Loading...
HomeMy WebLinkAbout041122 Request to Speak RegistrationMeeting Date:Full Name:City of Residence:Email Address:Topic: Spoke at Meeting 4/11/2022 Daniel Mendes Seattle drmendes@aol.com Warehouse building permit, Ordinance 6057 4/11/2022 Zhi Tang Renton cstzhi@gmail.com I believe there is several stream in the area of location potentially for the BESS system, because one of them went into my backyard during the rain season. 4/11/2022 Ernesto C. Podaca Renton I will be attending via zoom.Buffleheadhead Energy Storage Project Pre-planning proposal. 4/11/2022 John C Ramsey Renton joncanfxit@aol.com PSE plan to install, Battery Energy Storage BESS IN THE GREEN BELT. 4/11/2022 Nikki Nicola Robinson Renton bizbuzz135@outlook.com Regarding the pre-application with the cities planning department, from Bufflehead Battery Energy Storage System (BESS), to install 9.3 acres of grid scale hazardous Lithium-ion batteries, planned within 50' of our homes where families and children live.  4/11/2022 Nancy Quinn Renton nancyq_2@yahoo.com Prevent the damage to wildlife and dangerous proposal of BESS installation of behind our homes. 4/11/2022 Barbara Phalen Renton lazyann@msn.com Bess installation  4/11/2022 Lori Goeman Yes 206-406-9735 The per-application meeting that is happening on 04/14/2022 for proposal of a building for lithium-ion battery energy storage system. This property is not suited for such a possible hazardous project. The land has wetland area, two natural spring that runs into the Ceder River. What about protecting our salmon and clean water, if something happens?This will run out all the wild life that inhabits the property. Something this dangerous is way to close to residential neighborhood. The neighborhood this property boarders already has a natural gas running through it.  4/11/2022 Lizette Gillett Renton liz.ruvalcaba427@gmail.com Regarding the Bufflehead Energy Storage Project Proposed site behind the Maplewood Glenn neighborhood.  4/11/2022 Aaron Velasquez Renton aaronv226@gmail.com BESS 4/11/2022 Azure Allender Renton azure.allender@gmail.com Bufflehead Energy Storage Project ....To discuss the April 14th, 2022 pre-application meeting 