HomeMy WebLinkAbout0895.06 S 03302022.pdfEarth Solutions NWLLC
15365 NE 90th Street, Suite 100
Redmond, WA 98052
Main (425) 449-4704 | Fax (425) 449-4711
www.esnw.com
FIELD REPORT
Project No. 0895.06 Page 1 of 3 Report ID 0895.06 S 03302022
Date Wed 3/30/2022 Weather 48°F, Light Rain
Arrival/Departure Time(s) 10:10 – 11:00 Travel Time (hr)2.0
Project Name Weatherly Inn
Location 4500 Talbot Road S., Renton
ESNW Rep., CESCL No., Phone No. & Report Statement
Maggie Perme, (206) 751-7448, ECO-3-4042106
“This report is true, accurate, and complete to the best of my knowledge and belief.”
Client Info/Contact RJ Development | Jeff Bennett
Permit No(s). WAR-307963
Reviewed By MTA
Initials/Date
N/A
Initials/Date Field Supervisor Project Manager
Limitations: The presence of our field representative at the site is to provide our client with a source of professional advice, opinions, and recommendations based upon the field representative’s observations and testing of the contractor’s work. Our services do not include supervision or direction of the contractor, their employees, or agents. Recommendations for obtaining project
objectives may be made by our representatives; however, direction of the actual work should come from the owner or contractor, as appropriate. The contractor is responsible for complying
with the contract documents at all times, regardless of the presence of our field representative. Jobsite safety, including compliance with all applicable state or federal regulations, is the sole
responsibility of the contractor. The observations, recommendations, and conclusions provided in this field report are preliminary until reviewed by the ESNW project manager.
Type of visit: Weekly Monthly Post–Storm Event
Precipitation since last inspection (approximate): 0.00 inches
Precipitation in last 24 hours (approximate): 0.00 inches
Phase of active construction (check all that apply):
Pre-construction Clearing, demolition, or grading Infrastructure or roads
Concrete pours Vertical construction Utilities
Off-site improvements Site temporarily stabilized Final stabilization
Was water quality sampling part of this inspection? Yes No
If “Yes”:
Record results in the table below.
Hanna Turbidity Meter No. 10
Monitoring
Point Monitoring Location Turbidity
(NTU) pH Description of
Discharge Notes
MP 3 Baker tank F039 16.29 8 Relatively clear
MP 4 Baker tank F041 9.57 8 Relatively clear
Report ID 0895.06 S 03302022 Page 2 of 3
Earth Solutions NW, LLC
Erosion Control BMPs
(13 Elements)
Overall
Condition
(Good; Fair; Poor)
Needs
Repair?
(Yes; No)
Comments
1. Preserve Vegetation; Mark Clearing Limits
Buffer Zones around Sensitive Areas Silt Fence G N - Chain link fence installed along site perimeter
2. Establish Construction Access
Fabric; Quarry Spalls
Wheel Wash
Sweeper Truck
F N - Site entrance is paved
3. Control Flow Rates Stormwater Vault or Facility
Straw Wattles
Check Dams
G N - Onsite stormwater vault plugged
4. Install Sediment Controls
Silt Fence Straw Bale Barriers
Vegetation
Straw
Sediment Ponds, Traps & Filters Treatment Water Truck
F N
- Silt fence installed around majority of site perimeter
- Straw wattles placed along base of small slope near Talbot Rd S
- Asphalt berm at top of small slope
- Dirt berm installed along perimeter near entrance
to keep water from pooling against silt fence
- Small sump in front of dirt berm
5. Stabilize Soils
Nets & Blankets Mulch, Bark & Rock
Hydroseeding; Grass
Plastic Sheeting
Stockpiles
F N
- Much of site is paved, including entrance and
parking areas
- Slope near building covered in plastic held down
by sandbags
6. Protect Slopes
Benching; Track-Walking Pipe Slope Drains
Plastic Sheeting; Anchors
F N - Small slope along Talbot Rd S covered in straw
7. Protect Drain Inlets
Catch Basin Inserts G N - CB inserts installed in offsite catch basins
8. Stabilize Channels and Outlets
Channel Lining Check Dam
Outlet Protection
Nets and Blankets
- - N/A
9. Control Pollutants
Chemical Storage Area Covered Concrete Handling G N - Stormwater treated with dry ice to lower pH to
suitable levels
- Chemical/material storage onsite
10. Control Dewatering G N - Via KC Sewer Discharge Permit as needed
11. Maintain BMPs F N - See action item below
12. Maintain SWPPP & Site Logbook G N - Available upon request
13. Protect Low-Impact Development (LID BMPs)
Bioretention Rain Garden Facilities
Permeable Pavement - - N/A
Do existing BMPs need to be modified or removed, or do other BMPs need to be installed? Yes No
List the action items in the table below:
Element
# Description and Location Action Required Completion
Date
Report ID 0895.06 S 03302022 Page 3 of 3
Earth Solutions NW, LLC
BMP LEGEND
JOB SHACK
STORMWATER VAULT
WATTLE
SILT FENCE
CONSTRUCTION ENTRANCE
CHEMICAL/MATERIAL STORAGE
CATCH BASIN INSERT
CONCRETE WASHOUT
BAKER TANK
MONITORING POINT
BERM
COVERED WITH PLASTIC
TEMPORARY SEDIMENT POND/TRAP