HomeMy WebLinkAboutMFP22000729.pdfDEPARTMENT OF COMMUNITY
AND ECONOMIC DEVELOPMENT
Minor Franchise Permit: MFP22000729
IVR Number: 22000729
Permit Information
Permit Name: Comcast Cable Franchise Permit JB0000865114
Address/Location:02/14/2022Application Date:2146100010Parcel Number: 950 POWELL AVE SW
Permit Type:04/26/2022Issue Date:Franchise
Permit Work Class:04/26/2023Expiration Date:Minor Utility
Job Number: JB0000865114Franchise Type:Cable
Description: Comcast JB0000865114 SPLICE TAP IN EXISTING COAX IN EXISTING COMCAST PEDESTAL DIRECTIONAL
BORE. PLACE (1) 2" CONDUIT & PULL RG6 CABLE THROUGH. RESTORATION PER CITY OF RENTON
STANDARDS.
Contacts
Name Address PhoneTypeBilling
Andrew Parker
Comcast
410 Valley Ave NW, Suite 12 Bldg C
Puyallup, WA 98371
B: (253) 225-0596Applicant
James Hefley
Cannon Construction
3601 20th St E Suite 2
Fife, WA 98424
Applicant
Annie Robertson
Cannon Construction LLC
406 Porter Way
Milton, WA 98354
ApplicantX
Tom Donnelly
Comcast Business Communications
1701 Jfk Blvd, 32nd Floor
Philadelphia, PA 19103
B: (215) 286-7347
C: (215) 286-7557
Contact
CITY OF RENTON ROW 1055 S Grady Way
Renton, WA 98057-3232
Owner
Laurie Dietz
Comcast - Billing
1701 John F. Kennedy Blvd.
Philadelphia, PA 19103
H: (425) 741-5733Specialized
Billing
General Conditions & Signature
Permission is hereby given for the work described on this permit according to the conditions hereon and according to the
approved plans and specifications pertaining thereto, subject to compliance with the Ordinance of the City of Renton.
Ÿ
This permit and plans must be posted at the job site at all times.Ÿ
I hereby certify that no work is to be done except as described above and in approved plans, and that work is to conform to
Renton Trench Restoration and Street Overlay Requirements.
Ÿ
Call 425.430.7203 or go to: https://permitting.rentonwa.gov one working day in advance to schedule an inspections and for ANY
work in the Right of Way.
Ÿ
Call 8 1 1 to locate underground utilities at least two full business days prior to any excavation.Ÿ
In accordance with RCW 19.122.033(4) the permit holder is required to contact (Williams Northwest Pipeline at 425.868.1010)
(Olympic Pipeline at 206.510.0575) (Puget Sound Energy at 425.375.3397) to request a consultation with the transmission
pipeline company prior to performing any construction or excavation activities. This requirement to consult with the
transmission pipeline company is in addition to the requirement to Call before You Dig as required in RCW 19.122.
Ÿ
(Date)(Signature)
Page 1 of 1THIS PERMIT AND PLANS MUST BE POSTED AT THE JOB SITE AT ALL TIMES
DEPARTMENT OF COMMUNITY
AND ECONOMIC DEVELOPMENT
Page 1 of 1 | Published: 1/2/2019
Planning Division | 1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425-430-7200
Email: franchisepermits@rentonwa.gov Website: rentonwa.gov
FRANCHISE PERMIT APPLICATION
Published: 1/2/2019
TO THE APPLICANT: Submit an electronic copy of the plans with the Franchise Permit Application and the Site
Specific Traffic Control Application to franchisepermits@rentonwa.gov. Permit cost is $630.00. Inspection fee
for trenching more than 60 lineal feet or installation of 6 or more poles will be billed at $60.00 per hour.
Franchise Agency:
Franchise Job Number: Phone:
Contact Name: Email:
Job Site Address: Project Name:
Description of Work:
Please check all that apply:
☐ New Construction ☐ Repair/Relocate ☐ Underground ☐ Overhead ☐ Sidewalk ☐ Street
☐ Open Trench ☐ Bore # of feet:
Contractor Name: Phone:
State Contractors License #: City of Renton Business License #:
“I certify that I am the owner or applicant’s authorized agent and do hereby agree to abide to the terms and conditions set forth
under this permit and shall comply with the City of Renton’s Trench Restoration and Street Overlay Requirements. ”
Signature Date
INSPECTIONS SHALL BE REQUESTED 24 HOURS PRIOR TO COMMENCEMENT OF ALL WORK BY CALLING THE
INSPECTION LINE AT 425-430-7203 OR BY GOING TO MYBUILDINGPERMIT.COM
Jobs are required to be called in for job start, re-inspection and project final. Re-inspection fees are billed at
$125/hour. All Pre-Construction meetings shall be scheduled at a maximum of 14 days prior to the job start date.
Plan Review/Development Engineering Date Approved as submitted
Pre-Construction Meeting required
Site Construction Inspector Date Approved with comments or redlines
Camera inspection of utilities required
Development Engineering Manager Date
Comcast Cable Communications Management
JB0000865114
Rhonda Resnik
253-905-8972
Rhonda_Resnik@comcast.com
950 Powell Ave SW, Renton, WA 98057 Air Liquide USA LLC
SPLICE TAP IN EXISTING COAX IN EXISTING COMCAST PEDESTAL.
DIRECTIONAL BORE. PLACE (1) 2" CONDUIT & PULL RG6 CABLE THOUGH.
4
Cannon Construction LLC - James Hefley 253-922-2787 ext 286
601590363 20838
2/14/22
MFP22000729
Scott Warlick 4/26/2022
RESTORATION PER CITY OF RENTON STANDARDS
DEPARTMENT OF PUBLIC WORKS
Note: The Applicant is responsible for compliance with all codes and regulations, whether or not described in this document.
Page 1 of 2 | Published: 11/25/2019
Transportation Division | 1055 South Grady Way, 5th Floor | Renton, WA 98057 | 425-430-7380
Website: rentonwa.gov
TRAFFIC CONTROL PLAN (TCP) APPLICATION
Published: 11/25/2019
TRAFFIC CONTROL PLAN (TCP) MUST BE SUBMITTED TO PUBLIC WORKS TRANSPORTATION DIVISION
FOR REVIEW/APPROVAL NO LATER THAN FIVE (5) WORKING DAYS BEFORE THE DATE OF WORK.
The City of Renton requires any contractor, firm, corporation, or other public/private agency to prepare a TCP and
obtain City of Renton's approval of that plan when construction, repair, or maintenance work is to be conducted
within the city's right-of-way.
TO THE APPLICANT: Submit the TCP application form and required submittal documents to
TCP@rentonwa.gov with the subject line “TCP Application – [Project Name]” or the above address.
The following items, electronic copies preferred, are all required for submittal of the TCP Application:
1.☐ A copy of the Traffic Control Plan (TCP) Application form.
2.☐ A copy of the required TCP layout, preferred 11” X 17” paper size format, which shall:
☐Include map(s) showing the location of the project and work area.
☐Be legible lettering and clear, contrasting, symbols of viewing or printing.
☐Must indicate street names, and north arrow and scale.
☐All signs and detour routes shall conform to the MUTCD, WSDOT TCPs, and the Washington State
Traffic Control Flagger Certification handbook, by the Evergreen Safety Council.
☐Types of plans required:
☐Work hour plan – show all mobility impacts during construction hours.
☐Non-work plan - show all mobility impacts after work hours when limited or no work is
happening in the right-of-way (ROW), if applicable.
☐Changing construction phases – show construction sequence and each construction phase
change even if the traffic control is not modified, if applicable.
☐Pedestrian access/detour plan, if applicable.
Project Name: ______________________________________________ Permit #: _____________________
Project Address: ____________________________________________________________________________
Work Date: From _____________ To _____________ Work Time: Start ______________ End ______________
Description of Work, Work Schedule, Equipment Used: _____________________________________________
___________________________________________________________________________________________
___________________________________________________________________________________________
Construction Company: ________________________________________ Phone/Cell: (_____) _____-________
Applicant Name: _________________________________ Email: ______________________________________
Business Address: _________________________________ City/State: __________________ Zip: __________
Approved By: _______________________________________________ Date: ________________________
Transportation Operations Engineering
AIR LIQUIDE USA LLC
950 POWELL AVE SW, RENTON, WA 98057
Monday Friday 8am 3pm
SPLICE TAP IN EXISTING COAX
IN EXISTING COMCAST PEDESTAL.DIRECTIONAL BORE. PLACE
(1) 2" CONDUIT & PULL RG6 CABLE THROUGH
Cannon Construction LLC 253 922 2787
James Hefley jhefley@cannonconstructioninc.com
406 Milton Way Milton, WA 98354
Scott Warlick CED
MFP22000729
4/26/2022
Note: The Applicant is responsible for compliance with all codes and regulations, whether or not described in this document.
Page 2 of 2 | Published: 11/25/2019
APPLICANT AGREES TO ALL THE FOLLOWING:
•TCP must be approved prior to commencing the work, and all permit conditions shall be met.
•Existing pedestrian access shall be maintained. The work on pedestrian facilities shall be limited to one corner
at a time, with the least possible inconvenience or delay to pedestrians.
•Signage shall be used to warn motorcyclists/bicyclists of the potential hazards on any uneven surfaced or
slippery road conditions during work and non-work hours.
•The start of Work Time begins when any street or travel lane is fully/partially closed or impacts the follow of
traffic. This includes set up within the traveled way or immediately adjacent to the roadway.
•Emergency services (253-852-2121) shall be notified twenty-four (24) hours before any street or lane closures.
•Contractor or entity must call Renton School District (425-204-4455) or any public/private agency, including
public transit, to be affected by a temporary lane or road closure.
•TCP for all street and/or lane closures shall be implemented and performed in compliance with the Manual on
Uniform Traffic Control Devices (MUTCD) and/or State of Washington Department of Transportation (WSDOT)
and all traffic regulations of the City of Renton and Revised Code of Washington (RCW).
•Any lane or street closures not in conformance with the approved traffic control plan and/or without
notification of emergency services may result in receiving a citation for violation of RCW 47.36.200 Signs or
Flaggers at thoroughfare work sites and RCW 9A.36.050 Reckless Endangerment, and other applicable State
and City codes.
•Indemnify and hold harmless the City of Renton from any and all claims, actions, and judgments, including all
costs of defense and attorney’s fees incurred in defending against same, arising from and related to
implementation of the approved traffic control plans including claims arising from towing of private vehicles
and the acts of the Applicant’s agents and employees.
•The City of Renton shall be entitled, in its reasonable discretion, to settle claims prior to suit or judgment, and
in such event shall indemnify and hold harmless the City for any such claims paid, including the City’s
reasonable attorney’s fees and litigation costs incurred resulting from such claim.
•In the event any claim or suit is brought against the City within the scope of this Agreement, Applicant will pay
for legal counsel chosen by the City to defend against same.
•Flagger and sign placement are subject to revision by the City Inspector on site, if needed to address traffic or
pedestrian safety or travel.
•Total road closure lasting more than twenty-four (24) hours is subject to the approval by the City Council.
•Approved Temporary TCP must be at the work site during work hours.
•Complete assistance and accommodation shall be provided to all kinds of pedestrian traffic when sidewalk or
walkway is impeded to safely redirect pedestrians around a work zone.
•Any vehicle, equipment, barricade, or portable tow-away sign used within the work area must display a
company logo or any legally acceptable sign showing the company name, address, and telephone number at a
conspicuous place on the vehicle or equipment.
In the case of Temporary No Parking Zones, all the following apply in addition to previous:
•Contractor must complete form to show limits of Temporary No Parking Zone identifying barricade locations
for vacate parking or curb lane usage.
•Contractor must post notice of dates and time of Temporary No Parking Zone with at least two signs per block
seventy-two (72) hours in advance of effective date and time.
•The cover sheet of this TCP form must be attached to each Temporary No Parking Sign on the project site.
•Temporary traffic control devices must be removed immediately when work is done or no construction
activities are going on. If deemed abandoned, City crews will remove and store them at the City’s maintenance
shop (3555 NE 2nd Street; 425-430-7423).
_______________________________ _______________________________ _______________________
Applicant’s Signature Print Name Date
James Hefley Permit Coordinator 04/22/22
M920981950947SW 10TH STROWROWROWROWROWROWROWROWROWROWROWROWROWROWROWROWROWROWROWROWROWROW
ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW
EOPEOPEOPEOP EOP EOP EOP EOP
EOPEOPEOPEOPEOPEOPEOPEOPEOPSIDEWALKLANDSCAPINGDRIVEWAYSIDEWALKLANDSCAPINGSIDEWALK
LANDSCAPING
SIDEWALK
LANDSCAPING
SIDEWALKLANDSCAPINGPOWELL AVE SW
WT
W20-1W20-7aFLAGGERW20-4W20-1W20-7aFLAGGERW20-4DRIVEWAYDRIVEWAY
SIDEWALK
SIDEWALKTHE DESIGNED TRAFFIC CONTROLS CONTAINED WITHINTHIS TCP WILL NOT BE IMPLEMENTED UNTIL APPROVEDBY THE PUBLIC AUTHORITY HAVING JURISDICTIONSITE SPECIFIC TRAFFIC CONTROL PLAN[UNDERGROUND WORK] CONTROL TYPE: FLAGGING CONTROL 2-LANE ROADSIGN SPACING = X (FEET)FREEWAYS & EXPRESSWAYS 50/70 MPH 1500' +/-(OR AS PER MUTCO)RURAL HIGHWAYS 60/65 MPH 800' +/-RURAL ROADS 45/55 MPH 500' +/-RURAL ROADS & URBAN ARTERIALS 35/40 MPH 350' +/-RURAL ROADS & URBAN ARTERIALSRESIDENTAL & BUSINESS DISTRICTSURBAN STREETS 25 MPH OR LESS 100' +/-25/30 MPH 200' +/-ALL SIGNS ARE 48"x48" BLACK ON ORANGE UNLESS OTHERWISE DESIGNATED(1) ALL SIGN SPACING MAY BE ADJUSTED TO ACCOMMODATE INTERCHANGE RAMPS, AT GRADEINTERSECTIONS AND DRIVEWAYS.(2) THE SPACING MAY BE REDUCED IN URBAN AREAS TO FIT ROADWAY CONDITIONS.10105150205270450500550---11115160225295495550605660--12125180245320540600660720780840LANEWIDTH25303540455055606570MINIMUM TAPER LENGTH IN FEET = LPOSTED SPEED LIMIT (MPH)SPEED253035455055155200250360425495570LONGITUDINAL BUFFER SPACE = BLENGTH40305606570780840DISCLAIMERAll traffic control setups, sign spacing, and procedures will conformto the specifications stated in the federal Manual on Uniform TrafficControl Devices (M.U.T.C.D)Cities and various municipalities may have also adopted specializedguidelines for traffic control within their jurisdiction. It is theresponsibility of the on-site traffic control personnel to verify if anyspecial conditions exist.TRAFFIC CONTROL ADDITIONAL NOTES-For aerial work, there will be a moving traffic control setup-Will coordinate with businesses that will be affected byconstruction-Will have spotter on site to escort pedestrians throughwork zone-All work will stop while pedestrians are escorted throughwork zones-Will have no more than two work areas active at a timeSITE NOTES-Maintain driveway access at all times-Place temporary "NO PARKING" signs at least72 hours prior to work-Sidewalks to remain open during road workunless noted otherwiseFLAGGER
SPOTTER WTLEGENDWork Vehicle Work AreaFlagger SpotterNOFAPPROVED BY:PROJECT CODE:DRAWN BY:DATE:SCALE:PROJECT REVISIONS
REV DESCRIPTION OF CHANGEDATE BY QC
TCPMETRO-E
JB0000865114
00011SSWK2/14/2022NTSRENTON, WA 98057
950 POWELL AVE SW
AIR LIQUIDE USA LLC
17-050MFP22000729
SHEET INDEX:
1 - COVER SHEET
2 -LEGEND
3 -GENERAL NOTES
4 -DESIGN
THIS IS PROPRIETARY INFORMATION AND NOT MEANT FOR GENERAL PUBLICATION. ALL RIGHTS RESERVED BY CANNON COMPANIES
RG6 COAX: 4 FT + 20% STORAGE = 5 FT
CONTACTS:
PROJECT MAP:
*ALL FOOTAGES AND MATERIALS ARE ESTIMATED
N
SCOPE OF WORK:
-SPLICE TAP IN EXISTING COAX IN EXISTING COMCAST PEDESTAL
-DIRECTIONAL BORE. PLACE (1) 2" CONDUIT & PULL RG6 CABLE THROUGH
BILL OF MATERIALS*:
NEW AERIAL =
OVERLASH =
NEW UNDERGROUND =
EXISTING UNDERGROUND =
RISER (0)=
TOTAL ROW FOOTAGE =
0 FT.
0 FT.
0 FT.
4 FT.
0 FT.
4 FT.
CANNON COMPANIES
SAFETY | QUALITY | INTEGRITY | TEAMWORK
Connecting The Future Since 1985
COMCAST
Business/Job Contact
POC:Eric Waffle 425-228-2001
EMAIL: eric.waffle@airgas.com
950 POWELL AVE SW
RENTON, WA 98057AIR LIQUIDE USA LLC
JB0000865114
METRO-E
CANNON COMPANIES
Silas Schroeder - 253-709-3302 - sschroeder@cannonconstructioninc.com
ROW FOOTAGES*:
NEW BUILDING PATHWAY =
EXISTING BUILDING PATHWAY =
NEW UNDERGROUND =
EXISTING UNDERGROUND =
TOTAL SITE FOOTAGE =
0 FT.
0 FT.
0 FT.
0 FT.
0 FT.
SITE FOOTAGES*:
TOTAL PROJECT FOOTAGE =4 FT.
4
MFP22000729
RESTORATION PER CITY OF RENTON STANDARDS
OFAPPROVED BY:PROJECT CODE:DRAWN BY:DATE:SCALE:PROJECT REVISIONS
REV DESCRIPTION OF CHANGEDATE BY QC JB0000865114
AIR LIQUIDE USA LLC
950 POWELL AVE SW
RENTON, WA 98057
METRO-E17-0502/14/2022WKSSNTS00024LEGENDEDGE OF PAVEMENTFOGLINEPOWERCOMMUNICATIONSEWERDRAINDRAINAGE DITCHGASWATERTRAFFIC SIGNALTELCOMSTEAMUNKNOWN UTILITYRIGHT OF WAYTRAFFIC CONESPROPOSED NEW BORESTRAW WATTLESPLTCWRUTILITY POLEVAULT - SMALLPEDESTALSTREET LIGHTCROSSWALK LIGHTUTILITY RISERVVAULT - SMALL444LA MANHOLEVAULT - 25TACATCH BASINCATCH BASIN WITH SOCKGLULAM UTILITY POLECENTER LINELANE LINEFENCEHIGH VISIBILITY FENCE SSEWER MANHOLEDDRAIN MANHOLEWWATER MANHOLEVUTILITY VALVESHRUBBERYBORE PITVAULT - LARGEVAULT - 25TACCOMMUNICATION MANHOLEFIRE HYDRANTDISTANCE STATIONSTA 0+00CONSTRUCTION NOTE CALLOUT#X.XDISTANCE DIMENSIONASPHALT SURFACECONCRETE ROADWAY PANELHFH-FRAMEVAULT - LARGECABCABINETLEGENDLANE DIRECTION INDICATORPROPOSEDMARK-UP NOTATIONSRESTORATION TYPESEXISTING FEATURESLINE TYPESA7LANDSCAPECROSS SECTION SYMBOLCROSS SECTION NAMECROSS SECTION SHOWN ON PAGEFLFLPPTSTSCCDDDDDDDDDDDDGGWWTTSTSTROWROWSUKCBCBPPVVVVVVPROPOSED WORK1LOCATIONPHOTO NOTE CALLOUT#PHOTO LOCATOR SYMBOLPROPOSED NEW TRENCHEXISTING UNDERGROUND PATHWAYPROPOSED NEW AERIAL STRANDEXISTING AERIAL PATHWAYEXISTING SPLICE CASEPROPOSED SPLICE CASEEXISTING FIBER/COAX STORAGEPROPOSED FIBER/COAX STORAGETREEEOPVVAULT - SMALL444LA MANHOLEVAULT - 25TAVAULT - LARGEEXISTING - CONTINUED233LA MANHOLE233LA MANHOLEMFP22000729
OFAPPROVED BY:PROJECT CODE:DRAWN BY:DATE:SCALE:PROJECT REVISIONS
REV DESCRIPTION OF CHANGEDATE BY QC JB0000865114
AIR LIQUIDE USA LLC
950 POWELL AVE SW
RENTON, WA 98057
METRO-E17-0502/14/2022WKSSNTS00034GENERAL NOTESMFP22000729
CCCCCCCCCCCC
LANDSCAPING SSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSS
DDDDDDDDDDD D
D
D D
D D D D D
DDDDD D D D DD
DDDVMW W W W W W W W W W W W
FHW950ROWROWROWROWROWROWROWROWROWROWROW
ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW
EOP EOP EOP EOP EOP EOP
P P P P P P P P P P P P PEOPEOPEOPEOPEOPEOPCCCCTHLTS
4' BORECONSTRUCTION NOTES:SPLICE TAP IN EXISTING COAX IN EXISTING COMCASTPEDESTALDIRECTIONAL BORE. PLACE (1) 2" CONDUIT & PULL RG6CABLE THROUGH21RESTORATION LEGEND:= ASPHALT= CONCRETE= GRASS=LANDSCAPESTATION STARTSTATIONING STARTS AT 10+00 AT THEINTERSECTION OF POWELL AVE SW & SW 10TH STPROPOSED PATH DISCLAIMERS1.PROPOSED PATH MAY CHANGE AT TIME OFCONSTRUCTION DUE TO UTILITY LOCATIONSAND INSPECTOR REQUIREMENTS2.UNKNOWN UTILITY DEPTHS TO BE VERIFIED INFIELD DURING TIME OF CONSTRUCTIONUTILITY DISCLAIMERALL LOCATIONS OF UTILITIES SHOWN AREAPPROXIMATE. LOCATION OF ALL UTILITIES TO BEVERIFIED PRIOR TO CONSTRUCTION. CALL UTILITYUNDERGROUND LOCATION CENTER AT1-800-424-5555CSWPP LEGENDNATIVE TRENCH MATERIAL SHALL BE COVER WITHPROTECTIVE TARP AND SECURED WITH SANDBAGSTO PREVENT RAIN WATER ABSORPTION.CATCH BASIN WITH SOCKCBDRAINAGE SYSTEM DISCLAIMEREXISTING DRAINAGE SYSTEM (GRATE INLET, DITCH, ETC.)SHALL BE PROTECTED AND FUNCTIONAL THROUGHOUT THECONSTRUCTION PROJECT. IF ANY PARTS OF THE SYSTEM AREIMPACTED BY CONSTRUCTION ACTIVITIES, THEY SHALL BERESTORED TO THE ORIGINAL CONDITIONS.SIDEWALKLANDSCAPINGDRIVEWAYSIDEWALKSIDEWALKLANDSCAPING
SIDEWALKLANDSCAPINGPOWELL AVE SW
BOREPITSTA 11+50STA 12+00STA 12+50STA 13+00GGGGGGG G G G G G G GV
RESTORATION NOTES:RESTORE LANDSCAPING PER CITY OF RENTONSPECIFICATIONS1R21R5'5'1TH
STA 12+44DRIVEWAY
OFAPPROVED BY:PROJECT CODE:DRAWN BY:DATE:SCALE:PROJECT REVISIONS
REV DESCRIPTION OF CHANGEDATE BY QC JB0000865114
AIR LIQUIDE USA LLC
950 POWELL AVE SW
RENTON, WA 98057
METRO-E17-0502/14/2022WKSS1" = 20'010'20'44DESIGNNMFP22000729