Loading...
HomeMy WebLinkAboutR-385418A P S .. ECTIO 10, TW N., R G E': -5E., W. M. KING: GO:; WA. ..... 0: : PORTION OF W :1 %4 S N P "23 QUICKCOUPLER V VE 1" DOUBLE CHECK VALVE BACKFLOW 0 20 f ---- w TL 0 ASSEMBLY PERE COR- STD PLAN -340.8 '— SCALE: 1" = 20' aLL ... AL PER .D 3/2 �- - IRRIGATION CONTROLLER AND 1": IRRIGATION WATER METER (AT FULL SIZE) ZX _ -- N u - CONTROL VALVE PER DTL 1/20'- - INSTALLED BY COR Q - _- - - - - - -----_ - IRRIGATION NOTES = = 1. CONTRACTOR SHALL PERFORM ALL EXCAVATION AND RESTORATION RELATED TO WATER =� CG DEPARTMENT 10 WORKING DAY SSIvH SERVICE CONNECTIONS AND METER INSTALLATIONS. CONTRACTOR' SHALL NOTIFY COR QQ WATER UTILITY AND MAINTENANCE SAT LEAST S PRIOR .TO _ p PLANNED CONNECTION DATE. ROAD f - j t ,>f - • •r 2 .CCDR SHALL ONTRACTORPSOA DE ALL MATERIALS TO INSTALL WATER. SERVICES AND METERS. LL INSTALL ALL ;IRRIGATION EQUIPMENT BEHIND THE METERS. I. �. .y.7 Y.• Y.'". v.� Y� �• /.' y.• ll v.•: ,Y - Y. y '`y.• Ya• ... �! Y• g•;. 8• r v.• Y.• 'l.' �• y.• y.• Y• 'q• - - .. ° « ' ' s D ° ° e c tip. n !. �. t� -,_ yc✓. 3. POINT 'OF. CONNECTION IS TO A CITY MAINTAINED WATER MAIN.VERIFY STATIC PRESSURE, POC LOCATION, I Ili OND EXISTING I SIZE AT POC'PRIOR TO INSTALLING IRRIGATION: WRITTEN REPORT TO COR ENGINEER:PRIOR OTNG IRRIGATION. INS ALLI ON « a' x ° , . « > a ° a:. < < ® PRESSURE ISANTICIPATEDTO BE65 PSI PER RENTONWAT RR UTILITY. EX. 1.6 W 1 FACILITIES. SUBMIT E" -----�- -.------ - --mss 4. COORDINATE ALL IRRIGATION LAYOUTWITH .COR ENGINEER FOR APPROVAL. 'STAKE ALL __ -- - _ - -_ r - - - - -_ -- _ -- - N _ _ _ - --- -- _ VA R . ___ _- .- _ .._ - LVE BOX LOCATIONS FOR APPROVAL. C'I „ ON i S1DEWA1 K SCHEDULE 40 PVC IRRIGATION 3 " "' ° ^^^• rt _•___;; _._______._._ __—._..__—___:.._;�TERAC LINE, NP. 5. BEFORE BACKFILLING. ;CALL STEVE BROWN, COR PARKS DEPARTMENT, AT 425-430=6600 5F 12/2016' TYPICAL STORM DRAIN TRENCH,SECTION PER DTL 2/31,.- / DUVALL AVE NE COVER REQUIREMENTS PER COR WATER SERVICE STD PLAN 320:1 - HE g TYp^ FOR FINAL INSPECTION. ... ... . ... . Y POP UP SPRA 1" WATER SERVICE INSTALLED BY COR FIELD VERIFY POC WITH .COR ENGINEER Y 6. AD PER DTL 2/1 PLAN :IS SCHEMATIC. ALL IRRIGATION' EQUIPMENT SHALL BE INSTALLED WITHIN MEDIAN. _. A X AR A IRRIGATION PLAN . . " MEDINLAND NOT LI DER TREOE ROOST' B ALL PIPES SHALL RUN AD URB IN = o z ADJACENT TO: .. .. o' z 3 M TO 21+00 MEDIAN STA: 18+00I a .... QUICK COUPLER VALVE"'PAVEDAS INDICATED SLEEVINGSIZED OR o 0 ALL IRRIGATION PIPING BEHIND. METERS AND UNDER :BUILDINGS, ROADS, WALKS, PARK NG S PER. DTL 3/19 1'. DOUBLE CHECK VALVE BACKFLOW SLEEVES SHALLEAS OR EMINIMUM 4URDIAMETERFA ES HOR ALL BE THERHMAY BE NOT., :ALL AV NE .ASSEMBLY PER COR STD PLAN 340.8. INCLUDED -FOR FUTURE WORK. �q IRRIGATION CONTROLLER. AND --- - -__ 1" IRRIGATION WATER METER . I xI_ _—�> CONC SIDE'%lt? K e i D — w ------. CONTROL VALVE PER DTL 1/19 - - INSTALLED BY COR. < -- - ' _ LINES 24 MIN OF COV LINES SHALL HAL INANE 30oMAX COVER. o SHALL; HAVE ER, AND ALL 9. ADJUST IRRIGATION PLN TO ASSURE- COMPLETE AND ADEQUATE' COVERAGE WITH MINIMUM OVERSPRAY. ' �— 4 V IPfI , • ° ` _ i>_ r'' . ar a,' z , tt , , 10. ONE CONTROL VALVE AND ISOLATION VALVE PER V&:VE BOX: PROJECT: .� ..EX 16" W ' v 1.• v -+ s , , y. y. y. y �. �. 15005 r X' . . ROAD -- i' ,o . ' v " i v' �' �' �' v - �''' '' '' '' ''" �'I v' '' "%` �' '' �' 11. DIFFERENT TYPES OF HEADS' SHALL. NOT BE MIXED WITHIN A ZONE, LE. MP .ROTATORS SUBM17TAL: X. '_ • ; • 'ti • '' �' SH BE -INCLUDED ON A ZONE. ADVERTISEMENT :. « • ��: " a v .: v v y. � • y r j ✓ � � .. — 1 WATER`SERVICE 1NSWILED BY COR v: X4;1 FIELD VERIFY POC WITH COR ENGINEER ALL NO BE-IN p L, SCHEDULE 40 PVC POP-UP SPRAY HEAD . _ " a = . = a m _ _ _ • . = r « . s ° . s , MEDIAN STA 29+50. TO 33+00 P. MEDIAN .STA 18+00 TO 21+00' .. F .•sec RA I a s e rt • ` •' IRRIGATION LATERAL LINE.": PER DTL 2/19,' TYP._ s5. EX 10" ;W NORTH CONTROLLER SOUTH' CONTROLLER U a a • ^ TY _ - M�i VALVE KEY VALVE KEY ' p - k z a5---'-- IRRIGATION PLAN MEDIAN STA 29+50: T0: 33+00 IRRIGATION EQUIPMENT- LEGEND SYMBOL DESCRIPTION q P.S.I. ' : RADIUS N3 12" POP-UP SPRAY HEAD WITH PRESSURE REGULATION AND'CHECK VALVE: 30 8' 1" A. RAIN BIRD 181.2 -SAM -PRS W/8' SERIES MPR FIXED NOZZLES 24' 24 24 B. HUNTER MODEL PROS -I2 -NSI PRS30-CV W/B' SERIES. PRO FIXED SPRAY NOZZLES, 30 30 30 C..IRRITROL [-PRO 1200-SI-PR-CV:W/8' I -PRO SERIES FIXED. SPRAY. NOZZLES SPRAY SPRAY SPRAY D. OR APPROVED EQUAL 1" WATER METER INSTALLED BY COR DCV DOUBLE CHECK VALVE ASSEMBLY PER COR STO PLAN 340.8; A 1" TWO PIECE BRASS QUICK COUPLER VALVE WITH LOCKING CAP:-: A. RAIN BIRD 44 -LRC B. HUNTER HQ44-LRC C. SUPERIOR QB44LRCIO D. OR APPROVED EQUAL ®®' BATTERY. OPERATED CONTROLLER PER SECTION 9-15 OF THE SPECIAL PROVISIONS ® AUTOMATIC CONTROL VALVE LATCHING SOLENOID INSTALLED: A. RAIN BIRD PEB SERIES WITH TBOS LATCHING SOLENOID INSTALLED B. HUNTER ICV -101E -DC. WITH LATCHING SOLENOID: INSTALLED C. TORO P-220-26-94 WITH LATCHING SOLENOID INSTALLED D. OR APPROVED. EQUAL . - - - - - - - 1J�" SCHEDULE 40 PVC MAIN LINE'": SCHEDULE 40 PVC LATERAL PIPE,.SIZE.PER PLAN VALVE: N1 N2 N3 SIZE 1" 1" 1" GPM 24' 24 24 PSI 30 30 30 IRRIG TYPE SPRAY SPRAY SPRAY VALVE S;1 S2: S3 'SIZE:: 1" 1" FF a 0.%.. GPM'"". 21 21. 21 PSI 30 30: 30 IRRIG.TYPE SPRAY SPRAY SPRAY ! FPIUVCU wl vVI,au Uv 1v 1 CALL 2,BUSINESS DAYS ", SHEET: ... .Ip BEFORE YOU DIC31 V 1-800-424-5555 oF..31 City of Renton Date FF a 0.%.. Z d .. W z ! FPIUVCU wl vVI,au Uv 1v 1 CALL 2,BUSINESS DAYS ", SHEET: ... .Ip BEFORE YOU DIC31 V 1-800-424-5555 oF..31 City of Renton Date