Loading...
HomeMy WebLinkAboutR-4178105NW 1/4 OF THE NW 1/4 AND THE NE 1/4 OF THE NW 1/4 SECTION 9, TOWNSHIP 23 NORTH, RANGE 05 EAST W_M 00 ell 0 w Q w J O PLAN LEGEND —PROPERTY LINE * TREES SURVEYED BY SUSAN FRINGE OF CREATIVE LAND5GAPE SOLUTIONS ISA CERTIFIED ARBORIST #1461 TRAO CERTIFIED ARBORIST u451 TREE REPLACEMENT NUMBER OP REOUIRED TREE REPLACEMENTS ID LARGE TREES SCIENTIFIC NAME COMMON NAME SIZE 61TY CHAMAEGYPARI5 NGOTKATEN515 WEEPING ALASKA GEDAR 6 HT IT PENDULA •PSEUDOTEUGA HENZIE511 DOUGLAS FIR 6' HT -I Q THUJA PLIGATA WESTERN RED GEDAR 6'HT 10 • THUJA PLIGATA 'EXCELSA' EXGEL5A AESTERN 6' HT 14 RED GEDAR TOTAL TREE REPLACEMENT PROVIDED: 46 erAle p' NOTES LNa,vaEFTar I. SURVEY PROVIDED BY AXIS SURVEYS 4 MAPPING, 15241 NE BOTH 5T, REDMOND, WA gb052,(425) 625-5700. C/A 111 iAPlae 2. 51TE PLAN PROVIDED BY KPFF, 1601 FIFTH AVE, SUITE 1600, 5EATTLE, WA g8101 (206) 622-51522. 8. SOURCE DRAWING WAS MODIFIED SY TALA3AEA CONSULTANTS FOR VISUAL - ENHANCEMENT. ' NOT FOR CONSTRUCTION THESE PLANS HAVE BEEN 1 CINL CONSTRUCTION PERMIT 1 103/12/211Z LN Sexi eUBMITil TO THE APPROPRIATE 2 CINL CONSTRUCTION PERMIT RESUBM17AL 09/31/21DESIGNED, AS NOTED mmr�"� A6 IES FOR REVIEW AND 3 CINL CONSTRUCTION PERMIT RESUBM17AL 01/07/22 EP I. below. APPROVAL. UNTIL APPROVED, Know what's THESE PLANS ARE: 4 CINL CONSTRUCTION PERMIT RESUBM17AL 03/11/22 PH 8 LK Callbefore you dig. SUBJECT TO REVISION P -_ IT DA7UM EIF Nor WH WE NO. REVISION BY DATE APPR D, svaz cma y BS TREE RETENTION WORKSHEET Print Form Reset Form Save For, DEPARTMENT OF COMMUNITY AND ECONOMIC DEVELOPMENT - �Rent6h O Planning Division 1055 south Grady Way -Renton, WA 98057 Phone: 425-430.72001 www.rentonwa.goy 1. Total number of trees over 6" diameter`, or alder or cottonwood trees at least 8" in diameter on project site 32 trees 2. Deductions: Certain trees are excluded from the retention calculation Trees that are dangerous' 4 trees Trees in proposed public streets trees Trees in proposed private access easements/tracts trees Trees in critical areas' and buffers trees Total number of excluded trees: 4 trees 3. Subtract line 2 from line 1: 28 trees 4. Next, to determine the number of trees that must be retained", multiply line 3 by: 0.31n zones RC, R-1, R-4, R-6 or R-8 0.2 in all other residential zones 0.1 in all commercial and industrial zones 3 trees 5. List the number of 6" in diameter, or alder or cottonwood trees over Be in diameter that you are proposing to retain: 1 trees 6. Subtract line 5 from line 4 for trees to be replaced: (if line 6 is zero or less, crop here. No replacement trees are required) 2 trees 7. Multiply line 6 by 22" for number of required replacement inches: 24 inches 8. Proposed size of trees to meet additional planting requirement: (Minimum r Caliper trees required for replacement otherwise enter of 2 inches per tree or 6 ht conifer per 2" equil 9. Divide line 7 by line 8 for number of replacement trees`: Ulf remainder is .5 or greater, round up to the next whole number) 12 trees Measured at 4.5' above guide. A tree certRrtQ in a renter report, as dead, terminally diseased, damaged, or otherwise dangerous to persons or property by a licensed landscape architect, or cortiped w1borist, and approved by the City ' Critical areas, such as wetlands, streams, noodplains and protected slopes, are defined N RMC 4-3-050. 4 Count only those trees to be rebind outside of critical areas and buffers. sThe City may require modification of the tree retention plan to ensure retention of the maximum number of trees per RMC 4-0-1301+7a. `when the required number of protected trees cannot be recall replacement trees, with at least a twoinch 1r) caliper or an evergreen at least six fee (6') oil, shall he planted, see RMC 44-13o.H.l.e.nd for prohibited types of replacement trees. HACEmpea\corm:-TemplTe:\serc-Help HandcueVlanNrglTrre Retention workshenAov de/2015 OCITY OF RENTON Planning/Building/Public Works Dept. R-41-18105 IN COMPLIANCE WITH CITY OF RENTON STANDARDS CURRENT PLANNING DEVELOPMENT ENGINEERIN MHerrera 04/06/2022 msippo 04/07/2022 SOLERA 2842 NE SUNSET BLVD Bop` RENTON, WA 98056 p L2.3 TREE RETENTION 8 REPLACEMENT PLAN O N ED ED C13 T N i LO O M O ED O C) N Q J cot CV) DO t7 ED L] 00 T Cc 211