Loading...
HomeMy WebLinkAboutC_ConfirmationOfComplianceResponse_DylanSP_180308Dylan Short Plat  Confirmation of Compliance of Conditions with Short Plat Approval:  The Dylan Short Plat, File No. LUA16‐000754, SHPL‐A, as depicted in Exhibit 2, is approved and is subject  to the following conditions:     1. The applicant shall submit a building permit for review and approval by the City and received  final occupancy for the portion of the existing residence on Lot 1 to be removed and remodeled  in order to comply with Residential‐4 (R‐4) minimum side yard setbacks (combined 20 feet with  not less than 7.5 feet on either side) of the zone from Tract A (shared driveway) prior to final  plat approval.       Response:  Existing residence has been remodeled per above condition.    2. The applicant shall submit a detailed landscape plan that complies with RMC 4‐8‐120D.12 at the  time of utility construction permit application to the current planning project manager for  review and approval. Landscaping within the right‐of‐way and landscaping within the 10‐foot  wide landscape strip on Lot 1 shall be installed prior to short plat recording. Onsite landscaping  for Lot 2 shall be installed prior to final occupancy for the single‐family building permit.      Response:  Landscape Plan was submitted and approved.    3. The applicant shall submit a permanent drainage easement and a temporary construction  easement prior to construction permit issuance for all work proposed outside of the applicant’s  property.      Response:  Permanent drainage easement shown on final short plat map.  Wall has been             constructed.    4. The applicant shall be limited to single loaded garage driveway cut, not to exceed nine feet (9’)  in width, at the property line along Jones Ave NE to serve the existing single family home on Lot  1.  A plat note to this effect shall be added to the face of the final short plat. A final detailed site  plan shall be submitted to and approved by the City of Renton Project Manager prior to  construction permit approval.      Response:  Note 2 under Plat Notes on page 1 of the final short plat map.    5. The applicant shall comply with the recommendations included in the Geotechnical Engineering  Study prepared by Ages Engineering, LLC (dated July 6, 2016), or an updated report at a later  date.      Response:  Constructed in compliance with this condition.    6. The applicant shall comply with the AASHTO 2011 Roadside Design Guide which includes a  minimum   2‐foot separation between the retaining wall and the fully paved 16‐foot wide shared  driveway. A final shared access driveway road profile and grading plan shall be submitted to and  approved by the City of Renton Project Manager prior to utility construction permit approval.      Response:  The shared driveway was constructed per the approved plans.