Loading...
HomeMy WebLinkAbout2022_04_19_11_46_07.pdfCOAL CREEK UTILITY DISTRICT Final Inspection Report SEWER Date: 4/18/2022 Project: Christelle Ridge Division: Phase: Developer: Sound Building and Development Inspector: Curtis White Location: Coal Creek Pkwy/95th Way Contractor: AAA Contractors Supt./Job Foreman: Paul Purewal On-site/Off-site: Job No. from Print: 18013 1. All trenches bedded and backfilled per specifications YES 2. All manholes set to proper grade YES 3. Proper type pipe used for excess slope and depth YES 4. All manholes installed per specifications YES 5. All channeling approved /grouting complete YES 6. All manholes have been vacuum tested YES 7. Manhole installations completed per specifications YES 8. Pipe Anchors and Timber Baffles installed to specifications N/A 9. Required connections complete per specifications YES 10. Manhole ring and cover to grade YES 11. System cleaned and flushed YES 12. System N inspected (Reports and Video submitted) YES 13. Connection to existing system YES 14. Entire system tested and passed YES 15. Compaction Tests and Final Report passed YES 16. Onsite and easement restoration complete YES 17. Right -of -Way restoration complete and accepted YES 18. All construction complete as required by District Prints and Specifications YES 19. Photos and Video in project file YES 20. As -Built Mark-ups to District Engineer YES 21. Copies of Inspection Form, Compaction Report, YES 22. Other notes and comments: Page 1 of 1 Signature of Inspect Signature of Manager: