA
2842 NE SUNSET BLVDRENTON, WA 98056SOLERA LUA20-000305C21-001020PR18-0003331601 5th Avenue, Suite 1600
Seattle, WA 98101
206.622.5822
www.kpff.com
R
Call 811two business daysbefore you dig
NW 1/4 OF THE NW 1/4 AND THE NE 1/4 OF THE NW 1/4 SECTION 9, TOWNSHIP 23 NORTH, RANGE 05 EAST, W.M.
ROAD SECTIONS
R-417866
03/11/2022
DEVELOPMENT ENGINEERING
msippo 04/07/2022
CITY OF
RENTON
IN COMPLIANCE WITH CITY OF RENTON STANDARDSTED-40-4178SOLERA
2842 NE SUNSET BLVDRENTON, WA 98056SOLERA LUA20-000305C21-001020PR18-0003331601 5th Avenue, Suite 1600
Seattle, WA 98101
206.622.5822
www.kpff.com
R
Call 811two business daysbefore you dig
NW 1/4 OF THE NW 1/4 AND THE NE 1/4 OF THE NW 1/4 SECTION 9, TOWNSHIP 23 NORTH, RANGE 05 EAST, W.M.
ROAD DETAILS
R-417867
03/11/2022
DEVELOPMENT ENGINEERING
msippo 04/07/2022
CITY OF
RENTON
IN COMPLIANCE WITH CITY OF RENTON STANDARDSTED-40-4178SOLERA
2842 NE SUNSET BLVDRENTON, WA 98056SOLERA LUA20-000305C21-001020PR18-0003331601 5th Avenue, Suite 1600
Seattle, WA 98101
206.622.5822
www.kpff.com
R
Call 811two business daysbefore you dig
NW 1/4 OF THE NW 1/4 AND THE NE 1/4 OF THE NW 1/4 SECTION 9, TOWNSHIP 23 NORTH, RANGE 05 EAST, W.M.
ROAD DETAILS
R-417868
03/11/2022
DEVELOPMENT ENGINEERING
msippo 04/07/2022
CITY OF
RENTON
IN COMPLIANCE WITH CITY OF RENTON STANDARDSTED-40-4178SOLERA
2842 NE SUNSET BLVDRENTON, WA 98056SOLERA LUA20-000305C21-001020PR18-0003331601 5th Avenue, Suite 1600
Seattle, WA 98101
206.622.5822
www.kpff.com
R
Call 811two business daysbefore you dig
NW 1/4 OF THE NW 1/4 AND THE NE 1/4 OF THE NW 1/4 SECTION 9, TOWNSHIP 23 NORTH, RANGE 05 EAST, W.M.
ROAD DETAILS
R-417869
03/11/2022
DEVELOPMENT ENGINEERING
msippo 04/07/2022
CITY OF
RENTON
IN COMPLIANCE WITH CITY OF RENTON STANDARDSTED-40-4178SOLERA
2842 NE SUNSET BLVDRENTON, WA 98056SOLERA LUA20-000305C21-001020PR18-0003331601 5th Avenue, Suite 1600
Seattle, WA 98101
206.622.5822
www.kpff.com
R
Call 811two business daysbefore you dig
NW 1/4 OF THE NW 1/4 AND THE NE 1/4 OF THE NW 1/4 SECTION 9, TOWNSHIP 23 NORTH, RANGE 05 EAST, W.M.
STORM DRAINAGE DETAILS
R-417870
03/11/2022
SURFACE WATER UTILITY
JFarah 04/01/2022
DEVELOPMENT ENGINEERING
msippo 04/07/2022
CITY OF
RENTON
IN COMPLIANCE WITH CITY OF RENTON STANDARDSTED-40-4178SOLERA
2842 NE SUNSET BLVDRENTON, WA 98056SOLERA LUA20-000305C21-001020PR18-0003331601 5th Avenue, Suite 1600
Seattle, WA 98101
206.622.5822
www.kpff.com
R
Call 811two business daysbefore you dig
NW 1/4 OF THE NW 1/4 AND THE NE 1/4 OF THE NW 1/4 SECTION 9, TOWNSHIP 23 NORTH, RANGE 05 EAST, W.M.
STORM DRAINAGE DETAILS
R-417871
03/11/2022
SURFACE WATER UTILITY
JFarah 04/01/2022
DEVELOPMENT ENGINEERING
msippo 04/07/2022
CITY OF
RENTON
IN COMPLIANCE WITH CITY OF RENTON STANDARDSTED-40-4178SOLERA
2842 NE SUNSET BLVDRENTON, WA 98056SOLERA LUA20-000305C21-001020PR18-0003331601 5th Avenue, Suite 1600
Seattle, WA 98101
206.622.5822
www.kpff.com
R
Call 811two business daysbefore you dig
NW 1/4 OF THE NW 1/4 AND THE NE 1/4 OF THE NW 1/4 SECTION 9, TOWNSHIP 23 NORTH, RANGE 05 EAST, W.M.
STORM DRAINAGE DETAILS
R-417872
03/11/2022
SURFACE WATER UTILITY
JFarah 04/01/2022
DEVELOPMENT ENGINEERING
msippo 04/07/2022
CITY OF
RENTON
IN COMPLIANCE WITH CITY OF RENTON STANDARDSTED-40-4178SOLERA
2842 NE SUNSET BLVDRENTON, WA 98056SOLERA LUA20-000305C21-001020PR18-0003331601 5th Avenue, Suite 1600
Seattle, WA 98101
206.622.5822
www.kpff.com
R
Call 811two business daysbefore you dig
NW 1/4 OF THE NW 1/4 AND THE NE 1/4 OF THE NW 1/4 SECTION 9, TOWNSHIP 23 NORTH, RANGE 05 EAST, W.M.
STORM DRAINAGE DETAILS
R-417873
03/11/2022
SURFACE WATER UTILITY
JFarah 04/01/2022
DEVELOPMENT ENGINEERING
msippo 04/07/2022
CITY OF
RENTON
IN COMPLIANCE WITH CITY OF RENTON STANDARDSTED-40-4178SOLERA
2842 NE SUNSET BLVDRENTON, WA 98056SOLERA LUA20-000305C21-001020PR18-0003331601 5th Avenue, Suite 1600
Seattle, WA 98101
206.622.5822
www.kpff.com
R
Call 811two business daysbefore you dig
NW 1/4 OF THE NW 1/4 AND THE NE 1/4 OF THE NW 1/4 SECTION 9, TOWNSHIP 23 NORTH, RANGE 05 EAST, W.M.
STORMWATER CHAMBER SYSTEM LAYOUT
R-417874
03/11/2022
SURFACE WATER UTILITY
JFarah 04/01/2022
DEVELOPMENT ENGINEERING
msippo 04/07/2022
CITY OF
RENTON
IN COMPLIANCE WITH CITY OF RENTON STANDARDSTED-40-4178SOLERA
2842 NE SUNSET BLVDRENTON, WA 98056SOLERA LUA20-000305C21-001020PR18-0003331601 5th Avenue, Suite 1600
Seattle, WA 98101
206.622.5822
www.kpff.com
R
Call 811two business daysbefore you dig
NW 1/4 OF THE NW 1/4 AND THE NE 1/4 OF THE NW 1/4 SECTION 9, TOWNSHIP 23 NORTH, RANGE 05 EAST, W.M.
STORMWATER CHAMBER SYSTEM DETAILS
R-417875
03/11/2022
SURFACE WATER UTILITY
JFarah 04/01/2022
DEVELOPMENT ENGINEERING
msippo 04/07/2022
¹
¹
¹
¹
³
D
C
B
A
CITY OF
RENTON
IN COMPLIANCE WITH CITY OF RENTON STANDARDSTED-40-4178SOLERA
2842 NE SUNSET BLVDRENTON, WA 98056SOLERA LUA20-000305C21-001020PR18-0003331601 5th Avenue, Suite 1600
Seattle, WA 98101
206.622.5822
www.kpff.com
R
Call 811two business daysbefore you dig
NW 1/4 OF THE NW 1/4 AND THE NE 1/4 OF THE NW 1/4 SECTION 9, TOWNSHIP 23 NORTH, RANGE 05 EAST, W.M.
STORMWATER CHAMBER SYSTEM DETAILS
R-417876
03/11/2022
SURFACE WATER UTILITY
JFarah 04/01/2022
DEVELOPMENT ENGINEERING
msippo 04/07/2022
NE SUNSET BLVDNE 10TH STKIRKLAND AVE NENE 12TH
ST
HARRINGTON PL NEHAR
RI
N
G
T
O
N
A
V
E
N
E
NE SUNSET BLVD
+ TW
3
4
9
.
2
5
+ 350.25
+ TW 3
4
9
.
2
5
+ TW
3
4
5
.
0
0
+ 350.25
+ TW
3
4
7
.
5
0
+ TW
3
5
0.
2
5
+ TW 3
5
0.
2
5
+ TW 3
5
0
.
2
5
+ TW
3
5
0
.
2
5
+ 350.25 + 350.25 + 350.25+ 350.25 + 350.25 + 350.25+ 350.25
+ 350.25
TW 34
3
.
0
0
+
+ TW 3
5
5.
6
3
TW 3
6
5
.
0
0
+
+ TW 3
5
4.
5
0
TW 3
5
2
.
1
5
++ TW 352.15+ TW
3
5
4
.
5
0
TW 3
5
2
.
1
5
+
+ TW
3
5
4.
5
0
+ T
W
3
5
3
.
0
0
TW
3
5
6
.
9
9
+
TW 3
5
7
.
6
4
+
TW
3
5
8
.
3
9
+
TW 3
5
9
.
2
9
+
TW 3
6
0
.
2
8
+
TW 3
6
5
.
0
0
+
+ TW
3
4
7
.
5
0
+ TW
3
4
7
.
5
0
+ TW
3
4
7.
5
0
+ TW
3
4
7.
5
0
+ TW 3
4
7.
5
0
+ TW 3
5
0.
2
5
+ TW
3
4
3
.
9
2
+ TW 3
4
6.
9
2
BW 34
3.
9
2
BW 34
0
.
8
9
+ TW
3
4
5
.
0
0
+ TW
3
4
7
.
5
0
+ TW 3
4
9.
2
5
+ BS 3
4
8.
5
0
+ BS 3
4
9
.
2
5
+ BS 3
4
8.
2
5
+ BS 3
4
7
.
3
3
+ BS 3
4
6
.
2
0
+ BS 3
4
6
.
1
7
+ BS 3
4
6
.
2
0
+ TW 3
5
5.
5
0
+ TW =
T
S
=
3
6
0.
5
3
+ BS 3
5
5
.
8
6
TW 35
4
.
3
+
+ TW
3
6
2
.
1
6
+ TW 3
6
2
.
1
6
+ TW 3
6
2.
1
6
+ TW 3
6
2.
1
6
+ TW 3
6
7
.
8
3
TW 36
8.
4
2
+
+ TW 3
5
6
.
0
4
+ TW 3
5
6.
4
2
+ TW
3
5
6
.
8
8
+ TW 3
5
7
.
5
5
+ TW 3
5
8
.
3
5
+ TW 3
5
8.
9
9
+ TW 3
6
0.
0
0
+ TW 3
6
1.
0
8
+ TW
3
6
2
.
9
3
TW
3
5
5
.
7
5
+
+ TW 3
6
5
.
6
0
+ TW 3
6
5.
6
0 + 361.04+ 359.09
+ TW
3
6
1
.
1
0
+ TW 366.10+ TW 366.10+ TW
3
65.09+ 366.04+ 363.03
+ BS 34
7
.
7
5
+ TS 3
5
5.
1+ BS 3
5
3
.
5
+ TS 3
6
0
.
5
3
TW 35
4
.
3
++ TW 363.97+ TW 364.09
+ TW 363.09 + TW 360.47+ TW 3
6
0
.
1
2
+ TW 3
6
5.
0
9
+ TW 364.09
+ TW 363.09
+ BS 3
4
8
.
2
5
+ TS 3
5
0
.
2
5
+ TW 3
4
2
.
6
7
BW 35
2
.
1
5
BW 35
2
.
1
5
BW 35
2.
1
5
BW
3
5
0
.
0
0
BW 3
5
0
.
0
0BW 350.00
BW 35
4
.
1
3
BW 3
5
4
.
1
3
BW
3
5
6
.
1
4
BW
3
5
6
.
8
9
BW 3
5
8
.
0
5
BW
3
5
9
.
0
9
+ TS 3
5
2
.
1
5
BS
3
5
0
.
0
0
+
+ TS 3
5
2.
1
5
BS 350.
0
0
+
BW 3
5
2
.
0
0
TS 3
5
9
.
0
0
+
TS 3
5
7
.
9
6
+
TS 3
5
7
.
1
7
+
TS 3
5
6
.
4
2
+
+ TS 35
4.
8
3
+ TS 35
5
.
1
8
+ TS 3
5
5
.
6
5
+ TS 3
5
6
.
2
5
+ TS 3
5
6
.
9
7
+ TS 35
7.
8
1
+ TS 35
8
.
7
7
+ TS 3
5
9
.
8
7
+ TS 3
6
0
.
9
9
+ TS 365.51TW 363.86 +
+ TS 3
5
5
.
6
6+ 351.82CITY OF
RENTON
IN COMPLIANCE WITH CITY OF RENTON STANDARDSTED-40-4178SOLERA
2842 NE SUNSET BLVDRENTON, WA 98056SOLERA LUA20-000305C21-001020PR18-0003331601 5th Avenue, Suite 1600
Seattle, WA 98101
206.622.5822
www.kpff.com
R
Call 811two business daysbefore you dig
NW 1/4 OF THE NW 1/4 AND THE NE 1/4 OF THE NW 1/4 SECTION 9, TOWNSHIP 23 NORTH, RANGE 05 EAST, W.M.WWP-27-4178WTRP-27-4178COMPOSITE UTILITY PLAN
R-417877W-417801S-417801
03/11/2022
DEVELOPMENT ENGINEERING
msippo 04/07/2022
NE SUNSET BLVDNE 10TH STKIRKLAND AVE NENE 12TH
ST
HARRINGTON PL NEHAR
RI
N
G
T
O
N
A
V
E
N
E
NE SUNSET BLVD
CITY OF
RENTON
IN COMPLIANCE WITH CITY OF RENTON STANDARDSTED-40-4178SOLERA
2842 NE SUNSET BLVDRENTON, WA 98056SOLERA LUA20-000305C21-001020PR18-0003331601 5th Avenue, Suite 1600
Seattle, WA 98101
206.622.5822
www.kpff.com
R
Call 811two business daysbefore you dig
NW 1/4 OF THE NW 1/4 AND THE NE 1/4 OF THE NW 1/4 SECTION 9, TOWNSHIP 23 NORTH, RANGE 05 EAST, W.M.WWP-27-4178WTRP-27-4178SURFACE MOUNTED UTILITY PLAN
R-417878W-417802S-417802
03/11/2022
HEX Condition #17 remains applicable but
will be deferred due to PSE lag time.
Current Planning Project manager shall
review and approve prior to installation
of the transformers.
DEVELOPMENT ENGINEERING
msippo 04/07/2022
NE SUNSET BLVDNE 10TH STKIRKLAND AVE NENE 12TH
ST
HARRINGTON PL NEHAR
RI
N
G
T
O
N
A
V
E
N
E
NE SUNSET BLVD
+ TW
3
4
9
.
2
5
+ 350.25
+ TW 3
4
9
.
2
5
+ TW
3
4
5
.
0
0
+ 350.25
+ TW
3
4
7
.
5
0
+ TW
3
5
0.
2
5
+ TW 3
5
0.
2
5
+ TW 3
5
0
.
2
5
+ TW
3
5
0
.
2
5
+ 350.25 + 350.25 + 350.25+ 350.25 + 350.25 + 350.25+ 350.25
+ 350.25
TW 34
3
.
0
0
+
+ TW 3
5
5.
6
3
TW 3
6
5
.
0
0
+
+ TW 3
5
4.
5
0
TW 3
5
2
.
1
5
++ TW 352.15
+ TW
3
5
4
.
5
0
TW 3
5
2
.
1
5
+
+ TW
3
5
4
.
5
0
+ T
W
3
5
3
.
0
0
TW
3
5
6
.
9
9
+
TW 3
5
7
.
6
4
+
TW
3
5
8
.
3
9
+
TW 3
5
9
.
2
9
+
TW 3
6
0
.
2
8
+
TW 3
6
5
.
0
0
+
+ TW
3
4
7
.
5
0
+ TW
3
4
7
.
5
0
+ TW
3
4
7.
5
0
+ TW
3
4
7.
5
0
+ TW 3
4
7
.
5
0
+ TW 3
5
0.
2
5
+ TW
3
4
3
.
9
2
+ TW 3
4
6.
9
2
BW 34
3.
9
2
BW 34
0
.
8
9
+ TW
3
4
5
.
0
0
+ TW
3
4
7
.
5
0
+ TW 3
4
9.
2
5
+ BS 3
4
8.
5
0
+ BS 3
4
9
.
2
5
+ BS 3
4
8
.
2
5
+ BS 3
4
7
.
3
3
+ BS 3
4
6
.
2
0
+ BS 3
4
6
.
1
7
+ BS 3
4
6.
2
0
+ TW 3
5
5.
5
0
+ TW =
T
S
=
3
6
0.
5
3
+ BS 3
5
5
.
8
6
TW 35
4
.
3
+
+ TW
3
6
2
.
1
6
+ TW 3
6
2
.
1
6
+ TW 3
6
2.
1
6
+ TW 3
6
2
.
1
6
+ TW 3
6
7
.
8
3
TW 36
8.
4
2
+
+ TW 3
5
6
.
0
4
+ TW 3
5
6
.
4
2
+ TW
3
5
6
.
8
8
+ TW 3
5
7
.
5
5
+ TW 3
5
8
.
3
5
+ TW 3
5
8
.
9
9
+ TW 3
6
0.
0
0
+ TW 3
6
1.
0
8
+ TW 3
6
2
.
9
3
TW
3
5
5
.
7
5
+
+ TW 3
6
5.
6
0
+ TW 3
6
5.
6
0 + 361.04+ 359.09
+ TW
3
6
1
.
1
0
+ TW 366.10+ TW 366.10+ TW
36
5.0
9+ 366.04+ 363.03
+ BS 3
4
7
.
7
5
+ TS 3
5
5.
1+ BS 3
5
3
.
5
+ TS 3
6
0
.
5
3
TW 35
4
.
3
++ TW 363.97+ TW 364.09
+ TW 363.09 + TW 360.47+ TW 3
6
0
.
1
2
+ TW 3
6
5.
0
9
+ TW 364.09
+ TW 363.09
+ BS 3
4
8
.
2
5
+ TS 3
5
0
.
2
5
+ TW 3
4
2
.
6
7
BW 35
2
.
1
5
BW 35
2
.
1
5
BW 35
2.
1
5
BW
3
5
0
.
0
0
BW 3
5
0
.
0
0BW 350.00
BW 35
4
.
1
3
BW 3
5
4
.
1
3
BW
3
5
6
.
1
4
BW
3
5
6
.
8
9
BW 3
5
8
.
0
5
BW
3
5
9
.
0
9
+ TS 3
5
2
.
1
5
BS
3
5
0
.
0
0
+
+ TS 3
5
2.
1
5
BS 350.
0
0
+
BW 3
5
2
.
0
0
TS 3
5
9
.
0
0
+
TS 3
5
7
.
9
6
+
TS 3
5
7
.
1
7
+
TS 3
5
6
.
4
2
+
+ TS 35
4
.
8
3
+ TS 35
5
.
1
8
+ TS 3
5
5
.
6
5
+ TS 3
5
6
.
2
5
+ TS 3
5
6
.
9
7
+ TS 35
7.
8
1
+ TS 35
8
.
7
7
+ TS 3
5
9
.
8
7
+ TS 36
0
.
9
9
+ TS 365.51TW 363.86 +
+ TS 3
5
5
.
6
6+ 351.82CITY OF
RENTON
IN COMPLIANCE WITH CITY OF RENTON STANDARDSTED-40-4178SOLERA
2842 NE SUNSET BLVDRENTON, WA 98056SOLERA LUA20-000305C21-001020PR18-0003331601 5th Avenue, Suite 1600
Seattle, WA 98101
206.622.5822
www.kpff.com
R
Call 811two business daysbefore you dig
NW 1/4 OF THE NW 1/4 AND THE NE 1/4 OF THE NW 1/4 SECTION 9, TOWNSHIP 23 NORTH, RANGE 05 EAST, W.M.WWP-27-4178WTRP-27-4178WATER AND SEWER PLAN OVERVIEW
R-417879W-417803S-417803
03/11/2022
WASTEWATER UTILITY
JStowell 04/04/2022
DEVELOPMENT ENGINEERING
msippo 04/07/2022
WATER UTILITY
agafour 04/07/2022
CITY OF
RENTON
IN COMPLIANCE WITH CITY OF RENTON STANDARDSTED-40-4178SOLERA
2842 NE SUNSET BLVDRENTON, WA 98056SOLERA LUA20-000305C21-001020PR18-0003331601 5th Avenue, Suite 1600
Seattle, WA 98101
206.622.5822
www.kpff.com
R
Call 811two business daysbefore you dig
NW 1/4 OF THE NW 1/4 AND THE NE 1/4 OF THE NW 1/4 SECTION 9, TOWNSHIP 23 NORTH, RANGE 05 EAST, W.M.WWP-27-4178WTRP-27-4178FIRE PROTECTION PLAN
R-417880W-417804S-417804
03/11/2022
DEVELOPMENT ENGINEERING
msippo 04/07/2022
CITY OF
RENTON
IN COMPLIANCE WITH CITY OF RENTON STANDARDSTED-40-4178SOLERA
2842 NE SUNSET BLVDRENTON, WA 98056SOLERA LUA20-000305C21-001020PR18-0003331601 5th Avenue, Suite 1600
Seattle, WA 98101
206.622.5822
www.kpff.com
R
Call 811two business daysbefore you dig
NW 1/4 OF THE NW 1/4 AND THE NE 1/4 OF THE NW 1/4 SECTION 9, TOWNSHIP 23 NORTH, RANGE 05 EAST, W.M.WWP-27-4178WTRP-27-4178WATER AND SEWER
JEFFERSON AVENUE NE PLAN AND PROFILE
R-417881W-417805S-417805
03/11/2022
WASTEWATER UTILITY
JStowell 04/04/2022
DEVELOPMENT ENGINEERING
msippo 04/07/2022
4"4"
4"
4"
4"4" D.I.4" D.I.6" D.I.WATER UTILITY
agafour 04/07/2022
CITY OF
RENTON
IN COMPLIANCE WITH CITY OF RENTON STANDARDSTED-40-4178SOLERA
2842 NE SUNSET BLVDRENTON, WA 98056SOLERA LUA20-000305C21-001020PR18-0003331601 5th Avenue, Suite 1600
Seattle, WA 98101
206.622.5822
www.kpff.com
R
Call 811two business daysbefore you dig
NW 1/4 OF THE NW 1/4 AND THE NE 1/4 OF THE NW 1/4 SECTION 9, TOWNSHIP 23 NORTH, RANGE 05 EAST, W.M.WWP-27-4178WTRP-27-4178WATER AND SEWER
JEFFERSON AVENUE NE PLAN AND PROFILE
R-417881W-417806S-417806
03/11/2022
(1) 12" gate valve (fl x mj)
(1) 12" fl x mj adaptor
(fl x fl)
no gate valve to be
constructed here
no gate valve to be
constructed here
WASTEWATER UTILITY
JStowell 04/04/2022
DEVELOPMENT ENGINEERING
msippo 04/07/2022
WATER UTILITY
agafour 04/07/2022
CITY OF
RENTON
IN COMPLIANCE WITH CITY OF RENTON STANDARDSTED-40-4178SOLERA
2842 NE SUNSET BLVDRENTON, WA 98056SOLERA LUA20-000305C21-001020PR18-0003331601 5th Avenue, Suite 1600
Seattle, WA 98101
206.622.5822
www.kpff.com
R
Call 811two business daysbefore you dig
NW 1/4 OF THE NW 1/4 AND THE NE 1/4 OF THE NW 1/4 SECTION 9, TOWNSHIP 23 NORTH, RANGE 05 EAST, W.M.WWP-27-4178WTRP-27-4178WATER AND SEWER
JEFFERSON AVENUE NE PLAN AND PROFILE
R-417883W-417807S-417807
03/11/2022
construction to
maintain
approximately 4' of
minimum cover unless
vertical crossings
require deeper
construction.
WASTEWATER UTILITY
JStowell 04/04/2022
DEVELOPMENT ENGINEERING
msippo 04/07/2022
WATER UTILITY
agafour 04/07/2022
CITY OF
RENTON
IN COMPLIANCE WITH CITY OF RENTON STANDARDSTED-40-4178SOLERA
2842 NE SUNSET BLVDRENTON, WA 98056SOLERA LUA20-000305C21-001020PR18-0003331601 5th Avenue, Suite 1600
Seattle, WA 98101
206.622.5822
www.kpff.com
R
Call 811two business daysbefore you dig
NW 1/4 OF THE NW 1/4 AND THE NE 1/4 OF THE NW 1/4 SECTION 9, TOWNSHIP 23 NORTH, RANGE 05 EAST, W.M.WWP-27-4178WTRP-27-4178WATER AND SEWER
NE 11TH STREET PLAN AND PROFILE
R-417884W-417808S-417808
03/11/2022
WASTEWATER UTILITY
JStowell 04/04/2022
DEVELOPMENT ENGINEERING
msippo 04/07/2022
WATER UTILITY
agafour 04/07/2022
CITY OF
RENTON
IN COMPLIANCE WITH CITY OF RENTON STANDARDSTED-40-4178SOLERA
2842 NE SUNSET BLVDRENTON, WA 98056SOLERA LUA20-000305C21-001020PR18-0003331601 5th Avenue, Suite 1600
Seattle, WA 98101
206.622.5822
www.kpff.com
R
Call 811two business daysbefore you dig
NW 1/4 OF THE NW 1/4 AND THE NE 1/4 OF THE NW 1/4 SECTION 9, TOWNSHIP 23 NORTH, RANGE 05 EAST, W.M.WWP-27-4178WTRP-27-4178WATER AND SEWER
NE 11TH STREET PLAN AND PROFILE
R-417885W-417809S-417809
03/11/2022
WASTEWATER UTILITY
JStowell 04/04/2022
DEVELOPMENT ENGINEERING
msippo 04/07/2022
WATER UTILITY
agafour 04/07/2022
HARRINGTON PL NE
CITY OF
RENTON
IN COMPLIANCE WITH CITY OF RENTON STANDARDSTED-40-4178SOLERA
2842 NE SUNSET BLVDRENTON, WA 98056SOLERA LUA20-000305C21-001020PR18-0003331601 5th Avenue, Suite 1600
Seattle, WA 98101
206.622.5822
www.kpff.com
R
Call 811two business daysbefore you dig
NW 1/4 OF THE NW 1/4 AND THE NE 1/4 OF THE NW 1/4 SECTION 9, TOWNSHIP 23 NORTH, RANGE 05 EAST, W.M.WWP-27-4178WTRP-27-4178WATER AND SEWER
HARRINGTON PL NE PLAN AND PROFILE
R-417886W-417810S-417810
03/11/2022
DEVELOPMENT ENGINEERING
msippo 04/07/2022
WATER UTILITY
agafour 04/07/2022
KIRKLAND AVE NECITY OF
RENTON
IN COMPLIANCE WITH CITY OF RENTON STANDARDSTED-40-4178SOLERA
2842 NE SUNSET BLVDRENTON, WA 98056SOLERA LUA20-000305C21-001020PR18-0003331601 5th Avenue, Suite 1600
Seattle, WA 98101
206.622.5822
www.kpff.com
R
Call 811two business daysbefore you dig
NW 1/4 OF THE NW 1/4 AND THE NE 1/4 OF THE NW 1/4 SECTION 9, TOWNSHIP 23 NORTH, RANGE 05 EAST, W.M.
WATER AND SEWER
KIRKLAND AVE NE PLAN
R-417887W-417811S-417811
03/11/2022
condition of approval:
hydrant to be located
further away from
driveway wing to reduce
potential confilicts with
turning vehicles.
DEVELOPMENT ENGINEERING
msippo 04/07/2022
CUT-IN VALVES (BY CITY FORCES)
CUT-IN VALVES (BY CITY FORCES)
CUT-IN VALVES (BY CITY FORCES)
CUT-IN VALVES (BY CITY FORCES)
4"
4"
4"
4"
2-10" SLEEVES (MJ)
2-10" SLEEVES (MJ)
2-10" SLEEVES (MJ)
2-10" SLEEVES (MJ)4" D.I.4" D.I.6" D.I.WATER UTILITY
agafour 04/07/2022
CITY OF
RENTON
IN COMPLIANCE WITH CITY OF RENTON STANDARDSTED-40-4178SOLERA
2842 NE SUNSET BLVDRENTON, WA 98056SOLERA LUA20-000305C21-001020PR18-0003331601 5th Avenue, Suite 1600
Seattle, WA 98101
206.622.5822
www.kpff.com
R
Call 811two business daysbefore you dig
NW 1/4 OF THE NW 1/4 AND THE NE 1/4 OF THE NW 1/4 SECTION 9, TOWNSHIP 23 NORTH, RANGE 05 EAST, W.M.WWP-27-4178WTRP-27-4178ENLARGED WATER PLANS
R-417888W-417812S-417812
03/11/2022
DEVELOPMENT ENGINEERING
msippo 04/07/2022
WATER UTILITY
agafour 04/07/2022
CITY OF
RENTON
IN COMPLIANCE WITH CITY OF RENTON STANDARDSTED-40-4178SOLERA
2842 NE SUNSET BLVDRENTON, WA 98056SOLERA LUA20-000305C21-001020PR18-0003331601 5th Avenue, Suite 1600
Seattle, WA 98101
206.622.5822
www.kpff.com
R
Call 811two business daysbefore you dig
NW 1/4 OF THE NW 1/4 AND THE NE 1/4 OF THE NW 1/4 SECTION 9, TOWNSHIP 23 NORTH, RANGE 05 EAST, W.M.WWP-27-4178WTRP-27-4178ENLARGED WATER PLANS
R-417889W-417813S-417813
03/11/2022
DEVELOPMENT ENGINEERING
msippo 04/07/20224" D.I.4" D.I.6" D.I.4" D.I.4" D.I.WATER UTILITY
agafour 04/07/2022
4"x 3" REDUCER
CITY OF
RENTON
IN COMPLIANCE WITH CITY OF RENTON STANDARDSTED-40-4178SOLERA
2842 NE SUNSET BLVDRENTON, WA 98056SOLERA LUA20-000305C21-001020PR18-0003331601 5th Avenue, Suite 1600
Seattle, WA 98101
206.622.5822
www.kpff.com
R
Call 811two business daysbefore you dig
NW 1/4 OF THE NW 1/4 AND THE NE 1/4 OF THE NW 1/4 SECTION 9, TOWNSHIP 23 NORTH, RANGE 05 EAST, W.M.WWP-27-4178WTRP-27-4178WATER UTILITY NOTES AND SPECIFICATIONS
R-417890W-417814S-417814
’
”
“ ”
“”
“”
’
’
03/11/2022
DEVELOPMENT ENGINEERING
msippo 04/07/2022
CITY OF
RENTON
IN COMPLIANCE WITH CITY OF RENTON STANDARDSTED-40-4178SOLERA
2842 NE SUNSET BLVDRENTON, WA 98056SOLERA LUA20-000305C21-001020PR18-0003331601 5th Avenue, Suite 1600
Seattle, WA 98101
206.622.5822
www.kpff.com
R
Call 811two business daysbefore you dig
NW 1/4 OF THE NW 1/4 AND THE NE 1/4 OF THE NW 1/4 SECTION 9, TOWNSHIP 23 NORTH, RANGE 05 EAST, W.M.WWP-27-4178WTRP-27-4178WATER AND SEWER DETAILS
R-417891W-417815S-417815
03/11/2022
DEVELOPMENT ENGINEERING
msippo 04/07/2022
WATER UTILITY
agafour 04/07/2022
CITY OF
RENTON
IN COMPLIANCE WITH CITY OF RENTON STANDARDSTED-40-4178SOLERA
2842 NE SUNSET BLVDRENTON, WA 98056SOLERA LUA20-000305C21-001020PR18-0003331601 5th Avenue, Suite 1600
Seattle, WA 98101
206.622.5822
www.kpff.com
R
Call 811two business daysbefore you dig
NW 1/4 OF THE NW 1/4 AND THE NE 1/4 OF THE NW 1/4 SECTION 9, TOWNSHIP 23 NORTH, RANGE 05 EAST, W.M.WWP-27-4178WTRP-27-4178WATER AND SEWER DETAILS
R-417892W-417816S-417816
03/11/2022
WASTEWATER UTILITY
JStowell 04/04/2022
DEVELOPMENT ENGINEERING
msippo 04/07/2022
WATER UTILITY
agafour 04/07/2022
CITY OF
RENTON
IN COMPLIANCE WITH CITY OF RENTON STANDARDSTED-40-4178SOLERA
2842 NE SUNSET BLVDRENTON, WA 98056SOLERA LUA20-000305C21-001020PR18-0003331601 5th Avenue, Suite 1600
Seattle, WA 98101
206.622.5822
www.kpff.com
R
Call 811two business daysbefore you dig
NW 1/4 OF THE NW 1/4 AND THE NE 1/4 OF THE NW 1/4 SECTION 9, TOWNSHIP 23 NORTH, RANGE 05 EAST, W.M.WWP-27-4178WTRP-27-4178WATER AND SEWER DETAILS
R-417893W-417817S-417817
03/11/2022
WASTEWATER UTILITY
JStowell 04/04/2022
DEVELOPMENT ENGINEERING
msippo 04/07/2022
WATER UTILITY
agafour 04/07/2022
CITY OF
RENTON
IN COMPLIANCE WITH CITY OF RENTON STANDARDSTED-40-4178SOLERA
2842 NE SUNSET BLVDRENTON, WA 98056SOLERA LUA20-000305C21-001020PR18-0003331601 5th Avenue, Suite 1600
Seattle, WA 98101
206.622.5822
www.kpff.com
R
Call 811two business daysbefore you dig
NW 1/4 OF THE NW 1/4 AND THE NE 1/4 OF THE NW 1/4 SECTION 9, TOWNSHIP 23 NORTH, RANGE 05 EAST, W.M.WWP-27-4178WTRP-27-4178WATER AND SEWER DETAILS
R-417894W-417818S-417818
03/11/2022
DEVELOPMENT ENGINEERING
msippo 04/07/2022
FOR 3" METER INTALL 4"x3" REDUCER (MJxMJ)OUTSIDE OF VAULT
WATER UTILITY
agafour 04/07/2022
CITY OF
RENTON
IN COMPLIANCE WITH CITY OF RENTON STANDARDSTED-40-4178SOLERA
2842 NE SUNSET BLVDRENTON, WA 98056SOLERA LUA20-000305C21-001020PR18-0003331601 5th Avenue, Suite 1600
Seattle, WA 98101
206.622.5822
www.kpff.com
R
Call 811two business daysbefore you dig
NW 1/4 OF THE NW 1/4 AND THE NE 1/4 OF THE NW 1/4 SECTION 9, TOWNSHIP 23 NORTH, RANGE 05 EAST, W.M.WWP-27-4178WTRP-27-4178WATER AND SEWER DETAILS
R-417895W-417819S-417819
03/11/2022
WASTEWATER UTILITY
JStowell 04/04/2022
DEVELOPMENT ENGINEERING
msippo 04/07/2022
4'4'#4 REBAR AT 8" ON CENTER IN BOTH DIRECTIONS
WATER UTILITY
agafour 04/07/2022
Know what'sbelow.Callbefore you dig.CITY OFRENTONIN COMPLIANCE WITH CITY OF RENTON STANDARDSTED-40-4178
SOLERA2842 NE SUNSET BLVDRENTON, WA 98056SOLERA
LUA20-000305 C21-001020PR18-000333 NW 1/4 OF THE NW 1/4 AND THE NE 1/4 OF THE NW 1/4 SECTION 9, TOWNSHIP 23 NORTH, RANGE 05 EAST, W.M.96144896CURRENT PLANNINGMHerrera 04/06/2022DEVELOPMENT ENGINEERINGmsippo 04/07/2022
Know what'sbelow.Callbefore you dig.CITY OFRENTONIN COMPLIANCE WITH CITY OF RENTON STANDARDSTED-40-4178
SOLERA2842 NE SUNSET BLVDRENTON, WA 98056SOLERA
LUA20-000305 C21-001020PR18-000333 NW 1/4 OF THE NW 1/4 AND THE NE 1/4 OF THE NW 1/4 SECTION 9, TOWNSHIP 23 NORTH, RANGE 05 EAST, W.M.97144897CURRENT PLANNINGMHerrera 04/06/2022DEVELOPMENT ENGINEERINGmsippo 04/07/2022
Know what'sbelow.Callbefore you dig.CITY OFRENTONIN COMPLIANCE WITH CITY OF RENTON STANDARDSTED-40-4178
SOLERA2842 NE SUNSET BLVDRENTON, WA 98056SOLERA
LUA20-000305 C21-001020PR18-000333 NW 1/4 OF THE NW 1/4 AND THE NE 1/4 OF THE NW 1/4 SECTION 9, TOWNSHIP 23 NORTH, RANGE 05 EAST, W.M.98144898CURRENT PLANNINGMHerrera 04/06/2022DEVELOPMENT ENGINEERINGmsippo 04/07/2022
Know what'sbelow.Callbefore you dig.CITY OFRENTONIN COMPLIANCE WITH CITY OF RENTON STANDARDSTED-40-4178
SOLERA2842 NE SUNSET BLVDRENTON, WA 98056SOLERA
LUA20-000305 C21-001020PR18-000333 NW 1/4 OF THE NW 1/4 AND THE NE 1/4 OF THE NW 1/4 SECTION 9, TOWNSHIP 23 NORTH, RANGE 05 EAST, W.M.99144899CURRENT PLANNINGMHerrera 04/06/2022DEVELOPMENT ENGINEERINGmsippo 04/07/2022
Know what'sbelow.Callbefore you dig.CITY OFRENTONIN COMPLIANCE WITH CITY OF RENTON STANDARDSTED-40-4178
SOLERA2842 NE SUNSET BLVDRENTON, WA 98056SOLERA
LUA20-000305 C21-001020PR18-000333 NW 1/4 OF THE NW 1/4 AND THE NE 1/4 OF THE NW 1/4 SECTION 9, TOWNSHIP 23 NORTH, RANGE 05 EAST, W.M.1001448100CURRENT PLANNINGMHerrera 04/06/2022DEVELOPMENT ENGINEERINGmsippo 04/07/2022
Know what'sbelow.Callbefore you dig.CITY OFRENTONIN COMPLIANCE WITH CITY OF RENTON STANDARDSTED-40-4178
SOLERA2842 NE SUNSET BLVDRENTON, WA 98056SOLERA
LUA20-000305 C21-001020PR18-000333 NW 1/4 OF THE NW 1/4 AND THE NE 1/4 OF THE NW 1/4 SECTION 9, TOWNSHIP 23 NORTH, RANGE 05 EAST, W.M.1011448101CURRENT PLANNINGMHerrera 04/06/2022DEVELOPMENT ENGINEERINGmsippo 04/07/2022
Know what'sbelow.Callbefore you dig.CITY OFRENTONIN COMPLIANCE WITH CITY OF RENTON STANDARDSTED-40-4178
SOLERA2842 NE SUNSET BLVDRENTON, WA 98056SOLERA
LUA20-000305 C21-001020PR18-000333 NW 1/4 OF THE NW 1/4 AND THE NE 1/4 OF THE NW 1/4 SECTION 9, TOWNSHIP 23 NORTH, RANGE 05 EAST, W.M.1021448102CURRENT PLANNINGMHerrera 04/06/2022DEVELOPMENT ENGINEERINGmsippo 04/07/2022
Know what'sbelow.Callbefore you dig.CITY OFRENTONIN COMPLIANCE WITH CITY OF RENTON STANDARDSTED-40-4178
SOLERA2842 NE SUNSET BLVDRENTON, WA 98056SOLERA
LUA20-000305 C21-001020PR18-000333 NW 1/4 OF THE NW 1/4 AND THE NE 1/4 OF THE NW 1/4 SECTION 9, TOWNSHIP 23 NORTH, RANGE 05 EAST, W.M.1031448103CURRENT PLANNINGMHerrera 04/06/2022DEVELOPMENT ENGINEERINGmsippo 04/07/2022
Know what'sbelow.Callbefore you dig.CITY OFRENTONIN COMPLIANCE WITH CITY OF RENTON STANDARDSTED-40-4178
SOLERA2842 NE SUNSET BLVDRENTON, WA 98056SOLERA
LUA20-000305 C21-001020PR18-000333 NW 1/4 OF THE NW 1/4 AND THE NE 1/4 OF THE NW 1/4 SECTION 9, TOWNSHIP 23 NORTH, RANGE 05 EAST, W.M.1041448104CURRENT PLANNINGMHerrera 04/06/2022DEVELOPMENT ENGINEERINGmsippo 04/07/2022
Know what'sbelow.Callbefore you dig.CITY OFRENTONIN COMPLIANCE WITH CITY OF RENTON STANDARDSTED-40-4178
SOLERA2842 NE SUNSET BLVDRENTON, WA 98056SOLERA
LUA20-000305 C21-001020PR18-000333 NW 1/4 OF THE NW 1/4 AND THE NE 1/4 OF THE NW 1/4 SECTION 9, TOWNSHIP 23 NORTH, RANGE 05 EAST, W.M.1051448105CURRENT PLANNINGMHerrera 04/06/2022DEVELOPMENT ENGINEERINGmsippo 04/07/2022
Know what'sbelow.Callbefore you dig.CITY OFRENTONIN COMPLIANCE WITH CITY OF RENTON STANDARDSTED-40-4178
SOLERA2842 NE SUNSET BLVDRENTON, WA 98056SOLERA
LUA20-000305 C21-001020PR18-000333 NW 1/4 OF THE NW 1/4 AND THE NE 1/4 OF THE NW 1/4 SECTION 9, TOWNSHIP 23 NORTH, RANGE 05 EAST, W.M.1061448106CURRENT PLANNINGMHerrera 04/06/2022DEVELOPMENT ENGINEERINGmsippo 04/07/2022
Know what'sbelow.Callbefore you dig.CITY OFRENTONIN COMPLIANCE WITH CITY OF RENTON STANDARDSTED-40-4178
SOLERA2842 NE SUNSET BLVDRENTON, WA 98056SOLERA
LUA20-000305 C21-001020PR18-000333 NW 1/4 OF THE NW 1/4 AND THE NE 1/4 OF THE NW 1/4 SECTION 9, TOWNSHIP 23 NORTH, RANGE 05 EAST, W.M.1071448107CURRENT PLANNINGMHerrera 04/06/2022DEVELOPMENT ENGINEERINGmsippo 04/07/2022
Know what'sbelow.Callbefore you dig.CITY OFRENTONIN COMPLIANCE WITH CITY OF RENTON STANDARDSTED-40-4178
SOLERA2842 NE SUNSET BLVDRENTON, WA 98056SOLERA
LUA20-000305 C21-001020PR18-000333 NW 1/4 OF THE NW 1/4 AND THE NE 1/4 OF THE NW 1/4 SECTION 9, TOWNSHIP 23 NORTH, RANGE 05 EAST, W.M.1081448108CURRENT PLANNINGMHerrera 04/06/2022DEVELOPMENT ENGINEERINGmsippo 04/07/2022
Know what'sbelow.Callbefore you dig.CITY OFRENTONIN COMPLIANCE WITH CITY OF RENTON STANDARDSTED-40-4178
SOLERA2842 NE SUNSET BLVDRENTON, WA 98056SOLERA
LUA20-000305 C21-001020PR18-000333 NW 1/4 OF THE NW 1/4 AND THE NE 1/4 OF THE NW 1/4 SECTION 9, TOWNSHIP 23 NORTH, RANGE 05 EAST, W.M.1091448109CURRENT PLANNINGMHerrera 04/06/2022DEVELOPMENT ENGINEERINGmsippo 04/07/2022
Know what'sbelow.Callbefore you dig.CITY OFRENTONIN COMPLIANCE WITH CITY OF RENTON STANDARDSTED-40-4178
SOLERA2842 NE SUNSET BLVDRENTON, WA 98056SOLERA
LUA20-000305 C21-001020PR18-000333 NW 1/4 OF THE NW 1/4 AND THE NE 1/4 OF THE NW 1/4 SECTION 9, TOWNSHIP 23 NORTH, RANGE 05 EAST, W.M.1101448110CURRENT PLANNINGMHerrera 04/06/2022DEVELOPMENT ENGINEERINGmsippo 04/07/2022
Know what'sbelow.Callbefore you dig.CITY OFRENTONIN COMPLIANCE WITH CITY OF RENTON STANDARDSTED-40-4178
SOLERA2842 NE SUNSET BLVDRENTON, WA 98056SOLERA
LUA20-000305 C21-001020PR18-000333 NW 1/4 OF THE NW 1/4 AND THE NE 1/4 OF THE NW 1/4 SECTION 9, TOWNSHIP 23 NORTH, RANGE 05 EAST, W.M.1111448111CURRENT PLANNINGMHerrera 04/06/2022DEVELOPMENT ENGINEERINGmsippo 04/07/2022
Know what'sbelow.Callbefore you dig.CITY OFRENTONIN COMPLIANCE WITH CITY OF RENTON STANDARDSTED-40-4178
SOLERA2842 NE SUNSET BLVDRENTON, WA 98056SOLERA
LUA20-000305 C21-001020PR18-000333 NW 1/4 OF THE NW 1/4 AND THE NE 1/4 OF THE NW 1/4 SECTION 9, TOWNSHIP 23 NORTH, RANGE 05 EAST, W.M.1121448112CURRENT PLANNINGMHerrera 04/06/2022DEVELOPMENT ENGINEERINGmsippo 04/07/2022
Know what'sbelow.Callbefore you dig.CITY OFRENTONIN COMPLIANCE WITH CITY OF RENTON STANDARDSTED-40-4178
SOLERA2842 NE SUNSET BLVDRENTON, WA 98056SOLERA
LUA20-000305 C21-001020PR18-000333 NW 1/4 OF THE NW 1/4 AND THE NE 1/4 OF THE NW 1/4 SECTION 9, TOWNSHIP 23 NORTH, RANGE 05 EAST, W.M.1131448113CURRENT PLANNINGMHerrera 04/06/2022DEVELOPMENT ENGINEERINGmsippo 04/07/2022
Know what'sbelow.Callbefore you dig.CITY OFRENTONIN COMPLIANCE WITH CITY OF RENTON STANDARDSTED-40-4178
SOLERA2842 NE SUNSET BLVDRENTON, WA 98056SOLERA
LUA20-000305 C21-001020PR18-000333 NW 1/4 OF THE NW 1/4 AND THE NE 1/4 OF THE NW 1/4 SECTION 9, TOWNSHIP 23 NORTH, RANGE 05 EAST, W.M.1141448114CURRENT PLANNINGMHerrera 04/06/2022DEVELOPMENT ENGINEERINGmsippo 04/07/2022
Know what'sbelow.Callbefore you dig.CITY OFRENTONIN COMPLIANCE WITH CITY OF RENTON STANDARDSTED-40-4178
SOLERA2842 NE SUNSET BLVDRENTON, WA 98056SOLERA
LUA20-000305 C21-001020PR18-000333 NW 1/4 OF THE NW 1/4 AND THE NE 1/4 OF THE NW 1/4 SECTION 9, TOWNSHIP 23 NORTH, RANGE 05 EAST, W.M.1151448115CURRENT PLANNINGMHerrera 04/06/2022DEVELOPMENT ENGINEERINGmsippo 04/07/2022
Know what'sbelow.Callbefore you dig.CITY OFRENTONIN COMPLIANCE WITH CITY OF RENTON STANDARDSTED-40-4178
SOLERA2842 NE SUNSET BLVDRENTON, WA 98056SOLERA
LUA20-000305 C21-001020PR18-000333 NW 1/4 OF THE NW 1/4 AND THE NE 1/4 OF THE NW 1/4 SECTION 9, TOWNSHIP 23 NORTH, RANGE 05 EAST, W.M.1161448116CURRENT PLANNINGMHerrera 04/06/2022DEVELOPMENT ENGINEERINGmsippo 04/07/2022
Know what'sbelow.Callbefore you dig.CITY OFRENTONIN COMPLIANCE WITH CITY OF RENTON STANDARDSTED-40-4178
SOLERA2842 NE SUNSET BLVDRENTON, WA 98056SOLERA
LUA20-000305 C21-001020PR18-000333 NW 1/4 OF THE NW 1/4 AND THE NE 1/4 OF THE NW 1/4 SECTION 9, TOWNSHIP 23 NORTH, RANGE 05 EAST, W.M.1171448117CURRENT PLANNINGMHerrera 04/06/2022DEVELOPMENT ENGINEERINGmsippo 04/07/2022
Know what'sbelow.Callbefore you dig.CITY OFRENTONIN COMPLIANCE WITH CITY OF RENTON STANDARDSTED-40-4178
SOLERA2842 NE SUNSET BLVDRENTON, WA 98056SOLERA
LUA20-000305 C21-001020PR18-000333 NW 1/4 OF THE NW 1/4 AND THE NE 1/4 OF THE NW 1/4 SECTION 9, TOWNSHIP 23 NORTH, RANGE 05 EAST, W.M.1181448118CURRENT PLANNINGMHerrera 04/06/2022DEVELOPMENT ENGINEERINGmsippo 04/07/2022
Know what'sbelow.Callbefore you dig.CITY OFRENTONIN COMPLIANCE WITH CITY OF RENTON STANDARDSTED-40-4178
SOLERA2842 NE SUNSET BLVDRENTON, WA 98056SOLERA
LUA20-000305 C21-001020PR18-000333 NW 1/4 OF THE NW 1/4 AND THE NE 1/4 OF THE NW 1/4 SECTION 9, TOWNSHIP 23 NORTH, RANGE 05 EAST, W.M.1191448119CURRENT PLANNINGMHerrera 04/06/2022DEVELOPMENT ENGINEERINGmsippo 04/07/2022
CITY OFRENTONIN COMPLIANCE WITH CITY OF RENTON STANDARDSTED-40-4178
SOLERA2842 NE SUNSET BLVDRENTON, WA 98056SOLERA
LUA20-000305 C21-001020PR18-000333 NW 1/4 OF THE NW 1/4 AND THE NE 1/4 OF THE NW 1/4 SECTION 9, TOWNSHIP 23 NORTH, RANGE 05 EAST, W.M.1201448120CURRENT PLANNINGMHerrera 04/06/2022DEVELOPMENT ENGINEERINGmsippo 04/07/2022
Know what'sbelow.Callbefore you dig.CITY OFRENTONIN COMPLIANCE WITH CITY OF RENTON STANDARDSTED-40-4178
SOLERA2842 NE SUNSET BLVDRENTON, WA 98056SOLERA
LUA20-000305 C21-001020PR18-000333 NW 1/4 OF THE NW 1/4 AND THE NE 1/4 OF THE NW 1/4 SECTION 9, TOWNSHIP 23 NORTH, RANGE 05 EAST, W.M.1211448121CURRENT PLANNINGMHerrera 04/06/2022DEVELOPMENT ENGINEERINGmsippo 04/07/2022
Know what'sbelow.Callbefore you dig.CITY OFRENTONIN COMPLIANCE WITH CITY OF RENTON STANDARDSTED-40-4178
SOLERA2842 NE SUNSET BLVDRENTON, WA 98056SOLERA
LUA20-000305 C21-001020PR18-000333 NW 1/4 OF THE NW 1/4 AND THE NE 1/4 OF THE NW 1/4 SECTION 9, TOWNSHIP 23 NORTH, RANGE 05 EAST, W.M.″¼······½····″″″″″″″″··″″··1221448122CURRENT PLANNINGMHerrera 04/06/2022DEVELOPMENT ENGINEERINGmsippo 04/07/2022
Know what'sbelow.Callbefore you dig.CITY OFRENTONIN COMPLIANCE WITH CITY OF RENTON STANDARDSTED-40-4178
SOLERA2842 NE SUNSET BLVDRENTON, WA 98056SOLERA
LUA20-000305 C21-001020PR18-000333 NW 1/4 OF THE NW 1/4 AND THE NE 1/4 OF THE NW 1/4 SECTION 9, TOWNSHIP 23 NORTH, RANGE 05 EAST, W.M.1231448123CURRENT PLANNINGMHerrera 04/06/2022DEVELOPMENT ENGINEERINGmsippo 04/07/2022
Know what'sbelow.Callbefore you dig.CITY OFRENTONIN COMPLIANCE WITH CITY OF RENTON STANDARDSTED-40-4178
SOLERA2842 NE SUNSET BLVDRENTON, WA 98056SOLERA
LUA20-000305 C21-001020PR18-000333 NW 1/4 OF THE NW 1/4 AND THE NE 1/4 OF THE NW 1/4 SECTION 9, TOWNSHIP 23 NORTH, RANGE 05 EAST, W.M.1241448124CURRENT PLANNINGMHerrera 04/06/2022DEVELOPMENT ENGINEERINGmsippo 04/07/2022
Know what'sbelow.Callbefore you dig.CITY OFRENTONIN COMPLIANCE WITH CITY OF RENTON STANDARDSTED-40-4178
SOLERA2842 NE SUNSET BLVDRENTON, WA 98056SOLERA
LUA20-000305 C21-001020PR18-000333 NW 1/4 OF THE NW 1/4 AND THE NE 1/4 OF THE NW 1/4 SECTION 9, TOWNSHIP 23 NORTH, RANGE 05 EAST, W.M.1251448125CURRENT PLANNINGMHerrera 04/06/2022DEVELOPMENT ENGINEERINGmsippo 04/07/2022
Know what'sbelow.Callbefore you dig.CITY OFRENTONIN COMPLIANCE WITH CITY OF RENTON STANDARDSTED-40-4178
SOLERA2842 NE SUNSET BLVDRENTON, WA 98056SOLERA
LUA20-000305 C21-001020PR18-000333 NW 1/4 OF THE NW 1/4 AND THE NE 1/4 OF THE NW 1/4 SECTION 9, TOWNSHIP 23 NORTH, RANGE 05 EAST, W.M.1261448126CURRENT PLANNINGMHerrera 04/06/2022DEVELOPMENT ENGINEERINGmsippo 04/07/2022
Know what'sbelow.Callbefore you dig.CITY OFRENTONIN COMPLIANCE WITH CITY OF RENTON STANDARDSTED-40-4178
SOLERA2842 NE SUNSET BLVDRENTON, WA 98056SOLERA
LUA20-000305 C21-001020PR18-000333 NW 1/4 OF THE NW 1/4 AND THE NE 1/4 OF THE NW 1/4 SECTION 9, TOWNSHIP 23 NORTH, RANGE 05 EAST, W.M.1271448127CURRENT PLANNINGMHerrera 04/06/2022DEVELOPMENT ENGINEERINGmsippo 04/07/2022
Know what'sbelow.Callbefore you dig.CITY OFRENTONIN COMPLIANCE WITH CITY OF RENTON STANDARDSTED-40-4178
SOLERA2842 NE SUNSET BLVDRENTON, WA 98056SOLERA
LUA20-000305 C21-001020PR18-000333 NW 1/4 OF THE NW 1/4 AND THE NE 1/4 OF THE NW 1/4 SECTION 9, TOWNSHIP 23 NORTH, RANGE 05 EAST, W.M.1281448128CURRENT PLANNINGMHerrera 04/06/2022DEVELOPMENT ENGINEERINGmsippo 04/07/2022
Know what'sbelow.Callbefore you dig.CITY OFRENTONIN COMPLIANCE WITH CITY OF RENTON STANDARDSTED-40-4178
SOLERA2842 NE SUNSET BLVDRENTON, WA 98056SOLERA
LUA20-000305 C21-001020PR18-000333 NW 1/4 OF THE NW 1/4 AND THE NE 1/4 OF THE NW 1/4 SECTION 9, TOWNSHIP 23 NORTH, RANGE 05 EAST, W.M.1291448129CURRENT PLANNINGMHerrera 04/06/2022DEVELOPMENT ENGINEERINGmsippo 04/07/2022
Know what'sbelow.Callbefore you dig.CITY OFRENTONIN COMPLIANCE WITH CITY OF RENTON STANDARDSTED-40-4178
SOLERA2842 NE SUNSET BLVDRENTON, WA 98056SOLERA
LUA20-000305 C21-001020PR18-000333 NW 1/4 OF THE NW 1/4 AND THE NE 1/4 OF THE NW 1/4 SECTION 9, TOWNSHIP 23 NORTH, RANGE 05 EAST, W.M.1301448130CURRENT PLANNINGMHerrera 04/06/2022DEVELOPMENT ENGINEERINGmsippo 04/07/2022
Know what'sbelow.Callbefore you dig.CITY OFRENTONIN COMPLIANCE WITH CITY OF RENTON STANDARDSTED-40-4178
SOLERA2842 NE SUNSET BLVDRENTON, WA 98056SOLERA
LUA20-000305 C21-001020PR18-000333 NW 1/4 OF THE NW 1/4 AND THE NE 1/4 OF THE NW 1/4 SECTION 9, TOWNSHIP 23 NORTH, RANGE 05 EAST, W.M.1311448131CURRENT PLANNINGMHerrera 04/06/2022DEVELOPMENT ENGINEERINGmsippo 04/07/2022
CITY OF
RENTON
IN COMPLIANCE WITH CITY OF RENTON STANDARDSTED-40-4178SOLERA
2842 NE SUNSET BLVDRENTON, WA 98056
ILLUMINATION PLANSOLERA LUA20-000305C21-001020PR18-000333NW 1/4 OF THE NW 1/4 AND THE NE 1/4 OF THE NW 1/4 SECTION 9, TOWNSHIP 23 NORTH, RANGE 05 EAST, W.M.
TENW
Transportation Planning | Design | Traffic Impact & Operations
11400 SE 8th St, Suite 200, Bellevue, WA 98004 | Office (425) 889-6747
Transportation Engineering NorthWest
Project Contact: Grant Lewis
Phone: 952-270-908903-11-2022TRO-40-4178R-4178132 T-417801
PAVEMENT MARKING &
SIGNING PLAN
CROSS TRAFFIC
DOES NOT STOP
NO
PARKING
ANY
TIME
SPEED
LIMIT
35
DEVELOPMENT ENGINEERING
msippo 04/07/2022
TRANSPORTATION OPERATION
CBarnes 04/08/2022
conditions of approval:
1. city development engineer and transportation staff to review
crosswalk striping prior to installation. contact michael sippo at
425-430-7298.
2. all signs and markings shall be shall meet COR and WSDOT standards.
3. a summary schedule for signs showing the time, MUTCD number and
quantity shall be provided prior to installation.
CITY OF
RENTON
IN COMPLIANCE WITH CITY OF RENTON STANDARDSTED-40-4178SOLERA
2842 NE SUNSET BLVDRENTON, WA 98056
ILLUMINATION PLANSOLERA LUA20-000305C21-001020PR18-000333NW 1/4 OF THE NW 1/4 AND THE NE 1/4 OF THE NW 1/4 SECTION 9, TOWNSHIP 23 NORTH, RANGE 05 EAST, W.M.
TENW
Transportation Planning | Design | Traffic Impact & Operations
11400 SE 8th St, Suite 200, Bellevue, WA 98004 | Office (425) 889-6747
Transportation Engineering NorthWest
Project Contact: Grant Lewis
Phone: 952-270-908903-11-2022TRO-40-4178R-4178133 T-417802
PAVEMENT MARKING &
SIGNING PLAN
CROSS TRAFFIC
DOES NOT STOP
NO
PARKING
ANY
TIME
SPEED
LIMIT
35
DEVELOPMENT ENGINEERING
msippo 04/07/2022
TRANSPORTATION OPERATION
CBarnes 04/08/2022
CITY OF
RENTON
IN COMPLIANCE WITH CITY OF RENTON STANDARDSTED-40-4178SOLERA
2842 NE SUNSET BLVDRENTON, WA 98056
ILLUMINATION PLANSOLERA LUA20-000305C21-001020PR18-000333NW 1/4 OF THE NW 1/4 AND THE NE 1/4 OF THE NW 1/4 SECTION 9, TOWNSHIP 23 NORTH, RANGE 05 EAST, W.M.
TENW
Transportation Planning | Design | Traffic Impact & Operations
11400 SE 8th St, Suite 200, Bellevue, WA 98004 | Office (425) 889-6747
Transportation Engineering NorthWest
Project Contact: Grant Lewis
Phone: 952-270-908903-11-2022TRO-40-4178R-4178134 T-417803
CROSS TRAFFIC
DOES NOT STOP
NO
PARKING
ANY
TIME
SPEED
LIMIT
35
PAVEMENT MARKING &
SIGNING PLAN
DEVELOPMENT ENGINEERING
msippo 04/07/2022
TRANSPORTATION OPERATION
CBarnes 04/08/2022
CITY OF
RENTON
IN COMPLIANCE WITH CITY OF RENTON STANDARDSTED-40-4178SOLERA
2842 NE SUNSET BLVDRENTON, WA 98056
ILLUMINATION PLANSOLERA LUA20-000305C21-001020PR18-000333NW 1/4 OF THE NW 1/4 AND THE NE 1/4 OF THE NW 1/4 SECTION 9, TOWNSHIP 23 NORTH, RANGE 05 EAST, W.M.
TENW
Transportation Planning | Design | Traffic Impact & Operations
11400 SE 8th St, Suite 200, Bellevue, WA 98004 | Office (425) 889-6747
Transportation Engineering NorthWest
Project Contact: Grant Lewis
Phone: 952-270-908903-11-2022TRO-40-4178R-4178135 T-417805
PAVEMENT MARKING &
SIGNING DETAILS
DEVELOPMENT ENGINEERING
msippo 04/07/2022
TRANSPORTATION OPERATION
CBarnes 04/08/2022
CITY OF
RENTON
IN COMPLIANCE WITH CITY OF RENTON STANDARDSTED-40-4178SOLERA
2842 NE SUNSET BLVDRENTON, WA 98056
ILLUMINATION PLANSOLERA LUA20-000305C21-001020PR18-000333NW 1/4 OF THE NW 1/4 AND THE NE 1/4 OF THE NW 1/4 SECTION 9, TOWNSHIP 23 NORTH, RANGE 05 EAST, W.M.
TENW
Transportation Planning | Design | Traffic Impact & Operations
11400 SE 8th St, Suite 200, Bellevue, WA 98004 | Office (425) 889-6747
Transportation Engineering NorthWest
Project Contact: Grant Lewis
Phone: 952-270-908903-11-2022TRO-40-4178R-4178136 T-417806
ACCESSIBLE STALL DETAILB
PM-05 NOT TO SCALE
VOID AREA DETAILA
PM-05 NOT TO SCALE
8' MIN.8' MIN.
5' MIN.
-OR-
8' MIN.
VAN
VARIES
ACCESS AISLE STRIPING
COLOR, ANGLE, SPACING
TO MATCH EXISTING
INSTALLATIONS IN AGARAGE
4" LINE
COLOR TO MATCH
EXISTING INSTALLATIONS
IN GARAGE
INTERNATIONAL SYMBOL
OF ACCESS TO MATCH
EXISTING INSTALLATIONS
IN GARAGE
36", TYP.
4" WHITE BORDER,
TYP.
4" WHITE DIAGONAL
STIPE, TYP.
45°
R7-801 OR
R7-801VA
SIGN
ACCESSIBLE STALL SIGN DETAILSC
PM-05 NOT TO SCALE
WASHINGTON STATE
R7-801
12"W X 18"H
WASHINGTON STATE
R7-801VA
12"W X 18"H
NOTE:
ALL R7-801 AND R7-801VA SIGNS SHALL BE
MOUNTED AT 5' ABOVE FINISHED GRADE, AS
MEASURED TO THE BOTTOM OF THE SIGN.
PAVEMENT MARKING &
SIGNING DETAILS
DEVELOPMENT ENGINEERING
msippo 04/07/2022
TRANSPORTATION OPERATION
CBarnes 04/08/2022
CITY OF
RENTON
IN COMPLIANCE WITH CITY OF RENTON STANDARDSTED-40-4178SOLERA
2842 NE SUNSET BLVDRENTON, WA 98056
ILLUMINATION PLANSOLERA LUA20-000305C21-001020PR18-000333NW 1/4 OF THE NW 1/4 AND THE NE 1/4 OF THE NW 1/4 SECTION 9, TOWNSHIP 23 NORTH, RANGE 05 EAST, W.M.
TENW
Transportation Planning | Design | Traffic Impact & Operations
11400 SE 8th St, Suite 200, Bellevue, WA 98004 | Office (425) 889-6747
Transportation Engineering NorthWest
Project Contact: Grant Lewis
Phone: 952-270-908903-11-2022TRO-40-4178R-4178137 T-417801
DEVELOPMENT ENGINEERING
msippo 04/07/2022
07
TRANSPORTATION OPERATION
CBarnes 04/08/2022
CITY OF
RENTON
IN COMPLIANCE WITH CITY OF RENTON STANDARDSTED-40-4178SOLERA
2842 NE SUNSET BLVDRENTON, WA 98056
ILLUMINATION PLANSOLERA LUA20-000305C21-001020PR18-000333NW 1/4 OF THE NW 1/4 AND THE NE 1/4 OF THE NW 1/4 SECTION 9, TOWNSHIP 23 NORTH, RANGE 05 EAST, W.M.
TENW
Transportation Planning | Design | Traffic Impact & Operations
11400 SE 8th St, Suite 200, Bellevue, WA 98004 | Office (425) 889-6747
Transportation Engineering NorthWest
Project Contact: Grant Lewis
Phone: 952-270-908903-11-2022TRO-40-4178R-4178138 T-417802
DEVELOPMENT ENGINEERING
msippo 04/07/2022
08
TRANSPORTATION OPERATION
CBarnes 04/08/2022
CITY OF
RENTON
IN COMPLIANCE WITH CITY OF RENTON STANDARDSTED-40-4178SOLERA
2842 NE SUNSET BLVDRENTON, WA 98056
ILLUMINATION PLANSOLERA LUA20-000305C21-001020PR18-000333NW 1/4 OF THE NW 1/4 AND THE NE 1/4 OF THE NW 1/4 SECTION 9, TOWNSHIP 23 NORTH, RANGE 05 EAST, W.M.
TENW
Transportation Planning | Design | Traffic Impact & Operations
11400 SE 8th St, Suite 200, Bellevue, WA 98004 | Office (425) 889-6747
Transportation Engineering NorthWest
Project Contact: Grant Lewis
Phone: 952-270-908903-11-2022TRO-40-4178R-4178139 T-417803
DEVELOPMENT ENGINEERING
msippo 04/07/2022
09
TRANSPORTATION OPERATION
CBarnes 04/08/2022
CITY OF
RENTON
IN COMPLIANCE WITH CITY OF RENTON STANDARDSTED-40-4178SOLERA
2842 NE SUNSET BLVDRENTON, WA 98056
ILLUMINATION PLANSOLERA LUA20-000305C21-001020PR18-000333NW 1/4 OF THE NW 1/4 AND THE NE 1/4 OF THE NW 1/4 SECTION 9, TOWNSHIP 23 NORTH, RANGE 05 EAST, W.M.
TENW
Transportation Planning | Design | Traffic Impact & Operations
11400 SE 8th St, Suite 200, Bellevue, WA 98004 | Office (425) 889-6747
Transportation Engineering NorthWest
Project Contact: Grant Lewis
Phone: 952-270-908903-11-2022TRO-40-4178R-4178140 T-417804
DEVELOPMENT ENGINEERING
msippo 04/07/2022
10
TRANSPORTATION OPERATION
CBarnes 04/08/2022
pole numbers provided will also be installed on the poles.
CITY OF
RENTON
IN COMPLIANCE WITH CITY OF RENTON STANDARDSTED-40-4178SOLERA
2842 NE SUNSET BLVDRENTON, WA 98056
ILLUMINATION PLANSOLERA LUA20-000305C21-001020PR18-000333NW 1/4 OF THE NW 1/4 AND THE NE 1/4 OF THE NW 1/4 SECTION 9, TOWNSHIP 23 NORTH, RANGE 05 EAST, W.M.
TENW
Transportation Planning | Design | Traffic Impact & Operations
11400 SE 8th St, Suite 200, Bellevue, WA 98004 | Office (425) 889-6747
Transportation Engineering NorthWest
Project Contact: Grant Lewis
Phone: 952-270-908903-11-2022TRO-40-4178R-4178141 T-417805
TENW
Transportation Planning | Design | Traffic Impact & Operations
11400 SE 8th St, Suite 200, Bellevue, WA 98004 | Office (425) 889-6747
Transportation Engineering NorthWest
Project Contact: Grant Lewis
Phone: 952-270-908903-01-2022
DEVELOPMENT ENGINEERING
msippo 04/07/2022
a structural analysis
is required for pole
foundations capable
of handling 5g
hardware per city std.
detail 117.1a prior to
installation.
11
TRANSPORTATION OPERATION
CBarnes 04/08/2022
CITY OF
RENTON
IN COMPLIANCE WITH CITY OF RENTON STANDARDSTED-40-4178SOLERA
2842 NE SUNSET BLVDRENTON, WA 98056
ILLUMINATION PLANSOLERA LUA20-000305C21-001020PR18-000333NW 1/4 OF THE NW 1/4 AND THE NE 1/4 OF THE NW 1/4 SECTION 9, TOWNSHIP 23 NORTH, RANGE 05 EAST, W.M.
TENW
Transportation Planning | Design | Traffic Impact & Operations
11400 SE 8th St, Suite 200, Bellevue, WA 98004 | Office (425) 889-6747
Transportation Engineering NorthWest
Project Contact: Grant Lewis
Phone: 952-270-908903-11-2022TRO-40-4178R-4178142 T-417806
DEVELOPMENT ENGINEERING
msippo 04/07/2022
12
TRANSPORTATION OPERATION
CBarnes 04/08/2022
144R-41781431433/11/22DEVELOPMENT ENGINEERINGmsippo 04/07/2022
144R-41781441443/11/22DEVELOPMENT ENGINEERINGmsippo 04/07/2022