HomeMy WebLinkAboutR-385418A P
S .. ECTIO 10, TW N., R G E': -5E., W. M. KING: GO:; WA. ..... 0: :
PORTION OF W :1 %4 S N P "23
QUICKCOUPLER V VE 1" DOUBLE CHECK VALVE BACKFLOW
0 20
f ---- w TL 0 ASSEMBLY PERE COR- STD PLAN -340.8 '— SCALE: 1" = 20' aLL
... AL
PER .D 3/2
�-
- IRRIGATION CONTROLLER AND 1": IRRIGATION WATER METER (AT FULL SIZE) ZX
_ -- N u
- CONTROL VALVE PER DTL 1/20'- - INSTALLED BY COR Q -
_- - - - - - -----_
- IRRIGATION NOTES = =
1. CONTRACTOR SHALL PERFORM ALL EXCAVATION AND RESTORATION RELATED TO WATER =�
CG
DEPARTMENT 10 WORKING DAY
SSIvH SERVICE CONNECTIONS AND METER INSTALLATIONS. CONTRACTOR' SHALL NOTIFY COR QQ
WATER UTILITY AND MAINTENANCE SAT LEAST S PRIOR .TO
_ p
PLANNED CONNECTION DATE.
ROAD
f -
j t ,>f - • •r 2 .CCDR SHALL ONTRACTORPSOA DE ALL MATERIALS TO INSTALL WATER. SERVICES AND METERS.
LL INSTALL ALL ;IRRIGATION EQUIPMENT BEHIND THE METERS.
I. �. .y.7 Y.• Y.'". v.� Y� �• /.' y.• ll v.•: ,Y - Y. y '`y.• Ya• ... �! Y• g•;. 8• r v.• Y.• 'l.' �• y.• y.• Y• 'q• - - ..
° « ' ' s D ° ° e c tip. n !. �. t� -,_ yc✓. 3. POINT 'OF. CONNECTION IS TO A CITY MAINTAINED WATER MAIN.VERIFY STATIC PRESSURE,
POC LOCATION,
I
Ili
OND EXISTING I SIZE AT POC'PRIOR TO
INSTALLING IRRIGATION:
WRITTEN REPORT TO COR ENGINEER:PRIOR OTNG IRRIGATION.
INS ALLI ON
« a' x ° , . « > a ° a:. < < ® PRESSURE ISANTICIPATEDTO BE65 PSI PER RENTONWAT RR UTILITY.
EX. 1.6 W 1
FACILITIES. SUBMIT E"
-----�- -.------ - --mss 4. COORDINATE ALL IRRIGATION LAYOUTWITH .COR ENGINEER FOR APPROVAL. 'STAKE ALL
__ -- - _ - -_ r - - - - -_ -- _ -- - N _ _ _ - --- -- _ VA R
. ___ _- .- _ .._ - LVE BOX LOCATIONS FOR APPROVAL.
C'I „ ON
i S1DEWA1 K SCHEDULE 40 PVC IRRIGATION 3 " "' ° ^^^• rt
_•___;; _._______._._ __—._..__—___:.._;�TERAC LINE, NP. 5. BEFORE BACKFILLING. ;CALL STEVE BROWN, COR PARKS DEPARTMENT, AT 425-430=6600 5F 12/2016'
TYPICAL STORM DRAIN TRENCH,SECTION PER DTL 2/31,.- /
DUVALL AVE NE COVER REQUIREMENTS PER COR WATER SERVICE STD PLAN 320:1 - HE g TYp^ FOR FINAL INSPECTION.
... ... . ... .
Y POP UP SPRA
1" WATER SERVICE INSTALLED BY COR FIELD VERIFY POC WITH .COR ENGINEER Y 6.
AD PER DTL 2/1
PLAN :IS SCHEMATIC. ALL IRRIGATION' EQUIPMENT SHALL BE INSTALLED WITHIN MEDIAN.
_. A X AR A
IRRIGATION PLAN . . " MEDINLAND NOT LI DER TREOE ROOST' B ALL PIPES SHALL RUN AD URB IN = o z
ADJACENT TO:
.. .. o' z 3
M TO 21+00
MEDIAN STA: 18+00I a
.... QUICK COUPLER VALVE"'PAVEDAS INDICATED SLEEVINGSIZED OR o 0
ALL IRRIGATION PIPING BEHIND. METERS AND UNDER :BUILDINGS, ROADS, WALKS, PARK NG S
PER. DTL 3/19 1'. DOUBLE CHECK VALVE BACKFLOW SLEEVES SHALLEAS OR EMINIMUM 4URDIAMETERFA ES HOR ALL BE THERHMAY BE NOT.,
:ALL AV NE
.ASSEMBLY PER COR STD PLAN 340.8. INCLUDED -FOR FUTURE WORK.
�q IRRIGATION CONTROLLER. AND --- - -__ 1" IRRIGATION WATER METER . I xI_ _—�> CONC SIDE'%lt? K e i
D — w
------. CONTROL VALVE PER DTL 1/19 - - INSTALLED BY COR. <
--
- ' _ LINES 24 MIN OF COV
LINES SHALL HAL INANE 30oMAX COVER.
o
SHALL; HAVE ER, AND ALL
9. ADJUST IRRIGATION PLN TO ASSURE- COMPLETE AND ADEQUATE' COVERAGE WITH MINIMUM
OVERSPRAY. '
�— 4 V IPfI ,
• ° ` _ i>_ r'' . ar a,' z , tt , , 10. ONE CONTROL VALVE AND ISOLATION VALVE PER V&:VE BOX: PROJECT:
.� ..EX 16" W ' v 1.• v -+ s , , y. y. y. y �. �.
15005
r X' . .
ROAD -- i' ,o . ' v " i v' �' �' �' v - �''' '' '' '' ''" �'I v' '' "%` �' '' �' 11. DIFFERENT TYPES OF HEADS' SHALL. NOT BE MIXED WITHIN A ZONE, LE. MP .ROTATORS SUBM17TAL:
X. '_ • ; • 'ti • '' �' SH BE -INCLUDED ON A ZONE. ADVERTISEMENT
:. « • ��: " a v .: v v y. � • y r j ✓ � � .. — 1 WATER`SERVICE 1NSWILED BY COR
v: X4;1 FIELD VERIFY POC WITH COR ENGINEER ALL NO BE-IN
p L, SCHEDULE 40 PVC POP-UP SPRAY HEAD . _ " a = . = a m _ _ _ • . = r « . s ° . s , MEDIAN STA 29+50. TO 33+00 P. MEDIAN .STA 18+00 TO 21+00' .. F
.•sec RA I
a
s e rt • ` •' IRRIGATION LATERAL LINE.": PER DTL 2/19,' TYP._ s5. EX 10" ;W NORTH CONTROLLER SOUTH' CONTROLLER U
a a • ^ TY _ - M�i VALVE KEY VALVE KEY '
p -
k
z
a5---'-- IRRIGATION PLAN
MEDIAN STA 29+50: T0: 33+00
IRRIGATION EQUIPMENT- LEGEND
SYMBOL DESCRIPTION q
P.S.I. '
: RADIUS
N3
12" POP-UP SPRAY HEAD WITH PRESSURE REGULATION AND'CHECK VALVE:
30
8'
1"
A. RAIN BIRD 181.2 -SAM -PRS W/8' SERIES MPR FIXED NOZZLES
24'
24
24
B. HUNTER MODEL PROS -I2 -NSI PRS30-CV W/B' SERIES. PRO FIXED SPRAY NOZZLES,
30
30
30
C..IRRITROL [-PRO 1200-SI-PR-CV:W/8' I -PRO SERIES FIXED. SPRAY. NOZZLES
SPRAY
SPRAY
SPRAY
D. OR APPROVED EQUAL
1" WATER METER INSTALLED BY COR
DCV
DOUBLE CHECK VALVE ASSEMBLY PER COR STO PLAN 340.8;
A
1" TWO PIECE BRASS QUICK COUPLER VALVE WITH LOCKING CAP:-:
A. RAIN BIRD 44 -LRC
B. HUNTER HQ44-LRC
C. SUPERIOR QB44LRCIO
D. OR APPROVED EQUAL
®®'
BATTERY. OPERATED CONTROLLER PER SECTION 9-15 OF THE SPECIAL PROVISIONS
®
AUTOMATIC CONTROL VALVE LATCHING SOLENOID INSTALLED:
A. RAIN BIRD PEB SERIES WITH TBOS LATCHING SOLENOID INSTALLED
B. HUNTER ICV -101E -DC. WITH LATCHING SOLENOID: INSTALLED
C. TORO P-220-26-94 WITH LATCHING SOLENOID INSTALLED
D. OR APPROVED. EQUAL .
- - - - - - -
1J�" SCHEDULE 40 PVC MAIN LINE'":
SCHEDULE 40 PVC LATERAL PIPE,.SIZE.PER PLAN
VALVE:
N1
N2
N3
SIZE
1"
1"
1"
GPM
24'
24
24
PSI
30
30
30
IRRIG TYPE
SPRAY
SPRAY
SPRAY
VALVE
S;1
S2:
S3
'SIZE::
1"
1"
FF
a
0.%..
GPM'"".
21
21.
21
PSI
30
30:
30
IRRIG.TYPE
SPRAY
SPRAY
SPRAY
! FPIUVCU wl vVI,au Uv 1v 1
CALL 2,BUSINESS DAYS ", SHEET: ... .Ip
BEFORE YOU DIC31 V
1-800-424-5555 oF..31
City of Renton Date
FF
a
0.%..
Z
d ..
W
z
! FPIUVCU wl vVI,au Uv 1v 1
CALL 2,BUSINESS DAYS ", SHEET: ... .Ip
BEFORE YOU DIC31 V
1-800-424-5555 oF..31
City of Renton Date