CITY OF RENTON EROSION CONTROL NOTES
(CDR STD PLAN 268.00):
1. BEFORE ANY CONSTRUCTION OR DEVELOPMENT ACTIVITY OCCURS, A
PRE -CONSTRUCTION MEETING SHALL BE HELD AMONG THE CITY OF RENTON, HEREBY
REFERRED TO AS THE CITY, THE APPLICANT, AND THE APPLICANTS CONTRACTOR.
2. THE APPLICANT IS RESPONSIBLE FOR OBTAINING THE WASHINGTON STATE
DEPARTMENT OF ECOLOGY (ECOLOGY) CONSTRUCTION STORMWATER GENERAL PERMIT,
IF IT IS REQUIRED FOR THE PROJECT. THE APPLICANT SHALL PROVIDE THE CITY
COPIES OF ALL MONITORING REPORTS PROVIDED TO ECOLOGY ASSOCIATED WITH THE
CONSTRUCTION STORMWATER GENERAL PERMIT.
3. THE ESC PLAN SET SHALL INCLUDE AN ESC CONSTRUCTION SEQUENCE DETAILING THE
ORDERED STEPS THAT SHALL BE FOLLOWED FROM CONSTRUCTION COMMENCEMENT TO
POST -PROJECT CLEANUP IN ORDER TO FULFILL PROJECT ESC REQUIREMENTS.
4. THE BOUNDARIES OF THE CLEARING UMITS, SENSITIVE AREAS AND THEIR BUFFERS,
AND AREAS OF VEGETATION PRESERVATION AND TREE RETENTION AS PRESCRIBED ON
THE PLANS) SHALL BE CLEARLY DELINEATED BY FENCING AND PROTECTED IN THE
FIELD IN ACCORDANCE WITH APPENDIX D OF THE CITY OF RENTON SURFACE WATER
DESIGN MANUAL (RENTON SWDM) PRIOR TO THE START OF CONSTRUCTION. DURING
THE CONSTRUCTION PERIOD, NO DISTURBANCE BEYOND THE CLEARING UMITS SHALL
BE PERMITTED. THE CLEARING UMITS SHALL BE MAINTAINED BY THE APPUCANT/ESC
SUPERVISOR FOR THE DURATION OF CONSTRUCTION.
5. STABILIZED CONSTRUCTION ENTRANCES SHALL BE INSTALLED AT THE BEGINNING OF
CONSTRUCTION AND MAINTAINED FOR THE DURATION OF THE PROJECT. ADDITIONAL
MEASURES, SUCH AS CONSTRUCTED WHEEL WASH SYSTEMS OR WASH PADS, MAY BE
REQUIRED TO ENSURE THAT ALL PAVED AREAS ARE KEPT CLEAN AND TRACK -OUT
TO ROAD RIGHT OF WAY DOES NOT OCCUR FOR THE DURATION OF THE PROJECT. IF
SEDIMENT IS TRACKED OFFSITE, PUBLIC ROADS SHALL BE CLEANED THOROUGHLY AT
THE END OF EACH DAY, OR MORE FREQUENTLY DURING WET WEATHER, AS
NECESSARY TO PREVENT SEDIMENT FROM ENTERING WATERS OF THE STATE.
6. WASHOUT FROM CONCRETE TRUCKS SHALL BE PERFORMED OFF -SITE OR IN
DESIGNATED CONCRETE WASHOUT AREAS ONLY. DO NOT WASH OUT CONCRETE
TRUCKS ONTO THE GROUND, OR TO STORM DRAINS OR OPEN DITCHES. ON -SITE
DUMPING OF EXCESS CONCRETE SHALL ONLY OCCUR IN DESIGNATED CONCRETE
WASHOUT AREAS.
7. ALL REQUIRED ESC BMPS SHALL BE CONSTRUCTED AND IN OPERATION PRIOR TO
LAND CLEARING AND/OR CONSTRUCTION TO PREVENT TRANSPORTATION OF SEDIMENT
TO SURFACE WATER, DRAINAGE SYSTEMS AND ADJACENT PROPERTIES. ALL ESC BMPS
SHALL BE MAINTAINED IN A SATISFACTORY CONDITION UNTILSUCH TIME THAT
CLEARING AND/OR CONSTRUCTION IS COMPLETE AND POTENTIAL FOR ON -SITE
EROSION HAS PASSED. ALL ESC BMPS SHALL BE REMOVED AFTER CONSTRUCTION IS
COMPLETED AND THE SITE HAS BEEN STABILIZED TO ENSURE POTENTIAL FOR
ON -SITE EROSION DOES NOT EXIST. THE IMPLEMENTATION, MAINTENANCE,
REPLACEMENT, ENHANCEMENT, AND REMOVAL OF ESC BMPS SHALL BE THE
RESPONSIBILITY OF THE APPLICANT.
8. ANY HAZARDOUS MATERIALS OR LIQUID PRODUCTS THAT HAVE THE POTENTIAL TO
POLLUTE RUNOFF SHALL BE DISPOSED OF PROPERLY.
9. THE ESC BMPS DEPICTED ON THIS DRAWING ARE INTENDED TO BE MINIMUM
REQUIREMENTS TO MEET ANTICIPATED SITE CONDITIONS. AS CONSTRUCTION
PROGRESSES AND UNEXPECTED OR SEASONAL CONDITIONS DICTATE, THE APPLICANT
SHALL ANTICIPATE THAT MORE ESC BMPS WILL BE NECESSARY TO ENSURE COMPLETE
SILTATION CONTROL ON THE PROPOSED SITE. DURING THE COURSE OF
CONSTRUCTION, IT SHALL BE THE OBLIGATION AND RESPONSIBIUTY OF THE
APPLICANT TO ADDRESS ANY NEW CONDITIONS THAT MAY BE CREATED BY THE
ACTIVITIES AND TO PROVIDE ADDITIONAL ESC BMPS, OVER AND ABOVE MINIMUM
REQUIREMENTS, AS MAY BE NEEDED, TO PROTECT ADJACENT PROPERTIES AND WATER
QUAUTY OF THE RECEIVING DRAINAGE SYSTEM.
11. ANY DEWATERING SYSTEM NECESSARY FOR THE CONSTRUCTION OF STORMWATER
FACILITIES SHALL BE SUBMITTED TO THE CITY FOR REVIEW AND APPROVAL.
12. ANY AREAS OF EXPOSED SOILS, INCLUDING ROADWAY EMBANKMENTS, THAT WILL NOT
BE DISTURBED FOR TWO DAYS DURING THE WET SEASON (OCTOBER 1ST THROUGH
APRIL 30TH) OR SEVEN DAYS DURING THE DRY SEASON (MAY 1ST THROUGH
SEPTEMBER 30TH) SHALL BE IMMEDIATELY STABIUZED WITH THE APPROVED ESC
COVER METHODS (E.G., SEEDING, MULCHING, PLASTIC COVERING, ETC.) IN
CONFORMANCE WITH APPENDIX D OF THE RENTON SWDM.
13. 13.WET SEASON ESC REQUIREMENTS APPLY TO ALL CONSTRUCTION SITES BETWEEN
OCTOBER 1ST AND APRIL 30TH, UNLESS OTHERWISE APPROVED BY THE CITY.
14. ANY AREA NEEDING ADDITIONAL ESC MEASURES, NOT REQUIRING IMMEDIATE
ATTENTION, SHALL BE ADDRESSED WITHIN SEVEN (7) DAYS.
15. THE ESC BMPS ON INACTIVE SITES SHALL BE INSPECTED AND MAINTAINED AT A
MINIMUM OF ONCE A MONTH OR WITHIN 24 HOURS FOLLOWING A STORM EVENT.
INSPECTION AND MAINTENANCE SHALL OCCUR MORE FREQUENTLY AS REQUIRED BY
THE CITY.
NW 1/4 OF THE NW 1/4 AND THE NE 1/4 OF THE NW 1/4 SECTION 9, TOWNSHIP 23 NORTH, RANGE 05 EAST, W.M.
16. BEFORE COMMENCEMENT OF ANY CONSTRUCTION ACTIVITY, CATCH BASIN INSERTS
PER THE CITY STANDARD PLAN 216.30 SHALL BE PROVIDED FOR ALL STORM DRAIN
INLETS DOWNSLOPE AND WITHIN 500 FEET OF A DISTURBED OR CONSTRUCTION AREA,
UNLESS THE RUNOFF THAT ENTERS THE INLET WILL BE CONVEYED TO A SEDIMENT
POND OR TRAP. ALL CATCH BASIN INSERTS SHALL BE PERIODICALLY INSPECTED AND
REPLACED AS NECESSARY TO ENSURE FULLY FUNCTIONING CONDITION.
17. AT NO TIME SHALL SEDIMENT ACCUMULATION EXCEED 2/3 OF THE CAPACITY OF THE
CATCH BASIN SUMP. ALL CATCH BASINS AND CONVEYANCE LINES SHALL BE CLEANED
PRIOR TO PAVING. THE CLEANING OPERATION SHALL NOT FLUSH SEDIMENT -LADEN
WATER INTO THE DOWNSTREAM SYSTEM.
18. ANY PERMANENT STORMWATER FACILITY LOCATION USED AS A TEMPORARY SETTLING
BASIN SHALL BE MODIFIED WITH THE NECESSARY ESC BMPS AND SHALL PROVIDE
ADEQUATE STORAGE CAPACITY. IF THE TEMPORARY FACILITY IS TO ULTIMATELY
FUNCTION AS AN INFILTRATION SYSTEM IN ITS PERMANENT STATE, THE TEMPORARY
FACILITY SHALL BE ROUGH GRADED SO THAT THE BOTTOM AND SIDES ARE AT LEAST
THREE FEET ABOVE THE FINAL GRADE OF THE PERMANENT FACILITY.
19. AREAS DESIGNATED ON THE PLANS) CONTAINING EXISTING STORMWATER FACILITIES
OR ON -SITE BMPS (AMENDED SOILS, BIORETENTION, PERMEABLE PAVEMENT, ETC.)
SHALL BE CLEARLY FENCED AND PROTECTED USING ESC BMPS TO AVOID
SEDIMENTATION AND COMPACTION DURING CONSTRUCTION.
20. PRIOR TO THE BEGINNING OF THE WET SEASON (OCTOBER 1ST), ALL DISTURBED
AREAS SHALL BE INSPECTED TO IDENTIFY WHICH ONES SHALL BE SODDED OR
SEEDED IN PREPARATION FOR THE WINTER RAINS. DISTURBED AREAS SHALL BE
SODDED OR SEEDED WITHIN ONE WEEK OF THE BEGINNING OF THE WET SEASON. AN
EXHIBIT OF THOSE AREAS TO BE SODDED OR SEEDED AND THOSE AREAS TO REMAIN
UNCOVERED SHALL BE SUBMITTED TO THE CITY FOR REVIEW.
21. PRIOR TO FINAL CONSTRUCTION ACCEPTANCE, THE PROJECT SITE SHALL BE
STABILIZED TO PREVENT SEDIMENT -LADEN WATER FROM LEAVING THE PROJECT SITE,
ALL ESC BMPS SHALL BE REMOVED, AND STORMWATER CONVEYANCE SYSTEMS,
FACILITIES, AND ON -SITE BMPS SHALL BE RESTORED TO THEIR FULLY FUNCTIONING
CONDITION. ALL DISTURBED AREAS OF THE PROJECT SITE SHALL BE VEGETATED OR
OTHERWISE PERMANENTLY STABIUZED. AT A MINIMUM, DISTURBED AREAS SHALL BE
SODDED OR SEEDED AND MULCHED TO ENSURE THAT SUFFICIENT COVER WILL
DEVELOP SHORTLY AFTER FINAL APPROVAL MULCH WITHOUT SEEDING IS ADEQUATE
FOR AREAS TO BE LANDSCAPED BEFORE OCTOBER 1ST.
22. ROCKERIES ARE CONSIDERED TO BE A METHOD OF BANK STABIUZATION AND EROSION
CONTROL. ROCKERIES SHALL NOT BE CONSTRUCTED TO SERVE AS RETAINING WALLS.
ALL ROCKERIES IN CITY ROAD RIGHTS -OF -WAY SHALL BE CONSTRUCTED IN
ACCORDANCE WITH CITY STANDARDS. ROCKERIES OUTSIDE OF ROAD RIGHTS -OF -WAY
SHALL BE CONSTRUCTED IN ACCORDANCE WITH THE INTERNATIONAL BUILDING CODE.
CIVIL CONSTRUCTION PERMIT
CIVIL CONSTRUCTION PERMIT RESUBM17AL
3 CIVIL CONSTRUCTION PERMIT RMUBMITTAL
Call 811 4 CIVIL CONSTRUCTION PERMIT RESUBMI TAL
• two business days
before you dig
N0. REVISION
CONSTRUCTION SEQUENCE:
1. PRE -CONSTRUCTION MEETING.
2. POST SIGN WITH NAME AND PHONE NUMBER OF CSWPP/ESC SUPERVISOR (MAY
BE CONSOLIDATED WITH THE REQUIRED NOTICE OF CONSTRUCTION).
3. FLAG OR FENCE CLEARING LIMITS.
4. INSTALL CATCH BASIN PROTECTION AND STORMWATER BMP AREA PROTECTION AS
REQUIRED.
5. GRADE AND INSTALL CONSTRUCTION ENTRANCE($).
6. INSTALL PERIMETER PROTECTION (SILT FENCE, BRUSH BARRIER, ETC.).
7. CONSTRUCT SEDIMENT PONDS AND TRAPS .
8. GRADE AND STABILIZE CONSTRUCTION ROADS.
9. CONSTRUCT SURFACE WATER CONTROLS (INTERCEPTOR DIKES, PIPE SLOPE DRAINS,
ETC.) SIMULTANEOUSLY WITH CLEARING AND GRADING FOR PROJECT DEVELOPMENT.
CONSTRUCT SWPPS CONTROLS IN ANTICIPATION OF SCHEDULED CONSTRUCTION
ACTIVITY (E.G., CONCRETE -RELATED PH MEASURES FOR UTILITY, VAULT OR
ROADWAY CONSTRUCTION).
10. MAINTAIN EROSION CONTROL MEASURES IN ACCORDANCE WITH APPENDIX D OF
THE CITY OF RENTON SURFACE WATER DESIGN MANUAL AND MANUFACTURER'S
RECOMMENDATIONS.
11. RELOCATE EROSION CONTROL MEASURES OR INSTALL NEW MEASURES SO THAT AS
SITE CONDITIONS CHANGE THE EROSION AND SEDIMENT CONTROL AND POLLUTION
PREVENTION IS ALWAYS IN ACCORDANCE WITH THE CITYS EROSION AND SEDIMENT
CONTROL STANDARDS.
12. COVER ALL AREAS THAT WILL BE UNWORKED FOR MORE THAN SEVEN DAYS
DURING THE DRY SEASON 0 TWO DAYS DURING THE WET SEASON WITH STRAW,
WOOD FIBER MULCH, COMPOST, OR EQUIVALENT.
13. STABIUZE ALL AREAS THAT REACH FINAL GRADE WITHIN SEVEN DAYS.
14. SEED OR SOD ANY AREAS TO REMAIN UNWORKED FOR MORE THAN 30 DAYS.
15. UPON COMPLETION OF THE PROJECT, ALL DISTURBED AREAS MUST BE STABILIZED
AND BMPS REMOVED IF APPROPRIATE.
16. APPLY DUST CONTROL (BMP C140), SAWCUTTING AND SURFACING POLLUTION
PREVENTION (BMP 152).
17. COMPLETE MASS GRADING.
BY I DATE I APPR
AS NOTED RIZCN'�L. HAD I'°°n°°'
DATUM
AT Eu
IF NOT ONE INCH
lcpff
16015th Avenue, Suite 1600
Seattle, WA 98101
2015.622.5822
www.kpff.com
;� CITY OF
' FENTON
viav
Planning/Building/Public Works Dept.
ABBREVIATIONS
APPROX APPROXIMATELY
BC
BOTTOM OF CURB
BE
BOTTOM OF EXCAVATION
BMP
BEST MANAGEMENT PRACTICES
BOE
BOTTOM OF EXCAVATION
BP
BOTTOM OF POND
BW
BACK OF WALL
CB
CATCH BASIN
CCR
COORDINATED CIVIL REVIEW
q
CENTERUNE
CO
CLEAN OUT
COMM
COMMUNICATIONS
CDR
CITY OF RENTON
DI
DUCTILE IRON
DOE
DEPARTMENT OF ECOLOGY
DOM
DOMESTIC
DR
DOOR
EL
ELEVATION
ELEC
ELECTRICAL
EX/EXIST
EXISTING
FD
FRENCH DRAIN
FDC
FIRE DEPARTMENT CONNECTION
FF
FINISHED FLOOR
FIG
FINISHED GRADE
FL
FLOW LINE
FS
FIRE SERVICE
FW
FACE OF WALL
HP
HIGH POINT
IE
INVERT ELEVATION
LD
LANDING
LF
LINEAL FEET
LP
LOW POINT
LT
LEFT
ME
MATCH EXISTING
MECH
MECHANICAL
MEP
MECHANICAL ELECTRICAL PLUMBING
MH
MANHOLE
MMA
METHYL METHACRYLATE
MON
MONUMENT
NO.
NUMBER
NTS
NOT TO SCALE
PE
POLYETHELYNE
FED
PEDESTRIAN
PIV
POST INDICATOR VALVE
POC
POINT OF CONNECTION
PSE
PUGET SOUND ENERGY
R
RADIUS
ROW
RIGHT OF WAY
RT
RIGHT
SO
STORM DRAIN
SQ
SQUARE FEET
SS
SANITARY SEWER
SSS
SANITARY SIDE SEWER
ST
SOUND TRANSIT
STA
STATION
STD
STANDARD
STW
STORMWATER
TIC
TOP OF CURB
TESC
TEMPORARY EROSION AND
SEDIMENTATION CONTROL
TP
TOP OF POND
TW
TOP OF WALL
TYP
TYPICAL
W
WATER
NO
WATER QUAUTY
WSDOT
WASHINGTON STATE DEPARTMENT
OF TRANSPORTATION
R-417804
IN COMPLIANCE WITH CITY OF RENTON STANDARDS
msippo 04/07/2022
SOLERA
2842 NE SUNSET BLVD
RENTON, WA 98056
NOTES
m
Co. 1 1
4 14
O
N
O
O
O
W
N
Z
11'l
O
M
O
O
O
O
N
Q
J
OM
M
M
O
O
O
00
T
a