Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
ERC_Signature Sheet_Signed
CDEPARTMENTOFCOMMUNITY—“Renton0ANDECONOMICDEVELOPMENTENVIRONMENTAL(SEPA)DETERMINATIONOFNON-SIGNIFICANCE-MITIGATED(DNS-M)PROJECTNUMBER:LUA17-000237,ECF,PUDAPPLICANT:ParkwayCapital,Inc,CraigKoeppler,520PikeSt,Suite1500,Seattle,WA98101PROJECTNAME:VIA405ApartmentsPROJECTDESCRIPTION:TheapplicantisrequestingaPreliminaryPlannedUrbanDevelopment(PUD)landusedecisionandthresholddeterminationundertheStateEnvironmentalPolicyAct(SEPA)fortheconstructionofamixedusebuildingcontaining270multi-familydwellingunits,groundfloorcommercialandresidentialamenityspace,groundfloorandsecondfloorstructuredparking,andassociatedimprovements.ThepropertyislocatedwithintheCommercialOffice(CO)zoningclassificationandCommercialMixedUse(CMU)landusedesignation.Thesite’sexistingtheaterbuildingwillberemoved.AccesstothesubjectpropertyisprovidedviaexistingvehicledrivewayeasementswithintheRentonVillageShoppingCenterandEvergreenBuildingpropertiesthatconnecttoSGradyWayandSRentonVillageP1withnewpedestrianconnectionsproposedtothesepublicstreetswiththeproject.CriticalAreasidentifiedonCitymapsincludeFloodHazard,SeismicHazard,RegulatedSlopes,andaNon-FishPerennial(Np)stream.Astreambufferdeterminationasitrelatestonon-regulatedsitesseparatedfromcriticalareasbypreexistingsubstantialimprovementswillalsobeacomponentofthePUDapplication..PROJECTLOCATION:255GradyWay(APN723200-0010)LEADAGENCY:CityofRentonEnvironmentalReviewCommitteeDepartmentofCommunity&EconomicDevelopmentTheCityofRentonEnvironmentalReviewCommitteehasdeterminedthatitdoesnothaveaprobablesignificantadverseimpactontheenvironment.AnEnvironmentalImpactStatement(ElS)isnotrequiredunderRCW43.21C.030(2)(c).ConditionswereimposedasmitigationmeasuresbytheEnvironmentalReviewCommitteeundertheirauthorityofSection4-9-070DRentonMunicipalCode.Theseconditionsarenecessarytomitigateenvironmentalimpactsidentifiedduringtheenvironmentalreviewprocess.Becauseotheragenciesofjurisdictionmaybeinvolved,theleadagencywillnotactonthisproposalforfourteen(14)days.Appealsoftheenvironmentaldeterminationmustbefiledinwritingonorbefore5:00p.m.onSeptember1,2017.Appealsmustbefiledinwritingtogetherwiththerequiredfeewith:HearingExaminer,CityofRenton,1055SouthGradyWay,Renton,WA98057.AppealstotheExamineraregovernedbyRMC4-8-110andmoreinformationmaybeobtainedfromtheRentonCityClerk’sOffice,(425)430-6510.PUBLICATIONDATE:AUGUST18,2017DATEOFDECISION:AUGUST14,2017 DEPARTMENTOFCOMMUNITYANDECONOMICDEVELOPMENTSIGNATURES:C—Renton0pp%mmemGreggZirnkdrm;ci,Admini5tratorPublicWorksDepartment%&4I&Z4)?1NKellyBeymer,/dministfd’r”-’’CommunityServicesDepartment(6/I’!))?DateDate//ygickM.Marshall,AdministratorRentonRegionalFireAuthorityHCE.“Chip”Vincent,AdministratorDepartmentofCommunity&EconomicDevelopment)iy/i7Datei4(Date