Loading...
HomeMy WebLinkAboutExh. 22 Concurrency MemoDEPARTMENT OF COMMUNITY AND ECONOMIC DEVELOPMENT M E M O R A N D U M DATE: July 31, 2017 TO: Matt Herrera, Senior Planner FROM: Brianne Bannwarth, Development Engineering Manager SUBJECT: Traffic Concurrency Test – VIA 405 Apartments; LUA17-000237, ECF, PUD The applicant is requesting a Preliminary Planned Urban Development (PUD) land use decision and threshold determination under the State Environmental Policy Act (SEPA) for the construction of a mixed use building with 270 multi-family dwelling units, ground floor commercial and residential amenity space, ground floor and second floor structured parking, and associated improvements. The property is located within the Commercial Office (CO) zoning classification and Commercial Mixed Use (CMU) land use designation. The site's existing theater building will be removed. Access to the property is provided via existing vehicle driveway easements within the Renton Village Shopping Center connecting to S. Grady Way and S. Renton Village Pl. with new pedestrian connections proposed to these streets with the proposal. The proposed development would generate a reduction of approximately 340 net new average weekday daily trips. During the weekday AM peak hour, the project would generate approximately 64 net new trips (5 inbound and 59 outbound). During the weekday PM peak hour, the project would generate a reduction of approximately 102 net new trips (43 inbound and 59 outbound). The proposed project passes the City of Renton Traffic Concurrency Test per RMC 4- 6-070.D as follows: Transportation Concurrency Test – VIA 405 Apartments Page 2 of 3 July 31, 2017 Traffic Concurrency Test Criteria Pass Implementation of citywide Transportation Plan Yes Within allowed growth levels Yes Project subject to transportation mitigation or impact fees Yes Site specific street improvements to be completed by project Yes Traffic Concurrency Test Passes Evaluation of Test Criteria Implementation of citywide Transportation Plan: The City’s investment in completion of the forecast traffic improvements is 130% of the scheduled expenditure through 2017. Within allowed growth levels: As shown on the attached citywide traffic concurrency summary, the calculated citywide trip capacity for concurrency with the city adopted model for 2017 is 1,982 trips, which provides sufficient capacity to accommodate a reduction of 102 trips from this project. A resulting 2,084 trips are remaining. Project subject to transportation mitigation or impact fees: The project will be subject to transportation impact fees at time of building permit for the project. Site specific street improvements to be completed by project: The project will be required to complete all internal and frontage street improvements for the building prior to occupancy. Any additional off-site improvements identified through SEPA or land use approval will also be completed prior to final occupancy. Background Information on Traffic Concurrency Test for Renton The City of Renton Traffic Concurrency requirements for proposed development projects are covered under Renton Municipal Code (RMC) 4-6-070. The specific concurrency test requirement is covered in RMC 4-6-070.D, which is listed for reference: D. CONCURRENCY REVIEW PROCESS: 1. Test Required: A concurrency test shall be conducted by the Department for each nonexempt development activity. The concurrency test shall determine consistency with the adopted Citywide Level of Service Index and Concurrency Management System established in the Transportation Element of the Renton Comprehensive Plan, according to rules and procedures established by the Department. The Department shall issue an initial concurrency test result describing the outcome of the concurrency test. 2. Written Finding Required: Prior to approval of any nonexempt development activity permit application, a written finding of concurrency shall be made by the City as part of Transportation Concurrency Test – VIA 405 Apartments Page 3 of 3 July 31, 2017 the development permit approval. The finding of concurrency shall be made by the decision maker with the authority to approve the accompanying development permits required for a development activity. A written finding of concurrency shall apply only to the specific land uses, densities, intensities, and development project described in the application and development permit. 3. Failure of Test: If no reconsideration is requested, or if upon reconsideration a project fails the concurrency test, the project application shall be denied by the decision maker with the authority to approve the accompanying development activity permit application. The Concurrency Management System established in the Transportation Element on page XI-65 of the Comprehensive Plan states the following: Based upon the test of the citywide Transportation Plan, consideration of growth levels included in the LOS-tested Transportation Plan, payment of a Transportation Mitigation Fee, and an application of site specific mitigation, development will have met City of Renton concurrency requirements.