Loading...
HomeMy WebLinkAboutAPPROVED_Civil Construction Plans_220311_v4SOLERA CIVIL CONSTRUCTION PERMIT RENTON, WASHINGTON CITY OF RENTON IN COMPLIANCE WITH CITY OF RENTON STANDARDSTED-40-4178SOLERA 2842 NE SUNSET BLVDRENTON, WA 98056SOLERA LUA20-000305C21-001020PR18-0003331601 5th Avenue, Suite 1600 Seattle, WA 98101 206.622.5822 www.kpff.com R Call 811two business daysbefore you dig NW 1/4 OF THE NW 1/4 AND THE NE 1/4 OF THE NW 1/4 SECTION 9, TOWNSHIP 23 NORTH, RANGE 05 EAST, W.M. COVER SHEETCOVER SHEET R-417801 03/11/2022 SURFACE WATER UTILITY JFarah 04/01/2022 WASTEWATER UTILITY JStowell 04/04/2022 REGIONAL FIRE AUTHORITY cthomas 04/04/2022 APPROVED DEVELOPMENT ENGINEERING msippo 04/07/2022 WATER UTILITY agafour 04/07/2022 SOLERA CIVIL CONSTRUCTION PERMIT RENTON, WASHINGTON CITY OF RENTON IN COMPLIANCE WITH CITY OF RENTON STANDARDSTED-40-4178SOLERA 2842 NE SUNSET BLVDRENTON, WA 98056SOLERA LUA20-000305C21-001020PR18-0003331601 5th Avenue, Suite 1600 Seattle, WA 98101 206.622.5822 www.kpff.com R Call 811two business daysbefore you dig NW 1/4 OF THE NW 1/4 AND THE NE 1/4 OF THE NW 1/4 SECTION 9, TOWNSHIP 23 NORTH, RANGE 05 EAST, W.M. SHEET INDEX R-417802 CIVIL SHEET INDEX SHEET NOSHEET TITLE SHEET X OF 144 C0.00 COVER SHEET 1 C0.01 SHEET INDEX 2 C0.10 NOTES 3 C0.11 NOTES 4 C0.12 CONDITIONS OF APPROVAL FROM HEARING EXAMINER 5 C0.13 CONDITIONS OF APPROVAL FROM HEARING EXAMINER 6 C1.00 DEMOLITION PLAN 7 C1.01 DEMOLITION PLAN 8 C2.00 HORIZONTAL CONTROL PLAN ROADWAY CENTERLINES & BUILDING B9 C2.01 HORIZONTAL CONTROL PLAN ROADWAY CENTERLINES & BUILDING A10 C2.10 HORIZONTAL CONTROL PLAN 11 C2.11 HORIZONTAL CONTROL PLAN 12 C2.12 HORIZONTAL CONTROL PLAN 13 C2.13 HORIZONTAL CONTROL PLAN 14 C2.14 HORIZONTAL CONTROL PLAN 15 C3.00 TESC PLAN 16 C3.10 TESC DETAILS 17 C3.11 TESC DETAILS 18 C3.12 TESC DETAILS 19 C4.00 GRADING PLAN - BLOCK C 20 C4.01 GRADING PLAN - BLOCK D 21 C4.02 GRADING PLAN 22 C4.03 GRADING PLAN 23 C4.04 GRADING PLAN 24 C4.05 GRADING PLAN 25 C4.06 GRADING PLAN 26 C4.07 GRADING PLAN 27 C4.08 GRADING PLAN 28 C4.09 GRADING PLAN 29 C4.10 GRADING PLAN 30 C4.11 GRADING PLAN 31 C4.12 GRADING PLAN 32 C4.13 GRADING PLAN 33 C4.14 GRADING PLAN 34 C4.20 CURB RAMP AND DRIVEWAY DETAILS 35 C4.21 CURB RAMP AND DRIVEWAY DETAILS 36 C4.22 CURB RAMP AND DRIVEWAY DETAILS 37 C4.23 CURB RAMP AND DRIVEWAY DETAILS 38 C4.24 CURB RAMP AND DRIVEWAY DETAILS 39 C4.25 CURB RAMP AND DRIVEWAY DETAILS 40 C4.26 CURB RAMP AND DRIVEWAY DETAILS 41 C4.27 CURB RAMP AND DRIVEWAY DETAILS 42 C4.28 CURB RAMP AND DRIVEWAY DETAILS 43 C4.29 CURB RAMP AND DRIVEWAY DETAILS 44 C4.30 CURB RAMP AND DRIVEWAY DETAILS 45 C4.31 CURB RAMP AND DRIVEWAY DETAILS 46 C4.40 JOINTING PLAN 47 C4.41 JOINTING PLAN 48 C4.42 JOINTING PLAN AND DETAILS 49 C4.43 JOINTING DETAILS 50 C5.00 ROAD AND STORM DRAINAGE OVERVIEW 51 C5.10 GRADING AND STORM DRAINAGE JEFFERSON AVENUE NE PLAN AND PROFILE52 C5.11 GRADING AND STORM DRAINAGE JEFFERSON AVENUE NE PLAN AND PROFILE53 C5.12 GRADING AND STORM DRAINAGE JEFFERSON AVENUE NE PLAN AND PROFILE54 C5.13 GRADING AND STORM DRAINAGE NE 11TH STREET PLAN AND PROFILE55 C5.14 GRADING AND STORM DRAINAGE NE 11TH STREET PLAN AND PROFILE56 C5.15 GRADING AND STORM DRAINAGE NE SUNSET BOULEVARD PLAN AND PROFILE57 C5.16 GRADING AND STORM DRAINAGE NE SUNSET BOULEVARD PLAN AND PROFILE58 C5.17 GRADING AND STORM DRAINAGE NE SUNSET BOULEVARD PLAN AND PROFILE59 C5.18 GRADING AND STORM DRAINAGE HARRINGTON PLACE NE PLAN AND PROFILE60 C5.19 GRADING AND STORM DRAINAGE NE 12TH STREET PLAN AND PROFILE61 C5.20 GRADING AND STORM DRAINAGE KIRKLAND AVENUE NE PLAN AND PROFILE62 C5.30 STORM DRAINAGE PLAN 63 C5.31 STORM DRAINAGE PROFILE 64 C5.40 ROAD SECTIONS 65 C5.41 ROAD SECTIONS 66 C5.42 ROAD DETAILS 67 C5.43 ROAD DETAILS 68 C5.44 ROAD DETAILS 69 C5.50 STORM DRAINAGE DETAILS 70 C5.51 STORM DRAINAGE DETAILS 71 C5.52 STORM DRAINAGE DETAILS 72 C5.53 STORM DRAINAGE DETAILS 73 C5.60 STORMWATER CHAMBER SYSTEM LAYOUT 74 C5.61 STORMWATER CHAMBER SYSTEM DETAILS 75 C5.62 STORMWATER CHAMBER SYSTEM DETAILS 76 C6.00 COMPOSITE UTILITY PLAN 77 C6.01 SURFACE MOUNTED UTILITY PLAN 78 C6.02 WATER AND SEWER PLAN OVERVIEW 79 C6.03 FIRE PROTECTION PLAN 80 C6.10 WATER AND SEWER JEFFERSON AVENUE NE PLAN AND PROFILE 81 C6.11 WATER AND SEWER JEFFERSON AVENUE NE PLAN AND PROFILE 82 C6.12 WATER AND SEWER JEFFERSON AVENUE NE PLAN AND PROFILE 83 C6.13 WATER AND SEWER NE 11TH STREET PLAN AND PROFILE 84 C6.14 WATER AND SEWER NE 11TH STREET PLAN AND PROFILE 85 C6.15 WATER AND SEWER HARRINGTON PL NE PLAN AND PROFILE 86 C6.16 WATER AND SEWER KIRKLAND AVE NE PLAN 87 C6.17 ENLARGED WATER PLANS 88 C6.18 ENLARGED WATER PLANS 89 C6.30 WATER UTILITY NOTES AND SPECIFICATIONS 90 C6.31 WATER AND SEWER DETAILS 91 C6.32 WATER AND SEWER DETAILS 92 C6.33 WATER AND SEWER DETAILS 93 C6.34 WATER AND SEWER DETAILS 94 C6.35 WATER AND SEWER DETAILS 95 L1.0 SITE PLAN OVERVIEW & OPEN SPACE PLAN 96 L1.1 OPEN SPACE PLAN 97 L1.2 OPEN SPACE PLAN- COURTYARDS 98 L1.3 PEDESTRIAN-ORIENTED SPACE PLAN 99 L1.4 PEDESTRIAN-ORIENTED SPACE PLAN 100 L1.5 FENCING PLAN 101 L2.0 TREE RETENTION PLAN 102 L2.1 TREE INVENTORY- ON-SITE 103 L2.2 TREE INVENTORY- OFF-SITE 104 L2.3 TREE RETENTION & REPLACEMENT PLAN 105 L3.0 PARKING LOT & PERIMETER LANDSCAPE 106 L3.1 PARKING LOT & PERIMETER LANDSCAPE 107 L4.0 PLANTING PLAN- TREES & LARGE SHRUBS 108 L4.1 PLANTING PLAN- TREES & LARGE SHRUBS 109 L4.2 PLANTING PLAN- TREES & LARGE SHRUBS 110 L4.3 PLANTING PLAN- TREES & LARGE SHRUBS 111 L4.4 PLANTING PLAN - TREES & LARGE SHRUBS 112 L4.5 PLANTING PLAN - TREES & LARGE SHRUBS 113 L4.6 PLANTING PLAN- UNDERSTORY 114 L4.7 PLANTING PLAN- UNDERSTORY 115 L4.8 PLANTING PLAN- UNDERSTORY 116 L4.9 PLANTING PLAN- UNDERSTORY 117 L4.10 PLANTING PLAN- UNDERSTORY 118 L4.11 PLANTING PLAN- UNDERSTORY 119 L4.12 PLANT SCHEDULE & NOTES 120 L5.0 PLANTING SPECIFICATIONS 121 L5.1 BIORETENTION SOIL SPECIFICATIONS 122 L5.2 PLANTING DETAILS 123 L6.0 FURNISHING DETAILS 124 L6.1 DESIGN ELEMENTS & DETAILS 125 L6.2 DESIGN ELEMENTS & DETAILS 126 L6.3 DESIGN ELEMENTS & MATERIALS - COURTYARD 127 L6.4 DESIGN ELEMENTS & MATERIALS - COURTYARD 128 L6.5 DETAILS 129 L7.0 IRRIGATION SPECIFICATIONS 131 PM-01 PAVEMENT MARKING & SIGNING PLAN 132 PM-02 PAVEMENT MARKING & SIGNING PLAN 133 PM-03 PAVEMENT MARKING & SIGNING PLAN 134 PM-04 PAVEMENT MARKING & SIGNING DETAILS 135 PM-05 PAVEMENT MARKING & SIGNING DETAILS 136 IL-1 ILLUMINATION PLAN 137 IL-2 ILLUMINATION PLAN 138 IL-3 ILLUMINATION PLAN 139 IL-4 ILLUMINATION PLAN 140 IL-5 ILLUMINATION DETAILS 141 IL-6 ILLUMINATION DETAILS 142 EA1.00 SITE LIGHTING PLAN 143 EA1.01 SITE PHOTOMETRICS PLAN 144 03/11/2022 DEVELOPMENT ENGINEERING msippo 04/07/2022 · · ” CITY OF RENTON IN COMPLIANCE WITH CITY OF RENTON STANDARDSTED-40-4178SOLERA 2842 NE SUNSET BLVDRENTON, WA 98056SOLERA LUA20-000305C21-001020PR18-0003331601 5th Avenue, Suite 1600 Seattle, WA 98101 206.622.5822 www.kpff.com R Call 811two business daysbefore you dig NW 1/4 OF THE NW 1/4 AND THE NE 1/4 OF THE NW 1/4 SECTION 9, TOWNSHIP 23 NORTH, RANGE 05 EAST, W.M. NOTES R-417803 03/11/2022 DEVELOPMENT ENGINEERING msippo 04/07/2022 CITY OF RENTON IN COMPLIANCE WITH CITY OF RENTON STANDARDSTED-40-4178SOLERA 2842 NE SUNSET BLVDRENTON, WA 98056SOLERA LUA20-000305C21-001020PR18-0003331601 5th Avenue, Suite 1600 Seattle, WA 98101 206.622.5822 www.kpff.com R Call 811two business daysbefore you dig NW 1/4 OF THE NW 1/4 AND THE NE 1/4 OF THE NW 1/4 SECTION 9, TOWNSHIP 23 NORTH, RANGE 05 EAST, W.M. NOTES R-417804 03/11/2022 DEVELOPMENT ENGINEERING msippo 04/07/2022 CONDITIONS OF APPROVAL FROM HEARING EXAMINER R-417805 CITY OF RENTON IN COMPLIANCE WITH CITY OF RENTON STANDARDSTED-40-4178SOLERA 2842 NE SUNSET BLVDRENTON, WA 98056SOLERA LUA20-000305C21-001020PR18-0003331601 5th Avenue, Suite 1600 Seattle, WA 98101 206.622.5822 www.kpff.com R Call 811two business daysbefore you dig NW 1/4 OF THE NW 1/4 AND THE NE 1/4 OF THE NW 1/4 SECTION 9, TOWNSHIP 23 NORTH, RANGE 05 EAST, W.M. 03/11/2022 DEVELOPMENT ENGINEERING msippo 04/07/2022 CONDITIONS OF APPROVAL FROM HEARING EXAMINER R-417806 CITY OF RENTON IN COMPLIANCE WITH CITY OF RENTON STANDARDSTED-40-4178SOLERA 2842 NE SUNSET BLVDRENTON, WA 98056SOLERA LUA20-000305C21-001020PR18-0003331601 5th Avenue, Suite 1600 Seattle, WA 98101 206.622.5822 www.kpff.com R Call 811two business daysbefore you dig NW 1/4 OF THE NW 1/4 AND THE NE 1/4 OF THE NW 1/4 SECTION 9, TOWNSHIP 23 NORTH, RANGE 05 EAST, W.M. 03/11/2022 DEVELOPMENT ENGINEERING msippo 04/07/2022 BLOCK 3 9CORRECTED PLAT OFRENTON H IGHLANDS NO . 2V. 57 / PGS .9 2 - 9 8 BLOCK 3 9CORRECTED PLAT OFRENTON H IGHLANDS NO . 2V. 57 / PGS . 9 2 - 9 8 BLOCK 4 0CORRECTED PLAT OFRENTON H IGHLANDS NO . 2V. 5 7 / PGS .9 2 -9 8LOT 1C.O .R . LOT L INE REV IS IONLLA 003 -82REC. NO . 8 2 042 1 9003LOT 2C.O .R . LOT L INE REV IS IONLLA 00 3 -8 2REC. NO . 8 204 2 1 900 3LOT 2C.O .R . LOT L INE REV IS IONLLA 0 03 - 82REC. NO . 82 0 4 219 0 03 PARCEL C LOT 4LOT5 CITY OF RENTON IN COMPLIANCE WITH CITY OF RENTON STANDARDSTED-40-4178SOLERA 2842 NE SUNSET BLVDRENTON, WA 98056SOLERA LUA20-000305C21-001020PR18-0003331601 5th Avenue, Suite 1600 Seattle, WA 98101 206.622.5822 www.kpff.com R Call 811two business daysbefore you dig NW 1/4 OF THE NW 1/4 AND THE NE 1/4 OF THE NW 1/4 SECTION 9, TOWNSHIP 23 NORTH, RANGE 05 EAST, W.M. DEMOLITION PLAN 03/11/2022 DEVELOPMENT ENGINEERING msippo 04/07/2022 BLOCK 4 3CORRECTED PLAT OFRENTON H IGHLANDS NO . 2V. 57 / PGS . 9 2 - 9 8 BLOCK 39CORRECTED PLAT OFRENTON H IGHLANDS NO . 2V.57 / PGS . 92 - 98 PARCEL B CITY OF RENTON IN COMPLIANCE WITH CITY OF RENTON STANDARDSTED-40-4178SOLERA 2842 NE SUNSET BLVDRENTON, WA 98056SOLERA LUA20-000305C21-001020PR18-0003331601 5th Avenue, Suite 1600 Seattle, WA 98101 206.622.5822 www.kpff.com R Call 811two business daysbefore you dig NW 1/4 OF THE NW 1/4 AND THE NE 1/4 OF THE NW 1/4 SECTION 9, TOWNSHIP 23 NORTH, RANGE 05 EAST, W.M. DEMOLITION PLAN 03/11/2022 DEVELOPMENT ENGINEERING msippo 04/07/2022 211 H A CITY OF RENTON IN COMPLIANCE WITH CITY OF RENTON STANDARDSTED-40-4178SOLERA 2842 NE SUNSET BLVDRENTON, WA 98056SOLERA LUA20-000305C21-001020PR18-0003331601 5th Avenue, Suite 1600 Seattle, WA 98101 206.622.5822 www.kpff.com R Call 811two business daysbefore you dig NW 1/4 OF THE NW 1/4 AND THE NE 1/4 OF THE NW 1/4 SECTION 9, TOWNSHIP 23 NORTH, RANGE 05 EAST, W.M. HORIZONTAL CONTROL PLAN ROAD CENTERLINES & BUILDING B R-417809 X 03/11/2022 DEVELOPMENT ENGINEERING msippo 04/07/2022 K J 22 1 CITY OF RENTON IN COMPLIANCE WITH CITY OF RENTON STANDARDSTED-40-4178SOLERA 2842 NE SUNSET BLVDRENTON, WA 98056SOLERA LUA20-000305C21-001020PR18-0003331601 5th Avenue, Suite 1600 Seattle, WA 98101 206.622.5822 www.kpff.com R Call 811two business daysbefore you dig NW 1/4 OF THE NW 1/4 AND THE NE 1/4 OF THE NW 1/4 SECTION 9, TOWNSHIP 23 NORTH, RANGE 05 EAST, W.M. HORIZONTAL CONTROL PLAN ROADWAY CENTERLINES & BUILDING A R-417810 X 03/11/2022 DEVELOPMENT ENGINEERING msippo 04/07/2022 BLOCK 4 0CORRECTED PLAT OFRENTON H IGHLANDS NO . 2V. 5 7 / PGS .9 2 -9 8LOT 1C.O .R . LOT L INE REV IS IONLLA 0 03 - 82REC. NO . 82 0 4219 0 03LOT 2C.O .R . LOT L INE REV IS IONLLA 003 -8 2REC. NO . 8 2042 1 900 3LOT 2C.O .R . LOT L INE REV IS IONLLA 003 -82REC. NO . 8 2 042 1 9 003 PARCEL CLOT5CITY OF RENTON IN COMPLIANCE WITH CITY OF RENTON STANDARDSTED-40-4178SOLERA 2842 NE SUNSET BLVDRENTON, WA 98056SOLERA LUA20-000305C21-001020PR18-0003331601 5th Avenue, Suite 1600 Seattle, WA 98101 206.622.5822 www.kpff.com R Call 811two business daysbefore you dig NW 1/4 OF THE NW 1/4 AND THE NE 1/4 OF THE NW 1/4 SECTION 9, TOWNSHIP 23 NORTH, RANGE 05 EAST, W.M. HORIZONTAL CONTROL PLAN R-417811 03/11/2022 DEVELOPMENT ENGINEERING msippo 04/07/2022 CITY OF RENTON IN COMPLIANCE WITH CITY OF RENTON STANDARDSTED-40-4178SOLERA 2842 NE SUNSET BLVDRENTON, WA 98056SOLERA LUA20-000305C21-001020PR18-0003331601 5th Avenue, Suite 1600 Seattle, WA 98101 206.622.5822 www.kpff.com R Call 811two business daysbefore you dig NW 1/4 OF THE NW 1/4 AND THE NE 1/4 OF THE NW 1/4 SECTION 9, TOWNSHIP 23 NORTH, RANGE 05 EAST, W.M. HORIZONTAL CONTROL PLAN R-417812 03/11/2022 DEVELOPMENT ENGINEERING msippo 04/07/2022 CITY OF RENTON IN COMPLIANCE WITH CITY OF RENTON STANDARDSTED-40-4178SOLERA 2842 NE SUNSET BLVDRENTON, WA 98056SOLERA LUA20-000305C21-001020PR18-0003331601 5th Avenue, Suite 1600 Seattle, WA 98101 206.622.5822 www.kpff.com R Call 811two business daysbefore you dig NW 1/4 OF THE NW 1/4 AND THE NE 1/4 OF THE NW 1/4 SECTION 9, TOWNSHIP 23 NORTH, RANGE 05 EAST, W.M. HORIZONTAL CONTROL PLAN R-417813 03/11/2022 DEVELOPMENT ENGINEERING msippo 04/07/2022 CITY OF RENTON IN COMPLIANCE WITH CITY OF RENTON STANDARDSTED-40-4178SOLERA 2842 NE SUNSET BLVDRENTON, WA 98056SOLERA LUA20-000305C21-001020PR18-0003331601 5th Avenue, Suite 1600 Seattle, WA 98101 206.622.5822 www.kpff.com R Call 811two business daysbefore you dig NW 1/4 OF THE NW 1/4 AND THE NE 1/4 OF THE NW 1/4 SECTION 9, TOWNSHIP 23 NORTH, RANGE 05 EAST, W.M. HORIZONTAL CONTROL PLAN R-417814 03/11/2022 DEVELOPMENT ENGINEERING msippo 04/07/2022 CITY OF RENTON IN COMPLIANCE WITH CITY OF RENTON STANDARDSTED-40-4178SOLERA 2842 NE SUNSET BLVDRENTON, WA 98056SOLERA LUA20-000305C21-001020PR18-0003331601 5th Avenue, Suite 1600 Seattle, WA 98101 206.622.5822 www.kpff.com R Call 811two business daysbefore you dig NW 1/4 OF THE NW 1/4 AND THE NE 1/4 OF THE NW 1/4 SECTION 9, TOWNSHIP 23 NORTH, RANGE 05 EAST, W.M. HORIZONTAL CONTROL PLAN R-417815 03/11/2022 DEVELOPMENT ENGINEERING msippo 04/07/2022 CITY OF RENTON IN COMPLIANCE WITH CITY OF RENTON STANDARDSTED-40-4178SOLERA 2842 NE SUNSET BLVDRENTON, WA 98056SOLERA LUA20-000305C21-001020PR18-0003331601 5th Avenue, Suite 1600 Seattle, WA 98101 206.622.5822 www.kpff.com R Call 811two business daysbefore you dig NW 1/4 OF THE NW 1/4 AND THE NE 1/4 OF THE NW 1/4 SECTION 9, TOWNSHIP 23 NORTH, RANGE 05 EAST, W.M. TESC PLAN R-417816 FOR REFERENCE ONLY REFER TO EARLY CLEAR AND GRADE PERMIT C21-003938 03/11/2022 DEVELOPMENT ENGINEERING msippo 04/07/2022 CITY OF RENTON IN COMPLIANCE WITH CITY OF RENTON STANDARDSTED-40-4178SOLERA 2842 NE SUNSET BLVDRENTON, WA 98056SOLERA LUA20-000305C21-001020PR18-0003331601 5th Avenue, Suite 1600 Seattle, WA 98101 206.622.5822 www.kpff.com R Call 811two business daysbefore you dig NW 1/4 OF THE NW 1/4 AND THE NE 1/4 OF THE NW 1/4 SECTION 9, TOWNSHIP 23 NORTH, RANGE 05 EAST, W.M. TESC DETAILS R-417817 FOR REFERENCE ONLY REFER TO EARLY CLEAR AND GRADE PERMIT C21-003938 03/11/2022 DEVELOPMENT ENGINEERING msippo 04/07/2022 CITY OF RENTON IN COMPLIANCE WITH CITY OF RENTON STANDARDSTED-40-4178SOLERA 2842 NE SUNSET BLVDRENTON, WA 98056SOLERA LUA20-000305C21-001020PR18-0003331601 5th Avenue, Suite 1600 Seattle, WA 98101 206.622.5822 www.kpff.com R Call 811two business daysbefore you dig NW 1/4 OF THE NW 1/4 AND THE NE 1/4 OF THE NW 1/4 SECTION 9, TOWNSHIP 23 NORTH, RANGE 05 EAST, W.M. TESC DETAILS R-417818 FOR REFERENCE ONLY REFER TO EARLY CLEAR AND GRADE PERMIT C21-003938 03/11/2022 DEVELOPMENT ENGINEERING msippo 04/07/2022 CITY OF RENTON IN COMPLIANCE WITH CITY OF RENTON STANDARDSTED-40-4178SOLERA 2842 NE SUNSET BLVDRENTON, WA 98056SOLERA LUA20-000305C21-001020PR18-0003331601 5th Avenue, Suite 1600 Seattle, WA 98101 206.622.5822 www.kpff.com R Call 811two business daysbefore you dig NW 1/4 OF THE NW 1/4 AND THE NE 1/4 OF THE NW 1/4 SECTION 9, TOWNSHIP 23 NORTH, RANGE 05 EAST, W.M. TESC DETAILS R-417819 FOR REFERENCE ONLY REFER TO EARLY CLEAR AND GRADE PERMIT C21-003938 03/11/2022 DEVELOPMENT ENGINEERING msippo 04/07/2022 CITY OF RENTON IN COMPLIANCE WITH CITY OF RENTON STANDARDSTED-40-4178SOLERA 2842 NE SUNSET BLVDRENTON, WA 98056SOLERA LUA20-000305C21-001020PR18-0003331601 5th Avenue, Suite 1600 Seattle, WA 98101 206.622.5822 www.kpff.com R Call 811two business daysbefore you dig NW 1/4 OF THE NW 1/4 AND THE NE 1/4 OF THE NW 1/4 SECTION 9, TOWNSHIP 23 NORTH, RANGE 05 EAST, W.M. GRADING PLAN - BLOCK C R-417820 03/11/2022 DEVELOPMENT ENGINEERING msippo 04/07/2022 NE 12TH ST HARRINGTON PL NE CITY OF RENTON IN COMPLIANCE WITH CITY OF RENTON STANDARDSTED-40-4178SOLERA 2842 NE SUNSET BLVDRENTON, WA 98056SOLERA LUA20-000305C21-001020PR18-0003331601 5th Avenue, Suite 1600 Seattle, WA 98101 206.622.5822 www.kpff.com R Call 811two business daysbefore you dig NW 1/4 OF THE NW 1/4 AND THE NE 1/4 OF THE NW 1/4 SECTION 9, TOWNSHIP 23 NORTH, RANGE 05 EAST, W.M. GRADING PLAN - BLOCK D R-417821 03/11/2022 DEVELOPMENT ENGINEERING msippo 04/07/2022 CITY OF RENTON IN COMPLIANCE WITH CITY OF RENTON STANDARDSTED-40-4178SOLERA 2842 NE SUNSET BLVDRENTON, WA 98056SOLERA LUA20-000305C21-001020PR18-0003331601 5th Avenue, Suite 1600 Seattle, WA 98101 206.622.5822 www.kpff.com R Call 811two business daysbefore you dig NW 1/4 OF THE NW 1/4 AND THE NE 1/4 OF THE NW 1/4 SECTION 9, TOWNSHIP 23 NORTH, RANGE 05 EAST, W.M. R-417822 GRADING PLAN 04/05/2022 DEVELOPMENT ENGINEERING msippo 04/11/2022 CITY OF RENTON IN COMPLIANCE WITH CITY OF RENTON STANDARDSTED-40-4178SOLERA 2842 NE SUNSET BLVDRENTON, WA 98056SOLERA LUA20-000305C21-001020PR18-0003331601 5th Avenue, Suite 1600 Seattle, WA 98101 206.622.5822 www.kpff.com R Call 811two business daysbefore you dig NW 1/4 OF THE NW 1/4 AND THE NE 1/4 OF THE NW 1/4 SECTION 9, TOWNSHIP 23 NORTH, RANGE 05 EAST, W.M. GRADING PLAN R-417823 04/05/2022 DEVELOPMENT ENGINEERING msippo 04/11/2022 CITY OF RENTON IN COMPLIANCE WITH CITY OF RENTON STANDARDSTED-40-4178SOLERA 2842 NE SUNSET BLVDRENTON, WA 98056SOLERA LUA20-000305C21-001020PR18-0003331601 5th Avenue, Suite 1600 Seattle, WA 98101 206.622.5822 www.kpff.com R Call 811two business daysbefore you dig NW 1/4 OF THE NW 1/4 AND THE NE 1/4 OF THE NW 1/4 SECTION 9, TOWNSHIP 23 NORTH, RANGE 05 EAST, W.M. GRADING PLAN R-417824 03/11/2022 DEVELOPMENT ENGINEERING msippo 04/07/2022 CITY OF RENTON IN COMPLIANCE WITH CITY OF RENTON STANDARDSTED-40-4178SOLERA 2842 NE SUNSET BLVDRENTON, WA 98056SOLERA LUA20-000305C21-001020PR18-0003331601 5th Avenue, Suite 1600 Seattle, WA 98101 206.622.5822 www.kpff.com R Call 811two business daysbefore you dig NW 1/4 OF THE NW 1/4 AND THE NE 1/4 OF THE NW 1/4 SECTION 9, TOWNSHIP 23 NORTH, RANGE 05 EAST, W.M. GRADING PLAN R-417825 03/11/2022 DEVELOPMENT ENGINEERING msippo 04/07/2022 CITY OF RENTON IN COMPLIANCE WITH CITY OF RENTON STANDARDSTED-40-4178SOLERA 2842 NE SUNSET BLVDRENTON, WA 98056SOLERA LUA20-000305C21-001020PR18-0003331601 5th Avenue, Suite 1600 Seattle, WA 98101 206.622.5822 www.kpff.com R Call 811two business daysbefore you dig NW 1/4 OF THE NW 1/4 AND THE NE 1/4 OF THE NW 1/4 SECTION 9, TOWNSHIP 23 NORTH, RANGE 05 EAST, W.M. GRADING PLAN R-417826 03/11/2022 DEVELOPMENT ENGINEERING msippo 04/07/2022 CITY OF RENTON IN COMPLIANCE WITH CITY OF RENTON STANDARDSTED-40-4178SOLERA 2842 NE SUNSET BLVDRENTON, WA 98056SOLERA LUA20-000305C21-001020PR18-0003331601 5th Avenue, Suite 1600 Seattle, WA 98101 206.622.5822 www.kpff.com R Call 811two business daysbefore you dig NW 1/4 OF THE NW 1/4 AND THE NE 1/4 OF THE NW 1/4 SECTION 9, TOWNSHIP 23 NORTH, RANGE 05 EAST, W.M. GRADING PLAN R-417827 03/11/2022 DEVELOPMENT ENGINEERING msippo 04/07/2022 NE 10TH STCITY OF RENTON IN COMPLIANCE WITH CITY OF RENTON STANDARDSTED-40-4178SOLERA 2842 NE SUNSET BLVDRENTON, WA 98056SOLERA LUA20-000305C21-001020PR18-0003331601 5th Avenue, Suite 1600 Seattle, WA 98101 206.622.5822 www.kpff.com R Call 811two business daysbefore you dig NW 1/4 OF THE NW 1/4 AND THE NE 1/4 OF THE NW 1/4 SECTION 9, TOWNSHIP 23 NORTH, RANGE 05 EAST, W.M. GRADING PLAN R-417828 03/11/2022 DEVELOPMENT ENGINEERING msippo 04/07/2022 CITY OF RENTON IN COMPLIANCE WITH CITY OF RENTON STANDARDSTED-40-4178SOLERA 2842 NE SUNSET BLVDRENTON, WA 98056SOLERA LUA20-000305C21-001020PR18-0003331601 5th Avenue, Suite 1600 Seattle, WA 98101 206.622.5822 www.kpff.com R Call 811two business daysbefore you dig NW 1/4 OF THE NW 1/4 AND THE NE 1/4 OF THE NW 1/4 SECTION 9, TOWNSHIP 23 NORTH, RANGE 05 EAST, W.M. GRADING PLAN R-417829 03/11/2022 DEVELOPMENT ENGINEERING msippo 04/07/2022 NE SUNSET BLVD CITY OF RENTON IN COMPLIANCE WITH CITY OF RENTON STANDARDSTED-40-4178SOLERA 2842 NE SUNSET BLVDRENTON, WA 98056SOLERA LUA20-000305C21-001020PR18-0003331601 5th Avenue, Suite 1600 Seattle, WA 98101 206.622.5822 www.kpff.com R Call 811two business daysbefore you dig NW 1/4 OF THE NW 1/4 AND THE NE 1/4 OF THE NW 1/4 SECTION 9, TOWNSHIP 23 NORTH, RANGE 05 EAST, W.M. GRADING PLAN R-417830 03/11/2022 DEVELOPMENT ENGINEERING msippo 04/07/2022 CITY OF RENTON IN COMPLIANCE WITH CITY OF RENTON STANDARDSTED-40-4178SOLERA 2842 NE SUNSET BLVDRENTON, WA 98056SOLERA LUA20-000305C21-001020PR18-0003331601 5th Avenue, Suite 1600 Seattle, WA 98101 206.622.5822 www.kpff.com R Call 811two business daysbefore you dig NW 1/4 OF THE NW 1/4 AND THE NE 1/4 OF THE NW 1/4 SECTION 9, TOWNSHIP 23 NORTH, RANGE 05 EAST, W.M. GRADING PLAN R-417831 03/11/2022 DEVELOPMENT ENGINEERING msippo 04/07/2022 CITY OF RENTON IN COMPLIANCE WITH CITY OF RENTON STANDARDSTED-40-4178SOLERA 2842 NE SUNSET BLVDRENTON, WA 98056SOLERA LUA20-000305C21-001020PR18-0003331601 5th Avenue, Suite 1600 Seattle, WA 98101 206.622.5822 www.kpff.com R Call 811two business daysbefore you dig NW 1/4 OF THE NW 1/4 AND THE NE 1/4 OF THE NW 1/4 SECTION 9, TOWNSHIP 23 NORTH, RANGE 05 EAST, W.M. GRADING PLAN R-417832 03/11/2022 DEVELOPMENT ENGINEERING msippo 04/07/2022 NE SUNSET BLVD CITY OF RENTON IN COMPLIANCE WITH CITY OF RENTON STANDARDSTED-40-4178SOLERA 2842 NE SUNSET BLVDRENTON, WA 98056SOLERA LUA20-000305C21-001020PR18-0003331601 5th Avenue, Suite 1600 Seattle, WA 98101 206.622.5822 www.kpff.com R Call 811two business daysbefore you dig NW 1/4 OF THE NW 1/4 AND THE NE 1/4 OF THE NW 1/4 SECTION 9, TOWNSHIP 23 NORTH, RANGE 05 EAST, W.M. GRADING PLAN R-417833 03/11/2022 DEVELOPMENT ENGINEERING msippo 04/07/2022 KIRKLAND AVE NECITY OF RENTON IN COMPLIANCE WITH CITY OF RENTON STANDARDSTED-40-4178SOLERA 2842 NE SUNSET BLVDRENTON, WA 98056SOLERA LUA20-000305C21-001020PR18-0003331601 5th Avenue, Suite 1600 Seattle, WA 98101 206.622.5822 www.kpff.com R Call 811two business daysbefore you dig NW 1/4 OF THE NW 1/4 AND THE NE 1/4 OF THE NW 1/4 SECTION 9, TOWNSHIP 23 NORTH, RANGE 05 EAST, W.M. GRADING PLAN R-417834 03/11/2022 DEVELOPMENT ENGINEERING msippo 04/07/2022 CITY OF RENTON IN COMPLIANCE WITH CITY OF RENTON STANDARDSTED-40-4178SOLERA 2842 NE SUNSET BLVDRENTON, WA 98056SOLERA LUA20-000305C21-001020PR18-0003331601 5th Avenue, Suite 1600 Seattle, WA 98101 206.622.5822 www.kpff.com R Call 811two business daysbefore you dig NW 1/4 OF THE NW 1/4 AND THE NE 1/4 OF THE NW 1/4 SECTION 9, TOWNSHIP 23 NORTH, RANGE 05 EAST, W.M. CURB RAMP AND DRIVEWAY DETAILS R-417835 03/11/2022 DEVELOPMENT ENGINEERING msippo 04/07/2022 CITY OF RENTON IN COMPLIANCE WITH CITY OF RENTON STANDARDSTED-40-4178SOLERA 2842 NE SUNSET BLVDRENTON, WA 98056SOLERA LUA20-000305C21-001020PR18-0003331601 5th Avenue, Suite 1600 Seattle, WA 98101 206.622.5822 www.kpff.com R Call 811two business daysbefore you dig NW 1/4 OF THE NW 1/4 AND THE NE 1/4 OF THE NW 1/4 SECTION 9, TOWNSHIP 23 NORTH, RANGE 05 EAST, W.M. CURB RAMP AND DRIVEWAY DETAILS R-417836 03/11/2022 DEVELOPMENT ENGINEERING msippo 04/07/2022 CITY OF RENTON IN COMPLIANCE WITH CITY OF RENTON STANDARDSTED-40-4178SOLERA 2842 NE SUNSET BLVDRENTON, WA 98056SOLERA LUA20-000305C21-001020PR18-0003331601 5th Avenue, Suite 1600 Seattle, WA 98101 206.622.5822 www.kpff.com R Call 811two business daysbefore you dig NW 1/4 OF THE NW 1/4 AND THE NE 1/4 OF THE NW 1/4 SECTION 9, TOWNSHIP 23 NORTH, RANGE 05 EAST, W.M. CURB RAMP AND DRIVEWAY DETAILS R-417837 03/11/2022 DEVELOPMENT ENGINEERING msippo 04/07/2022 CITY OF RENTON IN COMPLIANCE WITH CITY OF RENTON STANDARDSTED-40-4178SOLERA 2842 NE SUNSET BLVDRENTON, WA 98056SOLERA LUA20-000305C21-001020PR18-0003331601 5th Avenue, Suite 1600 Seattle, WA 98101 206.622.5822 www.kpff.com R Call 811two business daysbefore you dig NW 1/4 OF THE NW 1/4 AND THE NE 1/4 OF THE NW 1/4 SECTION 9, TOWNSHIP 23 NORTH, RANGE 05 EAST, W.M. CURB RAMP AND DRIVEWAY DETAILS R-417838 03/11/2022 DEVELOPMENT ENGINEERING msippo 04/07/2022 CITY OF RENTON IN COMPLIANCE WITH CITY OF RENTON STANDARDSTED-40-4178SOLERA 2842 NE SUNSET BLVDRENTON, WA 98056SOLERA LUA20-000305C21-001020PR18-0003331601 5th Avenue, Suite 1600 Seattle, WA 98101 206.622.5822 www.kpff.com R Call 811two business daysbefore you dig NW 1/4 OF THE NW 1/4 AND THE NE 1/4 OF THE NW 1/4 SECTION 9, TOWNSHIP 23 NORTH, RANGE 05 EAST, W.M. CURB RAMP AND DRIVEWAY DETAILS R-417839 03/11/2022 DEVELOPMENT ENGINEERING msippo 04/07/2022 CITY OF RENTON IN COMPLIANCE WITH CITY OF RENTON STANDARDSTED-40-4178SOLERA 2842 NE SUNSET BLVDRENTON, WA 98056SOLERA LUA20-000305C21-001020PR18-0003331601 5th Avenue, Suite 1600 Seattle, WA 98101 206.622.5822 www.kpff.com R Call 811two business daysbefore you dig NW 1/4 OF THE NW 1/4 AND THE NE 1/4 OF THE NW 1/4 SECTION 9, TOWNSHIP 23 NORTH, RANGE 05 EAST, W.M. CURB RAMP AND DRIVEWAY DETAILS R-417840 03/11/2022 DEVELOPMENT ENGINEERING msippo 04/07/2022 CITY OF RENTON IN COMPLIANCE WITH CITY OF RENTON STANDARDSTED-40-4178SOLERA 2842 NE SUNSET BLVDRENTON, WA 98056SOLERA LUA20-000305C21-001020PR18-0003331601 5th Avenue, Suite 1600 Seattle, WA 98101 206.622.5822 www.kpff.com R Call 811two business daysbefore you dig NW 1/4 OF THE NW 1/4 AND THE NE 1/4 OF THE NW 1/4 SECTION 9, TOWNSHIP 23 NORTH, RANGE 05 EAST, W.M. CURB RAMP AND DRIVEWAY DETAILS R-417841 03/11/2022 DEVELOPMENT ENGINEERING msippo 04/07/2022 CITY OF RENTON IN COMPLIANCE WITH CITY OF RENTON STANDARDSTED-40-4178SOLERA 2842 NE SUNSET BLVDRENTON, WA 98056SOLERA LUA20-000305C21-001020PR18-0003331601 5th Avenue, Suite 1600 Seattle, WA 98101 206.622.5822 www.kpff.com R Call 811two business daysbefore you dig NW 1/4 OF THE NW 1/4 AND THE NE 1/4 OF THE NW 1/4 SECTION 9, TOWNSHIP 23 NORTH, RANGE 05 EAST, W.M. CURB RAMP AND DRIVEWAY DETAILS R-417842 03/11/2022 DEVELOPMENT ENGINEERING msippo 04/07/2022 CITY OF RENTON IN COMPLIANCE WITH CITY OF RENTON STANDARDSTED-40-4178SOLERA 2842 NE SUNSET BLVDRENTON, WA 98056SOLERA LUA20-000305C21-001020PR18-0003331601 5th Avenue, Suite 1600 Seattle, WA 98101 206.622.5822 www.kpff.com R Call 811two business daysbefore you dig NW 1/4 OF THE NW 1/4 AND THE NE 1/4 OF THE NW 1/4 SECTION 9, TOWNSHIP 23 NORTH, RANGE 05 EAST, W.M. CURB RAMP AND DRIVEWAY DETAILS R-417843 03/11/2022 DEVELOPMENT ENGINEERING msippo 04/07/2022 CITY OF RENTON IN COMPLIANCE WITH CITY OF RENTON STANDARDSTED-40-4178SOLERA 2842 NE SUNSET BLVDRENTON, WA 98056SOLERA LUA20-000305C21-001020PR18-0003331601 5th Avenue, Suite 1600 Seattle, WA 98101 206.622.5822 www.kpff.com R Call 811two business daysbefore you dig NW 1/4 OF THE NW 1/4 AND THE NE 1/4 OF THE NW 1/4 SECTION 9, TOWNSHIP 23 NORTH, RANGE 05 EAST, W.M. CURB RAMP AND DRIVEWAY DETAILS R-417844 03/11/2022 DEVELOPMENT ENGINEERING msippo 04/07/2022 CITY OF RENTON IN COMPLIANCE WITH CITY OF RENTON STANDARDSTED-40-4178SOLERA 2842 NE SUNSET BLVDRENTON, WA 98056SOLERA LUA20-000305C21-001020PR18-0003331601 5th Avenue, Suite 1600 Seattle, WA 98101 206.622.5822 www.kpff.com R Call 811two business daysbefore you dig NW 1/4 OF THE NW 1/4 AND THE NE 1/4 OF THE NW 1/4 SECTION 9, TOWNSHIP 23 NORTH, RANGE 05 EAST, W.M. CURB RAMP AND DRIVEWAY DETAILS R-417845 03/11/2022 DEVELOPMENT ENGINEERING msippo 04/07/2022 CITY OF RENTON IN COMPLIANCE WITH CITY OF RENTON STANDARDSTED-40-4178SOLERA 2842 NE SUNSET BLVDRENTON, WA 98056SOLERA LUA20-000305C21-001020PR18-0003331601 5th Avenue, Suite 1600 Seattle, WA 98101 206.622.5822 www.kpff.com R Call 811two business daysbefore you dig NW 1/4 OF THE NW 1/4 AND THE NE 1/4 OF THE NW 1/4 SECTION 9, TOWNSHIP 23 NORTH, RANGE 05 EAST, W.M. CURB RAMP AND DRIVEWAY DETAILS R-417846 03/11/2022 DEVELOPMENT ENGINEERING msippo 04/07/2022 CITY OF RENTON IN COMPLIANCE WITH CITY OF RENTON STANDARDSTED-40-4178SOLERA 2842 NE SUNSET BLVDRENTON, WA 98056SOLERA LUA20-000305C21-001020PR18-0003331601 5th Avenue, Suite 1600 Seattle, WA 98101 206.622.5822 www.kpff.com R Call 811two business daysbefore you dig NW 1/4 OF THE NW 1/4 AND THE NE 1/4 OF THE NW 1/4 SECTION 9, TOWNSHIP 23 NORTH, RANGE 05 EAST, W.M. JOINTING PLAN R-417847 03/11/2022 DEVELOPMENT ENGINEERING msippo 04/07/2022 CITY OF RENTON IN COMPLIANCE WITH CITY OF RENTON STANDARDSTED-40-4178SOLERA 2842 NE SUNSET BLVDRENTON, WA 98056SOLERA LUA20-000305C21-001020PR18-0003331601 5th Avenue, Suite 1600 Seattle, WA 98101 206.622.5822 www.kpff.com R Call 811two business daysbefore you dig NW 1/4 OF THE NW 1/4 AND THE NE 1/4 OF THE NW 1/4 SECTION 9, TOWNSHIP 23 NORTH, RANGE 05 EAST, W.M. JOINTING PLAN R-417848 03/11/2022 DEVELOPMENT ENGINEERING msippo 04/07/2022 CITY OF RENTON IN COMPLIANCE WITH CITY OF RENTON STANDARDSTED-40-4178SOLERA 2842 NE SUNSET BLVDRENTON, WA 98056SOLERA LUA20-000305C21-001020PR18-0003331601 5th Avenue, Suite 1600 Seattle, WA 98101 206.622.5822 www.kpff.com R Call 811two business daysbefore you dig NW 1/4 OF THE NW 1/4 AND THE NE 1/4 OF THE NW 1/4 SECTION 9, TOWNSHIP 23 NORTH, RANGE 05 EAST, W.M. JOINTING PLAN AND DETAILS R-417849 03/11/2022 DEVELOPMENT ENGINEERING msippo 04/07/2022 CITY OF RENTON IN COMPLIANCE WITH CITY OF RENTON STANDARDSTED-40-4178SOLERA 2842 NE SUNSET BLVDRENTON, WA 98056SOLERA LUA20-000305C21-001020PR18-0003331601 5th Avenue, Suite 1600 Seattle, WA 98101 206.622.5822 www.kpff.com R Call 811two business daysbefore you dig NW 1/4 OF THE NW 1/4 AND THE NE 1/4 OF THE NW 1/4 SECTION 9, TOWNSHIP 23 NORTH, RANGE 05 EAST, W.M. JOINTING DETAILS R-417850 1' - 0 " FACE OF CURB 1' - 0" (TYP.)4" R ISOLATION PAD USUAL JOINT TRACK LESS THAN 4' - 0"RECTANGULAR FRAME ISOLATION JOINT ~ 3/4" PREMOLDED JOINT FILLER 4' - 0" OR MORE FACE OF CURB RECTANGULAR FRAME 1' - 0 " CIRCULAR FRAME 1' - 0"CIRCULAR FRAME PAVEMENT JOINT (TYP.) ISOLATION JOINT ~ 3/4" PREMOLDED JOINT FILLER 1' - 0"USUAL JOINT TRACK CIRCULAR FRAME PAVEMENT JOINT (TYP.) ISOLATION JOINT ~ 3/4" PREMOLDED JOINT FILLER FACE OF CURB RECTANGULAR FRAME (COMBINATION INLET SHOWN)1' - 0"CIRCULAR FRAME 1' - 0 " PAVEMENT JOINT (TYP.) CIRCULAR FRAME ADJUSTED PAVEMENT JOINT LESS THAN 4' - 0" 4' - 0" OR LESS 4' - 0" OR MORE 4' - 0"OR MORE4' - 0"OR LESS1' - 0 " FACE OF CURB PAVEMENT JOINT 4' - 0" OR MORE LESS THAN 4' - 0" FACE OF CURB ALL CONDITIONS ARE SHOWN IN PLAN VIEW. (SHOULDER USE ONLY)6' - 0" MIN.PAVEMENT JOINT PAVEMENT JOINT PAVEMENT JOINT (TYP.) PAVEMENT JOINT (TYP.) FACE OF CURB EDGE OF SHOULDER ISOLATION JOINT ~ 3/4" PREMOLDED JOINT FILLER ISOLATION JOINT ~ 3/4" PREMOLDED JOINT FILLER ISOLATION JOINT ~ 3/4" PREMOLDED JOINT FILLER ISOLATION JOINT ~ 3/4" PREMOLDED JOINT FILLER ISOLATION JOINT ~ 3/4" PREMOLDED JOINT FILLER ISOLATION JOINT ~ 3/4" PREMOLDED JOINT FILLER ISOLATION JOINT ~ 3/4" PREMOLDED JOINT FILLER ISOLATION JOINT ~ 3/4" PREMOLDED JOINT FILLER TIE BAR ~ # 5 BAR, 30" LONG SPACING = 6" O.C. TIE BAR ~ # 5 BAR, 30" LONG SPACING = 6" O.C. ADJUSTED PAVEMENT JOINT (TYP.) PAVEMENT JOINT USUAL JOINT TRACK (TYP.) TIE BAR ~ # 5 BAR, 30" LONG SPACING = 6" O.C. TIE BAR ~ # 5 BAR, 30" LONG SPACING = 6" O.C. 03/11/2022 DEVELOPMENT ENGINEERING msippo 04/07/2022 CITY OF RENTON IN COMPLIANCE WITH CITY OF RENTON STANDARDSTED-40-4178SOLERA 2842 NE SUNSET BLVDRENTON, WA 98056SOLERA LUA20-000305C21-001020PR18-0003331601 5th Avenue, Suite 1600 Seattle, WA 98101 206.622.5822 www.kpff.com R Call 811two business daysbefore you dig NW 1/4 OF THE NW 1/4 AND THE NE 1/4 OF THE NW 1/4 SECTION 9, TOWNSHIP 23 NORTH, RANGE 05 EAST, W.M. ROAD AND STORM DRAINAGE OVERVIEW R-417851 03/11/2022 SURFACE WATER UTILITY JFarah 04/01/2022 DEVELOPMENT ENGINEERING msippo 04/07/2022 CITY OF RENTON IN COMPLIANCE WITH CITY OF RENTON STANDARDSTED-40-4178SOLERA 2842 NE SUNSET BLVDRENTON, WA 98056SOLERA LUA20-000305C21-001020PR18-0003331601 5th Avenue, Suite 1600 Seattle, WA 98101 206.622.5822 www.kpff.com R Call 811two business daysbefore you dig NW 1/4 OF THE NW 1/4 AND THE NE 1/4 OF THE NW 1/4 SECTION 9, TOWNSHIP 23 NORTH, RANGE 05 EAST, W.M. GRADING AND STORM DRAINAGE JEFFERSON AVENUE NE PLAN AND PROFILE R-417852 03/11/2022 SURFACE WATER UTILITY JFarah 04/01/2022 DEVELOPMENT ENGINEERING msippo 04/07/2022 CITY OF RENTON IN COMPLIANCE WITH CITY OF RENTON STANDARDSTED-40-4178SOLERA 2842 NE SUNSET BLVDRENTON, WA 98056SOLERA LUA20-000305C21-001020PR18-0003331601 5th Avenue, Suite 1600 Seattle, WA 98101 206.622.5822 www.kpff.com R Call 811two business daysbefore you dig NW 1/4 OF THE NW 1/4 AND THE NE 1/4 OF THE NW 1/4 SECTION 9, TOWNSHIP 23 NORTH, RANGE 05 EAST, W.M. GRADING AND STORM DRAINAGE JEFFERSON AVENUE NE PLAN AND PROFILE R-417853 03/11/2022 SURFACE WATER UTILITY JFarah 04/01/2022 DEVELOPMENT ENGINEERING msippo 04/07/2022 CITY OF RENTON IN COMPLIANCE WITH CITY OF RENTON STANDARDSTED-40-4178SOLERA 2842 NE SUNSET BLVDRENTON, WA 98056SOLERA LUA20-000305C21-001020PR18-0003331601 5th Avenue, Suite 1600 Seattle, WA 98101 206.622.5822 www.kpff.com R Call 811two business daysbefore you dig NW 1/4 OF THE NW 1/4 AND THE NE 1/4 OF THE NW 1/4 SECTION 9, TOWNSHIP 23 NORTH, RANGE 05 EAST, W.M. GRADING AND STORM DRAINAGE JEFFERSON AVENUE NE PLAN AND PROFILE R-417854 03/11/2022 SURFACE WATER UTILITY JFarah 04/01/2022 DEVELOPMENT ENGINEERING msippo 04/07/2022 CITY OF RENTON IN COMPLIANCE WITH CITY OF RENTON STANDARDSTED-40-4178SOLERA 2842 NE SUNSET BLVDRENTON, WA 98056SOLERA LUA20-000305C21-001020PR18-0003331601 5th Avenue, Suite 1600 Seattle, WA 98101 206.622.5822 www.kpff.com R Call 811two business daysbefore you dig NW 1/4 OF THE NW 1/4 AND THE NE 1/4 OF THE NW 1/4 SECTION 9, TOWNSHIP 23 NORTH, RANGE 05 EAST, W.M. GRADING AND STORM DRAINAGE NE 11TH STREET PLAN AND PROFILE R-417855 03/11/2022 SURFACE WATER UTILITY JFarah 04/01/2022 DEVELOPMENT ENGINEERING msippo 04/07/2022 CITY OF RENTON IN COMPLIANCE WITH CITY OF RENTON STANDARDSTED-40-4178SOLERA 2842 NE SUNSET BLVDRENTON, WA 98056SOLERA LUA20-000305C21-001020PR18-0003331601 5th Avenue, Suite 1600 Seattle, WA 98101 206.622.5822 www.kpff.com R Call 811two business daysbefore you dig NW 1/4 OF THE NW 1/4 AND THE NE 1/4 OF THE NW 1/4 SECTION 9, TOWNSHIP 23 NORTH, RANGE 05 EAST, W.M. GRADING AND STORM DRAINAGE NE 11TH STREET PLAN AND PROFILE R-417856 03/11/2022 SURFACE WATER UTILITY JFarah 04/01/2022 DEVELOPMENT ENGINEERING msippo 04/07/2022 CITY OF RENTON IN COMPLIANCE WITH CITY OF RENTON STANDARDSTED-40-4178SOLERA 2842 NE SUNSET BLVDRENTON, WA 98056SOLERA LUA20-000305C21-001020PR18-0003331601 5th Avenue, Suite 1600 Seattle, WA 98101 206.622.5822 www.kpff.com R Call 811two business daysbefore you dig NW 1/4 OF THE NW 1/4 AND THE NE 1/4 OF THE NW 1/4 SECTION 9, TOWNSHIP 23 NORTH, RANGE 05 EAST, W.M. GRADING AND STORM DRAINAGE NE SUNSET BOULEVARD PLAN AND PROFILE R-417857 03/11/2022 SURFACE WATER UTILITY JFarah 04/01/2022 DEVELOPMENT ENGINEERING msippo 04/07/2022 NE SUNSET BLVD CITY OF RENTON IN COMPLIANCE WITH CITY OF RENTON STANDARDSTED-40-4178SOLERA 2842 NE SUNSET BLVDRENTON, WA 98056SOLERA LUA20-000305C21-001020PR18-0003331601 5th Avenue, Suite 1600 Seattle, WA 98101 206.622.5822 www.kpff.com R Call 811two business daysbefore you dig NW 1/4 OF THE NW 1/4 AND THE NE 1/4 OF THE NW 1/4 SECTION 9, TOWNSHIP 23 NORTH, RANGE 05 EAST, W.M. GRADING AND STORM DRAINAGE NE SUNSET BOULEVARD PLAN AND PROFILE R-417858 03/11/2022 SURFACE WATER UTILITY JFarah 04/01/2022 DEVELOPMENT ENGINEERING msippo 04/07/2022 CITY OF RENTON IN COMPLIANCE WITH CITY OF RENTON STANDARDSTED-40-4178SOLERA 2842 NE SUNSET BLVDRENTON, WA 98056SOLERA LUA20-000305C21-001020PR18-0003331601 5th Avenue, Suite 1600 Seattle, WA 98101 206.622.5822 www.kpff.com R Call 811two business daysbefore you dig NW 1/4 OF THE NW 1/4 AND THE NE 1/4 OF THE NW 1/4 SECTION 9, TOWNSHIP 23 NORTH, RANGE 05 EAST, W.M. GRADING AND STORM DRAINAGE NE SUNSET BOULEVARD PLAN AND PROFILE R-417859 03/11/2022 SURFACE WATER UTILITY JFarah 04/01/2022 DEVELOPMENT ENGINEERING msippo 04/07/2022 CITY OF RENTON IN COMPLIANCE WITH CITY OF RENTON STANDARDSTED-40-4178SOLERA 2842 NE SUNSET BLVDRENTON, WA 98056SOLERA LUA20-000305C21-001020PR18-0003331601 5th Avenue, Suite 1600 Seattle, WA 98101 206.622.5822 www.kpff.com R Call 811two business daysbefore you dig NW 1/4 OF THE NW 1/4 AND THE NE 1/4 OF THE NW 1/4 SECTION 9, TOWNSHIP 23 NORTH, RANGE 05 EAST, W.M. GRADING AND STORM DRAINAGE HARRINGTON PLACE NE PLAN AND PROFILE R-417860 03/11/2022 condition of approval: provide future storm stub connection SURFACE WATER UTILITY JFarah 04/01/2022 DEVELOPMENT ENGINEERING msippo 04/07/2022 CITY OF RENTON IN COMPLIANCE WITH CITY OF RENTON STANDARDSTED-40-4178SOLERA 2842 NE SUNSET BLVDRENTON, WA 98056SOLERA LUA20-000305C21-001020PR18-0003331601 5th Avenue, Suite 1600 Seattle, WA 98101 206.622.5822 www.kpff.com R Call 811two business daysbefore you dig NW 1/4 OF THE NW 1/4 AND THE NE 1/4 OF THE NW 1/4 SECTION 9, TOWNSHIP 23 NORTH, RANGE 05 EAST, W.M. GRADING AND STORM DRAINAGE NE 12TH STREET PLAN AND PROFILE R-417861 03/11/2022 SURFACE WATER UTILITY JFarah 04/01/2022 DEVELOPMENT ENGINEERING msippo 04/07/2022 CITY OF RENTON IN COMPLIANCE WITH CITY OF RENTON STANDARDSTED-40-4178SOLERA 2842 NE SUNSET BLVDRENTON, WA 98056SOLERA LUA20-000305C21-001020PR18-0003331601 5th Avenue, Suite 1600 Seattle, WA 98101 206.622.5822 www.kpff.com R Call 811two business daysbefore you dig NW 1/4 OF THE NW 1/4 AND THE NE 1/4 OF THE NW 1/4 SECTION 9, TOWNSHIP 23 NORTH, RANGE 05 EAST, W.M. GRADING AND STORM DRAINAGE KIRKLAND AVENUE NE PLAN AND PROFILE R-417862 03/11/2022 SURFACE WATER UTILITY JFarah 04/01/2022 DEVELOPMENT ENGINEERING msippo 04/07/2022 NE 10TH STCITY OF RENTON IN COMPLIANCE WITH CITY OF RENTON STANDARDSTED-40-4178SOLERA 2842 NE SUNSET BLVDRENTON, WA 98056SOLERA LUA20-000305C21-001020PR18-0003331601 5th Avenue, Suite 1600 Seattle, WA 98101 206.622.5822 www.kpff.com R Call 811two business daysbefore you dig NW 1/4 OF THE NW 1/4 AND THE NE 1/4 OF THE NW 1/4 SECTION 9, TOWNSHIP 23 NORTH, RANGE 05 EAST, W.M. STORM DRAINAGE PLAN R-417863 03/11/2022 SURFACE WATER UTILITY JFarah 04/01/2022 DEVELOPMENT ENGINEERING msippo 04/07/2022 CITY OF RENTON IN COMPLIANCE WITH CITY OF RENTON STANDARDSTED-40-4178SOLERA 2842 NE SUNSET BLVDRENTON, WA 98056SOLERA LUA20-000305C21-001020PR18-0003331601 5th Avenue, Suite 1600 Seattle, WA 98101 206.622.5822 www.kpff.com R Call 811two business daysbefore you dig NW 1/4 OF THE NW 1/4 AND THE NE 1/4 OF THE NW 1/4 SECTION 9, TOWNSHIP 23 NORTH, RANGE 05 EAST, W.M. STORM DRAINAGE PROFILE R-417864 03/11/2022 SURFACE WATER UTILITY JFarah 04/01/2022 DEVELOPMENT ENGINEERING msippo 04/07/2022 CITY OF RENTON IN COMPLIANCE WITH CITY OF RENTON STANDARDSTED-40-4178SOLERA 2842 NE SUNSET BLVDRENTON, WA 98056SOLERA LUA20-000305C21-001020PR18-0003331601 5th Avenue, Suite 1600 Seattle, WA 98101 206.622.5822 www.kpff.com R Call 811two business daysbefore you dig NW 1/4 OF THE NW 1/4 AND THE NE 1/4 OF THE NW 1/4 SECTION 9, TOWNSHIP 23 NORTH, RANGE 05 EAST, W.M. ROAD SECTIONS R-417865 03/11/2022 DEVELOPMENT ENGINEERING msippo 04/07/2022 CITY OF RENTON IN COMPLIANCE WITH CITY OF RENTON STANDARDSTED-40-4178SOLERA 2842 NE SUNSET BLVDRENTON, WA 98056SOLERA LUA20-000305C21-001020PR18-0003331601 5th Avenue, Suite 1600 Seattle, WA 98101 206.622.5822 www.kpff.com R Call 811two business daysbefore you dig NW 1/4 OF THE NW 1/4 AND THE NE 1/4 OF THE NW 1/4 SECTION 9, TOWNSHIP 23 NORTH, RANGE 05 EAST, W.M. ROAD SECTIONS R-417866 03/11/2022 DEVELOPMENT ENGINEERING msippo 04/07/2022 CITY OF RENTON IN COMPLIANCE WITH CITY OF RENTON STANDARDSTED-40-4178SOLERA 2842 NE SUNSET BLVDRENTON, WA 98056SOLERA LUA20-000305C21-001020PR18-0003331601 5th Avenue, Suite 1600 Seattle, WA 98101 206.622.5822 www.kpff.com R Call 811two business daysbefore you dig NW 1/4 OF THE NW 1/4 AND THE NE 1/4 OF THE NW 1/4 SECTION 9, TOWNSHIP 23 NORTH, RANGE 05 EAST, W.M. ROAD DETAILS R-417867 03/11/2022 DEVELOPMENT ENGINEERING msippo 04/07/2022 CITY OF RENTON IN COMPLIANCE WITH CITY OF RENTON STANDARDSTED-40-4178SOLERA 2842 NE SUNSET BLVDRENTON, WA 98056SOLERA LUA20-000305C21-001020PR18-0003331601 5th Avenue, Suite 1600 Seattle, WA 98101 206.622.5822 www.kpff.com R Call 811two business daysbefore you dig NW 1/4 OF THE NW 1/4 AND THE NE 1/4 OF THE NW 1/4 SECTION 9, TOWNSHIP 23 NORTH, RANGE 05 EAST, W.M. ROAD DETAILS R-417868 03/11/2022 DEVELOPMENT ENGINEERING msippo 04/07/2022 CITY OF RENTON IN COMPLIANCE WITH CITY OF RENTON STANDARDSTED-40-4178SOLERA 2842 NE SUNSET BLVDRENTON, WA 98056SOLERA LUA20-000305C21-001020PR18-0003331601 5th Avenue, Suite 1600 Seattle, WA 98101 206.622.5822 www.kpff.com R Call 811two business daysbefore you dig NW 1/4 OF THE NW 1/4 AND THE NE 1/4 OF THE NW 1/4 SECTION 9, TOWNSHIP 23 NORTH, RANGE 05 EAST, W.M. ROAD DETAILS R-417869 03/11/2022 DEVELOPMENT ENGINEERING msippo 04/07/2022 CITY OF RENTON IN COMPLIANCE WITH CITY OF RENTON STANDARDSTED-40-4178SOLERA 2842 NE SUNSET BLVDRENTON, WA 98056SOLERA LUA20-000305C21-001020PR18-0003331601 5th Avenue, Suite 1600 Seattle, WA 98101 206.622.5822 www.kpff.com R Call 811two business daysbefore you dig NW 1/4 OF THE NW 1/4 AND THE NE 1/4 OF THE NW 1/4 SECTION 9, TOWNSHIP 23 NORTH, RANGE 05 EAST, W.M. STORM DRAINAGE DETAILS R-417870 03/11/2022 SURFACE WATER UTILITY JFarah 04/01/2022 DEVELOPMENT ENGINEERING msippo 04/07/2022 CITY OF RENTON IN COMPLIANCE WITH CITY OF RENTON STANDARDSTED-40-4178SOLERA 2842 NE SUNSET BLVDRENTON, WA 98056SOLERA LUA20-000305C21-001020PR18-0003331601 5th Avenue, Suite 1600 Seattle, WA 98101 206.622.5822 www.kpff.com R Call 811two business daysbefore you dig NW 1/4 OF THE NW 1/4 AND THE NE 1/4 OF THE NW 1/4 SECTION 9, TOWNSHIP 23 NORTH, RANGE 05 EAST, W.M. STORM DRAINAGE DETAILS R-417871 03/11/2022 SURFACE WATER UTILITY JFarah 04/01/2022 DEVELOPMENT ENGINEERING msippo 04/07/2022 CITY OF RENTON IN COMPLIANCE WITH CITY OF RENTON STANDARDSTED-40-4178SOLERA 2842 NE SUNSET BLVDRENTON, WA 98056SOLERA LUA20-000305C21-001020PR18-0003331601 5th Avenue, Suite 1600 Seattle, WA 98101 206.622.5822 www.kpff.com R Call 811two business daysbefore you dig NW 1/4 OF THE NW 1/4 AND THE NE 1/4 OF THE NW 1/4 SECTION 9, TOWNSHIP 23 NORTH, RANGE 05 EAST, W.M. STORM DRAINAGE DETAILS R-417872 03/11/2022 SURFACE WATER UTILITY JFarah 04/01/2022 DEVELOPMENT ENGINEERING msippo 04/07/2022 CITY OF RENTON IN COMPLIANCE WITH CITY OF RENTON STANDARDSTED-40-4178SOLERA 2842 NE SUNSET BLVDRENTON, WA 98056SOLERA LUA20-000305C21-001020PR18-0003331601 5th Avenue, Suite 1600 Seattle, WA 98101 206.622.5822 www.kpff.com R Call 811two business daysbefore you dig NW 1/4 OF THE NW 1/4 AND THE NE 1/4 OF THE NW 1/4 SECTION 9, TOWNSHIP 23 NORTH, RANGE 05 EAST, W.M. STORM DRAINAGE DETAILS R-417873 03/11/2022 SURFACE WATER UTILITY JFarah 04/01/2022 DEVELOPMENT ENGINEERING msippo 04/07/2022 CITY OF RENTON IN COMPLIANCE WITH CITY OF RENTON STANDARDSTED-40-4178SOLERA 2842 NE SUNSET BLVDRENTON, WA 98056SOLERA LUA20-000305C21-001020PR18-0003331601 5th Avenue, Suite 1600 Seattle, WA 98101 206.622.5822 www.kpff.com R Call 811two business daysbefore you dig NW 1/4 OF THE NW 1/4 AND THE NE 1/4 OF THE NW 1/4 SECTION 9, TOWNSHIP 23 NORTH, RANGE 05 EAST, W.M. STORMWATER CHAMBER SYSTEM LAYOUT R-417874 03/11/2022 SURFACE WATER UTILITY JFarah 04/01/2022 DEVELOPMENT ENGINEERING msippo 04/07/2022 CITY OF RENTON IN COMPLIANCE WITH CITY OF RENTON STANDARDSTED-40-4178SOLERA 2842 NE SUNSET BLVDRENTON, WA 98056SOLERA LUA20-000305C21-001020PR18-0003331601 5th Avenue, Suite 1600 Seattle, WA 98101 206.622.5822 www.kpff.com R Call 811two business daysbefore you dig NW 1/4 OF THE NW 1/4 AND THE NE 1/4 OF THE NW 1/4 SECTION 9, TOWNSHIP 23 NORTH, RANGE 05 EAST, W.M. STORMWATER CHAMBER SYSTEM DETAILS R-417875 03/11/2022 SURFACE WATER UTILITY JFarah 04/01/2022 DEVELOPMENT ENGINEERING msippo 04/07/2022 ¹ ¹ ¹ ¹ ³ D C B A CITY OF RENTON IN COMPLIANCE WITH CITY OF RENTON STANDARDSTED-40-4178SOLERA 2842 NE SUNSET BLVDRENTON, WA 98056SOLERA LUA20-000305C21-001020PR18-0003331601 5th Avenue, Suite 1600 Seattle, WA 98101 206.622.5822 www.kpff.com R Call 811two business daysbefore you dig NW 1/4 OF THE NW 1/4 AND THE NE 1/4 OF THE NW 1/4 SECTION 9, TOWNSHIP 23 NORTH, RANGE 05 EAST, W.M. STORMWATER CHAMBER SYSTEM DETAILS R-417876 03/11/2022 SURFACE WATER UTILITY JFarah 04/01/2022 DEVELOPMENT ENGINEERING msippo 04/07/2022 NE SUNSET BLVDNE 10TH STKIRKLAND AVE NENE 12TH ST HARRINGTON PL NEHAR RI N G T O N A V E N E NE SUNSET BLVD + TW 3 4 9 . 2 5 + 350.25 + TW 3 4 9 . 2 5 + TW 3 4 5 . 0 0 + 350.25 + TW 3 4 7 . 5 0 + TW 3 5 0. 2 5 + TW 3 5 0. 2 5 + TW 3 5 0 . 2 5 + TW 3 5 0 . 2 5 + 350.25 + 350.25 + 350.25+ 350.25 + 350.25 + 350.25+ 350.25 + 350.25 TW 34 3 . 0 0 + + TW 3 5 5. 6 3 TW 3 6 5 . 0 0 + + TW 3 5 4. 5 0 TW 3 5 2 . 1 5 ++ TW 352.15+ TW 3 5 4 . 5 0 TW 3 5 2 . 1 5 + + TW 3 5 4. 5 0 + T W 3 5 3 . 0 0 TW 3 5 6 . 9 9 + TW 3 5 7 . 6 4 + TW 3 5 8 . 3 9 + TW 3 5 9 . 2 9 + TW 3 6 0 . 2 8 + TW 3 6 5 . 0 0 + + TW 3 4 7 . 5 0 + TW 3 4 7 . 5 0 + TW 3 4 7. 5 0 + TW 3 4 7. 5 0 + TW 3 4 7. 5 0 + TW 3 5 0. 2 5 + TW 3 4 3 . 9 2 + TW 3 4 6. 9 2 BW 34 3. 9 2 BW 34 0 . 8 9 + TW 3 4 5 . 0 0 + TW 3 4 7 . 5 0 + TW 3 4 9. 2 5 + BS 3 4 8. 5 0 + BS 3 4 9 . 2 5 + BS 3 4 8. 2 5 + BS 3 4 7 . 3 3 + BS 3 4 6 . 2 0 + BS 3 4 6 . 1 7 + BS 3 4 6 . 2 0 + TW 3 5 5. 5 0 + TW = T S = 3 6 0. 5 3 + BS 3 5 5 . 8 6 TW 35 4 . 3 + + TW 3 6 2 . 1 6 + TW 3 6 2 . 1 6 + TW 3 6 2. 1 6 + TW 3 6 2. 1 6 + TW 3 6 7 . 8 3 TW 36 8. 4 2 + + TW 3 5 6 . 0 4 + TW 3 5 6. 4 2 + TW 3 5 6 . 8 8 + TW 3 5 7 . 5 5 + TW 3 5 8 . 3 5 + TW 3 5 8. 9 9 + TW 3 6 0. 0 0 + TW 3 6 1. 0 8 + TW 3 6 2 . 9 3 TW 3 5 5 . 7 5 + + TW 3 6 5 . 6 0 + TW 3 6 5. 6 0 + 361.04+ 359.09 + TW 3 6 1 . 1 0 + TW 366.10+ TW 366.10+ TW 3 65.09+ 366.04+ 363.03 + BS 34 7 . 7 5 + TS 3 5 5. 1+ BS 3 5 3 . 5 + TS 3 6 0 . 5 3 TW 35 4 . 3 ++ TW 363.97+ TW 364.09 + TW 363.09 + TW 360.47+ TW 3 6 0 . 1 2 + TW 3 6 5. 0 9 + TW 364.09 + TW 363.09 + BS 3 4 8 . 2 5 + TS 3 5 0 . 2 5 + TW 3 4 2 . 6 7 BW 35 2 . 1 5 BW 35 2 . 1 5 BW 35 2. 1 5 BW 3 5 0 . 0 0 BW 3 5 0 . 0 0BW 350.00 BW 35 4 . 1 3 BW 3 5 4 . 1 3 BW 3 5 6 . 1 4 BW 3 5 6 . 8 9 BW 3 5 8 . 0 5 BW 3 5 9 . 0 9 + TS 3 5 2 . 1 5 BS 3 5 0 . 0 0 + + TS 3 5 2. 1 5 BS 350. 0 0 + BW 3 5 2 . 0 0 TS 3 5 9 . 0 0 + TS 3 5 7 . 9 6 + TS 3 5 7 . 1 7 + TS 3 5 6 . 4 2 + + TS 35 4. 8 3 + TS 35 5 . 1 8 + TS 3 5 5 . 6 5 + TS 3 5 6 . 2 5 + TS 3 5 6 . 9 7 + TS 35 7. 8 1 + TS 35 8 . 7 7 + TS 3 5 9 . 8 7 + TS 3 6 0 . 9 9 + TS 365.51TW 363.86 + + TS 3 5 5 . 6 6+ 351.82CITY OF RENTON IN COMPLIANCE WITH CITY OF RENTON STANDARDSTED-40-4178SOLERA 2842 NE SUNSET BLVDRENTON, WA 98056SOLERA LUA20-000305C21-001020PR18-0003331601 5th Avenue, Suite 1600 Seattle, WA 98101 206.622.5822 www.kpff.com R Call 811two business daysbefore you dig NW 1/4 OF THE NW 1/4 AND THE NE 1/4 OF THE NW 1/4 SECTION 9, TOWNSHIP 23 NORTH, RANGE 05 EAST, W.M.WWP-27-4178WTRP-27-4178COMPOSITE UTILITY PLAN R-417877W-417801S-417801 03/11/2022 DEVELOPMENT ENGINEERING msippo 04/07/2022 NE SUNSET BLVDNE 10TH STKIRKLAND AVE NENE 12TH ST HARRINGTON PL NEHAR RI N G T O N A V E N E NE SUNSET BLVD CITY OF RENTON IN COMPLIANCE WITH CITY OF RENTON STANDARDSTED-40-4178SOLERA 2842 NE SUNSET BLVDRENTON, WA 98056SOLERA LUA20-000305C21-001020PR18-0003331601 5th Avenue, Suite 1600 Seattle, WA 98101 206.622.5822 www.kpff.com R Call 811two business daysbefore you dig NW 1/4 OF THE NW 1/4 AND THE NE 1/4 OF THE NW 1/4 SECTION 9, TOWNSHIP 23 NORTH, RANGE 05 EAST, W.M.WWP-27-4178WTRP-27-4178SURFACE MOUNTED UTILITY PLAN R-417878W-417802S-417802 03/11/2022 HEX Condition #17 remains applicable but will be deferred due to PSE lag time. Current Planning Project manager shall review and approve prior to installation of the transformers. DEVELOPMENT ENGINEERING msippo 04/07/2022 NE SUNSET BLVDNE 10TH STKIRKLAND AVE NENE 12TH ST HARRINGTON PL NEHAR RI N G T O N A V E N E NE SUNSET BLVD + TW 3 4 9 . 2 5 + 350.25 + TW 3 4 9 . 2 5 + TW 3 4 5 . 0 0 + 350.25 + TW 3 4 7 . 5 0 + TW 3 5 0. 2 5 + TW 3 5 0. 2 5 + TW 3 5 0 . 2 5 + TW 3 5 0 . 2 5 + 350.25 + 350.25 + 350.25+ 350.25 + 350.25 + 350.25+ 350.25 + 350.25 TW 34 3 . 0 0 + + TW 3 5 5. 6 3 TW 3 6 5 . 0 0 + + TW 3 5 4. 5 0 TW 3 5 2 . 1 5 ++ TW 352.15 + TW 3 5 4 . 5 0 TW 3 5 2 . 1 5 + + TW 3 5 4 . 5 0 + T W 3 5 3 . 0 0 TW 3 5 6 . 9 9 + TW 3 5 7 . 6 4 + TW 3 5 8 . 3 9 + TW 3 5 9 . 2 9 + TW 3 6 0 . 2 8 + TW 3 6 5 . 0 0 + + TW 3 4 7 . 5 0 + TW 3 4 7 . 5 0 + TW 3 4 7. 5 0 + TW 3 4 7. 5 0 + TW 3 4 7 . 5 0 + TW 3 5 0. 2 5 + TW 3 4 3 . 9 2 + TW 3 4 6. 9 2 BW 34 3. 9 2 BW 34 0 . 8 9 + TW 3 4 5 . 0 0 + TW 3 4 7 . 5 0 + TW 3 4 9. 2 5 + BS 3 4 8. 5 0 + BS 3 4 9 . 2 5 + BS 3 4 8 . 2 5 + BS 3 4 7 . 3 3 + BS 3 4 6 . 2 0 + BS 3 4 6 . 1 7 + BS 3 4 6. 2 0 + TW 3 5 5. 5 0 + TW = T S = 3 6 0. 5 3 + BS 3 5 5 . 8 6 TW 35 4 . 3 + + TW 3 6 2 . 1 6 + TW 3 6 2 . 1 6 + TW 3 6 2. 1 6 + TW 3 6 2 . 1 6 + TW 3 6 7 . 8 3 TW 36 8. 4 2 + + TW 3 5 6 . 0 4 + TW 3 5 6 . 4 2 + TW 3 5 6 . 8 8 + TW 3 5 7 . 5 5 + TW 3 5 8 . 3 5 + TW 3 5 8 . 9 9 + TW 3 6 0. 0 0 + TW 3 6 1. 0 8 + TW 3 6 2 . 9 3 TW 3 5 5 . 7 5 + + TW 3 6 5. 6 0 + TW 3 6 5. 6 0 + 361.04+ 359.09 + TW 3 6 1 . 1 0 + TW 366.10+ TW 366.10+ TW 36 5.0 9+ 366.04+ 363.03 + BS 3 4 7 . 7 5 + TS 3 5 5. 1+ BS 3 5 3 . 5 + TS 3 6 0 . 5 3 TW 35 4 . 3 ++ TW 363.97+ TW 364.09 + TW 363.09 + TW 360.47+ TW 3 6 0 . 1 2 + TW 3 6 5. 0 9 + TW 364.09 + TW 363.09 + BS 3 4 8 . 2 5 + TS 3 5 0 . 2 5 + TW 3 4 2 . 6 7 BW 35 2 . 1 5 BW 35 2 . 1 5 BW 35 2. 1 5 BW 3 5 0 . 0 0 BW 3 5 0 . 0 0BW 350.00 BW 35 4 . 1 3 BW 3 5 4 . 1 3 BW 3 5 6 . 1 4 BW 3 5 6 . 8 9 BW 3 5 8 . 0 5 BW 3 5 9 . 0 9 + TS 3 5 2 . 1 5 BS 3 5 0 . 0 0 + + TS 3 5 2. 1 5 BS 350. 0 0 + BW 3 5 2 . 0 0 TS 3 5 9 . 0 0 + TS 3 5 7 . 9 6 + TS 3 5 7 . 1 7 + TS 3 5 6 . 4 2 + + TS 35 4 . 8 3 + TS 35 5 . 1 8 + TS 3 5 5 . 6 5 + TS 3 5 6 . 2 5 + TS 3 5 6 . 9 7 + TS 35 7. 8 1 + TS 35 8 . 7 7 + TS 3 5 9 . 8 7 + TS 36 0 . 9 9 + TS 365.51TW 363.86 + + TS 3 5 5 . 6 6+ 351.82CITY OF RENTON IN COMPLIANCE WITH CITY OF RENTON STANDARDSTED-40-4178SOLERA 2842 NE SUNSET BLVDRENTON, WA 98056SOLERA LUA20-000305C21-001020PR18-0003331601 5th Avenue, Suite 1600 Seattle, WA 98101 206.622.5822 www.kpff.com R Call 811two business daysbefore you dig NW 1/4 OF THE NW 1/4 AND THE NE 1/4 OF THE NW 1/4 SECTION 9, TOWNSHIP 23 NORTH, RANGE 05 EAST, W.M.WWP-27-4178WTRP-27-4178WATER AND SEWER PLAN OVERVIEW R-417879W-417803S-417803 03/11/2022 WASTEWATER UTILITY JStowell 04/04/2022 DEVELOPMENT ENGINEERING msippo 04/07/2022 WATER UTILITY agafour 04/07/2022 CITY OF RENTON IN COMPLIANCE WITH CITY OF RENTON STANDARDSTED-40-4178SOLERA 2842 NE SUNSET BLVDRENTON, WA 98056SOLERA LUA20-000305C21-001020PR18-0003331601 5th Avenue, Suite 1600 Seattle, WA 98101 206.622.5822 www.kpff.com R Call 811two business daysbefore you dig NW 1/4 OF THE NW 1/4 AND THE NE 1/4 OF THE NW 1/4 SECTION 9, TOWNSHIP 23 NORTH, RANGE 05 EAST, W.M.WWP-27-4178WTRP-27-4178FIRE PROTECTION PLAN R-417880W-417804S-417804 03/11/2022 DEVELOPMENT ENGINEERING msippo 04/07/2022 CITY OF RENTON IN COMPLIANCE WITH CITY OF RENTON STANDARDSTED-40-4178SOLERA 2842 NE SUNSET BLVDRENTON, WA 98056SOLERA LUA20-000305C21-001020PR18-0003331601 5th Avenue, Suite 1600 Seattle, WA 98101 206.622.5822 www.kpff.com R Call 811two business daysbefore you dig NW 1/4 OF THE NW 1/4 AND THE NE 1/4 OF THE NW 1/4 SECTION 9, TOWNSHIP 23 NORTH, RANGE 05 EAST, W.M.WWP-27-4178WTRP-27-4178WATER AND SEWER JEFFERSON AVENUE NE PLAN AND PROFILE R-417881W-417805S-417805 03/11/2022 WASTEWATER UTILITY JStowell 04/04/2022 DEVELOPMENT ENGINEERING msippo 04/07/2022 4"4" 4" 4" 4"4" D.I.4" D.I.6" D.I.WATER UTILITY agafour 04/07/2022 CITY OF RENTON IN COMPLIANCE WITH CITY OF RENTON STANDARDSTED-40-4178SOLERA 2842 NE SUNSET BLVDRENTON, WA 98056SOLERA LUA20-000305C21-001020PR18-0003331601 5th Avenue, Suite 1600 Seattle, WA 98101 206.622.5822 www.kpff.com R Call 811two business daysbefore you dig NW 1/4 OF THE NW 1/4 AND THE NE 1/4 OF THE NW 1/4 SECTION 9, TOWNSHIP 23 NORTH, RANGE 05 EAST, W.M.WWP-27-4178WTRP-27-4178WATER AND SEWER JEFFERSON AVENUE NE PLAN AND PROFILE R-417881W-417806S-417806 03/11/2022 (1) 12" gate valve (fl x mj) (1) 12" fl x mj adaptor (fl x fl) no gate valve to be constructed here no gate valve to be constructed here WASTEWATER UTILITY JStowell 04/04/2022 DEVELOPMENT ENGINEERING msippo 04/07/2022 WATER UTILITY agafour 04/07/2022 CITY OF RENTON IN COMPLIANCE WITH CITY OF RENTON STANDARDSTED-40-4178SOLERA 2842 NE SUNSET BLVDRENTON, WA 98056SOLERA LUA20-000305C21-001020PR18-0003331601 5th Avenue, Suite 1600 Seattle, WA 98101 206.622.5822 www.kpff.com R Call 811two business daysbefore you dig NW 1/4 OF THE NW 1/4 AND THE NE 1/4 OF THE NW 1/4 SECTION 9, TOWNSHIP 23 NORTH, RANGE 05 EAST, W.M.WWP-27-4178WTRP-27-4178WATER AND SEWER JEFFERSON AVENUE NE PLAN AND PROFILE R-417883W-417807S-417807 03/11/2022 construction to maintain approximately 4' of minimum cover unless vertical crossings require deeper construction. WASTEWATER UTILITY JStowell 04/04/2022 DEVELOPMENT ENGINEERING msippo 04/07/2022 WATER UTILITY agafour 04/07/2022 CITY OF RENTON IN COMPLIANCE WITH CITY OF RENTON STANDARDSTED-40-4178SOLERA 2842 NE SUNSET BLVDRENTON, WA 98056SOLERA LUA20-000305C21-001020PR18-0003331601 5th Avenue, Suite 1600 Seattle, WA 98101 206.622.5822 www.kpff.com R Call 811two business daysbefore you dig NW 1/4 OF THE NW 1/4 AND THE NE 1/4 OF THE NW 1/4 SECTION 9, TOWNSHIP 23 NORTH, RANGE 05 EAST, W.M.WWP-27-4178WTRP-27-4178WATER AND SEWER NE 11TH STREET PLAN AND PROFILE R-417884W-417808S-417808 03/11/2022 WASTEWATER UTILITY JStowell 04/04/2022 DEVELOPMENT ENGINEERING msippo 04/07/2022 WATER UTILITY agafour 04/07/2022 CITY OF RENTON IN COMPLIANCE WITH CITY OF RENTON STANDARDSTED-40-4178SOLERA 2842 NE SUNSET BLVDRENTON, WA 98056SOLERA LUA20-000305C21-001020PR18-0003331601 5th Avenue, Suite 1600 Seattle, WA 98101 206.622.5822 www.kpff.com R Call 811two business daysbefore you dig NW 1/4 OF THE NW 1/4 AND THE NE 1/4 OF THE NW 1/4 SECTION 9, TOWNSHIP 23 NORTH, RANGE 05 EAST, W.M.WWP-27-4178WTRP-27-4178WATER AND SEWER NE 11TH STREET PLAN AND PROFILE R-417885W-417809S-417809 03/11/2022 WASTEWATER UTILITY JStowell 04/04/2022 DEVELOPMENT ENGINEERING msippo 04/07/2022 WATER UTILITY agafour 04/07/2022 HARRINGTON PL NE CITY OF RENTON IN COMPLIANCE WITH CITY OF RENTON STANDARDSTED-40-4178SOLERA 2842 NE SUNSET BLVDRENTON, WA 98056SOLERA LUA20-000305C21-001020PR18-0003331601 5th Avenue, Suite 1600 Seattle, WA 98101 206.622.5822 www.kpff.com R Call 811two business daysbefore you dig NW 1/4 OF THE NW 1/4 AND THE NE 1/4 OF THE NW 1/4 SECTION 9, TOWNSHIP 23 NORTH, RANGE 05 EAST, W.M.WWP-27-4178WTRP-27-4178WATER AND SEWER HARRINGTON PL NE PLAN AND PROFILE R-417886W-417810S-417810 03/11/2022 DEVELOPMENT ENGINEERING msippo 04/07/2022 WATER UTILITY agafour 04/07/2022 KIRKLAND AVE NECITY OF RENTON IN COMPLIANCE WITH CITY OF RENTON STANDARDSTED-40-4178SOLERA 2842 NE SUNSET BLVDRENTON, WA 98056SOLERA LUA20-000305C21-001020PR18-0003331601 5th Avenue, Suite 1600 Seattle, WA 98101 206.622.5822 www.kpff.com R Call 811two business daysbefore you dig NW 1/4 OF THE NW 1/4 AND THE NE 1/4 OF THE NW 1/4 SECTION 9, TOWNSHIP 23 NORTH, RANGE 05 EAST, W.M. WATER AND SEWER KIRKLAND AVE NE PLAN R-417887W-417811S-417811 03/11/2022 condition of approval: hydrant to be located further away from driveway wing to reduce potential confilicts with turning vehicles. DEVELOPMENT ENGINEERING msippo 04/07/2022 CUT-IN VALVES (BY CITY FORCES) CUT-IN VALVES (BY CITY FORCES) CUT-IN VALVES (BY CITY FORCES) CUT-IN VALVES (BY CITY FORCES) 4" 4" 4" 4" 2-10" SLEEVES (MJ) 2-10" SLEEVES (MJ) 2-10" SLEEVES (MJ) 2-10" SLEEVES (MJ)4" D.I.4" D.I.6" D.I.WATER UTILITY agafour 04/07/2022 CITY OF RENTON IN COMPLIANCE WITH CITY OF RENTON STANDARDSTED-40-4178SOLERA 2842 NE SUNSET BLVDRENTON, WA 98056SOLERA LUA20-000305C21-001020PR18-0003331601 5th Avenue, Suite 1600 Seattle, WA 98101 206.622.5822 www.kpff.com R Call 811two business daysbefore you dig NW 1/4 OF THE NW 1/4 AND THE NE 1/4 OF THE NW 1/4 SECTION 9, TOWNSHIP 23 NORTH, RANGE 05 EAST, W.M.WWP-27-4178WTRP-27-4178ENLARGED WATER PLANS R-417888W-417812S-417812 03/11/2022 DEVELOPMENT ENGINEERING msippo 04/07/2022 WATER UTILITY agafour 04/07/2022 CITY OF RENTON IN COMPLIANCE WITH CITY OF RENTON STANDARDSTED-40-4178SOLERA 2842 NE SUNSET BLVDRENTON, WA 98056SOLERA LUA20-000305C21-001020PR18-0003331601 5th Avenue, Suite 1600 Seattle, WA 98101 206.622.5822 www.kpff.com R Call 811two business daysbefore you dig NW 1/4 OF THE NW 1/4 AND THE NE 1/4 OF THE NW 1/4 SECTION 9, TOWNSHIP 23 NORTH, RANGE 05 EAST, W.M.WWP-27-4178WTRP-27-4178ENLARGED WATER PLANS R-417889W-417813S-417813 03/11/2022 DEVELOPMENT ENGINEERING msippo 04/07/20224" D.I.4" D.I.6" D.I.4" D.I.4" D.I.WATER UTILITY agafour 04/07/2022 4"x 3" REDUCER CITY OF RENTON IN COMPLIANCE WITH CITY OF RENTON STANDARDSTED-40-4178SOLERA 2842 NE SUNSET BLVDRENTON, WA 98056SOLERA LUA20-000305C21-001020PR18-0003331601 5th Avenue, Suite 1600 Seattle, WA 98101 206.622.5822 www.kpff.com R Call 811two business daysbefore you dig NW 1/4 OF THE NW 1/4 AND THE NE 1/4 OF THE NW 1/4 SECTION 9, TOWNSHIP 23 NORTH, RANGE 05 EAST, W.M.WWP-27-4178WTRP-27-4178WATER UTILITY NOTES AND SPECIFICATIONS R-417890W-417814S-417814 ’ ” “ ” “” “” ’ ’ 03/11/2022 DEVELOPMENT ENGINEERING msippo 04/07/2022 CITY OF RENTON IN COMPLIANCE WITH CITY OF RENTON STANDARDSTED-40-4178SOLERA 2842 NE SUNSET BLVDRENTON, WA 98056SOLERA LUA20-000305C21-001020PR18-0003331601 5th Avenue, Suite 1600 Seattle, WA 98101 206.622.5822 www.kpff.com R Call 811two business daysbefore you dig NW 1/4 OF THE NW 1/4 AND THE NE 1/4 OF THE NW 1/4 SECTION 9, TOWNSHIP 23 NORTH, RANGE 05 EAST, W.M.WWP-27-4178WTRP-27-4178WATER AND SEWER DETAILS R-417891W-417815S-417815 03/11/2022 DEVELOPMENT ENGINEERING msippo 04/07/2022 WATER UTILITY agafour 04/07/2022 CITY OF RENTON IN COMPLIANCE WITH CITY OF RENTON STANDARDSTED-40-4178SOLERA 2842 NE SUNSET BLVDRENTON, WA 98056SOLERA LUA20-000305C21-001020PR18-0003331601 5th Avenue, Suite 1600 Seattle, WA 98101 206.622.5822 www.kpff.com R Call 811two business daysbefore you dig NW 1/4 OF THE NW 1/4 AND THE NE 1/4 OF THE NW 1/4 SECTION 9, TOWNSHIP 23 NORTH, RANGE 05 EAST, W.M.WWP-27-4178WTRP-27-4178WATER AND SEWER DETAILS R-417892W-417816S-417816 03/11/2022 WASTEWATER UTILITY JStowell 04/04/2022 DEVELOPMENT ENGINEERING msippo 04/07/2022 WATER UTILITY agafour 04/07/2022 CITY OF RENTON IN COMPLIANCE WITH CITY OF RENTON STANDARDSTED-40-4178SOLERA 2842 NE SUNSET BLVDRENTON, WA 98056SOLERA LUA20-000305C21-001020PR18-0003331601 5th Avenue, Suite 1600 Seattle, WA 98101 206.622.5822 www.kpff.com R Call 811two business daysbefore you dig NW 1/4 OF THE NW 1/4 AND THE NE 1/4 OF THE NW 1/4 SECTION 9, TOWNSHIP 23 NORTH, RANGE 05 EAST, W.M.WWP-27-4178WTRP-27-4178WATER AND SEWER DETAILS R-417893W-417817S-417817 03/11/2022 WASTEWATER UTILITY JStowell 04/04/2022 DEVELOPMENT ENGINEERING msippo 04/07/2022 WATER UTILITY agafour 04/07/2022 CITY OF RENTON IN COMPLIANCE WITH CITY OF RENTON STANDARDSTED-40-4178SOLERA 2842 NE SUNSET BLVDRENTON, WA 98056SOLERA LUA20-000305C21-001020PR18-0003331601 5th Avenue, Suite 1600 Seattle, WA 98101 206.622.5822 www.kpff.com R Call 811two business daysbefore you dig NW 1/4 OF THE NW 1/4 AND THE NE 1/4 OF THE NW 1/4 SECTION 9, TOWNSHIP 23 NORTH, RANGE 05 EAST, W.M.WWP-27-4178WTRP-27-4178WATER AND SEWER DETAILS R-417894W-417818S-417818 03/11/2022 DEVELOPMENT ENGINEERING msippo 04/07/2022 FOR 3" METER INTALL 4"x3" REDUCER (MJxMJ)OUTSIDE OF VAULT WATER UTILITY agafour 04/07/2022 CITY OF RENTON IN COMPLIANCE WITH CITY OF RENTON STANDARDSTED-40-4178SOLERA 2842 NE SUNSET BLVDRENTON, WA 98056SOLERA LUA20-000305C21-001020PR18-0003331601 5th Avenue, Suite 1600 Seattle, WA 98101 206.622.5822 www.kpff.com R Call 811two business daysbefore you dig NW 1/4 OF THE NW 1/4 AND THE NE 1/4 OF THE NW 1/4 SECTION 9, TOWNSHIP 23 NORTH, RANGE 05 EAST, W.M.WWP-27-4178WTRP-27-4178WATER AND SEWER DETAILS R-417895W-417819S-417819 03/11/2022 WASTEWATER UTILITY JStowell 04/04/2022 DEVELOPMENT ENGINEERING msippo 04/07/2022 4'4'#4 REBAR AT 8" ON CENTER IN BOTH DIRECTIONS WATER UTILITY agafour 04/07/2022 Know what'sbelow.Callbefore you dig.CITY OFRENTONIN COMPLIANCE WITH CITY OF RENTON STANDARDSTED-40-4178 SOLERA2842 NE SUNSET BLVDRENTON, WA 98056SOLERA LUA20-000305 C21-001020PR18-000333 NW 1/4 OF THE NW 1/4 AND THE NE 1/4 OF THE NW 1/4 SECTION 9, TOWNSHIP 23 NORTH, RANGE 05 EAST, W.M.96144896CURRENT PLANNINGMHerrera 04/06/2022DEVELOPMENT ENGINEERINGmsippo 04/07/2022 Know what'sbelow.Callbefore you dig.CITY OFRENTONIN COMPLIANCE WITH CITY OF RENTON STANDARDSTED-40-4178 SOLERA2842 NE SUNSET BLVDRENTON, WA 98056SOLERA LUA20-000305 C21-001020PR18-000333 NW 1/4 OF THE NW 1/4 AND THE NE 1/4 OF THE NW 1/4 SECTION 9, TOWNSHIP 23 NORTH, RANGE 05 EAST, W.M.97144897CURRENT PLANNINGMHerrera 04/06/2022DEVELOPMENT ENGINEERINGmsippo 04/07/2022 Know what'sbelow.Callbefore you dig.CITY OFRENTONIN COMPLIANCE WITH CITY OF RENTON STANDARDSTED-40-4178 SOLERA2842 NE SUNSET BLVDRENTON, WA 98056SOLERA LUA20-000305 C21-001020PR18-000333 NW 1/4 OF THE NW 1/4 AND THE NE 1/4 OF THE NW 1/4 SECTION 9, TOWNSHIP 23 NORTH, RANGE 05 EAST, W.M.98144898CURRENT PLANNINGMHerrera 04/06/2022DEVELOPMENT ENGINEERINGmsippo 04/07/2022 Know what'sbelow.Callbefore you dig.CITY OFRENTONIN COMPLIANCE WITH CITY OF RENTON STANDARDSTED-40-4178 SOLERA2842 NE SUNSET BLVDRENTON, WA 98056SOLERA LUA20-000305 C21-001020PR18-000333 NW 1/4 OF THE NW 1/4 AND THE NE 1/4 OF THE NW 1/4 SECTION 9, TOWNSHIP 23 NORTH, RANGE 05 EAST, W.M.99144899CURRENT PLANNINGMHerrera 04/06/2022DEVELOPMENT ENGINEERINGmsippo 04/07/2022 Know what'sbelow.Callbefore you dig.CITY OFRENTONIN COMPLIANCE WITH CITY OF RENTON STANDARDSTED-40-4178 SOLERA2842 NE SUNSET BLVDRENTON, WA 98056SOLERA LUA20-000305 C21-001020PR18-000333 NW 1/4 OF THE NW 1/4 AND THE NE 1/4 OF THE NW 1/4 SECTION 9, TOWNSHIP 23 NORTH, RANGE 05 EAST, W.M.1001448100CURRENT PLANNINGMHerrera 04/06/2022DEVELOPMENT ENGINEERINGmsippo 04/07/2022 Know what'sbelow.Callbefore you dig.CITY OFRENTONIN COMPLIANCE WITH CITY OF RENTON STANDARDSTED-40-4178 SOLERA2842 NE SUNSET BLVDRENTON, WA 98056SOLERA LUA20-000305 C21-001020PR18-000333 NW 1/4 OF THE NW 1/4 AND THE NE 1/4 OF THE NW 1/4 SECTION 9, TOWNSHIP 23 NORTH, RANGE 05 EAST, W.M.1011448101CURRENT PLANNINGMHerrera 04/06/2022DEVELOPMENT ENGINEERINGmsippo 04/07/2022 Know what'sbelow.Callbefore you dig.CITY OFRENTONIN COMPLIANCE WITH CITY OF RENTON STANDARDSTED-40-4178 SOLERA2842 NE SUNSET BLVDRENTON, WA 98056SOLERA LUA20-000305 C21-001020PR18-000333 NW 1/4 OF THE NW 1/4 AND THE NE 1/4 OF THE NW 1/4 SECTION 9, TOWNSHIP 23 NORTH, RANGE 05 EAST, W.M.1021448102CURRENT PLANNINGMHerrera 04/06/2022DEVELOPMENT ENGINEERINGmsippo 04/07/2022 Know what'sbelow.Callbefore you dig.CITY OFRENTONIN COMPLIANCE WITH CITY OF RENTON STANDARDSTED-40-4178 SOLERA2842 NE SUNSET BLVDRENTON, WA 98056SOLERA LUA20-000305 C21-001020PR18-000333 NW 1/4 OF THE NW 1/4 AND THE NE 1/4 OF THE NW 1/4 SECTION 9, TOWNSHIP 23 NORTH, RANGE 05 EAST, W.M.1031448103CURRENT PLANNINGMHerrera 04/06/2022DEVELOPMENT ENGINEERINGmsippo 04/07/2022 Know what'sbelow.Callbefore you dig.CITY OFRENTONIN COMPLIANCE WITH CITY OF RENTON STANDARDSTED-40-4178 SOLERA2842 NE SUNSET BLVDRENTON, WA 98056SOLERA LUA20-000305 C21-001020PR18-000333 NW 1/4 OF THE NW 1/4 AND THE NE 1/4 OF THE NW 1/4 SECTION 9, TOWNSHIP 23 NORTH, RANGE 05 EAST, W.M.1041448104CURRENT PLANNINGMHerrera 04/06/2022DEVELOPMENT ENGINEERINGmsippo 04/07/2022 Know what'sbelow.Callbefore you dig.CITY OFRENTONIN COMPLIANCE WITH CITY OF RENTON STANDARDSTED-40-4178 SOLERA2842 NE SUNSET BLVDRENTON, WA 98056SOLERA LUA20-000305 C21-001020PR18-000333 NW 1/4 OF THE NW 1/4 AND THE NE 1/4 OF THE NW 1/4 SECTION 9, TOWNSHIP 23 NORTH, RANGE 05 EAST, W.M.1051448105CURRENT PLANNINGMHerrera 04/06/2022DEVELOPMENT ENGINEERINGmsippo 04/07/2022 Know what'sbelow.Callbefore you dig.CITY OFRENTONIN COMPLIANCE WITH CITY OF RENTON STANDARDSTED-40-4178 SOLERA2842 NE SUNSET BLVDRENTON, WA 98056SOLERA LUA20-000305 C21-001020PR18-000333 NW 1/4 OF THE NW 1/4 AND THE NE 1/4 OF THE NW 1/4 SECTION 9, TOWNSHIP 23 NORTH, RANGE 05 EAST, W.M.1061448106CURRENT PLANNINGMHerrera 04/06/2022DEVELOPMENT ENGINEERINGmsippo 04/07/2022 Know what'sbelow.Callbefore you dig.CITY OFRENTONIN COMPLIANCE WITH CITY OF RENTON STANDARDSTED-40-4178 SOLERA2842 NE SUNSET BLVDRENTON, WA 98056SOLERA LUA20-000305 C21-001020PR18-000333 NW 1/4 OF THE NW 1/4 AND THE NE 1/4 OF THE NW 1/4 SECTION 9, TOWNSHIP 23 NORTH, RANGE 05 EAST, W.M.1071448107CURRENT PLANNINGMHerrera 04/06/2022DEVELOPMENT ENGINEERINGmsippo 04/07/2022 Know what'sbelow.Callbefore you dig.CITY OFRENTONIN COMPLIANCE WITH CITY OF RENTON STANDARDSTED-40-4178 SOLERA2842 NE SUNSET BLVDRENTON, WA 98056SOLERA LUA20-000305 C21-001020PR18-000333 NW 1/4 OF THE NW 1/4 AND THE NE 1/4 OF THE NW 1/4 SECTION 9, TOWNSHIP 23 NORTH, RANGE 05 EAST, W.M.1081448108CURRENT PLANNINGMHerrera 04/06/2022DEVELOPMENT ENGINEERINGmsippo 04/07/2022 Know what'sbelow.Callbefore you dig.CITY OFRENTONIN COMPLIANCE WITH CITY OF RENTON STANDARDSTED-40-4178 SOLERA2842 NE SUNSET BLVDRENTON, WA 98056SOLERA LUA20-000305 C21-001020PR18-000333 NW 1/4 OF THE NW 1/4 AND THE NE 1/4 OF THE NW 1/4 SECTION 9, TOWNSHIP 23 NORTH, RANGE 05 EAST, W.M.1091448109CURRENT PLANNINGMHerrera 04/06/2022DEVELOPMENT ENGINEERINGmsippo 04/07/2022 Know what'sbelow.Callbefore you dig.CITY OFRENTONIN COMPLIANCE WITH CITY OF RENTON STANDARDSTED-40-4178 SOLERA2842 NE SUNSET BLVDRENTON, WA 98056SOLERA LUA20-000305 C21-001020PR18-000333 NW 1/4 OF THE NW 1/4 AND THE NE 1/4 OF THE NW 1/4 SECTION 9, TOWNSHIP 23 NORTH, RANGE 05 EAST, W.M.1101448110CURRENT PLANNINGMHerrera 04/06/2022DEVELOPMENT ENGINEERINGmsippo 04/07/2022 Know what'sbelow.Callbefore you dig.CITY OFRENTONIN COMPLIANCE WITH CITY OF RENTON STANDARDSTED-40-4178 SOLERA2842 NE SUNSET BLVDRENTON, WA 98056SOLERA LUA20-000305 C21-001020PR18-000333 NW 1/4 OF THE NW 1/4 AND THE NE 1/4 OF THE NW 1/4 SECTION 9, TOWNSHIP 23 NORTH, RANGE 05 EAST, W.M.1111448111CURRENT PLANNINGMHerrera 04/06/2022DEVELOPMENT ENGINEERINGmsippo 04/07/2022 Know what'sbelow.Callbefore you dig.CITY OFRENTONIN COMPLIANCE WITH CITY OF RENTON STANDARDSTED-40-4178 SOLERA2842 NE SUNSET BLVDRENTON, WA 98056SOLERA LUA20-000305 C21-001020PR18-000333 NW 1/4 OF THE NW 1/4 AND THE NE 1/4 OF THE NW 1/4 SECTION 9, TOWNSHIP 23 NORTH, RANGE 05 EAST, W.M.1121448112CURRENT PLANNINGMHerrera 04/06/2022DEVELOPMENT ENGINEERINGmsippo 04/07/2022 Know what'sbelow.Callbefore you dig.CITY OFRENTONIN COMPLIANCE WITH CITY OF RENTON STANDARDSTED-40-4178 SOLERA2842 NE SUNSET BLVDRENTON, WA 98056SOLERA LUA20-000305 C21-001020PR18-000333 NW 1/4 OF THE NW 1/4 AND THE NE 1/4 OF THE NW 1/4 SECTION 9, TOWNSHIP 23 NORTH, RANGE 05 EAST, W.M.1131448113CURRENT PLANNINGMHerrera 04/06/2022DEVELOPMENT ENGINEERINGmsippo 04/07/2022 Know what'sbelow.Callbefore you dig.CITY OFRENTONIN COMPLIANCE WITH CITY OF RENTON STANDARDSTED-40-4178 SOLERA2842 NE SUNSET BLVDRENTON, WA 98056SOLERA LUA20-000305 C21-001020PR18-000333 NW 1/4 OF THE NW 1/4 AND THE NE 1/4 OF THE NW 1/4 SECTION 9, TOWNSHIP 23 NORTH, RANGE 05 EAST, W.M.1141448114CURRENT PLANNINGMHerrera 04/06/2022DEVELOPMENT ENGINEERINGmsippo 04/07/2022 Know what'sbelow.Callbefore you dig.CITY OFRENTONIN COMPLIANCE WITH CITY OF RENTON STANDARDSTED-40-4178 SOLERA2842 NE SUNSET BLVDRENTON, WA 98056SOLERA LUA20-000305 C21-001020PR18-000333 NW 1/4 OF THE NW 1/4 AND THE NE 1/4 OF THE NW 1/4 SECTION 9, TOWNSHIP 23 NORTH, RANGE 05 EAST, W.M.1151448115CURRENT PLANNINGMHerrera 04/06/2022DEVELOPMENT ENGINEERINGmsippo 04/07/2022 Know what'sbelow.Callbefore you dig.CITY OFRENTONIN COMPLIANCE WITH CITY OF RENTON STANDARDSTED-40-4178 SOLERA2842 NE SUNSET BLVDRENTON, WA 98056SOLERA LUA20-000305 C21-001020PR18-000333 NW 1/4 OF THE NW 1/4 AND THE NE 1/4 OF THE NW 1/4 SECTION 9, TOWNSHIP 23 NORTH, RANGE 05 EAST, W.M.1161448116CURRENT PLANNINGMHerrera 04/06/2022DEVELOPMENT ENGINEERINGmsippo 04/07/2022 Know what'sbelow.Callbefore you dig.CITY OFRENTONIN COMPLIANCE WITH CITY OF RENTON STANDARDSTED-40-4178 SOLERA2842 NE SUNSET BLVDRENTON, WA 98056SOLERA LUA20-000305 C21-001020PR18-000333 NW 1/4 OF THE NW 1/4 AND THE NE 1/4 OF THE NW 1/4 SECTION 9, TOWNSHIP 23 NORTH, RANGE 05 EAST, W.M.1171448117CURRENT PLANNINGMHerrera 04/06/2022DEVELOPMENT ENGINEERINGmsippo 04/07/2022 Know what'sbelow.Callbefore you dig.CITY OFRENTONIN COMPLIANCE WITH CITY OF RENTON STANDARDSTED-40-4178 SOLERA2842 NE SUNSET BLVDRENTON, WA 98056SOLERA LUA20-000305 C21-001020PR18-000333 NW 1/4 OF THE NW 1/4 AND THE NE 1/4 OF THE NW 1/4 SECTION 9, TOWNSHIP 23 NORTH, RANGE 05 EAST, W.M.1181448118CURRENT PLANNINGMHerrera 04/06/2022DEVELOPMENT ENGINEERINGmsippo 04/07/2022 Know what'sbelow.Callbefore you dig.CITY OFRENTONIN COMPLIANCE WITH CITY OF RENTON STANDARDSTED-40-4178 SOLERA2842 NE SUNSET BLVDRENTON, WA 98056SOLERA LUA20-000305 C21-001020PR18-000333 NW 1/4 OF THE NW 1/4 AND THE NE 1/4 OF THE NW 1/4 SECTION 9, TOWNSHIP 23 NORTH, RANGE 05 EAST, W.M.1191448119CURRENT PLANNINGMHerrera 04/06/2022DEVELOPMENT ENGINEERINGmsippo 04/07/2022 CITY OFRENTONIN COMPLIANCE WITH CITY OF RENTON STANDARDSTED-40-4178 SOLERA2842 NE SUNSET BLVDRENTON, WA 98056SOLERA LUA20-000305 C21-001020PR18-000333 NW 1/4 OF THE NW 1/4 AND THE NE 1/4 OF THE NW 1/4 SECTION 9, TOWNSHIP 23 NORTH, RANGE 05 EAST, W.M.1201448120CURRENT PLANNINGMHerrera 04/06/2022DEVELOPMENT ENGINEERINGmsippo 04/07/2022 Know what'sbelow.Callbefore you dig.CITY OFRENTONIN COMPLIANCE WITH CITY OF RENTON STANDARDSTED-40-4178 SOLERA2842 NE SUNSET BLVDRENTON, WA 98056SOLERA LUA20-000305 C21-001020PR18-000333 NW 1/4 OF THE NW 1/4 AND THE NE 1/4 OF THE NW 1/4 SECTION 9, TOWNSHIP 23 NORTH, RANGE 05 EAST, W.M.1211448121CURRENT PLANNINGMHerrera 04/06/2022DEVELOPMENT ENGINEERINGmsippo 04/07/2022 Know what'sbelow.Callbefore you dig.CITY OFRENTONIN COMPLIANCE WITH CITY OF RENTON STANDARDSTED-40-4178 SOLERA2842 NE SUNSET BLVDRENTON, WA 98056SOLERA LUA20-000305 C21-001020PR18-000333 NW 1/4 OF THE NW 1/4 AND THE NE 1/4 OF THE NW 1/4 SECTION 9, TOWNSHIP 23 NORTH, RANGE 05 EAST, W.M.″¼······½····″″″″″″″″··″″··1221448122CURRENT PLANNINGMHerrera 04/06/2022DEVELOPMENT ENGINEERINGmsippo 04/07/2022 Know what'sbelow.Callbefore you dig.CITY OFRENTONIN COMPLIANCE WITH CITY OF RENTON STANDARDSTED-40-4178 SOLERA2842 NE SUNSET BLVDRENTON, WA 98056SOLERA LUA20-000305 C21-001020PR18-000333 NW 1/4 OF THE NW 1/4 AND THE NE 1/4 OF THE NW 1/4 SECTION 9, TOWNSHIP 23 NORTH, RANGE 05 EAST, W.M.1231448123CURRENT PLANNINGMHerrera 04/06/2022DEVELOPMENT ENGINEERINGmsippo 04/07/2022 Know what'sbelow.Callbefore you dig.CITY OFRENTONIN COMPLIANCE WITH CITY OF RENTON STANDARDSTED-40-4178 SOLERA2842 NE SUNSET BLVDRENTON, WA 98056SOLERA LUA20-000305 C21-001020PR18-000333 NW 1/4 OF THE NW 1/4 AND THE NE 1/4 OF THE NW 1/4 SECTION 9, TOWNSHIP 23 NORTH, RANGE 05 EAST, W.M.1241448124CURRENT PLANNINGMHerrera 04/06/2022DEVELOPMENT ENGINEERINGmsippo 04/07/2022 Know what'sbelow.Callbefore you dig.CITY OFRENTONIN COMPLIANCE WITH CITY OF RENTON STANDARDSTED-40-4178 SOLERA2842 NE SUNSET BLVDRENTON, WA 98056SOLERA LUA20-000305 C21-001020PR18-000333 NW 1/4 OF THE NW 1/4 AND THE NE 1/4 OF THE NW 1/4 SECTION 9, TOWNSHIP 23 NORTH, RANGE 05 EAST, W.M.1251448125CURRENT PLANNINGMHerrera 04/06/2022DEVELOPMENT ENGINEERINGmsippo 04/07/2022 Know what'sbelow.Callbefore you dig.CITY OFRENTONIN COMPLIANCE WITH CITY OF RENTON STANDARDSTED-40-4178 SOLERA2842 NE SUNSET BLVDRENTON, WA 98056SOLERA LUA20-000305 C21-001020PR18-000333 NW 1/4 OF THE NW 1/4 AND THE NE 1/4 OF THE NW 1/4 SECTION 9, TOWNSHIP 23 NORTH, RANGE 05 EAST, W.M.1261448126CURRENT PLANNINGMHerrera 04/06/2022DEVELOPMENT ENGINEERINGmsippo 04/07/2022 Know what'sbelow.Callbefore you dig.CITY OFRENTONIN COMPLIANCE WITH CITY OF RENTON STANDARDSTED-40-4178 SOLERA2842 NE SUNSET BLVDRENTON, WA 98056SOLERA LUA20-000305 C21-001020PR18-000333 NW 1/4 OF THE NW 1/4 AND THE NE 1/4 OF THE NW 1/4 SECTION 9, TOWNSHIP 23 NORTH, RANGE 05 EAST, W.M.1271448127CURRENT PLANNINGMHerrera 04/06/2022DEVELOPMENT ENGINEERINGmsippo 04/07/2022 Know what'sbelow.Callbefore you dig.CITY OFRENTONIN COMPLIANCE WITH CITY OF RENTON STANDARDSTED-40-4178 SOLERA2842 NE SUNSET BLVDRENTON, WA 98056SOLERA LUA20-000305 C21-001020PR18-000333 NW 1/4 OF THE NW 1/4 AND THE NE 1/4 OF THE NW 1/4 SECTION 9, TOWNSHIP 23 NORTH, RANGE 05 EAST, W.M.1281448128CURRENT PLANNINGMHerrera 04/06/2022DEVELOPMENT ENGINEERINGmsippo 04/07/2022 Know what'sbelow.Callbefore you dig.CITY OFRENTONIN COMPLIANCE WITH CITY OF RENTON STANDARDSTED-40-4178 SOLERA2842 NE SUNSET BLVDRENTON, WA 98056SOLERA LUA20-000305 C21-001020PR18-000333 NW 1/4 OF THE NW 1/4 AND THE NE 1/4 OF THE NW 1/4 SECTION 9, TOWNSHIP 23 NORTH, RANGE 05 EAST, W.M.1291448129CURRENT PLANNINGMHerrera 04/06/2022DEVELOPMENT ENGINEERINGmsippo 04/07/2022 Know what'sbelow.Callbefore you dig.CITY OFRENTONIN COMPLIANCE WITH CITY OF RENTON STANDARDSTED-40-4178 SOLERA2842 NE SUNSET BLVDRENTON, WA 98056SOLERA LUA20-000305 C21-001020PR18-000333 NW 1/4 OF THE NW 1/4 AND THE NE 1/4 OF THE NW 1/4 SECTION 9, TOWNSHIP 23 NORTH, RANGE 05 EAST, W.M.1301448130CURRENT PLANNINGMHerrera 04/06/2022DEVELOPMENT ENGINEERINGmsippo 04/07/2022 Know what'sbelow.Callbefore you dig.CITY OFRENTONIN COMPLIANCE WITH CITY OF RENTON STANDARDSTED-40-4178 SOLERA2842 NE SUNSET BLVDRENTON, WA 98056SOLERA LUA20-000305 C21-001020PR18-000333 NW 1/4 OF THE NW 1/4 AND THE NE 1/4 OF THE NW 1/4 SECTION 9, TOWNSHIP 23 NORTH, RANGE 05 EAST, W.M.1311448131CURRENT PLANNINGMHerrera 04/06/2022DEVELOPMENT ENGINEERINGmsippo 04/07/2022 CITY OF RENTON IN COMPLIANCE WITH CITY OF RENTON STANDARDSTED-40-4178SOLERA 2842 NE SUNSET BLVDRENTON, WA 98056 ILLUMINATION PLANSOLERA LUA20-000305C21-001020PR18-000333NW 1/4 OF THE NW 1/4 AND THE NE 1/4 OF THE NW 1/4 SECTION 9, TOWNSHIP 23 NORTH, RANGE 05 EAST, W.M. TENW Transportation Planning | Design | Traffic Impact & Operations 11400 SE 8th St, Suite 200, Bellevue, WA 98004 | Office (425) 889-6747 Transportation Engineering NorthWest Project Contact: Grant Lewis Phone: 952-270-908903-11-2022TRO-40-4178R-4178132 T-417801 PAVEMENT MARKING & SIGNING PLAN CROSS TRAFFIC DOES NOT STOP NO PARKING ANY TIME SPEED LIMIT 35 DEVELOPMENT ENGINEERING msippo 04/07/2022 TRANSPORTATION OPERATION CBarnes 04/08/2022 conditions of approval: 1. city development engineer and transportation staff to review crosswalk striping prior to installation. contact michael sippo at 425-430-7298. 2. all signs and markings shall be shall meet COR and WSDOT standards. 3. a summary schedule for signs showing the time, MUTCD number and quantity shall be provided prior to installation. CITY OF RENTON IN COMPLIANCE WITH CITY OF RENTON STANDARDSTED-40-4178SOLERA 2842 NE SUNSET BLVDRENTON, WA 98056 ILLUMINATION PLANSOLERA LUA20-000305C21-001020PR18-000333NW 1/4 OF THE NW 1/4 AND THE NE 1/4 OF THE NW 1/4 SECTION 9, TOWNSHIP 23 NORTH, RANGE 05 EAST, W.M. TENW Transportation Planning | Design | Traffic Impact & Operations 11400 SE 8th St, Suite 200, Bellevue, WA 98004 | Office (425) 889-6747 Transportation Engineering NorthWest Project Contact: Grant Lewis Phone: 952-270-908903-11-2022TRO-40-4178R-4178133 T-417802 PAVEMENT MARKING & SIGNING PLAN CROSS TRAFFIC DOES NOT STOP NO PARKING ANY TIME SPEED LIMIT 35 DEVELOPMENT ENGINEERING msippo 04/07/2022 TRANSPORTATION OPERATION CBarnes 04/08/2022 CITY OF RENTON IN COMPLIANCE WITH CITY OF RENTON STANDARDSTED-40-4178SOLERA 2842 NE SUNSET BLVDRENTON, WA 98056 ILLUMINATION PLANSOLERA LUA20-000305C21-001020PR18-000333NW 1/4 OF THE NW 1/4 AND THE NE 1/4 OF THE NW 1/4 SECTION 9, TOWNSHIP 23 NORTH, RANGE 05 EAST, W.M. TENW Transportation Planning | Design | Traffic Impact & Operations 11400 SE 8th St, Suite 200, Bellevue, WA 98004 | Office (425) 889-6747 Transportation Engineering NorthWest Project Contact: Grant Lewis Phone: 952-270-908903-11-2022TRO-40-4178R-4178134 T-417803 CROSS TRAFFIC DOES NOT STOP NO PARKING ANY TIME SPEED LIMIT 35 PAVEMENT MARKING & SIGNING PLAN DEVELOPMENT ENGINEERING msippo 04/07/2022 TRANSPORTATION OPERATION CBarnes 04/08/2022 CITY OF RENTON IN COMPLIANCE WITH CITY OF RENTON STANDARDSTED-40-4178SOLERA 2842 NE SUNSET BLVDRENTON, WA 98056 ILLUMINATION PLANSOLERA LUA20-000305C21-001020PR18-000333NW 1/4 OF THE NW 1/4 AND THE NE 1/4 OF THE NW 1/4 SECTION 9, TOWNSHIP 23 NORTH, RANGE 05 EAST, W.M. TENW Transportation Planning | Design | Traffic Impact & Operations 11400 SE 8th St, Suite 200, Bellevue, WA 98004 | Office (425) 889-6747 Transportation Engineering NorthWest Project Contact: Grant Lewis Phone: 952-270-908903-11-2022TRO-40-4178R-4178135 T-417805 PAVEMENT MARKING & SIGNING DETAILS DEVELOPMENT ENGINEERING msippo 04/07/2022 TRANSPORTATION OPERATION CBarnes 04/08/2022 CITY OF RENTON IN COMPLIANCE WITH CITY OF RENTON STANDARDSTED-40-4178SOLERA 2842 NE SUNSET BLVDRENTON, WA 98056 ILLUMINATION PLANSOLERA LUA20-000305C21-001020PR18-000333NW 1/4 OF THE NW 1/4 AND THE NE 1/4 OF THE NW 1/4 SECTION 9, TOWNSHIP 23 NORTH, RANGE 05 EAST, W.M. TENW Transportation Planning | Design | Traffic Impact & Operations 11400 SE 8th St, Suite 200, Bellevue, WA 98004 | Office (425) 889-6747 Transportation Engineering NorthWest Project Contact: Grant Lewis Phone: 952-270-908903-11-2022TRO-40-4178R-4178136 T-417806 ACCESSIBLE STALL DETAILB PM-05 NOT TO SCALE VOID AREA DETAILA PM-05 NOT TO SCALE 8' MIN.8' MIN. 5' MIN. -OR- 8' MIN. VAN VARIES ACCESS AISLE STRIPING COLOR, ANGLE, SPACING TO MATCH EXISTING INSTALLATIONS IN AGARAGE 4" LINE COLOR TO MATCH EXISTING INSTALLATIONS IN GARAGE INTERNATIONAL SYMBOL OF ACCESS TO MATCH EXISTING INSTALLATIONS IN GARAGE 36", TYP. 4" WHITE BORDER, TYP. 4" WHITE DIAGONAL STIPE, TYP. 45° R7-801 OR R7-801VA SIGN ACCESSIBLE STALL SIGN DETAILSC PM-05 NOT TO SCALE WASHINGTON STATE R7-801 12"W X 18"H WASHINGTON STATE R7-801VA 12"W X 18"H NOTE: ALL R7-801 AND R7-801VA SIGNS SHALL BE MOUNTED AT 5' ABOVE FINISHED GRADE, AS MEASURED TO THE BOTTOM OF THE SIGN. PAVEMENT MARKING & SIGNING DETAILS DEVELOPMENT ENGINEERING msippo 04/07/2022 TRANSPORTATION OPERATION CBarnes 04/08/2022 CITY OF RENTON IN COMPLIANCE WITH CITY OF RENTON STANDARDSTED-40-4178SOLERA 2842 NE SUNSET BLVDRENTON, WA 98056 ILLUMINATION PLANSOLERA LUA20-000305C21-001020PR18-000333NW 1/4 OF THE NW 1/4 AND THE NE 1/4 OF THE NW 1/4 SECTION 9, TOWNSHIP 23 NORTH, RANGE 05 EAST, W.M. TENW Transportation Planning | Design | Traffic Impact & Operations 11400 SE 8th St, Suite 200, Bellevue, WA 98004 | Office (425) 889-6747 Transportation Engineering NorthWest Project Contact: Grant Lewis Phone: 952-270-908903-11-2022TRO-40-4178R-4178137 T-417801 DEVELOPMENT ENGINEERING msippo 04/07/2022 07 TRANSPORTATION OPERATION CBarnes 04/08/2022 CITY OF RENTON IN COMPLIANCE WITH CITY OF RENTON STANDARDSTED-40-4178SOLERA 2842 NE SUNSET BLVDRENTON, WA 98056 ILLUMINATION PLANSOLERA LUA20-000305C21-001020PR18-000333NW 1/4 OF THE NW 1/4 AND THE NE 1/4 OF THE NW 1/4 SECTION 9, TOWNSHIP 23 NORTH, RANGE 05 EAST, W.M. TENW Transportation Planning | Design | Traffic Impact & Operations 11400 SE 8th St, Suite 200, Bellevue, WA 98004 | Office (425) 889-6747 Transportation Engineering NorthWest Project Contact: Grant Lewis Phone: 952-270-908903-11-2022TRO-40-4178R-4178138 T-417802 DEVELOPMENT ENGINEERING msippo 04/07/2022 08 TRANSPORTATION OPERATION CBarnes 04/08/2022 CITY OF RENTON IN COMPLIANCE WITH CITY OF RENTON STANDARDSTED-40-4178SOLERA 2842 NE SUNSET BLVDRENTON, WA 98056 ILLUMINATION PLANSOLERA LUA20-000305C21-001020PR18-000333NW 1/4 OF THE NW 1/4 AND THE NE 1/4 OF THE NW 1/4 SECTION 9, TOWNSHIP 23 NORTH, RANGE 05 EAST, W.M. TENW Transportation Planning | Design | Traffic Impact & Operations 11400 SE 8th St, Suite 200, Bellevue, WA 98004 | Office (425) 889-6747 Transportation Engineering NorthWest Project Contact: Grant Lewis Phone: 952-270-908903-11-2022TRO-40-4178R-4178139 T-417803 DEVELOPMENT ENGINEERING msippo 04/07/2022 09 TRANSPORTATION OPERATION CBarnes 04/08/2022 CITY OF RENTON IN COMPLIANCE WITH CITY OF RENTON STANDARDSTED-40-4178SOLERA 2842 NE SUNSET BLVDRENTON, WA 98056 ILLUMINATION PLANSOLERA LUA20-000305C21-001020PR18-000333NW 1/4 OF THE NW 1/4 AND THE NE 1/4 OF THE NW 1/4 SECTION 9, TOWNSHIP 23 NORTH, RANGE 05 EAST, W.M. TENW Transportation Planning | Design | Traffic Impact & Operations 11400 SE 8th St, Suite 200, Bellevue, WA 98004 | Office (425) 889-6747 Transportation Engineering NorthWest Project Contact: Grant Lewis Phone: 952-270-908903-11-2022TRO-40-4178R-4178140 T-417804 DEVELOPMENT ENGINEERING msippo 04/07/2022 10 TRANSPORTATION OPERATION CBarnes 04/08/2022 pole numbers provided will also be installed on the poles. CITY OF RENTON IN COMPLIANCE WITH CITY OF RENTON STANDARDSTED-40-4178SOLERA 2842 NE SUNSET BLVDRENTON, WA 98056 ILLUMINATION PLANSOLERA LUA20-000305C21-001020PR18-000333NW 1/4 OF THE NW 1/4 AND THE NE 1/4 OF THE NW 1/4 SECTION 9, TOWNSHIP 23 NORTH, RANGE 05 EAST, W.M. TENW Transportation Planning | Design | Traffic Impact & Operations 11400 SE 8th St, Suite 200, Bellevue, WA 98004 | Office (425) 889-6747 Transportation Engineering NorthWest Project Contact: Grant Lewis Phone: 952-270-908903-11-2022TRO-40-4178R-4178141 T-417805 TENW Transportation Planning | Design | Traffic Impact & Operations 11400 SE 8th St, Suite 200, Bellevue, WA 98004 | Office (425) 889-6747 Transportation Engineering NorthWest Project Contact: Grant Lewis Phone: 952-270-908903-01-2022 DEVELOPMENT ENGINEERING msippo 04/07/2022 a structural analysis is required for pole foundations capable of handling 5g hardware per city std. detail 117.1a prior to installation. 11 TRANSPORTATION OPERATION CBarnes 04/08/2022 CITY OF RENTON IN COMPLIANCE WITH CITY OF RENTON STANDARDSTED-40-4178SOLERA 2842 NE SUNSET BLVDRENTON, WA 98056 ILLUMINATION PLANSOLERA LUA20-000305C21-001020PR18-000333NW 1/4 OF THE NW 1/4 AND THE NE 1/4 OF THE NW 1/4 SECTION 9, TOWNSHIP 23 NORTH, RANGE 05 EAST, W.M. TENW Transportation Planning | Design | Traffic Impact & Operations 11400 SE 8th St, Suite 200, Bellevue, WA 98004 | Office (425) 889-6747 Transportation Engineering NorthWest Project Contact: Grant Lewis Phone: 952-270-908903-11-2022TRO-40-4178R-4178142 T-417806 DEVELOPMENT ENGINEERING msippo 04/07/2022 12 TRANSPORTATION OPERATION CBarnes 04/08/2022 144R-41781431433/11/22DEVELOPMENT ENGINEERINGmsippo 04/07/2022 144R-41781441443/11/22DEVELOPMENT ENGINEERINGmsippo 04/07/2022