Loading...
HomeMy WebLinkAboutRC 20170411000179 2�170411000179 CITY OF RENTON CO PAGE-001 OF 006 KING1COUNTY,9WA5 bu e1 �� � �v�'1`�C�:I1'"�';' RECORDING REQUESTED BY AND W�IEN RECORDED MAII.T�: CITY CLERK'S OFFICE CITY OF RENT4N ` 1055 SOUTH GRADY WAY RENTON,WA 98057 DECLARATION OF COVENANT FOR MAINTENANCE AND INSPECTION OF FLOW CONTROL BMPS Grantor: Karunakafage Silva Grantee:City of Renton Legal Description: Lot 43, Block 17, Plat of Hiliman's Lake Washington Garden of Eden #1, Records of King County, Washington . Additional Legal(s)on: N/A , Assessor's Ta�c Parcel ID#: 334210-2220 IN CONSIDERATION of the approved City of Renton(check one of the following) �esidential building permit,O eommercial building permit, 0 clearing and grading pemut, 0 subdivisiou pertnit,or ❑ short subdivision permit for Application File No.LUA/SWP relating to the real pmperty("Property")described above,the Grantar(s),the owner(s)in fee of that Progerty,hereby covenants(covenant)with City or Renton,a political subdivision of the state of Washington,that he/she(they)will observe,consent to,and abide by the conditions and obligations set forth and described in Paragraphs 1 through 8 below with regard to the Property. Grantor(s)hereby grants(grant), covenants(covenant),and agrees(agree)as follows: 1. Grantor(s)or his/her(their)successors in interest and assigns("Owners")shall retain,uphold, and protect the stormwater management devices,features,pathways,limits,and restricrions,known as flow control best management practices("BMPs"),shown on the approved Flow Control BMP Site Plan for the Property attached hereto aud incorporated herein as E�ibit A. 2. The Owners sha11 at their own cost,operate,maintain,and keep in good repair,the Property's BMPs as described in the approved Design and Maintenance Details for each BMP attached hereto and incorpora.ted herein as E�ibit B. 3. City or Renton shall provide at least 30 days written notice to the Owners that entry on the Property is planned for the inspection of the BMPs. After the 30 days,the Owners shall allow the City of Renton to enter for the sole purpose of inspecting the BMPs. In lieu of inspection by the City,the Owners may elect to engage a iicensed civil engineer registered in the state of Washington who has expertise in drainage to inspect the BMPs and provide a written report describing their condition. If the engineer option is chosen,the Owners shall provide written notice to the City of Renton within fifteen days of receiving the City's notice of inspection. Within 30 days of giving this notice,the Owners,or the - engineer on behalf af the Owners,shall provide the engineer's report to the City of Renton. If the report is not provided in a timely manner as specified above,the Ciry of Renton may inspect the BMPs without further notice. 4. ff the City determines from its inspection,or from an engineer's report provided in accordance with Paragraph 3,that maintenance,repair,restoration,and/or mitigation work is required for the BMPs, The City shall notify the Owners of the specific ma.intenance,repair,restoration,and/or mitigation work (Work)required under RMC 46-030. The City shall also set a reasonable deadline for completing the Work or providing an engineer's report that verifies completion of the Work. After the deadline has passed,the Owners shall allow the City access to re-inspect the BMPs unless an engineer's report has been provided verifying complerion of the Work. If the work is not completed properly within the time n frame set by the City,the City may initiate an enforcement action. Failure to properly maintain the BMPs is a violation of RMC 4-6-030 and may subject the Owners to enforcement under the RMC 1-3,including fines and penalties. 5. Apart from performing routine landscape maintenance,the Owners are hereby required to obtain written approval from the City or Renton before performing any alterations or modifications to the "'" BMPs. 6. Any notice or approval required to be given by one garty to the other under the provisions of this Declaration of Covenant shall be effecrive upon personal delivery to the other party,or after three(3) days from the date that the notice or approval is mailed with delivery confirmation to the current address on record with each Party. The parties shall notify each other of any change to their addresses. 7. This Declaration of Covenant is intended to promote the efficient and effective management of surface water drainage on the Property,and it shall inure to the benefit of a11 the citizens of the City of Renton and its successars and assigus. This Declaration of Covenant shall run with the land and be binding upon Grantor(s),and Crrantor's(s')successors in interest and assigns. 8. This Declaration of Covenant may be terminated by execution of a written agreement by the Owners and the City of Renton that is recarded by King County in its real property records. IN WITNESS WHEREOF,this Declararion of Covenant for the Maintenance and Inspection of Flow Control BMPs is e�cecuted this �� day of M�r�l� ,20 �'�- . G ,owner of the Property GRANTOR,owner of the Property �-- STATE OF WASHINGTON ) COLJNTY OF�ING )ss. On this day personally appeared before me: �'1 12,4� � 1 t,-V'� ,to me known to be the individual(s)described in and who executed the within and foregoing instrument and acknowledged that they signed the same as their free and voluntary act and deed,for the uses and purposes therein stated. Given under my hand and official seal this�day of �L�.�;..�-� ,20�Z. �- :� . D �""r� ��cc��rz ► ►� Printed name Notary Public in and for the State of Washington, residing at 1.�%SS c �r�d T�, IZ�,�-k,� W/t ��7 My appointment expires ��-U 1 -I 7 c���� -- o,�.��.�'�' : r,�� �..�G�15?�,° c�/N '�rrc,�..�.�✓y� , -�-� v�, �'�" '/3�' � oo/ , ��.-'�" -� �,, '� Y � �� �s.a+�"� '� %� _._.___�__.----.�---.�. _ � �' -- ..�.�".��°.� a'7.+G�.ei'rY�''s� �'d�O ..r.:s'„�' c,��'. �� �'i�r,+�o4/! J5�1�s✓e7'� �%�`.±t�'..��'�'+.�Ct'�,S;/ �• �� s �'''...� h -�'c''�..�`' i+ � ldi,�c�' �__......,,_....... ; � . . i . i i i � � � µ � � �.5 �� , . - l� �� � 1 �' � ' d�: +� �� � � �' �� � �:`��5�'e'iit�r ��'�-.✓'r�,�,,.�', � �' ���'�' /.yD ..� � s'9"I a;s°'rY'Lo �i.�'�/4 i�d�' � �''7'�.:�t��"d''.�. � ��:.�Jv�.��.�. i'y 43 d'�",Pye2�.�7 I'�''�� �� �`a�°�.'�.�/�iOr'" .�� � �� ��S� � � �,� �3a� �r�7� s� � � � � S� � sa . b ������� �.�d,.� � sd s�, .��.,�'�'�� ,�'�..�.�' .�'rir�o-r�f�' v'�rl''6�.5 - � s�' '�'r �'� �'�i e•� _ :_,r ,— _..y'� ' ft y"✓.�/�GT,�J�..+s� ,} � � � � 1 IY.�YI'�`''i'.F.'t.��`..Q,. .ii/�.�`�id'�i �/ ` J J � Y �� � � ���� �� ,.��" X. i-�/ �% % � ;.-. MATNTENANCE INSTRUCTIONS FOR LIMITED INFILTRATION If the limited infiltration flow control BMP is proposed for a project,the following maintenance and operation instructions must be recorded as an attachment to the required declaration of covenant and grant of easement per Requirement 3 of Section C.13.3(p.C-18). The intent of these instructions is to explain to future property owners,the purpose of the BMP and how it must be maintained and operated. These instructions are intended to be a minimum;DDES may require additional instructions based on site- "'�'""''"'� specific condirions. Also,as the County gains more experience with the maintenance and operation of these BMPs,future updates to the instructions will be posted on King County's Surface Water Design Manual website. ❑ TEXT OF INSTRUCTIONS ` Your property contains a stormwater management flow control BMP(best management practice)called "limited infiltration,"which was installed to mitigate the stormwater quantity and quality impacts of some or all of the impervious surtaces on your property. Limited infiltration is a method of soaking runoff from impervious area(such as paved areas and roofs)into the ground. Infiltration devices,such as gravel filled trenches,drywells,and ground surface depressions,facilitate this process by putting runoff in direct contact with the soil and holding the runoff long enough to soak most of it into the ground. To be successful,the soil condition around the infiltration device must be able to soak water into the ground for a reasonable number of years. The infiltration devices used on your property include the following as indicated on the flow control BMP site plan: �avel filled trenches, O drywells. The size, placement,and composition of these devices as depicted by the flow contro!BMP site plan and design details must be maintained and may not be changed without written approvat either from the King County Water and Land Resources Division or through a future development permit frorrt King County. Infiltration devices must be inspected annually and after major storm events to identify and repair any � physical defects. Maintenance and operation of the system should focus on ensuring the system's viability by preventing sediment-laden flows from entering the device. Excessive sedimentation witl result in a _ plugged or non-functioning facility. If the infiltration device has a catch basin,sediment accumulation must be removed on a yearfy basis or more frequently if necessary. Prolonged ponding around or.atop a device may indicate a plugged facility. If the device becomes plugged, it must be replaced. Keeping the areas • that drain to infiltration devices well swept and clean will enhance the longeviry of these devices. For roofs, frequent cleaning of gutters will reduce sediment loads to these devices.