HomeMy WebLinkAboutTIR-4180
www.FURRENGINEERING.com
Drainage Assessment for
GURUDWARA SIKH TEMPLE
POND REPLACEMENT VAULT
5200 Talbot Rd. S.
Renton, WA 98055
Renton, Washington – King County
March 18, 2021
Prepared by: Dean A. Furr, P.E.
FES Project #20067
3/18/2021
R
G
G
N
A FU
R
SEF
O
RP
I ANO EL
T
S
GE SI
N
ERE DEEATDSNTAWFO
.
SAHI
INREENOTR46937
Scott Warlick 4/4/2022 SURFACE WATER UTILITY
JFarah 04/04/2022
Page 1
VICINITY MAP - nts
Page 2
PROJECT OVERIEW
The Proposal is to construct an underground combined detention/wet vault in place of the
existing detention/wet pond. The project also proposes to provide a play structure and
grass over the vault. The project does not propose to “increase” the impervious surface.
Currently, the detention pond HIGH WATER surface area is approximately 4,677sf.
The detention vault design is required to conform to the 2017 Renton SWDM and in
discussions with the city, that the vault performance and water quality criteria must match
the designed detention pond.
DEVELOPED CONDITIONS
The project proposes to replace the existing pond with a combined detention/wet vault
and cover the remaining area with grass and a play structure. The pervious area will be
amended with the compost. See the following Area Breakdown Table
EX/DEV AREA sf ac
DISTURBED 6,290 0.14
EXIST. POND
SURFACE 4,677 0.084 TO BE REPLACED BY PERVIOUS AREA
PLAY AREA 1,275 0.029 WOOD CHIPS
GRASS 5,015 0.115 COMPOST AMENDED SOIL
Table 1: Existing/Development Area Breakdown
PERFORMANCE CRITERIA
The proposed Detention/Wet vault volume sizing shall meet OR exceed the approved
construction plans. Additionally, it is assumed that the pond surface area is considered
impervious surface and any proposed impervious shall not exceed the designed pond
surface area.
Furr Engineering Services, through records request from the city, obtained a copy of the
“Preliminary” Gurudwara Singh Saba Church Drainage Report, as well as, the “Phase1
and 2 - Construction Plans.
APPROVED CONSTRUCTION PLANS
The partial plan set (C1, C3-C10, and C11) was prepared by SEGA Engineers, Greg
Thesenvitz, PE.
Review of the plans showed that the pertinent drainage sheets C3-C7 were signed and
approved by A. Henninger “Arneta Henninger”, dated August 21, 1997. Below is a snip of
the Combined Detention/Wet Pond callout on the approved plan C-4.
COMBINED DETENTION/WET POND
WITH 4,175 CF LIVE DETENTION VOLUME
& 5,666 CF WATER QUALITY STORAGE VOL.
MAX W.S. EL DETENTION 149.0
WATER QUALITY W.S. EL 147.50
BOTTOM OF DEAD STORAGE EL. 144.0
-SEE SHT C-7 FOR POND SECTIONS
Page 3
We have reviewed this information and compared it to the survey of the existing pond and
found them to be consistent with each other.
Additional review of the Control Structure Detail on sheet C-11 showed that it is an earlier
design and does not represent the final design of the control structure. Also, this plan
sheet does not have a signature of approval. However, the project proposes to utilize the
existing Control Structure and Storm Drainage Manhole by a pipe outlet from the vault to
the SDMH.
PRELIMINARY DRAINAGE REPORT
The report is dated April 19, 1996 and was prepared by SEGA Engineers, Greg
Thesenvitz, PE.
Review of the “Preliminary” Report does not contain information that supports the
approved construction plans, therefore, it will not be used for reference in this report.
COMBINED DETENTION/WET VAULT
The proposed Combined Detention/Wet Vault will be designed to match or exceed the
designed pond volumes per sheet C-3 of the approved Gurudwara Singh Sabha Sikh
Temple plan. Below is a list of the required live and dead storage requirements.
Required Live Storage Volume = 4,175cf
Required Live Storage Depth = 1.50ft
Max. WS Elevation = 149.00
Discharge Elevation = 147.50 **the surveyed IE in the Control Structure is 147.22
Required Dead Storage Volume = 5,666cf
Required Dead Storage Depth = 3.50
Required Dead Storage Bottom Elevation = 144.00
The proposed vault will have an internal depth of 7ft and a sloped bottom toward the center
to comply Section 5.13 of the CORSWDM. The Vault will be 40ft wide and 72ft long. The
outlet pipe will be set at 147.22 to coincide with the existing IE’s at the Control Structure
SDMH. The provided live and dead storage are shown in the table below.
VAULT SIZING L(FT) W(FT) D(FT) VOL(CF) REQ’D
LIVE 72 40 1.5 4,320 >4,175CF
DEAD 1,518SF 4 6,072 >5,666CF
SEDIMENT 72 40 1 2,880 -
Table 2: VAULT SIZING BREAKDOWN
The above table shows that the combined detention/wet vault exceeds the designed pond
storage requirements.
EROSION CONTROL EVALUATION
In order to prevent erosion within the project site, the following BMPs will be used
approximately as shown in the ESC details on the TESC plan:
• Clearing limits will be marked by fencing or other means on the ground.
Page 4
• The existing paved driveway will be used as a construction entrance.
• Existing catch basins will be fit with inlet protection.
• Silt fencing will be placed along the south side of the proposed excavationl.
• Mulch will be spread over all cleared areas of the site when they are not being worked.
Mulch will consist of air-dried straw and chipped site vegetation.
Page 5
EXHIBITS
1. SHEET C-4 OF APPROVED PLANS
2. EXISTING CONDITIONS
3. DEVELOPED CONDITIONS
4. VAULT DETAIL SHEET
TWO STORY HOUSE
RH = 170.80'
FF = 154.33'
STORM RETENTIONPONDCBRIM = 150.24'INV E = 147.84'
CB
RIM = 149.98'
INV N 8"PVC = 147.78'
INV S 8"PVC = 147.88'
CB
RIM = 157.23'
INV N 12"CPEP = 153.73'
CB
RIM = 153.24'
INV N 12"CPEP = 150.64'
INV E 12"CPEP = 150.84'
CB
RIM = 160.11'
INV N 8"PVC = 153.61'
INV S 12"CPEP = 153.41'
INV W 12"CPEP = 153.46'
CBRIM = 159.53'INV S 6"PVC = 155.73'INV E 8"PVC = 155.79'SDMHRIM = 151.32'INV W 12"CPEP = 147.22'INV E 12"CPEP = 147.22'
SDMH
RIM = 160.93'
INV WATER
= 156.14'
BUILDING
OVERHANG
S88°35'44"E
10.00'N0°49'42"E155.01'S0°49'42"W146.01'SP10CULVERT12"CPEP = 147.45'
DECK
ABOVE
CULVERT
8"CPEP = 147.67'
CULVERT
12"CPEP
= 148.34'
OVERFLOWSTRUCTURE 160150
150POND SURFACE AREA4,677.49SF
EXISTING CONDITIONSDISTURBED6,289.58 SFPOND SURFACE4,677.49 SFDEVELOPED CONDITIONSph 206.890.82914715 142nd Pl. SW #B,Edmonds, WA 9802640202010FEETSCALE:01 INCH = 20DAF12/13/202020067NEXISTING CONDITIONS POND DATA
SP10DETENTION VAULTph 206.890.82914715 142nd Pl. SW #B,Edmonds, WA 9802640202010FEETSCALE:01 INCH = 20DAF12/13/202020067NDEVELOPED CONDITIONSCONNECT EXIST.PIPES TO VAULTYARD DRAINDETENTION VAULTEX. CONTROL STRUCTUREEX. EMERGENCYOVERFLOW
DETENTION VAULTRIM = 150.24'
INV E = 147.84'
CB
RIM = 149.98'
INV N 8"PVC = 147.78'
INV S 8"PVC = 147.88'
CB
RIM = 153.24'
INV N 12"CPEP = 150.64'
INV E 12"CPEP = 150.84'
CB
RIM = 160.11'
INV N 8"PVC = 153.61'
INV S 12"CPEP = 153.41'
INV W 12"CPEP = 153.46'
SDMH
RIM = 151.32'
INV W 12"CPEP = 147.22'
INV E 12"CPEP = 147.22'
173.5'
162.5'
SD
SDSDSD
SDSDSD160
SD
IN COMPLIANCE WITH CITY OF RENTON STANDARDSSE 1/4 SEC. 31, T 23N, R 05E, W.M.ph 206.890.82914715 142nd Pl. SW #B,Edmonds, WA 98026AS SHOWNGURUDWARA SIKH TEMPLEDETENTION VAULTGURUDWARA SIKH TEMPLE DETENTION VAULT12-11-2020TED-40-4180
9/3/2021RGGNAFURSEFORPIANOELTSGESINEREDE
E
AT
D
S
NT AWFO.SAHII
N
RE
E NOTR46937Know what'sbelow.before you dig.CallRSTORM DETAILS0.67' (8") HOLLOW COREVAULT COVER3" HMAWQ EL. 147.22HWS EL. 148.72VAULT TOP EL. 150.22WQ (SEDIMENT) EL. 143.22NOTES:1.DETENTION VAULT DESIGN (BY STRUCTURAL ENGINGEER) UNDER SEPARATE PERMIT.2.DETENTION VAULT COVER SHALL BE CAPABLE OF SUPPORTING THE POINT LOADING OF THEFIRE TRUCK OUTRIGGERS.3.ALL DIMENSIONS SHOWN ARE INTERIOR DIMENSIONS.4.THE VAULT SHALL NOT BE USED FOR DETENTION UNTIL THE WALLS HAVE BEEN BACKFILLEDTO THE FINAL GRADE.5.CONTRACTOR SHALL COORDINATE SIZE AND LOCATIONS OF GRATES WITH STRUCTURALENGINEER.6.ENTRANCE TO CONFINED SPACE WILL BE CLEARLY MARKED AS REQUIRED BY OSHA. THISMAY BE ACCOMPLISHED BY HANGING A REMOVABLE SIGN IN THE ACCESS RISERS JUSTUNDER THE ACCESS GRATE.7.THE VAULT SHALL BE WATER TIGHT. ALL CONSTRUCTION JOINTS MUST HAVE WATER STOPS.8.VAULT LID WILL HANDLE THE POINT LOADING OF THE FIRE TRUCK OUTRIGGERS.1.50'
LIVE STORAGE
4.0'
DEAD
STORAGE
0.5'
FREEBOARD
1.0'
SEDIMENT
STORAGE
5' SQUARE OPENINGWQ EL. 147.22HWS EL. 148.727.00'ASCALE: 1"=10'DETENTION VAULT SECTIONASCALE: 1"=10'DETENTION VAULT SECTIONBDEAD STORAGEINLET-28" IE 153.240.33'72.0'20'20'2' ROUND ACCESS MANHOLE(APPROX. LOCATION) SOLID COVER"DRAIN" WITH LOCKING NUTS (TYP)INLET-38" IE 147.00EMERGENCY OVERFLOWOUTLET-112" IE 146.72 OUTLET-212" IE 147.22SCALE: 1"=10'DETENTION VAULTVAULTLIVE STORAGE 40'X72'X1.5'DP.4,320CFDEAD STORAGE (SINGLE CELL)6,072CF1' OF SEDIMENT STORAGE1.00' HOLLOWCORE COVER5% BOTTOMR-418005B5'X10 ACCESS GRATE W/LADDER & 3'X3'INSPECTION PORT (SEE STRUCTURALPLANS FOR EXACT LOCATION)1.5' MINREMOVABLE BAFFLEPER COR SWDMREMOVABLE BAFFLEPER COR SWDM5% BOTTOM5% BOTTOM5% BOTTOMREMOVABLEBAFFLE
Page 10
OPERATIONS AND MAINTENANCE
APPENDIX A MAINTENANCE REQUIREMENTS FOR STORMWATER FACILITIES AND ON-SITE BMPS
12/12/2016 2017 City of Renton Surface Water Design Manual A-6
NO. 3 – DETENTION TANKS AND VAULTS
MAINTENANCE
COMPONENT
DEFECT OR
PROBLEM
CONDITIONS WHEN
MAINTENANCE IS NEEDED
RESULTS EXPECTED WHEN
MAINTENANCE IS PERFORMED
Site Trash and debris Any trash and debris which exceed 1 cubic foot per 1,000 square feet (this is about equal to the amount of trash it would take to fill up one standard size office garbage can). In general, there should be no visual evidence of dumping.
Trash and debris cleared from site.
Noxious weeds Any noxious or nuisance vegetation which may constitute a hazard to City personnel or the public.
Noxious and nuisance vegetation removed according to applicable regulations. No danger of noxious vegetation where City personnel or the public might normally be.
Contaminants and pollution Any evidence of contaminants or pollution such as oil, gasoline, concrete slurries or paint.
Materials removed and disposed of according to applicable regulations. Source control BMPs implemented if appropriate. No contaminants present other than a surface oil film.
Excessive growth of grass/groundcover Grass or groundcover exceeds 18 inches in height. Grass or groundcover mowed to a height no greater than 6 inches.
Tank or Vault Storage Area Trash and debris Any trash and debris accumulated in vault or tank (includes floatables and non-floatables).
No trash or debris in vault.
Sediment accumulation Accumulated sediment depth exceeds 10% of the diameter of the storage area for ½ length of storage vault or any point depth exceeds 15% of diameter. Example:
72-inch storage tank would require cleaning when sediment reaches depth of 7 inches for more than ½ length of tank.
All sediment removed from storage area.
Tank Structure Plugged air vent Any blockage of the vent. Tank or vault freely vents.
Tank bent out of shape Any part of tank/pipe is bent out of shape more than 10% of its design shape. Tank repaired or replaced to design.
Gaps between sections, damaged
joints or cracks or tears in wall
A gap wider than ½-inch at the joint of any tank sections or any evidence of soil
particles entering the tank at a joint or through a wall.
No water or soil entering tank through joints or walls.
Vault Structure Damage to wall, frame, bottom, and/or top slab
Cracks wider than ½-inch, any evidence of soil entering the structure through cracks or qualified inspection personnel determines that the vault is not structurally sound.
Vault is sealed and structurally sound.
Inlet/Outlet Pipes Sediment accumulation Sediment filling 20% or more of the pipe. Inlet/outlet pipes clear of sediment.
Trash and debris Trash and debris accumulated in inlet/outlet pipes (includes floatables and non-floatables).
No trash or debris in pipes.
Damaged inlet/outlet pipes Cracks wider than ½-inch at the joint of the inlet/outlet pipes or any evidence of soil entering at the joints of the inlet/outlet pipes.
No cracks more than ¼-inch wide at the joint of the inlet/outlet pipe.
Access Manhole Cover/lid not in place Cover/lid is missing or only partially in place. Any open manhole requires immediate maintenance.
Manhole access covered.
APPENDIX A MAINTENANCE REQUIREMENTS FOR STORMWATER FACILITIES AND ON-SITE BMPS
2017 City of Renton Surface Water Design Manual 12/12/2016 A-7
NO. 3 – DETENTION TANKS AND VAULTS
MAINTENANCE
COMPONENT
DEFECT OR
PROBLEM
CONDITIONS WHEN
MAINTENANCE IS NEEDED
RESULTS EXPECTED WHEN
MAINTENANCE IS PERFORMED
Access Manhole (cont.) Locking mechanism not working Mechanism cannot be opened by one maintenance person with proper tools. Bolts cannot be seated. Self-locking cover/lid does not work.
Mechanism opens with proper tools.
Cover/lid difficult to remove One maintenance person cannot remove cover/lid after applying 80 lbs of lift. Cover/lid can be removed and reinstalled by one maintenance person.
Ladder rungs unsafe Missing rungs, misalignment, rust, or
cracks.
Ladder meets design standards. Allows
maintenance person safe access.
Large access
doors/plate
Damaged or difficult
to open
Large access doors or plates cannot be
opened/removed using normal equipment.
Replace or repair access door so it can
opened as designed.
Gaps, doesn't cover completely Large access doors not flat and/or access opening not completely covered. Doors close flat; covers access opening completely.
Lifting rings missing, rusted Lifting rings not capable of lifting weight of door or plate. Lifting rings sufficient to lift or remove door or plate.
APPENDIX A MAINTENANCE REQUIREMENTS FOR STORMWATER FACILITIES AND ON-SITE BMPS
12/12/2016 2017 City of Renton Surface Water Design Manual A-8
NO. 4 – CONTROL STRUCTURE/FLOW RESTRICTOR
MAINTENANCE
COMPONENT
DEFECT OR
PROBLEM
CONDITION WHEN MAINTENANCE
IS NEEDED
RESULTS EXPECTED WHEN
MAINTENANCE IS PERFORMED
Structure Trash and debris Trash or debris of more than ½ cubic foot which is located immediately in front of the structure opening or is blocking capacity of the structure by more than 10%.
No Trash or debris blocking or potentially blocking entrance to structure.
Trash or debris in the structure that exceeds 1/3 the depth from the bottom of basin to invert the lowest pipe into or out of the basin.
No trash or debris in the structure.
Deposits of garbage exceeding 1 cubic foot in volume. No condition present which would attract or support the breeding of insects or rodents.
Sediment accumulation Sediment exceeds 60% of the depth from the bottom of the structure to the invert of the lowest pipe into or out of the structure or the bottom of the FROP-T section or is
within 6 inches of the invert of the lowest pipe into or out of the structure or the bottom of the FROP-T section.
Sump of structure contains no sediment.
Damage to frame and/or top slab Corner of frame extends more than ¾ inch past curb face into the street (If applicable).
Frame is even with curb.
Top slab has holes larger than 2 square inches or cracks wider than ¼ inch. Top slab is free of holes and cracks.
Frame not sitting flush on top slab, i.e., separation of more than ¾ inch of the frame from the top slab.
Frame is sitting flush on top slab.
Cracks in walls or bottom Cracks wider than ½ inch and longer than 3 feet, any evidence of soil particles entering structure through cracks, or maintenance person judges that structure is unsound.
Structure is sealed and structurally sound.
Cracks wider than ½ inch and longer than 1 foot at the joint of any inlet/outlet pipe or
any evidence of soil particles entering structure through cracks.
No cracks more than 1/4 inch wide at the joint of inlet/outlet pipe.
Settlement/ misalignment Structure has settled more than 1 inch or has rotated more than 2 inches out of alignment.
Basin replaced or repaired to design standards.
Damaged pipe joints Cracks wider than ½-inch at the joint of the inlet/outlet pipes or any evidence of soil entering the structure at the joint of the inlet/outlet pipes.
No cracks more than ¼-inch wide at the joint of inlet/outlet pipes.
Contaminants and pollution Any evidence of contaminants or pollution such as oil, gasoline, concrete slurries or paint.
Materials removed and disposed of according to applicable regulations. Source control BMPs implemented if appropriate. No contaminants present other than a surface oil film.
Ladder rungs missing or unsafe Ladder is unsafe due to missing rungs, misalignment, rust, cracks, or sharp edges. Ladder meets design standards and allows maintenance person safe access.
FROP-T Section Damaged FROP-T T section is not securely attached to
structure wall and outlet pipe structure should support at least 1,000 lbs of up or down pressure.
T section securely attached to wall and
outlet pipe.
Structure is not in upright position (allow up to 10% from plumb). Structure in correct position.
APPENDIX A MAINTENANCE REQUIREMENTS FOR STORMWATER FACILITIES AND ON-SITE BMPS
2017 City of Renton Surface Water Design Manual 12/12/2016 A-9
NO. 4 – CONTROL STRUCTURE/FLOW RESTRICTOR
MAINTENANCE
COMPONENT
DEFECT OR
PROBLEM
CONDITION WHEN MAINTENANCE
IS NEEDED
RESULTS EXPECTED WHEN
MAINTENANCE IS PERFORMED
FROP-T Section (cont.) Damaged FROP-T (cont.) Connections to outlet pipe are not watertight or show signs of deteriorated grout.
Connections to outlet pipe are water tight; structure repaired or replaced and works as designed.
Any holes—other than designed holes—in
the structure.
Structure has no holes other than designed
holes.
Cleanout Gate Damaged or missing cleanout gate Cleanout gate is missing. Replace cleanout gate.
Cleanout gate is not watertight. Gate is watertight and works as designed.
Gate cannot be moved up and down by one maintenance person. Gate moves up and down easily and is watertight.
Chain/rod leading to gate is missing or damaged. Chain is in place and works as designed.
Orifice Plate Damaged or missing
orifice plate
Control device is not working properly due
to missing, out of place, or bent orifice plate.
Plate is in place and works as designed.
Obstructions to orifice plate Any trash, debris, sediment, or vegetation blocking the plate. Plate is free of all obstructions and works as designed.
Overflow Pipe Obstructions to
overflow pipe
Any trash or debris blocking (or having the
potential of blocking) the overflow pipe.
Pipe is free of all obstructions and works
as designed.
Deformed or damaged lip of overflow pipe
Lip of overflow pipe is bent or deformed. Overflow pipe does not allow overflow at an elevation lower than design
Inlet/Outlet Pipe Sediment accumulation Sediment filling 20% or more of the pipe. Inlet/outlet pipes clear of sediment.
Trash and debris Trash and debris accumulated in
inlet/outlet pipes (includes floatables and non-floatables).
No trash or debris in pipes.
Damaged inlet/outlet
pipe
Cracks wider than ½-inch at the joint of the
inlet/outlet pipes or any evidence of soil entering at the joints of the inlet/outlet pipes.
No cracks more than ¼-inch wide at the
joint of the inlet/outlet pipe.
Metal Grates (If applicable) Unsafe grate opening Grate with opening wider than 7/8 inch. Grate opening meets design standards.
Trash and debris Trash and debris that is blocking more
than 20% of grate surface.
Grate free of trash and debris. footnote to
guidelines for disposal
Damaged or missing grate Grate missing or broken member(s) of the grate. Grate is in place and meets design standards.
Manhole Cover/Lid Cover/lid not in place Cover/lid is missing or only partially in place. Any open structure requires urgent maintenance.
Cover/lid protects opening to structure.
Locking mechanism
not working
Mechanism cannot be opened by one
maintenance person with proper tools. Bolts cannot be seated. Self-locking cover/lid does not work.
Mechanism opens with proper tools.
Cover/lid difficult to remove One maintenance person cannot remove cover/lid after applying 80 lbs. of lift. Cover/lid can be removed and reinstalled by one maintenance person.
APPENDIX A MAINTENANCE REQUIREMENTS FOR STORMWATER FACILITIES AND ON-SITE BMPS
12/12/2016 2017 City of Renton Surface Water Design Manual A-10
NO. 5 – CATCH BASINS AND MANHOLES
MAINTENANCE
COMPONENT
DEFECT OR
PROBLEM
CONDITION WHEN MAINTENANCE
IS NEEDED
RESULTS EXPECTED WHEN
MAINTENANCE IS PERFORMED
Structure Sediment accumulation Sediment exceeds 60% of the depth from the bottom of the catch basin to the invert of the lowest pipe into or out of the catch basin or is within 6 inches of the invert of the lowest pipe into or out of the catch basin.
Sump of catch basin contains no sediment.
Trash and debris Trash or debris of more than ½ cubic foot which is located immediately in front of the catch basin opening or is blocking capacity of the catch basin by more than 10%.
No Trash or debris blocking or potentially blocking entrance to catch basin.
Trash or debris in the catch basin that exceeds 1/3 the depth from the bottom of basin to invert the lowest pipe into or out of the basin.
No trash or debris in the catch basin.
Dead animals or vegetation that could generate odors that could cause complaints or dangerous gases (e.g., methane).
No dead animals or vegetation present within catch basin.
Deposits of garbage exceeding 1 cubic foot in volume. No condition present which would attract or support the breeding of insects or rodents.
Damage to frame and/or top slab Corner of frame extends more than ¾ inch past curb face into the street (If applicable).
Frame is even with curb.
Top slab has holes larger than 2 square inches or cracks wider than ¼ inch. Top slab is free of holes and cracks.
Frame not sitting flush on top slab, i.e., separation of more than ¾ inch of the frame from the top slab.
Frame is sitting flush on top slab.
Cracks in walls or bottom Cracks wider than ½ inch and longer than 3 feet, any evidence of soil particles entering catch basin through cracks, or maintenance person judges that catch
basin is unsound.
Catch basin is sealed and is structurally sound.
Cracks wider than ½ inch and longer than 1 foot at the joint of any inlet/outlet pipe or any evidence of soil particles entering catch basin through cracks.
No cracks more than 1/4 inch wide at the joint of inlet/outlet pipe.
Settlement/ misalignment Catch basin has settled more than 1 inch or has rotated more than 2 inches out of alignment.
Basin replaced or repaired to design standards.
Damaged pipe joints Cracks wider than ½-inch at the joint of the inlet/outlet pipes or any evidence of soil entering the catch basin at the joint of the inlet/outlet pipes.
No cracks more than ¼-inch wide at the joint of inlet/outlet pipes.
Contaminants and pollution Any evidence of contaminants or pollution such as oil, gasoline, concrete slurries or paint.
Materials removed and disposed of according to applicable regulations. Source control BMPs implemented if appropriate. No contaminants present other than a surface oil film.
Inlet/Outlet Pipe Sediment accumulation Sediment filling 20% or more of the pipe. Inlet/outlet pipes clear of sediment.
Trash and debris Trash and debris accumulated in
inlet/outlet pipes (includes floatables and non-floatables).
No trash or debris in pipes.
APPENDIX A MAINTENANCE REQUIREMENTS FOR STORMWATER FACILITIES AND ON-SITE BMPS
2017 City of Renton Surface Water Design Manual 12/12/2016 A-11
NO. 5 – CATCH BASINS AND MANHOLES
MAINTENANCE
COMPONENT
DEFECT OR
PROBLEM
CONDITION WHEN MAINTENANCE
IS NEEDED
RESULTS EXPECTED WHEN
MAINTENANCE IS PERFORMED
Inlet/Outlet Pipe (cont.) Damaged inlet/outlet pipe Cracks wider than ½-inch at the joint of the inlet/outlet pipes or any evidence of soil entering at the joints of the inlet/outlet pipes.
No cracks more than ¼-inch wide at the joint of the inlet/outlet pipe.
Metal Grates (Catch Basins) Unsafe grate opening Grate with opening wider than 7/8 inch. Grate opening meets design standards.
Trash and debris Trash and debris that is blocking more than 20% of grate surface. Grate free of trash and debris. footnote to guidelines for disposal
Damaged or missing grate Grate missing or broken member(s) of the grate. Any open structure requires urgent maintenance.
Grate is in place and meets design standards.
Manhole Cover/Lid Cover/lid not in place Cover/lid is missing or only partially in place. Any open structure requires urgent maintenance.
Cover/lid protects opening to structure.
Locking mechanism not working Mechanism cannot be opened by one maintenance person with proper tools. Bolts cannot be seated. Self-locking cover/lid does not work.
Mechanism opens with proper tools.
Cover/lid difficult to remove One maintenance person cannot remove cover/lid after applying 80 lbs. of lift. Cover/lid can be removed and reinstalled by one maintenance person.
APPENDIX A MAINTENANCE REQUIREMENTS FOR STORMWATER FACILITIES AND ON-SITE BMPS
12/12/2016 2017 City of Renton Surface Water Design Manual A-12
NO. 6 – CONVEYANCE PIPES AND DITCHES
MAINTENANCE
COMPONENT
DEFECT OR
PROBLEM
CONDITIONS WHEN
MAINTENANCE IS NEEDED
RESULTS EXPECTED WHEN
MAINTENANCE IS PERFORMED
Pipes Sediment & debris accumulation Accumulated sediment or debris that exceeds 20% of the diameter of the pipe. Water flows freely through pipes.
Vegetation/root growth in pipe Vegetation/roots that reduce free movement of water through pipes. Water flows freely through pipes.
Contaminants and pollution Any evidence of contaminants or pollution such as oil, gasoline, concrete slurries or paint.
Materials removed and disposed of according to applicable regulations. Source control BMPs implemented if appropriate.
No contaminants present other than a surface oil film.
Damage to protective coating or corrosion Protective coating is damaged; rust or corrosion is weakening the structural integrity of any part of pipe.
Pipe repaired or replaced.
Damaged pipes Any dent that decreases the cross section area of pipe by more than 20% or is determined to have weakened structural integrity of the pipe.
Pipe repaired or replaced.
Ditches Trash and debris Trash and debris exceeds 1 cubic foot per 1,000 square feet of ditch and slopes. Trash and debris cleared from ditches.
Sediment accumulation Accumulated sediment that exceeds 20% of the design depth. Ditch cleaned/flushed of all sediment and debris so that it matches design.
Noxious weeds Any noxious or nuisance vegetation which may constitute a hazard to City personnel or the public.
Noxious and nuisance vegetation removed according to applicable regulations. No danger of noxious vegetation where City personnel or the public might normally be.
Contaminants and pollution Any evidence of contaminants or pollution such as oil, gasoline, concrete slurries or paint.
Materials removed and disposed of according to applicable regulations. Source control BMPs implemented if appropriate. No contaminants present other than a surface oil film.
Excessive vegetation growth Vegetation that reduces free movement of water through ditches. Water flows freely through ditches.
Erosion damage to
slopes
Any erosion observed on a ditch slope. Slopes are not eroding.
Rock lining out of place or missing (If applicable)
One layer or less of rock exists above native soil area 5 square feet or more, any exposed native soil.
Replace rocks to design standards.
BOND QUANTITY
Planning Division |1055 South Grady Way – 6 th Floor | Renton, WA 98057 (425) 430-7200
Date Prepared:
Name:
PE Registration No:
Firm Name:
Firm Address:
Phone No.
Email Address:
Project Name: Project Owner:
CED Plan # (LUA):Phone:
CED Permit # (U):Address:
Site Address:
Street Intersection:Addt'l Project Owner:
Parcel #(s):Phone:
Address:
Clearing and grading greater than or equal to 5,000 board feet of timber?
Yes/No:No Water Service Provided by:
If Yes, Provide Forest Practice Permit #:Sewer Service Provided by:
AddressAbbreviated Legal
Description:
Abbreviated Legal N 146 FT OF S 931 FT OF W 240 FT OF SE 1/4 OF SE
1/4 LESS CO RD City, State, Zip
Site Address 5200 Talbot Rd. S. Renton WA 98055
Address 5200 Talbot Rd. S.
Additional Project OwnerStreet Intersection S. 55th St. & Talbot Rd. S.
40-4180
Phone 206-226-2277
Date 03/18/2021
Prepared by:
FOR APPROVALProject Phase 1
Email Address furrengineering@gmail.com
Name Dean Furr
PE Registration No. 46937
Firm Name Furr Engineering Services, PLLC
Firm Address 4715 142nd Pl SW Unit B Edmonds WA 98026
Phone No. 206-890-8291
SITE IMPROVEMENT BOND QUANTITY WORKSHEET
PROJECT INFORMATION
CITY OF RENTON
CITY OF RENTON
1 Select the current project status/phase from the following options:
For Approval - Preliminary Data Enclosed, pending approval from the City;
For Construction - Estimated Data Enclosed, Plans have been approved for contruction by the City;
Project Closeout - Final Costs and Quantities Enclosed for Project Close-out Submittal
Phone
Engineer Stamp Required
(all cost estimates must have original wet stamp and signature)
Clearing and Grading Utility Providers
N/A
Project Location and Description Project Owner Information
Project Name Gurudwara Sikh Temple
City, State, Zip Renton WA 98055
Parcel Number 3123059073
Project Owner Gurudwara Singh Sabah of WA
TED-40-4180
Page 1 of 13
Ref 8-H Bond Quantity Worksheet SECTION I PROJECT INFORMATION
Unit Prices Updated: 06/14/2016
Version: 04/26/2017
Printed 9/16/2021
9/3/2021RGG
N
A F
U
R
SEF
ORP
I ANO EL
T
S
GE SI
N
ERE D
EEATDSN
T
A WFO
.
SAHI
IN REENOTR46937
CED Permit #:40-4180
Unit
Reference #Price Unit Quantity Cost
Backfill & compaction-embankment ESC-1 6.50$ CY
Check dams, 4" minus rock ESC-2 SWDM 5.4.6.3 80.00$ Each
Catch Basin Protection ESC-3 35.50$ Each 5 177.50
Crushed surfacing 1 1/4" minus ESC-4 WSDOT 9-03.9(3)95.00$ CY
Ditching ESC-5 9.00$ CY
Excavation-bulk ESC-6 2.00$ CY
Fence, silt ESC-7 SWDM 5.4.3.1 1.50$ LF 82 123.00
Fence, Temporary (NGPE)ESC-8 1.50$ LF
Geotextile Fabric ESC-9 2.50$ SY
Hay Bale Silt Trap ESC-10 0.50$ Each
Hydroseeding ESC-11 SWDM 5.4.2.4 0.80$ SY
Interceptor Swale / Dike ESC-12 1.00$ LF
Jute Mesh ESC-13 SWDM 5.4.2.2 3.50$ SY
Level Spreader ESC-14 1.75$ LF
Mulch, by hand, straw, 3" deep ESC-15 SWDM 5.4.2.1 2.50$ SY
Mulch, by machine, straw, 2" deep ESC-16 SWDM 5.4.2.1 2.00$ SY
Piping, temporary, CPP, 6"ESC-17 12.00$ LF
Piping, temporary, CPP, 8"ESC-18 14.00$ LF
Piping, temporary, CPP, 12"ESC-19 18.00$ LF
Plastic covering, 6mm thick, sandbagged ESC-20 SWDM 5.4.2.3 4.00$ SY 10 40.00
Rip Rap, machine placed; slopes ESC-21 WSDOT 9-13.1(2)45.00$ CY
Rock Construction Entrance, 50'x15'x1'ESC-22 SWDM 5.4.4.1 1,800.00$ Each
Rock Construction Entrance, 100'x15'x1'ESC-23 SWDM 5.4.4.1 3,200.00$ Each
Sediment pond riser assembly ESC-24 SWDM 5.4.5.2 2,200.00$ Each
Sediment trap, 5' high berm ESC-25 SWDM 5.4.5.1 19.00$ LF
Sed. trap, 5' high, riprapped spillway berm section ESC-26 SWDM 5.4.5.1 70.00$ LF
Seeding, by hand ESC-27 SWDM 5.4.2.4 1.00$ SY
Sodding, 1" deep, level ground ESC-28 SWDM 5.4.2.5 8.00$ SY
Sodding, 1" deep, sloped ground ESC-29 SWDM 5.4.2.5 10.00$ SY
TESC Supervisor ESC-30 110.00$ HR
Water truck, dust control ESC-31 SWDM 5.4.7 140.00$ HR
Unit
Reference #Price Unit Quantity Cost
EROSION/SEDIMENT SUBTOTAL:340.50
SALES TAX @ 10%34.05
EROSION/SEDIMENT TOTAL:374.55
(A)
SITE IMPROVEMENT BOND QUANTITY WORKSHEET
FOR EROSION & SEDIMENT CONTROL
Description No.
(A)
WRITE-IN-ITEMS
Page 2 of 13
Ref 8-H Bond Quantity Worksheet SECTION II.a EROSION_CONTROL
Unit Prices Updated: 06/14/2016
Version: 04/26/2017
Printed 9/16/2021
CED Permit #:40-4180
Existing Future Public Private
Right-of-Way Improvements Improvements
(D) (E)
Description No. Unit Price Unit Quant.Cost Quant.Cost Quant.Cost Quant.Cost
GENERAL ITEMS
Backfill & Compaction- embankment GI-1 6.00$ CY
Backfill & Compaction- trench GI-2 9.00$ CY
Clear/Remove Brush, by hand (SY)GI-3 1.00$ SY
Bollards - fixed GI-4 240.74$ Each
Bollards - removable GI-5 452.34$ Each
Clearing/Grubbing/Tree Removal GI-6 10,000.00$ Acre
Excavation - bulk GI-7 2.00$ CY
Excavation - Trench GI-8 5.00$ CY
Fencing, cedar, 6' high GI-9 20.00$ LF
Fencing, chain link, 4'GI-10 38.31$ LF
Fencing, chain link, vinyl coated, 6' high GI-11 20.00$ LF
Fencing, chain link, gate, vinyl coated, 20' GI-12 1,400.00$ Each
Fill & compact - common barrow GI-13 25.00$ CY 750 18,750.00
Fill & compact - gravel base GI-14 27.00$ CY
Fill & compact - screened topsoil GI-15 39.00$ CY
Gabion, 12" deep, stone filled mesh GI-16 65.00$ SY
Gabion, 18" deep, stone filled mesh GI-17 90.00$ SY
Gabion, 36" deep, stone filled mesh GI-18 150.00$ SY
Grading, fine, by hand GI-19 2.50$ SY
Grading, fine, with grader GI-20 2.00$ SY
Monuments, 3' Long GI-21 250.00$ Each
Sensitive Areas Sign GI-22 7.00$ Each
Sodding, 1" deep, sloped ground GI-23 8.00$ SY 450 3,600.00
Surveying, line & grade GI-24 850.00$ Day
Surveying, lot location/lines GI-25 1,800.00$ Acre
Topsoil Type A (imported)GI-26 28.50$ CY
Traffic control crew ( 2 flaggers )GI-27 120.00$ HR
Trail, 4" chipped wood GI-28 8.00$ SY
Trail, 4" crushed cinder GI-29 9.00$ SY
Trail, 4" top course GI-30 12.00$ SY
Conduit, 2"GI-31 5.00$ LF
Wall, retaining, concrete GI-32 55.00$ SF
Wall, rockery GI-33 15.00$ SF
SUBTOTAL THIS PAGE:22,350.00
(B)(C)(D)(E)
SITE IMPROVEMENT BOND QUANTITY WORKSHEET
FOR STREET AND SITE IMPROVEMENTS
Quantity Remaining
(Bond Reduction)
(B)(C)
Page 3 of 13
Ref 8-H Bond Quantity Worksheet SECTION II.b TRANSPORTATION
Unit Prices Updated: 06/14/2016
Version: 04/26/2017
Printed 9/16/2021
CED Permit #:40-4180
Existing Future Public Private
Right-of-Way Improvements Improvements
(D) (E)
Description No. Unit Price Unit Quant.Cost Quant.Cost Quant.Cost Quant.Cost
SITE IMPROVEMENT BOND QUANTITY WORKSHEET
FOR STREET AND SITE IMPROVEMENTS
Quantity Remaining
(Bond Reduction)
(B)(C)
ROAD IMPROVEMENT/PAVEMENT/SURFACING
AC Grinding, 4' wide machine < 1000sy RI-1 30.00$ SY
AC Grinding, 4' wide machine 1000-2000sy RI-2 16.00$ SY
AC Grinding, 4' wide machine > 2000sy RI-3 10.00$ SY
AC Removal/Disposal RI-4 35.00$ SY
Barricade, Type III ( Permanent )RI-5 56.00$ LF
Guard Rail RI-6 30.00$ LF
Curb & Gutter, rolled RI-7 17.00$ LF
Curb & Gutter, vertical RI-8 12.50$ LF
Curb and Gutter, demolition and disposal RI-9 18.00$ LF
Curb, extruded asphalt RI-10 5.50$ LF
Curb, extruded concrete RI-11 7.00$ LF
Sawcut, asphalt, 3" depth RI-12 1.85$ LF
Sawcut, concrete, per 1" depth RI-13 3.00$ LF
Sealant, asphalt RI-14 2.00$ LF
Shoulder, gravel, 4" thick RI-15 15.00$ SY
Sidewalk, 4" thick RI-16 38.00$ SY
Sidewalk, 4" thick, demolition and disposal RI-17 32.00$ SY
Sidewalk, 5" thick RI-18 41.00$ SY
Sidewalk, 5" thick, demolition and disposal RI-19 40.00$ SY
Sign, Handicap RI-20 85.00$ Each
Striping, per stall RI-21 7.00$ Each
Striping, thermoplastic, ( for crosswalk )RI-22 3.00$ SF
Striping, 4" reflectorized line RI-23 0.50$ LF
Additional 2.5" Crushed Surfacing RI-24 3.60$ SY
HMA 1/2" Overlay 1.5" RI-25 14.00$ SY
HMA 1/2" Overlay 2"RI-26 18.00$ SY
HMA Road, 2", 4" rock, First 2500 SY RI-27 28.00$ SY
HMA Road, 2", 4" rock, Qty. over 2500SY RI-28 21.00$ SY
HMA Road, 4", 6" rock, First 2500 SY RI-29 45.00$ SY
HMA Road, 4", 6" rock, Qty. over 2500 SY RI-30 37.00$ SY
HMA Road, 4", 4.5" ATB RI-31 38.00$ SY
Gravel Road, 4" rock, First 2500 SY RI-32 15.00$ SY
Gravel Road, 4" rock, Qty. over 2500 SY RI-33 10.00$ SY
Thickened Edge RI-34 8.60$ LF
SUBTOTAL THIS PAGE:
(B)(C)(D)(E)
Page 4 of 13
Ref 8-H Bond Quantity Worksheet SECTION II.b TRANSPORTATION
Unit Prices Updated: 06/14/2016
Version: 04/26/2017
Printed 9/16/2021
CED Permit #:40-4180
Existing Future Public Private
Right-of-Way Improvements Improvements
(D) (E)
Description No. Unit Price Unit Quant.Cost Quant.Cost Quant.Cost Quant.Cost
SITE IMPROVEMENT BOND QUANTITY WORKSHEET
FOR STREET AND SITE IMPROVEMENTS
Quantity Remaining
(Bond Reduction)
(B)(C)
PARKING LOT SURFACING No.
2" AC, 2" top course rock & 4" borrow PL-1 21.00$ SY
2" AC, 1.5" top course & 2.5" base course PL-2 28.00$ SY
4" select borrow PL-3 5.00$ SY
1.5" top course rock & 2.5" base course PL-4 14.00$ SY
SUBTOTAL PARKING LOT SURFACING:
(B)(C)(D)(E)
LANDSCAPING & VEGETATION No.
Street Trees LA-1
Median Landscaping LA-2
Right-of-Way Landscaping LA-3
Wetland Landscaping LA-4
SUBTOTAL LANDSCAPING & VEGETATION:
(B)(C)(D)(E)
TRAFFIC & LIGHTING No.
Signs TR-1
Street Light System ( # of Poles)TR-2
Traffic Signal TR-3
Traffic Signal Modification TR-4
SUBTOTAL TRAFFIC & LIGHTING:
(B)(C)(D)(E)
WRITE-IN-ITEMS
SUBTOTAL WRITE-IN ITEMS:
STREET AND SITE IMPROVEMENTS SUBTOTAL:22,350.00
SALES TAX @ 10%2,235.00
STREET AND SITE IMPROVEMENTS TOTAL:24,585.00
(B)(C)(D)(E)
Page 5 of 13
Ref 8-H Bond Quantity Worksheet SECTION II.b TRANSPORTATION
Unit Prices Updated: 06/14/2016
Version: 04/26/2017
Printed 9/16/2021
CED Permit #:40-4180
Existing Future Public Private
Right-of-Way Improvements Improvements
(D) (E)
Description No. Unit Price Unit Quant.Cost Quant.Cost Quant.Cost Quant.Cost
DRAINAGE (CPE = Corrugated Polyethylene Pipe, N12 or Equivalent) For Culvert prices, Average of 4' cover was assumed. Assume perforated PVC is same price as solid pipe.)
Access Road, R/D D-1 26.00$ SY
* (CBs include frame and lid)
Beehive D-2 90.00$ Each
Through-curb Inlet Framework D-3 400.00$ Each
CB Type I D-4 1,500.00$ Each
CB Type IL D-5 1,750.00$ Each
CB Type II, 48" diameter D-6 2,300.00$ Each 1 2,300.00
for additional depth over 4' D-7 480.00$ FT
CB Type II, 54" diameter D-8 2,500.00$ Each
for additional depth over 4'D-9 495.00$ FT
CB Type II, 60" diameter D-10 2,800.00$ Each
for additional depth over 4'D-11 600.00$ FT
CB Type II, 72" diameter D-12 6,000.00$ Each
for additional depth over 4'D-13 850.00$ FT
CB Type II, 96" diameter D-14 14,000.00$ Each
for additional depth over 4'D-15 925.00$ FT
Trash Rack, 12"D-16 350.00$ Each
Trash Rack, 15"D-17 410.00$ Each
Trash Rack, 18"D-18 480.00$ Each
Trash Rack, 21"D-19 550.00$ Each
Cleanout, PVC, 4"D-20 150.00$ Each
Cleanout, PVC, 6"D-21 170.00$ Each
Cleanout, PVC, 8"D-22 200.00$ Each
Culvert, PVC, 4" D-23 10.00$ LF
Culvert, PVC, 6" D-24 13.00$ LF
Culvert, PVC, 8" D-25 15.00$ LF
Culvert, PVC, 12" D-26 23.00$ LF
Culvert, PVC, 15" D-27 35.00$ LF
Culvert, PVC, 18" D-28 41.00$ LF
Culvert, PVC, 24"D-29 56.00$ LF
Culvert, PVC, 30" D-30 78.00$ LF
Culvert, PVC, 36" D-31 130.00$ LF
Culvert, CMP, 8"D-32 19.00$ LF
Culvert, CMP, 12"D-33 29.00$ LF
SUBTOTAL THIS PAGE:2,300.00
(B)(C)(D)(E)
Quantity Remaining
(Bond Reduction) (B)(C)
SITE IMPROVEMENT BOND QUANTITY WORKSHEET
FOR DRAINAGE AND STORMWATER FACILITIES
Page 6 of 13
Ref 8-H Bond Quantity Worksheet SECTION II.c DRAINAGE
Unit Prices Updated: 06/14/2016
Version: 04/26/2017
Printed 9/16/2021
CED Permit #:40-4180
Existing Future Public Private
Right-of-Way Improvements Improvements
(D) (E)
Description No. Unit Price Unit Quant.Cost Quant.Cost Quant.Cost Quant.Cost
Quantity Remaining
(Bond Reduction) (B)(C)
SITE IMPROVEMENT BOND QUANTITY WORKSHEET
FOR DRAINAGE AND STORMWATER FACILITIES
DRAINAGE (Continued)
Culvert, CMP, 15"D-34 35.00$ LF
Culvert, CMP, 18"D-35 41.00$ LF
Culvert, CMP, 24"D-36 56.00$ LF
Culvert, CMP, 30"D-37 78.00$ LF
Culvert, CMP, 36"D-38 130.00$ LF
Culvert, CMP, 48"D-39 190.00$ LF
Culvert, CMP, 60"D-40 270.00$ LF
Culvert, CMP, 72"D-41 350.00$ LF
Culvert, Concrete, 8"D-42 42.00$ LF
Culvert, Concrete, 12"D-43 48.00$ LF
Culvert, Concrete, 15"D-44 78.00$ LF
Culvert, Concrete, 18"D-45 48.00$ LF
Culvert, Concrete, 24"D-46 78.00$ LF
Culvert, Concrete, 30"D-47 125.00$ LF
Culvert, Concrete, 36"D-48 150.00$ LF
Culvert, Concrete, 42"D-49 175.00$ LF
Culvert, Concrete, 48"D-50 205.00$ LF
Culvert, CPE Triple Wall, 6" D-51 14.00$ LF
Culvert, CPE Triple Wall, 8" D-52 16.00$ LF
Culvert, CPE Triple Wall, 12" D-53 24.00$ LF
Culvert, CPE Triple Wall, 15" D-54 35.00$ LF
Culvert, CPE Triple Wall, 18" D-55 41.00$ LF
Culvert, CPE Triple Wall, 24" D-56 56.00$ LF
Culvert, CPE Triple Wall, 30" D-57 78.00$ LF
Culvert, CPE Triple Wall, 36" D-58 130.00$ LF
Culvert, LCPE, 6"D-59 60.00$ LF
Culvert, LCPE, 8"D-60 72.00$ LF
Culvert, LCPE, 12"D-61 84.00$ LF
Culvert, LCPE, 15"D-62 96.00$ LF
Culvert, LCPE, 18"D-63 108.00$ LF
Culvert, LCPE, 24"D-64 120.00$ LF
Culvert, LCPE, 30"D-65 132.00$ LF
Culvert, LCPE, 36"D-66 144.00$ LF
Culvert, LCPE, 48"D-67 156.00$ LF
Culvert, LCPE, 54"D-68 168.00$ LF
SUBTOTAL THIS PAGE:
(B)(C)(D)(E)
Page 7 of 13
Ref 8-H Bond Quantity Worksheet SECTION II.c DRAINAGE
Unit Prices Updated: 06/14/2016
Version: 04/26/2017
Printed 9/16/2021
CED Permit #:40-4180
Existing Future Public Private
Right-of-Way Improvements Improvements
(D) (E)
Description No. Unit Price Unit Quant.Cost Quant.Cost Quant.Cost Quant.Cost
Quantity Remaining
(Bond Reduction) (B)(C)
SITE IMPROVEMENT BOND QUANTITY WORKSHEET
FOR DRAINAGE AND STORMWATER FACILITIES
DRAINAGE (Continued)
Culvert, LCPE, 60"D-69 180.00$ LF
Culvert, LCPE, 72"D-70 192.00$ LF
Culvert, HDPE, 6"D-71 42.00$ LF
Culvert, HDPE, 8"D-72 42.00$ LF
Culvert, HDPE, 12"D-73 74.00$ LF
Culvert, HDPE, 15"D-74 106.00$ LF
Culvert, HDPE, 18"D-75 138.00$ LF
Culvert, HDPE, 24"D-76 221.00$ LF
Culvert, HDPE, 30"D-77 276.00$ LF
Culvert, HDPE, 36"D-78 331.00$ LF
Culvert, HDPE, 48"D-79 386.00$ LF
Culvert, HDPE, 54"D-80 441.00$ LF
Culvert, HDPE, 60"D-81 496.00$ LF
Culvert, HDPE, 72"D-82 551.00$ LF
Pipe, Polypropylene, 6"D-83 84.00$ LF
Pipe, Polypropylene, 8"D-84 89.00$ LF 14 1,246.00
Pipe, Polypropylene, 12"D-85 95.00$ LF 7 665.00
Pipe, Polypropylene, 15"D-86 100.00$ LF
Pipe, Polypropylene, 18"D-87 106.00$ LF
Pipe, Polypropylene, 24"D-88 111.00$ LF
Pipe, Polypropylene, 30"D-89 119.00$ LF
Pipe, Polypropylene, 36"D-90 154.00$ LF
Pipe, Polypropylene, 48"D-91 226.00$ LF
Pipe, Polypropylene, 54"D-92 332.00$ LF
Pipe, Polypropylene, 60"D-93 439.00$ LF
Pipe, Polypropylene, 72"D-94 545.00$ LF
Culvert, DI, 6"D-95 61.00$ LF
Culvert, DI, 8"D-96 84.00$ LF
Culvert, DI, 12"D-97 106.00$ LF
Culvert, DI, 15"D-98 129.00$ LF
Culvert, DI, 18"D-99 152.00$ LF
Culvert, DI, 24"D-100 175.00$ LF
Culvert, DI, 30"D-101 198.00$ LF
Culvert, DI, 36"D-102 220.00$ LF
Culvert, DI, 48"D-103 243.00$ LF
Culvert, DI, 54"D-104 266.00$ LF
Culvert, DI, 60"D-105 289.00$ LF
Culvert, DI, 72"D-106 311.00$ LF
SUBTOTAL THIS PAGE:1,911.00
(B)(C)(D)(E)
Page 8 of 13
Ref 8-H Bond Quantity Worksheet SECTION II.c DRAINAGE
Unit Prices Updated: 06/14/2016
Version: 04/26/2017
Printed 9/16/2021
CED Permit #:40-4180
Existing Future Public Private
Right-of-Way Improvements Improvements
(D) (E)
Description No. Unit Price Unit Quant.Cost Quant.Cost Quant.Cost Quant.Cost
Quantity Remaining
(Bond Reduction) (B)(C)
SITE IMPROVEMENT BOND QUANTITY WORKSHEET
FOR DRAINAGE AND STORMWATER FACILITIES
Specialty Drainage Items
Ditching SD-1 9.50$ CY
Flow Dispersal Trench (1,436 base+)SD-3 28.00$ LF
French Drain (3' depth)SD-4 26.00$ LF
Geotextile, laid in trench, polypropylene SD-5 3.00$ SY
Mid-tank Access Riser, 48" dia, 6' deep SD-6 2,000.00$ Each
Pond Overflow Spillway SD-7 16.00$ SY
Restrictor/Oil Separator, 12"SD-8 1,150.00$ Each
Restrictor/Oil Separator, 15"SD-9 1,350.00$ Each
Restrictor/Oil Separator, 18"SD-10 1,700.00$ Each
Riprap, placed SD-11 42.00$ CY
Tank End Reducer (36" diameter)SD-12 1,200.00$ Each
Infiltration pond testing SD-13 125.00$ HR
Permeable Pavement SD-14
Permeable Concrete Sidewalk SD-15
Culvert, Box __ ft x __ ft SD-16
SUBTOTAL SPECIALTY DRAINAGE ITEMS:
(B)(C)(D)(E)
STORMWATER FACILITIES (Include Flow Control and Water Quality Facility Summary Sheet and Sketch)
Detention Pond SF-1 Each
Detention Tank SF-2 Each
Detention Vault SF-3 100,000.00$ Each 1 100,000.00
Infiltration Pond SF-4 Each
Infiltration Tank SF-5 Each
Infiltration Vault SF-6 Each
Infiltration Trenches SF-7 Each
Basic Biofiltration Swale SF-8 Each
Wet Biofiltration Swale SF-9 Each
Wetpond SF-10 Each
Wetvault SF-11 Each
Sand Filter SF-12 Each
Sand Filter Vault SF-13 Each
Linear Sand Filter SF-14 Each
Proprietary Facility SF-15 Each
Bioretention Facility SF-16 Each
SUBTOTAL STORMWATER FACILITIES:100,000.00
(B)(C)(D)(E)
Page 9 of 13
Ref 8-H Bond Quantity Worksheet SECTION II.c DRAINAGE
Unit Prices Updated: 06/14/2016
Version: 04/26/2017
Printed 9/16/2021
CED Permit #:40-4180
Existing Future Public Private
Right-of-Way Improvements Improvements
(D) (E)
Description No. Unit Price Unit Quant.Cost Quant.Cost Quant.Cost Quant.Cost
Quantity Remaining
(Bond Reduction) (B)(C)
SITE IMPROVEMENT BOND QUANTITY WORKSHEET
FOR DRAINAGE AND STORMWATER FACILITIES
WRITE-IN-ITEMS (INCLUDE ON-SITE BMPs)
Yard Drain WI-1 150.00$ 1 150.00
Type ll Flat top, cast iron frame, solid cover, riser WI-2 1,500.00$ 1 1,500.00
12" Over flow riser WI-3 1,500.00$ 1 1,500.00
WI-4
WI-5
WI-6
WI-7
WI-8
WI-9
WI-10
WI-11
WI-12
WI-13
WI-14
WI-15
SUBTOTAL WRITE-IN ITEMS:3,150.00
DRAINAGE AND STORMWATER FACILITIES SUBTOTAL:107,361.00
SALES TAX @ 10%10,736.10
DRAINAGE AND STORMWATER FACILITIES TOTAL:118,097.10
(B)(C)(D)(E)
Page 10 of 13
Ref 8-H Bond Quantity Worksheet SECTION II.c DRAINAGE
Unit Prices Updated: 06/14/2016
Version: 04/26/2017
Printed 9/16/2021
CED Permit #:40-4180
Existing Future Public Private
Right-of-Way Improvements Improvements
(D) (E)
Description No. Unit Price Unit Quant.Cost Quant.Cost Quant.Cost Quant.Cost
Connection to Existing Watermain W-1 2,000.00$ Each
Ductile Iron Watermain, CL 52, 4 Inch Diameter W-2 50.00$ LF
Ductile Iron Watermain, CL 52, 6 Inch Diameter W-3 56.00$ LF
Ductile Iron Watermain, CL 52, 8 Inch Diameter W-4 60.00$ LF
Ductile Iron Watermain, CL 52, 10 Inch Diameter W-5 70.00$ LF
Ductile Iron Watermain, CL 52, 12 Inch Diameter W-6 80.00$ LF
Gate Valve, 4 inch Diameter W-7 500.00$ Each
Gate Valve, 6 inch Diameter W-8 700.00$ Each
Gate Valve, 8 Inch Diameter W-9 800.00$ Each
Gate Valve, 10 Inch Diameter W-10 1,000.00$ Each
Gate Valve, 12 Inch Diameter W-11 1,200.00$ Each
Fire Hydrant Assembly W-12 4,000.00$ Each
Permanent Blow-Off Assembly W-13 1,800.00$ Each
Air-Vac Assembly, 2-Inch Diameter W-14 2,000.00$ Each
Air-Vac Assembly, 1-Inch Diameter W-15 1,500.00$ Each
Compound Meter Assembly 3-inch Diameter W-16 8,000.00$ Each
Compound Meter Assembly 4-inch Diameter W-17 9,000.00$ Each
Compound Meter Assembly 6-inch Diameter W-18 10,000.00$ Each
Pressure Reducing Valve Station 8-inch to 10-inch W-19 20,000.00$ Each
WATER SUBTOTAL:
SALES TAX @ 10%
WATER TOTAL:
(B)(C)(D)(E)
SITE IMPROVEMENT BOND QUANTITY WORKSHEET
FOR WATER
Quantity Remaining
(Bond Reduction)
(B)(C)
Page 11 of 13
Ref 8-H Bond Quantity Worksheet SECTION II.d WATER
Unit Prices Updated: 06/14/2016
Version: 04/26/2017
Printed 9/16/2021
CED Permit #:40-4180
Existing Future Public Private
Right-of-Way Improvements Improvements
(D) (E)
Description No. Unit Price Unit Quant.Cost Quant.Cost Quant.Cost Quant.Cost
Clean Outs SS-1 1,000.00$ Each
Grease Interceptor, 500 gallon SS-2 8,000.00$ Each
Grease Interceptor, 1000 gallon SS-3 10,000.00$ Each
Grease Interceptor, 1500 gallon SS-4 15,000.00$ Each
Side Sewer Pipe, PVC. 4 Inch Diameter SS-5 80.00$ LF
Side Sewer Pipe, PVC. 6 Inch Diameter SS-6 95.00$ LF
Sewer Pipe, PVC, 8 inch Diameter SS-7 105.00$ LF
Sewer Pipe, PVC, 12 Inch Diameter SS-8 120.00$ LF
Sewer Pipe, DI, 8 inch Diameter SS-9 115.00$ LF
Sewer Pipe, DI, 12 Inch Diameter SS-10 130.00$ LF
Manhole, 48 Inch Diameter SS-11 6,000.00$ Each
Manhole, 54 Inch Diameter SS-13 6,500.00$ Each
Manhole, 60 Inch Diameter SS-15 7,500.00$ Each
Manhole, 72 Inch Diameter SS-17 8,500.00$ Each
Manhole, 96 Inch Diameter SS-19 14,000.00$ Each
Pipe, C-900, 12 Inch Diameter SS-21 180.00$ LF
Outside Drop SS-24 1,500.00$ LS
Inside Drop SS-25 1,000.00$ LS
Sewer Pipe, PVC, ____ Inch Diameter SS-26
Lift Station (Entire System)SS-27 LS
SANITARY SEWER SUBTOTAL:
SALES TAX @ 10%
SANITARY SEWER TOTAL:
(B)(C)(D)(E)
SITE IMPROVEMENT BOND QUANTITY WORKSHEET
FOR SANITARY SEWER
Quantity Remaining
(Bond Reduction)
(B)(C)
Page 12 of 13
Ref 8-H Bond Quantity Worksheet SECTION II.e SANITARY SEWER
Unit Prices Updated: 06/14/2016
Version: 04/26/2017
Printed 9/16/2021
Planning Division |1055 South Grady Way – 6 th Floor | Renton, WA 98057 (425) 430-7200
Date:
Name:Project Name:
PE Registration No:CED Plan # (LUA):
Firm Name:CED Permit # (U):
Firm Address:Site Address:
Phone No.Parcel #(s):
Email Address:Project Phase:
Site Restoration/Erosion Sediment Control Subtotal (a)
Existing Right-of-Way Improvements Subtotal (b)(b)-$
Future Public Improvements Subtotal (c)-$
Stormwater & Drainage Facilities (Public & Private) Subtotal (d)(d)118,097.10$
(e)
(f)
Site Restoration
Civil Construction Permit
Maintenance Bond 23,619.42$
Bond Reduction2
Construction Permit Bond Amount 3
Minimum Bond Amount is $10,000.00
1 Estimate Only - May involve multiple and variable components, which will be established on an individual basis by Development Engineering.
2 The City of Renton allows one request only for bond reduction prior to the maintenance period. Reduction of not more than 70% of the original bond amount, provided that the remaining 30% will
cover all remaining items to be constructed.
3 Required Bond Amounts are subject to review and modification by Development Engineering.
* Note: The word BOND as used in this document means any financial guarantee acceptable to the City of Renton.
** Note: All prices include labor, equipment, materials, overhead and profit.
EST1
((b) + (c) + (d)) x 20%
-$
MAINTENANCE BOND */**
(after final acceptance of construction)
374.55$
-$
118,097.10$
374.55$
-$
118,097.10$
-$
118,471.65$
P
(a) x 100%
SITE IMPROVEMENT BOND QUANTITY WORKSHEET
BOND CALCULATIONS
Date 03/18/2021
Name Dean Furr
PE Registration No. 46937
Firm Name Furr Engineering Services, PLLC
R
((b x 150%) + (d x 100%))
S
(e) x 150% + (f) x 100%
Bond Reduction: Existing Right-of-Way Improvements (Quantity
Remaining)2
Bond Reduction: Stormwater & Drainage Facilities (Quantity
Remaining)2
T
(P +R - S)
Prepared by:Project Information
CONSTRUCTION BOND AMOUNT */**
(prior to permit issuance)
Phone No. 206-890-8291
Email Address furrengineering@gmail.com
Project Name Gurudwara Sikh Temple
TED-40-4180
Site Address 5200 Talbot Rd. S. Renton WA 98055
Parcel Number 3123059073
FOR APPROVAL
40-4180
Firm Address 4715 142nd Pl SW Unit B Edmonds WA 98026
Page 13 of 13
Ref 8-H Bond Quantity Worksheet SECTION III. BOND WORKSHEET
Unit Prices Updated: 06/14/2016
Version: 04/26/2017
Printed 9/16/2021