HomeMy WebLinkAbout2022_04_19_11_46_07.pdfCOAL CREEK UTILITY DISTRICT
Final Inspection Report
SEWER
Date:
4/18/2022
Project: Christelle Ridge
Division:
Phase:
Developer: Sound Building and Development
Inspector:
Curtis White
Location: Coal Creek Pkwy/95th Way
Contractor:
AAA Contractors
Supt./Job Foreman: Paul Purewal
On-site/Off-site:
Job No. from Print: 18013
1. All trenches bedded and backfilled per specifications
YES
2. All manholes set to proper grade
YES
3. Proper type pipe used for excess slope and depth
YES
4. All manholes installed per specifications
YES
5. All channeling approved /grouting complete
YES
6. All manholes have been vacuum tested
YES
7.
Manhole installations completed per specifications
YES
8.
Pipe Anchors and Timber Baffles installed to specifications
N/A
9.
Required connections complete per specifications
YES
10.
Manhole ring and cover to grade
YES
11.
System cleaned and flushed
YES
12.
System N inspected (Reports and Video submitted)
YES
13.
Connection to existing system
YES
14.
Entire system tested and passed
YES
15.
Compaction Tests and Final Report passed
YES
16.
Onsite and easement restoration complete
YES
17.
Right -of -Way restoration complete and accepted
YES
18.
All construction complete as required by District Prints and Specifications
YES
19.
Photos and Video in project file
YES
20.
As -Built Mark-ups to District Engineer
YES
21.
Copies of Inspection Form, Compaction Report,
YES
22.
Other notes and comments:
Page 1 of 1 Signature of Inspect
Signature of Manager: