FIELD REPORT
Date Project Name Project No. Report No.
2022-04-19 Bethany Corner 20160674E002 033
Location Municipality AESI Project Manager AESI Field Rep
1055 SE 165th St. Renton Matthew A. Miller, P.E. Scott R. Hannah, L.G., L.E.G.
Permit No. Client/Owner Attn Requested By
B22000536 Mark Seek (Tiger Mountain Homes) Mark Seek Contractor
Engineer/Architect General Contractor Earthwork Contractor Weather
D.R. Strong Tiger Mountain Homes / Mark Tiger Mountain Sunny, 48 deg
THE FOLLOWING WAS NOTED:
Lot 7 ADU Building Foundation Excavation, Permit #B22000356:
AESI was onsite at 10am this morning to observe the foundation excavation for the Lot 7 ADU building (see plan on page
2). Upon arrival, we met with Mark Seek of Tiger Mountain Homes. Prior to our arrival, the contractor excavated
approximately 4 to 7 feet below existing grade for the 20-foot by 26-foot ADU building.
The excavation was deepened from the building area to remove old fill soil, black, organic-rich material and wet, loose
native soil. The excavation exposed medium dense to dense (based on observations with a ½ inch diameter, steel soil
probe), native, brown and gray, silty sand with some gravel that was suitably firm for fill placement. We were informed
that they planned to use approximately 3 to 6 feet of structural fill consisting of 2 to 4-inch size, recycled concrete (spalls)
capped by 1 to 2 feet of 1 ¼” minus recycled concrete to re-establish their foundation subgrade. The contractor will
continue to tamp the spalls with the excavator bucket every 2 feet thick to create a tight mass of unyielding spalls
followed by compacting the top recycled material with a jumping jack in maximum 1-foot-thick lifts. We will return for a
final observation of the compacted material.
Lot 7 ADU excavation upon arrival, looking W.
Date Project Name Project No. Report No.
4/19/2022 Bethany Corner 20160674E002 033
Page 2 of 2
FIELD REPORT
Lot 7 ADU excavation looking SW.