CITY OF RENTON SURFACE WATER DRAINAGE NOTES:
1. BEFORE ANY CONSTRUCTION OR DEVELOPMENT ACTIVITY OCCURS, A
PRE -CONSTRUCTION MEETING SHALL BE HELD AMONG THE CITY OF RENTON,
HEREBY REFERRED TO AS THE CITY, THE APPLICANT, AND THE APPLICANT'S
CONTRACTOR.
2. THE APPLICANT SHALL BE RESPONSIBLE FOR SECURING ALL NECESSARY CITY,
STATE, AND FEDERAL PERMITS PRIOR TO CONSTRUCTION.
3. ALL STORM DRAINAGE IMPROVEMENTS SHALL BE DESIGNED AND CONSTRUCTED IN
ACCORDANCE WITH THE LATEST EDITION OF THE CITY OF RENTON SURFACE WATER
DESIGN MANUAL (RENTON SWDM), RENTON MUNICIPAL CODE (RMC), AND THE
STANDARD SPECIFICATIONS FOR ROAD, BRIDGE AND MUNICIPAL CONSTRUCTION
PREPARED BY WSDOT AND THE AMERICAN PUBLIC WORKS ASSOCIATION (APWA). IT
SHALL BE THE SOLE RESPONSIBILITY OF THE APPLICANT TO CORRECT ANY ERROR,
OMISSION OR VARIATION FROM THE ABOVE REQUIREMENTS FOUND IN THE PLANS.
ALL CORRECTIONS SHALL BE AT NO ADDITIONAL COST TO THE CITY.
4. APPROVAL OF THE ROAD, GRADING, PARKING, BUILDING, AND DRAINAGE PLAN DOES
NOT CONSTITUTE AS APPROVAL OF ANY OTHER CONSTRUCTION (E.G. WATER, SEWER,
GAS, ELECTRICAL. ETC.). PLANS FOR STRUCTURES SUCH AS BRIDGES, VAULTS, AND
RETAINING WALLS REQUIRE A SEPARATE REVIEW AND APPROVAL BY THE CITY PRIOR
TO CONSTRUCTION. THE SURFACE WATER DRAINAGE SYSTEM SHALL BE
CONSTRUCTED ACCORDING TO THE APPROVED PLANS. ANY DEVIATION FROM THE
APPROVED PLANS WILL REQUIRE COORDINATION FOLLOWED BY WRITTEN APPROVAL
FROM THE CITY.
5. A COPY OF THE APPROVED PLANS SHALL BE ON THE JOB SITE WHENEVER
CONSTRUCTION IS IN PROGRESS.
6. THE LOCATIONS OF ALL EXISTING UTILITIES SHOWN HEREON HAVE BEEN
ESTABLISHED BY FIELD SURVEY OR OBTAINED FROM AVAILABLE RECORDS AND
SHALL THEREFORE BE CONSIDERED APPROXIMATE ONLY AND NOT NECESSARILY
COMPLETE. IT IS THE SOLE RESPONSIBILITY OF THE APPLICANT AND THE
APPLICANTS CONTRACTOR TO INDEPENDENTLY VERIFY THE ACCURACY OF ALL
UTILITY LOCATIONS SHOWN, AND TO FURTHER DISCOVER AND AVOID ANY OTHER
UTILITIES NOT SHOWN HEREON THAT MAY BE AFFECTED BY THE IMPLEMENTATION OF
THIS PLAN. THE APPLICANT SHALL RECORD ON THE AS -BUILT DRAWINGS ALL
UNDOCUMENTED UTILITIES DISCOVERED AND ANY CHANGES TO THE APPROVED
PLANS. THE APPLICANT SHALL IMMEDIATELY NOTIFY THE ENGINEER OF RECORD IF A
CONFLICT EXISTS.
7. VERTICAL DATUM SHALL BE NAVD 88 AND HORIZONTAL DATUM SHALL BE NAD 83
(WA STATE PLANE, NORTH), UNLESS OTHERWISE APPROVED BY THE CITY.
REFERENCE BENCHMARK, DATUM, AND ELEVATIONS SHALL BE NOTED ON THE
PLANS.
8. ALL UTILITY TRENCH BACKFILL AND ROADWAY SUBGRADE SHALL BE COMPACTED TO
95% MAXIMUM DRY DENSITY PER SECTION 2-03.3(14)D - COMPACTION AND
MOISTURE CONTROL TESTS OF THE WSDOT STANDARD SPECIFICATIONS. IN
PERMEABLE PAVEMENT AND OTHER INFILTRATION AREAS, ALL TRENCH BACKFILL
SHALL BE FIRM AND UNYIELDING BUT IN NO CASE SHALL BE COMPACTED TO MORE
THAN 92% OF MAXIMUM DRY DENSITY.
9. OPEN CUTTING OF EXISTING ROADWAYS FOR STORM DRAINAGE WORK IS NOT
ALLOWED UNLESS SPECIFICALLY APPROVED BY THE CITY AND NOTED ON THESE
APPROVED PLANS. ANY OPEN CUT SHALL BE RESTORED IN ACCORDANCE WITH THE
CITY TRENCH RESTORATION STANDARDS.
10. ALL PIPE AND STRUCTURES SHALL BE STAKED FOR SURVEY LINE AND GRADE PRIOR
TO THE START OF CONSTRUCTION. WHERE SHOWN ON THE PLANS OR WHERE
DIRECTED BY THE CITY, THE EXISTING MANHOLES, CATCH BASINS, OR INLETS SHALL
BE ADJUSTED TO THE GRADE AS STAKED.
11. ALL FLOW CONTROL FACILITIES SHALL BE INSTALLED AND IN OPERATION PRIOR TO,
OR IN CONJUNCTION WITH, ANY CONSTRUCTION ACTIVITY UNLESS OTHERWISE
APPROVED BY THE CITY.
12. ALL PIPE AND APPURTENANCES SHALL BE LAID ON A PROPERLY PREPARED
FOUNDATION IN ACCORDANCE WITH THE CURRENT STATE OF WASHINGTON STANDARD
SPECIFICATION FOR ROAD AND BRIDGE CONSTRUCTION. THIS SHALL INCLUDE
NECESSARY LEVELING OF THE TRENCH BOTTOM OR THE TOP OF THE FOUNDATION
MATERIAL, AS WELL AS PLACEMENT AND COMPACTION OF REQUIRED BEDDING
MATERIAL TO UNIFORM GRADE SO THAT THE ENTIRE LENGTH OF THE PIPE WILL BE
SUPPORTED ON A UNIFORMLY DENSE, UNYIELDING BASE. ALL PIPE BEDDING AND
BACKFILL SHALL BE AS SHOWN ON THE CITY STANDARD PLAN 220.00, 220.10, AND
220.20.
13. STEEL PIPE SHALL BE ALUMINIZED, OR GALVANIZED WITH ASPHALT TREATMENT 1, 2,
OR 5 INSIDE AND OUTSIDE.
14. ALL DRAINAGE STRUCTURES SUCH AS CATCH BASINS AND MANHOLES SHALL BE
FITTED WITH DUCTILE IRON, BOLT -LOCKING LIDS PER THE CITY STANDARD PLAN
204.101 204.20, 204.309 204.40, AND 204.50. STRUCTURES SHALL HAVE:
RECTANGULAR OR ROUND, SOLID LIDS WHEN NOT COLLECTING RUNOFF, AND
OUTSIDE OF THE ROADWAY.
• ROUND, SOLID LIDS WHEN NOT COLLECTING RUNOFF, AND LOCATED WITHIN THE
ROADWAY, BUT OUTSIDE OF THE CURB/GUTTER LINE.
• ROUND, SOLID LIDS DISPLAYING THE CITY LOGO WHEN WITHIN THE PUBLIC
RIGHT-OF-WAY OR IN AN EASEMENT TO THE CITY. PRIVATE STRUCTURE LIDS
OUTSIDE PUBLIC RIGHT-OF-WAY AND EASEMENTS TO THE CITY SHALL NOT DISPLAY
THE CITY LOGO.
NW 1/4 OF THE NW 1/4 AND THE NE 1/4 OF THE NW 1/4 SECTION 9, TOWNSHIP 23 NORTH, RANGE 05 EAST, W.M.
15. BUILDINGS AND OTHER STRUCTURES SHALL BE PLACED IN ACCORDANCE WTH TABLE
4.1 EASEMENT WIDTHS AND BUILDING SETBACKS LINES OF THE RENTON SWDM
16. LIDS OF MANHOLES/CATCH BASINS WITHIN PUBLIC RIGHT-OF-WAY SHALL NOT BE
ADJUSTED TO FINAL GRADE UNTIL AFTER PAVING. ALL MANHOLE/CATCH BASIN RIMS
SHALL BE ADJUSTED TO BE FLUSH WITH FINAL FINISHED GRADES, UNLESS
OTHERWISE SHOWN.
19. FOOTING DRAINAGE SYSTEMS AND ROOF DOWNSPOUT SYSTEMS SHALL NOT BE
INTERCONNECTED AND SHALL SEPARATELY CONVEY COLLECTED FLOWS TO THE
CONVEYANCE SYSTEM OR FLOW CONTROL FACILITY ON THE SITE, UNLESS APPROVED
BY THE CITY. FOOTING DRAINS SHALL NOT BE CONNECTED TO ON -SITE BMPS.
20. THE END OF EACH STORM DRAIN STUB SHALL BE CAPPED. A CLEANOUT TOPPED
WITH A BOLT -LOCKING LID MARKED "STORM"OR "DRAIN" SHALL BE LOCATED AT
THE PROPERTY LINE OR AT THE POINT OF CONNECTION OF A PRIVATE STORM
DRAINAGE CONVEYANCE SYSTEM PER THE CITY STANDARD PLAN 227.00.
21. ALL STORM SYSTEM EXTENSIONS SHALL BE STAKED FOR LINE AND GRADE BY A
SURVEYOR LICENSED IN WASHINGTON STATE, AND CUT SHEETS SHALL BE PROVIDED
TO THE CITY PRIOR TO CONSTRUCTION.
22. ALL NEWLY -INSTALLED AND NEWLY -REHABILITATED (PUBLIC AND PRIVATE) STORM
CONVEYANCE SYSTEMS SHALL BE INSPECTED BY MEANS OF REMOTE CCTV
ACCORDING TO THE CITY STANDARD PLAN 266.00. CCTV INSPECTIONS AND REPORTS
SHALL BE SUBMITTED TO THE CITY PRIOR TO RECEIVING APPROVAL TO INSTALL
PROJECT CURBS, GUTTERS AND/OR PAVEMENT.
23. ALL STORM SYSTEMS AND CONNECTIONS TO EXISTING MAINS SHALL BE TESTED IN
ACCORDANCE WITH SECTION 7-04.3(1) OF THE WSDOT STANDARD SPECIFICATIONS
AND IN THE PRESENCE OF A REPRESENTATIVE OF THE CITY. STORM DRAIN STUBS
SHALL BE TESTED FOR ACCEPTANCE AT THE SAME TIME THE MAIN STORM IS
TESTED.
24. FOR ALL DISTURBED PERVIOUS AREAS (COMPACTED, GRADED, LANDSCAPED, ETC.)
OF THE DEVELOPMENT SITE, TO MAINTAIN THE MOISTURE CAPACITY OF THE SOIL
EITHER STOCKPILE AND REDISTRIBUTE THE EXISTING DUFF LAYER AND NATIVE
TOPSOIL OR AMEND THE SOIL WITH COMPOST IN ACCORDANCE WITH STANDARD
PLAN 264.00.
25. ISSUANCE OF THE BUILDING OR CONSTRUCTION PERMITS BY THE CITY DOES NOT
RELIEVE THE APPLICANT OF THE CONTINUING LEGAL OBLIGATION AND/OR LIABILITY
CONNECTED WITH STORMWATER DISPOSAL. THE CITY DOES NOT ACCEPT ANY
OBLIGATION FOR THE PROPER FUNCTIONING AND MAINTENANCE OF THE STORM
SYSTEM PROVIDED DURING CONSTRUCTION.
26. ADEQUATE SAFEGUARDS, SAFETY DEVICES, PROTECTIVE EQUIPMENT, FLAGGERS, AND
ANY OTHER ACTIONS NEEDED TO PROTECT THE LIFE, HEALTH, AND SAFETY OF THE
PUBLIC, AND TO PROTECT PROPERTY IN CONNECTION WITH THE PERFORMANCE OF
WORK SHALL BE PROVIDED. ANY WORK WITHIN THE TRAVELED RIGHT-OF-WAY THAT
MAY INTERRUPT NORMAL TRAFFIC FLOW SHALL REQUIRE A TRAFFIC CONTROL PLAN
APPROVED BY THE CITY. ALL SECTIONS OF THE WSDOT STANDARD SPECIFICATIONS
1-10 TEMPORARY TRAFFIC CONTROL SHALL APPLY.
27. PROJECTS LOCATED WITHIN THE CITYS AQUIFER PROTECTION AREA (APA) SHALL
COMPLY WITH SPECIAL REQUIREMENT #6 OF THE RENTON SWDM AND AQUIFER
PROTECTION REGULATIONS (RMC 4-3-050).
28. PLACEMENT OF SURFACE APPURTENANCES (CATCH BASIN/MANHOLE LIDS,
CLEANOUTS, INLETS, ETC.) IN THE STREET TRAVEL LANE WHEEL PATH,
INTERSECTIONS OF STREET TRAVEL LANES, BIKE LANES, SIDEWALKS, AND
CROSSWALKS SHALL BE AVOIDED WHENEVER POSSIBLE. ANY SURFACE
APPURTENANCE PLACED IN A SIDEWALK OR CROSSWALK SHALL BE FITTED WITH A
NON -SLIP OR NON-SKID LID PER ADA REQUIREMENTS.
29. CLEARLY LABEL PUBLIC AND PRIVATE SYSTEMS ON THE PLANS. PRIVATE SYSTEMS
SHALL BE MAINTAINED BY THE APPLICANT.
30. MINIMUM COVER OVER STORM DRAINAGE PIPE SHALL CONFORM TO TABLE 4.2.1.A2
OF THE RENTON SWDM.
CIVIL CONSTRUCTION PERMIT
CIVIL CONSTRUCTION PERMIT RESUBM17AL
3 CIVIL CONSTRUCTION PERMIT RMUBMITTAL
Call 811 4 CIVIL CONSTRUCTION PERMIT RESUBMI TAL
• two business days
before you dig
N0. REVISION
CITY OF RENTON WASTEWATER STANDARD DETAILS:
1. ALL WORK AND MATERIAL SHALL BE IN CONFORMANCE WITH THE STANDARDS AND
SPECIFICATION OF THE CITY OF RENTON PUBLIC WORKS DEPARTMENT AND THE LATEST
EDITION OF THE WSDOT/APWA STANDARDS AND SPECIFICATIONS,AS APPROVED AND
MODIFIED BY THE CITY OF RENTON STANDARD PLANS&SPECIFICATIONS.A SET OF
APPROVED PLANS SHALL BE KEPT ON SITE AT ALL TIMES DURING CONSTRUCTION.
2. DATUM FOR VERTICAL CONTROL SHALL BE NORTH AMERICAN VERTICAL DATUM
1988.HORIZONTAL CONTROL SHALL BE NORTH AMERICAN DATUM 1983/1991 UNLESS
OTHERWISE APPROVED BY THE CITY.BENCHMARKS AND MONUMENTS SHALL BE
REFERENCED ON THE APPROVED PLANS.
3. A PRE -CONSTRUCTION CONFERENCE AND A 24-HOUR NOTICE SHALL BE REQUIRED
PRIOR TO STARLING NEW CONSTRUCTION. IT SHALL BE THE CONTRACTOR'S
RESPONSIBUTY TO SECURE ALL NECESSARY PERMITS, INCLUDING STREET USE
PERMITS,PRIOR TO STARTING CONSTRUCTION.INSPECTION WILL BE ACCOMPLISHED BY A
REPRESENTATIVE OF THE CITY. IT SHALL BE THE CONTRACTOR'S RESPONSIBILITY TO
NOTIFY THE PUBLIC WORKS INSPECTOR 24 HOURS IN ADVANCE OF BACKFIWNG ALL
CONSTRUCTION.
4. THE HOURS OF WORK IN THE STREET RIGHT-OF-WAY SHALL BE PER CITY
SPECIFICATIONS ON WEEKDAYS UNLESS OTHERWISE APPROVED IN WRITING BY THE
PUBLIC WORKS DEPARTMENT.AN APPROVED TRAFFIC CONTROL PLAN MUST BE
OBTAINED PRIOR TO BEGINNING ANY WORK WITHIN THE PUBLIC RIGHT-OF-WAY.
5. CONTRACTOR IS SOLELY RESPONSIBLE FOR THE MEANS,METHODS AND SEQUENCES OF
CONSTRUCTION AND FOR THE SAFETY OF WORKERS AND OTHERS ON THE
CONSTRUCTION SITE IN ACCORDANCE WITH LOCAL, STATE AND FEDERAL REQUIREMENTS.
6. ALL LOCATIONS OF EXISTING UTILITIES SHOWN ARE APPROXIMATE AND IT SHALL BE
THE CONTRACTOR'S RESPONSIBUTY TO VERIFY THE TRUE AND CORRECT LOCATION SO
AS TO AVOID DAMAGE OR DISTURBANCE. THE CONTRACTOR SHALL COMPLY WITH THE
REQUIREMENTS OF RCW 19.122. A DIG TICKET SHALL BE OBTAINED A MINIMUM OF TWO
BUSINESS DAYS PRIOR TO STARTING ANY EXCAVATION.THE CONTRACTOR SHALL HAVE
A COPY OF THE DIG TICKET ON SITE AT ALL TIMES.
7. BACKFILL SHALL BE PLACED EQUALLY ON BOTH SIDES OF THE PIPE IN LAYERS WITH A
LOOSE AVERAGE DEPTH OF 12-INCHES,MAXIMUM DEPTH 18-INCHES,THOROUGHLY
COMPACTING EACH LAYER TO 95 PERCENT OF MAXIMUM DENSITY.THESE COMPACTED
LAYERS MUST EXTEND FOR ONE PIPE DIAMETER ON EACH SIDE OF THE PIPE OR TO
THE SIDE OF THE TRENCH.MATERIALS TO COMPLETE THE FILL OVER THE PIPE SHALL
BE EQUIVALENT TO BANK RUN GRAVEL FOR TRENCH BACKFILL(9-03.19).
8. SANITARY SEWER PIPE SHALL BE POLYVINYL CHLORIDE(PVC)RUBBER-GASKETED ASTM D
3034,SDR 35, C900/C905 OR DUCTILE IRON CLASS 50,UNLESS OTHERWISE APPROVED
BY THE CITY.
9. SANITARY SEWER PIPES SHALL NOT BE LOCATED UNDER ANY STRUCTURE
(WALLBUILDING FOUNDATION,ETC.) UNLESS APPROVED BY THE CITY.IF A SANITARY
SEWER IS TO BE LOCATED UNDER ANY STRUCTURE(WALL BUILDING
FOUNDATON,ETC.),IT SHALL BE DESIGNED BY A PROFESSIONAL ENGINEER LICENSED IN
THE STATE OF WASHINGTON IN ACCORDANCE WITH STANDARD DETAIL 412.
10. OPEN -CUT ROAD CROSSINGS FOR UTILITY TRENCHES ON EXISTING TRAVELED
ROADWAYS SHALL BE BACKFILLED WITH CRUSHED SURFACING AGGREGATE(WSDOT
SPECIFICATION 9-03.9(3)AND MECHANICALLY COMPACTED UNLESS OTHERWISE
APPROVED BY THE CITY.
11. ALL PIPE AND APPURTENANCES SHALL BE LAID ON A PROPERLY PREPARED
FOUNDATION IN ACCORDANCE WITH THE STANDARDS AND SPECIFICATION OF THE CITY
AND THE LATEST EDITION OF THE WSDOT/APWA STANDARDS AND SPECIFICATION AS
APPROVED AND MODIFIED BY THE CITY IN THE RENTON STANDARD PLANS&
SPECIFICATIONS.THIS SHALL INCLUDE NECESSARY LEVELING OF THE TRENCH BOTTOM OR
THE TOP OF THE FOUNDATION MATERIAL TO A UNIFORM GRADE SO THAT THE ENTIRE
LENGTH OF THE PIPE WILL BE SUPPORTED ON A UNIFORMLY DENSEUNYIELDING
BASE.PIPE BEDDING SHALL BE IN ACCORDANCE WITH STANDARD PLAN 405.
12. ALL DISTURBED AREAS SHALL BE SEEDED AND MULCHED OR OTHERWISE STABILIZED TO
THE SATISFACTION OF THE CITY FOR THE PREVENTION OF ON -SITE EROSION BOTH
DURING CONSTRUCTION AND AFTER THE COMPLETION OF CONSTRUCTION IN
ACCORDANCE WITH THE CURRENT SURFACE WATER DESIGN MANUAL.
13. THE CONTRACTOR SHALL PROVIDE THE CITY OF RENTON WITH A RECORD DRAWING OF
THE SANITARY SEWER SYSTEM WHICH HAS BEEN STAMPED AND SIGNED BY A LICENSED
PROFESSIONAL ENGINEER OR LICENSED PROFESSIONAL SURVEYOR.
BY I DATE I APPR
AS NOTED a'"�w Nm9°°n°°,
AT DATUM
IF NOT ONE INCH
lcpff
36015th Avenue, Suite 1600
Seattle, WA 98101
306.632.5811
www.kpff.com
AV%L 1[=CITY OF
' FENTON
viav
Planning/Building/Public Works Dept.
R-417803
IN COMPLIANCE WITH CITY OF RENTON STANDARDS
DEVELOPMENT ENGINEERING
MSiDDO 04/07/2022
SOLERA
2842 NE SUNSET BLVD
RENTON, WA 98056
NOTES
OWNING NO
Co. 10
sa, 3 14
O
N
O
O
O
N
Z
O
M
O
O
O
O
N
Q
J
CM
M
M
O
O
O
DO
a