COVER PIPE CONNECTION TO END CAP WITH ADS
GEOSYNTHETIGS 601T NON -WOVEN GEOTEXTILE
FLEXSTORM PURE INSERT
INLET MANIFOLD TO
NON ISOLATOR ROLLS
2' SUMP
INSPECTION & MAINTENANCE
MC-3500 CHAMBER
12" (300 ITT) HDPE ACCESS PIPE REQUIRED USE
FACTORY PRE -CORED END CAP PART: MC35001EPP24BC
OR MC35001EPP24BW
STEP 1) INSPECT ISOLATOR ROW FOR SEDIMENT
A. ALL ISOLATOR ROWS
A.1. REMOVE COVER FROM STRUCTURE AT UPSTREAM END OF ISOLATOR ROW
A.2. USING A FLASHLIGHT, INSPECT DOWN THE ISOLATOR ROW THROUGH OUTLET
PIPE
i) MIRRORS ON POLES OR CAMERAS MAY BE USED TO AVOID A CONFINED
SPACE ENTRY
ii) FOLLOW OSHA REGULATIONS FOR CONFINED SPACE ENTRY IF ENTERING
MANHOLE
A.3. IF SEDIMENT IS AT, OR ABOVE, 3" (80 Turn) PROCEED TO STEP 2. IF NOT,
PROCEED TO STEP 3.
STEP 2) CLEAN OUT ISOLATOR ROW USING THE JETVAC PROCESS
A. A FIXED CULVERT CLEANING NOZZLE WITH REAR FACING SPREAD OF 45" (1.1 m)
OR MORE IS PREFERRED
B. APPLY MULTIPLE PASSES OF JETVAC UNTIL BACKFLUSH WATER IS CLEAN
C. VACUUM STRUCTURE SUMP AS REQUIRED
STEP 3) REPLACE ALL COVERS, GRATES, FILTERS, AND LIDS; RECORD OBSERVATIONS AND
ACTIONS.
STEP 4) INSPECT AND CLEAN BASINS AND MANHOLES UPSTREAM OF THE STORMTECH SYSTEM.
NOTES
Gcb111117N1III
Inv LII ur AI oEOSYNTHETICS 315WTM
WOVEN GEOTEXTILE BETWEEN FOUNDATION
STONE AND CHAMBERS 8.25' (2.51 m) MIN
WIDE CONTINUOUS FABRIC WITHOUT SEAMS
1. INSPECT EVERY 6 MONTHS DURING THE FIRST YEAR OF
OPERATION. ADJUST THE INSPECTION INTERVAL BASED ON
PREVIOUS OBSERVATIONS OF SEDIMENT ACCUMULATION AND HIGH
WATER ELEVATIONS.
2. CONDUCT JETTING AND VACTORING ANNUALLY OR WHEN
INSPECTION SHOWS THAT MAINTENANCE IS NECESSARY.
MC-3500
ISOLATOR ROW DETAIL
- MODIFIED
Call 811
• twoC business days
before you dig
CIVIL CONSTRUCTION PERMIT
CIVIL CONSTRUCTION PERMIT RESUBM17AL
CIVIL CONSTRUCTION PERMIT RESUBMITTAL
NO. I REVISION
BY I DATE I APPR
VALLEY 86.0"
STIFFENING RIB CREST INSTALLED
S7IFFENING
CREST WEB
RIB
LOWER JOINT
CORRUGATION
1 1 1 1 1 1 FOOT
L UPPER JOINT CORRUGATION
r/dyWdyWdyW�WW6T7W�WWdT!
BUILD ROW IN THIS DIRECTION o
900„
ACTUAL LENGTH
45.0" 45.0°
22 2"
1
INSTALLED 1
i— 77.0"
75.0"
NOMINAL CHAMBER SPECIFICATIONS
SIZE (W X H X INSTALLED LENGTH)
77.0" X 45.0" X 86.0"
CHAMBER STORAGE
109.9 CUBIC FEET
-{
I
25,7" F
MINIMUM INSTALLED STORAGE*
178.9 CUBIC FEET
WEIGHT
134 lbs.
NOMINAL END CAP SPECIFICATIONS
SIZE (W X H X INSTALLED LENGTH)
75.0" X 45.0" X 22.2"
L
END CAP STORAGE
14.9 CUBIC FEET
B
MINIMUM INSTALLED STORAGE'
46.0 CUBIC FEET
WEIGHT
49 Ibs.
'ASSUMES 12" STONE ABOVE, 9" STONE FOUNDATION AND
BETWEEN CHAMBERS, 6" STONE PERIMETER IN FRONT OF END
CAPS AND 40% STONE POROSITY G
L
T—
OUTLET MANIFOLD STUBS AND INLET MANIFOLD STUBS CONNECTED TO ISOLATOR ROWS AT
BOTTOM OF END CAP FOR PART NUMBERS ENDING WITH "B", INLET MANIFOLD STUBS AT TOP
OF END CAP FOR PART NUMBERS ENDING WITH "T"
PART #
STUB
C
MC35001EPP12T
12"
P-4—1
MC35001EPP128
—
1.35"
MC-3500
TECHNICAL SPECIFICATIONS
PER STORMTECH - MODIFIED BY KPFF
AS NOTED a':mow NON I HD III
� � DATUMIF NOT ONE INCH
lcpff
16015th Avenue, Suite 1600
Seattle, WA 98101
205.622.5811
www.kpff.com
= CITY OF
' FENTON
viav
Planning/Building/Public Works Dept.
IN COMPLIANCE WITH CITY OF RENTON STANDARDS
SURFACE WATER UTILITY DEVELOPMENT ENGINEERING
JFarah 04/01/2022 msippo 04/07/2022
SOLERA
2842 NE SUNSET BLVD " °°"'
RENTON, WA 98056
"C5.61
STORMWATER CHAMBER SYSTEM DETAILS.
O
N
O
T
O
O
,
N
Z
Ln
O
M
O
O
O
O
N
Q
J
M
M
M
0
O
O
00
MT
LL