Loading...
HomeMy WebLinkAboutSR_AdminReport_LindberghHS_170427_v1MINOR MODIFICATION OF LINDBERGH HIGH SCHOOL SITE IMPROVEMENTS  APPROVAL  DENIAL EVALUATION FORM & DECISION DATE: April 28, 2017  PROJECT NAME: Lindbergh High School Site Improvements  PROJECT NUMBER(S): LUA17-000198, MOD (AKA LUA11-1012, SA-A)  PROJECT MANAGER: Matt Herrera, Senior Planner  OWNER: Rick Stracke, 7812 S. 124th St., Seattle, WA 98178  APPLICANT/CONTACT: Calvin Gasaway, Greene Gasaway Architects, PO Box 4158, Federal Way, WA 98063  PROJECT LOCATION: 16426 128th Ave SE, Renton, WA 98058  EXHIBITS: Exhibit 1: Minor Modification Request Report & Decision Exhibit 2: Lindberg High School Site Improvements Site Plan Decision (2011) Exhibit 3: Modified Site Plan Exhibit 4: Modified Floor Plan & Elevation Exhibit 5: Renton Fire Authority Comments Exhibit 6: Renton School District MDNS Addendum   SUMMARY OF REQUEST: The applicant proposes to construct a 285 square foot addition to the Lindbergh High School building to be used as support space for two (2) existing classrooms. Proposed site work would include excavations for a concrete floor slab, footings, and footing drains. The addition’s exterior brick cladding and roof shingles match the existing building’s finish. Improvements are located on the back of the building (northeast façade) and are generally not visible offsite. PROJECT DESCRIPTION: The Lindbergh High School Site Improvements received Administrative Site Plan approval of the original project on April 27, 2011 (LUA11-012, SA-A; Exhibit 2). The approval included parking lot and access improvements that have been constructed. The applicant now requests a minor modification to the approved site plan (Exhibit 3). The proposed modification consists of a building addition that would add 285 square feet to the existing high school on an existing impervious area abutting the building. The addition would provide support space for classroom equipment and mechanical/electrical improvements for the school’s culinary arts program. As shown on the floor plan and partial elevation (Exhibit 4), the addition would essentially fill in a 9’ wide x 31’ long modulation on the back of the building. The addition’s exterior finish would match the building’s existing brick façade and asphalt shingle roof composition. A 20 square foot window and metal door would also be provided on the addition’s façade. The addition is located where it would likely not be visible off-site or from the building’s entry. The concrete floor slab, footings, and footing drains will require excavations on existing impervious surfaces abutting the building. Total excavations are estimated at 30 cubic yards of cut and 20 cubic yards of fill. The proposed modification would maintain the total site area, significant trees, landscaping, and parking area. Changes to the site plan include an increase of building lot coverage of 285 square feet. The minor modification request would require the applicant to extend the existing fire sprinkler and fire alarm systems into the new addition and pay current Fire Impact Fees per square foot of new addition (Exhibit 5) with the forthcoming building permit application. The Renton School District issued an addendum to the Lindberg High School Site Improvements Mitigated Determination of Non-significance (MDNS) (Exhibit 6) to comply with the State Environmental Policy Act. The addendum provides the additional scope of work for the modification request that is deemed minor by the Lead Agency. The addendum does not modify the mitigation measures of initial MDNS. The above site plan modification request would not involve more than a 10 percent increase in area or scale of the development or change the boundaries of the original approved plan as the project would not extend beyond the original site boundaries of 1,624,800 square feet. The project would not have a greater impact on the environment and/or public facilities than the original approved plan. ANALYSIS OF REQUEST: RMC 4-9-200H.2 addresses the modifications to Site Plan. Criteria Criteria Met  a. Involve more than a ten percent (10%) increase in area or scale of the development in the approved plan; or X  b. Have a significantly greater impact on the environment and/or public facilities than the approved plan; or X  c. Change the boundaries of the originally approved plan. X   DECISION: The proposal satisfies 3 of the 3 criteria listed in RMC 4-9-200H.2 for approval of modifications. Therefore, the Lindbergh High School Site Improvements modification of the Site Plan, Project Number LUA17-000198, MOD, is approved. _______________ Jennifer Henning, Planning Director Date Department of Community & Economic Development The decision to approve the modification(s) will become final if not appealed in writing together with the required fee to: Hearing Examiner, City of Renton, 1055 South Grady Way, Renton, WA 98057 on or before 5:00 pm, on May 12, 2017. Additional information regarding the appeal process may be obtained from the City Clerk’s office, Renton City Hall – 7th Floor, 425-430-6510. If you have any further questions regarding this decision, please contact the project manager, Matt Herrera, at 425-430-6593 or mherrera@rentonwa.gov.