HomeMy WebLinkAboutAdden 3
AMENDMENTNO.3TOAGREEMENTCAGͲ20Ͳ002FOR
BRONSONWAYBRIDGE–SEISMICRETROFITANDPAINTING
THISAMENDMENT,datedforreferencepurposesonlyas________________,isbyandbetween
theCityofRenton(the“City”),aWashingtonmunicipalcorporation,andSargentEngineers,Inc.
(“Consultant”),aWashingtoncorporation.TheCityandtheConsultantarereferredtocollectively
inthisAmendmentasthe“Parties.”OncefullyexecutedbytheParties,thisAmendmentis
effectiveasofthelastdatesignedbybothparties.
Whereas,theCityengagedtheservicesoftheConsultantunderAgreementCAGͲ20Ͳ002,dated
April14,2020,toprovidenecessaryservicesforthecompletionofDesignPhase1fortheBronson
WayBridge–SeismicRetrofitandPaintingProject(referredtohereinasthe“Agreement”);
Whereas,thePartieswishtoamendtheAgreementtochangethescopeofworkandchangethe
compensationinordertocompleteDesignPhase4fortheBronsonWayBridge–SeismicRetrofit
andPaintingProject.
NOWTHEREFORE,ItismutuallyagreeduponthatCAGͲ20Ͳ002isamendedasfollows:
1.ScopeofWork:Section1,ScopeofWork,isamendedtoaddworkasspecifiedinExhibit
AͲ3,whichisattachedandincorporatedherein.
2.TimeofPerformance:Section3,TimeofPerformance,isamendedpursuanttothe
schedule(s)setforthinExhibitAͲ3.AllWorkshallbeperformedbynolaterthan
December31,2024.
3.Compensation:Section4,Compensation,isamendedsothatthemaximumamountof
compensationpayabletoConsultantisincreasedby$99,000from$290,864to$389,864,
plusanyapplicablestateandlocalsalestaxes.Theadditionalcompensationshallbepaid
baseduponWorkactuallyperformedaccordingtotherate(s)oramountsspecifiedin
ExhibitsDͲ3andE3Ͳ3,whichisattachedandincorporatedherein.
4.AlltermsoftheAgreementnotexplicitlymodifiedhereinshallremaininfullforceand
effectandsuchtermsshallapplytoWorkperformedaccordingtothisAmendmentasif
fullysetforthherein.
INWITNESSWHEREOF,thePartieshavevoluntarilyenteredintothisAmendmentasofthedate
lastsignedbythePartiesbelow.
CAG-20-002, Adden #3-22
April 15, 2022
4-15-2022
Approved by Cheryl Beyer via 4/14/2022 email
Page1of11
EXHIBITAͲ3
SCOPEOFWORK
CONTRACT:CAGͲ20Ͳ002
PROJECT:BRONSONWAYBRIDGE–SEISMICRETROFITANDPAINTING
CONSULTANT:SARGENTENGINEERS,INC.
A. PROJECTDESCRIPTION:
Nochangefromoriginalcontract.
B. PURPOSE:
NochangefromcontractAmendmentNo.2.
C. DESIGNCRITERIA
NochangefromcontractAmendmentNo.2.
D. GENERALASSUMPTIONS:
Nochangefromoriginalcontract.
E. DELIVERABLES:
DeliverablestobepreparedandproducedbytheCONSULTANT,aspartofthiscontractamendment,are
identifiedattheendofeachtasklistedbelow.
F. SCHEDULE:
TheCITYanticipatesprojectconstructionwilloccurinsummer2022,sometimebetweenJulyandOctober.
Therefore,finalbiddocumentsshallbecompletedtoallowenoughtimetoadvertisetheprojectforbids
andtoawardandexecuteaconstructioncontractforthesummer2022constructionseasonandCedar
Riverfishwindow.AnticipatedbidadvertisementdateisMay10,2022.
Giventhecontinueduncertaintywiththepublichealthcrisis,locally,nationallyandworldwide,shoulda
stayͲinͲplaceorderand/ortravelbanbeenactedbytheFederalGovernment,StateofWashington,King
Countyand/orCityofRentonthatresultsinconditionswheretheCONSULTANTcannotobtainfielddata
requiredtocontinueworkonanygiventask,theCONSULTANTshallstopworkonthetask.Additionally,
thecompletiondatesforthedeliverablesofthattaskwillbeextendedforaperiodoftimethatequalsthe
timeperiodofthestayͲinͲplaceorderand/ortravelban.Finally,theoverallprojectschedulewillbe
adjustedtoreflectthedelay.
G. SCOPEOFWORK:
TASK12–PROJECTMANAGEMENTFORDESIGNPHASENO.4
Page2of11
TheCONSULTANTwillprovideoverallprojectmanagement,coordinationwiththeCITY,monthlyprogress
reportsandinvoicing.Thiseffortwillincludethefollowingelements.
12.1–Administration,CoordinationandSupervision
x InitiateprojectsetͲupincludingestablishmentoftimesheets(chargecodes),creationofproject
files(electronicandphysical)andschedulingofCONSULTANTpersonnelworkactivitiesforTasks
12,13and14describedinthiscontractamendment.
x CoordinationwithCITYforanyrequiredpublicmeetingsorotherformsofpublicoutreachthat
mayberequiredfortheworktobeperformedinthiscontract.
x SupervisionofCONSULTANTpersonnelandactivitiestoensurecompliancewithcontractscope
andscheduleandproperchargingoftimeagainstthecontract.
x OversiteofsubͲconsultantactivitiestoensurecompliancewithcontractscope,scheduleand
budget.
12.2–Invoicing
x Preparationofmonthlyinvoiceswithprogressreportsthatincludethefollowing:
o Summaryofbudget,expensestodateandexpensesforinvoiceperiod,assignedtoeachtask.
o Summaryofworkaccomplishedfortheinvoiceperiod.
o SummaryofoutstandingissuestoberesolvedbytheCITY.
o Backupdetailthatincludesthename,directsalaryrateandhourscharged,foreachindividual
chargingtimetothiscontract,fortheinvoiceperiod.
o BackupdetailofalldirectnonͲsalarycostsincludedintheinvoicefortheworkperiod.
12.3–ProjectMeetingsandSiteVisits
x DesignPhase4KickoffMeeting–AfterreceivingaNoticetoProceed(NTP)fromtheCITY,setup
aDesignPhase4kickoffmeetingwithkeyCITYanddesignteampersonnel.Thepurposeofthe
meetingistodiscusskeyelementsofthescopeofwork,projectscheduletimelinesandcritical
pathelements.ThismeetingwillbeheldatRentonCityHall.However,thismeetingmaybeheld
onͲlineorviaconferencecalliftheneedarises(e.g.RentonCityHallisclosedtothepublic).
x MeetingsandcoordinationwithCITY–ForDesignPhase4,theCONSULTANTprojectmanagerwill
participateinphoneconferencecallswiththeCITYprojectmanagertoprovidestatusupdates.
Thefrequencyisestimatedtobeonceperweek.TheCONSULTANTprojectmanagerandkey
teammemberswillattendprojectmeetingswiththeCITYprojectmanager.Estimatetwo
meetings.TheCITYanticipatesthatthemeetingswillbeheldonͲlineorviaconferencecall.
x ForanyfacetofaceprojectmeetingswiththeCITY,theCONSULTANTshallprepareanagenda,
signͲinsheet,recordofmeetingincludingalistofactionitems,ifany.
x Internaldesigncoordinationmeetings–TheCONSULTANTprojectmanagerwillconductregular
internaldesigncoordinationmeetingsand/orconferencecallswithkeydesignteammembers
includingsubͲconsultants.
x SiteVisitforFinalEnvironmentalCoordination–CONSULTANTandCITYstaffmayperformone(1)
sitevisitwiththeCITY’senvironmentalconsultanttodiscussenvironmentalconsiderations.
x SiteVisitforDesignCoordination–Uptotwo(2)additionalsitevisitsareestimatedforthe
CONSULTANTtoevaluateandverifyprojectdesignelementsduringDesignPhase4.Thesesite
visitsmayalsoincludemeetingswiththeCITYandfranchiseutilitiestocoordinateanddiscuss
temporaryrelocationofexistingfranchiseutilities,asnecessary.
12.4–EnvironmentalCoordination
Page3of11
x Asthefinaldesigniscompleted,coordinationwiththeCITY’senvironmentalconsultantmaybe
necessarytoensurethatthedesignremainsincompliancewithenvironmentalpermitting.
DELIVERABLES
ThefollowingdeliverablesanddeliverytimesareincludedinTask9.
x Meetingagenda(s)inMicrosoftWordformat–DeliveredtotheCITYone(1)businessdaybefore
scheduledmeeting.
x SignͲinsheet(s)inMicrosoftWordorExcelformat–DeliveredtotheCITYatthescheduled
meeting.
x DraftrecordofmeetinginMicrosoftWordformat–DeliveredtotheCITYthree(3)businessdays
afterscheduledmeeting.
x FinalrecordofmeetinginMicrosoftWordformat–DeliveredtotheCITYthree(3)businessdays
aftercommentsreceivedfromCITY.
x Monthlyinvoiceswithprogressreports–DeliveredtotheCITYmonthly.
TASK13–FINALDESIGN–100%SUBMITTAL(ADREADY)
ThefollowingitemsaretobeperformedbytheCONSULTANTunderthistask.
Assumption(s)
x ThebudgetshowninExhibitDͲ3assumesthistaskisfour(4)weeksinduration.
x Forthefinalconstructioncontract(100%),two(2)volumesareanticipated.Volume1consistsof
instructionstobidders,scheduleofprices,bidandcontractforms(e.g.bidbond,agreement,
contractbond,etc.),specialprovisionsandappendices.Volume2consistsofthecontractplans
withbridgerecorddrawingsincludedattheendoftheplanset.
x CITYtoassemblefinalconstructioncontract(100%)Volumes1and2inAdobepdfformatupon
receiptofPlans,SpecialProvisionsandScheduleofPricesfromCONSULTANT.Oncefinal
constructioncontractassemblyiscomplete,theCITYwillsendacompletepdfelectroniccopyof
Volumes1and2totheCONSULTANT.
x CITYtoadvertiseprojectforbids.
x CITYtosubmitbiddocumentstoBuildersExchangeofWashington(BXWA).
13.1–100%Plans
x Incorporatechanges/revisionsresultingfromthe90%reviewcomments.
x The100%plansaretobethefinalplans,readytoadvertiseforbids.
13.2–FinalScheduleofPrices
x Incorporateanychanges/revisionstotheScheduleofPricesresultingfrom90%review.
x VerifyallprojectelementsareincludedasbiditemsintheScheduleofPrices.
x VerifyquantitiesforallbiditemsintheScheduleofPrices.
x VerifyallbiditemshaveameasurementandpaymentprovisionintheWSDOTStandard
Specificationsand/orSpecialProvisions.
13.3–FinalSpecialProvisions
x Incorporatechanges/revisionstoSpecialProvisionsDivisions1thru9resultingfrom90%review.
Page4of11
x UpdateTableofContentsforSpecialProvisionsasnecessary.
x Updatepagenumberingasnecessary.StartpagenumbersonfirstpageofTableofContentsfor
SpecialProvisions.PagenumberformattobeSPͲ#.
x CoverofSpecialProvisionssectiontobestampedandsignedbyEngineerofRecord.
13.4–FinalEngineer’sOpinionofProbableConstructionCosts
x Prepareafinalengineer’sopinionofprobableconstructioncostusingthebiditemlistand
quantitiesdevelopedinSubtask13.2.Includeacontingencyonthetotalsumthatisappropriate
fora100%submittalandcurrenteconomicconditions.
13.5–100%QA/QC
x ReviewallCONSULTANTgeneratedworkperformedinSubtasks13.1through13.4forqualityand
accuracy,priortosubmissiontoCITY.Noteerrorsand/oromissionsandreviewcorrections.
DELIVERABLES
ThefollowingdeliverablesanddeliverytimesareincludedinTask13.
x Final100%PlansinAdobepdfformat–DeliveredtotheCITYwithinfour(4)weeksafterNotice
toProceeddate.AsperWAC196Ͳ23Ͳ020,finalplanssubmittedtotheCityforconstructionmust
bestamped,signedanddatedbythelicensee.
x FinalScheduleofPrices–DeliveredtotheCITYwithinfour(4)weeksafterNoticetoProceeddate.
x FinalSpecialProvisions–DeliveredtotheCITYwithinfour(4)weeksafterNoticetoproceeddate.
SpecialProvisionsSectioncovertobestamped,signedanddatedbytheCONSULTANTforthis
submittal.
x FinalEngineer’sOpinionofProbableCostsinAdobepdfformat–DeliveredtotheCitywithinfour
(4)weeksafterNoticetoProceeddate.
TASK14–DESIGNSUPPORTDURINGBIDPHASE
ThefollowingitemsaretobeperformedbytheCONSULTANTunderthistask.
Assumption(s)
x ThebudgetshowninExhibitDͲ3assumesthistaskisnine(9)weeksinduration.
x ThebudgetshowninExhibitDͲ3assumesthree(3)inquiriesperweekduringthebidphase.
Additionally,aSummaryofBiddersInquirieswillbeissuedaminimumofonceperweekduring
thebidphase.
x ThebudgetshowninExhibitDͲ3assumestwo(2)Addendawillbeissuedduringthebidphase.
Additionally,eachAddendawillinvolverevisionstothree(3)SpecialProvisionSectionsandthree
(3)Plansheets.
14.1–ResponsestoBidderInquiries
x TheCITYwillbetheprimarycontactforinquiriesfrombiddersaspertheinstructionstobidders.
x TheCITYwillprovidecopiesofallbidderinquiriestotheCONSULTANT.
x TheCITYwilleitherprovidesuggesteddraftresponsestotheCONSULTANTforrevieworrequest
responsesfromtheCONSULTANT.TheCONSULTANTshallprovidewrittenresponsestobidder
inquiriestotheCITY,whenrequestedtodoso.
Page5of11
x Onceresponsesaresettledon,CITYtoprepareSummaryofBidderInquiriesandsubmitto
CONSULTANTforreview.IfnocommentsaregeneratedbyCONSULTANT,CITYtosubmitto
Builder’sExchangeofWashington(BXWA).
14.2–Addenda
x TheCONSULTANTshallassistinthepreparationofuptotwo(2)addendatothecontract.
AddendamayrequiremodificationstotheScheduleofPrices,SpecialProvisionsand/or
EngineeringPlans.
x CONSULTANTtopreparemodificationstoScheduleofPrices,asnecessary,withinputfromCITY.
Addingbiditems,deletingbiditemsormodifyingbiditemnames,quantitiesand/orunitsof
measurementwillrequireacompletereissueoftheScheduleofPriceswiththeapplicable
Addendum.Therefore,theAddendumNumbershallbeaddedtotheheaderofeachpageofthe
ScheduleofPricesissuedwiththeapplicableAddendum.
x CONSULTANTtopreparemodificationstoSpecialProvisionsand/orEngineeringPlans,as
necessary,withinputfromCITY.RevisionsonindividualsheetsoftheEngineeringPlansshallbe
highlightedwithcloud(s).Smalltriangle(s)withtheapplicableaddendumnumberinsideshallbe
addedtothesheet,adjacenttothecloud(s).Thetriangle(s)withapplicableaddendumnumber
insideshallalsobeaddedtotheTitleBlockintheRevisionNumbersection.Therevision
descriptionshallbe“AddendumNo.__”.Placecloud(s)onaseparatelayerthatistobeturned
offwhengeneratingtheConformedEngineeringPlans.
x CITYtoassembleAddendaandsubmittoCONSULTANTforreview.Ifnocommentsaregenerated
byCONSULTANT,CITYtosubmittoBuilder’sExchangeofWashington(BXWA).
14.3–PreparationofConformedPlansandSpecialProvisions
x Afterbidopening,theCONSULTANTshallconformSpecialProvisionsand/orEngineeringPlans
anddelivertoCITYforincorporationintothefinalconstructioncontractdocuments.Addenda
modificationstoSpecialProvisionsshallbeincorporatedintofinalconformedSpecialProvisions.
AddendamodificationstoindividualsheetsoftheEngineeringPlansshallbeshownwithout
cloudsinthefinalconformedEngineeringPlans.
x CONSULTANTtodeliverfinalconformedSpecialProvisionsand/orEngineeringPlanstoCITYfor
incorporationintofinalconstructioncontractdocuments.
14.4–PreparepreliminaryRecordofMaterials(ROM)andMasterListofSubmittals
x TheCONSULTANTwillprepareapreliminaryRecordofMaterials(ROM)basedontheconstruction
contractspecifications.TheprimarypurposeoftheROMisfortrackingtheapprovaland
acceptancerequirementsformaterialspermanentlyincorporatedintotheproject.Ataminimum,
theROMwillincludethebiditemnumber,quantity,unitofmeasurement,description,
specificationreference(noteifstandardspec.(SS)orspecialprovision(SP))andconditionsof
engineerapproval.AtemplatewillbeprovidedbytheCITYtotheCONSULTANTforanexample.
ThepreliminaryROMwillbeprovidedtotheConstructionManagementTeamforreviewanduse
indevelopingafinalROMfortheproject.
x TheCONSULTANTwillprepareapreliminaryMasterListofSubmittalsbasedontheconstruction
contractspecifications.TheprimarypurposeoftheMasterListofSubmittalsisfortrackingthe
approvalofsubmittals(e.g.shopdrawings,SWPPP,criticalpathschedule,etc.)theContractoris
requiredtoprovide.Ataminimum,thelistwillincludethespecificationreference(noteif
standardspec.(SS)orspecialprovision(SP)),documentsrequiredforsubmission,andwhenthe
submittalisrequired.ThepreliminaryMasterListofSubmittalswillbeprovidedtothe
Page6of11
ConstructionManagementTeamforreviewanduseindevelopingafinalMasterListofSubmittals
fortheproject.
14.5–QA/QC
x ReviewallCONSULTANTgeneratedworkperformedinSubtasks14.1through14.4forqualityand
accuracy,priortosubmissiontoCITY.Noteerrorsand/oromissionsandreviewcorrections.
DELIVERABLES
ThefollowingdeliverablesanddeliverytimesareincludedinTask14.
x WrittenResponsetoBidderInquiry–DeliveredtotheCITYwithintwo(2)businessdaysafter
receiptfromCITY.
x ReviewofdraftCITYResponsetoBidderInquiry–DeliveredtotheCITYwithintwo(2)business
daysafterreceiptfromCITY.
x ReviewofdraftSummaryofBidderInquiries–DeliveredtotheCITYwithinone(1)businessday
afterreceiptfromCITY.
x SpecialProvisionmodificationsforAddenda–DeliveredtotheCITYwithinthree(3)businessdays
afterrequestfromCITY.
x PlanSheetrevisionsforAddenda–DeliveredtotheCITYwithinthree(3)businessdaysafter
requestfromCITY.
x ReviewofdraftAddenda(complete)–DeliveredtotheCITYwithinone(1)businessdayafter
receiptfromCITY.
x ConformedSpecialProvisionsand/orEngineeringPlans–DeliveredtotheCITYwithinthree(3)
weeksafterbidopening.
x PreliminaryROM–DeliveredtotheCITYwithinsix(6)weeksafterbidopening.
x PreliminaryMasterListofSubmittals–DeliveredtotheCITYwithinsix(6)weeksafterbid
opening.
TASK15–PROJECTMANAGEMENTFORDESIGNPHASENO.5
ThefollowingitemsaretobeperformedbytheCONSULTANTunderthistask,uponawardofthe
constructioncontracttothelowestresponsiveandresponsiblebidder.
Assumption(s)
x Asofthedateofawardoftheconstructioncontract,CONSULTANTTasks9and12willbe
complete.TheCONSULTANTwillchargenomoreexpensestoTasks9and12afterthedateof
awardandallunspentbudgetassignedtotheCONSULTANTforTasks9and12shallbereallocated
toTask15,effectivethedatefollowingthedateofaward.
x TheCITYrecognizesthatafutureamendmenttothisagreementmaybenecessarytoprovidefor
sufficientbudgettocompletethistask.Therefore,afutureamendmentwillbepreparedand
executedasnecessary,toaddbudgetforcompletionofthistaskand/oraddadditionalsubtasks
andbudgettothistask.
15.1–Administration,CoordinationandSupervision
Page7of11
x InitiateprojectsetͲupincludingestablishmentoftimesheets(chargecodes),creationofproject
files(electronicandphysical)andschedulingofCONSULTANTpersonnelworkactivitiesforTasks
15and16describedinthiscontractamendment.
x SupervisionofCONSULTANTpersonnelandactivitiestoensurecompliancewithcontractscope
andscheduleandproperchargingoftimeagainstthecontract.
x OversiteofsubͲconsultantactivitiestoensurecompliancewithcontractscope,scheduleand
budget.
15.2–Invoicing
x Preparationofmonthlyinvoiceswithprogressreportsthatincludethefollowing:
o Summaryofbudget,expensestodateandexpensesforinvoiceperiod,assignedtoeachtask.
o Summaryofworkaccomplishedfortheinvoiceperiod.
o SummaryofoutstandingissuestoberesolvedbytheCITY.
o Backupdetailthatincludesthename,directsalaryrateandhourscharged,foreachindividual
chargingtimetothiscontract,fortheinvoiceperiod.
o BackupdetailofalldirectnonͲsalarycostsincludedintheinvoicefortheworkperiod.
15.3–ProjectMeetingsandSiteVisits
x FirstmeetingwithContractor–Typically,theCITYschedulesameetingwiththeContractor,
ConstructionManagementTeam,DesignEngineeringSupportTeamandEnvironmentalSupport
Teamthedayafterawardoftheconstructioncontract.Thepurposeofthismeetingisthreefold.
First,toprovidetheContractorwiththeconformedconstructioncontractforexecution.Second,
tomakeintroductionsbetweenallthepartiesinvolvedwiththeproject.Third,todiscuss
preliminariessuchaspotentialdaysoftheweekandtimesforweeklymeetingsandadateand
timetoholdtheofficialPreͲConMeeting.PriortotheCOVIDͲ19pandemic,thismeetingwas
typicallyheldinpersonatRentonCityHall.SinceCOVIDͲ19,thesemeetingshavebeenconduction
onͲline.Forthisproject,itmaybeeitherorsomecombinationthereof.
x PreͲConMeeting–ThisistheofficialPreconstructionMeetingfortheproject.Typically,the
Contractor,ConstructionManagementTeam,DesignEngineeringSupportTeamand
EnvironmentalSupportTeamattendthismeeting.Theprimarypurposeistodiscussandsettle
preliminarymatters,projectschedule,weeklymeetingschedule,invoicecutoffdate,submittals
plusanyothertopicdeemedimportantforconstruction.PriortotheCOVIDͲ19pandemic,this
meetingwastypicallyheldinpersonatRentonCityHall.SinceCOVIDͲ19,thesemeetingshave
beenconductiononͲline.Forthisproject,itmaybeeitherorsomecombinationthereof.
x WeeklyMeetings–TheCITYandContractorwillholdweeklymeetingsforthedurationof
construction.TheConstructionManagementTeam,DesignEngineeringSupportTeamand
EnvironmentalSupportTeamareanticipatedtoroutinelyattendthesemeetings.Estimate12
weeklymeetings.
x Sitevisitsduringconstruction–Shouldweeklymeetingsoccurinperson,theCONSULTANTmay
decidetovisitthesiteandobservetheconstructionprogress.Itisassumedthatthismayoccur
immediatelyfollowingtheweeklymeeting.Estimate6sitevisits.
x SpecificsitevisitsrequestedbytheCITYͲTheCONSULTANTmaybeaskedbytheCITYtoperform
specificsitevisitstoobserveanddiscussspecificissue(s)raisedbytheContractorduring
construction.Thisrequestwillmostlikelyoccurataweeklymeeting,ifatall.Uponcompletionof
thesitevisit,theCONSULTANTwillprepareandprovidearecordofthesitevisittotheCITY.This
recordshouldaddresswho(whoconductedthesitevisit),what(issuetobeobservedand/or
discussed),where(specificlocationoftheissue),when(dateandtime),why(thepurposeofthe
Page8of11
sitevisit),observationsmadeandanydirectionsgiventowardsresolvingtheissue.The
requirementforasummaryofthesitevisitdoesnotapplytoroutinesitevisitsconductedto
observeconstructionprogress.Estimate3specificsitevisits.
DELIVERABLES
ThefollowingdeliverablesanddeliverytimesareincludedinTask15.
x DraftrecordofsitevisitinMicrosoftWordformat–DeliveredtotheCITYthree(3)businessdays
aftersitevisit.
x FinalrecordofsitevisitinAdobepdfformat–DeliveredtotheCITYthree(3)businessdaysafter
reviewcommentsreceivedfromCITY.
x Monthlyinvoiceswithprogressreports–DeliveredtotheCITYmonthly.
TASK16–ENGINEERINGSUPPORTDURINGCONSTRUCTION
ThefollowingitemsaretobeperformedbytheCONSULTANTunderthistask,uponawardofthe
constructioncontracttothelowestresponsiveandresponsiblebidder.
Assumption(s)
x Asofthedateofawardoftheconstructioncontract,CONSULTANTTasks10,11,13and14willbe
complete.TheCONSULTANTwillchargenomoreexpensestoTasks10,11,13and14afterthe
dateofawardandallunspentbudgetassignedtotheCONSULTANTforTasks10,11,13and14
shallbereallocatedtoTask16,effectivethedatefollowingthedateofaward.
x TheCITYrecognizesthatafutureamendmenttothisagreementmaybenecessarytoprovidefor
sufficientbudgettocompletethistask.Therefore,afutureamendmentwillbepreparedand
executedasnecessary,toaddbudgetforcompletionofthistaskand/oraddadditionalsubtasks
andbudgettothistask.
16.1–SubmittalReviewandApproval
x TheconstructioncontracthasrequirementsfortheContractortosubmitvariousdocumentsfor
review.Thesedocumentsincludebutarenotlimitedtothefollowing:
9 RequestsforApprovalofMaterials(RAM’s)
9 ShopDrawings
x TheConstructionManagementTeamwillbetaskedwithprovidinganinitialreviewofsubmittals
withrecommendationsforapprovalorrejection.TheCITYmayprovideadditionalreview
comments.ThesubmittalsandassociatedrecommendationswillbeprovidedtoCONSULTANTfor
finalapprovalorrejection.
16.2–RequestsforInformation(RFI’s)
x TheContractorwillbeinstructedtosubmitallRequestsforInformation(RFI’s)totheConstruction
ManagementTeamandCITY.
x TheConstructionManagementTeamand/orCITYwillprovidecopiesofallRFI’stothe
CONSULTANT.
x TheCITYwilleitherprovidesuggesteddraftresponsestotheCONSULTANTforrevieworrequest
responsesfromtheCONSULTANT.TheCONSULTANTshallprovidewrittenresponsestoRFI’sto
theCITYandConstructionManagementTeam,whenrequestedbytheCITYtodoso.
Page9of11
x TheConstructionManagementTeamand/orCITYwillprovidetheRFIresponsetotheContractor.
16.3–ChangeOrders
x TheConstructionManagementTeamwillinitiateandpreparedraftchangeordersforreviewand
commentbytheCITY.TheCITYwillsenddraftchangeorderstoCONSULTANTforreviewwithCITY
reviewcomments.Oncefinalized,theConstructionManagementTeam,CONSULTANTandCITY
willsignthechangeorder,priortoissuancetotheContractor.
x Forchangeordersrequiringrevisionstoplansheetsand/orspecifications,theCONSUTLANTshall
prepareanddeliverrevisedplansheetsand/orspecificationstotheCITYforincorporationinto
thechangeorder,whenrequestedbytheCITYtodoso.
16.4–RecordDrawings
x Uponphysicalcompletionoftheconstructioncontract,theCITYwillprovideredlinemarkupsof
thebiddrawingsettotheCONSULTANT.TheCONSULTANTshallprepareasetofrecorddrawings
fortheprojectbasedontheseredlinemarkups.Therecorddrawingsareintendedtocapture
significantfieldchangesmadeduringconstruction(additions,modifications,ordeletions).The
recorddrawingsetshallincludeandsheetsrevisedorreissuedduringconstructionastheresult
ofchangeordersandshallincludechangesresultingfromRFIresponses.Thesedrawingsshallbe
notedas“RecordDrawings”inthedrawingrevisionsblockandshallbestampedandsealedby
theEngineerofRecord.
16.5–QA/QC
x ReviewallCONSULTANTgeneratedworkperformedinSubtasks16.1through16.4forqualityand
accuracy,priortosubmissiontoCITY.Noteerrorsand/oromissionsandreviewcorrections.
DELIVERABLES
ThefollowingdeliverablesanddeliverytimesareincludedinTask16.
x SubmittalReviewandApproval–DeliveredtotheCITYwithinthree(3)businessdaysafterreceipt
ofthesubmittalfromCITYand/orConstructionManagementTeam.
x RFIResponses–DeliveredtotheCITYwithinthree(3)businessdaysafterreceiptoftheRFIfrom
CITYand/orConstructionManagementTeam.
x ChangeOrderApprovals–DeliveredtotheCITYwithinthree(3)businessdaysafterreceiptofthe
changeorderfromCITYand/orConstructionManagementTeam.
x Revisionstodrawingsand/orspecificationsresultingfromchangeorders–DeliverytoCITYto
bedeterminedonacasebycasebasisandmutualagreementbetweenCITYandCONSULTANT.
Timefordeliveryisdependentupontheextentofchanges.
x RecordDrawings–DeliverytotheCITYtobedeterminedbymutualagreementbetweenCITYand
CONSULTANT.DeliverytooccursometimeaftertheacceptanceoftheprojectbytheCITY.Time
fordeliveryisdependentupontheextentofchanges.
TASKS3–TRAFFICANALYSISANDTRAFFICCONTROLPLANS(SUPPLEMENTTOAMENDMENTNO.2)
ThefollowingitemssupplementTaskS3inAmendmentNo.2andaretobeperformedbythe
subconsultant,KPG,P.S.(KPG),underthistask.
Page10of11
Assumption(s)
x ThebudgetshowninExhibitE3Ͳ3assumesthesupplementalworkinthistaskissix(6)weeksin
duration.
S3.1–Administration,CoordinationandSupervision
x NochangefromcontractAmendmentNo.2.
S3.2–Invoicing
x NochangefromcontractAmendmentNo.2.
S3.3–ProjectMeetings
x DesigncoordinationmeetingswithCITYandCONSULTANTstaff.Thesemeetingsaretobeheldat
RentonCityHall.However,thesemeetingsmaybeheldonͲlineorviaconferencecalliftheneed
arises(e.g.RentonCityHallisclosedtothepublic).ItisestimatedthatKPGwillattendupto3
meetingsforDesignPhase4.
x Internaldesigncoordinationmeetings–KPGwillconductregularinternaldesigncoordination
meetingswithkeydesignteammembersand,asapplicable,withKPGsubͲconsultants.
S3.4–ReviewConstructionPhasing
x NochangefromcontractAmendmentNo.2.
S3.5–TrafficModelRefinement
x NochangefromcontractAmendmentNo.2.
S3.6–TrafficAnalysis
x NochangefromcontractAmendmentNo.2.
S3.7–TechnicalMemorandum
x KPGwillincorporateanyreviewcommentsfromCITYand/orCONSULTANTonthedraftfinal
technicalmemorandumintoafinaltechnicalmemorandum.Thefinaltechnicalmemorandumis
anticipatedtobeincludedwiththe100%submittal(Task13)submittedbytheCONSULTANTto
theCITY.
S3.8–TrafficControlPlans
x KPGwillreviewthedraftfinaltrafficcontrolplansandprovidecommentstoTrafficControl
Services.TrafficControlServiceswillincorporaterevisions,resultingfromreviewcommentsfrom
CITY,CONSULTANTand/orKPG,intothefinaltrafficcontrolplans.Thefinaltrafficcontrolplans
areanticipatedtobeincludedinthe100%submittal(Task13)submittedbytheCONSULTANTto
theCITY.
S3.9–ReviewTempTrafficControlBidItemsinScheduleofPricesandSpecialProvisions
x NochangefromcontractAmendmentNo.2.
S3.10–BidPhaseSupport
x AssistCONSULTANTinprovidingresponsetobidderinquiriesregardingTemporaryTrafficControl.
Page11of11
x KPGshallprepareplansheetrevisionstoTemporaryTrafficControlPlansforAddenda,upon
requestfromCONSULTANT,andsubmittoCONSULTANTforincorporationintoAddendapackage.
RevisionsonindividualsheetsoftheEngineeringPlansshallbehighlightedwithcloud(s).Small
triangle(s)withtheapplicableaddendumnumberinsideshallbeaddedtothesheet,adjacentto
thecloud(s).Thetriangle(s)withapplicableaddendumnumberinsideshallalsobeaddedtothe
TitleBlockintheRevisionNumbersection.Therevisiondescriptionshallbe“AddendumNo.__”.
Placecloud(s)onaseparatelayerthatistobeturnedoffwhengeneratingtheConformed
EngineeringPlans.
x Afterbidopening,theKPGshallconformTrafficControlPlanSheets,uponrequestfrom
CONSULTANT,anddelivertoCONSULTANTforsubmissiontotheCITY.Addendamodificationsto
individualsheetsoftheEngineeringPlansshallbeshownwithoutcloudsinthefinalconformed
EngineeringPlans.
DELIVERABLES
ThefollowingdeliverablesanddeliverytimesareincludedinTaskS3.
x FinalTechnicalMemoranduminAdobepdfformat–DeliveredtotheCONSULTANTwithintwo
(2)weeksafterreceivingreviewcommentsfromCITYand/orCONSULTANT.AsperWAC196Ͳ23Ͳ
020,officialfinalreportssubmittedtotheCITYmustbestamped,signedanddatedbythelicensee.
x FinalTrafficControlPlansinAdobepdfformat–DeliveredtotheCONSULTANTwithintwo(2)
weeksafterreceivingreviewcommentsfromCITYand/orCONSULTANT.AsperWAC196Ͳ23Ͳ020,
officialfinalplanssubmittedtotheCITYformustbestamped,signedanddatedbythelicensee.
x PlanSheetrevisionsforAddenda–DeliveredtotheCONSULTANTwithinthree(3)businessdays
afterrequestfromCONSULTANT.
x ConformedSpecialProvisionsand/orEngineeringPlans–DeliveredtotheCONSULTANTwithin
three(3)weeksafterbidopening.
ADDITIONALSERVICES
TheCITYwillrequireadditionalservicesoftheCONSULTANTforfuturedesignphasesofthisproject.
SectionBsummarizesthefuturedesignphasesanddescribestheworkanticipatedforeach.
Thescopeofworkforadditionalserviceswillbedeterminedbasedonanticipatedorunanticipatedproject
needsorotherconsiderationsatthesolediscretionoftheCITY.Thisworkmayincludeitemsidentifiedin
thecurrenttaskauthorizationsaswellotheritems,whichmayinclude,butarenotnecessarilylimitedto
thefollowing:
x EngineeringSupportDuringConstructionServices
x Otherservicesnotspecificallyreferencedthisscopeofwork.
Theseserviceswillbeauthorizedunderfuturesupplementalagreementstothiscontract.Atthetime
theseservicesarerequired,theCONSULTANTshallprovideadetailedscopeofworkandanestimateof
costs.TheCONSULTANTshallnotproceedwiththeworkuntiltheCITYhasauthorizedtheworkandissued
anoticetoproceed.
CONTRACT:CAGͲ20Ͳ002
PROJECT:BRONSONWAYBRIDGEͲSEISMICRETROFITANDPAINTING
PRIMECONSULTANT:SARGENTENGINEERS,INC.
DIRECT(RAW)LABOR(DL):
Classification DL HOURS TOTAL
Principal $54.00 x 172 = $9,288
SeniorProjectEngineer $44.00 x 328 = $14,432
ProjectEngineer $40.00 x 0 = $0
DesignEngineer $35.00 x 0 = $0
$0.00 x 0 = $0
DLSubtotal=500 $23,720
INDIRECTCOSTRATE(ICR)
DLxICRof 177.33% x $23,720 =$42,063
FEE(PROFIT)
DLxFEE 30.00% x $23,720 =$7,116
DL+ICR+FEE=$72,899
DIRECTNONͲSALARYCOSTS(DNSC)
Mileage 300 x $0.560 = $168
SUBTOTAL =$168
TOTALFORPRIME = $73,067
TOTALFORPRIME(ROUNDED)=$73,100
SUBCONSULANTS
Traffic= $25,896
TOTALFORSUBCONSULTANTS = $25,896
TOTALFORSUBCONSULTANTS(ROUNDED)=$25,900
TOTAL=$99,000
EXHIBITDͲ3
PRIMECONSULTANTCOSTCOMPUTATIONSSUMMARY
NEGOTIATEDHOURLYRATE
Page1of2
CONTRACT:CAGͲ20Ͳ002
PROJECT:BRONSONWAYBRIDGEͲSEISMICRETROFITANDPAINTING
PRIMECONSULTANT:SARGENTENGINEERS,INC.
Principal Sr.Proj. Project Design
Engineer Engineer Engineer
$54.00 $44.00 $40.00 $35.00
TASK12ͲPROJECTMANAGEMENTFORDESIGNPHASENO.4
12.1 Administration,CoordinationandSupervision 160000$864
12.2 Invoicing80000$432
12.3 ProjectMeetingsandSiteVisits 88000$784
12.4 EnvironmentalCoordination 80000$432
Total 408000$2,512
IndirectCostRate(ICR) ICR=DLxICR% ICR%=177.33%ICR=$4,455
Fee(Profit) FEE=DLxFEE% FEE%=30.00%FEE=$754
DirectNonͲSalaryCost(DNSC) Mileage=300 Rate=$0.560 DNSC=$168
Task9Total=$7,888
Task9Total(Rounded)=$7,890
TASK13ͲFINALDESIGNͲ100%SUBMITTAL
13.1 100%Plans
100%PlanSheetsbySEI(Est.18) 8 72 0 0 0 $3,600
Review100%PlanSheetsbyKPG(Est.6) 8 16 0 0 0 $1,136
13.2 FinalScheduleofPrices 8 16 0 0 0 $1,136
13.3 FinalSpecialProvisions 8 40 0 0 0 $2,192
13.4 FinalEngineer'sOpinionofProbableCosts 8 24 0 0 0 $1,488
13.5 100%QA/QC 88000$784
Total 48 176 0 0 0 $10,336
IndirectCostRate(ICR) ICR=DLxICR% ICR%=177.33%ICR=$18,329
Fee(Profit) FEE=DLxFEE% FEE%=30.00%FEE=$3,101
DirectNonͲSalaryCost(DNSC) Mileage=0 Rate=$0.560 DNSC=$0
Task10Total=$31,766
Task10Total(Rounded)=$31,770
TASK14ͲDESIGNSUPPORTDURINGBIDPHASE
14.1 ResponsestoBidderInquiries 12 24 0 0 0 $1,704
14.2 Addenda 16 32 0 0 0 $2,272
14.3 PreparationofConformedPlansandSpecialProvisions 24 40 0 0 0 $3,056
14.4 PreparePrelimROMandMasterListofSubmittals 24 40 0 0 0 $3,056
14.5QA/QC 88000$784
Total 84 144 0 0 0 $10,872
IndirectCostRate(ICR) ICR=DLxICR% ICR%=177.33%ICR=$19,279
Fee(Profit) FEE=DLxFEE% FEE%=30.00%FEE=$3,262
DirectNonͲSalaryCost(DNSC) Mileage=0 Rate=$0.560 DNSC=$0
Task11Total=$33,413
Task11Total(Rounded)=$33,420
TotalHours=172 328 0 0 0
TotalMileage=300
TotalDL=$23,720
TotalICR=$42,063
TotalFEE=$7,116
TotalDNSC=$168
TOTAL=$73,067
TOTAL(ROUNDED)=$73,100
DirectLabor(DL)
EXHIBITDͲ3
PRIMECONSULTANTͲHOURANDFEESUMMARY
Task Description Total
Page2of2
CONTRACT:CAGͲ20Ͳ002
PROJECT:BRONSONWAYBRIDGEͲSEISMICRETROFITANDPAINTING
SUBCONSULTANT:KPG,P.S.
Project SeniorProj Design SeniorTran Tran Office
Manager Engineer Engineer Planner Planner Admin
$56.00 $60.00 $42.50 $56.00 $36.54 $32.24
TASKS3ͲTRAFFICANALYSISANDTRAFFICCONTROLPLANS
S3.1 Administration,CoordinationandSupervision 800000$448
S3.2 Invoicing200002$176
S3.3 ProjectMeetings(upto3meetings) 400000$224
S3.4 ReviewConstructionPhasing 000000 $0
S3.5 TrafficModelRefinement 000000 $0
S3.6 TrafficAnalysis 000000 $0
S3.7 TechnicalMemorandum 8 0 0 16 11 2 $1,810
S3.8 TrafficControlPlans 8 8 4 18 12 0 $2,544
S3.9 ReviewTempTrafficControlBidItems 048000$580
S3.10 BidPhaseSupport 4 0 24 0 8 0 $1,536
Total 34 12 36 34 31 4 $7,320
IndirectCostRate(ICR) ICR=DLxICR% ICR%=167.61%ICR=$12,269
Fee(Profit) FEE=DLxFEE% FEE%=30.00%FEE=$2,196
DirectNonͲSalaryCost(DNSC) Mileage=200 Rate=$0.56 DNSC=$112
TrafficCounts(7day,24hrtubecount,1location)=$0 ($800perlocation)DNSC=$0
TurningMovementCounts(peak2hr,13locations,AM&PMweekdaypeak)=$0 ($150perlocation)DNSC=$0
TrafficControlPlans(Est.8sheets90%to100%)=$4,000 DNSC=$4,000
TaskS3Total=$25,896
TaskS3Total(Rounded)=$25,900
TotalHours=34 12 36 34 31 4
TotalMileage=200
TotalDL=$7,320
TotalICR=$12,269
TotalFEE=$2,196
TotalDNSC=$4,112
TOTAL=$25,896
TOTAL(ROUNDED)=$25,900
EXHIBITE3Ͳ3
SUBCONSULTANTͲHOURANDFEESUMMARY
Task Description
DirectLabor(DL)
Total
Page1of1