Loading...
HomeMy WebLinkAboutCouncil 06/01/2009AGENDA RENTON CITY COUNCIL REGULAR MEETING June 1, 2009 Monday, 7 p.m. 1. CALL TO ORDER AND PLEDGE OF ALLEGIANCE 2. ROLL CALL 3. SPECIAL PRESENTATION: Federal and Comcast Digital Television Transitions 4. ADMINISTRATIVE REPORT 5. AUDIENCE COMMENT (Speakers must sign up prior to the Council meeting. Each speaker is allowed five minutes. The comment period will be limited to one-half hour. The second audience comment period later on in the agenda is unlimited in duration.) When you are recognized by the Presiding Officer, please walk to the podium and state your name and city of residence for the record, SPELLING YOUR LAST NAME. NOTICE to all participants: pursuant to state law, RCW 42.17.130, campaigning for any ballot measure or candidate from the lectern during any portion of the council meeting, and particularly, during the audience comment portion of the meeting, is PROHIBITED. 6. CONSENT AGENDA The following items are distributed to Councilmembers in advance for study and review, and the recommended actions will be accepted in a single motion. Any item may be removed for further discussion if requested by a Councilmember. a. Approval of Council meeting minutes of 5/18/2009. Council concur. b. City Clerk reports bid opening on 5/19/2009 for CAG-09-084, Seismic Retrofit of Renton Fire Station #11; eight bids; engineer's estimate $613,899; and submits staff recommendation to award the contract to the low bidder, Landon Construction Group, LLC, in the amount of $431,639.15. Council concur. c. Community Services Department requests authorization to waive all fees and charges for 2009 Renton River Days activities endorsed by Renton River Days Board of Directors. Council concur. d. Community Services Department recommends approval of a contract with Transwestern Harvest Lakeshore, LLC dba "The Landing" to receive $75,000 for title sponsorship for the 2009 through 2011 City of Renton 4th of July events. Council concur. e. Community Services Department requests authorization to utilize $187,932 in combined Community Development Block Grant Recovery (CDBG-R) funds and unallocated Community Development Block Grant (CDBG) capital funds to upgrade approximately 51 City traffic signals/pedestrian crossings to light emitting diode (LED) fixtures, saving approximately $26,265 annually in energy costs. Council concur. f. Legal Services Division recommends adopting an ordinance adding new provisions relating to automated traffic safety camera signage. Council concur. (See 8.a. for ordinance.) g. Transportation Systems Division submits the annual update of the Six -Year Transportation Improvement Program (TIP) and Arterial Street Plan. Refer to Transportation (Aviation) Committee; set public hearing on 6/22/2009 to consider the TIP. (CONTINUED ON REVERSE SIDE) h. Transportation Systems Division submits CAG-08-066, Logan Ave. N. Bike Lane and Channelization Revision; and requests approval of the project, authorization for final pay estimate in the amount of $22,008.65, commencement of 60-day lien period, and release of retained amount of $17,225.02 to Rodarte Construction, Inc., contractor, if all required releases are obtained. Council concur. i. Transportation Systems Division recommends approval of a contract in the amount of $44,750 with David Evans and Associates, Inc. for services related to the S. 3rd St. and Shattuck Ave. S. Intersection Safety Improvements project. Council concur. j. Transportation Systems Division recommends approval of an amendment to CAG-06-069, agreement with Sound Transit, to describe the commitments of the parties relative to the Rainier Ave. Arterial Improvements project. Council concur. k. Transportation Systems Division recommends approval of an agreement with the Washington State Department of Transportation formalizing reimbursement commitments for railroad improvement costs incurred at Rainier Ave. S., Hardie Ave. SW, and Shattuck Ave. S. Council concur. 1. Utility Systems Division request authorization to establish the Baxter Lift Station Replacement Special Assessment District, waive the preliminary assessment requirements, and approve the final assessment. Refer to Utilities Committee. in. Utility Systems Division recommends approval of an interlocal agreement with King County Flood Control Zone District for transfer of Opportunity Funds for City flood control projects. Council concur. (See 8. for resolution.) 7. UNFINISHED BUSINESS Topics listed below were discussed in Council committees during the past week. Those topics marked with an asterisk (*) may include legislation. Committee reports on any topic may be held by the Chair if further review is necessary. a. Committee of the Whole: Waste Management Rates for Multi -Family Units* b. Finance Committee: Vouchers c. Utilities Committee: Highlands Water Main Improvements Special Assessment District*; Gill Sanitary Sewer Extension Application 8. RESOLUTIONS AND ORDINANCES Resolution: King County Flood Control Zone District interlocal agreement (See 6.m.) Ordinance for first reading: a. Automated Traffic Safety Camera signage provisions (See 6.f.) b. Establishing the Highlands Water Main Improvements Special Assessment District (See 7.c.) c. Waste Management rates for multi -family units (See Ta.) Ordinances for second and final reading: a. Approving the Shamrock Annexation (1st reading 5/18/2009) b. Establishing R-4 zoning for the Shamrock Annexation (1st reading 5/18/2009) 9. NEW BUSINESS (Includes Council Committee agenda topics; call 425-430-6512 for recorded information.) 10. AUDIENCE COMMENT 11. ADJOURNMENT (CONTINUED ON NEXT PAGE) COMMITTEE OF THE WHOLE AGENDA (Preceding Council Meeting) 7TH FLOOR CONFERENCING CENTER June 1, 2009 Monday, 5:30 p.m. Emerging Issues COUNCIL CHAMBERS Approximately 6:00 p.m. Waste Management Rates for Multi -Family Units • Hearing assistance devices for use in the Council Chambers are available upon request to the City Clerk • CITY COUNCIL MEETINGS ARE TELEVISED LIVE ON GOVERNMENT ACCESS CHANNEL 21 AND ARE RE- CABLECAST TUES. & THURS. AT 11 AM & 9 PM, WED. & FRI. AT 9 AM & 7 PM AND SAT. & SUN. AT 1 PM & 9 PM CITY OF RENTON COUNCIL AGENDA BILL / L AI #: I ubmitting Data: For Agenda of: Dept/Div/Board.. AJLS/City Clerk June 1, 2009 Staff Contact...... Bonnie Walton Agenda Status Consent .............. X subject: Public Hearing.. Bid opening on May 19, 2009, for CAG-09-084, Correspondence.. Seismic Retrofit of Renton Fire Station #11 Ordinance ............. Resolution.. ...... . Old Business........ ?xhibits: New Business....... Staff Recommendation Study Sessions...... Bid Tabulation Sheet (eight bids) Information......... Recommended Action: Approvals: Legal Dept......... Council concur Finance Dept...... Other ............... Fiscal Impact: Expenditure Required... $431,639.15 Transfer/Amendment....... Amount Budgeted....... $656,000 (2009) Revenue Generated......... Total Project Budget $896,018 City Share Total Project.. Engineer's Estimate: $613,899 In accordance with Council procedure, bids submitted at the subject bid opening met the following three criteria: There was more than one bid, the low bid was within the project budget, and there were no irregularities. Therefore, staff recommends acceptance of the low bid submitted by Landon Construction Group, LLC in the amount of $394,191, plus sales tax of $37,448.15. STAFF RECOMMENDATION: Accept the low bid submitted by Landon Construction Group, LLC in the amount of $431,639.15, including sales tax. r Y o� COMMUNITY SERVICES DEPARTMENT M E M O R A N D U M DATE: May 26, 2009 TO: Bonnie Walton, City Clerk FROM: Peter Renner, Facilities Director SUBJECT: Award of Bid, Fire Station 11 Seismic. Retrofit The Community Services Department would like to submit the results of the following project bid for Council's review and approval: • For Council Date: June 1, 2009 • Project Name: Fire Station 11 Seismic Retrofit, CAG-09-084 • Project Summary: This project consists of two portions: the first involves the reinforcement of structural members of the roof, reinforcement of connections between the roof trusses and the sidewalls, replacement of the dropped ceiling with a code -compliant assembly, adding a stiffening layer of plywood and re -roofing a portion of the roof. The second portion involves energy upgrades, dormitory, kitchen, and bathroom updates. A substantial amount of the engineering and architectural services have already been performed. This contract is for the construction portion of the work. • Bid Opening Date: May 19, 2009 • Number of Bidders: Eight (8) • Apparent Low Bidder: Landon Construction Group, LLC • Apparent Low Bid: $394,191 • Engineer's Estimate: $613,899 • Project Budget: Total Budget $896,018/ 2009 Budget: $656,000 • Funding Source: Maximum FEMA grant funds for structural improvements = $379,000, Fund 316 = $517,018. • Bid Irregularities: None with this Contractor • Staff Recommendation: Award the contract for the Fire Station 11 Seismic Retrofit to the apparent low bidder, Landon Construction Group, LLC, via Council concurrence. Cc: Jay Covington, Chief Administrative Officer Iwen Wang, Finance/IS Administrator Terry Higashiyama, Community Services Administrator Fire Station I 1 Bid Award Memo City of Renton Bid Tabulation Sheet PROJECT: SEISMIC RETROFIT OF RENTON FIRE STATION 11; CAG-09-084 DATE: May 19, 2009 - — PROPOSAL - BID BOND LL w a m BASE BID DEDUCTIVE BID ALTERNATES CONTRACTOR NAME - E c E a� - Part 1 Part 2 Total Alt. 1 . Alt2 Alt. 3 Alt. 4 Alt. S Alt. 6 1 Advanced Construction, Inc. 4640 Campus Place, Suite 150 x x x x I x x $142,000 $290,000 $432,000 ($9,500) 1 ($3,1001 ($1,200) 1$2,500) ($1,100) ($2, ZOO) Mukilteo, WA 98275 AJ Smith 2 Apus Construction, Inc. 4-164th Ave. NE x x x x x x $230,000 $240,000 $450,000 ($2,000) ($3,000) ($800) ($6,000) ($11,000) ($6,000) Bellevue, WA 98008 Yury Palatnik 3 BNBuilders, Inc. I 2601 Fourth Ave., Suite 350 x x x x x x $130,600 $307,568 $438,168 ($4,000) ($1,125) _ ($1,800) 1$2,700) ($14,000) ($6,150) Seattle, WA 98121 Jeff Nielsen 4 Biwell Construction, Inc. - 4002 134th Ave. SE x x x x x x $183,262 $252,965 5436,227 ($2,830) ($376) ($277) ($4,504) ($17,234) ($5,973) Bellevue, WA 98006 LI (Mike Wagner 5 Landon Construction Group, LLC 5950 Sth Ave. S., Sutie 200 x x I x x x x 1 $136,761 $257,430 $394,191 ($6,160) ($2,247) ($651) I ($2,290) ($13,205) I ($8,386) PO Box 8120S Seattle, WA 98108 Greg Bogard Page 1 Of 2 City of Renton Bid Tabulation Sheet PROJECT: SEISMIC RETROFIT OF RENTON FIRE STATION 11; CAG-09-084 DATE: May 19, 2009 PROPOSAL p BID BOND = O Q m y ° BASE BID DEDUCTIVE BID ALTERNATES CONTRACTOR NAME ' - E a o E - N Part 1 Part 2 Total Alt. 1 Alt. 2 Alt. 3 Alt. 4 Alt. S Alt. 6 6 Fischer General Contracting, Inc. PO BOX 661 _ LI Poulsbo, WA 98370 x x x x x x $180,915 $252,480 $433,395 ($4,600) ($2,800) ($1,500) ($3,200) ($11,500) ($4,500) Daniel Fischer 7 1 Moon Construction Company 19624 - 76th Ave. W., Suite B Lynnwood, WA 98036 x x x x x x $194,263 $204,018 $398,281 ($4,871) ($2,799) ($1,150) ($2,550) ($15,395) ($1,050) Clifford E. Moon I 8 Stetz Construction I PO Box 39220 _ I Lakewood, WA 98055 x x x x x x $220,963 $222,062 $443,025 ($3,070) ($950) ($500) ($1,025) ($12,375) ($350) Dave Stephens Page 2 of 2 ENGINEER'S ESTIMATE: $613,899 LEGEND: Forms: Triple Form: Non -Collusion Affidavit, Anti -Trust Claims, Minimum Wage CITY OF RENTON COUNCIL AGENDA BILL AI #: p , Submitting Data: For Agenda of. June 1, 2009 Dept/Div/Board.. Community Services/Community Resources & Events Division Agenda Status Staff Contact...... Sonja Mejlaender, x6514 Consent .............. X Public Hearing.. Subject: Waiver of fees during 2009 IKEA Renton River Days Correspondence.. Ordinance ............. Resolution............ Old Business........ New Business....... Exhibits: Letter from Renton River Days Study Sessions...... Information......... Recommended Action: Approvals: Council Concur Legal Dept......... Finance Dept...... Other ............... Fiscal Impact: Expenditure Required... Transfer/Amendment....... Amount Budgeted....... Revenue Generated......... Total Project Budget City Share Total Project.. SUMMARY OF ACTION: 241" Annual IKEA Renton River Days will be July 22 — July 26, 2009. In the past, it has been the policy of the City to waive all park use, facility use and permit fees for activities endorsed by the Renton River Days Board of Directors. Each IKEA Renton River Days event and activity will still be subject to review and approval by the appropriate City departments, such as inspection of food booths and large shade tents (Fire & Emergency Services), and street closures for the Parade route (PBPW/Transportation). STAFF RECOMMENDATION: Authorize the Administration to waive all fees and charges associated with the 2009 IKEA Renton River Days Community Festival. LIKE river days gar, LP, 1055 S. Grady Way LF Renton, WA 98057 1!425-430-6528 LP www.rentonriverdays.org 1! Fax: 425-430-6603 BOARD OF DIRECTORS City of Renton May 20, 2009 W 1055 South Grady Way Renton Western W Jerry Kar Renton, WA 98057 Wear Festival Chairman Vicki Hart Dear Mayor and Renton City Council: Banner Bank Past Chairman This year we celebrate the 24th Annual IKEA Renton River Days, bringing thousands of residents ai-d visitors togeiher Paul Hebron who will experience our community spirit, enjoy beautiful city amenities, and participate in a variety of events, activities, Wizards of the Coast arts & crafts, recreation, stage entertainment, and many special features just for kids. Terry Higashiyama City of Renton Renton River Days Board of Directors is requesting fee waivers for facility use of Liberty and Ceda!- River Parks, Ronson Bill Hulten Community Center, Senior Activity Center, Cedar River Trail, and Gene Coulon Memorial Beach Park for festival related Community Member events and activities. There are no IKEA Renton River Days events at the Piazza this year. Carol Janssen First Savings Bank Northwest Requested use of City parks and facilities includes: Randy Matheson o Liberty Palk: Set-up and preparation for the week's itinerary of activities begins Monday, July 20 Renton School District o Liberty Park: July 22 for Kids' Day, and the main 3-day weekend, July 24-26 Toni Nelson o Renton Community Center (RCC). Senior Day Picnic on July 23 and the Renton Annual Art Shove. July 23-26 Community Member o Senior Activity Center (SAC): July 25, Pancake Breakfast Marc Ogren o Cedar River Trail: July 25-26 for the Volkssports 5K, 1 OK, & 20K Fun Walks (utilizes part of the trail) Accent Print o Gene Coulon Memorial Beach Park: July 25-26, Cascade Canoe & Kayak Regatta (inside log boom area; Bonnie Rerecich o Cedar River Park: July 26, BMW Car Club "Concours d'Elegance" Car Show City of Renton Tim Searing Over the past few years, festival management has worked in cooperation with City staff to truck less of rental fees at esty RSM McGladrey facilities during festival week. It is estimated that there is a $3,000 loss from Liberty Park and Cedar River Park picnic; Festival Treasurer shelter rental revenues and a combined rental loss of $17,000 for RCC and SAC, thus totaling approximately $20,000. Suzanne Thompson McLendon Hardware Festival management works closely with dozens of volunteer event planning committees and !itemll; hundred's ,, Sonia Meilaender volunteers to develop and produce the annual IKEA Renton River Days Festival. It is estimated that.'; :is,tors Coordinator attend each year. As a result of the 2008 IKEA Renton River Days, nearly $75,000.00 was distribu?Nu "ni^ the Renton community from the net proceeds of the festival's charitable events, donations, awards, and prizes. CITY OF RENTON Thank you for your consideration and approval to waive fees for park and facility usage. Each fe-stival ;-.vent and activi y Denis law will still be subject to review and approval by the appropriate City department, such as inspection; of food sect and lar4e Mayor shade tents (Fire & Emergency Services), and street closures for the Parade route (PBPW/Transportatior�). COUNCILMEMBERS The partnership between Renton River Days and the City of Renton is critical to the health and ongoing success of Randy Carman Renton's premier community family festival. Thank you for your strong support each year. President Don Persson President Pro -Tern I Terri Briere K Marcie Palmer Festivai airman King Parker 425.228,6170, ext. 17 Greg Taylor Rich Zwicker ierry rentonww.com FIRST SAVINGS BANK:J� %� = `"`�`` w1m,� \Ll N O R T H W E S T WASTE MANAGEMENT CITY OF RENTON COUNCIL AGENDA BILL Al #: Submitting Data: For Agenda of: June 1 „ 2009 Dept/Div/Board.. Community Services/Community Resources & Events Division Staff Contact...... Sonja Mejlaendar, ext. 6514 Agenda Status Consent .............. X Subject: Public Hearing.. 2009-2011 Title Sponsorship Agreement with Transwestern Correspondence.. Ordinance ............. Harvest Lakeshore, LLC, dba "The Landing" for the City's Resolution............ 4th of July events Old Business........ ibits: New Business.. Issue Paper Study Sessions. Information..... Title Sponsor Agreement Recommended Action: Approvals: Legal Dept......... Finance Dept...... Council concur Other ............... Fiscal Impact: Expenditure Required... Transfer/Amendment....... Amount Budgeted.......... Revenue Generated......... Total Project Budget City Share Total Project.. Due to event management and planning of logistics, safety, fireworks display, and entertainment activities for children, and event marketing, Community Services Department recommends accepting the 2009-2011 Agreement for Title Sponsorship with Transwestern Harvest Lakeshore, LLC, dba "The Landing." The event would be branded "Renton's Fabulous 4th of July presented by The Landing." Authorize the Mayor and City Clerk to sign the 2009-2011 Title Sponsorship Agreement with Transwestern Harvest Lakeshore, LLC, dba "The Landing", and receive $20,000 in 2009, $25,000 in 2010, and $30,000 in 2011 in revenue for their sponsorship of the City's 4th of July events. Y COMMUNITY SERVICES DEPARTMENT M E M O R A N D U M DATE: May 20, 2009 TO: Randy Corman, Council President Members of the Renton City Council VIA: -Y' Denis Law, Mayor 1. FROM: Terry Higashiyama, Community Services Administrator STAFF CONTACT: Sonja Mejlaender, Community Relations & Events Coordinator (x-6514) SUBJECT: 2009-2011 Title Sponsor Agreement for City's 41h of July Event at Gene Coulon Memorial Beach Park Issue• Should City Council authorize the Mayor and City Clerk to sign the 2009-2011 Title Sponsor Agreement with Transwestern Harvest Lakeshore, LLC, dba "The Landing," and receive $20,000 in 2009, $25,000 in 2010, and $30,000 in 2011 in revenue for their sponsorship of the City's 4th of July event? Recommendation: Council authorize the Mayor and City Clerk to sign the 2009-2011 Title Sponsor Agreement with Transwestern Harvest Lakeshore, LLC, dba "The Landing," and receive $20,000 in 2009, $25;000 in 2010, and $30,000 in 2011 in revenue for their sponsorship of the City's 4th of July event. Background: Since 2003, when Council authorized relocating the City -produced 4th of July event from Liberty Park to Gene Coulon Memorial Beach Park, City staff has actively sought sponsor funding to offset increasing event costs. Prior to 2002, the City's 4th of July event was a family style, daytime event at Liberty Park, which lasted from 11 am-4pm. In 2002, the event was a split -day event: daytime activities went from 11 am to 4pm, and then a 1 Opm fireworks display in Liberty Park. The first year the event was held at Gene Coulon Memorial Beach Park was in 2003. From 2003-2006, Freddie's Club of Renton was the Title Sponsor of the City -produced 4th of July celebration. Freddie's Club of Renton annual sponsorship, $25,000, helped defray event expenses such as the fireworks show, free face -painting and activities for children, stage entertainment, free shuttle, and marketing. The City of Renton provided all staff time and labor expenses. Memorandum Page 2 of 2 May 20, 2009 • In June 2004, City Council adopted the ordinance to ban fireworks. This ordinance went into effect May 2005. This was the first official year that fireworks were banned in the City of Renton. • In 2007, the City welcomed a new Title Sponsor, Wasatch Development/Revo225 at the $25,000 investment level. Event features were the same as in prior years. Two other sponsors supported the 2007 41h of July celebration: The Bristol at Southport for $2,500 and Conner Homes for $500. Total sponsor revenue for 2007 was $28,000.00. • In a comprehensive post -event report to City Council, staff calculated that the total cost to the City of Renton for the 2007 41h of July event was $83,294.56. This included staff time with benefits, loss of revenue for picnic shelters/printing support, and all event -related expenses such as the fireworks display, marketing, shuttle, entertainment and activities for children. Offset with $28,000 in 2007 sponsor revenues, net expense to the City was $55,294.56. • In 2008, despite numerous efforts and a Title Sponsor relationship nearly confirmed with Snoqualmie Casino, no sponsor revenues were received for 2008. Total cost to the City of Renton for the 2008 4ih of July was $83,172.59. This included staff time with benefits, loss of revenue for picnic shelters/printing support, and all event -related expenses such as the fireworks display, marketing, shuttle, entertainment and activities for children. • A 2009 budget request was made to increase event -related expenditures from $25,000 to $40,000 in order to meet the rising costs of event production. The request was approved for the 2009 Budget. • For 2009-2011, Transwestern Harvest Lakeshore, LLC, dba "The Landing," would be the new Title Sponsor. The event would be branded "Renton's Fabulous 41h of July presented by The Landing." Revenue to the City of Renton, for the 3-year agreement, will be $20,000 for 2009, $25,000 for 2010, and $30,000 for 2011. (Note: City staff has also confirmed an additional $8,000 in revenue for 2009 from Fairfield Residential Properties, dba "Sanctuary & The Reserve Apartments" as the Stage Entertainment Sponsor.) Conclusion: Due to event management and planning of logistics, safety, fireworks display, entertainment, activities for children, and event marketing, Community Services Department recommends accepting the 2009-2011 Agreement for Title Sponsorship with Transwestern Harvest Lakeshore, LLC, dba "The Landing." Staff will continue to secure additional sponsor funding at secondary levels. Attachments Cc: Jay Covington, Chief Administrative Officer Iwen Wang, Administrator Finance/IS Terry Higashiyama, Administrator Community Services CITY OF RENTON COUNCIL AGENDA BILL Al #: Lo , . submitting Data: For Agenda of: Dept/Div/Board.. Community Services/Human June 1, 2009 Services Staff Contact...... Karen Bergsvik, ext. 6652 Agenda Status Consent .............. Public Hearing.. subject: Use of federal stimulus Community Development Correspondence.. Block Grant Recovery Funds and CDBG funds Ordinance............ Resolution........... . Old Business........ New Business....... 3xhibits: Issue Paper Study Sessions...... Information........ . Recommended Action: Approvals: Council concur. Legal Dept......... Finance Dept...... Other ............... Expenditure Required... $187,932 CDBG Transfer/Amendment....... Amount Budgeted....... Revenue Generated......... $187, 932 Total Project Budget $ City Share Total Project.. ON: The City is receiving Community Development Block Grant Recovery (CDBG-R) funds in the amount of $123,689 and has unallocated CDBG capital funds of $70,427. CDBG-R funds must go toward activities that can be initiated by June 17, 2009 and must be used to modernize the Nation's infrastructure, improve energy efficiency or expand educational opportunities and access to health care as well as benefit residents in low and moderate income areas. $6184 will go to King County for Planning and Administration, $6184 to Renton for Planning and Administration (used to offset General Fund Contribution to salary/benefits of contract specialist position), and the remainder of $181,748 for traffic light/pedestrian crossing upgrades. Approximately 51 intersections will have the incandescent light bulbs in the traffic/pedestrian signal heads replaced with more efficient light emitting diode (LED) fixtures. In addition to energy efficiency, these will make the pedestrian crossings safer as the LED lights are brighter and more easily seen by those with vision impairments. This will supplement any signals replaced with the Energy Efficiency & Conservation Block Grant if sufficient funding is available. Of the 121 lights, 66 have already been done. Each light costs approximately $3,160 and it is projected to save $1,122 per year in energy, material and labor costs per signalized intersection, of which $515 is the annual savings of energy cost per intersection. The Human Services Advisory Committee and staff recommend these funds be used to upgrade city traffic signals/pedestrian crossings to the energy saving LED fixtures and that the energy savings of approximately $26,265.00 per year (depending on the number upgraded) be used for energy programs such as utility rebate, discount or energy assistance programs that help low income Renton residents. X Rentonnet/agnbill/ bh �� COMMUNITY SERVICE DEPARTMENT M E M O R A N D U M DATE: May 20, 2009 TO: Randy Corman, Council President Members of the Renton City Council J�- VIA: Denis Law, Mayor FROM: Terry Higashiyama, Community Services Administrator, X6606 STAFF CONTACT: Karen Bergsvik, Human Services Manager, X6652 SUBJECT: Community Development Block Grant Recovery Funds ISSUE: How should the City of Renton utilize Community Development Block Grant Recovery funds (CDBG-R) and unallocated 2009 Community Development Block Grant Capital funds? BACKGROUND: Renton has been allocated $123,689 in CDBG-R funds and may use up to 10% ($12,368) of the funds for planning and administration of the funds. Per our agreement with King County, planning and administration funds will be split evenly between King County and the City of Renton. Unallocated 2009 CDBG capital funds of $70,427 are also available. The funds must be used in low/moderate income neighborhoods. Due to the small amount of funding available, we did not have an application process in 2009 for capital funds. Combined with the CDBG-R funds, a total of $194,116 is available. The Department of Housing and Urban Development (HUD) released the notice of Program Requirements for CDBG-R on May 5, 2009. Renton receives its CDBG funds through King County. King County must submit an amendment to their 2008 action plan to HUD by June 5, 2009 or funds may be reallocated. The Recovery Act funds are intended to stimulate the economy through measures that modernize the Nation's infrastructure, improve energy efficiency and expand education opportunities and access to health care. HUD strongly encourages grantees to use CDBG-R funds for hard development costs associated with infrastructure activities that provide basic services to residents or activities that promote energy efficiency and conservation through rehabilitation or retrofitting of existing buildings. Additional requirements are: At least 50% of the funds need to go toward activities that can be initiated no later than June 17, 2009; Jobs are created or retained by use of the funds; American -made materials are required for iron, steel and manufactured goods used in construction, alteration, repair or maintenance of a public building or public work project assisted with CDBG-R funds. N Randy Corman, Council President Members of the Renton City Council Page 2 of 2 May 20, 2009 The Human Services Advisory Committee and staff propose to use the funds for LED traffic signals/pedestrian crossing signals -part of the same project as proposed for a portion of the Energy Efficiency & Conservation Block Grant (EECBG). Funds will replace incandescent light bulbs in the traffic/pedestrian crossing signals of 51 city intersections with more efficient light emitting diode (LED) fixtures, while improving signal visibility and increasing the safety of those with vision impairments. It has been recommended that the majority of EECBG funds be used for HVAC upgrades in the 200 Mill building. If the project comes in at the estimated cost, EECBG funding is available for about 12 signals. The cost is approximately $3,160 per signal, so funding can replace about 51 intersections. Of the 121 signalized intersections, 66 have been replaced, leaving 55 to be upgraded. The cost savings are twofold: • Maintenance costs decreased 75% in Portland because of longer lamp life and less frequent replacement; • Energy utilization dropped 80% in Portland; • Cost savings (energy, material, and labor) per signal replaced is $7855 over a period of 7 years (average life of an LED bulb), of which $515 is the annual savings of energy cost per intersection. Calculation: Estimated cost savings for 55 signals is $432,000 over 7 years. $432,000/55 =$7855 per signal, which equates to $1122 per signal per year. For 51 signals, the energy cost savings is $26,265 per year. It is recommended that the energy cost -savings go towards energy programs that help low income residents. The funds may be used to help pay for the utility rebate program or utility discount program (the demand for assistance exceeds the budget and there is a waiting list) or can be used to increase the amount of funds available to assist people with their water bills when they are unable to pay. The City currently contracts with The Salvation Army for $18,000 for this program. RECOMMENDATION: Council concur with recommendation that CDBG-R and CDBG unallocated capital funds be used to replace incandescent lights with LED fixtures in the city traffic/pedestrian signal heads and that the energy cost savings go toward energy programs such as utility rebate, discount or energy assistance programs that help low income Renton residents. Cc: Jay Covington CITY OF RENTON COUNCIL AGENDA BILL Submitting Data: Dept/Div/Board.. Staff Contact...... 12 May 2009 City Attorney Zanetta Fontes Subject: Amending Traffic Camera Ordinance RMC 10-12-15 Exhibits: Issue Paper Ordinance Recommended Action: Council Concur I Al a: LP 0 For Agenda of: 1 June 2009 Agenda Status Consent .............. Public Hearing.. Correspondence.. Ordinance ............. Resolution........... . Old Business........ New Business....... Study Sessions..... Information......... Approvals: Legal Dept......... Finance Dept...... Other ............... Fiscal Impact: N/A Expenditure Required... Transfer/Amendment....... Amount Budgeted....... Revenue Generated......... Total Project Budget City Share Total Project.. 0 0 SUMMARY OF ACTION: The Legislature passed a law that would allow cities to enact ordinances authorizing the use of cameras to enforce certain traffic codes in certain areas. That legislation required that the city's code contain certain requirements. While the city's current code does include those requirements by reference to the state law, at least one attorney has challenged the language of the city's code. Repeating the provisions regarding signage will remove any argument that could be made by individuals who want to argue that the city's code lacks some procedural step. STAFF RECOMMENDATION: Adopt an amendment to RMC 10-12-15, adding a new section with provisions relating to signage. RENTON CITY ATTORNEY M E M O R A N D U M DATE: 13 May 2009 TO: Randy Corman, Council President Members of the Renton City Council VIA: --' Denis Law, Mayor FROM: Lawrence J. Warren, City Attorney Staff Contact: Zanetta L. Fontes, Sr. Ass't City Attorney' I 425-255-8678 i SUBJECT: Amending Traffic Camera Ordinance RMC 10-12-15 Issue: Whether to amend the city's Traffic Camera Ordinance to eliminate possible procedural challenges. Recommendation: Amend RMC 10-12-15 to make specific reference to signage requirements. Backl4round: The state legislature enacted a statute that permitted municipalities to use photo enforcement in limited situations and subject to certain rules. Those parameters are found in RCW 46.63.170. RCW 46.63.170 says, in. pertinent part: "(1) The use of automated traffic safety cameras for issuance of notices of infraction is subject to the following requirements: (a) the appropriate local legislative authority must first enact an ordinance allowing for their use..... At a minimum, the local ordinance must contain the restrictions described in this section and provisions for public notice and signage." (Emphasis added.) RCW 46.63.170 (1) (g) says: "All locations where an automated traffic safety camera is used must be clearly marked by placing signs in locations that clearly indicate to a driver that he or she is entering a zone where traffic laws are enforced by an automated traffic safety camera." The current language in our ordinance is: Randy Corman, Council President Members of the Renton City Council 13 May 2009 Page 2 of 2 10-12-15 TRAFFIC SAFETY CAMERAS: A. The use of automated traffic safety cameras to detect a violation of RMC 10-12-1 is authorized at intersections where two arterial roadways intersect, at railroad crossings, or in school speed zones, subject to the restrictions specified in RCW 46.63.170, as now or hereafter amended. (Emphasis added.) B. A law enforcement officer has the authority to issue a notice of traffic infraction when the notice of infraction is detected through the use of an automated traffic safety camera under RCW 46.63.030 and 46.63.170, as now or hereafter amended. C. A traffic infraction for violation of this Section, detected through the use of an automated traffic safety camera, shall be processed in the same manner as a parking infraction, with a monetary penalty no greater than the amount of a fine issued for other parking infractions within the City of Renton. So, while our city code (RMC 10-12-15) does say that the use of photo enforcement is "subject to the restrictions of RCW 46.63.170", it does not specifically refer to the provisions relating to public notice and signage, which are found in RCW 46.63.170(1)(g). Our code's reference to the restrictions found in RCW 46.63.170 includes all of 46.63.170, which encompasses the notice and signage requirements found in subsection (g). So, when our code says the "restrictions found in" that statute, the restrictions in subsection (g) are also implicated. In my view, that fulfills the requirement of the legislation. Recently, an attorney advanced an argument on behalf of a recipient of a photo enforcement ticket. The argument was that the ordinance (RMC 10-12-15) is deficient because the legislature said that "at a minimum" the enabling legislation needed to contain the restrictions AND the provisions for public notice and signage. The argument being: as there is no specific wording relating to signage, the city's law is flawed. (Note: the case was decided on other grounds so the judge did not have to rule on this argument.) The city can eliminate the argument by amending the ordinance by adding a new section B, and re -lettering the subsequent sections. The proposed new section B is a recitation of the language found at RCW46.63.170(1)(g), with the proviso that the requirements are as set out in RCW 46.63.170(1)(g) as now or hereafter amended. cc: Jay Covington, CAO Hon. Terry Jurado, Judge Kevin Milosevich, Police Chief S CITY OF RENTON, WASHINGTON ORDINANCE NO. AN ORDINANCE OF THE CITY OF RENTON, WASHINGTON, AMENDING CHAPTER 12, TRAFFIC CODE, OF TITLE X (TRAFFIC) OF ORDINANCE NO. 4260 ENTITLED "CODE OF GENERAL ORDINANCES OF THE CITY OF RENTON, WASHINGTON," TO ADD A NEW SUBSECTION REQUIRING THE PLACEMENT OF SIGNS WHERE A DRIVER IS ENTERING A ZONE WHERE TRAFFIC LAWS ARE ENFORCED BY AN AUTOMATED TRAFFIC SAFETY CAMERA. THE CITY COUNCIL OF THE CITY OF RENTON, WASHINGTON, DOES ORDAIN AS FOLLOWS: SECTION I. Section 10-12-15, Traffic Safety Cameras, of Chapter 12, Traffic Code, of Title X (Traffic) of Ordinance No. 4260 entitled "Code of General Ordinances of the City of Renton, Washington," is hereby amended by adding a new subsection "B" and re - lettering the subsequent subsections, to read as follows: 10-12-15 TRAFFIC SAFETY CAMERAS: A. The use of automated traffic safety cameras to detect a violation of RMC 10-12-1 is authorized at intersections where two arterial roadways intersect, at railroad crossings, or in school speed zones, subject to the restrictions specified in RCW 46.63.170, as now or hereafter amended. B. All locations where an automated traffic safety camera is used must be clearly marked by placing signs in locations that clearly indicate to a driver that he or she is entering a zone where traffic laws are enforced by an automated traffic safety camera, as required by RCW46.63.170(1)(g), as now or hereafter amended. C. A law enforcement officer has the authority to issue a notice of traffic infraction when the notice of infraction is detected tluough the use of an I ORDINANCE NO. automated traffic safety camera under RCW 46.63.030 and 46.63.170, as now or • hereafter amended. D. A 4affic infraction for violation of this Section, detected through the use of an automated traffic safety camera, shall be processed in the same manner as a parking infraction, with a monetary penalty no greater than the amount of a fine issued for other parking infractions within the City of Renton. SECTION IL This ordinance shall be effective upon its passage, approval, and thirty (30) days after publication. PASSED BY THE CITY COUNCIL this day of , 2008. Bonnie I. Walton, City Clerk APPROVED BY THE. MAYOR this day of , 2008. Approved as to form: Lawrence J. Warren, City Attorney Date of Publication: ORD. I 550:5/7/09:scr Denis Law, Mayor 2 CITY OF RENTON COUNCIL AGENDA BILL Submitting Data: Public Works Department Dept/Div/Board.. Transportation Systems Division Staff Contact...... Juliana Fries, Program Development Coordinator, (extension 7232) Subject: 2010-2015 Six -Year Transportation Improvement Program (TIP) and Arterial Street Plan Update Exhibits: Issue Paper Resolution Draft 2010-2015 TIP including Project Map (Exhibit A) and Map Index (Exhibit B) within the document Arterial Street Plan (Exhibit C) Recommended Action: 1. Refer to Transportation Committee 2. Set a Public Hearing date of June 22, 2009 Al #: , For Agenda of: June 1, 2009 Agenda Status: Consent .............. Public Hearing...... Correspondence..... Ordinance........... Resolution........... Old Business........ New Business....... Study Sessions...... Information......... Other ................ Interlocal X X X K4 Approvals: Legal Dept.......... X Finance Dept....... X Fiscal Impact: Expenditure Required..... N/A Transfer/Amendment....... Amount Budgeted ......... Revenue Generated......... SUMMARY OF ACTION: The City is required by law to annually review the Six -Year Transportation Improvement Program (TIP) and adopt the update by resolution. In conjunction with this, the Arterial Street Plan is also updated. STAFF RECOMMENDATION: 1. Approve the annual updates to the Six -Year Transportation Improvement Program (TIP 2010-2015). 2. Approve the 2009 Arterial Street Plan. 3. Set June 22, 2009, as the public hearing date for the 2010-2015 TIP. 4. Present the resolution regarding this matter for reading and adoption. H: Division/Trans/planning/juliana/Agenda Bill/2010/2010TIP agenda bill.doc �� PUBLIC WORKS DEPARTMENT M E M O R A N D U M DATE: June 1, 2009 TO: Randy Corman, Council President Members of the Renton City Council VIA: Denis Law, Mayor FROM: Gregg Zimmermaric Works Administrator STAFF CONTACT: Juliana Fries, Program Development Coordinator, (extension 7232) SUBJECT: 2010-2015 Six -Year Transportation Improvement Program (TIP) and Arterial Street Plan Update ISSUE: Should Council approve the annual updates to the Six -Year Transportation Improvement Program (TIP), approve the 2009 Arterial Street Plan, set a public hearing for the 2010- 2015 TIP for June 22 and adopt the resolution accepting the 2010-2015 Six -Year TIP? RECOMMENDATION: 1. Approve the annual updates to the Six -Year Transportation Improvement Program (TIP 2010-2015). 2. Approve the 2009 Arterial Street Plan. 3. Set June 22, 2009, as the public hearing date for the 2010-2015 TIP. 4. Present the resolution regarding this matter for reading and adoption. BACKGROUND: The City is required by law to annually review and update the Six -Year Transportation Improvement Program and formally adopt it by resolution. The draft TIP is presented to the Council and referred to the Transportation Committee for review in advance of the public hearing. In addition to the projected revenues and expenditures for the future six years, the TIP also includes current -year project allocations and past project expenditures. Randy Corman, Council President Members of the Renton City Council June 1, 2009 Page 2 of 2 The City Council adopted the previous Six -Year TIP 2009-2014, on July 21, 2008, as a planning document for the next six years. It was distributed to the Puget Sound Regional Council, the Washington State Department of Transportation, King County Department of Transportation, the Association of Washington Cities, Puget Sound Energy, surrounding local agencies, the library and to internal departments. Ultimately, all projects in the TIP are presented to Council for review and approval, collectively during the budget process, and again individually when approval is requested for design and construction contracts. cc: Peter Hahn, Deputy PW Administrator — Transportation Jim Seitz, Transportation Planning and Programming Supervisor Juliana Fries, Program Development Coordinator JoAnn Wykpisz, PW Principal Financial & Administrative Analyst Vidya Vinod, FIS Grants Accountant Connie Brundage, Transportation Administrative Secretary File H:\Division.s\TRANSPOR.TAT\PLANNINGUuliana\TIP\2010\IP 2010 TIP.doc CITY OF RENTON, WASHINGTON RESOLUTION NO. A RESOLUTION OF THE CITY OF RENTON, WASHINGTON, UPDATING THE CITY'S SIX -YEAR TRANSPORTATION IMPROVEMENT PROGRAM 2010-2015. WHEREAS, the City of Renton has heretofore adopted a "Six -Year Transportation Improvement Program" pursuant to RCW 35.77.010, and the plan and program having been amended and modified from time to time as authorized by law; and WHEREAS, the City Council, after recommendation of the Public Works Department, held a public hearing on June 22, 2009, after notice to the public as provided by law for the purpose of considering adoption, modification, and amendments of the plan and program; and WHEREAS, at the public hearing held on June 22, 2009, due consideration was given to the proposed changes and amendments for the purpose of updating the plan and program; NOW, THEREFORE, THE CITY COUNCIL OF THE CITY OF RENTON, WASHINGTON, DOES RESOLVE AS FOLLOWS: SECTION I. The above findings are true and correct in all respects. SECTION II. The City's "Six -Year Transportation Improvement Program" and the City's "Arterial Street Plan" are hereby further amended and modified, all as more particularly shown on the attached Exhibits "A," "B" and "C" incorporated herein as if fully set forth. SECTION III. The plan and program, as evidenced by said Exhibits, shall be and constitute the City's "Six -Year Transportation Improvement Program" and the City's "Arterial Street Plan," and shall remain in full force and effect until further revised, amended, and modified as provided by law. 1 RESOLUTION NO. SECTION IV. The Administrator of the Public Works Department and the City Clerk are hereby authorized and directed to file this Resolution, together with the Exhibits, with the Director of Highways for the State of Washington and as otherwise provided by law. PASSED BY THE CITY COUNCIL this day of , 2009. Bonnie I. Walton, City Clerk APPROVED BY THE MAYOR this day of , 2009. Approved as to form: Lawrence J. Warren, City Attorney RES.1409:5/19/09:scr Denis Law, Mayor 2 City of Renton Washington Six -Year Transportation Improvement Program Mayor Denis Law Hearing: Adopted: Gregg Zimmerman Resolution: Public Works Administrator June 22, 2009 June ..., 2009 EXHIBIT YAO NPAIN EXHIBIT `B' City of Renton 2010 — 2015 Transportation Improvement Program Map Index TIP No. Project Title 1 Street Overlay Program 2 Arterial Rehabilitation Program 3 Rainier Avenue — Grady Way to S 2nd 4 SW 27th St/Strander Blvd Connection 5 NE 3rd/NE 4th Corridor 6 Duval Ave NE — NE 7th to Sunset Blvd NE 7 SR 169 HOV — SE 140th to SR 900 8 Garden Avenue 9 Park Ave North Extension 10 1161h Ave SE/Edmonds Ave SE Improvements 11 Carr Road Improvements 12 Sunset Blvd Corridor Improvements 13 Oakesdale Ave SW — Monster Road to SR 900 14 South 71h Street — Rainier Ave S to Talbot Road S 15 Lake Washington Trail Connection (Sam Chastain Trail) 16 Walkway Program 17 Sidewalk Rehabilitation and Replacement 18 Monterrey / NE 201h St Wall Replacement 19 Bridge Inspection and Repair 20 Intersection Safety and Mobility 21 Traffic Safety Program 22 Preservation of Traffic Operation Devices Program 23 Intelligent Transportation Systems (ITS) Program 24 Transit Program 25 TDM Program 26 Bicycle Route Development Program 27 Barrier Free Transition Plan Implementation 28 South Renton Project 29 Project Development/Predesign 30 Arterial Circulation Program 31 Transportation Concurrency 32 Environmental Monitoring 33 WSDOT Coordination Program 34 GIS Needs Assessment 35 1 % for the Arts Program 36 Lake Washington Boulevard — Park Avenue N to Coulon Park 37 Lind Avenue —SW 16th to SW 43' 38 Logan Avenue Concrete Panel Repair 2-2 CITY OF RENTON - PUBLIC WORKS - TRANSPORTATION SYSTEMS DIVISION - 2010-2015 TIP Six -Year Total Project Funded Unfunded Type TIP Project Title 2010 2011 2012 2013 2014 2015 Period Total oa , 1 Street Overlay 717,300 751,000 786,000 824,000 863,000 906,000 4,847,300 4,643,600 203,700 2 Arterial Rehabilitation Program 325,500 342,000 , , , , ,, 2,126,500 84,000 17 Sidewalk Rehabilitation and Replacq 140,000 250,000 250,000 250,000 250,000 250,000 1,390,000 140,000 1,250,000 h 5 411s Bridge Ins ection & Repair Progran 100,000 220,000 160,000 55,000 50,000 50,000 635,000 330,000 305,000 a 22 Preservation of Traffic Operation Dc 57,500 62,500 62,500 62,500 62,500 62,500 370,000 370,000 3 Rainier Ave Improvements - Grady 8,165,833 8,365,000 4,202,500 20,733,333 15,933,333 4,800,000 4 SW 27th Street/Strander Boulevard 6,500,000 5,600,000 2,010,000 4,960,000 10,060,000 10,900,000 40,030,000 11,438,458 28,591,542 5 NE 3rd/NE 4th Corridor Improveme 238,000 826,280 1,843,820 3,687,700 1,843,800 980,400 9,420,000 3,301,050 6,118,950 6 Duvall Ave NE - NE 7th St to Sunset 660,000 2,900,000 2,120,000 445,000 6,125,000 100,000 6,025,000 7 SR 169 HOV -140th Wa SE to SR-9 2,550,000 2,550,000 130,000 2,420,000 8 Garden Ave N Widening 150,000 90,000 240,000 150,000 90,000 9 Park Avenue North Extension 2,400,000 2,600,000 5,000,000 5,000,000 V 10 116th Ave SE/Edmonds Ave SE Imp 820,0001 2,754,000 4,860,000 500,000 5,351,000 14,285,000 14,285,000 05 11 Carr Road Improvements 100,000 100,000 100,000 v+ 12 Sunset Boulevard Corridor Improve 300,000 50,000 5,300,000 300,000 5,350,000 300,000 5,350,000 13 o Oakesdale Ave SW - Monster Road 130,000 150,000 14 a` South 7th Street - Rainier Ave S to 150,000 30,738 30,000 18 MontereyAve NE - NE 20th Street - 30,000 82,413 138,325 738 36 Lake Washington Blvd - Park Ave N Lind Avenue SW - SW 16th St to SW 8,000 1,914,000 626,000 548,000 2,460,000 548,000 2,460,000 37 Lo an Av N Concrete Panel Repair 460,000 460,000 460,000 38 >, 1 20 lintersection Safety & Mobility Pror 200,000 250,000 250,000 250,000 250,000 250,000 1,450,000 1,387,900 62,100 2 ITraffic Safety Program 20,000 40,000 40,000 50,000 40,000 40,000 230,000 210,000 20,000 1 21 N Intelligent Transportation Systems 50,000 50,000 50,000 30,000 30,000 30,000 240,000 240,000 23 tl 15 Lake Washington Trail South Lake 465,840 465,840 465,840 0 WalkwayProgram 280,000 280,000 280,000 280,000 280,000 80,000 280,000 80,000 1,680,000 450,000 1,680,000 240,000 210,000 16 26 ° Bicycle Route Development Pro ra 20,000 110,000 50,000 80,000 50,000 80,000 50,000 50,000 50,000 300,000 300,000 27 c Barrier Free Transition Plan Implem 50,000 325,000 325,000 28 z South Renton Burnett Park Neighbc 50,000 275,000 275,000 275,000 275,000 275,000 275,000 275,000 1,650,000 1,500,000 150,000 - i •y 24 Transit Program Transportation Demand Mana eme 65,000 65,000 65,000 65,000 65,000 65,000 390,000 390,000 25 H. 29 Project Develo ment & Pre -Design 130,000 150,000 150,000 150,000 150,000 150,000 250,000 880,000 1,430,000 760,000 1,180,000 120,000 250,000 3o Arterial Circulation Program 180,000 250,000 250,000 250,000 10,000 250,000 30,000 30,000 130,000 130,000 31 Transportation Concurrenc /LOS P 10,000 10,000 30,000 40,000 30,000 30,000 30,000 30,000 180,000 150,000 30,000 32 L Environmental Monitoring Program 30,000 65,000 60,000 60,000 40,000 40,000 40,000 305,000 285,000 20,000 33 WSDOT Coordination Program Geographic Information System - N 20,000 20,000 80,0001 80,000 80,000 80,000 360,000 360,000 34 1%for the Arts Program Total Sources 15,000 18 619 973 15,000 20 104 780 15,000 22 048 233 15,000 22 014 525 15,000 18,884,300125,878,9001127,550,711 15,000 90,000 90,000 48 686 681 78 864 030 35 3-5 3:20 PM 9y Type CITY OF RENTON PUBLIC WORKS TRANSPORTATION SYSTEMS DIVISION 2010 - 2015 SIX -YEAR TIP Six -Year Proiect Cost Summary * TIP Project Title 2010 2011 2012 2013 2014 2015 Period Total 1 Street Overlay 717,300 751,000 786,000 824,000 863,000 906,000 4,847,300 2 Arterial Rehabilitation Program 325,500 342,000 358,000 376,000 395,000 414,000 2,210,500 3 Rainier Ave Improvements - Grad Wa 8,165,833 8,365,000 4,202,500 20,733,333 4 SW 27th Street/Strander Boulevard Coi 6,500,000 5,600,000 2,010,000 4,960,000 10,060,000 10,900,000 40,030,000 5 NE 3rd/NE 4th Corridor Improvements 238,000 826,280 1,843,820 3,687,700 1,843,800 980,400 9,420,000 6 Duvall Ave NE - NE 7th St to Sunset BI 660,000 2,900,000 2,120,000 445,000 6,125,000 7 SR 169 HOV - 140th Way SE to SR-900 2,550,000 2,550,000 8 Garden Ave N Widening 150,000 90,000 240,000 9 Park Avenue North Extension 2,400,000 2,600,000 5,000,000 10 1116th Ave SE/Edmonds Ave SE Improv 820,000 2,754,000 4,860,000 500,000 5,351,000 14,285,000 11 Carr Road Improvements 100,000 100,000 12 Sunset Boulevard Corridor Improveme 300,000 300,000 13 Oakesdale Ave SW - Monster Road to 50,000 5,300,000 5,350,000 14 South 7th Street - Rainier Ave S to Talk 150,000 150,000 15 Lake Washington Trail South Lake Co 465,840 465,840 16 Walkway Program 280,000 280,000 280,000 280,000 280,000 280,000 1,680,000 17 Sidewalk Rehabilitation and Replacem 140,000 250,000 250,000 250,000 250,000 250,000 1,390,000 18 Monterey Ave NE - NE 20th Street - Wa 30,000 30,000 19 Bridge Inspection & Repair Program 100,000 220,000 160,000 55,000 50,000 50,000 635,000 20 Intersection Safety & Mobility Program 200,000 250,000 250,000 250,000 250,000 250,000 1,450,000 21 Traffic Safety Program 20,000 40,000 40,000 50,000 40,000 40,000 230,000 22 Preservation of Traffic Operation Devic 57,500 62,500 62,500 62,500 62,500 62,500 370,000 23 Intelligent Transportation Systems IT 50,000 50,000 50,000 30,000 30,000 30,000 240,000 24 Transit Program 275,000 275,000 275,000 275,000 275,000 275,000 1,650,000 25 Transportation Demand Management 65,000 65,000 65,000 65,000 65,000 65,000 390,000 26 Bicycle Route Development Program 20,000 110,000 80,000 80,000 80,000 80,000 450,000 27 Barrier Free Transition Plan Implemen 50,000 50,000 50,000 50,000 50,000 50,000 300,000 28 South Renton Burnett Park Nei hborh 50,000 275,000 325,000 29 Project Development & Pre -Design Pr 130,000 150,000 150,000 150,000 150,000 150,000 880,000 30 Arterial Circulation Program 180,000 250,000 250,000 250,000 250,000 250,000 1,430,000 31 Transportation Concurrenc /LOS Prog 10,000 10,000 40,000 10,000 30,000 30,000 130,000 32 Environmental Monitoring Program 30,000 30,000 30,000 30,000 30,000 30,000 180,000 33 WSDOT Coordination Program 65,000 60,000 60,000 40,000 40,000 40,000 305,000 34 Geographic Information System - Neet 20,000 20,000 80,000 80,000 80,000 80,000 360,000 35 1%for the Arts Program 15,000 15,000 15,000 15,000 15,000 15,000 90,000 36 Lake Washington Blvd - Park Ave N to 82,413 138,325 220,738 37 Lind Avenue SW - SW 16th St to SW 43 8,000 1,914,000 626,000 2,548,000 38 Logan Av N Concrete Panel Repair 460,000 460,000 Total Expenditures 18,619,973 20,104,780 22,048,2331 22,014,525 18,884,300 25,878,900 127,550,711 Su-Ya , Nq Sum *Including unfunded amounts. W19/2M 11:23 4-1 DRAFT CITY OF RENTON PUBLIC WORKS TRANSPORTATION SYSTEMS DIVISION 2010 - 2015 SIX -YEAR TIP SUMMARY OF FUNDING SOURCES Period ITEM Period Total 2010 2011 2012 2013 2014 2015 SIX -YEAR PROJECT COSTS: Planning 5,749,400 1,048,000 993,000 939,400 863,000 1,033,000 873,000 Pro'ect Enqineering 13,059,940 1,122,440 3,286,800 2,615,500 1,111,800 723,500 4,199,900 R-O-W includes Admin 7,853,313 4,283,333 219,980 300,000 650,000 50,000 2,350,000 Construction 91,614,813 10,971,700 14,098,000 16,558,413 17,714,700 15,470,000 16,802,000 Construction Services 9,023,745 1,159,500 1,462,000 1,592,420 1,628,025 1,567,800 1,614,000 Other/ Post Const. Services 249,500 35,000 45,000 42,500 47,000 40,000 40,000 Sub - TOTAL SIX -YEAR COST 127,550,711 18,619,973 20,104,780 22,048,233 22,014,525 18,884,300 25,878,900 SOURCE OF FUNDS: Vehicle Fuel Tax 4,640,000 755,000 760,000 770,000 780,000 785,000 790,000 Business License Fee 11,000,001 1,600,000 1,600,000 1,800,000 2,000,000 2,000,000 2,000,000 Proposed Fund Balance 434,971 434,971 Grants In -Hand 8,782,146 6,496,002 3,418,394 1,367,750 Miti ation In -Hand 4,300,000 1,100,000 500,000 600,000 500,000 700,000 900,000 Bonds/Vehicle License Fee Other In -Hand 18,729,564 6,834,000 6,123,564 1,543,000 493,000 493,000 743,000 Sub - TOTAL SIX -YEAR FUNDED 47,886,681 17,219,973 12,401,958 6,080,750 3,773,000 3,978,000 4,433,000 Grants Proposed 10,730,000 1,200,000 2,400,000 2,380,000 2,750,000 2,000,000 Other Proposed 1,300,000 200,000 450,000 450,000 200,000 Undetermined 67,634,030 4,852,822 13,137,483 15,291,525 12,906,300 21,445,900 Sub - TOTAL SIX -YEAR UNFUNDED 79,664,030 1,400,000 7,702,822 15,967,483 18,241,525 14,906,300 21,445,900 TOTAL SOURCES - FUNDED & UNFUNDED 127,550,711 18,619 973 20 104,780 22,048,233 22,014 525 18,884,300 25,878 900 Summ_of_Source 05/19/2009 11:23 4-2 DRAFT CITY OF RENTON PUBLIC WORKS TRANSPORTATION SYSTEMS DIVISION 2010 - 2015 SIX -YEAR TIP Vehicle Fuel Tax TIP Project Title 2010 2011 2012 2013 2014 2015 Period Total 1 Street Overlay 500,000 500,000 550,000 550,000 550,000 576,000 3,226,000 2 Arterial Rehabilitation Program 250,000 250,000 200,000 200,000 215,000 194,000 1,309,000 3 Rainier Ave Improvements - Grady 5,000 10,000 15,000 4 ISW 27th Street/Strander Boulevard 5 NE 3rd/NE 4th Corridor Improvemer 30,000 20,000 20,000 70,000 6 Duvall Ave NE - NE 7th St to Sunset 7 SR 169 HOV - 140th Way SE to SR-9 20,000 20,000 8 Garden Ave N Widening 9 Park Avenue North Extension 10 116th Ave SE/Edmonds Ave SE Imp 11 Carr Road Improvements 12 Sunset Boulevard Corridor Improve 13 Oakesdale Ave SW - Monster Road 14 South 7th Street - Rainier Ave S to 15 Lake Washington Trail South Lake 16 Walkway Program 17 Sidewalk Rehabilitation and Replac 18 Monterey Ave NE - NE 20th Street - 19 Bridge Inspection & Repair Prograrr 20 Intersection Safety & Mobility Pro r 21 Traffic Safety Program 22 Preservation of Traffic Operation D 23 Intelligent Transportation Systems 24 Transit Program 25 Transportation Demand Mana eme 26 Bicycle Route Development Pro ra 27 Barrier Free Transition Plan Implem 28 South Renton Burnett Park Nei hb 29 Project Development & Pre -Design 30 Arterial Circulation Program 31 Transportation Concurrenc /LOS P 32 Environmental Monitoring Program 33 WSDOT Coordination Program 34 Geographic Information System - N 35 1 % for the Arts Program 36 Lake Washington Blvd - Park Ave N 37 Lind Avenue SW - SW 16th St to S 38 Logan Av N Concrete Panel Repair Total Sources 755,000 760,000 770,000 780,000 785,000 790,000 4,640,000 G. T. 0&191 0 1235 4-3 DRAFT CITY OF RENTON PUBLIC WORKS TRANSPORTATION SYSTEMS DIVISION 2010 - 2015 SIX -YEAR TIP Business License Fee TIP Project Title 2010 2011 2012 2013 2014 2015 Period Total 1 Street Overlay 167,300 201,000 236,000 228,300 225,000 260,000 1,317,600 2 Arterial Rehabilitation Program 75,500 28,000 158,000 176,000 180,000 200,000 817,500 3 Rainier Ave Improvements - Grady 14,450 119,500 4,750 138,701 4 JSW 27th Street/Strander Boulevard 5 1 NE 3rd/NE 4th Corridor Im roveme 55,000 147,000 136,750 338,800 325,000 255,500 1,258,050 6 Duvall Ave NE - NE 7th St to Sunse 7 SR 169 HOV - 140th Way SE to SR- 10,000 10,000 8 Garden Ave N Widening 104,000 104,000 9 Park Avenue North Extension 10 116th Ave SE/Edmonds Ave SE Im 11 Carr Road Improvements 12 Sunset Boulevard Corridor Improve 13 Oakesdale Ave SW - Monster Road 14 South 7th Street - Rainier Ave S to 15 Lake Washington Trail South Lake 19,250 19,250 16 Walkway Program 30,0001 30,000 50,000 80,000 80,000 80,000 350,000 17 Sidewalk Rehabilitation and Replac 130,000 130,000 18 Monterey Ave NE - NE 20th Street - 30,000 30,000 19 Bridge Inspection & Repair Prograr 100,000 40,000 40,000 50,000 50,000 50,000 330,000 20 Intersection Safety & Mobility Prog 150,000 220,000 230,000 242,400 245,500 250,000 1,337,900 21 Traffic Safety Program 20,000 20,000 40,000 50,000 40,000 40,000 210,000 22 Preservation of Traffic Operation D 57,500 62,5001 62,500 62,500 62,500 62,500 370,000 23 Intelligent Transportation Systems 50,000 50,000 50,000 30,000 30,000 30,000 240,000 24 Transit Pro ram 125,000 125,000 125,000 125,000 125,000 125,000 750,000 25 Transportation Demand Manageme 22,000 22,000 22,000 22,000 22,000 22,000 132,000 26 Bicycle Route Development Prograi 20,000 30,000 40,000 50,000 50,000 50,000 240,000 27 Barrier Free Transition Plan Impleff 50,000 50,000 50,000 50,000 50,000 50,000 300,000 28 South Renton Burnett Park Nei hb 29 Project Development & Pre -Design 130,000 110,000 130,000 130,000 130,000 130,000 760,000 30 jArterial Circulation Program 180,000 200,000 200,000 200,000 200,000 200,000 1,180,000 31 Transportation Concurrent /LOS P 10,000 10,000 40,000 10,000 30,000 30,000 130,000 32 Environmental Monitoring Program 30,000 30,000 20,000 20,000 20,000 30,000 150,000 33 WSDOT Coordination Program 25,000 40,000 60,000 40,000 40,000 40,000 245,000 34 Geographic Information System - N 20,000 20,000 80,000 80,000 80,000 80,000 360,000 35 1% for the Arts Program 15,000 15,000 15,000 15,000 15,000 15,000 90,000 36 Lake Washington Blvd - Park Ave 37 Lind Avenue SW - SW 16th St to S 38 1 Logan Av N Concrete Panel Repair Total Sources 1,600,000 1,600,000 1,800,000 2,000,000 2,000,000 2,000,000 11,000,001 Buvr,ess_Lix 4-4 DRAFT CITY OF RENTON PUBLIC WORKS TRANSPORTATION SYSTEMS DIVISION 2010 - 2015 SIX -YEAR TIP Use of Fund Balance TIP Project Title 2010 2011 2012 2013 2014 2015 Period Total 1 Street Overlay 2 Arterial Rehabilitation Program 3 Rainier Ave Improvements - Grady 424,971 424,971 4 SW 27th Street/Strander Boulevard 5 NE 3rd/NE 4th Corridor Im roveme 6 Duvall Ave NE - NE 7th St to Sunse 7 SR 169 HOV -140th Way SE to SR- 8 Garden Ave N Widening 9 Park Avenue North Extension 10 116th Ave SE/Edmonds Ave SE Im 11 Carr Road Improvements 12 Sunset Boulevard Corridor Improv 13 Oakesdale Ave SW - Monster Road 14 South 7th Street - Rainier Ave S to 15 Lake Washington Trail South Lake 16 Walkway Program 17 Sidewalk Rehabilitation and Repla 10,000 10,000 18 Monterey Ave NE - NE 20th Street - 19 Bridge Inspection & Repair Progra 20 Intersection Safety & Mobility Pro 21 Traffic Safety Program 22 Preservation of Traffic Operation D 23 Intelligent Transportation Systems 24 Transit Program 25 Transportation Demand Mana em 26 Bicycle Route Development Progra 27 Barrier Free Transition Plan Imple 28 South Renton Burnett Park Nei hb 29 Project Development & Pre -Design 30 Arterial Circulation Program 31 Transportation Concurrent /LOS 32 Environmental Monitoring Program 33 WSDOT Coordination Program 34 Geographic Information System - 35 1 % for the Arts Program 36 Lake Washington Blvd - Park Ave 37 Lind Avenue SW - SW 16th St to S 38 Logan Av N Concrete Panel Repair Total Sources 434,971 434,971 Prapr Fu. Balance 05119/2009 1235 4-5 DRAFT CITY OF RENTON PUBLIC WORKS TRANSPORTATION SYSTEMS DIVISION 2010 - 2015 SIX -YEAR TIP Grants In -Hand TIP Project Title 2010 2011 2012 2013 2014 2015 Period Total 1 Street Overlay 2 Arterial Rehabilitation Program 3 Rainier Ave Improvements -Grady 2,149,412 2,735,500 1,367,750 6,252,662 4 SW 27th Street/Strander Boulevard 3,900,000 682,894 4,582,894 5 1 NE 3rd/NE 4th Corridor Improveme 6 Duvall Ave NE - NE 7th St to Sunse 7 SR 169 HOV -140th Way SE to SR- 8 Garden Ave N Widening 9 Park Avenue North Extension 10 116th Ave SE/Edmonds Ave SE Im 11 Carr Road Improvements 12 Sunset Boulevard Corridor Improve 13 Oakesdale Ave SW - Monster Road 14 South 7th Street - Rainier Ave S to 15 Lake Washington Trail South Lake 446,590 446,590 16 Walkway Program 17 Sidewalk Rehabilitation and Repla 18 Monterey Ave NE - NE 20th Street - 19 Bridge Inspection & Repair Progra 20 Intersection Safety & Mobility Prog 21 Traffic Safety Program 22 Preservation of Traffic Operation D 23 Intelligent Transportation Systems 24 Transit Program 25 Transportation Demand Mana eme 26 Bicycle Route Development Progra 27 Barrier Free Transition Plan Implerr 28 South Renton Burnett Park Nei hb 29 Project Development & Pre -Design 30 Arterial Circulation Program 31 Transportation Concurrenc /LOS P 32 Environmental Monitoring Program 33 WSDOT Coordination Program 34 Geographic Information System - N 35 1 % for the Arts Program 36 Lake Washington Blvd - Park Ave 37 Lind Avenue SW - SW 16th St to S 38 Logan Av N Concrete Panel Repair Total Sources 6,496,002 3,418,394 1,367,750 11,282,146 GrentaimHend 4-6 DRAFT CITY OF RENTON PUBLIC WORKS TRANSPORTATION SYSTEMS DIVISION 2010 - 2015 SIX -YEAR TIP Mitigation In -Hand TIP Project Title 2010 2011 2012 2013 2014 2015 Period Total 1 Street Overlay 50,000 50,000 100,000 2 Arterial Rehabilitation Program 3 Rainier Ave Improvements - Grady 521,000 80,000 601,000 4 SW 27th Street/Strander Boulevard 5 NE 3rd/NE 4th Corridor Improverner 183,000 200,000 90,000 300,000 500,000 700,000 1,973,000 6 Duvall Ave NE - NE 7th St to Sunset 100,000 100,000 7 SR 169 HOV - 140th Way SE to SR-9 100,000 100,000 8 Garden Ave N Widening 46,000 46,000 9 Park Avenue North Extension 10 116th Ave SE/Edmonds Ave SE Imp 11 Carr Road Improvements 12 Sunset Boulevard Corridor Improve 13 Oakesdale Ave SW - Monster Road 14 South 7th Street - Rainier Ave S to 15 Lake Washington Trail South Lake 16 Walkway Program 250,000 250,000 230,000 200,000 200,000 200,000 1,330,000 17 Sidewalk Rehabilitation and Re lac 18 Monterey Ave NE - NE 20th Street - 19 Bridge Inspection & Repair Prograrr 20 Intersection Safety & Mobility Progr 50,000 50,000 21 Traffic Safety Program 22 Preservation of Traffic Operation D 23 Intelligent Transportation Systems 24 Transit Program 25 Transportation Demand Manageme 26 Bicycle Route Development Progra 27 Barrier Free Transition Plan Implem 28 South Renton Burnett Park Neighb 29 Project Development & Pre -Design 30 Arterial Circulation Program 31 Transportation Concurrenc /LOS P 32 Environmental Monitoring Program 33 WSDOT Coordination Program 34 Geographic Information System - N 35 1 % for the Arts Program 36 Lake Washington Blvd - Park Ave N 37 Lind Avenue SW - SW 16th St to S 38 Logan Av N Concrete Panel Repair Total Sources 1,100,000 500,000 600,000 500,000 700,000 900,000 4,300,000 Mi6gatlm_InWd 05119IE009 1236 4-7 DRAFT CITY OF RENTON PUBLIC WORKS TRANSPORTATION SYSTEMS DIVISION 2010 - 2015 SIX -YEAR TIP Other -in -Hand TIP Project Title 2010 2011 2012 2013 2014 2015 Period Total 1 Street Overlay 2 Arterial Rehabilitation Program 3 Rainier Ave Improvements - Grady 3,651,000 2,700,000 1,350,000 7,701,000 4 JSW 27th Street/Strander Boulevard 2,600,000 2,955,564 300,000 300,000 700,000 6,855,564 5 NE 3rd/NE 4th Corridor Improveme 6 Duvall Ave NE - NE 7th St to Sunse 7 SR 169 HOV -140th Way SE to SR- 8 Garden Ave N Widening 9 Park Avenue North Extension 10 116th Ave SE/Edmonds Ave SE Im 11 Carr Road Improvements 12 Sunset Boulevard Corridor Improv 300,000 300,000 13 Oakesdale Ave SW - Monster Road 14 South 7th Street - Rainier Ave S to 15 Lake Washington Trail South Lake 16 Walkway Program 17 Sidewalk Rehabilitation and Repla 18 Monterey Ave NE - NE 20th Street - 19 Bridge Inspection & Repair Pro ra 20 Intersection Safety & Mobility Prog 21 Traffic Safety Program 22 Preservation of Traffic Operation D 23 Intelligent Transportation Systems 24 Transit Program 150,000 150,000 150,000 150,000 150,000 750,000 25 Transportation Demand Manageme 43,000 43,000 43,000 43,000 43,000 43,000 258,000 26 Bicycle Route Development Pro ra 27 Barrier Free Transition Plan Imple 28 South Renton Burnett Park Nei hb 50,000 275,000 325,000 29 Project Development & Pre -Design 30 Arterial Circulation Program 31 Transportation Concurrenc /LOS 32 Environmental Monitoring Prograrr 33 WSDOT Coordination Program 40,000 40,000 34 Geographic Information System - 35 1 % for the Arts Program 36 Lake Washington Blvd - Park Ave 37 Lind Avenue SW - SW 16th St to S 38 Logan Av N Concrete Panel Repair Total Sources 1 6,834,000 1 6,123,564 1,543,000 493,000 493,000 743,000 16,229,564 Nino _In_H.. 05,19/2009 1236 4-8 DRAFT CITY OF RENTON PUBLIC WORKS TRANSPORTATION SYSTEMS DIVISION 2010 - 2015 SIX -YEAR TIP Grants Proposed TIP Project Title 2010 2011 2012 2013 2014 2015 Period Total 1 Street Overlay 2 Arterial Rehabilitation Program 3 Rainier Ave Improvements - Grady 1,200,000 2,400,000 1,200,000 4,800,000 4 SW 27th Street/Strander Boulevard 500,000 2,500,000 2,000,000 5,000,000 5 INE 3rd/NE 4th Corridor Improveme 6 Duvall Ave NE - NE 7th St to Sunse 7 SR 169 HOV -140th Way SE to SR- 8 Garden Ave N Widening 9 Park Avenue North Extension 10 116th Ave SE/Edmonds Ave SE Im 11 Carr Road Improvements 12 Sunset Boulevard Corridor Improv 13 Oakesdale Ave SW - Monster Road 14 South 7th Street - Rainier Ave S to 15 Lake Washin ton Trail South Lake 16 Walkway Program 17 Sidewalk Rehabilitation and Repla 18 Monterey Ave NE - NE 20th Street - 19 Bridge Inspection & Repair Progra 20 Intersection Safety & Mobility Prog 21 Traffic Safety Program 22 Preservation of Traffic Operation D 23 Intelligent Transportation Systems 24 Transit Program 25 Transportation Demand Managem 26 Bicycle Route Development Progra 27 Barrier Free Transition Plan Imple 28 South Renton Burnett Park Nei hb 29 Project Development & Pre -Design 30 Arterial Circulation Program 31 Transportation Concurrent /LOS 32 Environmental Monitoring Prograrr 33 WSDOT Coordination Program 34 - Geographic Information System IS 35 1 % for the Arts Program 36 Lake Washington Blvd - Park Ave IS 50,000 50,000 100,000 37 Lind Avenue SW - SW 16th St to SV 630,000 200,000 830,000 38 Logan Av N Concrete Panel Repair Total Sources 1,200,000 2,400,000 2,380,000 2,750,000 2,000,000 10,730,000 Gr ts_Pr p— ml gnoog 12:96 4-9 DRAFT CITY OF RENTON PUBLIC WORKS TRANSPORTATION SYSTEMS DIVISION 2010 - 2015 SIX -YEAR TIP Other Pr000sed TIP Project Title 2010 2011 2012 2013 2014 2015 Period Total 1 Street Overlay 2 Arterial Rehabilitation Program 3 Rainier Ave Improvements -Grady 200,000 400,000 200,000 800,000 4 SW 27th Street/Strander Boulevard 5 NE 3rd/NE 4th Corridor Improveme 6 Duvall Ave NE - NE 7th St to Sunse 50,000 250,000 200,000 500,000 7 SR 169 HOV - 140th Way SE to SR- 8 Garden Ave N Widening 9 Park Avenue North Extension 10 116th Ave SE/Edmonds Ave SE Im 11 Carr Road Improvements 12 Sunset Boulevard Corridor Improv 13 Oakesdale Ave SW - Monster Road 14 South 7th Street - Rainier Ave S to 15 Lake Washington Trail South Lake 16 Walkway Program 17 Sidewalk Rehabilitation and Replace 18 Monterey Ave NE - NE 20th Street - 19 Bridge Inspection & Repair Pro ra 20 Intersection Safety & Mobility Progi 21 Traffic Safety Program 22 Preservation of Traffic Operation D 23 Intelligent Transportation Systems 24 Transit Program 25 Transportation Demand Mana em 26 Bicycle Route Development Pro ra 27 Barrier Free Transition Plan Imple 28 South Renton Burnett Park Nei hb 29 Project Development & Pre -Design 30 Arterial Circulation Program 31 Transportation Concurrenc /LOS 32 Environmental Monitoring Prograrr 33 WSDOT Coordination Program 34 Geographic Information System - 35 1 % for the Arts Program 36 Lake Washington Blvd - Park Ave 37 Lind Avenue SW - SW 16th St to S 38 Logan Av N Concrete Panel Repair Total Sources 1 200,000 450,000 450,000 200,000 1,300,000 Other —Proposed include Utilities and grants OS MW9 1236 4-10 DRAFT CITY OF RENTON PUBLIC WORKS TRANSPORTATION SYSTEMS DIVISION 2010 - 2015 SIX -YEAR TIP Undetermined TIP Project Title 2010 2011 2012 2013 2014 2015 Period Total 1 Street Overlay 45,700 88,000 70,000 203,700 2 Arterial Rehabilitation Program 64,000 20,000 84,000 3 Rainier Ave Improvements - Grad 4 SW 27th Street/Strander Boulevard 1,961,542 1,510,000 2,160,000 7,760,000 10,200,000 23,591,542 5 INE 3rd/NE 4th Corridor Improvemei 479,280 1,617,070 3,018,900 998,800 4,900 6,118,950 6 Duvall Ave NE - NE 7th St to Sunse 610,000 2,550,000 1,920,000 445,000 5,525,000 7 SR 169 HOV -140th Way SE to SR-1 2,420,000 2,420,000 8 Garden Ave N Widening 90,000 90,000 9 Park Avenue North Extension 2,400,000 2,600,000 5,000,000 10 116th Ave SE/Edmonds Ave SE Imr 820,000 2,754,000 4,860,000 500,000 5,351,000 14,285,000 11 Carr Road Improvements 100,000 100,000 12 Sunset Boulevard Corridor Improv 13 Oakesdale Ave SW - Monster Road 50,000 5,300,000 5,350,000 14 South 7th Street - Rainier Ave S to 150,000 150,000 15 Lake Washington Trail South Lak 16 Walkway Program ,7 Sidewalk Rehabilitation and Replac 250,000 250,000 250,000 250,000 250,000 1,250,000 18 IlMonterey Ave NE - NE 20th Street - 19 Bridge Inspection & Repair Prograr 180,000 120,000 5,000 305,000 20 Intersection Safety & Mobility Progi 30,000 20,000 7,600 4,500 62,100 21 Traffic Safety Program 20,000 20,000 22 Preservation of Traffic Operation D 23 Intelligent Transportation Systems 24 Transit Program 150,000 150,000 25 Transportation Demand Mana em 26 Bicycle Route Development Progra 80,000 40,000 30,000 30,000 30,000 210,000 27 Barrier Free Transition Plan Imple 28 South Renton Burnett Park Nei hb 29 Project Development & Pre -Design 40,000 20,000 20,000 20,000 20,000 120,000 30 Arterial Circulation Program 50,000 50,000 50,000 50,000 50,000 250,000 31 Transportation Concurrenc /LOS 32 Environmental Monitoring Prograrr 10,000 10,000 10,000 30,000 33 WSDOT Coordination Program 20,000 20,000 34 Geographic Information System - 35 1% for the Arts Program 36 Lake Washington Blvd - Park Ave IS 32,413 88,325 120,738 37 Lind Avenue SW - SW 16th St to SV 8,000 1,284,000 426,000 1,718,000 38 Logan Av N Concrete Panel Repair 460,000 460,000 Total Sources 4,852,822 13,137,483 15,291,525 12,906,300 21,445,900 67,634,030 Ul funJd_Sum OS iWN9 1236 4 - 11 DRAFT CITY OF RENTON PUBLIC WORKS TRANSPORTATION SYSTEMS DIVISION 2010 - 2015 SIX -YEAR TIP Street Overlay Type: 1 - MAINTENANCE AND PRESERVATION Functional Classification: N/A Fund: 317 Proj. Length: N/A Proj: t12108 TIP No. 1 CONTACT: Bill wressell 425.430.7400 DESCRIPTION: Annual program for repairing and resurfacing existing roadways, operating the City's Pavement Management System and providing data for deficiency ratings. JUSTIFICATION: ACP overlay, SMA, and slurry seal of streets provide for improved driving surface and are highly cost- effective ways of avoiding expensive repairs and reconstruction. The computerized Pavement Management System and yearly survey of roadway conditions greatly improve the efficiency of the Overlay Program. The arterial streets are rated every year, while the residential streets are rated every other year. STATUS: Ongoing yearly program. This program funds overlays on neighborhood streets and collector streets. The Arterial Rehabilitation Program funds major and minor arterials. Installation of ADA compliant curb ramps has been incorporated into the annual Street Overlay program in accordance with federal requirements. CHANGES: A 5% annual cost increase has been incorporated into this program. The Transportation/Aviation Committee recommended that $25,000 be allocated in 2009 for maintenance of existing alleyways. ]Funded: 16,006,340 IUnfunded : 1 203,700 Project Totals Programmed Pre-2010 Six -Year Program ITEM Programmed Spent In 2008 2009 Total 2010 2011 2012 2013 2014 2015 EXPENSES: Planning Preliminary Engineering 96,960 2,060 12,000 82,900 12,600 13,000 13,000 14,300 15,000 15,006 R-O-W includes Admin Construction 5,792,083 385,683 883,000 4,523,400 664,700 698,000 733,000 769,700 808,000 850,000 Construction Services 320,997 39,997 40,000 241,000 40,000 40,000 40,000 40,000 40,000 41,000 Post Construction Services TOTAL EXPENSES 6,210,040 427,740 935,000 4,847,300 717,300 751,000 786,000 824,000 863,000 906,000 SOURCE OF FUNDS: Vehicle Fuel Tax 4,111,000 385,000 500,000 3,226,000 500,000 500,000 550,000 550,000 550,000 576,000 Business License Fee 1,545,340 42,740 185,000 1,317,600 167,300 201,000 236,000 228,300 225,000 260,000 Proposed Fund Balance 170,000 170,000 Grants In -Hand 1 Grants In -Hand 2 Miti ation In -Hand 180,000 80,000 100,000 50,000 50,000 Other In -Hand 1 Other In -Hand 2 Grants Proposed Other Proposed Undetermined 203,7061 1 203,700 45,700 88,000 70,000 TOTAL SOURCESI 6,210,0401 427,7401 935,0001 4,847 300 717,300 751,000 786,000 824,000 863,000 906,000 Ovway 05/19/2009 9:45 AM 5-1 DRAFT CITY OF RENTON PUBLIC WORKS TRANSPORTATION SYSTEMS DIVISION 2010 - 2015 SIX -YEAR TIP Arterial Rehabilitation Program Functional Classification: Various Fund: 317 Proj. Length: N/A Proj: t12186 Type: 1 - MAINTENANCE AND PRESERVATION TIP No. 2 CONTACT: Bill Wressel 425.430.7400 DESCRIPTION: As funding is available, this program will provide for the rehabilitation of arterial streets where the restoration requirements are beyond that which can be accomplished through the annual Overlay Program. Installation of ADA compliant curb ramps has been incorporated into the annual Arterial Rehabilitation and Overlay programs according to new federal requirements. JUSTIFICATION: The Overlay Program concentrates to a great degree on maintaining residential streets, where relatively small traffic volumes and less truck and bus traffic make standard asphalt overlays a long term means of maintenance. Arterial streets can often deteriorate rather quickly and often require more costly rehabilitation measures and/or costly temporary repairs to avoid more extensive deterioration. A number of arterials identified as needing major rehabilitation are being addressed in this program and the Overlay Program. STATUS: Proposed paving schedule: 2009 - Puget Dr. (Rolling Hills to Edmonds); 2010 Carr Road (East of SR 167 to Mill Ave); 2011 - East Valley Rd. S. (SW 41st St to SW 16th St); 2012 - Benson Rd. (S of 1-405 to SR 515); 2013 - N 3rd St. and N 4th St. (Logan Ave to Sunset Blvd): 2014 - Airport Way (Rainier Ave N to Logan Ave). This order may change depending on future ratings. CHANGES: A 5% annual cost increase has been incorporated into this program. The Transportation/Aviation Committee recommended that $25,000 be allocated in 2009 for maintenance of existing alleyways. Funded : 12,906,500 lUnfunded : 184,000 Project Totals Programmed Pre-2010 Six ear Program ITEM Programmed Spent in 2008 2009 Total 2010 2011 2012 2013 2014 2015 EXPENSES: Planning Preliminary Engineering 67,500 67,500 10,500 11,000 11,000 11,000 12,000 12,000 R-O-W includes Admin Construction 2,846,500 470,000 300,000 2,076,500 304,500 320,000 336,000 354,000 372,000 390,000 Construction Services 76,500 10,000 66,500 10,500 11,000 11,000 11,000 11,000 12,000 Post Construction Services TOTAL EXPENSES 2,990,500 470,000 310,000 2,210,500 325,500 342,000 358,000 376,000 395,000 414,000 SOURCE OF FUNDS: Vehicle Fuel Tax 1,759,000 200,000 250,000 1,309,000 250,000 250,000 200,000 200,000 215,000 194,000 Business License Fee 1,127,500 270,000 40,000 817,500 75,500 28,000 158,000 176,000 180,000 200,000 Proposed Fund Balance Grants In -Hand 1 Grants In -Hand 2 Mitigation In -Hand 20,000 20,000 Other In -Hand 1 Other In -Hand 2 Grants Proposed Other Proposed Undetermined 84,0001 1 84,000 64,000 20,000 TOTAL SOURCES 2990,5001 470,000 310,0001 2,210,500 1 325,500 342,000, 358,000 376,000, 395,0001 414,000 Arterial Rehe 05/19/2009 9:45 AM 5-2 DRAFT CITY OF RENTON PUBLIC WORKS TRANSPORTATION SYSTEMS DIVISION 2010 - 2015 SIX -YEAR TIP Rainier Ave Improvements - Grady Way to S 2nd Street Type: 2 -TRANSIT Functional Classification: Principal & Minor Fund: 317 Proj. Length: 0.89 mi Proj: 02703 TIP No. 3 CONTACT: Derek Akesson 425.430.7243 DESCRIPTION: Improvements remove barriers, eliminate substandard conditions, control and consolidate access points to existing major businesses, provide an enhanced pedestrian environment. Project elements include adding BAT (business access and transit) lanes (north and southbound), removing the BNSF railroad bridge support pier, adding left -turn lanes at intersections, widening sidewalks with streetscaping, adding pedestrian -scale illumination, bollards (at crossings), transit facility improvements (shelters, benches, info kiosks), planted buffer strips and landscaped medians. JUSTIFICATION: Rainier Ave is a critical corridor in central Renton with existing operational problems and in need of infrasructure enhancements to provide greater ease of non -motorized and transit -based travel. Existing high level of traffic congestion and accidents. Improvements will enhance traffic flow and reduce accidents. BAT lanes will be provided from S 2nd St to Grady Way southbound and from Grady Way to S 3rd St northbound. STATUS: The Sound Transit agreement authorizes $14.9 million for transit improvements. Two State Pedestrian and Bicycle Safety Grants have been awarded: $200,000 (2006) and $230,000 (2007). TIB awarded grant funds of $2,202,000 (2003); $1,906,200 (2006); and $2,831,500 (2008). A $2.0 million (2009) federal grant was awarded for Phase 1 (Shattuck Ave). Mitigation funds in the amount of $2,100,000 must be dedicated to fulfill grant requirements to this project. CHANGES: Rainier Ave has 30% design completed. Construction of the Phase 1 - Shattuck Ave Stormwater bypass system is scheduled for the summer of 2009. Funded:1 34 841 933 Unfunded :1 4,800,000 Project Totals Pro rammed Pre-2010 Six Year Program ITEM Programmed Spent Pre-2009 2009 Total 2010 2011 2012 2013 2014 2015 EXPENSES: Planning Preliminary Engineering 6,132,407 2,932,014 2,566,393 634,000 634,000 R-O-W includes Admin 5,000,984 984 1,666,667 3,333,333 3,333,333 Construction 16,774 799 29,799 1,745,000 15,000,000 3,750,000 7,500,000 3,750,000 Construction Services 2,034,227 1,227 267,000 1,766,000 448,500 865,000 452,500 BNSF Bridge - work by others 9,699,516 4,706,984 4,992,532 TOTAL EXPENSES 39,641,933 7,671,008 11,237,592 20,733,333 8,165,833 8,365,000 4,202,500 SOURCES OF FUNDS: Vehicle Fuel Tax 15,000 15,000 5,000 10,000 Business License Fee 326,188 187,487 138,701 14,450 119,500 4,750 Proposed Fund Balance 1,607,116 774,306 407,839 424,971 424,971 Grants In -Hand TIB 6,939,700 422,628 645,186 5,871,886 2,043,136 2,552,500 1,276,250 Grants In -Hand WSDOT+ARR 2,430,000 4,898 2,044,326 380,775 106,275 183,000 91,500 Miti ation In -Hand 4,223,929 2,622,929 1,000,000 601,000 521,000 80,000 Other In -Hand Sound Tran. 14,225,000 3,658,760 2,865,240 7,701,000 3,651,000 2,700,000 1,350,000 Other In -Hand WSDOT bridge sa 3,500,000 3,500,000 Grants Proposed STP 4800,000 4,800,000 1,200,000 2,400,000 1,200,000 Other Pro Water Proposed Surfacewater/ 1,575,000 775,000 800,000 200,000 400,000 200,000 Undetermined TOTAL SOURCES 39,641,9331 7 671 008 11,237,5921 20,733,333 8,165,8331 8,365,000 4,202 500 05/19/2009 3:20 PM ReN. 5T 5-3 DRAFT CITY OF .TON PUBLIC WORKS TRANSPORTATION SYSTEMS DIVISION 7f11(1 _ 9nir; CIY_YPAP TIP SW 27th Street/Strander Boulevard Connection Functional Classification: Minor Arterial Fund: 317 Proj. Length: 1.27 miles Proj: t12239, 12240 Type: 4 - PROJECTS AND CORRIDORS TIP No. 4 CONTACT: Rob Lochmiller 425.430.7303 DESCRIPTION: This project provides a critical four/five-lane arterial that will serve as a connector to West Valley Highway (SR-181) and East Valley Road, as well as an arterial connector to SR-167 from the south. The project will provide a grade -separated crossing at the Union Pacific Railroad (UPRR) and Burlington Northern Santa Fe (BNSF) railroad tracks. Right-of-way includes: City of Renton - $3.17 million, City of Tukwila - $0.95 million. Donated ROW: Sound Transit - $55,000 (not included). JUSTIFICATION: A new east -west arterial roadway will connect the cities of Renton and Tukwila, and provide significant congestion relief to existing arterials. The new road will provide access to the new Tukwila Station, a multi- modal center being developed immediately north of the new alignment, and to the Boeing Longacres site. By crossing over the UPRR and BNSF railroads, the new arterial will provide significant benefits to both freight mobility and general motorists. STATUS: The 30% design includes the environmental documents, base -mapping, road sections, and project phasing. $1,000,000 was received from the General Fund in 2003. Ph.1 Seg. 1 is complete and has been paid with approximately $3M in bonds. Grants include: TEA-21 funds of $745,563 (2003) and $2,398 (2005); federal discretionary (STP) of $737,946, STP- N of $94,420, federal discretionary (HPP) of $684,380, and Section 129 of $122,500. CHANGES: Railroad track work to be done in 2009-2011. Both FMSIB and Sound Transit are contributing $4 M each to various elements of the project. The City was awarded $4.6 M of STP Regional funds. Of the $5.5 M WSDOT Mobility grant awarded for the Sound Transit station, $2.5M will be used for the SW 27th project elements directly related to the Sound Transit station. $500,000 Metro mitigation reserve to be approved by Council. Funded:1 28 524 348 Unfunded :1 28,591,542 Project Totals Programmed Pre-2010 Six -Year Program ITEM Programmed Spent Pre-2009 2009 Total 2010 2011 2012 2013 2014 2015 EXPENSES: Planning 60,000 60,000 20,000 10,000 10,000 10,000 10,000 Preliminary Engineering 7,294,979 2,684,979 1,500,000 3,110,000 760,000 2,000,000 350,000 R-O-W includes Admin 4,372,500 3,172,500 1,200,000 950,000 150,000 50,000 50,000 Construction 38,128,969 8,969 6,000,000 32,120,000 5,000,000 4,370,000 4,000,000 9,000,000 9,750,000 Construction Services 4,250,000 710,000 3,540,000 530,000 460,000 450,000 1,000,000 1,100,000 Phase 1, Seg 1 design and cons 3,009,442 3,009,442 TOTAL EXPENSES 57,115,890 8,875,890 8,210,000 40,030,000 6,500,000 5,600,000 2,010,000 4,960,000 10,060,000 10,900,000 SOURCES OF FUNDS: Vehicle Fuel Tax Business License Fee Gen Fund & Pro .Fund Balance 3,260,922 3,160,922 100,000 Grants In -Hand State & Fed 2,387,207 1,346,313 684,000 356,894 356,894 Grants In -Hand FMSIB 4,000,000 448,000 3,500,000 52,000 52,000 Mitigation In -Hand 557,500 557,500 Bonds 2,799,500 2,799,500 Other: Sound Transit+ FRB +Tukwila (RO 8,419,219 563,655 1,000,000 6,855,564 2,600,000 2,955,564 300,000 300,000 700,000 Grants In -Hand STP Grant 4,600,000 2,100,000 2,500,000 2,300,000 200,000 Grants In -Hand WSDOT Mobility) 2,500,000 826,000 1,674,000 1,548,000 126,000 Grants Proposed T.I.B. 5,000,000 5,000,000 500,000 2,500,000 2,000,000 Other Proposed Undetermined 23,591,5421 1 23,591,542 1,961,542 1,510,000 2,160,000 7,760,000 10,200,000 TOTAL SOURCES 1 57,115,8901 2,875,8901 8,210,0001 40,030,000 1.6 500,000 5,600,0001 2,010,0001 4,960,0001 10,060,0001 10,900 000 St ­de de Gabon 05/19/2009 9:45 AM 5-4 DRAFT CITY OF RENTON PUBLIC WORKS TRANSPORTATION SYSTEMS DIVISION 2010 - 2015 SIX -YEAR TIP NE 3rd/NE 4th Corridor Improvements Type: 2 - TRANSIT Functional Classification: Principal Proj. Length: N/A TIP No. 5 Fund: 317 Proj: t12176 CONTACT: Keith Woolley 425.430.7318 DESCRIPTION: This project involves a series of key improvements in this corridor to improve traffic operations such as rechannel ization and traffic signal modifications, possible transit priority signal treatments and possibly queue jumps. This project will seek to meet pedestrian, transit and bicycle needs. JUSTIFICATION: This corridor has a strong potential for transit usage and is experiencing rapid residential and retail growth. The NE 3rd/4th Corridor Study was adopted in May 2005. The study refined the corridor transportation needs and costs, including pedestrian, transit, bicycle improvements, as well as streetscape enhancement. STATUS: The estimated cost for design and construction for the entire corridor (from Sunset Blvd to the east City limits) is $37M. Efforts to obtain grants are ongoing. The project corridor has been phased in 3 phases. Cost estimate for Phase 1 is $8.4M. Costs beyond 2015 not shown in the TIP. CHANGES: Moved construction expenses from 2011 to 2012 as the project remains partially unfunded. Funded : 13,525,377 lUnfunded : 16,118,950 Project Totals Programmed Pre-2010 Six -Year Program ITEM Programmed Spent Pre-2009 2009 Total 2010 2011 2012 2013 2014 2015 EXPENSES: Planning 221,620 218,420 3,200 Preliminary Engineering 1,573,407 2,707 1,570,700 238,000 606,300 726,400 R-O-W includes Admin 219,980 219,980 219,980 Construction 6,990,000 6,990,000 1,689,000 3,378,000 1,689,000 234,000 Construction Services 639,320 639,320 154,820 309,700 154,800 20.000 Post Construction Services TOTAL EXPENSES 9,644,327 221,127 3,200 9,420,000 238,000 826,280 1,843,820 3,687,700 1,843,800 980,400 SOURCE OF FUNDS: Vehicle Fuel Tax 70,000 70,000 30,000 20,000 20,000 Business License Fee 1,288,412 27,162 3,200 1,258,050 55,000 147,000 136,750 338,800 325,000 255,500 Proposed Fund Balance 265 265 Grants In -Hand 1 Grants In -Hand 2 Mitigation In -Hand 2,166,700 193,700 1,973,000 183,000 200,000 90,000 300,000 500,000 700,000 Other In -Hand 1 Other In -Hand 1 Grants Proposed Other Proposed Undetermined 6,118,9501 1 6,118,950 479,280 1,617,070 3,018,900 998,800 4,900 TOTAL SOURCES 9 644 327 221 127 3,200 9,420,000 238,0001 826,280 1,843,820 3,687,700 1,843,800 980,4001 NE3rd_NE4th 05119rZ009 9.45 AM 5-5 DRAFT CITY OF. 4TON PUBLIC WORKS TRANSPORTATION SYSTEMS DIVISION 2010 - 2015 SIX -YEAR TIP Duvall Ave NE - NE 7th St to Sunset Blvd NE Type: 1 - MAINTENANCE AND PRESERVATION Functional Classification: Minor Arterial Proj. Length: 0.67 mi TIP No. 6 Fund: Proj: CONTACT: James Wilhoit 317 t12702 425.430.7319 DESCRIPTION: Widening roadway to five lanes, including new pavement, curb, gutter, sidewalk, street lights, storm drainage, channelization and bike lanes from NE 7th St to the intersection with NE Sunset Blvd. JUSTIFICATION: Complete a missing link of 5-lane roadway, bicycle lanes and sidewalks on Duvall Ave NE, from NE 4th St to Sunset Blvd NE. Condition of the existing roadway pavement requires total replacement. STATUS: Construction to be completed in 2014, pending outside funding. New project to enhance safe vehicle, bicycle and pedestrian access along a minor arterial street. CHANGES: Project is largely unfunded. Funded:Funded:1 100,0001 Unfunded : 6 025 000 Project Totals Programme Pre-2010 Six Year Program ITEM Programmed Spent Pre-2009 2009 Total 2010 2011 2012 2013 2014 2015 EXPENSES: Planning 10,000 10,000 10,000 Preliminary Engineering 650,000 650,000 650,000 R-O-W includes Admin Construction 4,900,000 4,900,000 2,600,000 1,900,000 400,000 Construction Services 565,000 300,000 220,000 45,000 Post Construction Services TOTAL EXPENSES 6,125,000 6,125,000 660,000 2,900,000 2,120,000 445,000 SOURCES OF FUNDS: Vehicle Fuel Tax Business License Fee Proposed Fund Balance Grants In -Hand 1 Grants In -Hand 2 Mitigation In -Hand 100,000 100,000 100,000 Other In -Hand 1 Other In -Hand 2 Grants Proposed Other Proposed Utilities 500,000 500,000 50,000 250,000 200,000 Undetermined 5,525,000 5,525,000 610,000 2,550,000 1,920,000 445,000 TOTAL SOURCES 1 6,125,0001 1 6,125,000 1 1 660,0001 2,900,0001 2,120,0001 445,0001 Dwell 7th to Sunset 05/19/2009 05/19/2009 9:45 5-6 DRAFT CITY OF RENTON PUBLIC WORKS TRANSPORTATION SYSTEMS DIVISION 2010 - 2015 SIX -YEAR TIP SR 169 HOV - 140th Way SE to SR-900 Functional Classification: Principal Fund: 317 Proj. Length: N/A Proj: 12175 Type: 2 -TRANSIT TIP NO. 7 CONTACT: Rob Lochmiller 425.430.7303 DESCRIPTION: Construct queue jumps and bypass lanes that provide transit priority traffic signal improvements on SR-169 (Maple Valley Hwy.) at 140th Way SE and in the area of 1-405. Involves roadway widening at intersection approaches and modifications to channelization and traffic signals, and widening to improve the northbound on -ramp and southbound off -ramp movement at the 1-405/SR 169 interchange. Improve access to Cedar River Park and Stoneway site through traffic modifications. JUSTIFICATION: This is a high volume, high congestion corridor where providing travel time benefits for transit and car/van- pools can be achieved with high cost effectiveness. There are severe congestion and safety problems that can be addressed by adding a right -turn lane westbound on SR-169 and a protected right -turn lane from the 1-405 northbound off -ramp on to eastbound SR-169. *Council allocated $1.2 million from the King County Metro mitigation fund which is included in "proposed fund balance"). STATUS: WSDOT committed $300,000 to design. KC built a pond at 140th Way SE for our use ($275,000 value). Grant awards: $2,208,000 from TIB (R/W and construction), $392,947 TEA-21 Countywide funds (construction), $765,993 TEA-21 Countywide for Ph. 2 (construction), $2.5 M State legislature from gas tax revenue for 2007-2009 biennium (Ph. 2). WSDOT is providing funding for additional work to be constructed as part of the project ($153,298 towards ROW + $292,100 for improvements). CHANGES: The portion of work at the 1-405 location are phased. Phase 1 constructed the signal access road and parking lot. Phase 2 widened SR 169, removed the park maintenance building and constructed additional WSDOT improvements. Phase 3 is the intersection at 140th Way SE and is awaiting funding. Funded : 17,797,946 1 Unfunded 12,420,000 Project Totals Programmed Pre-2010 Six -Year Program ITEM Programmed Spent Pre-2009 2009 Total 2010 2011 2012 2013 2014 2015 EXPENSES: Planning 4,438 4,438 Preliminary Engineering 1,291,897 1,241,897 50,000 50,000 R-O-W includes Admin 628,274 628,274 Construction 7,838,127 5,358,127 230,000 2,250,000 2,250,000 Construction Services 455,209 185,209 20,000 250,000 250,000 Post Construction Services TOTAL EXPENSES 10,217,946 7,417,946 250,000 2,550,000 2,550,000 SOURCE OF FUNDS: Vehicle Fuel Tax 20,000 20,000 20,000 Business License Fee 10,000 10,000 10,000 Proposed Fund Balance * 1,496,760 1,496,760 Grants In -Hand TIB 2,026,157 1,776,157 250,000 Grants In -Hand TEA-21 844,197 844,197 Mitigation In -Hand 712,500 612,500 100,000 100,000 Other WSDOT, State Leg., addit work 2,688,332 2,688,332 Other in -Hand Grants Proposed Other Proposed Undetermined 2,420,0001 1 2,420,000 2,420,000 TOTAL SOURCES 10,217,9461 7,417 946 250,0001 2,550,000 2,550,000 SR169 HOV 05119/2009 9:45 AM 5-7 DRAFT CITY OF. . FON PUBLIC WORKS TRANSPORTATION SYSTEMS DIVISION 2010 - 2015 SIX -YEAR TIP Garden Ave N Widening Type: 4 - PROJECTS AND CORRIDORS Functional Classification: Minor Arterial Fund: 317 Proj. Length: 0.38 miles Proj: 12603 TIP No. 8 CONTACT: Rob Lochmiller 425.430.7303 DESCRIPTION: The project will determine necessary roadway, intersection and traffic route improvements on Garden Ave N, Lake Washington Blvd and Houser Way to mediate the growing traffic demands in the area. It includes widening a portion of Garden Avenue N to accomodate additional traffic from existing and future development plans in the area, JUSTIFICATION: With the additional development growth in the North Renton area, which includes The Landing, Lowe's, and the Southport residential/office development, this project will identify and construct improvements to improve traffic flows in the vicinity. STATUS: The North Renton Area Traffic Analysis has been completed. Design of Garden Ave N to be completed in 2009 with construction to be completed in 2009-2010. CHANGES: Houser Way N and the extension of Park Ave N have been separated into individual TIP project. un e n un e Project Totals Programmed Pre-2010 Six -Year Program ITEM Programmed Spent Pre-2009 2009 Total 2010 2011 2012 2013 2014 2015 EXPENSES: Planning 6,781 6,781 Preliminary Engineering 203,963 33,963 140,000 30,000 20,000 10,000 R-O-W includes Admin Construction 790,000 600,000 190,000 110,000 80,000 Construction Services 90,000 70,000 20,000 20,000 Post Construction Services TOTAL EXPENSES 1,090,744 40,744 810,000 240,000 150,000 90,000 SOURCES OF FUNDS: Vehicle Fuel Tax Business License Fee 144,744 40,744 104,000 104,000 Proposed Fund Balance 310,000 310,000 Grants In -Hand 1 Grants In -Hand 2 Miti ation In -Hand 546,000 500,000 46,000 46,000 Other In -Hand 1 Other In -Hand 2 Grants Proposed Other Proposed Undetermined 1 90,0001 1 90,000 90,000 TOTAL SOURCES 1 1,090,7441 40 744T 810,0001 240,000 150,000 90,000 Garden Ave N 05119/20M 9:45 AM 5-8 DRAFT CITY OF RENTON PUBLIC WORKS TRANSPORTATION SYSTEMS DIVISION 2010 - 2015 SIX -YEAR TIP Park Avenue North Extension Type: 4 - PROJECTS AND CORRIDORS Functional Classification: Proj. Length: TIP No. 9 Fund: 317 Proj: CONTACT: Rob Lochmiller 425.430.7303 DESCRIPTION: The project will extend Park Ave N to provide access to Southport, PSE property and The Boeing Company. Right-of-way for extension of Park Ave N to be dedicated by Boeing per previous agreement. Improvements needed to convert Houser Way N to two-way operations (between N 8th St and Lake Washington Blvd). JUSTIFICATION: With the additional development growth in the North Renton area, which includes The Landing and the Southport residential/office development, this project will construct improvements to extend Park Ave N. STATUS: Design and construction of Park Ave N extension and improvements on Houser Way N are anticipated in 2013 and 2014 and are unfunded. CHANGES: Funds are needed for the improvements on Houser Way N and for the extension of Park Ave N. un ed:1 I Unfunde Project Totals Programmed Pre-2010 Six -Year Program ITEM Programmed Spent Pre-2009 2009 Total 2010 2011 2012 2013 2014 2015 EXPENSES: Planning Preliminary Engineering 630,000 630,000 580,000 50,000 R-O-W includes Admin 500,000 500,000 500,000 Construction 3,500,000 3,500,000 1,200,000 2,300,000 Construction Services 370,000 370,000 120,000 250,000 Post Construction Services TOTAL EXPENSES 5,000,000 5,000,000 2,400,000 2,600,000 SOURCES OF FUNDS: Vehicle Fuel Tax Business License Fee Proposed Fund Balance Grants In -Hand 1 Grants In -Hand 2 Mitigation In -Hand Other In -Hand 1 Other In -Hand 2 Grants Proposed Other Proposed Undetermined 5,000,000 5,000,000 2,400,000 2,600,000 ITUTAL SOURCES 5,000,0001 5,000,000 1 1 2,400,000 2,600,000 Garden Ave N 05119/2009 9:45 AM 5-9 DRAFT CITY OF RENTON PUBLIC WORKS TRANSPORTATION SYSTEMS DIVISION 2010 - 2015 SIX-YFAR TIP 116th Ave SE/Edmonds Ave SE Improvements Functional Classification: Minor arterial Fund: 317 Proj. Length: 2.5 mi Proj: Type: 4 - PROJECTS AND CORRIDORS TIP No. 10 CONTACT: Jim Seitz 425.430.7245 DESCRIPTION: Widen roadway to provide a 3-lane roadway with bike lanes along 116th Ave SE and Edmonds Ave SE, including new pavement, curb, gutter, sidewalk, street lights, traffic signals, storm drainage, channelization and landscaping from Puget Drive SE to south City limits. JUSTIFICATION: 116th Ave SE was recently annexed to the City of Renton and is classified as a minor arterial. It has generally two lanes of traffic with left -turn lanes at signalized intersections and intermittent two -way -left -turn - lane south of SE 168th. Short segments of sidewalk exist on both sides of the roadway. Improvements will enhance vehicular, bicycle and pedestrian safety along this important north -south transportation corridor. STATUS: New project in the Benson Hill annexation area. The priority, cost and schedule for improvements will be determined through Arterial Circulation studies. Construction of improvements between Puget Drive SE and SE 176th Street is antecipated as a first phase. CHANGES: New project. Funded : I JUnfunded 114,285,000 Project Totals Programmed Pre-2010 Six -Year Program ITEM Programmed Spent in 2008 2009 Total 2010 2011 2012 2013 2014 2015 EXPENSES: Planning 10,000 10,000 10,000 Preliminary Engineering 1,904,000 1,904,000 810,000 294,000 500,000 300,000 R-O-W includes Admin 300,000 300,000 300,000 Construction 11,177,000 11,177,000 2,000,000 4,500,000 4,677,000 Construction Services 894,000 894,000 160,000 360,000 374,000 Post Construction Services TOTAL EXPENSES 14,285,000 14,285,000 820,000 2,754,000 4,860,000 500,000 5,351,000 SOURCE OF FUNDS: Vehicle Fuel Tax Business License Fee Proposed Fund Balance Grants In -Hand 1 Grants In -Hand 2 Mitigation In -Hand Other In -Hand 1 Other In -Hand 2 Grants Proposed Other Proposed Undetermined 14,285,0001 1 14,285,000 820,000 2,754,000 4,860,000 500,000 5,351,000 TOTAL SOURCESI 14,285,0001 1 14,285 000 820,000 2 754 000 4,860,000 500,000 5 351,000 Benson Hill 05119/2009 9:45 AM 5 - 10 DRAFT CITY OF RENTON PUBLIC WORKS TRANSPORTATION SYSTEMS DIVISION 2010 - 2015 SIX -YEAR TIP rr Road Improvements 1 - MAINTENANCE AND PRESERVATION )ESCRIPTION: ncludes new pavement, curb, gutter, sidewalk, street lights, traffic signals from Benson Rd South to Talbot td South. Potential improvements vary from roadway realignment/widening at several locations to address leometric deficiencies, widening to 5-lane roadway (2 lanes westbound, 3 lanes eastbound), to a new 4-5 ane roadway on new alignment. This project includes intersection improvements at Carr Road and 1-8th We SE. 71FICATION: Road was recently annexed to the City of Renton and has been classified as a major arterial. It has lanes of traffic with left turn lanes at intersections. King County has identified the need for 'ovements to improve vehicle traffic capacity and enhance vehicular, bicycle, and pedestrian safety on major east -west transportation corridor. Functional Classification: Major Arterial Fund: 317 Proj. Length: Proj: TIP No. 11 CONTACT: Jim Seitz 425.430.7245 STATUS: Roadway improvements options including spot safety improvements, roadway widening and new roadway on new alignment have previously been investigated by King County. Funding proposed in the TIP is for re-evaluation of the King County improvement option as well as investigation of other alternative improvements, and finalization of a scope, cost and schedule of improvements. The amount shown in the last part of the TIP is to review alternatives for improvements on Carr Rd. CHANGES: New project in the Benson Hill annexation area. Project Totals I Programmed Pre-2010 I Six -Year Program ITEM Programmed I Spent In 2008 1 2009 1 Total 1 2010 1 2011 1 2012 1 2013 1 2014 1 2015 1 TOTAL EXPENSESI 100,0001 1 1 100.000 1 1 1 1 1 100,0001 1 nce Loops 05/19/2009 9:45 AM 5-11 DRAFT CITY OF TON PUBLIC WORKS TRANSPORTATION SYSTEMS DIVISION 2010 - 2015 SIX -YEAR TIP Sunset Boulevard Corridor Improvements Functional Classification: N/A Fund: 317 Type: 1 - MAINTENANCE AND PRESERVATION Proj. Length: N/A Proj: TIP No. 12 CONTACT: DESCRIPTION: This project involves a series of key improvements in this corridor to improve traffic operations such as channelization, traffic signal modifications, signal treatments and possibly queue jumps. This project will seek to meet pedestrian, transit and bicycle needs. The project limits are from 1-405 on the west to the east City limits. JUSTIFICATION: This corridor has strong potential for transit usage and is experiencing residential and retail growth. STATUS: The Sunset Blvd Corridor study will initiate in 2010 and will refine transportation needs in the corridor, as well as the costs of the improvements. CHANGES: New project. Funded:Funded:1 300,0001 Unfunded Project Totals Programmed Pre-2010 Six Year Program ITEM Programmed Spent Pre-2009 2009 Total 2010 2011 2012 2013 2014 2015 EXPENSES: Planning 300,000 300,000 300,000 Preliminary Engineering R-O-W includes Admin Construction Construction Services Post Construction Services TOTAL EXPENSES 300,000 300,000 300,000 SOURCES OF FUNDS: Vehicle Fuel Tax Business License Fee Proposed Fund Balance Grants In -Hand 1 Grants In -Hand 2 Mitigation In -Hand Other In -Hand CED 300,000 300,000 300,000 Other In -Hand Grants Proposed Other Proposed Undetermined TOTALR E 300,0001 1 300,000 300,000 May Creek 05/19/2009 9A5 AM 5-12 DRAFT CITY OF RENTON PUBLIC WORKS TRANSPORTATION SYSTEMS DIVISION gnin - 9n1.r, SIX-YFAR TIP Oakesdale Ave SW - Monster Road to SR 900 Functional Classification: Fund: 317 Proj. Length: N/A Proj: Type: 1 - MAINTENANCE AND PRESERVATION TIP No. 13 CONTACT: Bob Mahn 425.430.7322 DESCRIPTION: Widen existing roadway to four lanes plus two -way -left -turn -lane where needed, and bike lanes. Realign Beacon Coal Mine Road approach to intersection with the new Oakesdale Ave roadway. Includes new roadway, curbs, sidewalk, drainage, street lighting, traffic signals, channelization, retaining walls and widening existing bridge. JUSTIFICATION: Will serve growing north -south traffic demand. STATUS: A preliminary design study was completed in 1999. A first stage of improvements will address roadway deficiencies and drainage problems between the Monster Rd bridge and Beacon Coal Mine Road. Scope, cost and implementation schedule has yet to be determined. The project cost is estimated to be $25 million and is shown to be programmed for future years. CHANGES: Funded : I I Unfunded : 15,350,000 Project Totals Programmed Pre-2010 Six -Year Program ITEM Programmed Spent Pre-2009 2009 Total 2010 2011 2012 2013 2014 2015 EXPENSES: Planning 50,000 50,000 50,000 Preliminary Engineering 3,000,000 3,000,000 3,000,000 R-O-W includes Admin 2,300,000 2,300,000 2,300,000 Construction Construction Services Post Construction Services TOTAL EXPENSES 5,350,000 5,350,000 50,000 5,300,000 SOURCE OF FUNDS: Vehicle Fuel Tax Business License Fee Proposed Fund Balance Grants In -Hand 1 Grants In -Hand 1 Mitigation In -Hand Vehicle License Fee Other In -Hand 1 Other In -Hand 1 Grants Proposed Other Proposed Undetermined 5,350,000 5,350,000 50,000 5,300,000 TOTAL SOURCES 5,350,0001 5,350,000 50 000 5 300 000 Pw"unset 05M9/2009 9:45 AM 5-13 DRAFT CITY OF RENTON PUBLIC WORKS TRANSPORTATION SYSTEMS DIVISION 2010 - 2015 SIX -YEAR TIP South 7th Street - Rainier Ave S to Talbot Road South Functional Classification: Fund: 317 Proj. Length: N/A Proj: Type: 4 -PROJECTS AND CORRIDORS TIP No. 14 CONTACT: Bob Mahn 425.430.7322 DESCRIPTION: Preliminary engineering study to evaluate widening the existing roadway to 3 or 5 lanes and the feasibility of a separated bike/pedestrian trail. Included will be new curb, gutter, sidewalk, streetlighting, traffic signals and signal modification, channelization, storm drainage improvements and landscaping, including street trees. The study will identify right-of-way requirements, project costs and finalize the scope of improvements. JUSTIFICATION: This segment of the heavily travelled S/SW 7th St corridor connects Talbot Rd S (SR 515) with Rainier Ave S (SR 167). This segment also borders the South Renton Neighborhood. Increasing traffic demands resulting from the WSDOT 1-405/Talbot Rd interchange ramps will create the need for increased capacity of S 7th St. This segment of S 7th St is part of a designated east -west ped/bike route through the City's commercial core and an important link between regional trails. The South Renton Neighborhood Study has identified S 7th St as needing streetscape improvements. STATUS: Funding is for project development. Schedule and funding for project construction will be determined after completion of WSDOT 1-405/Talbot Road interchange ramps. CHANGES: New project. Funded : I JUnfuncled 1150,000 Project Totals Programmed Pre-2010 Six -Year Program ITEM Programmed Spent Pre-2009 2009 Total 2010 2011 2012 2013 2014 2015 EXPENSES: Planning 150,000 150,000 150,000 Preliminary Engineering R-O-W includes Admin Construction Construction Services Post Construction Services TOTAL EXPENSES 150,000 150,000 150,000 SOURCE OF FUNDS: Vehicle Fuel Tax Business License Fee Proposed Fund Balance Grants In -Hand 1 Grants In -Hand 1 Miti ation In -Hand Vehicle License Fee Other In -Hand 1 Other In -Hand 1 Grants Proposed Other Proposed Undetermined 150,0001 1 150,000 150,000 TOTAL R 150,0001 1 150,000 150,000 Park_Sunset 05/192009 9:45AM 5-14 DRAFT CITY OF RENTON PUBLIC WORKS TRANSPORTATION SYSTEMS DIVISION 2010 - 2015 SIX -YEAR TIP Lake Washington Trail (South Lake Connector) - AKA Sam Chastain Trail Functional Classification: N/A Fund: 317 Proj. Length: N/A Proj: t12707 Type: 3 - NON -MOTORIZED TIP No. 15 CONTACT: James Wilhoit 425.430.7319 DESCRIPTION: The Sam Chastain Trail will will connect Gene Coulon Memorial Beach Park to the Cedar River Trail. The multi -purpose trail will improve non -motorized access to Renton's Urban Center Downtown and Urban Center North. JUSTIFICATION: This trail will complete a missing link and provide connections to 52+ miles of trail for pedestrians, bicyclists and multi -use. The connection between Lake Washington Trail and the Cedar River Trail will be along Logan Ave N. STATUS: The City was awarded a $500,000 Federal Enhancement grant (design) and a $900,000 Enhancement grant (construction). Additional $100,000 grant funding became available through the STP contingency list. CHANGES: This project has been phased. Stage 1 is complete and constructed approximately 4,000 feet of southbound bike lane along Logan Ave N, from Lake Washington Blvd to N 6th St. Stage 2 will construct 2,500 feet of northbound and 2,500 feet of southbound bike lanes along Logan Ave N (from N 6th St to the Cedar River Trail) and construction of non - motorized improvements. Funded : 11,635,045 IUnfunded Project Totals Programmed Pre-2010 Six -Year Program Programmed Spent Pre-2009 2009 Total 2010 2011 2012 2013 2014 2015 EXPENSES: Planning Preliminary Engineering 243,904 88,064 150,000 5,840 5,840 R-O-W includes Admin Construction 1,231,333 321,333 500,000 410,000 410,000 Construction Services 159,807 59,807 50,000 50,000 50,000 Post Construction Services TOTAL EXPENSES 1,635,045 469,205 700,000 465,840 465,840 SOURCE OF FUNDS: Vehicle Fuel Tax Business License Fee 54,250 35,000 19,250 19,250 Proposed Fund Balance 80,795 80,795 Grants In -Hand STP-1 1,000,000 298,813 315,000 386,187 386,187 Grants In -Hand STP-E 500,000 89,597 350,000 60,403 60,403 Mitigation In -Hand Other In -Hand 1 Other In -Hand 2 Grants Proposed Other Proposed Undetermined TOTAL SOURCESI 1,635,0451 469,205 700,0001 465,840 465,840 Bika_Rari 05/19/2009 9:45 AM 5-15 DRAFT CITY OF RENTON PUBLIC WORKS TRANSPORTATION SYSTEMS DIVISION 2010 - 2015 SIX -YEAR TIP Walkway Program Type: 3 - NON -MOTORIZED Functional Classification: N/A Fund: 317 Proj. Length: N/A Proj: to0009 TIP No. 16 CONTACT: Ryan Plut 425.430.7372 DESCRIPTION: This program provides for the design and construction of high priority non -motorized transportation facilities for pedestrians and missing links. Projects are identified and prioritized using criteria from the Comprehensive Citywide Walkway Study, Council direction, and through coordination with the City's Neighborhood Program. JUSTIFICATION: Providing safe and convenient non -motorized facilities is an integral part of a complete transportation network. Specific improvements will respond to the needs of school children, the aged and persons with disabilities, and will support increased use of transit. STATUS: The Comprehensive Citywide Walkway Study is being used to select projects that move into the design and construction phases. Construction of sidewalks along Jones Ave NE are completed. Sidewalks on NE 24th St (adjacent to Jones Ave NE) and curb ramps and missing links in identified locations within downtown Renton are scheduled for 2010. CHANGES: The Comprehensive Citywide Walkway Study was completed in 2009. "Recognized School Walk Routes" will be added to the criteria for project prioritization. Projects for 2011 will be selected in the fall of 2009 based on the recommendations contained in the Walkway Study (posted on the City's web site). The Missing Links Program has been combined into this program. Funded : 12,544,949 IUnfunded Project Totals Programmed Pre-2010 Six -Year Program ITEM Programmed Spent in 2008 2009 Total 2010 2011 2012 2013 2014 2015 EXPENSES: Planning 53,254 18,254 5,000 30,000 5,000 5,000 5,000 5,000 5,000 5,006 Preliminary Engineering 322,190 147,190 25,000 150,000 25,000 25,000 25,000 25,000 25,000 25,000 R-O-W includes Admin 54 54 Construction 1,990,129 140,129 470,000 1,380,000 230,000 230,000 230,000 230,000 230,000 230,000 Construction Services 179,322 9,322 50,000 120,000 20,000 20,000 20,000 20,000 20,000 20,000 Post Construction Services TOTAL EXPENSES 2,544,949 314,949 550,000 1,680,000 280,000 280,000 280,000 280,000 280,000 280,000 SOURCE OF FUNDS: Vehicle Fuel Tax Business License Fee 350,000 350,000 30,000 30,000 50,000 80,000 80,000 80,000 Proposed Fund Balance 414,949 314,949 100,000 Grants In -Hand 1 Grants In -Hand 2 Miti ation In -Hand 1,780,000 450,000 1,330,000 250,000 250,000 230,000 200,000 200,000 200,005 Other In -Hand 1 Other In -Hand 2 Grants Proposed Other Proposed Undetermined TOTAL SOURCES 2,544,9491 314,949 550,0001 1,680 000 280,0001 280,0001 280,000 280,0001 280 0001 280,0001 Walkway 05119/2009 9:45 AM 5-16 DRAFT CITY OF RENTON PUBLIC WORKS TRANSPORTATION SYSTEMS DIVISION 2010 - 2015 SIX -YEAR TIP Sidewalk Rehabilitation and Replacement Program Type: 1 - MAINTENANCE AND PRESERVATION Functional Classification: N/A Proj. Length: N/A TIP No. 17 Fund: 317 Proj: 12801 CONTACT: Bill Wressel 425.430.7400 DESCRIPTION: This program provides for the removal and replacement of existing curb and gutter, sidewalks, and curb ramp, where such facilities have deteriorated or have been damaged. JUSTIFICATION: The Walkway Program installs curb and gutter, sidewalks, and curb ramps where they don't exist. There are many older neighboorhoods with damaged or deteriorated curb and gutter, sidewalks, and curb ramps. There are some places where curb ramps do not exist or are not to current ADA Standards. This program will address these deficiencies and provide safe and convenient non -motorized facilities for pedestrians. STATUS: This program started in 2009. CHANGES: This program is largely unfunded. Funded:Funded:1 390,0001 Unfunded : 1,250,000 Project Totals Programmed Pre-2010 Six -Year Program ITEM Programmed Spent in 2008 2009 Total 2010 2011 2012 2013 2014 2015 EXPENSES: Planning Preliminary Engineering R-O-W includes Admin Construction 1,640,000 250,000 1,390,000 140,000 250,000 250,000 250,000 250,000 250,006 Construction Services Post Construction Services TOTAL EXPENSES 1,640,000 250,000 1,390,000 140,000 250,000 250,000 250,000 250,000 250,000 SOURCE OF FUNDS: Vehicle Fuel Tax Business License Fee 380,000 250,000 130,000 130,000 Proposed Fund Balance 10,000 10,000 10,000 Grants In -Hand 1 Grants In -Hand 2 Miti ation In -Hand Other In -Hand 1 Other In -Hand 2 Grants Proposed Other Proposed Undetermined 1,250,0001 1,250,000 250,000 250,000 250,000 250,000 250,000 TOTAL SOURCES 1 1,640,0001 1 250,0001 1,390,000 140,0001 250,000 250,000 250,0001 250,0001 250,000 NE 41h SUHoqulem Av 05/19/2009 945 AM 5-17 DRAFT CITY OF fON PUBLIC WORKS TRANSPORTATION SYSTEMS DIVISION 2010 - 2015 SIX -YEAR TIP Monterey Ave NE - NE 20th Street - Wall Replacement Type: 1 - MAINTENANCE AND PRESERVATION Functional Classification: Residential Proj. Length: 0.03 miles TIP No. 18 Fund: 317 Proj: t12704 CONTACT: Ran Plut 425.430.7372 DESCRIPTION: Replacement of a 150 If existing gravity wall located behind sidewalk and within existing right-of-way in Monterrey Ave NE (east side) and NE 20th Street (south side). The wall height varies from 2-4 feet and does not meet the current standards for rockeries. JUSTIFICATION: Replacement of the wall is needed as rocks from the existing wall fall into adjacent sidewalk preventing safe movement for pedestrians. STATUS: Construction scheduled for 2011. CHANGES: Funded:Funded:1 30,0001 Unfunded Project Totals Programmed Pre-2010 Six Year Program ITEM Programmed Spent Pre-2009 2009 Total 2010 2011 2012 2013 2014 2015 EXPENSES: Planning Preliminary Engineering R-O-W includes Admin Construction 30,000 30,000 30,000 Construction Services Post Construction Services TOTAL EXPENSES 30,000 30,000 30,000 SOURCES OF FUNDS: Vehicle Fuel Tax Business License Fee 30,000 30,000 30,000 Proposed Fund Balance Grants In -Hand 1 Grants In -Hand 2 Mitigation In -Hand Other In -Hand 1 Other In -Hand 2 Grants Proposed Other Proposed Undetermined TOTAL SOURCES 1 30,0001 1 30,000 1 30,0001 Mmtmey Ave 011/19/2009 9:45AM 5 - 18 DRAFT CITY OF RENTON PUBLIC WORKS TRANSPORTATION SYSTEMS DIVISION 2010 - 2015 SIX -YEAR TIP Bridge Inspection & Repair Program Functional Classification: N/A Fund: 317 Proj. Length: N/A Proj: 106 Type: 1 - MAINTENANCE AND PRESERVATION TIP No. 19 CONTACT: Derek Akesson 425.430.7243 DESCRIPTION: Inspect all roadway bridges owned by the City every two years to determine bridge sufficiency and load ratings, seismic retrofit needs, undertake minor repairs, and preventative maintenance as needed. JUSTIFICATION: Inspection program must be done for safety and funding purposes and as part of WSBIS Program to determine structural deficiencies, physical deterioration, or functional obsolescence and to qualify for Federal bridge replacement grant funding. Repair funding is provided to accomplish improvements, identified through the inspection program, that will increase the safety and extend the longevity of the structures. STATUS: Biennial bridge inspections occur in 2009, 2011 and 2013. Scour and load rating for each of the bridges were evaluated in 2007 and 2008. The Monster Road Bridge repairs require an annual inspection frequency for the next three inspection cycles. CHANGES: Working on an interlocal agreement with King County for bridge inspection and repair. Additional maintenance and inspection of the bridges in 2011 requires additional funds. Proposed expenses for 2010 moved to 2011-12 due to funding restrictions. Funded : 1561,656 Unfunded : 1305,000 Project Totals Programmed Pre-2010 Six -Year Program ITEM Programmed Spent in 2008 2009 Total 2010 2011 2012 2013 2014 2015 EXPENSES: Planning Preliminary Engineering 137,318 47,318 30,000 60,000 10,000 10,000 10,000 10,000 10,000 10,000 R-O-W includes Admin Construction 354,052 4,052 50,000 300,000 50,000 150,000 100,000 Construction Services 50,191 191 20,000 30,000 5,000 15,000 10,000 Post Construction Services/Other 325,095 95 80,000 245,000 35,000 45,000 40,000 45,000 40,000 40,000 TOTAL EXPENSES 866,656 51,656 180,000 635,000 100,000 220,000 160,000 55,000 50,000 50,000 SOURCE OF FUNDS: Vehicle Fuel Tax Business License Fee 4309000 10,000 90,000 330,000 100,000 40,000 40,000 50,000 50,000 50,000 Proposed Fund Balance 131,656 41,656 90,000 Grants In -Hand 1 Grants In -Hand 2 Mitigation In -Hand Other In -Hand Other In -Hand Grants Proposed Other Proposed Undetermined 305,0001 305,000 180,000 120,000 5,000 TOTAL SOURCESI 866,6561 51,6561 180,0001 635,000 1 100,000 220,0001 160,0001 55,000 50,000 509000 Br1dp Inspect 05/19/2009 9:45 AM 5-19 DRAFT CITY OF RENTON PUBLIC WORKS TRANSPORTATION SYSTEMS DIVISION 2010 - 2015 SIX -YEAR TIP Intersection Safety & Mobility Program Functional Classification: N/A Fund: 317 Proj. Length: N/A Proj: 12601 Type: 5 - SAFETY TIP No. 20 CONTACT: Bob Cavanaugh 425.430.7222 DESCRIPTION: This program will design and construct traffic signals identified by the transportation system traffic signal priority needs list, including intersection improvements. Intersections without signalized traffic control will be evaluated. JUSTIFICATION: Historically, on the average, one traffic signal is designed and constructed every two years to meet safety and mobility needs. This program budgets for projects needed to meet increasing demand, and the need for signalized traffic control. Elements used to prioritize project intersections may include vehicular approach volumes, accident analysis, signal -warrant analysis, and pedestrian volume. STATUS: The priorities and schedules for new traffic signals will be set by the transportation system traffic signal warrant priority list. The list is determined by citizen concerns, intersection safety, mobility needs, and intersections that meet MUTCD traffic signal warrants. CHANGES: Traffic signals high on the warrant priority list include: SW 41st St & Oakesdale Ave SW, S Carr Road & Mill Ave S, SW 34th St & Lind Ave SW, and S 55th St & Talbot Rd. Proposed expenses for 2010 reduced by $50,000 due to funding restrictions Funded : 12,013,032 lUnfunded : 162,100 Project Totals Programmed Pre-2010 Six -Year Program ITEM Programmed Spent in 2008 2009 Total 2610 2011 2012 2013 2014 2015 EXPENSES: Planning Preliminary Engineering 250,596 68,596 26,000 156,000 26,000 26,000 26,000 26,000 26,000 26,000 R-O-W includes Admin Construction 1,645,609 24,609 455,000 1,166,000 156,000 202,000 202,000 202,000 202,000 202,005 Construction Services 178,927 11,927 39,000 128,000 18,000 22,000 22,000 22,000 22,000 22,000 Post Construction Services TOTAL EXPENSES 2,075,132 105,132 520,000 1,450,000 200,000 250,000 250,000 250,000 250,000 250,000 SOURCE OF FUNDS: Vehicle Fuel Tax Business License Fee 1,687,900 100,000 250,000 1,337,900 150,000 220,000 230,000 242,400 245,500 250,000 Proposed Fund Balance 75,132 5,132 70,000 Grants In -Hand 1 Grants In -Hand 2 Miti ation In -Hand 250,000 200,000 50,000 50,000 Other In -Hand Other In -Hand Grants Proposed Other Proposed Undetermined 62,100 62,100 30,000 20,000 7,600 4,500 TOTAL SOURCES 2,075,1321 105,132 520,0001 1,450,000 200,000 250,000 250,000 250,000 250,000 250,000 Inters Safely 05/19/2009 9.45 AM 5 - 20 DRAFT CITY OF RENTON PUBLIC WORKS TRANSPORTATION SYSTEMS DIVISION 2010 - 2015 SIX -YEAR TIP Traffic Safety Program Functional Classification: N/A Fund: 317 Proj. Length: N/A Proj: t12115 Type: 5 - SAFETY TIP No. 21 CONTACT: Dave Whitmarsch 425.430.7423 DESCRIPTION: This ongoing yearly program provides for special small-scale traffic safety improvements that are identified and require materials, labor or equipment beyond the normal scope of City operations and maintenance crews. This program includes providing materials for railroad crossing upgrades and converting school zone signs to electronic operation. JUSTIFICATION: Historically, this level of traffic safety improvements are required on an annual basis. This program budgets for safety projects to address these needs. Projects are typically identified through citizen concerns, analysis of accident records or observation by City Traffic Operations and Maintenance personnel. Traffic Operations Section identify and prioritize locations. STATUS: Uninterruptable power supply (UPS) at various intersections has been completed. Program goal is to install UPS at four critical intersections per year (all years), pending sufficient funding. LED Replacement Program is part of the Intelligent Transportation System (ITS) Program. CHANGES: Railroad Crossing Safety Program and School Zone Sign Upgrades have been combined into this program. ]Funded: 1330,493 lUnfunded : 120,000 Project Totals Programmed Pre-2010 Six -Year Program ITEM Programmed Spent in 2008 2009 Total 2010 2011 2012 2013 2014 2015 EXPENSES: Planning Preliminary Engineering 41,912 912 6,000 35,000 2,500 4,500 4,500 14,500 4,500 4,500 R-O-W includes Admin Construction 291,081 44,581 68,000 178,500 16,000 32,500 32,500 32,500 32,500 32,500 Construction Services 17,500 1,000 16,500 1,500 3,000 3,000 3,000 3,000 3,000 Post Construction Services TOTAL EXPENSES 350,493 45,493 75,000 230,000 20,000 40,000 40,000 50,000 40,000 40,000 SOURCE OF FUNDS: Vehicle Fuel Tax Business License Fee 270,000 30,000 30,000 210,000 20,000 20,000 40,000 50,000 40,000 40,000 Proposed Fund Balance 60,493 15,493 45,000 Grants In -Hand 1 Grants In -Hand 2 Miti ation In -Hand Other In -Hand 1 Other In -Hand 2 Grants Proposed Other Proposed Undetermined Z_'0001 1 20,000 20,000 350,4931 45,493 75,0001 230,000 20,000 40,000 40,000 50,000 40,000 40,000 Safety 05119r"9 9:4SAM 5-21 DRAFT CITY OF RENTON PUBLIC WORKS TRANSPORTATION SYSTEMS DIVISION 2010 - 2015 SIX -YEAR TIP Preservation of Traffic Operation Devices Program Functional Classification: N/A Fund: 317 Proj. Length: N/A Proj: Type: 1.- MAINTENANCE AND PRESERVATION TIP No. 22 CONTACT: Dave Whitmarsh 425.430.7423 DESCRIPTION: Replace failed or failing traffic signal vehicle detection loops and repair pavement as required to achieve proper installation and assure reliability. This program also provides for the replacement and/or relocation of signs that are obsolete, faded, poorly located or no longer appropriate, and replacement of damaged luminaire and signal poles. These poles have been damaged in unknown incidents where reimbursement through normal channels is impossible. JUSTIFICATION: Most of Renton's signals require extensive vehicle detection systems to provide traffic count data needed for the intersection controllers and VMS signal coordination system to operate effectively. The detection loops in the pavement must be properly maintained; their failure results in highly inefficient operation. Pavement deterioriation due to heavy traffic volumes, trucks, and adverse weather have increased the need for replacement. STATUS: Ongoing yearly program. The program provides for the purchase and repair of poles and materials that will be assembled and installed by the City. CHANGES: Traffic Loop, Traffic Sign and Pole Replacement Programs have been combined into this program. Funded : 1420,000 1 Unfunded Project Totals Programmed Pre-2010 Six -Year Program ITEM Programmed Spent In 2008 2009 Total 2010 2011 2012 2013 2014 2015 EXPENSES: Planning Preliminary Engineering R-O-W includes Admin Construction 420,000 50,000 370,000 57,500 62,500 62,500 62,500 62,500 62,506 Construction Services Post Construction Services TOTAL EXPENSES 420,000 50,000 370,000 57,500 62,500 62,500 62,500 62,500 62,500 SOURCE OF FUNDS: Vehicle Fuel Tax Business License Fee 420,000 50,000 370,000 57,500 62,500 62,500 62,500 62,500 62,500 Proposed Fund Balance Grants In -Hand 1 Grants In -Hand 2 Miti ation In -Hand Other In -Hand 1 Other In -Hand 2 Grants Proposed Other Proposed Undetermined TOTAL SOURCES 420,0001 50,0001 370,000 57,500 62,500 62,500 62,500 62,500 62,500 Loops 05/19/2009 945 AM 5 - 22 DRAFT CITY OF RENTON PUBLIC WORKS TRANSPORTATION SYSTEMS DIVISION 2010 - 2015 SIX -YEAR TIP Intelligent Transportation Systems (ITS) Program Type: 5 - SAFETY Functional Classification: N/A Proj. Length: N/A TIP No. 23 Fund: Proj: CONTACT: Chris Barnes 317 12162 425.430.7220 DESCRIPTION: Provides for improvements to the operational efficiency of the existing roadway system, including such items as development and implementation of signal coordination programs, signing and channelization improvements, surveillance control and driver information system (SC & DI), transit signal priority, Intelligent Traffic Systems (ITS) Master Plan, signal improvements such as protective/permissive phasing, and matching funds for possible grants to upgrade the central traffic control system. JUSTIFICATION: Improving the capacity and efficiency of the existing roadway system is a very cost effective element of the transportation program. STATUS: Upgrading of all signal controllers (to be compatible with the new central system) continues into 2009. Program goal is to replace signal controllers at ten intersections per year. CHANGES: Funded : 1386,113 Unfunded Project Totals Programmed Pre-2010 Six -Year Program ITEM Programmed Spent in 2008 2009 Total 2010 2011 2012 2013 2014 2015 EXPENSES: Planning Preliminary Engineering 37,896 10,896 3,000 24,000 3,000 3,000 3,000 5,000 5,000 5,000 R-O-W includes Admin Construction 232,000 43,000 189,000 43,000 43,000 43,000 20,000 20,000 20,000 Construction Services 31,000 4,000 27,000 4,000 4,000 4,000 5,000 5,000 5,000 Post Construction Services/Other 85,217 85,217 TOTAL EXPENSES 386,113 96,113 50,000 240,000 50,000 50,000 50,000 30,000 30,000 30,000 SOURCE OF FUNDS: Vehicle Fuel Tax Business License Fee 386,113 96,113 50,000 240,000 50,000 50,000 50,000 30,000 30,000 30,000 Proposed Fund Balance Grants In -Hand 1 Grants In -Hand 2 Miti ation In -Hand Other In -Hand 1 Other In -Hand 2 Grants Proposed Other Proposed General Fund Undetermined TOTAL SOURCESI 386,1131 96,113 50,0001 240,000 50,000 50,000 50,000 30,000 30,000 30,000 Efr i-y 05/19/2009 9:45 AM 5 - 23 DRAFT CITY OF RENTON PUBLIC WORKS TRANSPORTATION SYSTEMS DIVISION 2010 - 2015 SIX -YEAR TIP Transit Program Functional Classification: N/A Fund: 317 Proj. Length: N/A Proj: 12706 Type: 2 - TRANSIT TIP No. 24 CONTACT: Nathan Jones 425.430.7217 DESCRIPTION: Plan and fund short-range and long-range transit services and facilities, including park -and -ride lots, bus shelters, and arterial system improvement high occupancy vehicle (HOV) lanes required to facilitate transit access. Joint projects with King County Metro and Sound Transit will also be pursued to improve local and regional transit service in Renton. Coordination with transit agencies, community, and businesses for implementation. JUSTIFICATION: Transit improvements are a vital component of the transportation system's ability to absorb future traffic demand and meet level -of -service standards. The City and private developers have invested millions of dollars in capital improvements in support of transit -oriented development and services. Transit will be one key in meeting the goals of the downtown area as well as development in other parts of the City. Coordination with Metro and Sound Transit projects and programs will help leverage these funds and increase benefits to Renton. STATUS: Staff continue to attend regional coordination meetings with transit agencies, monitor service and capital facility improvements within Renton, pursue and advocate for better -timed arrivals and departures at major Renton transit facilities. Currently RUSH (aka Metro Route 110) provides peak -hour commute services connecting the train station, downtown and north Renton. CHANGES: Use a portion as local matching funds for Transit Now King County Metro program to provide enhanced service hours on local Renton routes 153 and 110. Starting in 2008, Renton pays $73,000 yearly for Route 153. In 2010 program will provide $200,000/year for Route 110 (Transit Now partnerships). These are 5-year service agreements. The status in 2014 and beyond assumes these services will continue after 5 years. ]Funded: 11,606,583 IUnfunded : 1150,000 Project Totals Programmed Pre-2010 Six -Year Program ITEM Programmed Spent in 2008 2009 Total 2010 2011 2012 2013 2014 2015 EXPENSES: Planning 1,756,583 21,583 85,000 1,650,000 275,000 275,000 275,000 275,000 275,000 275,000 Preliminary Engineering R-O-W includes Admin Construction Construction Services Post Construction Services TOTAL EXPENSES 1,756,583 21,583 85,000 1,650,000 275,000 275,000 275,000 275,000 275,000 275,000 SOURCE OF FUNDS: Vehicle Fuel Tax Business License Fee 851,583 21,583 80,000 750,000 125,000 125,000 125,000 125,000 125,000 125,006 Proposed Fund Balance 5,000 5,000 Grants In -Hand 1 Grants In -Hand 1 Miti ation In -Hand Other In -Hand General Fund 750,000 750,000 150,000 150,000 150,000 150,000 150,000 Other In -Hand 2 Grants Proposed FTA Other Proposed Undetermined 150,0001 150,000 150,000 TOTAL SOURCES 1 1,756,5831 21,5831 85,0001 1,650,000 1 275,0001 275,0001 275,0001 275,0001 275,000 275,000 Transit 05/19/2009 9:45 AM 5 - 24 DRAFT CITY OF RENTON PUBLIC WORKS TRANSPORTATION SYSTEMS DIVISION 2010 - 2015 SIX -YEAR TIP Transportation Demand Management (TDM) Program Functional Classification: N/A Fund: 317 Proj. Length: N/A Proj: 12135 Type: 2 - TRANSIT TIP No. 25 CONTACT: Nate Jones 425.430.7217 DESCRIPTION: Renton's TDM program implements the State's Commute Trip Reduction (CTR) Act by encouraging a reduction in the use of single occupancy vehicles (SOV). Incentives are offered to employees (at businesses with 100 or more employees) arriving to work between 6 and 9 a.m. The City has two CTR programs: 1. The Citywide and 2. the City Hall CTR program (see note below). The TIP funds the Citywide CTR Program and offers technical assistance to Renton businesses affected by the Act. JUSTIFICATION: The City is required by 1991 State Legislation to develop and implement a CTR program. This law applies to areas of the State with continuing air quality problems. TDM is an important element in achieving desired transportation, environmental, and land use goals. Note: Renton City Hall is an affected CTR site and must implement its own CTR program for City employees; it is funded outside the TIP program. STATUS: It is expected that technical assistance to employers for the Citywide program will continue at current levels in future years (provided State funds in support of this program continue). Renton receives a State allotment every two years to help fund the Citywide CTR program. The actual amount is determined by the number of CTR-affected worksites. CHANGES: Funded : 1507,656 lUnfunded Project Totals Programmed Pre-2010 Six -Year Program ITEM Programmed Spent in 2008 2009 Total 2010 2011 2012 2013 2014 2015 EXPENSES: Planning 507,155 52,155 65,000 390,000 65,000 65,000 65,000 65,000 65,000 65,006 Preliminary Engineering R-O-W includes Admin Construction 501 501 Construction Services Post Construction Services TOTAL EXPENSES 507,656 52,656 65,000 390,000 65,000 65,000 65,000 65,000 65,000 65,000 SOURCE OF FUNDS: Vehicle Fuel Tax Business License Fee 169,000 15,000 22,000 132,000 22,000 22,000 22,000 22,000 22,000 22,000 Proposed Fund Balance 2,430 2,430 Grants In -Hand 1 Grants In -Hand 2 Mitigation In -Hand Other In -Hand CTR allot. 336,226 35,226 43,000 258,000 43,000 43,000 43,000 43,000 43,000 43,000 Other In -Hand 2 Grants Proposed Other Proposed Undetermined TOTAL SOURCESI 507,6561 52,656 65,0001 390,000 65,0001 65,0001 65,0001 65,0001 65,000165 000 TDM 05/19/2009 9:45 AM 5 - 25 DRAFT CITY OF RENTON PUBLIC WORKS TRANSPORTATION SYSTEMS DIVISION 2010 - 2015 SIX -YEAR TIP Bicycle Route Development Program Functional Classification: N/A Fund: 317 Proj. Length: N/A Proj: 12173 Type: 3 - NON -MOTORIZED TIP No. 26 CONTACT: Dan Hasty 425.430.7246 DESCRIPTION: Partner with other City departments to further develop the City's non -motorized facilities. Sign bicycle routes along preferred corridors. Construct missing links in the bicycle route system. Construct site- specific improvements. Upgrade routes as needed to safely accommodate bicycle traffic. Publicize Renton bicycle network. Provides funding to match grant requests for bicycle planning and construction improvements. JUSTIFICATION: The City does not currently have a well -developed bicycle route system. This program will complete an integrated system of bicycle routes and trails and upgrade streets to better accommodate bicycles. Many locations along existing and potential routes have site -specific safety problems, which would be addressed in this program. Additionally, there is a strong demand for better -developed non -motorized facilities in Renton. STATUS: The City was awarded a Federal Enhancement Grant: $100,000 to develop and produce a map that identifies a bicycle network with connections leading into and out of the City of Renton. Public outreach in various forms will be part of the effort to educate the public on using bicycle routes in the safest manner. The map will identify preferred routes, shared use paths, bicycle lanes, steep grades, etc. CHANGES: Funded : 1476,037 lUnfuncled 1210,000 Project Totals Programmed Pre-2010 Six -Year Program ITEM Programmed Spent Pre-2009 2009 Total 2010 2011 2012 2013 2014 2015 EXPENSES: Planning 235,285 217,285 18,000 Preliminary Engineering 74,752 752 74,000 20,000 10,000 11,000 11,000 11,000 11,000 R-O-W includes Admin Construction 346,000 346,000 90,000 64,000 64,000 64,000 64,006 Construction Services 30,000 30,000 10,000 5,000 5,000 5,000 5,000 Post Construction Services TOTAL EXPENSES 686,037 218,037 18,000 450,000 20,000 110,000 80,000 80,000 80,000 80,000 SOURCE OF FUNDS: Vehicle Fuel Tax Business License Fee 291,954 33,954 18,000 240,000 20,000 30,000 40,000 50,000 50,000 50,000 Proposed Fund Balance 96,602 96,602 Grants In -Hand 1 87,481 87,481 Grants In -Hand 2 Mitigation In -Hand Other In -Hand 1 Other In -Hand 2 Grants Proposed Other Pro osed Undetermined 210,0001 1 210,000 80,000 40,000 30,000 30,000 30,000 TOTAL SOURCESI 686,0371 218,037 18,0001 450,000 20,000 110,000 80,000 80,000 80.000. 80,000 Bk. R.A. 05/19/2009 9.45 AM 5-26 DRAFT CITY OF RENTON PUBLIC WORKS TRANSPORTATION SYSTEMS DIVISION 2(l1B - 9fl1.ri SIX -YEAR TIP Barrier Free Transition Plan Implementation Functional Classification: N/A Fund: 317 Proj. Length: N/A Proj: 12705 Type: 4 - PROJECTS AND CORRIDORS TIP No. 27 CONTACT: Dan Hasty 425.430.7246 DESCRIPTION: This program will fund implementation of projects that support the City's effort to transition pedestrian facilities that lie within the right-of-way into conformity with provisions contained in the Americans with Disabilities Act (ADA) Guidelines. This program will also provide funding for designing and building features on an "as needed" basis in response to individual requests to improve access for individuals with specialized needs. JUSTIFICATION: A programatic approach is now recognized as being required to ensure compliance with federal law. STATUS: An annual project will be put together based upon the standing of individual sites as identified in the Transition Plan section of the City of Renton Comprehensive Citywide Sidewalk Study. This "project" will have a target budget of --$30,000. The remaining - $20,000 will be set aside to respond to requests to address barriers to movement for individuals with special needs. CHANGES: This program started in 2008 Funded:Fundedd 345,9701 Unfunded Project Totals Programmed Pre-2010 Six Year Program ITEM Programmed Spent Pre-2009 2009 Total 2010 2011 2012 2013 2014 2015 EXPENSES: Planning 95,988 4,988 13,000 78,000 13,000 13,000 13,000 13,000 13,000 13,000 Preliminary Engineering R-O-W includes Admin Construction 235,958 958 25,000 210,000 35,000 35,000 35,000 35,000 35,000 35,000 Construction Services 23 2,000 12,000 2,000 2,000 2,000 2,000 2,000 2,000 Post Construction Services TOTAL EXPENSES 345,970 5,970 40,000 300,000 50,000 50,000 50,000 50,000 50,000 50,000 SOURCES OF FUNDS: Vehicle Fuel Tax Business License Fee 345,970 5,970 40,000 300,000 50,000 50,000 50,000 50,000 50,000 50,000 Proposed Fund Balance Grants In -Hand 1 Grants In -Hand 1 Mitigation In -Hand Other In -Hand 1 Other In -Hand 2 Grants Proposed Other Proposed Undetermined TOTAL SOURCES 345,9701 5,970 40,0001 300,000 50,000 50,000 50,000 50,000 50,000150,000 B.flx Free 05/19/2009 10:43 AM 5 - 27 DRAFT CITY OF RENTON PUBLIC WORKS TRANSPORTATION SYSTEMS DIVISION 2010 - 2015 SIX YEAR TIP South Renton Burnett Park Neighborhood Street Improvements Type: 1 - INFRASTRUCTURE Functional Classification: N/A Fund: 317 Proj. Length: N/A Proj: 12194 TIP No. 28 CONTACT: Jim Seitz 425.430.7245 DESCRIPTION: Provide improvements and asphalt overlay in the South Renton Burnett Park neighborhood. Asphalt overlay Shattuck Av S from SW 7th St to Houser Wy S, South 6th St from Burnett Av S to Shattuck Av S, SW 7th St from Shattuck Av S to Rainier Av S, South 5th St from Burnett Av S to Smithers Av S. JUSTIFICATION: STATUS: Transportation will work with Economic Development to review current plans and conduct outreach meetings in 2010. Outcome from revised plans to be implemented in 2011 with South Renton Mitigation Reserve funds. Use of Metro mitigation funds requires Council approval. CHANGES: Funded : 1731,250 lUnfunded Project Totals Programmed Pre-2010 Six -Year Program ITEM Programmed SpentPre-2009 2009 Total 2010 2011 2012 2013 2014 2015 EXPENSES: Planning 973 973 Preliminary Engineering 376,112 51,112 325,000 50,000 275,000 R-O-W includes Admin Construction 294,138 Construction Services 60,027 Post Construction ServicesETOTAL A731,250 EXPENSES 406,250 325,000 50,000 275,000 SOURCE OF FUNDS: Vehicle Fuel Tax Business License Fee Prop. Fund Bal. 181,250 181,250 Grants In -Hand 1 Grants In -Hand 2 Miti ation In -Hand 125,000 125,000 Other In -Hand - Metro Miti . 425,000 100,000 325,000 50,000 275,000 Other In -Hand 2 Grants Proposed Other Proposed Undetermined TOTAL SOURCES 1 731,2501 406,2501 1 325,000 50,000 275,000 5 Renton Project 05/19/2009 9:45 AM 5-28 DRAFT CITY OF RENTON PUBLIC WORKS TRANSPORTATION SYSTEMS DIVISION 2010 - 2015 SIX -YEAR TIP Project Development & Pre -Design Program Type: 2 -TRANSIT Functional Classification: N/A Proj. Length: N/A TIP No. 29 Fund: 317 Proj: 12150 CONTACT: Jim Seitz 425.430.7245 DESCRIPTION: Perform critical activities needed for the development of future CIP projects and for grant applications, including scoping, cost estimates, pre -design, interlocal agreements and deficiency analysis. Also provides for the monitoring of active grant projects for compliance with State and Federal laws, regulations and specifications. JUSTIFICATION: Analysis of existing and projected transportation operation problems, infrastructure maintenance needs, local and regional mobility goals and revenues/costs is vital to the development of transportation projects that will best serve the needs of Renton and compete well for grants. Also to maintain eligibility for grant funding, the City must assure that project specifications and management comply with current State and Federal standards. STATUS: Ongoing yearly program. This program includes small studies funding and funds required to match new grants. CHANGES: Funded : 1878,330 1 Unfunded 1120,000 Project Totals Programmed Pre-2010 Six -Year Program ITEM Programmed Spent in 2008 2009 Total 2010 2011 2012 2013 2014 2015 EXPENSES: Planning 688,330 18,330 90,000 580,000 80,000 100,000 100,000 100,000 100,000 100,000 Preliminary Engineering 310,000 10,000 300,000 50,000 50,000 50,000 50,000 50,000 50,000 R-O-W includes Admin Construction Construction Services Post Construction Services TOTAL EXPENSES 998,330 18,330 100,000 880,000 130,000 150,000 150,000 150,000 150,000 150,000 SOURCE OF FUNDS: Vehicle Fuel Tax Business License Fee 803,330 18,330 25,000 760,000 130,000 110,000 130,000 130,000 130,000 130,000 Proposed Fund Balance 75,000 75,000 Grants In -Hand 1 Grants In -Hand 2 Miti ation In -Hand Other In -Hand WSDOT A reem Other In -Hand 2 Grants Proposed Other Proposed Undetermined 1 120,0001 120,000 40,000 20,000 20,000 20,000 20,000 TOTAL SOURCESI 998,3301 18,3301 100,0001 880,000 130,0001 150,0001 150,000 150,0001 150,0001 150,000 PreD 05/19/2009 9:45 AM 5-29 DRAFT CITY OF RENTON PUBLIC WORKS TRANSPORTATION SYSTEMS DIVISION 2010 - 2015 SIX -YEAR TIP Arterial Circulation Program Functional Classification: N/A Fund: 317 Proj. Length: N/A Proj: 29 Type: 2 - TRANSIT TIP No. 30 CONTACT: Keith Woolley 425.430.7318 DESCRIPTION: This program provides for the long-range and short-range planning and traffic analysis required to evaluate and update the Transportation Element in relation to the Comprehensive Land Use Plan, to assess the impacts of new development proposals and to recommend local and regional transportation system improvements for all modes of travel. Funding for hardware, software and employee hours required to operate the computer model is also included under this program. JUSTIFICATION: Combined State and Federal Clean Air legislation, the Growth Management Act, passage of the RTA plan and the increasing importance of making sure that local and regional transportation plans are coordinated to the benefit of Renton, make ongoing, multi -modal planning a high priority need. STATUS: This project will fund the ongoing planning work which will lead to refinement and/or adjustment of the of improvement projects on the arterial network identified in the Transportation Plan. CHANGES: Transportation circulation in the South Lake Washington neighborhood continues to adapt to new variables, including the 1-405 Renton to Bellevue project. Upgrades to traffic analysis software are included. Funded : 11,461,200 ILInfuncled : 250 000 Project Totals Programmed Pre-2010 Six -Year Program ITEM Programmed Spent In 2008 2009 Total 2010 2011 2012 2013 2014 2015 EXPENSES: Planning 1,711,200 81,200 200,000 1,430,000 180,000 250,000 250,000 250,000 250,000 250,000 Preliminary Engineering R-O-W includes Admin Construction Construction Services Post Construction Services TOTAL EXPENSES 1,711,200 81,200 200,000 1,430,000 180,000 250,000 250,000 250,000 250,000 250,000 SOURCE OF FUNDS: Vehicle Fuel Tax Business License Fee 1,311,200 81,200 50,000 1,180,000 180,000 200,000 200,000 200,000 200,000 200,006 Proposed Fund Balance 150,000 150,000 Grants In -Hand 1 Grants In -Hand 2 Mitigation In -Hand Other In -Hand 1 Other In -Hand 2 Grants Proposed Other Proposed Undetermined 250,0001 1 250,000 50,000 50,000 50,000 50,000 50,000 TOTAL SOURCES1 1,711,2001 81,200 200,0001 1,430,000 180,000 250,000 250,000 250,000 250,0001 250,0001 AA.W Circ M19/2009 9:45 AM 5 - 30 DRAFT CITY OF RENTON PUBLIC WORKS TRANSPORTATION SYSTEMS DIVISION 2010 - 2015 SIX -YEAR TIP Transportation Concurrency / LOS Program Type: 4 - PROJECTS AND CORRIDORS Functional Classification: N/A Proj. Length: N/A TIP No. Fund: 317 Proj: 12107 31 CONTACT: Keith Woolley 425.430.7318 DESCRIPTION: The City has created a citywide Transportation Benefit Zone as part of the GMA Comprehensive Plan's Transportation Concurrency requirements to provide a source of funds for transportation improvements necessary to support new development. This project supports the necessary planning effort to determine appropriate fees to charge as part of the mitigation process, to adjust the fee due to transportation plan changes and other factors affecting the fees as a funding source and to monitor the funds collected. JUSTIFICATION: Management of the transportation concurrency and mitigation programs is an integral part of planning transportation improvements, ensuring that new development pays a fair share of the cost, and in maintaining a level of service required under GMA to allow new development to be approved and take place. STATUS: Ongoing yearly program. CHANGES: Funded : 1180,000 lUnfunded Project Totals Programmed Pre-2010 Six -Year Program ITEM Programmed Spent in 2008 2009 Total 2010 2011 2012 2013 2014 2015 EXPENSES: Planning 180,000 50,000 130,000 10,000 10,000 40,000 10,000 30,000 30,000 Preliminary Engineering R-O-W includes Admin Construction Construction Services Post Construction Services TOTAL EXPENSES 180,000 50,000 130,000 10,000 10,000 40,000 10,000 30,000 30,000 SOURCE OF FUNDS: Vehicle Fuel Tax Business License Fee 140,000 10,000 130,000 10,000 10,000 40,000 10,000 30,000 30,000 Proposed Fund Balance 40,000 40,000 Grants In -Hand 1 Grants In -Hand 2 Mitigation In -Hand Other In -Hand 1 Other In -Hand 2 Grants Proposed Other Proposed Undetermined TOTAL SOURCESI 180,0001 50,0001 130,000 1 10,0001 10,0001 40,0001 10,0001 30,000130 000 C .rr..y 05/19/2009 9.45 AM 5 - 31 DRAFT CITY OF RENTON PUBLIC WORKS TRANSPORTATION SYSTEMS DIVISION 2010 - 2015 SIX -YEAR TIP Environmental Monitoring Program Type: 1 - MAINTENANCE AND PRESERVATION Functional Classification: N/A Fund: Proj. Length: N/A Proj: TIP No. 32 CONTACT: Ryan Plut 317 12187 425.430.7372 DESCRIPTION: Monitoring of wetland mitigation installed as a project environmental requirement and to perform biological assessments as required by the Endangered Species Act. JUSTIFICATION: Monitoring ensures that the wetland vegetation installed is properly established. Creates an account to pay for unscheduled project environmental assessments. STATUS: The 5-Year report for the Oakesdale - Phase 2 site has been sent to the regulatory agencies for review. Current site maintenance and monitoring contracts have been terminated. A consultant has been contracted to evaluate wetlands. CHANGES: Attempts to get early acceptance for the Phase 1 site have been successful. The Corps of Engineers has allowed the City to reduce the monitoring requirements to match the site's success. Funded : 1258,984 lUnfunded : 30 000 Project Totals Programmed Pre-2010 Six -Year Program ITEM Programmed Spent in 2008 2009 Total 2010 2011 2012 2013 2014 2015 EXPENSES: Planning Preliminary Engineering 172,884 32,884 50,000 90,000 15,000 15,000 15,000 15,000 15,000 15,000 R-O-W includes Admin Construction 54,100 6,100 18,000 30,000 5,000 5,000 5,000 5,000 5,000 5,000 Construction Services 62,000 2,000 60.000 10,000 10,000 10,000 10,000 10,000 10,000 Post Construction Services TOTAL EXPENSES 288,984 38,984 70,000 180,000 30,000 30,000 30,000 30,000 30,000 30,006 SOURCE OF FUNDS: Vehicle Fuel Tax Business License Fee 238,984 38,984 50,000 150,000 30,000 30,000 20,000 20,000 20,000 30,000 Proposed Fund Balance 20,000 20,000 Grants In -Hand 1 Grants In -Hand 2 Mitigation In -Hand Other In -Hand 1 Other In -Hand 2 Grants Proposed Other Proposed Undetermined 30,000 30,000 1 10,000 10,000 10,000 TOTAL SOURCES 288,9841 38,984 70,0001 180,000 1 30,0001 30,000 30,000 30,000 30,000 30,000 En*m 05/19/2009 9.45 AM 5 - 32 DRAFT CITY OF RENTON PUBLIC WORKS TRANSPORTATION SYSTEMS DIVISION 2010 - 2015 SIX -YEAR TIP WSDOT Coordination Program Type: 2 -TRANSIT Functional Classification: N/A Fund: 317 Proj. Length: N/A Proj: 12146 TIP No. 33 CONTACT: Keith Woolley 425.430.7318 DESCRIPTION: Provide pre -design, design and construction coordination for WSDOT projects within or adjacent to Renton to assure that those projects provide the maximum benefits and minimum problems for Renton's transportation system. JUSTIFICATION: WSDOT projects can have signficant impacts within the City. STATUS: Ongoing yearly program. Staff coordination on grant -funded projects. Staff coordination on the 1-405 Corridor Improvements is included in 1-405 Improvements in Renton." WSDOT agreements (Stage I: $43,300) and (Stage 11: $52,000) will contribute towards a portion of City's staff time. CHANGES: The 1-405 Improvements in Renton" program has been combined with this. The 1-405/1-5 to SR-169 Widening Project is now broken into two stages. Coordination with the 1-405 project will continue in depth for some time. Funded : 1396,175 lUnfunded : 120,000 Project Totals Pro rammed Pre-2010 Six -Year Program ITEM Programmed Spent in 2008 2009 Total 2010 2011 2012 2013 2014 2015 EXPENSES: Planning 403,933 38,933 60,000 305,000 65,000 60,000 60,000 40,000 40,000 40,000 Preliminary Engineering R-O-W includes Admin Construction 12,243 12,243 Construction Services Post Construction Services TOTAL EXPENSES 416,175 51,175 60,000 305,000 65,000 60,000 60,000 40,000 40,000 40,000 SOURCE OF FUNDS: Vehicle Fuel Tax Business License Fee 298,885 28,885 25,000 245,000 25,000 40,000 60,000 40,000 40,000 40,006 Proposed Fund Balance 1,990 1,990 Grants In -Hand 1 Grants In -Hand 2 Mitigation In -Hand Other In -Hand WSDOT a reemen 95,300 22,290 33,010 40,000 40,000 Other In -Hand 2 Grants Proposed Other Pro osed Undetermined 1 20,0001 1 20,000 20,000 TOTAL SOURCES 1 416,1751 51,175 60,0001 305,000 65,000 60,000 60 000 40,000 40 000 40,000 WSDOT 05/19/2009 9:45 AM 5 - 33 DRAFT CITY OF RENTON PUBLIC WORKS TRANSPORTATION SYSTEMS DIVISION 2010 - 2015 SIX YEAR TIP Geographic Information System - Needs Assessment & Data Development Functional Classification: N/A Fund: 317 Proj. Length: N/A Proj: 12206 Type: 1 - INFRASTRUCTURE TIP No. 34 CONTACT: Nate Jones 425.430.7217 DESCRIPTION: Collect transportation geographic data to meet the requirements of City's departmental needs. JUSTIFICATION: Effective use of GIS related resources is dependent on careful planning and execution. The Transportation Systems Division is interested in expanding the development and use of GIS technology, data, and applications to support the Division's business needs. STATUS: The Transportation Division is coordinating with Technical Services and Information Services to develop GIS data and participating in training opportunities and user's group meetings. CHANGES: An intern was hired in 2009 by Technical Services, paid for by Transportation to assist in the update and editing of the King County GIS T-Net data sets. T-Net is a framework of transportation related GIS data. Funded : 1384,338 Unfunded Project Totals Programmed Pre-2010 Six -Year Program ITEM Programmed Spent in 2008 2009 Total 2010 2011 2012 2013 2014 2015 EXPENSES: Planning 384,338 4,338 20,000 360,000 20,000 20,000 80,000 80,000 80,000 80,000 Preliminary Engineering R-O-W includes Admin Construction Construction Services Post Construction Services TOTAL EXPENSES 384,338 4,338 20,000 360,000 20,000 20,000 80,000 80,000 80,000 80,000 SOURCE OF FUNDS: Vehicle Fuel Tax Business License Fee 384,338 4,338 20,000 360,000 20,000 20,000 80,000 80,000 80,000 80,000 Proposed Fund Balance Grants In -Hand 1 Grants In -Hand 2 Mitigation In -Hand Other in -Hand 1 Other In -Hand 2 Grants Proposed Other Proposed Undetermined TOTAL SOURCES 1 384,3381 4,338 20,0001 360,000 20,000 20,000 80,000 80,000 80,000 80 000 05/19/2009 9:45 AM 5 - 34 DRAFT CITY OF RENTON PUBLIC WORKS TRANSPORTATION SYSTEMS DIVISION 2010 - 2015 SIX -YEAR TIP 1 % for the Arts Program Functional Classification: N/A Fund: 317 Proj. Length: N/A Proj: 12112 Type: 3 - NON -MOTORIZED TIP No. 35 CONTACT: Jim Seitz 425.430.7245 DESCRIPTION: Beautify entrance locations to the City. Projects to include signing and landscaping. Funding is tied to the calculated share of eligible types of transportation projects and transportation funding subject to the City's 1 % for the Arts Program. All gateway project proposals under this program are subject to approval of the Arts Commission. JUSTIFICATION: Displays a sense of civic pride. STATUS: Program is now based on actual design and construction costs. $17,505 was transferred in 2006 for 1 % of 2005 expenditures. $60,000 was transferred in 2007 for 1 % of 2006 expenditures (amount due: $22,483). Remaining credit ($37,517) used for 1 % of 2007 (amount due: $26,726). Remaining credit ($10,791) used for 1 % of 2008. CHANGES: This program has moved to Department of Community and Economic Development. Funded : 1130,000 lUnfunded Project Totals Programmed Pre-2010 Six -Year Program ITEM Programmed Spent in 2008 2009 Total 2010 2011 2012 2013 2014 2015 EXPENSES: Planning 130,000 40,000 90,000 15,000 15,000 15,000 15,000 15,000 15,000 Preliminary Engineering R-O-W includes Admin Construction Construction Services Post Construction Services TOTAL EXPENSES 130,000 40,000 90,000 15,000 15,000 15,000 15,000 15,000 15,000 SOURCE OF FUNDS: Vehicle Fuel Tax Business License Fee 130,000 40,000 90,000 15,000 15,000 15,000 15,000 15,000 15,000 Proposed Fund Balance Grants In -Hand 1 Grants In -Hand 2 Miti ation In -Hand Other In -Hand 1 Other In -Hand 2 Grants Proposed Other Pro osed Undetermined 11 TOTAL SOURCES 130,0001 40,0001 90,000 15,000 15,000 15,000 15,000 15,000. 15,000 1%Arta 05/19/2009 9:45 AM 5 - 35 DRAFT CITY OF RENTON PUBLIC WORKS TRANSPORTATION SYSTEMS DIVISION 2010 - 2015 SIX -YEAR TIP Lake Washington Blvd - Park Ave N to Gene Coulon Memorial Park Type: 4 - ECONOMIC DEVELOPMENT Functional Classification: Collector Fund: 317 Proj. Length: N/A Proj: 12121 TIP No. 36 CONTACT: James Wilhoit 425.430.7318 DESCRIPTION: This project includes road widening, traffic signals, railroad crossings, drainage, curb, gutter and sidewalks. JUSTIFICATION: This project will serve the development and access needs to Coulon Park and to the Southport Development. STATUS: Developer to design and construct, and get credit toward mitigation contribution. The developer is completing the project in 3 phases. Project received a Railroad Crossing Safety grant in 2001. Estimated contract costs and developer reimbursement is included. Railroad crossing construction complete except for signal start-up requirements. Waiting for developer to continue their construction. CHANGES: Remainder of project shown as unfunded until developer has definite schedule to build office building. Funded : 1327,500 1 Unfunded 1220,738 Project Totals Programmed Pre-2010 Six -Year Program ITEM Programmed Spent Pre-2009 2009 Total 2010 2011 2012 2013 2014 2015 EXPENSES: Planning 16,299 14,899 1,400 1,400 Preliminary Engineering R-O-W includes Admin Construction 502,992 294,579 208,413 76,413 132,000 Construction Services 11,225 4,800 6,425 2,100 4,325 Post Construction Services 17,722 13,222 4,500 2,500 2,000 TOTAL EXPENSES 548;238 327,500 220,738 82,413 138,325 SOURCE OF FUNDS: Vehicle Fuel Tax 14,490 14,490 Business License Fee 2,362 2,362 Proposed Fund Balance 5,720 5,720 Grants In -Hand 1 106,575 106,575 Grants In -Hand 2 Miti ation In -Hand 198,353 198,353 Other In -Hand 1 Other In -Hand 2 Grants Proposed 100,000 100,000 50,000 50,000 Other Proposed Undetermined 1 120,7381 1 120,738 32,413 88,325 TOTAL SOURCESI 548,2381 327,500 1 220,738 1 1 82,4131 138,3251 Lk WA 05/19/2009 11.01 AM 5 - 36 DRAFT CITY OF RENTON PUBLIC WORKS TRANSPORTATION SYSTEMS DIVISION 2010 - 2015 SIX -YEAR TIP Lind Avenue SW - SW 16th St to SW 43rd St Type: 5 - SAFETY Functional Classification: Minor Arterial Proj. Length: 1.69 miles TIP No. 37 Fund: 317 Proj: 24 CONTACT: Keith Woolley 425.430.7318 DESCRIPTION: Widen existing roadway to five lanes where required. Includes new roadway, curbs, sidewalks, drainage, signals, lighting, signing and channelization. JUSTIFICATION: Increasing traffic demands in the Valley due in part to development, will create the need for increasing the capacity of this major north/south arterial. A potential project is a signal installation at the intersection at Lind Ave. SW and SW 34th St (currently unsignalized). Additionally, improvements may result from future WSDOT 1-405 plans which include an interchange at Lind Ave SW (currently unfunded). STATUS: The needs, priorities and schedules for improvements on Lind Avenue will be determined through Arterial Circulation studies. CHANGES: Funded : 13,000 1 Unfunded 12,548,000 Project Totals Programmed Pre-2010 Six -Year Program ITEM Programmed Spent Pre-2009 2009 Total 2010 2011 2012 2013 2014 2015 EXPENSES: Planning 3,000 3,000 Preliminary Engineering 86,000 86,000 8,000 78,000 R-O-W includes Admin Construction 2,280,000 2,280,000 1,700,000 580,000 Construction Services 182,000 182,000 136,000 46,000 Post Construction Services TOTAL EXPENSES 2,551,000 3,000 2,548,000 8,000 1,914,000 626,000 SOURCE OF FUNDS: Vehicle Fuel Tax Business License Fee 3,000 3,000 Proposed Fund Balance Grants In -Hand 1 Grants In -Hand 2 Mitigation In -Hand Other In -Hand 1 Other In -Hand 2 Grants Proposed 830,000 830,000 630,000 .200,000 Other Proposed Undetermined 1 1,718,0001 1 1,718,000 8,000 1,284,000 426,000 TOTAL SOURCESI 2,551,0001 3,0001 2,548 000 8,000 1914000 626,000 Oily 05/1912009 945 AM 5-37 DRAFT CITY OF 4TON PUBLIC WORKS TRANSPORTATION SYSTEMS DIVISION 2010 - 2015 SIX -YEAR TIP Logan Av N Concrete Panel Repair Type: 1 - MAINTENANCE AND PRESERVATION Functional Classification: Principal Arterial Proj. Length: N/A TIP No. 38 Fund: 317 Proj: 12303 CONTACT: James Wilhoit 425.430.7319 DESCRIPTION: Location: From the Logan Avenue Bridge north to N 6th St. Repair concrete panels under the asphalt to stop the panels from moving. JUSTIFICATION: The panels are moving, causing the asphalt overlay to severely spall at the joints. STATUS: CHANGES: Low priority. Project is unfunded. Funded : I I Unfunded 1460,000 Project Totals Programmed Pre-2010 Six -Year Program ITEM Programmed Spent in 2008 2009 Total 2010 2011 2012 2013 2014 2015 EXPENSES: Planning 25,000 25,000 25,000 Preliminary Engineering 25,000 25,000 25,000 R-O-W includes Admin Construction 400,000 400,000 400,000 Construction Services 10,000 10,000 10,000 Post Construction Services TOTAL EXPENSES 460,000 460,000 460,000 SOURCES OF FUNDS: Vehicle Fuel Tax Business License Fee Proposed Fund Balance Grants In -Hand 1 Grants In -Hand 1 Mitigation In -Hand Other In -Hand 1 Other In -Hand 2 Grants Proposed Other Proposed Undetermined i 460,0001 i 460,000 460,000 TOTAL SOURCES 1 460,0001 460,000 460,000 Loym p-1 05/19/2009 9:45 AM 5 - 38 DRAFT ABBREVIATIONS AND ACRONYMS The following list defines the abbreviated words or acronyms used in the City of Renton's Six -Year Transportation Improvement Plan. ACP Asphalt Concrete Pavement ADA American Disability Act AIP Arterial Improvement Program (administered by TIB) BAT Business Access Transit BNSF Burlington Northern Sante Fe BRAC Bridge Replacement Advisory Committee CBD Central Business District CIP Capital Improvement Program CMAQ Congestion Mitigation and Air Quality CTED Community, Trade and Economic Development CTR Commute Trip Reduction (State Act) DOE Department of Ecology EB Eastbound ECL East City Limits EDA Economic Development Administration EIS Environmental Impact Study ER Emergency Relief FAS Federal Aid Secondary Program FAUS Federal Aid Urban System FHWA Federal Highway Administration FMSIB Freight Mobility Strategic Investment Board FTA Federal Transit Administration GIS Geographic Information System GMA Growth Management Act HCT High Capacity Transit HES Federal Aid Hazard Elimination and Safety Program HOV High Occupancy Vehicles UC Interchange ISTEA Intermodal Surface Transportation Efficiency Act (Federal Highway Bill) ITS Intelligent Transportation System IVHS Intelligent Vehicle Highway Systems LF Linear Feet LID Local Improvement District LOS Level of Service METRO Municipality of Metropolitan Seattle MOU Memorandum of Understanding MUTCD Manual on Uniform Traffic Control Devices NCL North City Limits NB Northbound PMS Pavement Management System 6-1 Precon Preconstruction Engineering/Administration (design phase of project) PS&E Plans, Specifications, and Estimates ROW Right-of-way RTA Regional Transit Authority RTID Regional Transportation Investment District RUSH Renton Urban Shuttle SB Southbound SC&DI Surveillance Control and Driver Information SCATBd South County Area Transportation Board SCL South City Limits SMA Structural Matrix Asphalt SOV Single Occupant Vehicle ST Sound Transit ST 2 Sound Transit 2 STP Surface Transportation Program TDM Transportation Demand Management Program TEA-21 Transportation Efficiency Act TIA Transportation Improvement Account (previous TIB program) TIB Transportation Improvement Board TIP Transportation Improvement Plan TOD Transit Oriented Development TPA Transportation Partnership Act TPP Transportation Partnership Program (administered by TIB) UATA Urban Arterial Trust Account (previous TIB program) UPRR Union Pacific Railroad UPS Uninterruptible Power Supple VHS Vehicle Highway System VMS Vehicle Master System WB Westbound WCL West City Limits WSBIS Washington State Bridge Inventory System WSDOT Washington State Department of Transportation H:\Division. s\TRANSPOR.TAT\PLANNINGUul Tana\TIP\2010\Pub1 i sb\ACRONYMS.DOC J� -IC I E-11 qf9 W L7AVON ggu C9 �° u _ �.... `�� .�� � D � 'off—� ER F zA (S) AE LL if ID 7 r7mw t t- A IN S, a w-11 ";4- mNi-4 -q-,,�,4;, M 4 U! 4 CITY OF RENTON COUNCIL AGENDA BILL Submitting Data: Public Works Department Dept/Div/Board.. Transportation Systems Staff Contact...... James Wilhoit, Project Manager Extension 7319 Subject: Logan Avenue North Bike Lane CAG-08-066 Rodarte Construction Exhibits: Final Pay Estimate Notice of Completion Al #: , For Agenda of - June 1, 2009 Agenda Status Consent .............. X Public Hearing.. Correspondence.. Ordinance ............. Resolution ............ Old Business........ New Business....... X Study Sessions...... Information......... Recommended Action: Approvals: Legal Dept......... Council Concur Finance Dept...... Other ............... Fiscal Impact: T1.2707/fO10/18/0001 Expenditure Required... $ 22,008.65 Final Pay Est. Transfer/Amendment. N/A $ 17,225.02 Retainage Amount Budgeted....... $344,500.31 Revenue Generated N/A Total Project Budget $344,500.31 SUMMARY OF ACTION: The project started on July 28, 2008, and was completed on May 7, 2009. The original contract amount was $334,565. The final contract amount is $344,500.31, an increase of $9,935.31 over the original contract amount. Change orders 1 through 5 added a total of $25,798.97 to the contract amount. This amount was offset by a net under run in quantities totaling $15,863.66. STAFF RECOMMENDATION: Accept completion of the project, authorize payment of the final pay estimate in the amount of $22,008.65, and release retainage for the full project in the total amount of $17,225.02 after 60 days, subject to the required authorization. H:\Division.s\TRANSPOR.TAT\DESIGN.ENG\jwilhoit\Logan Bike Lane\Contract\Constniction Management\construction\logbbFinalPayAGENDA BILL.doc TO: FINANCE DIRECTOR 05/07/2009 FROM: TRANSPORTATION SYSTEMS DIRECTOR CONTRACTOR: Rodarte Construction, Inc CONTRACT NO. CAG #08-066 ESTIMATE NO. 3 Final PROJECT: LOGAN AVENUE N. BIKE LANE AND CHANNELIZATION REVISION 1. CONTRACTOR EARNINGS THIS ESTIMATE 23,167.00 2. SALES TAX @ N/A $ 3. TOTAL CONTRACT AMOUNT THIS ESTIMATE $ 23,167.00 4. EARNINGS PREVIOUSLY PAID -CONTRACTOR $ 305,266.64 5. * EARNINGS DUE CONTRACTOR THIS ESTIMATE $ 22,008.65 6. SUBTOTAL - CONTRACTOR PAYMENTS 7. RETAINAGE ON PREVIOUS EARNINGS $ 16,066.67 8. ** RETAINAGE ON EARNINGS THIS ESTIMATE - $ 1,158.35 9. SUBTOTAL - RETAINAGE 10. SALES TAX PREVIOUSLY PAID 11. SALES TAX DUE THIS ESTIMATE $ - $ 327,275.29 $ 17,225.02 12. SUBTOTAL - SALES TAX $ - * (95%xLINEI) ** (RETAINAGE: 5%) GRAND TOTAL: $ 344,500.31 FINANCE DEPARTMENT ACTION: PAYMENT TO CONTRACTOR (Lines 5 and 11): ACCOUNT T12707/f010/18/0001 RETAINED AMOUNT (Line 8): ACCOUNT T12707/f010/18/0001 TOTAL THIS ESTIMATE: CHARTER 116, LAWS OF 1965 CITY OF RENTON CERTIFICATION L THE UNDERSIGNED DO HEREBY CERTIFY UNDER PENALTY OF PERJURY, THAT THE MATERIALS HAVE BEEN FURNISHED, THE $ARVICES RENDERED OR THE LABOR PERFORMED AS DESCRIBED HEREIN, AND THAT THE CLAIM IS A JUST, DUE AND UNPAID OBLIGATION AGAINST THE CITY OF RENTON, AND THAT I AM AUTHORIZED TO AUTHENTICATE AND CERTIFY TO SAID CLAIM SIGNED: $ 22,008.65 $ 1,158.35 - Jfu $ 23,167.00�'� i Date:05/08/­_ City of Rentoi_ i ransportation Time:10:20 am PROJECT PAY ESTIMATE Project: Logan Avenue N. Bike Lane And Channelization Project Estimate No. 3 10/16/2008- 4/30/2009 Engineer: James P. Wilhoit Vendor °RodarteaConstruction Inc:, PO Number: Project Number: CAG 08-066 IPO Box 1875 Total Authorized: $335,336.50 Revised Total Authorized w/ CO: $362,755.97 Contract No: Contract Working Days: 40 Award Date: 6/02/2008 Auburn WA 00009 8057v Notice To Proceed: 7/28/2008 Phone �(253) 939 0532 Page 1 of 2 Item No: Description UM Contract Previous This Estimate Total Work Completed Percent Complete .Quantity Unit.Price• TotaL:Price Oty Qty Amount Qty Amount 01 1 02 IAdjust Roadway Surveying Utility To Grade LS EA 1.00001 3.0000 10,000.0000 450.0000 10,000.00 1,350.00 1.0000 7.0000 0.00001 0.00001 0.00 0.00 1.00001 7.0000I 10,000�00 3,150.001 100 233 03 ISPCC Plan LS 1.0000 500.0000 500.00 1.0000 0.0000 0.00 1.0000 500.00 100 04 Mobilization LS 1.0000 44,350.0000 44,350.00 0.7500 0.2500 11,087.501 1.0000 44,350.00` 100 05 Project Temporary Traffic Control LS 1.0000 25,000.0000 25,000.00 0.90001 0.1000 2,500.00 1.0000 25,000.001 - 100 06 07 IRemoving Asphalt Pvmt (Intl 20 CY C01) I Removing Cement Concret Pavement SY SYI 436.0000 365.00001 15.0000 45.00001 6,540.00I 16,425.OL 127.8000 250.10001 0.0000 0.00001 0.001 0_00 127.8000 250.10001 1,917.001 11,254.501 - 29 69 O8 Removing Existing Concrete Sidewalk SY 30.0000 15.0000 450.00 28.10001 0.0000 0.00 28.1000 421.50 _ -94 09 Removing Existing Median Island SY 230.0000 7.00001 1,610.001 250.10001 0.0000 0.00 250.1000 1,750.70 109 10 Removing Cement Concrete Curb And Gutter LF 382.0000 10.0000 3,820.00 362.0000 0.0000 0.00 362.0000 3,620.00 95 11 Sawcut LF 3,060.0000 0.6000 1,836.00 2,808.5000 1 0.0000 0.00 2,808.5000 1,685.10 92 12 13 Roadway Excavation Incl. Haul 1CS13C (Inc[ 7.3 TON C01) I LSJ I TON 1.0000 1,507.3000 20,000.0000 25.0000 20,000.00 37,682.50 1.00001 1,303.0400 0.0000 1 0.00001 0.00 0.001 1.0000 1,303.04001 20,000.00 32,576.001 100 86 14 HMA CI. 1/2 In. PG 64-22 (Intl 3.4 TON CO1) 1 TONI 603.4000I 85.0000 51,289.001 662.0600 0.00001 0.001 662.06001 56,275.101 110 15 Longitudinal Joint Seal 16 ':Moving Existing Hydrants 1 LFI I EAI 2,200.00001 1.00001 4.0000 1,300.0000 8,800.001 1,300.001 2,233.0000 1.00001 0.00001 0.0000 0.001 0.00 2,233.0000 1.0000 8,932.00 1,300.00 - 102 100 17 Erosion And Sediment Control I LS1 1.0000 7,000.0000 7,000.001 1.00001 0.0000 - 0.001 1.00001 7,000.001 100 18 SWPPP I LSI 1.0000I 500.00001 500.001 1.0000 0.00001 0.001 1.00001 _ 500.001 100 19 ITopsoil Type A I CYI 34.00001 50.00001 1,700.001 35.00001 0.00001 0.001 35.00001 1,750.00 103 20 1Cement Conc. Traffic Curb and Gutter LFI 16.010001 80.00001 1,280.001 5.00001 0.0000 0.001 5.00001 - 400.00 _ 31 21 Cement Concrete Extruded Curb LF 2,557.00001 7.0000 17,899.001 2,480.0000 1 109.0000 763.001 2,589.00001 18,123.00 101 22 Cement Conc. Pedestrian Curb LF 32.0000 70.0000 2,240.00 32.0000 0.0000I 0.001 32.0000 2,240.00 100 23 IRaised Pavement Marker, Type 1 I HUNDI 47.10001 250.0000 11,775.001 19.81001 0.5500 137.50 20.36001 5,090.001 _ -43 24 Raised Pavement Markers Type 2 HUNDI 3.20001 400.0000 1,280.001 2.69001 0.0000 0.00 2.6900 1,076.00 _ 84 25 Cement Conc. Sidewalk I SYI 30.0000 125.00001 3,750.001 11.00001 0.00001 0.001 11.00001 1,375.001 37 26 Signal Relocation Complete I LS 1.0000 45,000.0000 45,000.00I 1.0000 0.0000 0.00 1.0000 45,000.00 _ 100 27 (Permanent Signing I LSI 1.0000I 6,500.00001 6,500.00 1.0000 0.00001 0.00 1.0000 6,500.001 100 28 IRemoving Plastic Traffic Marking_ I EAI 34.00001 25.00001 850.00I 36.0000 0.00001 0.00 36.00001 900.001 _ 106 Run By: James P. Wilhoit Generated by a SharpeSoft Product Date:05roer2009 City of Renton - Transportation Tkne:10:21 am PROJECT PAY ESTIMATE Project: Logan Avenue N. Bike Lane And Channelizalion Pr*d Estimate No, 3 10M B12008- 443012009 - Engineer. James P. VWholt vend or::}4b'PO Number: _ :...-:?�.._:'_� �=-i;?::�::v-e;..'�' yc'.=•S:.''. !t-'1�-.'::;:..k i'= T..wl A..N....ti...i. Page 2 of 2 IAm i .... _ -. L»... _ - us `COnhe. ' - link .: Q. Qy A cunt i}'=-'Ahiouiit Gr 29 Removing Paint Line LF 11000.0000 D.4000 400.00 1,8D0-0D O,OODO 3f.OD00 0.0000 O.D000 0.00 0.00 O.D000 31.0000 D.00 1,86D.00 0 103 30 Removing Raised Pavement Marker HUND 30.000D 60,0000 31 Painted Bicycle Lane Symbol EA 10.6000 35.0000 350.00 10.15D00 1.0000 35.D0 11,0000 385.00 110 32 Plaslic Traffic Arrow EA 24.OD00 65.0000 1,560.00 25.0000 D.0000 0.00 25.0000 1,625,001 104 33 Solid While Line 4' LF1 6,000MOO1 0.10D0 600.00 3,494,0000 1,755.4000 175.64 L 5,249ADO4 524.941 105 hens ...r.,.�-. .�_ . ... ... ....... ...... ..::....:..... - -- � - e additional asphalt and sawcul depths FA 1.0900 5,535.3600 5,535.36 1.0000 o.00D0 O.DO 1.0000 6,b35.36 100 e two (2) oil-mater separator lids FA 1.0000 2,392.000D 2,392.00 1.00DO O.ODDO 0.00 1.0000 2,392.00 100 Relocation Revislons +Replace LS 1.0000 14,698.2000 f4,698.20 0.7500 0.2,900 3,674.55 1.D000 14,898.20 10D e four (4) ped heads with "countdown" heads e subsurface asphalt to place conducts LS 1.0000 3,920.0000 3,920.OD 873.91 0.0000 0.0000 1.0000 1,0000 3,920.00 873.91 1.000D 1.0000 3,920.00 873.91 1 DO 100 LS 1.0000 873.9100 Reside g f Date onstruct on Englneer Date Construction manager Date K May 0 9 Contractor's Representative Data Percent otAmt Completed: Percent of Days Completed: Contractor Started: Working Days Started: Original Completion: NonAlVorking Days: Time i xtenelon Days: Estimated Compfatlon: Actual Completion: 103% Amount This Estimate VCO: 347% Total Work Completed to Date: 712812008 CO Amount This Estimate: VM2008 CIO Total to Date: Vaterlats On Hand: 9172I2OD8 Materials On Hand Deduction: 9 Overall Total Completed: 1$ Deduct 6.00% Retention 10t24I200a Retention Withheld this Estimate 1012CV2006 Retention Withheld to Date: Retention Released to Date: Other Deductions: Toted Deductions: Total Due to Date; Deduct Previous Payments: Baranae Due This Estimate: $23.167.00 3317,080.84 38,466.49 $27, 419.47 $0.00 $0,00 5344,500.31 $(17,225,02) $0,158.35) $(17.225.02) $0.00 $0.00 $(17, 225.02) $327,275.29 $(305,266,04) $22,0D8.65 Run By: .fames P. WlihOlt G. waWhyasharpeSon Pro&U= 05/08/20091 10:22 am Project Number: CAG 08-066 Contract No: Bid Date: 5/27/2008 2:30PM Funding No. PO Number: Date: 10/16/2008 Inspector: James P. Wilhoit Weather: Warm, Cloudy, Rain Status: Rain/Weather Day Temperature: 70 F Controling Operation: City of Renton_ .•ransportation Logan Avenue N. Bike Lane And Channelization Project Daily Activity Report Vendor: Rodarte Construction, Inc. PO Box 1875 Auburn, WA 000.09-8057 Phone: (253) 939-0532 G ,ge: 1 Run By: James P. Wilhoit , I- Generated by a SharpeSoft Product 05/08/2009 City of Renton - Transportation 10:22 am Logan Avenue N. Bike Lane And Channelization Project Daily Activity Report Project Number: CAG 08-066 Vendor: Rodarte Construction, Inc. Contract No: PO Box 1875 Bid Date: 5/27/2008 2:30PM Funding No. Auburn, WA 00009-8057 PO Number: Phone: (253) 939-0532 Date: 10/17/2008 Inspector: Corey Wight Weather: WARM, CLDY Status: No Activity Observed Temperature: 70 F Controling Operation: Page: 1 Run By: .' ; P. Wllholt � 1; Generated byi� 'eSoRProduct 05/08/2009 10:22 am Project Number: CAG 08-066 Contract No: Bid Date: 5/27/2008 2:30PM Funding No. PO Number: Date: 10/20/2008 Inspector: James P. Wilhoit Weather: WARM, PCLD Status: Work Day Temperature: 70 F City of Rentor, i ransportation Logan Avenue N. Bike Lane And Channelization Project Daily Activity Report Vendor: Rodarte Construction, Inc. PO Box 1875 Auburn, WA 00009-8057 Phone: (253) 939=0532 Controling Operation: Signal Work, Excess Asphalt Removal, Joint Seal Run By: James P. Wilhoit .ge: 1 �; Generated by a SharpeSoff Product 05/08/2009 City of Renton - Transportation Page: 1 10:22 am Logan Avenue N. Bike Lane And Channelization Project Daily Activity Report Project Number: CAG 08-066 Vendor: Rodarte Construction, Inc. Contract No: PO Box'1875 Bid Date: 5/27/2008 2:30PM Funding No. Auburn, WA 00009-80.57 PO Number: Phone: (253) 939-0532 Date: 10/21/2008 Inspector: Corey Wight Weather: WARM, CLDY Status: Non Workday Temperature: 70 F - . Controling Operation: Punchlist- Ext Curb, Paint Lines Bid Items Quantity UM Todays QV Qty to Date Projected Est. Quantity j 91 (`.—t ('--tc ;: t+— .H r'.urh 9 Fr7 MM I F 1 no nnM 9 FRa onnn 9 F9;7 nnnn 101.0000 j 31 Painted Bicycle Lane Symbol 10.0000 EA 1.0000 11.0000 10.0000 System/Line Unit/Detail Station Start Station End Qty Completed I Sheet-Ncf 1.00OOI —_ 33 Solid White Line 4" 5,000.0000 LF _ 1,654.0000 5,148.0000 5,000.0000 _ System/Line Unit/Detail Station Start Station End Qty Completed Sheet -No _ j 1,654.00OO1 Run By: P. Wilhoit Generated by, 'eSoft Product 05/08/2009 City of Renton - i ransportation _ige: 1 10:22 am Logan Avenue N. Bike Lane And Channelization Project Daily Activity Report Project Number: CAG 08-066 Vendor: Rodarte Construction, Inc. Contract No: PO Box 1875 Bid Date: 5/27/2008 2:30PM Funding No. Auburn, WA 00009-8057 PO Number: Phone: (253) 939-0532 Date: 1/08/2009 Inspector: James P. Wilhoit Weather: COOL, PCLD Status: Non Workday Temperature: 45 F Controling Operation: Punchlist (COs)- Ped Pole & Ped Countdown Head Installation Change Orders Quantity UM Todays Qty Qty to Date PCO 01 Signal Relocation Revisions 1.0000 LS 0.2000 0.9500 1.0000 System/Line Unit/Detail Station Start Station End Qty Completed Sheet -No j IPS Ped Pole I 58+41.9 I 0.2000 EX02 Unit/Detail I Station Start I Station.End ; Qty Completed I Sheet -No 1.00001 Run By: James P. Wilhoit *I- Generated by a SharpeSoft Product 05/08/2009 10:22 am Project Number: CAG 08-066 Contract No: Bid Date: 5/27/2008 2:30PM Funding No. PO Number: Date: 1/15/2009 Inspector: James P. Wilhoit Weather: COOL, OCST Status: Non Workday Temperature: 38 F City of Renton - Transportation Logan Avenue N. Bike Lane And Channelization Project Daily Activity Report Vendor: Rodarte Construction, Inc. PO Box 1875 Auburn, WA 00009-8057 Phone: (253) 939-0532 Controling Operation: Purichlist- Final RPMs & Striping Page: 1 Bid Items Quantity UM Toda s City QV to Date Projected Est. Quantity 23 Raised Pavement Marker Type 1 47.1000 HUND 0.5500 20.3600 47.1000 System/Line Unit/Detail Station Start Station End Qty Completed T Sheet -No Park/Logan I/S (Chan nt1'1 (as RPM) I68+00 68+75 I 0.5500I PP04 zz (ZMiH Whit. I inc d" 5 000.0000 LF� 101.4000 5.249.4000 5,000.0000 System/Line Unit/Detail Station Start Station End Qty Completed I Sheet -No (Chan nt 1 1152+21.4 35LT 1151+50 71.4000 1 PP01 —� I152+20.4 28LT I152+38.2 27LT 30.00OO1 PP01 Run By: I P. Wilhoit s Generated bye 'eSoH Product ' 05/08/2009 City of Renton . ransportation ,fie: 1 10:22 am Logan Avenue N. Bike Lane And Channelization Project Daily Activity Report Project Number: CAG 08-066 Vendor: Rodarte Construction, Inc. Contract No: PO Box 1875 Bid Date: 5/27/2008 2:30PM Funding No. Auburn, WA 00009-8057 PO Number: Phone: (253) 939-0532 Date: 2/16/2009 Inspector: James P. Wilhoit Weather: COOL, OCST Status: Non Workday Temperature: 50 F Controling Operation: Change Orders Quantity UM'. Todays Qty Qty to Date PCO 05 Remove subsurface asphalt to place conduits 1.0000 LS 1.0000 1.0000 1.0000 System/Line Unit/Detail Station Start Station End Qty Completed Sheet -No 1.00001 Run By: James P. Wilhoit !\,: Generated by a SharpeSoft Product 05/08/2009 City of Renton - Transportation Page: 1 10:22 am Logan Avenue N. Bike Lane And Channelization Project Daily Activity Report Project Number: CAG 08-066 Vendor: .Rodarte. Construction, Inc. Contract No: PO Box 1875 Bid Date: 5/27/2008 2:30PM Funding No. Auburn, WA 00009-8057 PO Number: Phone: (253) 93970532 Date: 4/30/2009 Inspector: James P. Wilhoit Weather: COOL, OCST Status: Non Workday Temperature: 50 F Controling Operation: Bid Items Quantity UM Todays Qty Qty to Date Projected Est. Quantity . 04 Mobilization 1.0000 LS 0.2500 1.0000 _1.0000_ System/Line Unit/Detail Station Start Station End Qty Completed Sheet -No -- _ I I 1 0.25001 05 Project Temporary Traffic Control 1.0000 LS 0.1000 1.0000 1.0000 Change Orders Quantity UM Todays Qty Qty to Date j Run By: P. Wilhoit Generated by iSoft Product sTATE O� State of Washington Reg.No.: oa b Department of Revenue i x Audit Procedures & Administration Date: May 11 2009 PO Box 47474 Olympia, Washington 98504-7474 NOTICE OF COMPLETION OF PUBLIC WORKS CONTRACT From: DEPARTMENT USE ONLY City of Renton Assigned To 1055 South Grady Way Renton, WA 98057 Date Assigned Notice is hereby given relative to the completion of contract or project described below. Description of Contract CAG 08-066 Logan Avenue N Bike Lane Project Contractor's Name Rodarte Construction Telephone No. (253) 939-0532 Contractor's Address P.O. Box 1875 Auburn, WA 98071 Date Work Commenced Date Work Completed Date Work Accepted July 28, 2008 May 7, 2008 May 7, 2008 Surety or Bonding Co. St. Paul Travelers 1501 Fourth Ave., Suite 1650 Seattle WA 98101 Agent's Address Kenneth J. Frick Terril, Lewis & Wilke Insurance, Inc. 3720 Olympic Blvd. W University Place WA 98466 Contract Amount: Additions or Reductions: Sales Tax: Total $ 334,565 $ 9,935.31 $ ------ $ 344,500.31 am Phone No: Amount Disbursed: $ 327,275.29 Amount Retained: $ 17,225.02 - Total: $ 344,500.31 (Disbursing Officer) The Disbursing Officer must complete and mail THREE copies of this notice to the Department of Revenue, Olympia, Washington 98504- 7474, immediately after acceptance of the work done under this contract. NO PAYMENTS SHALL BE MADE FROM RETAINED FUND until receipt of Department's certificate, and then only in accordance with said certificate. FORM REV 31 0020 (12-92) H:\Division.s\TRANSPOR.TAT\DESIGN.ENG\jwilhoit\Logan Bike Lane\Contract\Construction Management\construction\logbCOMPFORM. DOC CITY OF RENTON COUNCIL AGENDA BILL Submitting Data: Public Works Department For Agenda of- Dept/Div/Board.. Transportation Systems Division June 1, 2009 Staff Contact...... James Wilhoit, Project Manager Agenda Status (extension 7319) Consent .............. X Public Hearing.. Subject: South 3rd Street and Shattuck Avenue South Correspondence..... Intersection Safety Improvements Project Ordinance ............. Contract with David Evans and Associates, Inc. (DEA) Resolution............ Old Business........ New Business....... X Exhibits: Issue Paper Study Sessions...... Consultant Agreement Information......... Recommended Action: Approvals: Council Concur Legal Dept......... X Finance Dept...... Fiscal Impact: (02604/fl02/ 0018/0002) Expenditure Required... $ 44,750 Transfer/Amendment....... Amount Budgeted....... $ 44,750 Revenue Generated......... Total Project Budget $ 450,000 City Share Total Project.. SUMMARY OF ACTION: On November 21, 2006, a consultant agreement was executed by the City with David Evans and Associates (DEA) to design the South 3rd Street and Shattuck Avenue South Intersection Safety Improvements Project in the amount of $38,911. Three subsequent supplemental agreements increased the amount to $51,877 and extended the completion date from December 31, 2007 to December 31, 2008. DEA completed the 100% plans and specifications in the fall of 2008 and its consultant agreement with the City expired on December 31, 2008. In the course of reviewing the 100% plans the City determined that it needed some significant revisions made, which fell outside of the scope of the original design agreement. It was also necessary, due to some underground wastewater projects that had been completed but not reflected in input given to DEA, as well as uncertainty about locations of some franchise utility lines, to have utility potholing done prior to finalizing the plans. It was determined that some consultant construction support would be necessary to respond to inquiries from the contractor, attend meetings, prepare change orders arising from some unforeseen site conditions and prepare as -built or record drawings from the contractor's marked up plans. DEA is the most logical choice to provide this service due to its familiarity with the project. STAFF RECOMMENDATION: Authorize the Mayor and City Clerk to execute a consultant agreement with DEA for utilities potholing, design revisions, on -call construction assistance and as -built plans on the South 3rd Street and Shattuck Avenue South Intersection Safety Improvements Project in the amount of $44,750, with a completion date of February 28, 2010. H:\Division.s\TRANSPOR.TAT\DESIGN.ENG\jwilhoit\shattuck\constsupptsvcs\Agenda Bill 3rdshattsuppt.doc Y O� Al + PUBLIC WORKS DEPARTMENT mu M E M O R A N D U M DATE: June 1, 2009 TO: Randy Corman, Council President Members of the Renton City Council VIA: Denis Law, Mayor t FROM: ;'v* Gregg Zimmerman', dministrator STAFF CONTACT: James Wilhoit, Project Manager (extension 7319) SUBJECT: South 3rd Street and Shattuck Avenue South Intersection Safety Improvements Project Contract with David Evans and Associates, Inc. (DEA) ISSUE: Should Council authorize the Mayor and City Clerk to execute a contract with David Evans and Associates, Inc. (DEA) for design revisions and construction support services on the South 3rd Street and Shattuck Avenue South Intersection Safety Improvements Project? RECOMMENDATION: Authorize the Mayor and City Clerk to execute a consultant agreement with DEA for utilities potholing, design revisions, on -call construction assistance, and as -built plans on the South 3rd Street and Shattuck Avenue South Intersection Safety Improvements Project in the amount of $44,750, with a completion date of February 28, 2010. BACKGROUND: On November 21, 2006, a consultant agreement was executed by the City with DEA to design the South 3rd Street and Shattuck Avenue South Intersection Safety Improvements Project in the amount of $38,911. Three subsequent supplemental agreements increased the amount to $51,877 and extended the completion date from December 31, 2007 to December 31, 2008. DEA completed the 100% plans and specifications in the fall of 2008 and its consultant agreement with the City expired on December 31, 2008. In the course of reviewing the 100% plans the City determined that it needed some significant revisions made, which fell outside of the scope of the original design agreement. It was also necessary, due to some underground wastewater projects that had been completed but not reflected in input given to DEA, as well as uncertainty about locations of some franchise utility lines, to have utility potholing done prior to finalizing the plans. It was determined that some Randy Cornian, Council President Members of the Renton City Council Page 2 of 2 June 1, 2009 consultant construction support (mostly of an on -call nature) would be necessary to respond to inquiries from the contractor, attend meetings, prepare change orders arising from some unforeseen site conditions, and prepare as -built or record drawings from the contractor's marked up plans. DEA is the most logical choice to provide this service due to its familiarity with the project. The Transportation Division engineer's estimate for this change is $50,400 and the consultant's proposal does not exceed this amount. cc: Peter Hahn, Deputy PW Administrator — Transportation Bob Hanson, Transportation Design Supervisor Chris Barnes, Transportation Operations Manager Connie Brundage, Transportation Administrative Secretary H:\Division.s\TRANSPOR.TAT\DESIGN.ENG\jwilhoit\shattuck\constsupptsvcs\lssue Paper 3rdshattsuppt.doc Cons ultant/Address/Telephone Local Agency David Evans and Associates, Inc. Standard Consultant 415 118th Avenue SE Agreement Bellevue, WA 98005 (425) 519-6500 ® Architectural/Engineering Agreement ❑ Personal Services Agreement Agreement Number Project Title And Work Description South 3rd Street and Shattuck Avenue South Intersection Safety Improvements Project: Federal Aid Number Design, on -call construction assistance, and as -built plans. Agreement Type (Choose one) ❑ Lump Sum Lump Sum Amount $ DBE Participation ® Cost Plus Fixed Fee Overhead Progress Payment Rate 178.76 % []Yes ® No % Federal ID Number or Social Security Number Overhead Cost Method ® Actual Cost 93-0661195 Do you require a 1099 for IRS? ®Yes ElNo Completion Date El Actual Cost Not To Exceed % February 28, 2010 El Fixed Rate Fixed Fee $ 3, l 14.00 El Specific Rates Of Pay Total Amount Authorized $ 44,750.00 ❑ Negotiated Hourly Rate Management Reserve Fund $ ❑ Provisional Hourly Rate Maximum Amount Payable $ 44,750.00 ❑ Cost Per Unit of Work Index of Exhibits Exhibit "A" - Scope of Work Exhibit "B" - DBE Participation Exhibit "C" - Electronic Exchange of Engineering and Other Data Exhibit "D" - Payment (by Agreement Type) Exhibit "E" - Consultant Fee Determination Exhibit "F" - Breakdown of Overhead Cost Exhibit "G" - Subcontract Work/Fee Determination Exhibit "H" — Title VI Assurances Exhibit "I" — Payment Upon Termination of Agreement Exhibit "J" — Alleged Consultant Design Error Procedures Exhibit "K" — Consultant Claim Procedures Exhibit "L" — Liability Insurance Increase Exhibit "M" — Certification Documents THIS AGREEMENT, made and entered into this between the Local Agency of City of Renton and the above organization hereinafter called the "CONSULTANT". DOT Form 140-089 EF Page 1 of 8 Revised 6/05 day of 2009 , Washington, hereinafter called the "AGENCY" WITNESSETH THAT: WHEREAS, the AGENCY desires to accomplish the above referenced project, and WHEREAS, the AGENCY does not have sufficient staff to meet the required commitment and therefore deems it advisable and desirable to engage the assistance of a CONSULTANT to provide the necessary services for the PROJECT; and WHEREAS, the CONSULTANT represents that he/she is in compliance with the Washington State Statutes relating to professional registration, if applicable, and has signified a willingness to furnish Consulting services to the AGENCY, NOW THEREFORE, in consideration of the terms, conditions, covenants and performance contained herein, or attached and incorporated and made a part hereof, the parties hereto agree as follows: 1 General Description of Work The work under this AGREEMENT shall consist of the above described work and services as herein defined and necessary to accomplish the completed work for this PROJECT. The CONSULTANT shall furnish all services, labor, and related equipment necessary to conduct and complete the work as designated elsewhere in this AGREEMENT. II Scope of Work The Scope of Work and projected level of effort required for this PROJECT is detailed in Exhibit "A" attached hereto and by this reference made a part of this AGREEMENT. III General Requirements All aspects of coordination of the work of this AGREEMENT with outside agencies, groups, or individuals shall receive advance approval by the AGENCY. Necessary contacts and meetings with agencies, groups, and/or individuals shall be coordinated through the AGENCY. The CONSULTANT shall attend coordination, progress and presentation meetings with the AGENCY and/or such Federal, State, Community, City or County officials, groups or individuals as may be requested by the AGENCY. The AGENCY will provide the CONSULTANT sufficient notice prior to meetings requiring CONSULTANT participation. The minimum required hours or days notice shall be agreed to between the AGENCY and the CONSULTANT and shown in Exhibit "A." The CONSULTANT shall prepare a monthly progress report, in a form approved by the AGENCY, which will outline in written and graphical form the various phases and the order of performance of the work in sufficient detail so that the progress of the work can easily be evaluated. The CONSULTANT, and each SUBCONSULTANT, shall not discriminate on the basis of race, color, national origin, or sex in the performance of this contract. The CONSULTANT, and each SUBCONSULTANT, shall carry out applicable requirements of 49 CFR Part 26 in the award and administration of USDOT-assisted contracts. Failure by the CONSULTANT to carry out these requirements is a material breach of this AGREEMENT that may result in the termination of this AGREEMENT. Participation for Disadvantaged Business Enterprises (DBE), if required, per 49 CFR Part 26, or participation of Minority Business Enterprises (MBE), and Women Business Enterprises (WBE), shall be shown on the heading of this AGREEMENT. If D/M/WBE firms are utilized, the amounts authorized to each firm and their certification number will be shown on Exhibit `B" attached hereto and by this reference made a part of this AGREEMENT. If the Prime CONSULTANT is a DBE firm they must comply with the Commercial Useful Function (CUF) regulation outlined in the AGENCY'S "DBE Program Participation Plan". The mandatory DBE participation goals of the AGREEMENT are those established by the WSDOT'S Highway and Local Programs Project Development Engineer in consultation with the AGENCY. All Reports, PS&E materials, and other data furnished to the CONSULTANT by the AGENCY shall be returned. All electronic files, prepared by the CONSULTANT, must meet the requirements as outlined in Exhibit "C." All designs, drawings, specifications, documents, and other work products, including all electronic files, prepared by the CONSULTANT prior to completion or termination of this AGREEMENT are instruments of service for this PROJECT, and are the property of the AGENCY. Reuse by the AGENCY or by others, acting through or on behalf of the AGENCY of any such instruments of service, not occurring as a part of this PROJECT, shall be without liability or legal exposure to the CONSULTANT. Page 2 of 8 IV Time for Beginning and Completion The CONSULTANT shall not begin any work under the terms of this AGREEMENT until authorized in writing by the AGENCY. All work under this AGREEMENT shall be completed by the date shown in the heading of this AGREEMENT under completion date. The established completion time shall not be extended because of any delays attributable to the CONSULTANT, but may be extended by the AGENCY in the event of a delay attributable to the AGENCY, or because of unavoidable delays caused by an act of GOD or governmental actions or other conditions beyond the control of the CONSULTANT. A prior supplemental agreement issued by the AGENCY is required to extend the established completion time. V Payment Provisions The CONSULTANT shall be paid by the AGENCY for completed work and services rendered under this AGREEMENT as provided in Exhibit "D" attached hereto, and by reference made part of this AGREEMENT. Such payment shall be full compensation for work performed or services rendered and for all labor, materials, supplies, equipment, and incidentals necessary to complete the work. The CONSULTANT shall conform to all applicable portions of 48 CFR Part 31. A post audit may be performed on this AGREEMENT. The need for a post audit will be determined by the State Auditor, WSDOT External Audit Office and/or at the request of the AGENCY'S PROJECT Manager. VI Sub -Contracting The AGENCY permits sub -contracts for those items of work as shown in Exhibit "G" attached hereto and by this reference made part of this AGREEMENT. Compensation for this sub -consultant work shall be based on the cost factors shown on Exhibit "G." The work of the sub -consultant shall not exceed its maximum amount payable unless a prior written approval has been issued by the AGENCY. All reimbursable direct labor, overhead, direct non -salary costs and fixed fee costs for the sub -consultant shall be substantiated in the same manner as outlined in Section V. All sub -contracts shall contain all applicable provisions of this AGREEMENT. With respect to sub -consultant payment, the CONSULTANT shall comply with all applicable sections of the Prompt Payment laws as set forth in RCW 39.04.250 and RCW 39.76.011. The CONSULTANT shall not sub -contract for the performance of any work under this AGREEMENT without prior written permission of the AGENCY. No permission for sub -contracting shall create, between the AGENCY and sub- contractor, any contract or any other relationship. A DBE certified sub -consultant is required to perform a minimum amount of their sub -contracted agreement that is established by the W SDOT Highways and Local Programs Project Development Engineer in consultation with the AGENCY. VII Employment The CONSULTANT warrants that they have not employed or retained any company or person, other than a bona fide employee working solely for the CONSULTANT, to solicit or secure this contract, and that it has not paid or agreed to pay any company or person, other than a bona fide employee working solely for the CONSULTANT, any fee, commission, percentage, brokerage fee, gift, or any other consideration, contingent upon or resulting from the award or making of this contract. For breach or violation of this warrant, the AGENCY shall have the right to annul this AGREEMENT without liability or, in its discretion, to deduct from the AGREEMENT price or consideration or otherwise recover the full amount of such fee, commission, percentage, brokerage fee, gift, or contingent fee. Any and all employees of the CONSULTANT or other persons while engaged in the performance of any work or services required of the CONSULTANT under this AGREEMENT, shall be considered employees of the CONSULTANT only and not of the AGENCY, and any and all claims that may arise under any Workmen's Compensation Act on behalf of said employees or other persons while so engaged, and any and all claims made by a Page 3 of 8 third party as a consequence of any act or omission on the part of the CONSULTANT'S employees or other persons while so engaged on any of the work or services provided to be rendered herein, shall be the sole obligation and responsibility of the CONSULTANT. The CONSULTANT shall not engage, on a full- or part-time basis, or other basis, during the period of the contract, any professional or technical personnel who are, or have been, at any time during the period of the contract, in the employ of the United States Department of Transportation, or the STATE, or the AGENCY, except regularly retired employees, without written consent of the public employer of such person. VIII Nondiscrimination During the performance of this contract, the CONSULTANT, for itself, its assignees, and successors in interest agrees to comply with the following laws and regulations: Title VI of the Civil Rights Act of 1964 (42 USC Chapter 21 Subchapter V Section 2000d through 2000d-4a) Federal -aid Highway Act of 1973 (23 USC Chapter 3 Section 324) Rehabilitation Act of 1973 (29 USC Chapter 16 Subchapter V Section 794) Age Discrimination Act of 1975 (42 USC Chapter 76 Section 6101 et seq.) Civil Rights Restoration Act of 1987 (Public Law 100-259) American with Disabilities Act of 1990 (42 USC Chapter 126 Section 12101 et. seq.) 49 CFR Part 21 23 CFR Part 200 RCW 49.60.180 In relation to Title VI of the Civil Rights Act of 1964, the CONSULTANT is bound by the provisions of Exhibit "H" attached hereto and by this reference made part of this AGREEMENT, and shall include the attached Exhibit "H" in every sub -contract, including procurement of materials and leases of equipment, unless exempt by the Regulations or directives issued pursuant thereto. IX Termination of Agreement The right is reserved by the AGENCY to terminate this AGREEMENT at any time upon ten (10) days written notice to the CONSULTANT. In the event this AGREEMENT is terminated by the AGENCY other than for default on the part of the CONSULTANT, a final payment shall be made to the CONSULTANT as shown in Exhibit "I" for the type of AGREEMENT used. No payment shall be made for any work completed after ten (10) days following receipt by the CONSULTANT of the Notice to Terminate. If the accumulated payment made to the CONSULTANT prior to Notice of Termination exceeds the total amount that would be due when computed as set forth herein above, then no final payment shall be due and the CONSULTANT shall immediately reimburse the AGENCY for any excess paid. If the services of the CONSULTANT are terminated by the AGENCY for default on the part of the CONSULTANT, the above formula for payment shall not apply. Page 4 of 8 In such an event, the amount to be paid shall be determined by the AGENCY with consideration given to the actual costs incurred by the CONSULTANT in performing the work to the date of termination, the amount of work originally required which was satisfactorily completed to date of termination, whether that work is in a form or a type which is usable to the AGENCY at the time of termination, the cost to the AGENCY of employing another firm to complete the work required and the time which may be required to do so, and other factors which affect the value to the AGENCY of the work performed at the time of termination. Under no circumstances shall payment made under this subsection exceed the amount, which would have been made using the formula set forth above. If it is determined for any reason that the CONSULTANT was not in default or that the CONSULTANT'S failure to perform is without the CONSULTANT'S or it's employee's default or negligence, the termination shall be deemed to be a termination for the convenience of the AGENCY. In such an event, the CONSULTANT would be reimbursed for actual costs in accordance with the termination for other than default clauses listed previously. In the event of the death of any member, partner or officer of the CONSULTANT or any of its supervisory personnel assigned to the PROJECT, or dissolution of the partnership, termination of the corporation, or disaffiliation of the principally involved employee, the surviving members of the CONSULTANT hereby agree to complete the work under the terms of this AGREEMENT, if requested to do so by the AGENCY. This subsection shall not be a bar to renegotiation of the AGREEMENT between the surviving members of the CONSULTANT and the AGENCY, if the AGENCY so chooses. In the event of the death of any of the parties listed in the previous paragraph, should the surviving members of the CONSULTANT, with the AGENCY'S concurrence, desire to terminate this AGREEMENT, payment shall be made as set forth in the second paragraph of this section. Payment for any part of the work by the AGENCY shall not constitute a waiver by the AGENCY of any remedies of any type it may have against the CONSULTANT for any breach of this AGREEMENT by the CONSULTANT, or for failure of the CONSULTANT to perform work required of it by the AGENCY. Forbearance of any rights under the AGREEMENT will not constitute waiver of entitlement to exercise those rights with respect to any future act or omission by the CONSULTANT. X Changes of Work The CONSULTANT shall make such changes and revisions in the complete work of this AGREEMENT as necessary to correct errors appearing therein, when required to do so by the AGENCY, without additional compensation thereof. Should the AGENCY find it desirable for its own purposes to have previously satisfactorily completed work or parts thereof changed or revised, the CONSULTANT shall make such revisions as directed by the AGENCY. This work shall be considered as Extra Work and will be paid for as herein provided under Section XIV. XI Disputes Any dispute concerning questions of fact in connection with the work not disposed of by AGREEMENT between the CONSULTANT and the AGENCY shall be referred for determination to the Director of Public Works or AGENCY Engineer, whose decision in the matter shall be final and binding on the parties of this AGREEMENT; provided, however, that if an action is brought challenging the Director of Public Works or AGENCY Engineer's decision, that decision shall be subject to de novo judicial review. If the parties to this AGREEMENT mutually agree, disputes concerning alleged design errors will be conducted under the procedures found in Exhibit "J", and disputes concerning claims will be conducted under the procedures found in Exhibit "K". XII Venue, Applicable Law, and Personal Jurisdiction In the event that either party deems it necessary to institute legal action or proceedings to enforce any right or obligation under this AGREEMENT, the parties hereto agree that any such action shall be initiated in the Superior court of the State of Washington, situated in the county in which the AGENCY is located. The parties hereto agree that all questions shall be resolved by application of Washington law and that the parties to such action shall have the right of appeal from such decisions of the Superior court in accordance with the laws of the State of Washington. The CONSULTANT hereby consents to the personal jurisdiction of the Superior court of the State of Washington, situated in the county in which the AGENCY is located. Page 5 of 8 XIII Legal Relations The CONSULTANT shall comply with all Federal, State, and local laws and ordinances applicable to the work to be done under this AGREEMENT. This contract shall be interpreted and construed in accordance with the laws of the State of Washington. The CONSULTANT shall indemnify and hold the AGENCY and the STATE and its officers and employees harmless from and shall process and defend at its own expense all claims, demands, or suits at law or equity arising in whole or in part from the CONSULTANT'S negligence or breach of any of its obligations under this AGREEMENT; provided that nothing herein shall require a CONSULTANT to indemnify the AGENCY or the STATE against and hold harmless the AGENCY or the STATE from claims, demands or suits based solely upon the conduct of the AGENCY or the STATE, their agents, officers and employees; and provided further that if the claims or suits are caused by or result from the concurrent negligence of (a) the CONSULTANT'S agents or employees, and (b) the AGENCY or the STATE, their agents, officers and employees, this indemnity provision with respect to (1) claims or suits based upon such negligence (2) the costs to the AGENCY or the STATE of defending such claims and suits shall be valid and enforceable only to the extent of the CONSULTANT'S negligence or the negligence of the CONSULTANT'S agents or employees. The CONSULTANT'S relation to the AGENCY shall be at all times as an independent contractor. The CONSULTANT shall comply with all applicable sections of the applicable Ethics laws, including RCW 42.23, which is the Code of Ethics for regulating contract interest by municipal officers. The CONSULTANT specifically assumes potential liability for actions brought by the CONSULTANT'S own employees against the AGENCY and, solely for the purpose of this indemnification and defense, the CONSULTANT specifically waives any immunity under the state industrial insurance law, Title 51 RCW. Unless otherwise specified in the AGREEMENT, the AGENCY shall be responsible for administration of construction contracts, if any, on the PROJECT. Subject to the processing of a new sole source, or an acceptable supplemental agreement, the CONSULTANT shall provide On -Call assistance to the AGENCY during contract administration. By providing such assistance, the CONSULTANT shall assume no responsibility for: proper construction techniques, job site safety, or any construction contractor's failure to perform its work in accordance with the contract documents. The CONSULTANT shall obtain and keep in force during the terms of the AGREEMENT, or as otherwise required, the following insurance with companies or through sources approved by the State Insurance Commissioner pursuant to Title 48 RCW. Insurance Coverage A. Worker's compensation and employer's liability insurance as required by the STATE. B. Commercial general liability and property damage insurance in an aggregate amount not less than two million dollars ($2,000,000) for bodily injury, including death and property damage. The per occurrence amount shall not exceed one million dollars ($1,000,000). C. Vehicle liability insurance for any automobile used in an amount not less than a one million dollar ($1,000,000) combined single limit. Excepting the Worker's Compensation Insurance and any Professional Liability Insurance secured by the CONSULTANT, the AGENCY will be named on all policies as an additional insured. The CONSULTANT shall furnish the AGENCY with verification of insurance and endorsements required by the AGREEMENT. The AGENCY reserves the right to require complete, certified copies of all required insurance policies at any time. All insurance shall be obtained from an insurance company authorized to do business in the State of Washington. The CONSULTANT shall submit a verification of insurance as outlined above within fourteen (14) days of the execution of this AGREEMENT to the AGENCY. No cancellation of the foregoing policies shall be effective without thirty (30) days prior notice to the AGENCY. The CONSULTANT'S professional liability to the AGENCY shall be limited to the amount payable under this AGREEMENT or one million ($1,000,000) dollars, whichever is the greater, unless modified by Exhibit "L". In no case shall the CONSULTANT'S professional liability to third parties be limited in any way. Page 6 of 8 The AGENCY will pay no progress payments under Section V until the CONSULTANT has fully complied with this section. This remedy is not exclusive; and the AGENCY and the STATE may take such other action as is available to it under other provisions of this AGREEMENT, or otherwise in law. XIV Extra Work A. The AGENCY may at any time, by written order, make changes within the general scope of the AGREEMENT in the services to be performed. B. If any such change causes an increase or decrease in the estimated cost of, or the time required for, performance of any part of the work under this AGREEMENT, whether or not changed by the order, or otherwise affects any other terms and conditions of the AGREEMENT, the AGENCY shall make an equitable adjustment in the (1) maximum amount payable; (2) delivery or completion schedule, or both; and (3) other affected terms and shall modify the AGREEMENT accordingly. C. The CONSULTANT must submit any "request for equitable adjustment", hereafter referred to as "CLAIM", under this clause within thirty (30) days from the date of receipt of the written order. However, if the AGENCY decides that the facts justify it, the AGENCY may receive and act upon a CLAIM submitted before final payment of the AGREEMENT. D. Failure to agree to any adjustment shall be a dispute under the Disputes clause. However, nothing in this clause shall excuse the CONSULTANT from proceeding with the AGREEMENT as changed. E. Notwithstanding the terms and conditions of paragraphs (A) and (B) above, the maximum amount payable for this AGREEMENT, shall not be increased or considered to be increased except by specific written supplement to this AGREEMENT. XV Endorsement of Plans If applicable, the CONSULTANT shall place their endorsement on all plans, estimates, or any other engineering data furnished by them. XVI Federal and State Review The Federal Highway Administration and the Washington State Department of Transportation shall have the right to participate in the review or examination of the work in progress. XVII Certification of the Consultant and the Agency Attached hereto as Exhibit "M-1(a and b)" are the Certifications of the CONSULTANT and the AGENCY, Exhibit "M -2" Certification Regarding Debarment, Suspension and Other Responsibility Matters - Primary Covered Transactions, Exhibit "M-3" Certification Regarding the Restrictions of the Use of Federal Funds for Lobbying and Exhibit "M-4" Certificate of Current Cost or Pricing Data. Exhibit "M-3" is required only in AGREEMENTS over $100,000 and Exhibit "M-4" is required only in AGREEMENTS over $500,000. XVIII Complete Agreement This document and referenced attachments contain all covenants, stipulations, and provisions agreed upon by the parties. No agent, or representative of either party has authority to make, and the parties shall not be bound by or be liable for, any statement, representation, promise or agreement not set forth herein. No changes, amendments, or modifications of the terms hereof shall be valid unless reduced to writing and signed by the parties as an amendment to this AGREEMENT. XIX Execution and Acceptance This AGREEMENT may be simultaneously executed in several counterparts, each of which shall be deemed to be an original having identical legal effect. The CONSULTANT does hereby ratify and adopt all statements, representations, warranties, covenants, and agreements contained in the proposal, and the supporting material submitted by the CONSULTANT, and does hereby accept the AGREEMENT and agrees to all of the terms and conditions thereof. Page 7 of 8 In witness whereof, the parties hereto have executed this AGREEMENT as of the day and year shown in the "Execution Date" box on page one (1) of this AGREEMENT. By By Consultant David Evans and Associates, Inc. Agency City of Renton DOT Form 140-089 EF Revised 6/05 Page 8 of 8 Exhibit A CITY OF RENTON SOUTH 3RD STREET AND SHATTUCK AVENUE SOUTH INTERSECTION SAFETY IMPROVEMENTS PROJECT SCOPE OF SERVICES INTRODUCTION The following scope of services is to provide the City of Renton with intersection design updates, on -call construction assistance, and the preparation of as -built plans for the South 3rd Street (SR 900) and Shattuck Avenue South Intersection Safety Improvements project. TASK 1— PROJECT ADMINISTRATION The CONSULTANT shall provide project management and administration services for intersection design services following the potholing investigation and for construction support during the construction phase of the project. The CONSULTANT will prepare monthly progress reports and invoices for work completed. The budget assumes an eight (8) month duration of the project prior to the contract completion date. TASK 2 — INTERSECTION DESIGN The CONSULTANT shall arrange to have potholing of existing utilities performed at an estimated twenty-one (21) locations in the intersection in order to determine whether adequate clearances can be achieved to the proposed storm drain pipe and traffic signal pole foundation facilities. The proposed potholing locations will be based upon a pothole exhibit submitted by the CONSULTANT to the City on 4-23-09. The CONSULTANT shall update the plans, details, specifications, and the construction cost estimate based upon the findings of the existing utilities potholing subtask. The bid documents submitted by the CONSULTANT to the City on 1 l -07-08 will be used as the basis of the updates. Meetings • Two project coordination meetings. Deliverables • Updated bid documents. TASK 3 — CONSTRUCTION ASSISTANCE The CONSULTANT shall answer questions and provide clarification of plans and contract provisions as requested by the City. The budget assumes review and response to approximately 10 requests for information (RFIs) by the Contractor. The CONSULTANT will provide support for contract change orders as requested by the City. This may include providing new or revised plans, special provisions, and quantities. The budget assumes a total of two (2) change orders. The CONSULTANT may attend up to six (6) meetings at the City's request at either City Hall or the project site to assist the City in addressing project issues. P:\r\RENT00000009\OOOOCON\On-Call Contract\Exhibit A 3rd & Shattuck Services Estimate 09-0512.doc 5/12/2009 TASK 4 — PREPARE AS-BUILTS The CONSULTANT shall prepare as -built plans in AutoCAD based on City -provided marked - up plans. Assumptions: • Field survey for as-builts is not included in this scope of work. • Review of materials submittals is not included in this scope of work. SCHEDULE The duration of construction is expected to last through the end of December 2009. If CONSULTANT work is required beyond that time, a contract supplement will be prepared. The contract period will expire February 28, 2010. PAYMENT The maximum amount payable is $44,750 per "Exhibit E." P:\r\RENT00000009\OOOOCON\On-Call Contract\Exhibit A 3rd & Shattuck Services Estimate 09-0512.doc 5/12/2009 David Evans and Associates, Inc. Bellevue, WA Exhibit E-1 CONSULTANT FEE DETERMINATION -SUMMARY SHEET (COST PLUS FIXED FEE) South 3rd Street and Shattuck Avenue South Intersection Safety Project City of Renton, Washington p+H66ts b"-,Cladstfl6ationt�r'4;t'.':a,'"i" , 7es ,, ,r'STS4, $? #. .: 4 SP,8Ma` ;' MGP,E -, SDEN,',;i C ;DEEN¢ "VAD,MA'1 ; SCADW9. Wk;SV1fW -„ ,P,LSt}.V: 5. ,: • l9jCreiv=2* Task 1 - Project Administration 1 16 12 $3,906 Task 2 - Intersection Design 2a - Pothole Coordination 8 8 2 $2,240 2b - Intersection Design Updates 1 8 16 $2,990 2c - Bid Document Preparation 8 12 2 $2,592 Task 3 - Construction Assistance 3a-RFIs 16 16 2 $4,324 3b - Change Order Support & Review 12 8 8 $3,652 3c - Meetings / Site Visits 18 2 $3,263 Task 4 - Prepare As-builts 2 2 2 32 $4,192 QA/QC 2 2 $753 Total hours by classification 4 90 62 22 40 $27,912 DEA classification SPJM MGPE SDEN DEEN ADMA SCAD SVYM PLSU SVTE Craw-2 Hourly billing rate $65 $55 $42 $28 $25 $35 $65 $40 $25 $56 Total Direct Salary Cost (DSC) = $8,896 Overhead at 178.76 % of DSC = $15,902 Fixed fee at 35 % of DSC = $3,114 Total Labor Cost = $27,912 Reimbursable Expenses: Mileage at $0.55 per mile = $193 Reproduction = $400 Deliveries = $120 Total Reimbursable Expenses = $713 Subconsultant Expenses: APS Potholing (see attached) _ $16,125 Total Subconsultant Expenses = $16,126 Maximum Amount Payable = $44,760 P:V\RENT00000009\000000N\O,Call ContracnExhibit E 3rd & Shattuck Services Estimate 09-0512.xis 5/12/2009 CITY OF RENTON COUNCIL AGENDA BILL Submitting Data: Public Works Department Dept/Div/Board.. Transportation Systems Division Staff Contact...... Jim Seitz, extension 7245 subject: Third Amendment to an Agreement Between the Central Puget Sound Regional Transit Authority (aka Sound Transit) and the City of Renton Issue Paper Third Amendment to the Interlocal Agreement a ot: June 1, 2009 Consent .............. X Public Hearing.. Correspondence.. Ordinance ............. Resolution........... . Old Business........ New Business....... X Study Sessions...... Information........ . Recommended Action: Approvals: Council Concur Legal Dept......... X Finance Dept...... Fiscal Impact Expenditure Required... Transfer/Amendment....... Amount Budgeted Revenue Generated Amount Needed City Share Total Project. SUMMARY OF ACTION: On May.3, 2006, Sound Transit and the City of Renton entered into Interlocal Agreement CAG 06-069 for two projects: Hardie -Rainier Corridor Improvements and the SW 27th/Strander Blvd. projects. This agreement specified that Sound Transit would contribute $14.9 million toward the Hardie -Rainier Corridor Improvements Project and $4 million toward the SW 27th/Strander Blvd. Project. The purpose of this third amendment is to amend the 2006 agreement and describe the commitments of the parties relative to the final design and right-of-way acquisition phases of the Rainier Avenue Arterial Improvements Project. These phases are proceeding concurrently. STAFF RECOMMENDATION: Authorize the Mayor and City Clerk to execute the third amendment to the agreement between the Central Puget Sound Regional Transit Authority (aka Sound Transit) and the City of Renton. H:\Division.s\TRANSPOR.TAT\ADMIN\Agenda 2009\ST ILA 3rd amendment June 2009 agenda bill.doc _% , PUBLIC WORKS DEPARTMENT �u ��xTrco) M E M O R A N D U M DATE: June 1, 2009 TO: Randy Corman, Council President Members of the Renton City Council VIA: h Denis Law, Mayor FROM: Gregg Zimmerma]�Iic Works Administrator SUBJECT: Third Amendment to an Agreement Between the Central Puget Sound Regional Transit Authority (aka Sound Transit) and the City of Renton ISSUE: Should Council authorize the Mayor and City Clerk to execute the third amendment to an agreement between the Central Puget Sound Regional Transit Authority (aka Sound Transit) and the City of Renton? RECOMMENDATION: Authorize the Mayor and City Clerk to execute the third amendment to the agreement between the Central Puget Sound Regional Transit Authority (aka Sound Transit) and the City of Renton. BACKGROUND: On May 3, 2006, Sound Transit and the City of Renton entered into an interlocal agreement for two projects: Hardie -Rainier Corridor Improvements and the SW 27th Street/Strander Boulevard projects. This agreement specified that Sound Transit would contribute $14.9 million toward the Hardie -Rainier Corridor Improvements Project and $4 million toward the SW 27th Street/Strander Boulevard Project. The purpose of this third amendment is to amend the 2006 agreement and describe the commitments of the parties relative to the final design and right-of-way acquisition phases of the Rainier Avenue Arterial Improvements Project. These phases are proceeding concurrently. Under this amendment Sound Transit agrees to the following funding obligations: ➢ Sound Transit will pay the City $4,500,000 for the final design and right-of-way acquisition phase of the Rainier Avenue Project. ➢ Sound Transit will reimburse the City 70% of the actual costs invoiced to and paid by the City. Randy Corman, Council President Members of the Renton City Council Page 2 of 2 June 1, 2009 The remaining $5,400,000 of the $14,900,000 Sound Transit funding is for the construction phase of the project. The City agrees to achieve substantial completion of all the transit elements of the project (BAT lanes) by April 1, 2012. cc: Jim Seitz, Transportation Planning and Programming Supervisor Juliana Fries, Program Development Coordinator Connie Brundage, Transportation Administrative Secretary File H:\Division.s\TRANSPOR.TATIADMIN\Agenda 2009\ST ILA 3rd amendment June 2009 issue paper.doc THIRD AMENDMENT TO AN AGREEMENT BETWEEN THE CENTRAL PUGET SOUND REGIONAL TRANSIT AUTHORITY AND THE CITY OF RENTON THIS Third Amendment is made this day of , 2009 to the Interlocal Cooperative Agreement between the Central Puget Sound Regional Transit Authority (hereinafter referred to as "Sound Transit") and the City of Renton, a municipal corporation ("Renton" or "City"), dated May 3, 2006. RECITALS WHEREAS, the City and Sound Transit entered into an Interlocal Cooperative Agreement on May 3, 2006 (the "2006 Agreement") to outline the scope, schedule and budget for the Strander Boulevard/SW 27th Street Extension, West Valley Highway to Oaksdale Ave S.W., and Rainier Avenue Arterial Improvements Projects; and WHEREAS, the Parties amended the scope of the Rainier Avenue Arterial Improvements Project resulting in the First Amendment to an Agreement Between the Central Puget Sound Regional Transit Authority and the City of Renton (the "First Amendment to the 2006 Agreement"), without increasing Sound Transit's financial contribution as provided in the 2006 Agreement; and WHEREAS, the Rainier Avenue Arterial Improvement Project will construct north- and south -bound business access and transit (BAT) lanes on Rainier Avenue South that will improve express bus service; and WHEREAS, future construction of the BAT lanes on Rainier Avenue South are contingent upon the rebuilding and lengthening of the BNSF Rainier Avenue South Railroad Overpass, which BNSF has rebuilt and lengthened; and WHEREAS, the Parties agreed to the use of grant funds to include reimbursement for the final configuration of the Rainier Avenue South Railroad Overpass resulting in the Second Agreement to an Agreement Between the Central Puget Sound Regional Transit Authority and the City of Renton (the "Second Amendment to the 2006 Agreement"), without increasing Sound Transit's financial contribution as provided in the 2006 Agreement; and WHEREAS, the Parties have received and are currently reviewing the Preliminary Engineering and Environmental Documentation (PE/ED) for the Rainier Avenue Arterial Improvements Project and desire to immediately proceed to the Final Design and Right -Of -Way Acquisition phase of the project to avoid any delay in the project schedule; and WHEREAS, the scope of work for the Rainier Avenue Arterial Improvement Project is specified in Section 2.0 of the First Amendment to the 2006 Agreement; and WHEREAS, the responsibilities of the Parties for the Final Design and Right -Of -Way Acquisition Phases are specified in Sections 6.0 and 7.0 of the 2006 Agreement; NOW THEREFORE, for and in consideration of the mutual covenants contained herein the City and Sound Transit do hereby agree to amend the 2006 Agreement as follows. 1.0 PURPOSE The purpose of this Third Amendment is to amend the 2006 Agreement and describe the commitments of the Parties relative to the Final Design and Right -Of -Way Acquisition phases of the Rainier Avenue Arterial Improvements Project. These phases are proceeding concurrently. 2.0 FUNDING OBLIGATIONS 2.1 As provided in the 2006 Agreement, and which will remain unchanged by this third amendment, Fourteen Million Nine Hundred Thousand dollars ($14,900,000) will be the maximum amount of the Sound Transit funding contributions to the City for completion of the Rainier Avenue Arterial Improvements Project. As more fully set forth in the 2006 Agreement, Two Million Five Hundred Thousand Dollars ($2,500,000) of that amount is for completion of the Preliminary Engineering and Environmental Documentation for the Transit Elements, and the remaining Twelve Million Four Hundred Thousand Dollars ($12,400,000) is for Final Design, Right - Of -Way Acquisition and Construction of the Transit Elements. 2.2 Pursuant to the Second Amendment to the 2006 Agreement, Sound Transit paid the City the amount of Two Million Five Hundred Thousand Dollars ($2,500,000) for the Rainier Avenue Arterial Railroad Overpass Improvement Sub -Project. The amount provided pursuant to the Second Amendment is considered part of the Twelve Million Four Hundred Thousand Dollars ($12,400,000) for Final Design, Right -Of -Way Acquisition and Construction of the Transit Elements. 2.3 Pursuant to this Third Amendment, Sound Transit will pay to the City the amount of Four Million Five Hundred Thousand Dollars ($4,500,000) for the Final Design and Right -Of -Way Acquisition phase of the Rainier Avenue Arterial Improvement Project. Until the $4,500,000 limit for Final Design and Right -Of -Way Acquisition is reached, Sound Transit will reimburse to the City 70% of the actual costs invoiced to and paid by the City to the City's consultants, contractors, or property owners for such Final Design and Right -Of -Way Acquisition services. Sound Transit will reimburse such amounts within thirty (30) days of receipt of the City's proof of payment and supporting documentation. By way of example, if the City is invoiced 2 H:\Division.s\TRANSPOR.TAT\ADMIN\Agenda 2009\Third Amendment to Sound Transit Agreement with Renton (2-25-09) (2) (2).doc for $100,000 and pays the consultant $100,000, then within thirty days of the City's submission of proof of payment and supporting documentation, Sound Transit will reimburse the City $70,000. 2.4 The remaining Five Million Four Hundred Thousand Dollars ($5,400,000) is for Construction of the Transit Elements, and it will be provided pursuant to a separate agreement for Construction that will incorporate terms and conditions consistent with the 2006 Agreement and all applicable amendments thereto and other terms appropriate for this phase of work. 2.5 All remaining funding for the Rainier Avenue Arterial Improvement Project, including the Preliminary Engineering and Environmental Documentation, and Final Design, Right -Of -Way Acquisition, and Construction of this project will be provided by the City through City funds or other funding obtained by the City. If the actual cost of the Rainier Avenue Arterial Improvements Project exceeds the City's estimates for the project, Sound Transit will not be obligated to increase its contribution under the 2006 Agreement or this or any prior amendment to the 2006 Agreement. If the total Project costs exceed the available matching funding from the City or other sources, the City may reduce the scope of the general purpose improvements, but in no event shall the City reduce the scope of the Transit Elements, unless written approval is received from Sound Transit. 3.0 Schedule 3.1 In the event that the City for any reason does not achieve substantial completion of all of the Transit Elements of the Rainier Avenue Arterial Improvements Project by April 1, 2012, the City shall within thirty (30) days of written request by Sound Transit, reimburse to Sound Transit all amounts paid under this Third Amendment by Sound Transit to the City for right of way acquisition, plus interest. Interest shall be calculated from the date Sound Transit provided the funds to the City until the date such funds are returned to Sound Transit. Interest will be calculated at a rate of six percent (6%) per annum. 4.0 EFFECT OF THIRD AMENDMENT Unless expressly revised by this Third Amendment, all other terms and conditions of the 2006 Agreement, as amended by the First and Second Amendments to the 2006 Agreement shall remain in effect and unchanged by this Third Amendment. IN WITNESS WHEREOF, the Parties hereto hereby agree to the terms and Conditions of this Agreement as of the date first written above. H:ADivision.s\TRANSPOR.TAT\ADMIN\Agenda 2009\Third Amendment to Sound Transit Agreement with Renton (2-25-09) (2) (2).doc For the City of Renton: By: Denis Law Title: Mayor Approved as to Form: By: Title: Renton Legal Counsel Attest: By: Bonnie I. Walton Title: Renton City Clerk 11 For Sound Transit: By: Joan M. Earl Title: Executive Officer Approved as to Form: By: Stephen G. Sheehy Title: Sound Transit Legal Counsel H:\Division.s\TRANSPOR.TAT\ADMIN\Agenda 2009\Third Amendment to Sound Transit Agreement with Renton (2-25-09) (2) (2).doc CITY OF RENTON COUNCIL AGENDA BILL submitting Data: Public Works Department Dept/Div/Board.. Transportation Systems Division Staff Contact...... Jim Seitz, extension 7245 Reimbursement to the City of Renton for Costs Incurred for Railroad Improvements at Rainier Avenue South, Hardie Avenue SW, and Shattuck Avenue South Issue Paper Interlocal A Council Concur Fiscal Impact (317.12703) Expenditure Required... Amount Budgeted Amount Needed SUMMARY OF ACTION: For Agenda of: June 1, 2009 Agenda Status Consent .............. X Public Hearing.. Correspondence.. Ordinance ............. Resolution........... . Old Business........ New Business....... X Study Sessions...... Information........ . Legal Dept......... X Finance Dept...... Trans fer/Amendment ....... Revenue Generated Up to $4,000,000 City Share Total Project. In July 2007, the City Council approved a Letter of Agreement between the City of Renton and BNSF regarding the replacement of the Hardie Avenue SW, Rainier Avenue South, and Shattuck Avenue South railroad bridges. BNSF has since constructed these bridges during the second half of 2007. In the July letter, the City agreed to pay the costs up to $8.95 million. Anything above $8.95 million would be shared equally between the City and BNSF. At the same time, up to $4 million in savings from the Cedar River Bridge being funded by WSDOT would be applied toward the $8.95 million share. The actual cost has ended up being $10.4 million. The attached agreement formalizes the past commitments made by WSDOT regarding its reimbursement to the City of Renton based on the cost saving from the Cedar River Bridge Project that will be applied to the cost of the replacement of the three other bridges over Hardie Avenue SW, Rainier Avenue South and Shattuck Avenue South. The project costs have been included in the Six -Year Transportation Improvement Program (TIP project #7) and in the 2009 budget. There are no additional impacts because of this agreement. STAFF RECOMMENDATION: Authorize the Mayor and City Clerk to execute an agreement between the Washington State Department of Transportation (WSDOT) and the City of Renton for reimbursement to the City for costs incurred for railroad improvements at Rainier Avenue South, Hardie Avenue SW, and Shattuck Avenue South. H:\Division.s\TRANSPOR.TAT\ADMIN\Agenda 2009\WSDOT Cedar River Bridge June 2009 agenda bill.doc PUBLIC WORKS DEPARTMENT ru \L�NTT0) M E M O R A N D U M DATE: June 1, 2009 TO: Randy Corman, Council President Members of the Renton City Council VIA: j Denis Law, Mayor FROM:v Gregg ZimmermaIministrator SUBJECT: Reimbursement to the City of Renton for Costs Incurred for Railroad Improvements at Rainier Avenue South, Hardie Avenue SW, and Shattuck Avenue South ISSUE: Should Council authorize the Mayor and City Clerk to execute an agreement between the Washington State Department of Transportation (WSDOT) and the City of Renton for. reimbursement to the City of Renton for costs incurred for railroad improvements at Rainier Avenue South, Hardie Avenue SW, and Shattuck Avenue South? RECOMMENDATION: Authorize the Mayor and City Clerk to execute an agreement between the Washington State Department of Transportation (WSDOT) and the City of Renton for reimbursement to the City for costs incurred for railroad improvements at Rainier Avenue South, Hardie Avenue SW, and Shattuck Avenue South. BACKGROUND: In July 2007, the City Council approved a Letter of Agreement between the City of Renton and BNSF regarding the replacement of the Hardie Avenue SW, Rainier Avenue South, and Shattuck Avenue South railroad bridges. BNSF constructed these bridges during the second half of 2007. In the July letter, the City agreed to pay the costs up to $8.95 million. Anything above $8.95 million would be shared equally between the City and BNSF. At the same time, up to $4 million in savings from the Cedar River Bridge being funded by WSDOT would be applied toward the $8.95 million share. The actual cost has ended up being $10.4 million. The attached agreement formalizes the past commitments made by WSDOT regarding its reimbursement to the City of Renton based on the cost savings from the Cedar River Bridge Project that will be applied to the cost of the replacement of the three other bridges over Hardie Avenue SW, Rainier Avenue South and Shattuck Avenue South. The project costs have been included in the Six -Year Transportation Improvement Program (TIP project #7) and in the 2009 budget. There are no additional impacts because of this agreement. cc: Jim Seitz, Transportation Planning and Programming Supervisor Juliana Fries, Program Development Coordinator Connie Brundage, Transportation Administrative Secretary File I Washington State Department of Transportation (WSDOT) 2 and the City of Renton 3 4 Agreement for Reimbursement to the 5 City of Renton for Costs Incurred for Railroad Improvements 6 at Rainier Avenue, Hardie Avenue, and Shattuck Avenue 7 9 THIS Agreement is made and entered into between the CITY OF RENTON (the 10 "CITY') and the STATE OF WASHINGTON, DEPARTMENT OF TRANSPORTATION (the 11 "STATE"). 12 13 WHEREAS, the STATE, in the interest of providing congestion relief in the I-405 14 Corridor, is constructing improvements to I-405 between 112th Avenue SE and SE 8th Street, 15 including work on the railroad infrastructure along the I-405 Corridor; and 16 17 WHEREAS, the STATE entered into agreements with the BNSF Railway Company 18 ("BNSF") to construct improvements under agreements, RR00354 — Additional BNSF Public 19 Projects Management Staff, RR00355 — Wilburton Tunnel Improvements (BNSF RR MP 10.6 to 20 11.35 LS 405), RR00356 — Cedar River Bridge Improvements (BNSF RR MP 2.36 LS 405), and 21 RR00363 — Preliminary Engineering for Cedar River Bridge Project (collectively referred to as 22 "the BNSF AGREEMENTS"); and 23 24 WHEREAS, the STATE previously agreed to fund the BNSF AGREEMENTS up to a 25 maximum of $10 million; and 26 27 WHEREAS, the improvements constructed under the BNSF AGREEMENTS will result 28 in the transport of oversized freight movements and reliable rail accessibility to and from major 29 manufacturing sites within the CITY; and 30 31 WHEREAS, the STATE entered into a contract for the I-405/112th Ave SE to SE 8th St 32 Widening Project (the "PROJECT"), which included the removal of the railroad infrastructure at 33 the Wilburton Tunnel and thereby eliminated redundant railroad access to a major manufacturing 34 facility in Renton; and 35 36 WHEREAS, BNSF entered into a construction contract for infrastructure improvements 37 at the Cedar River Bridge; and 38 39 WHEREAS, the BNSF AGREEMENTS and the PROJECT will facilitate economic 40 roadway construction activities for the STATE; and 41 42 WHEREAS, the CITY planned future improvements to CITY arterials, including work 43 on the railroad infrastructure at Rainier Avenue, Hardie Avenue, and Shattuck Avenue; and 44 45 WHEREAS, the CITY accelerated the planned improvements to the railroad 46 infrastructure at Rainier Avenue, Hardie Avenue, and Shattuck Avenue ("IMPROVEMENTS"), 1, 7 .8 49 50 51 52 53 54 55 56 57 58 59 60 61 62 63 64 65 66 67 68 59 0 71 72 73 74 75 76 77 78 79 80 81 82 83 84 85 86 87 88 89 90 91 and entered into agreements with BNSF under Letter Agreement dated April 16, 2007 and Letter Agreement dated July 17, 2007 (the "CITY LETTER AGREEMENTS"); and WHEREAS, the IMPROVEMENTS constructed under the CITY LETTER AGREEMENTS will result in the transport of oversize freight movements and reliable rail accessibility to major manufacturing sites within the CITY and the I-405 Corridor; and WHEREAS, under State of Washington Legislature Engrossed Substitute House Bill 1094, Section 305 (9) [Chapter 518, Laws of 2007], the STATE may enter into agreements to preserve reliable rail accessibility to major manufacturing sites within the I-405 Corridor, provided that the cost for such agreements remains within the PROJECT approved budget; and WHEREAS, the STATE desires to contribute funds toward the work covered by the CITY LETTER AGREEMENTS. NOW, THEREFORE, pursuant to Revised Code of Washington (RCW) 47.28.140 and in consideration of the terms, conditions, covenants, and_peformances contained herein, or attached and incorporated and made a part hereof, IT IS'MUTUALLY AGREED AS FOLLOWS: 1.0 GENERAL 1.1 The BNSF AGREEMENTS and the CITY LETTER AGREEMENTS, described in Exhibit A and Exhibit B, respectively, are attached hereto and incorporated herein and by this reference made a part hereof. 1.2 The PARTIES agree that they receive mutual benefits from the PROJECT and from the IMPROVEMENTS �constrtrcted'under the CITY LETTER AGREEMENTS. The STATE will partially reimburse the CITY's costs to construct the IMPROVEMENTS, which contributed to the PROJECT, to the extent it has remaining BNSF AGREEMENTS Funds available after making final payments to BNSF as delineated below. 2.0 STATE RESPONSIBILITIES 2.1 The STATE agrees to calculate the remaining BNSF AGREEMENTS Funds available as described in Section 4.0 herein. 2.2 Once the STATE determines whether BNSF AGREEMENTS Funds are available, the STATE will notify the CITY within thirty (30) calendar days of making the determination. 2.3 If the STATE determines BNSF AGREEMENTS Funds are available, the STATE agrees to reimburse the CITY for work performed pursuant to itemized billings submitted by the CITY as described in Section 3.0 herein. FI-\TIi..V,;- OTR ANSPnP TA nA TIMTN\A.... 1. 7009\WSTNIT f -i- R;vr, R,;d- A---t d- 92 2.4 The STATE agrees that upon receipt on the CITY's invoice for reimbursement, the 93 STATE will pay the invoice within thirty (30) calendar days. 94 95 96 3.0 CITY RESPONSIBILITIES 97 98 3.1 The CITY will submit an invoice for reimbursement of the remaining BNSF 99 AGREEMENTS Funds to the STATE as delineated in Section 3.2 here, once the 100 following conditions have occurred: 101 102 3.1.1 BNSF shall submit final billings to the CITY for all work covered under the CITY 103 LETTER AGREEMENTS. 104 105 3.1.2 BNSF certifies in writing that all of the rail bridges improved under the CITY 106 LETTER AGREEMENTS are open to railroad traffic and such written certification is 107 provided to the STATE. 108 109 3.2 Once the CITY is notified by the STATE of the;remaining BNSF AGREEMENTS Funds 110 available, if any, the CITY agrees to submiteo an invoice`�within thirty (30) calendar days 111 to the STATE. 112 113 3.2.1 The ,invoice submitted by the CITY to the STATE will include a copy of itemized 114 final billings for all work performid byBNNSF� under the CITY LETTER 115 AGREEMENTS. Included in he itemized final billings will be a statement from the 116 CITY indicating that any and all costs associated with the CITY LETTER 117 AGREEMENTS have been settled and accounted for between the CITY and BNSF. 118 119 3.3 All records in support of costs incurred for work performed under the CITY LETTER 120 AGREEMENTS shall be maintained by the CITY for a period of six (6) years. The 121 STATE shall have full access to and right to examine said records, during normal 122 business hours and as often as it deems necessary. 123 124 4.0 CALCULATION OF REMAINING BSNF AGREEMENTS FUNDS 125 126 4.1 Reimbursement funding under this Agreement is contingent upon the payment for work 127 constructed under the BNSF AGREEMENTS by BNSF on behalf of the STATE. The 128 STATE shall determine whether there are any remaining BNSF AGREEMENTS Funds, 129 after paying BNSF that may reimburse the CITY pursuant to Section 4.2 herein. 130 131 4.2 Upon STATE certification of the PROJECT, the STATE will determine the total amount 132 paid under the terms of the BNSF AGREEMENTS as follows: 133 134 4.2.1 The STATE will determine the total sum of payments made to BNSF for work 135 constructed under the BNSF AGREEMENTS which will equal the "TOTAL SUM 136 OF PAYMENTS" by the STATE. 137 14 -\ N 66— OTR A NSPO P TAT\ A IlM IN\ A ornria A --- rinn 4.2.2 The STATE will determine the remaining BNSF AGREEMENTS Funds available by deducting the TOTAL SUM OF PAYMENTS from the total $10 million in BNSF AGREEMENTS Funds funds budgeted for BNSF work. 4.2.3 The remaining BNSF AGREEMENTS Funds available which may be reimbursed to the CITY cannot be greater than the total of unallocated funds remaining in the overall PROJECT budget, estimated to be up to $4.0 million. 5.0 NOTIFICATION 5.1 Any notice required or permitted to be given pursuant to this Agreement shall be in writing and shall be sent postage prepaid by U.S. Mail, to the following addresses, unless otherwise indicated by the PARTIES to this Agreement: To the STATE: Kim Henry I-405 Project Director Washington State, part ent of Transportation 600 — 108t1i Avenue NE Suite 405 Bellevue, WA'98004 To the CITY: Gregg Zimmerman Public Works Administrator City of Renton 1055 South `Grady Way Renton, WA 98057 6.0 EFFECTIVENESS AND DURATION 6.1 This Agreement is effective upon execution by both PARTIES and will remain in effect until whichever occurs first: (a) it is determined that there are no remaining BNSF AGREEMENTS Funds, as set out in Section 4.0; or (b) the remaining BNSF AGREEMENTS Funds, as set out in Section 4.2.3, are reimbursed to the CITY. 7.0 TERMINATION 7.1 This Agreement may be terminated by either PARTY upon thirty (30) calendar days' written notice. 8.0 AMENDMENT 8.1 Either PARTY may request modifications to this Agreement. Such modifications shall be mutually agreed upon by written amendments and/or supplements to this Agreement. No variation or alteration of the terms of this Agreement shall be valid unless made in H\D;6v i—c\TR ANZPOR TAT\ATIMTN\Ao-1,,')OO(AWCMnTf Polar River R,iri— A .... m— d— 183 writing and signed by authorized representatives of the PARTIES hereto. 184 185 9.0 INDEMNIFICATION 186 187 9.1 Each PARTY shall protect, defend, indemnify, and save harmless the other PARTY, its 188 officers, officials, employees, and agents, while acting within the scope of their 189 employment as such, from any and all costs, claims, judgments, and/or awards of 190 damages (both to persons and/or property), arising out of, or in any way resulting from, 191 each PARTY's own acts or omissions. No PARTY will be required to indemnify, 192 defend, or save harmless the other PARTY if the claim, suit, or action for injuries, death, 193 or damages (both to persons and/or property) is caused by the sole negligence of the other 194 PARTY, its officers, officials, employees, and agents, while acting within the scope of 195 their employment as such. Where such claims, suits, or actions result from the 196 concurrent negligence of the PARTIES, the indemnity provided herein shall be valid and 197 enforceable only to the extent of a PARTY's own negligence. 198 199 9.2 The STATE and the CITY agree that their obligations>under this Section extend to any 200 claim, demand, and/or cause of action brought.by, or onbehalf of, any of its employees 201 or agents. For this purpose, the PARTIES, by mutual negotiation, hereby waive, with 202 respect to the other PARTY only, any immunity that would otherwise be available 203 against such claims under the Industrial Insurance provisions of Title 51 RCW. 204 205 9.3 In the event either PARTY incurs any judgment, award, and/or cost arising herefrom, 206 including attorneys' fees, to enforce the provisions of this Section, all such fees, 207 expenses, and costs shall be recoverable from the other PARTY. 208 209 9.4 This indemnification and waiver shall survive the termination of this Agreement. 210 211 10.0 ALL WRITINGS 212 213 10.1 This Agreement contains all the terms and conditions agreed upon by the PARTIES to 214 this Agreement. No other understanding, oral or otherwise, regarding the subject matter 215 of this Agreement shall be deemed to exist or to bind any of the PARTIES hereto. 216 217 11.0 GOVERNANCE 218 219 11.1 This Agreement is entered into pursuant to and under the authority granted by the laws of 220 the State of Washington and any applicable federal laws. The provisions of this 221 Agreement shall be construed to conform to those laws. 222 223 12.0 SEVERABILITY 224 225 12.1 If any provision of this Agreement, or any provision of any document incorporated by 226 reference shall be held invalid, such invalidity shall not affect the other provisions of this 227 Agreement which shall remain in effect without the invalid provision, if such remainder 228 conforms to the requirements of applicable law and the fundamental purpose of this }I.\Ilivicinn c\TP AN.CPOP TA T\ A IIMIN\ AA or ,-1 ,1— "'9 ,0 231 232 233 234 235 236 237 238 239 240 241 242 243 244 245 246 247 248 249 250 —51 ,2 253 254 255 256 257 258 259 260 261 262 263 264 265 266 267 268 269 270 271 272 '' 73 4 Agreement. To this end, the provisions of this Agreement are declared to be severable. 13.0 VENUE 13.1 In the event that either PARTY deems it necessary to institute legal action or proceedings to enforce any right or obligation under this Agreement, the PARTIES agree that any such action or proceeding shall be brought in the superior court situated in King County, Washington. IN WITNESS WHEREOF, the PARTIES hereto have executed this Agreement as of the latest date written below: CITY OF RENTON By: Denis Law Mayor Date: APPROVED AS TO FORM: By (print): Signature: City Attorney Date: ATTEST: STATE OF WASHINGTON DEPARTMENT OF TRANSPORTATION By: Kim Henry I405 Project Director Date: APPROVED AS TO FORM: By (print): Signature: Assistant Attorney General Office of the Attorney General Date: PAN,i6— OTR AN' POP TAT A DM IN\A--IA A orr—ld— 275 276 277 278 279 280 281 282 By: Bonnie I. Walton City Clerk Date: N\Ilnri Ginn c\TR A NCPOQ TAT411M IN\A.—ir9M0\Wqr)OTC,A,,rPivrrRriDiorAorrrmrntd— CITY O REIN'TON Oiv COUi1CiL AGENDA BILL Submitting Data: Public Works Department Dept/Div/Board.. Utility Systems/Wastewater Staff Contact...... Dave Christensen (0212) Subject: Establishment of the Baxter Lift Station Replacement Special Assessment District No. 0043 Exhibits: Issue Paper Ordinance Draft Final Notice of Potential Assessment Final Assessment District Roll For Agenda of: June 1, 2009 Agenda Status Consent .............. Public Hearing.. Correspondence.. Ordinance ............. Resolution............ Old Business........ New Business....... Study Sessions...... Information......... X Recommended Action: Approvals: Refer to Utilities Committee Legal Dept......... X Finance Dept...... X Other........ Fiscal Impact: N/A Expenditure Required... Transfer/Amendment....... Amount Budgeted....... Revenue Generated......... Total Project Budget City Share Total Project.. SUMMARY OF ACTION: The Wastewater Utility has completed reimbursement for the oversizing of the Baxter Lift Station Replacement. A portion of the funds reimbursed to the developer that built the lift station benefit an additional developable parcel adjacent to the lift station. A special assessment district should be formed in order for the City to be reimbursed for its costs upon development of this adjacent parcel. The amount attributable to this parcel is $166,421. Interest will accrue on the assessment at a rate of 5.30 percent for a period of 10 years (per City Ordinance #4505) 30 days after final approval of the ordinance. STAFF RECOMMENDATION: Waive the requirement for preliminary approval and preliminary notice for the Baxter Lift Station Replacement Special Assessment District. Approve the final Baxter Lift Station Replacement Special Assessment District No. 0043 and present the ordinance for first reading. H:\File Sys\WWP - WasteWater\WWP-03-0000 Correspondence - Wastewater\DaveC\2009 Correspondence\Baxter Final SAD AB.doc\DMCtp PUBLIC WORKS DEPARTMENT M E M O R A N D U M DATE: May 14, 2009 TO: Randy Corman, Council President Members of the Renton City Council VIA: Denis Law, Mayor FROM: Gregg Zimmerma> iiinistrator STAFF CONTACT: Dave Christensen, Wastewater Supervisor (ext. 7212) SUBJECT: Establishment of the Baxter Lift Station Replacement Special Assessment District No. 0043 T011Si 1F- Does the City wish to establish a Special Assessment District for the Baxter Lift Station Replacement, in order to ensure that the cost of the project is equitably distributed to those who benefit? RECOMMENDATION: Waive the requirements for the preliminary approval and preliminary notice for the Baxter Lift Station Replacement Special Assessment District. Approve the final Baxter Lift Station Replacement Special Assessment District No. 0043 and present the ordinance for first reading. BACKGROUND SUMMARY: The Baxter Lift Station was replaced by two developers as part of their new developments. Connor Homes and Football Northwest needed additional capacity to accommodate their development. As part of the replacement of the station, the City requested the developer to size the lift station to provide sufficient capacity for a moderate size development on the parcel (Port Quendall property) between their two developments. The developers requested, and the City granted oversizing reimbursement. The old Port Quendall property will benefit from this facility at such time as they develop. The additional capacity provided by the developers was for two purposes. First, capacity was provided for the City's existing flows coming from the Misty Cove Lift Station. This accounts for 72 GPM of the additional 183.1 GPM provided. The remaining 111.1 GPM is available for the Port Quendall site. Council/Baxter Lift Station SAD May 14, 2009 Page 2 of 2 To calculate the benefit for the Port Quendall property we are using a percentage of total flow to the lift station. The developers accounted for 60.9% of the total flow, and at a total cost of $697,754 for the station, their share is $424,932. That leaves $272,822 to be split between the City, for the Misty Cove flows, and the Port Quendall site. Based upon flows of 72 GPM for the City (39%) and 111.1 for the Port Quendall site (61 %), the dollar amount to assign to the Port Quendall site is $166,421. Staff did not come forward with this special assessment district request prior to the developer starting construction, thus no preliminary notice was provided. However, City capital funds have been expended that benefit a future developable parcel. As such, staff is requesting that Council waive.the code section requiring preliminary notice and proceed with the acceptance of the Final Special Assessment District. ONCLUSION: It has been the policy of the City that when sanitary sewer facilities have been installed that the City hold a Special Assessment District in order to ensure that each property benefitting from the new facility pays their fair share of the costs. This policy helps to ensure that the existing ratepayers do not pay a disproportionate share of the costs for these City -installed facilities. Therefore, we recommend that Council approve the establishment of the Baxter Lift Station Replacement Special Assessment District No. 0043. cc: Lys Hornsby, Utility Systems Director File H:\File Sys\WWP - WasteWater\WWP-03-0000 Correspondence - Wastewater\DaveC\2009 Correspondence\Baxter Final SAD Issue.doc\DMCtp DRAFT CITY OF RENTON 4)R4PJ, FINAL NOTICE OF POTENTIAL ASSESSMENT for City of Renton Baxter Lift Station Replacement Special Assessment District No. 0043 Quendall Terminals PER UNIT ASSESSMENT P.O. Box 477 $166,421 Renton, WA 98055 (Lump Sum) King County Account No. 292405-9002 LEGAL DESCRIPTION: POR OF GL 5 & SH LDS ADJ LY WLY OF NP R/W & SLY OF A LN BAAP ON WLY MGN OF SD R/W 1049.63 FT NELY OF S LN SD GL TH SWLY TAP N 59-24-36 W 50 FT FRM PT ON WLY MGN OF R/W WCH IS 949.63 FT NELY OF S LN SD GL TH S 56-28-50 W 111.16 FT TH N 59-24-36 W TO INNER HARBOR LN ALSO POR SD GL LY WLY OF ST HWY #1 & ELY OF LK WASH BLVD LESS PSH #1 LESS POR FOR RD PER REC# 2000619001179 The facilities, as shown on the attached map, are eligible for cost recovery under City Special Assessment District Ordinance No. XXXX. For those properties that could receive benefit directly by the sewers, future use would trigger payment of a 'fair share' cost of the sewer. This assessment is calculated, as a unit charge, by dividing the cost of the replacement lift station by the total number of GPM for the new station, and then multiply the per GPM amount to the estimated GPM for each parcel/user. The unit charge for the above referenced property is located in the upper right corner of this page. The purpose of the assessment district is to allow the City the ability to collect the costs of the construction of the sewer facilities from all those who benefit from its construction. To accomplish this, we are required to record an ordinance which will serve as a notice of potential assessment. This ordinance will establish a boundary that includes any parcel that may benefit in the future. It is our goal to ensure, in fairness to all, that any property owner that connects at a later date pays their share just Like those who will connect right away. The benefit area is defined as the ultimate service area that the facility may be able to serve. This boundary is shown on the attached inap. This assessment district does not create a lien against real estate and is not a charge against your property until your property is connected to, or benefitting from, the Baxter Lift Station Replacement project. You will only be required to pay this assessment when the property gains benefit from these sewer facilities. Until that time, the property can be sold or change hands without triggering the assessment. Benefit from these sewer facilities can be described as follows: • A property not currently connected to a City sewer facility (i.e., currently utilizing an on -site system or a vacant parcel), that connects to the sewer system associated with this district will trigger the assessment. Until then, the assessment will not be triggered. • For those properties that are already connected to City sewer, this assessment will only be triggered if the property increases its density either by change of use (i.e., single family to multi- family housing) or through increased density within the same use (i.e., further subdivision of land for single family housing). HAFile Sys\W WP - WastcWater\W WP-03-0000 Correspondence - Wastewater\DaveC\2009 Correspondence\L3axter—fit naInotice. doc\DMCtp You will not be required to pay the assessment unless one of the above situations occurs. However, the assessment district will accrue simple interest at a rate of 5.30% per annum for a period of ten years. The accrual of interest will begin thirty (30) days after the notice of potential assessment is recorded with King County Records. To avoid interest charges at a future date, you may pay the amount of assessment during the thirty -day period after recording, interest free. This option is totally at the discretion of the property owner. Some properties within the boundary of this special assessment district are currently within other city held special assessment districts. Each property will only be responsible to pay the charges for the special assessment districts that they derive benefit from. Per City Ordinance No. 4444 you may request an appeal hearing by writing to the Renton City Council, c/o City Clerk, 1055 S. Grady Way, Renton, WA 98057, within twenty (20) days of this mailing (by XXX XX, XXXX, 5:00 P.M.). Grounds for protest: An appeal shall include a statement of claimed errors that concern the proposed assessment and must be accompanied by a $75.00 non-refundable fee. Errors which are not set forth in writing will not be considered. Pursuant to City Ordinance No. 4444, Sections 9-16-9.0 and D, the only items of appeal that will be considered are the cost of the facilities, the costs distribution methodology, and the issue of benefit to the properties to be assessed Appeal Fee and Appeal Process: A non-refundable appeal fee in the amount of $75.00 shall be submitted with each appeal. If a protest is received and deemed timely and establishes a proper ground.for protest according to City Ordinance, a public hearing will be held. If no protests are received, the above -quoted notice of potential assessment will be recorded against your property. The charge(s) will not be collected until you subsequently tap onto or use the facilities covered by the Special Assessment District notice. We hope that this notice will answer most of your questions. If you do, however, have questions pertaining to the lift station modification, the background of the assessment district, or the appeal process, please contact Dave Christensen at 425-430-7212. Bonnie 1. Walton, City Clerk Notice of Final Assessment/Final Hearing IlTile Sys\WWP - WasteWater\WWP-03-0000 Correspondence - Wastewater\Dave02009 Correspondence\Baxter_final_notice.doc\DMCtp CITY OF RENTON FINAL ASSESSMENT ROLL SPECIAL ASSESSMENT DISTRICTS BAXTER LIFT STATION REPLACEMENT Type: Wastewater Utility Improvements Property Name/Address of Owner Identification Quendall Terminals P.O. Box 477 Renton WA 98055 KC Tax Act # 292405-9002 Cost Per Unit $166,421.00 (Lump Sum) Legal Description: POR OF GL 5 & SH LDS ADJ LY WLY OF NP R/W & SLY OF A LN BAAP ON WLY MGN OF SD R/W 1049.63 FT NELY OF S LN SD GL TH SWLY TAP N 59-24-36 W 50 FT FRM PT ON WLY MGN OF R/W WCH IS 949.63 FT NELY OF S LN SD GL TH S 56-28-50 W 111.16 FT TH N 59-24-36 W TO INNER HARBOR LN ALSO POR SD GL LY WLY OF ST HWY #1 & ELY OF LK WASH BLVD LESS PSH #1 LESS POR FOR RD PER REC# 2000619001179 H:\File Sys\WWP - WasteWater\WWP-03-0000 Correspondence - Wastewater\DaveC\2009 Correspondence\Baxter Final sad roll.doc\DMCtp UKAVF CITY OF RENTON, WASHINGTON ')k4rr F� ORDINANCE NO. AN ORDINANCE OF THE CITY OF RENTON, WASHINGTON, ESTABLISHING AN ASSESSMENT DISTRICT FOR SANITARY SEWER SERVICE FOR PROPERTIES BENEFITTING FROM THE BAXTER LIFT STATION REPLACEMENT ESTABLISHING THE AMOUNT OF THE CHARGE UPON CONNECTION TO THE FACILITIES THE CITY COUNCIL OF THE CITY OF RENTON, WASHINGTON, DO ORDAIN AS FOLLOWS: SECTION I. There is hereby created a Sanitary Sewer Service Special Assessment District for the area served by the Baxter Lift Station Replacement project in the northwest quadrant of the City of Renton and within King County, which area is more particularly described in Exhibit "A" attached hereto. A map of the service area is attached as Exhibit "B". The recording of this document is to provide notification of potential connection and interest charges. While this connection charge may be paid at any time, the City does not require payment until such time as the parcel is connected to and, thus, benefiting from the sewer facilities. The property may be sold or in any other way change hands without triggering the requirement, by the City, of payment of the charges associated with this district. SECTION II. Persons connecting to the sanitary sewer facilities,in this Special Assessment District, and which properties have not been charged or assessed with all costs of the Baxter Lift Station Replacement as detailed in this ordinance, shall pay, in addition to the payment of the connection permit fee and in addition to the system development charge, the following additional fees: A. Per Unit Charge. Any new connection that flows to the Baxter Lift Station shall pay a Lump Sun charge of $166,421.00 total for the entire parcel. SECTION III. In addition to the aforestated charges, there shall be a charge of 5.30% per annum added to the Special Assessment District charge. The interest charge shall accrue for no more than ten (10) years from the date this ordinance becomes effective. Interest charges will be simple interest and not compound interest. SECTION IV. This ordinance is effective upon its passage, approval and thirty (30) days after publication. PASSED BY THE CITY COUNCIL this day of 2009. Bonnie 1. Walton, City Clerk APPROVED BY THE MAYOR this day of Denis Law, Mayor 2009. H:\File Sys\WWP - WasteWater\WWP-03-0000 Correspondence - Wastewater\DaveC\2009 Correspondence\Baxter SAD Ordinance.doc\DMCtp EXHIBIT A LEGAL DESCRIPTION That portion of Government Lot 5 in Section 29, Township 24 North, Range 5 East, W.M., and shoreland adjoining lying westerly of the Northern Pacific Railroad right-of- way and southerly of a line described as follows: Beginning at the quarter corner on the south line of said Section 29; Thence North 89°58'36" West along the South line of said Lot 5, 1,113.01 feet to the westerly line of said Northern Pacific Railroad right-of-way; Thence North 29°44'54" East 849.62 feet along said right-of-way line to a point hereinafter referred to as Point A; Thence continuing North 29°44'54" East 200.01 feet to the True Point of Beginning of the line herein described; Thence South 56'28'50" West 222.32 feet to a point which bears North 59°24'56" West 100.01 feet from said Point A; Thence North 59°24'56" West to the inner harbor line and the end of said line description. LESS that portion of the above described area dedicated as right-of-way under King County Recording No. 20080619001179. Situate in the City of Renton, King County, Washington. P:\PRM-27 - Assessment Districts From 1994 and Forward\0043\ExhA.doc Scale 1" = EXHIBIT "B" BAXTER LIFT STATION REPLACEMENT Special Assessment SPECIAL ASSESSMENT DISTRICT District Boundary CITY OF RENTON COUNCIL AGENDA BILL AI #: , 044. Submitting Data: Public Works For Agenda of. June 1, 2009 Dept/Div/Board.. Utility Systems Division/ Surface Water Utility Agenda Status Staff Contact...... Ron Straka (ext. 7248) Consent ...........:.. X Public Hearing.. Subject: King County Flood Control Zone District Interlocal Correspondence.. Cooperation Agreement For Opportunity Fund Projects Ordinance ............. Resolution............ X Old Business........ New Business....... Exhibits: Issue Paper Study Sessions...... Resolution Information......... Interlocal Cooperation Agreement Recommended Action: Approvals: Council Concur Legal Dept......... X Finance Dept...... X Other. . Fiscal Impact: Expenditure Required... Amendment....... Amount Budgeted....... $214,824 Revenue Generated......... $214,824 Total Project Budget... $214,824 City Share Total Project... SUMMARY OF ACTION: The King County Flood Control Zone District (District) was established in 2008, which included an Opportunity Fund. The Opportunity Fund allows for 10 percent of the District's assessment that is collected within a jurisdiction to be returned to the jurisdiction for use on eligible local storm and surface water management projects. The Interlocal Cooperation Agreement for Opportunity Fund Projects (Agreement) is needed to allow for the transfer of funds from the District to the City. The Agreement will allow for the transfer of the City's share of the District assessments to the Surface Water Utility for 2008 and 2009 ($214,824) and in future years. The Opportunity Funds have to be spent on projects that reduce flooding, habitat projects that are linked to flood control projects, or the implementation of eligible watershed management plans. The 2008 and 2009 Opportunity Funds will be used to fund the City's share of the Cedar River Spawning Channel Replacement Project that is planned for construction this summer in cooperation with the Army Corps of Engineers. The Cedar River Spawning Channel Replacement Project will replace a ground water spawning channel that was lost due to the Nisqually Earthquake and was mitigation for the construction of the Lower Cedar River Section 205 Flood Hazard Reduction Project, which included dredging and construction of levee and floodwalls on the lower 1.25 miles of the Cedar River. The spawning channel project will increase floodplain storage and provide salmon spawning and rearing habitat. STAFF RECOMMENDATION: Approve a resolution authorizing the Mayor and City Clerk to sign the Interlocal Cooperation Agreement with the King County Flood Control Zone District for Opportunity Fund Projects. HAFile Sys\SWA -Surface Water Section Administration\SWA 11- Interagency Cooperation\11-0014 KC Flood Control Zone Dist\1010 Opportunity Fund\Opportunity Fund ILA\AgenBill-KCFCZD Opportunity Fund ILA.doc\RStp Y im `R PUBLIC WORKS DEPARTMENT U-;b-1,qL + mw M E M O R A N D U M DATE: May 14, 2009 TO: Randy Corman, Council President Members of the Renton City Council VIA:Denis Law, Mayor FROM: Gregg Zimmerma lic Works Administrator STAFF CONTACT: Ron Straka, Surface Water Utility Supervisor (ext. 7248) SUBJECT: King County Flood Control Zone District Interlocal Cooperation Agreement For Opportunity Fund Projects ISSUE: Should the Council approve a resolution authorizing the Mayor and City Clerk to sign the Interlocal Cooperation Agreement with the King County Flood Control Zone District for Opportunity Fund Projects? RECOMMENDATION: Approve a resolution authorizing the Mayor and City Clerk to sign the Interlocal Cooperation Agreement with the King County Flood Control Zone District for Opportunity Fund Projects. BACKGROUND SUMMARY: The King County Flood Control Zone District (District) was established in 2008, which included an Opportunity Fund. The Opportunity Fund allows for 10 percent of the District's assessment that is collected within a jurisdiction to be returned to the jurisdiction for use on eligible local storm and surface water management projects. The Interlocal Cooperation Agreement for Opportunity Fund Projects (Agreement) is needed to allow for the transfer of funds from the District to the City. The Agreement will allow for the transfer of the City's share of the District assessments to the Surface Water Utility for 2008 and 2009 ($214,824) and in future years. The Opportunity Funds have to be spent on projects that reduce flooding, habitat projects that are linked to flood control projects, or the implementation of eligible watershed management plans. The 2008 and 2009 Opportunity Funds will be used to fund the City's share of the Cedar River Spawning Channel Replacement Project that is planned for construction this summer in cooperation with the Army Corps of Engineers. The Cedar River Spawning Channel Replacement Project will replace a ground water spawning channel that was lost due to the Nisqually Earthquake. The groundwater spawning channel was mitigation for the construction of the Lower Cedar River Section 205 Flood Hazard Reduction Project (205 Project) that was Council/KCFCZD Interlocal Agreement May 14, 2009 Page 2 of 2 constructed in cooperation with the Army Corps of Engineers starting in 1998, which included dredging and construction of levee and floodwalls on the lower 1.25 miles of the Cedar River. The 205 Project was needed and solved regionally significant flooding on the lower 1.25 miles of the Cedar River. The Spawning Channel Replacement Project will replace the lost groundwater spawning channel to satisfy the mitigation requirements for the initial 205 Project construction and the required future maintenance of the project, which includes periodic maintenance dredging needed to insure the flood protection benefits of the project. The Spawning Channel Replacement Project will increase floodplain storage and provide salmon spawning and rearing habitat. The purpose of the agreement is to formalize the terms and conditions by which the District will provide funds to the City for eligible Opportunity Fund Projects. The Agreement defines the City's responsibilities, associated project applications, use of the Opportunity Funds, project management and reporting requirements. The Agreement also defines the District's responsibilities and legal requirements. The Surface Water Utility will submit applications for eligible projects to the King County Flood Control Zone District for review and approval by the District Board of Supervisors to obtain the City's share of the Opportunity Fund in future years. The King County Flood Control Zone District assessment is an ad valorem property tax that is $0.10 per $1,000 of assessed valuation. The assessment is used to fund the District's capital improvement projects, maintenance projects and operating programs that are needed to address regionally significant flooding problems in King County. The District is focusing on significant flooding problems in the Cedar River and Green River basins, which is a benefit to the City. The Opportunity Fund Projects 10 percent (I-cent)of the total District's assessment. The City's share of the Opportunity Fund is approximately $107,400 per year depending upon the assessed value of property in the City. CONCLUSION: Approve a resolution authorizing the Mayor and City Clerk to sign the Interlocal Cooperation Agreement with the King County Flood Control Zone District for Opportunity Fund Projects. cc: Lys Hornsby, Utility Systems Director JoAnn Wykpisz, PW Principal Financial and Administrative Analyst File H:\File Sys\SWA - Surface Water Section Administration\SWA I I- Interagency Cooperation\1 1-00 14 KC Flood Control Zone Dist\1010 Opportunity Fund\Opportunity Fund ILA\Opportunity Fund Projects ILA Issue Paper.doc\RStp CITY OF RENTON, WASHINGTON RESOLUTION NO. A RESOLUTION OF THE CITY OF RENTON, WASHINGTON, AUTHORIZING THE MAYOR AND CITY CLERK TO ENTER INTO AN INTERLOCAL AGREEMENT WITH THE KING COUNTY FLOOD CONTROL ZONE DISTRICT FOR OPPORTUNITY FUND PROJECTS. WHEREAS, the King County Flood Control Zone District (District) was established in 2008, which included an Opportunity Fund. The Opportunity Fund allows for 10% of the District's assessment that is collected within a jurisdiction to be returned to the jurisdiction for use on eligible local storm and surface water management projects; and WHEREAS, the Opportunity Funds have to be spent on projects that reduce flooding, habitat projects that are linked to a flood control projects, or the implementation of eligible watershed management plans; and WHEREAS, the 2008 and 2009 Opportunity Funds will be used to fund the City's share of the Cedar River Spawning Channel Replacement project that is planned for construction this summer in cooperation with the Army Corps of Engineers; and WHEREAS; it is necessary to memorialize the agreement between the City and the District to allow for the transfer of the City's share of the District assessments to the Surface Water Utility for 2008 and 2009 in the amount of $214,824 and for future years; NOW, THEREFORE, THE CITY COUNCIL OF THE CITY OF RENTON, WASHINGTON, DOES RESOLVE AS FOLLOWS: SECTION I. The above recitals are found to be true and correct in all respects. SECTION II. The Mayor and City Clerk are hereby authorized to enter into an interlocal agreement with King County Flood Control Zone District entitled Interlocal Cooperation Agreement Between the King County Flood Control Zone District and the City of RESOLUTION NO. Renton for Opportunity Fund Projects and future such agreements that don't materially differ from this agreement. PASSED BY THE CITY COUNCIL this day of , 2009. Bonnie I. Walton, City Clerk APPROVED BY THE MAYOR this day of , 2009. Approved as to form: Lawrence J. Warren, City Attorney RES.1408:5/18/09:scr Denis Law, Mayor 2 INTERLOCAL COOPERATION AGREEMENT BETWEEN THE KING COUNTY FLOOD CONTROL ZONE DISTRICT AND THE CITY OF RENTON FOR OPPORTUNITY FUND PROJECTS THIS INTERLOCAL COOPERATION AGREEMENT is entered into between the CITY OF RENTON, a municipal corporation of the State of Washington ("City"), and the KING COUNTY FLOOD CONTROL ZONE DISTRICT, a quasi municipal corporation of the State of Washington ("District") ("Parties" or when singular "Party") and shall be effective upon execution by the Municipality and the District. Article I. Recitals. In April 2007, the King County Council, as authorized by chapter 86.15 RCW, created the District as a quasi -municipal corporation. The King County Council members ex officio constitute the Board of Supervisors of the District, the governing body of the District. In Resolution FCZD 2008-15.2, the Board of Supervisors approved the District's 2009 budget and annual work program, and allocated 10 percent of the District's annual property tax revenues for a sub -regional opportunity fund to be used by King County municipalities . The Board of Supervisors further determined that eligibility of projects for opportunity funds be based on consistency with chapter 86.15 RCW; provided that expenditures under RCW 86.15.035 and RCW 39.34.190 for salmonid habitat protection be linked to the construction of a flood or stormwater project. The Board of Supervisors also allocated the opportunity funds to a municipality based on that municipality's proportional contribution to the overall King County assessed valuation, as collected. -1- In Resolution FCZD 2009-01.1, the Board of Supervisors included the projects and activities described in Attachment A to this Agreement in an amendment to the District's annual budget and work program for the year 2009. The Board of Supervisors desires to have the City implement its approved opportunity fund projects and activities for the years 2008 and 2009, as well as the projects and activities that are approved for the City in subsequent District annual budgets and work programs. The City desires to implement such projects and activities, and to receive opportunity funds to finance in whole or in part such projects and activities. The City and the District are authorized to enter into this Agreement pursuant to Chapter 39.34 RCW (the Interlocal Cooperation Act), and agree as follows: Article II. Definitions. 2.1 Eligibility Criteria. The term "Eligibility Criteria" means one of the two following criteria that Projects shall meet to qualify for Opportunity Funds: 2.1.1. Under RCW 86.15.110, Opportunity Funds may be expended for either flood control improvements or stormwater control improvements that are extended, enlarged, acquired or constructed, provided that the City has developed a comprehensive plan of development for flood control or for stormwater control, respectively, and the improvement contributes to the objectives of the plan. For flood control improvements, such plan shall be submitted to and approved by the Department of Ecology. In addition, for newly constructed improvements, the City shall develop preliminary engineering studies and plans, and such plans and studies shall be filed with the District's engineer. For all projects, the City shall provide cost estimates and underlying data and shall describe the benefit provided by the improvement. -2- 2.1.2. Pursuant to the criteria in RCW 86.15.035 and RCW 39.34.190, as modified by Resolution FCZD 2008-15.2, District funds may be expended for cooperative watershed management actions, including watershed management partnerships and other intergovernmental agreements, for the purposes of water supply, water quality, and water resource and habitat protection and management, provided that Opportunity Funds expended for salmon habitat protection shall be linked to the construction of a flood or stormwater project, and provided further that all such funds shall be used for the implementation of watershed management plans, including but not limited to the following: a. Watershed plans developed under chapter 90.82 RCW; b. Salmon recovery plans developed under chapter 77.85 RCW; c. Watershed management elements of comprehensive land use plans developed under the growth management act, chapter 36.70A RCW; d. Watershed management elements of shoreline inaster programs developed under the shoreline management act, chapter 90.58 RCW; e. Nonpoint pollution action plans developed under the Puget Sound water quality management planning authorities of chapter 90.71 RCW and chapter 400-12 WAC; f. Other comprehensive management plans addressing watershed health at a WRIA level or sub-WRIA basin drainage level; g. Coordinated water system plans under chapter 70.116 RCW and similar regional plans for water supply; and h. Any combination of the foregoing plans in an integrated watershed management plan. The authority to use funds for implementation of these plans is broadly construed to include: 1. Coordination and oversight of watershed management plan implementation, including funding a watershed management partnership for this purpose; 2. Technical support, monitoring, and data collection and analysis; 3. Design, development, construction, and operation of projects included in the plan; and 4. Conducting activities and programs included as elements in the plan. -3- 2.2 Project. The term "Project" or "Projects" means specific projects or activities that meet the Eligibility Criteria of this Agreement, are approved by the Board of Supervisors in a resolution approving the annual budget and work program, or amendment thereto, and are described in an attachment to this Agreement that is approved pursuant to this Agreement. 2.3 Opportunity Funds. The term "Opportunity Funds" means the funds made available by the Board of Supervisors to the municipalities within King County for implementation of Projects. For each of the years 2008 and 2009, these funds represent 10 percent of property tax revenues collected for each of those years, and are available to individual municipalities based on the proportional amount that municipality's assessed valuation as collected (as determined by the King County Assessor's office) bears to the entire amount of assessed valuation in all of King County (as determined by the King County Assessor's office). For the years after 2009, this term means District funds that are designated as "Opportunity Funds" by the Board of Supervisors in either a resolution approving the District's annual budget and work program or a separate resolution. 2.4 Service Provider. The term "Service Provider" means the Water and Land Resources Division of the King County Department of Natural Resources and Parks. Article III. Duration of Agreement --Survival of Agreement. This Agreement shall be effective upon execution by both Parties, and shall remain in effect until terminated by one or both of the Parties. Either Party may terminate this Agreement by providing written notice of termination to the other Party no less than sixty (60) days prior to the effective date of termination. This Agreement also may be terminated -4- upon mutual agreement of the Parties expressed in writing. Sections 4.2, 5.2, 5.3, 5.4, 5.5, 6.3, 6.4 and 6.5 and Article VII shall survive any termination of this Agreement. Article IV. Conditions of Agreement. 4.1 Project Descriptions. The initial approved Projects are described in Attachment A, which is incorporated by reference. Subsequent approved Projects shall be described in new Attachments to this Agreement that are approved through the amendment process of Section 7.2.2, which Attachments shall be incorporated by reference into this Agreement. 4.2 Use of Funds. The City shall use Opportunity Funds distributed pursuant to this Agreement only for expenses related to the Projects. Article V. Responsibilities of City. 5.1 Project Application and Description. The City may submit an application for distribution of Opportunity Funds within a period of time designated by the Service Provider and on a form approved by the Service Provider. As part of application to receive Opportunity Funds, the City shall submit to the Service Provider the following information for each proposed Project: 5.1.1. Name of proposed project or activity; 5.1.2. Description of the flooding, stormwater, or watershed management problem to be addressed (one to two paragraphs); 5.1.3. Description of how the proposed project or activity will address the problem (one to two paragraphs); 5.1.4. Type of project or activity (e.g., feasibility study, design, construction, acquisition, programmatic activities, etc.); -5- 5.1.5. Description of how the project or activity satisfies the "Eligibility Criteria," as defined in this Agreement; 5.1.6. Identification of the plan (flood control, stormwater control, or watershed management) that includes the Project; studies; and 5.1.7. Product/deliverable and, for constructed Projects, design plans or 5.1.8. Schedule, milestones, costs and budget for each Project, consistent with the requirements of this Agreement. The schedule for a Project shall provide for the expenditure of Opportunity Funds within two years after the commencement date of the Project. The City shall submit a request for distribution of Opportunity Funds after an actual expenditure is incurred for the Project, provided that the City may request distribution of up to 10 percent of Opportunity Funds for a Project upon approval of a Project by the Board of Supervisors. After approval of the Project by the Board of Supervisors, the application form, as approved by the Board of Supervisors, shall become an attachment to this Agreement through the amendment process in Section 7.2.2. 5.2 City Obligations for Projects. The City shall implement the Project as described and provided for in the approved attachment to this Agreement. Upon receipt, the City shall deposit Opportunity Funds in a separate account, which shall accrue interest at the rate earned by the City on its investments. To request a distribution of Opportunity Funds, the City shall submit to the Service Provider such information and proof of expenditure as requested by the Service Provider. -6- 5.3. Projects Seeking Opportunity Funds Beyond Current Appropriation Year. The City may request distribution of Opportunity Funds beyond the appropriation year for the District's budget and annual work program, provided that District approval of such distribution of Opportunity Funds shall not be construed as nor constitute a District obligation or commitment to appropriate Opportunity Funds for the Project beyond the approved appropriation year. The District shall have no obligation to provide Opportunity Funds beyond the appropriation year for the District's budget and annual work program, provided that the District shall distribute to the City after such appropriation year any Opportunity Funds that were allocated to the City in such appropriation year and in previous years and that have not been distributed to the City. 5.4 Reporting. 5.4.1. Until the Project is completed or all Opportunity Funds for a Project have been spent, the City shall provide semi-annually to the Service Provider brief written reports describing the progress on and status of the Project and any other relevant information that the Service Provider may request to determine compliance with this Agreement. 5.4.2. Upon completion of a Project, or upon expenditure of all of the Opportunity Funds for the Project, whichever occurs first, the City shall submit a final report to the Service Provider within 90 days of such completion or expenditure. The final report shall contain a summary of all Project expenditures, copies of invoices if requested by the Service Provider, a description of the Project status and accomplishments, and other relevant information requested by the Service Provider to verify compliance with this Agreement. The final report also shall contain a certification that all Opportunity Funds -7- provided to the City were expended solely on the Project in accordance with this Agreement and the Project approval. If a Project is not completed prior to termination of this Agreement, a report as described in this Section shall be provided to the Service Provider within 90 days of such termination. All records relating to a Project shall be retained by the City for a minimum of seven years, unless required by law to be retained for a longer period, in which case the longer period shall apply. 5.5 City obligations upon Project completion or termination. As consideration for receipt Opportunity Funds to implement the Project, the City agrees that: 5.5.1. If the Project involves developing a report or study, undertaking a study or collecting data, or producing written or electronic materials of any kind, copies of all such materials shall be provided upon request to the District or the Service Provider: and 5.5.2. If the Project involves the acquisition, extension, enlargement, or construction of a physical improvement, the City shall take ownership of; and shall be obligated to operate, maintain, and repair such improvement for the ordinary expected useful life of such improvement. 5.5.3 If the City terminates a Project, and the City has not expended all of the Opportunity Funds paid in advance pursuant to Section 6.3, the City shall return to the Service Provider the remaining Opportunity Funds within 60 days of the close of the calendar year in which the Project was terminated. Such returned Opportunity Funds shall be credited to the City's Opportunity Fund account, and may be used on future approved Projects, provided that if the Board of Supervisors has terminated the Opportunity Fund program at that time, the returned Opportunity Funds may be used by the District for District projects and activities. -8- Article VI. Responsibilities of District. 6.1 Upon timely submission of a Project application by the City, the Service Provider will review the application, provide reasonable and appropriate feedback, and consider including the Project as an element of the District's annual budget and work program. 6.2 If the Board of Supervisors approves the Project application by including the Project in the District's annual budget and work program, or an amendment thereto, the Service Provider shall attach a copy of the Project application as approved to this Agreement and it shall become a part hereof. 6.3 The District, through the Service Provider, shall distribute Opportunity Funds, up to the remaining amount of the City's total Opportunity Fund allocation, after City expenditure of funds for a Project as set forth in the approved schedule for the Project, provided that upon request of the City, the District shall pay up to 10 percent of the total Opportunity Funds allocated for a Project upon approval of an attachment to this Agreement. The Service Provider shall pay the Opportunity Funds after confirming that the expenditures have been made consistent with the Project approval and schedule. 6.4 The District assumes no obligation for future support of Projects meeting the Eligibility Criteria except as expressly set forth in this Agreement. 6.5 The District shall have no obligation to provide Opportunity Funds beyond the appropriation year for the District's budget and annual. work program, provided that the District shall distribute to the City after such appropriation year any Opportunity Funds that were allocated to the City in such appropriation year and in previous years and that have not been distributed to the City. -9- Article VII. Other Provisions. 7.1 Hold Harmless and Indemnification. 7.1.1. The District assumes no responsibility for the direct payment of any compensation, fees, wages, benefits or taxes to or on behalf of the City, its employees, contractors or others by reason of this Agreement. The City shall protect, indemnify and save harmless the District, its officers, agents, employees and the Service Provider from any and all claims, cost and whatsoever occurring or resulting from (1) the City's failure to pay any compensation, fees, wages, benefits or taxes, and (2) the supplying to the City of works services, materials or supplies by City employees or agents or other contractors or suppliers in connection with or in support of performance of this Agreement. 7.1.2. The City further agrees that it is financially responsible for and will repay the District all indicated amounts following an audit exception, which occurs due to the negligent or intentional acts by the City, its officers, employees, agents or representatives. 7.1.3. The City shall protect, indemnify and save harmless the District from any and all costs, claims, judgments, or awards of damages, arising out of or in any way resulting from the negligent acts or omissions of the City, its officers, employees or agents in connection with the implementation of the terms of this Agreement and/or implementation of the Projects. For purpose of this Agreement only, the City agrees to waive the immunity granted it for industrial insurance claims pursuant to Washington Statute Chapter 51 to the extent necessary to extend its obligations under this paragraph to any claim, demand, or cause of action brought by or on behalf of any employee, including judgments, awards and costs arising therefrom including attorney's fees. -10- 7.2 Amendment. 7.2.1. This Agreement may be modified by written instrument approved by the City Council and the District Board of Supervisors and signed by the Parties. 7.2.2. This Agreement also may be modified by additional attachment for Projects subsequently approved by the Board of Supervisors. After approval of a Project in the District's annual budget and work program, or amendment thereto, the Project application as approved shall become an attachment to this Agreement and shall constitute an amendment to this Agreement without further action by either Party. 7.3 Contract Waiver. No waiver by either Party of any term or condition of this Agreement shall be deemed or construed to be a waiver of any other term or condition, nor shall a waiver of any breach be deemed to constitute a waiver of any subsequent breach whether of the same or different provision of this Agreement. No waiver shall be effective unless made in writing. 7.4 No Third Party Rights. Nothing in this Agreement shall be construed to create any rights in or duties to any third party, nor any liability to or standard of care with reference to any third party. 7.5. Entirety. This Agreement is the complete expression of the terms hereto and any oral representations or understandings not incorporated are excluded. 'This Agreement merges and supersedes all prior negotiations, representations and agreements between the parties relating to the projects and constitutes the entire agreement between the parties. The parties recognize that time is of the essence in the performance of the provisions of this Agreement. -11- IN WITNESS WHEREOF, authorized representatives of the parties hereto have signed their names in the spaces put forth below: By Mayor (or City Manager or Executive) Date: Approved as to form: Municipal Attorney KING COUNTY FLOOD CONTROL ZONE DISTRICT Poe E utive Director Date: �0 Acting under the authority of Resolution���' -12- AT"TACHMENT A CING COUNTY King County Water Land Resource Division a C R Nq ROT River and Floodplain Management Sub -Regional Opportunity Fund Project Application King County Application Due Date: December 8, 2008 Jurisdiction: City of Renton 1) Do you wish to forego the receipt of your Opportunity Fund allocation this year, allowing it to accrue for a future ear? ❑ Yes ® No 2) Would you prefer to apply your Opportunity Funds toward an existing project on the District's 6-year CIP? ® Yes ❑ No If Yes, please provide the name of the project: Cedar River Gravel Removal Project (Ref# 53) - Spawning Channel Replacement project as listed in the District's 6-yr CIP for the Cedar River. Additional information regarding the project is provided below. If you said Yes to either (1) or (2) above, you do not need to comolete the remainder of this form 3) Proposed project or activity name Cedar River Gravel Removal Project: (Spawning Channel Replacement Project) at and location: River Mile 3.5 4) Description of the flooding, stormwater, or linked watershed management problem that this project or activity will address (1500 character maximum): The Spawning Channel Replacement project is part of the Cedar River Gravel Removal Project described in the District's Flood Hazard Management Plan (pg. 210). The project is needed to replaces a ground water spawning channel that was lost due to the Nisqually Earthquake. The ground water spawning channel was constructed as mitigation for the initial construction of the Lower dar River Flood Hazard Reduction Project and future gravel removal (maintenance dredging) within the lower 1.25 miles of the cedar River. The Spawning Channel Replacement project is needed to meet the mitigation requirements of the project and allow future gravel removal (maintenance dredging) on the lower Cedar River (Cedar River Gravel Removal Project). The City of Renton and the Army Corps of Engineers constructed the Lower Cedar River Section 205 Flood Hazard Reduction project in 1998 to solve regionally significant flooding on the lower 1.25 miles of the Cedar River. The Army Corps of Engineers Section 205 Project was constructed following the November 1990 flood, which resulted in significant damages to the Renton Municipal Airport, the Boeing Renton Commercial Airplane Plant, public facilities and infrastructure and other properties. The Army Corps of Engineers requires the maintenance of the levees and floodwalls that were constructed as part of the project, in addition to periodic gravel removal maintenance dredging) when needed to maintain the flood protection benefits of the project. 5) Description of how the proposed activity will address the problem outlined in number 2 (1500 character maximum): The Spawning Channel Replacement project will address District's Cedar River Gravel Removal Project by meeting the necessary permits/mitigation requirements needed prior to conducting the future gravel removal (maintenance dredging). It is estimated that the permitting for the future gravel removal will need to start within the next three years and construction completed within the next five years ❑ Feasibility Study ❑Project Design ®Project ❑ Property Acquisition 6) Type of Construction Activity: ❑ Programmatic — identify: ❑ Other — identify: —13— 7) Describe how the proposed project or activity satisfies the eligibility criteria for at least one of the three categories listed in Section III of the attached document (1500 character maximum): The City plans on using the Opportunity Funds matching funding from the Army Corps of Engineers for the construction of the Spawning Channel Replacement project. The project includes channel excavation that will increase floodplain storage, provide spawning and rearing habitat along with other the installation of habitat improvement such as LWD, spawning gravel and habitat plantings 8) Identify the management plan (i.e. flood control, stormwater control, or watershed management) within which implementation of the project or activity is an element or is recommended: The District's Flood Hazard Management Plan (pg. 210) is the element that this proposed project would fall under. The project is also identified in the City of Renton's Surface Water Utility 6-year Capital Improvement Program. 9) Identify deliverables and any relevant design plans or studies (for construction projects): Attached are the completed construction plans for the Spawning Channel Replacement project. 10) Identify a timeline for this project from inception to completion. List any relevant milestones, and provide a rough estimate of project costs and budget: The project will begin the bidding process during the March of 2009 with construction expected to begin during late spring/early summer. The habitat planting work is expected to begin during late September to mid October, with the all work completed by the end of November 2009. The project schedule is dependent upon the Seattle District of the Army Corps of Engineers securing the required federal funding for the project For Informational Purposes only: We wish to inform the Flood Control District Board of Supervisors on how Opportunity Funds leverage other resources, and we appreciate any information you are willing to provide in this regard. If you plan to partner with other jurisdictions to conduct a project or otherwise intend to use your Opportunity Fund allocation to leverage grant funds or other surface water management funds, please provide us with this information (1200 character limit): The City of Renton Opportunity Funds ($214,824) will be used to match Army Corps of Engineers funding for the construction of the project. The total constructioi cost of: the project is estimated to b e$1.2 million. The Army Corps of Engineers share of the project is estimated to be $900,000. The City of Renton Surface Water Utility will contribute approximately $100,000 to the project. For Internal Use Onl 10"A"... ggn g a ❑ Pro ectFEli ible and Accepted ❑ I?ro e°ct'Ineligible -14- CITY OF RENTON, WASHINGTON RESOLUTION NO. A RESOLUTION OF THE CITY OF RENTON, WASHINGTON, AUTHORIZING THE MAYOR AND CITY CLERK TO ENTER INTO AN INTERLOCAL AGREEMENT WITH THE KING COUNTY FLOOD CONTROL ZONE DISTRICT FOR OPPORTUNITY FUND PROJECTS. WHEREAS, the King County Flood Control Zone District (District) was established in 2008, which included an Opportunity Fund. The Opportunity Fund allows for 10% of the District's assessment that is collected within a jurisdiction to be returned to the jurisdiction for use on eligible local storm and surface water management projects; and WHEREAS, the Opportunity Funds have to be spent on projects that reduce flooding, habitat projects that are linked to a flood control projects, or the implementation of eligible watershed management plans; and WHEREAS, the 2008 and 2009 Opportunity Funds will be used to fund the City's share of the Cedar River Spawning Channel Replacement project that is planned for construction this summer in cooperation with the Army Corps of Engineers; and WHEREAS; it is necessary to memorialize the agreement between the City and the District to allow for the transfer of the City's share of the District assessments to the Surface Water Utility for 2008 and 2009 in the amount of $214,824 and for future years; NOW, THEREFORE, THE CITY COUNCIL OF THE CITY OF RENTON, WASHINGTON, DOES RESOLVE AS FOLLOWS: SECTION I. The above recitals are found to be true and correct in all respects. SECTION II. The Mayor and City Clerk are hereby authorized to enter into an interlocal agreement with King County Flood Control Zone District entitled Interlocal Cooperation Agreement Between the King County Flood Control Zone District and the City of 1 RESOLUTION NO. Renton for Opportunity Fund Projects and future such agreements that don't materially differ from this agreement. PASSED BY THE CITY COUNCIL this day of )2009. Bonnie I. Walton, City Clerk APPROVED BY THE MAYOR this day of , 2009. Denis Law, Mayor Approved as to form: Lawrence J. Warren, City Attorney RES.1408:5/18/09:scr CITY OF RENTON, WASHINGTON ORDINANCE NO. AN ORDINANCE OF THE CITY OF RENTON, WASHINGTON, AMENDING CHAPTER 12, TRAFFIC CODE, OF TITLE X (TRAFFIC) OF ORDINANCE NO. 4260 ENTITLED "CODE OF GENERAL ORDINANCES OF THE CITY OF RENTON, WASHINGTON," TO ADD A NEW SUBSECTION REQUIRING THE PLACEMENT OF SIGNS WHERE A DRIVER IS ENTERING A ZONE WHERE TRAFFIC LAWS ARE ENFORCED BY AN AUTOMATED TRAFFIC SAFETY CAMERA. THE CITY COUNCIL OF THE CITY OF RENTON, WASHINGTON, DOES ORDAIN AS FOLLOWS: SECTION I. Section 10-12-15, Traffic Safety Cameras, of Chapter 12, Traffic Code, of Title X (Traffic) of Ordinance No. 4260 entitled "Code of General Ordinances of the City of Renton, Washington," is hereby amended by adding a new subsection "B" and re - lettering the subsequent subsections, to read as follows: 10-12-15 TRAFFIC SAFETY CAMERAS: A. The use of automated traffic safety cameras to detect a violation of RMC 10-12-1 is authorized at intersections where two arterial roadways intersect, at railroad crossings, or in school speed zones, subject to the restrictions specified in RCW 46.63.170, as now or hereafter amended. B. All locations where an automated traffic safety camera is used must be clearly marked by placing signs in locations that clearly indicate to a driver that he or she is entering a zone where traffic laws are enforced by an automated traffic safety camera, as required by RCW46.63.170(1)(g), as now or hereafter amended. C. A law enforcement officer has the authority to issue a notice of traffic infraction when the notice of infraction is detected through the use of an ORDINANCE NO. automated traffic safety camera under RCW 46.63.030 and 46.63.170, as now or hereafter amended. D. A traffic infraction for violation of this Section, detected through the use of an automated traffic safety camera, shall be processed in the same manner as a parking infraction, with a monetary penalty no greater than the amount of a fine issued for other parking infractions within the City of Renton. SECTION II. This ordinance shall be effective upon its passage, approval, and thirty (30) days after publication. PASSED BY THE CITY COUNCIL this day of 12008. Bonnie I. Walton, City Clerk APPROVED BY THE MAYOR this day of )2008. Approved as to form: Lawrence J. Warren, City Attorney Date of Publication: ORD.1550:5/7/09:scr Denis Law, Mayor 2 � 4 Y CITY OF RENTON, WASHINGTON ORDINANCE NO. AN ORDINANCE OF THE CITY OF RENTON, WASHINGTON, ESTABLISHING A SPECIAL ASSESSMENT DISTRICT FOR THE HIGHLANDS WATER MAIN IMPROVEMENTS PROJECT AND PROVIDING FOR THE COLLECTION OF SPECIAL ASSESSMENTS UPON CERTAIN PROPERTIES RECEIVING BENEFITS FROM THE IMPROVEMENTS. WHEREAS, the City Council of the City of Renton, Washington (the "City") has authorized the establishment of a preliminary Special Assessment District, as allowed by State Law (RCW 35.92.025) and by City Code (RMC 9-16-1 to 9-16-12) for the construction of the Highlands Water Main Improvements Project (the "Improvements'); and WHEREAS, the City has completed the construction of the improvements and has established the actual and final costs associated with the improvements; NOW, THEREFORE, THE CITY COUNCIL OF THE CITY OF RENTON, WASHINGTON, DOES ORDAIN AS FOLLOWS: SECTION I. There is hereby created a Special Assessment District for the area that can receive benefit from the Highlands Water Main Improvements project. The area benefiting from the improvements is generally located in the Renton Highlands, along NE Sunset Blvd. from NE 121h St to Harrington Ave NE, along Harrington Ave NE from NE Sunset Blvd to NE 91h St, and along NE 91h St. from Harrington Ave to Kirkland Ave NE, in the City of Renton, King County, Washington. The special assessment district area boundary is described in the attached Exhibit "A", and shown on a map attached under Exhibit "B". The recording of this document is to notify owners of property within the assessment district boundary about potential assessment fees and interest charges that are triggered when the o ORDINANCE NO. development or redevelopment of properties require a connection to the improvements or benefit from the improvements. SECTION II. The City does not require payment of the assessment until such time the development or redevelopment of the properties require a connection to the improvements or benefit from the improvements. The properties may be sold or change ownerships without triggering the assessment. Properties that will connect to or benefit from the water main improvements installed under this Special Assessment District, at such time the properties are developed or redeveloped, shall be subject to payment of applicable permit fees, water system development charges and to the following special assessment charges of: $204.95 per Front -Foot Unit Charge. In addition to the above -mentioned charges, there shall be a charge of 5.30% per annum added to the Special Assessment District charge. The interest charge shall accrue for no more than ten (10) years from the date this ordinance becomes effective. Interest charges will be simple interest and not compound interest. SECTION III. The City. Clerk shall notify the owners of the properties within the Special Assessment District area boundary of the amounts of their respective assessments and applicable interest charges, the criteria for the triggering of the assessment charges, and the procedures and grounds for appeal of the assessment. SECTION IV. This Ordinance is effective upon its passage, approval and thirty (30) days after publication. 2 ORDINANCE NO. PASSED BY THE CITY COUNCIL this day of , 2009. Bonnie I. Walton, City Clerk APPROVED BY THE MAYOR this day of 32009. Denis Law, Mayor Approved as to form: Lawrence J. Warren, City Attorney Date of Publication: ORD.1549:5/1/09:scr EXHIBIT "A" LEGAL DESCRIPTION OF ASSESSMENT DISTRICT BOUNDARY CITY OF RENTON SPECIAL ASSESMENT DISTRICT No. 0041 FOR THE HIGHLANDS WATER MAIN MPROVEMENTS PROJECT A special assessment district boundary area within a portion of the Northwest quarter of Section 9, Township 23 North, Range 5 East, W.M., in the City of Renton, King County, Washington, described as follows: Commencing at the intersection of the westerly right of way margin of Kirkland Ave NE with the northerly right of way margin of NE 9th St, said point being the True Point of Beginning; Thence westerly along said northerly right of way margin of NE 9"' St and along its westerly extension, crossing Harrington Ave NE, to the easterly right of way margin of a 16-foot wide alley in Block 6, of Renton Highlands, recorded in Volume 46 of Plats, Pages 34 to 41, records of King County, Washington; Thence northerly along the easterly right of way margin of said alley and along its northerly extension, crossing NE Sunset Blvd, to the northerly right of way margin thereof; Thence northeasterly along said northerly right of way margin of NE Sunset Blvd and along its northeasterly extension, crossing Harrington Ave NE, to the easterly right of way margin thereof; Thence northerly along said easterly right of way margin to the southerly right of way margin of Sunset Lane NE; Thence northeasterly along said southerly right of way margin and along its northerly extension, crossing NE 10'h St, to the northerly right of way margin thereof; Thence northwesterly along said northerly right of way margin to the easterly right of way margin of Sunset Lane NE; Thence northerly along said easterly right of way line, to its intersection with the northerly right of way margin of NE I O St; Thence northwesterly along said northerly right of way line, a distance of 25 feet, to the centerline of the vacated 50-foot right of way of Sunset Lane NE; Thence northeasterly along the centerline of said vacated right of way to the point of intersection of said centerline with the southerly extension of the west line of that property conveyed to Greater Hilands, a Washington Limited Partnership, via Deed as recorded under number 20000831000557, records of King County, Thence northerly along said southerly extension of said west line to the south property line of said property said south line also being the northerly right of way margin of said vacated Sunset Lane NE; Thence northeasterly along said south property line and said northerly margin and along its easterly extension, crossing Kirkland Ave NE, to the easterly right of way margin thereof; Thence northerly along said easterly right of way margin to the southerly right of way margin of NE 12`t' St; Exhibit `A" Page 1 of 2 EXHIBIT "A", Continued Thence easterly along said southerly right of way margin and along its easterly extension, crossing NE Sunset Blvd, to a point that is 31.57 feet westerly of the westerly right of way margin of Lynwood Ave NE, said point also being on a line 205 feet southeasterly of and parallel with the center line of NE Sunset Blvd; Thence southwesterly along said parallel line a distance of 297.98 feet; Thence northwesterly on a line perpendicular there from to an intersection with a line 175 feet southeasterly of and parallel with the center line of NE Sunset Blvd; Thence southwesterly along said parallel line, crossing Kirkland Ave NE, to the westerly right of way margin thereof; Thence southerly along said westerly right of way margin of Kirkland Ave NE, to its intersection with the centerline of the vacated 50-foot right of way of Index Ave NE; Thence along said centerline of the vacated right of way of Index Ave NE, North 87' 09' 45" West a distance of 27.35 feet; Thence North 4° 00' 5 1 " West, a distance of 39.24 feet; Thence South 85' 59' 09" West, a distance of 114 feet; Thence South 4° 00' 5 1 " East, a distance of 40.99 feet; Thence South 41 ° 46' 32" East, a distance of 25 feet, to the centerline of said vacated right of way of Index Ave NE; Thence southwesterly along said centerline of vacated right of way of Index Ave NE, to the northerly right of way margin of Jefferson Ave NE; Thence northwesterly along said northerly right of way margin to its intersection with the westerly right of way margin of Index Ave NE; Thence southerly along said westerly right of way to a line that is 150 feet northerly of and parallel with the northerly right of way margin of NE l0a' St; Thence northwesterly along said parallel line, a distance of 69.55 feet; Thence southwesterly along a line perpendicular thereto, crossing NE 10"' St, to the southerly right of way margin thereof; Thence southeasterly along said southerly right of way margin of NE 10h St, to the northwest corner of Parcel `B" of City of Renton Lot Line Adjustment No LLA 92-144, recorded in King County under recording number 9212229004; Thence southerly, easterly and northerly along the westerly, southerly, and easterly boundaries of said Parcel B, to the northeast corner thereof, said corner being on the southerly right of way margin of NE 10`h St; Thence easterly along said southerly right of way margin to the westerly right of way margin of Kirkland Ave NE; Thence southerly along said westerly right of way margin of Kirkland Ave NE, to the northerly right of way margin of NE 9 h St and the True Point of Beginning and the terminus of the boundary area. Exhibit "A' Page 2 of 2 EXHIBIT "B" HIGHLANDS 565-ZONE WATER MAIN IMPROVEMENTS SPECIAL ASSESSMENT DISTRICT J 20 LINES V1 CITY OF RENTON, WASHINGTON ORDINANCE NO. AN ORDINANCE OF THE CITY OF RENTON, WASHINGTON, AMENDING CHAPTER 1, GARBAGE, OF TITLE VIII (HEALTH & SANITATION) OF ORDINANCE NO. 4260 ENTITLED "CODE OF GENERAL ORDINANCES OF THE CITY OF RENTON, WASHINGTON," RELATED TO YEAR 2009 SERVICES AND UTILITY RATES FOR MULTI -FAMILY COMMERCIAL CUSTOMERS. THE CITY COUNCIL OF THE CITY OF RENTON WASHINGTON, DOES ORDAIN AS FOLLOWS: SECTION I. Subsection 8-1-1013, Commercial Customers, of Chapter 1, Garbage, of Title VIII (Health and Sanitation) of Ordinance No. 4260 entitled "Code of General Ordinances of the City of Renton, Washington," is hereby amended to read as follows: B. Commercial Customers: 1. Multi -Family Carts: Customers have the following contractor cart -based services available: Commercial Service Level 2009 SWU Monthly Rates Weekly Commercial Can and Cart One 20 Gallon Mini Cart $20.00 One 35 Gallon Garbage Cart $26.00 One 64 Gallon Contractor Cart $38.50 One 96 Gallon Contractor Cart $51.00 Extra Cans or Units $5.64 Weekly Yard Waste Collection Cart $37.61 2. Other Commercial Carts: Customers have the following contractor cart -based services available: 1 i ORDINANCE NO. Commercial Service Level 2009 SWU Monthly Rates Weekly Commercial Can and Cart One 20 Gallon Mini Cart $32.85 One 35 Gallon Garbage Cart $36.52 One 64 Gallon Contractor Cart $46.93 One 96 Gallon Contractor Cart $57.64 Extra Cans or Units $5.64 Weekly Yard Waste Collection Cart $37.61 3. Hydraulically Handled Containers One (1) to Eight (8) Yards: The rate for the handling of hydraulically handled containers approved by the City's contractor and the City for use by commercial, industrial and multiple -family residence establishments shall be as follows: a. Monthly Rates: Commercial Service Level 2009 SWU Monthly Rates Commercial 1 Cubic Yard, 1 pickup/week $98.57 Detachable 1 Cubic Yard, 2 pickups/week $185.12 Container 1 Cubic Yard, 3 pickups/week $271.68 (loose) 1 Cubic Yard, 4pickups/week $358.23 1 Cubic Yard, 5 pickups/week $444.78 1.5 Cubic Yard, 1 pickup/week $135.12 1.5 Cubic Yard, 2 pickups/week $258.23 1.5 Cubic Yard, 3 pickups/week $381.34 1.5 Cubic Yard, 4 pickups/week $504.45 1.5 Cubic Yard, 5 pickups/week $627.55 2 Cubic Yard, 1 pickup/week $170.35 2 Cubic Yard, 2 pickups/week $328.68 2 Cubic Yard, 3 pickups/week $487.01 2 Cubic Yard, 4pickups/week $645.34 2 Cubic Yard, 5 pickups/week $803.67 3 Cubic Yard, 1 pickup/week $242.38 3 Cubic Yard, 2pickups/week $472.75 3 Cubic Yard, 3 pickups/week $703.12 3 Cubic Yard, 4 pickups/week $933.49 3 Cubic Yard, 5 pickups/week $1,163.86 2 ORDINANCE NO. 4 Cubic Yard, 1 pickup/week $314.29 4 Cubic Yard, 2 pickups/week $616.57 4 Cubic Yard, 3 pickups/week $918.86 4 Cubic Yard, 4 pickups/week $1,221.13 4 Cubic Yard, 5 pickups/week $1,523.41 6 Cubic Yard, 1pickup/week $456.00 6 Cubic Yard, 2 pickups/week $899.99 6 Cubic Yard, 3 pickups/week $1,343.98 6 Cubic Yard, 4 pickups/week $1,787.97 6 Cubic Yard, 5 pickups/week $2,231.96 8 Cubic Yard, 1 pickup/week $596.87 8 Cubic Yard, 2 pickups/week $1;181.73 8 Cubic Yard, 3 pickups/week $1,766.58 8 Cubic Yard, 4 pickups/week $2,351.44 8 Cubic Yard, 5 pickups/week $2,936.30 Extra loose cubic yard, per pickup $19.97 Commercial Service Level 2009 SWU Monthly Rates Commercial Detachable Container (Compacted) 1 Cubic Yard Compactor $235.09 1.5 Cubic Yard Compactor $339.73 2 Cubic Yard Compactor $436.62 3 Cubic Yard Compactor $643.03 4 Cubic Yard Compactor $849.71 6 Cubic Yard Compactor $1,262.47 b. Rental Rates: Rental rates for one (1) to eight (8) yard containers will be paid in the monthly rates. c. Minimum Pickups: Minimum pickups for containers and compactors between one (1) to eight (8) yards will be once per week. 4. Temporary containers are rented and billings are handled directly by Waste Management, Inc. 5. Extra Charges: a. The following extra charges will apply for commercial services: 3 ORDINANCE NO. Commercial Extra Service )Fees Commercial cart carry out charge if > 50 feet (per time) Additional roll out fees over 25 ft., from point of safe truck access/pickup Unlocking and locking gates and/or container lids, per pickup Return trip for containers not available for collection at regularly scheduled pickup time b. Any extra yardage charges determined by the collection contrac overflowing containers will be charged per yard at the one (1) yard rate listed under subsection B3 of this Section. 6. Special Services: Whenever special services not contained within this schedule are required, the rate charged for those special services shall be negotiated by the customer with the City and the collection contractor. SECTION II. These rates become effective with billings computed on or after August 1, 2009. SECTION III. This ordinance shall be effective August 1, 2009. PASSED BY THE CITY COUNCIL this day of , 2009. Bonnie I. Walton, City Clerk APPROVED BY THE MAYOR this day of , 2009. Denis Law, Mayor 0 ORDINANCE NO. Approved as to form: Lawrence J. Warren, City Attorney Date of Publication: ORD.1554:5/28/09:scr