Loading...
HomeMy WebLinkAboutAdmin Report Mayor’s Office Memorandum DATE: April 11, 2022 TO: Ryan McIrvin, Council President Members of Renton City Council FROM: Armondo Pavone, Mayor Ed VanValey, Chief Administrative Officer SUBJECT: Administrative Report • Clean the World’s mobile shower unit will be available in Renton every Monday in April from 8 a.m. to 12 p.m. at 300 Rainier Avenue North; Renton. For more information on this service and others provided by the foundation, visit www.cleantheworldfoundation.org. • Construction for the Kennydale Beach Playground Replacement project will begin Monday, April 11 and be completed before Memorial Day weekend 2022. The project will replace aging equipment and address updated safety requirements for sand play surfaces. Kennydale Beach Park will be closed to the public during construction. Additional information can be found at rentonwa.gov/currentprojects and questions may be directed to Betsy Severtsen at 425-757-6657. • The Emergency Feeding Program/SOS will be hosting a pop-up lunch event at the Sunset Neighborhood Park; 2680 Sunset Lane NE, from 12:30-2 p.m. on Tuesday, April 19. Unsheltered and those residents with food insecurities will receive free ready-to-eat food and drinks from Amazon Fresh. Personal hygiene kits, cleaning supplies, and socks will also be available. future pop-up lunch events are scheduled for the first and third Tuesdays of the month. Locations will be announced monthly. • Information about preventative street maintenance, traffic impact projects, and road closures happening this week can be found at http://rentonwa.gov/traffic. All projects are weather permitting and unless otherwise noted, streets will always remain open. Preventative street maintenance, traffic impact projects, and road closures will be at the following locations:  Monday, April 11 through Thursday, April 14, 7:00 a.m. to 4:00 p.m. Lane closures on Talbot Road South between S 200th Street and S 43rd Steet due to asphalt repairs. Flaggers will be on site.  Monday, April 11 through Friday, April 15, 7:00 am to 2:30 pm. Single intermittent lane closures on the southernmost eastbound lane closure on NE Sunset Boulevard between Aberdeen Ave NE overpass and Harrington Avenue Ryan McIrvin, Council President Members of Renton City Council Page 2 of 2 April 11, 2022 NE due to utility construction. Questions may be directed to Brad Stocco, 425- 282-2373.  Monday, April 11 through Friday, April 15, 8:30 am to 3:00 pm. Intermittent lane closures in both directions of Duvall Avenue NE between NE 10th Street and NE 12th Street due to utility construction. Approved traffic control plans were issued for all work and will be followed. Questions may be directed to Tom Main, 206-999-1833.  Monday, April 11 through Friday, April 15, 8:30 am to 3:00 pm. Intermittent lane closures in both directions of SW 7th Street east of Lind Avenue SW due to utility construction. Approved traffic control plans were issued for all work and will be followed. Questions may be directed to Tom Main, 206-999-1833.  Monday, April 11 through Friday, April 15, 8:30 am to 3:00 pm. Intermittent lane closures in both directions of SW 7th Street at Naches Ave SW due to utility construction. Approved traffic control plans were issued for all work and will be followed. Questions may be directed to Tom Main, 206-999-1833.  Downtown Utility Improvement Project. Pavement restoration is anticipated start as soon as April 18, weather permitting. Paving will take approximately 2 weeks and once complete, manhole lids will be adjusted and install pavement striping will be installed through June. Expect lane closures, parking restrictions and detours as the paving operation moves around the downtown core. Additional information can be found at rentonwa.gov/duip.  Duvall Avenue Northeast Project: Continuous right lane closure on northbound Duvall Avenue NE between NE 7th and NE 10th Street and southbound Duvall Ave NE between NE 9th street and Sunset Blvd., and right-turn lane closure on southbound Duvall Ave NE and NE 4th Street. Estimated project completion is February 2023.  On-going Street Closure through October 4, 2023 (City of Renton Resolution No. 4446). FULL STREET CLOSURE on Sunset Lane NE between NE 10th Street and Harrington Place NE in support the Solera Development Project (LUA20- 000305). Questions may be directed to Brad Stocco, 425-282-2373.