Minor Franchise Permit: MFP22002038
IVR Number: 22002038
Permit Information
Permit Name: Comcast Cable Franchise Permit CSG 422167
1408 Bronson Way N, Renton, WA 98057Address/Location:04/18/2022Application Date:1352300825Parcel Number: 1408 BRONSON WAY N
Permit Type:04/28/2022Issue Date:Franchise
Permit Work Class:04/28/2023Expiration Date:Minor Utility
Job Number: CSG 422167Franchise Type:Cable
Description: Comcast CSG 422167 1408 Bronson Way N, Renton, WA 98057
Requesting to bore 42' and open cut 5 x 2 in r/w and place 2" PVC. Begin at pole East of 111's property bore 30' then
bore 12' under sidewalk and open cut 5 x 2 to private property. Utility crossing to be potholed to ensure required
separation is maintained, locations to be identified at pre con inspection. All substructures have a 36 inch cover.
Restoration per City of Renton standards.
Contacts
Name Address PhoneTypeBilling
Fahm Saelee
Prince Telecom
Applicant
Michele Moore
Prince Telecom LLC
13701 24th St E, 24th St E
Sumner, WA 98390
H: (206) 388-4316ApplicantX
Rhonda Resnik
Comcast
410 Valley Ave NW, Suite 12, Bldg C
Puyallup, WA 98371
B: (253) 864-4246Applicant
Sandra Castro
Comcast
C: (209) 561-4786Contact
Akisha Brown
Prince Telecom Inc
551A Mews Dr
New Castle, DE 19720
B: (302) 482-8893
C: (302) 482-8892
Contractor
Business License Number: 29850Electrical Contractor: PRINCTL834BF
Construction Contractor: PRINCTL862PS
CITY OF RENTON ROW 1055 S Grady Way
Renton, WA 98057-3232
Owner
Laurie Dietz
Comcast - Billing
1701 John F. Kennedy Blvd.
Philadelphia, PA 19103
H: (425) 741-5733Specialized
Billing
General Conditions & Signature
Permission is hereby given for the work described on this permit according to the conditions hereon and according to the
approved plans and specifications pertaining thereto, subject to compliance with the Ordinance of the City of Renton.
Ÿ
This permit and plans must be posted at the job site at all times.Ÿ
I hereby certify that no work is to be done except as described above and in approved plans, and that work is to conform to
Renton Trench Restoration and Street Overlay Requirements.
Ÿ
Call 425.430.7203 or go to: https://permitting.rentonwa.gov one working day in advance to schedule an inspections and for ANY
work in the Right of Way.
Ÿ
Call 8 1 1 to locate underground utilities at least two full business days prior to any excavation.Ÿ
In accordance with RCW 19.122.033(4) the permit holder is required to contact (Williams Northwest Pipeline at 425.868.1010)
(Olympic Pipeline at 206.510.0575) (Puget Sound Energy at 425.375.3397) to request a consultation with the transmission
pipeline company prior to performing any construction or excavation activities. This requirement to consult with the
transmission pipeline company is in addition to the requirement to Call before You Dig as required in RCW 19.122.
Ÿ
(Date)(Signature)
Page 1 of 1THIS PERMIT AND PLANS MUST BE POSTED AT THE JOB SITE AT ALL TIMES
Note: The Applicant is responsible for compliance with all codes and regulations, whether or not described in this document.
DEPARTMENT OF PUBLIC WORKS
Page 1 of 3 | Published: 10/27/2021
Transportation Division | 1055 South Grady Way, 5th Floor | Renton, WA 98057 | 425-430-7380
Website: rentonwa.gov
TRAFFIC CONTROL PLAN APPLICATION
Published: 10/27/2021
TRAFFIC CONTROL PLAN (TCP) MUST BE SUBMITTED TO PUBLIC WORKS TRANSPORTATION DIVISION
FOR REVIEW/APPROVAL AT LEAST FIVE (5) WORKING DAYS BEFORE THE DATE OF WORK.
The City of Renton requires any contractor, firm, corporation, or other public/private agency to prepare a traffic control
plan (TCP) and obtain city's approval of that plan when construction, repair, or maintenance work is to be conducted
within the city's right-of-way.
1. Fill out the Traffic Control Plan (TCP) Application form and prepare required submittal documents.
2. The following items are all required for submittal of the TCP Application:
☐ Electronic Copy of the TCP Application
☐ Electronic Copy of the TCP Layout, on 11” X 17” paper size format, which shall:
Include map(s) showing the location of the project and work area.
Be legible lettering and clear, contrasting, symbols of viewing or printing.
Must indicate street names, and north arrow and scale.
Types of plans required:
o Work hour plan – show all mobility impacts during construction hours.
o Non-work plan - show all mobility impacts after work hours when limited or no work is
happening in the right-of-way (ROW), if applicable.
o Changing construction phases – show construction sequence and each construction phase
change even if the traffic control is not modified, if applicable.
o Pedestrian access/detour plan, if applicable.
- Shall conform to the Washington State Traffic Control Flagger Certification handbook, by the
Evergreen Safety Council.
3. Submit Application via email to TCP@rentonwa.gov with the subject line “TCP Application – [Project Name].”
Project Name: Permit #:
Site Address:
Work Date: From _____________ To _____________ Work Time: Start ______________ End ______________
Construction Company:
Contact Name: Phone/Cell: _________________________
Business Address: City/State: Zip:
Description of Work:
Approval By: _________________________________________________ Date:____________________
Transportation Engineering
CSG 422167
1408 Bronson Way N,Renton,WA 98057
WILL CALL 1 DAY 8AM 3PM
Prince Telecom LLC
Fahm Saelee or Ryan Wilkerson 206-743-2173 or 253-261-1882
13701 24th St E Bldg "G"Sumner,WA 98390
Requesting to bore 42'and open cut 5 x 2 in r/w and place 2"PVC.Begin at pole East of 111's property
bore 30'then bore 12'under sidewalk and open cut 5 x 2 to private property.Utility crossing to be potholed
to ensure required separation is maintained,locations to be identified at pre con inspection.All
substructures have a 36 inch cover.
MFP22002038
Monday - Friday
Scott Warlick CED 4/28/2022
Note: The Applicant is responsible for compliance with all codes and regulations, whether or not described in this document.
Page 2 of 3 | Published: 10/27/2021
PERMIT HOLDER AGREES TO ALL THE FOLLOWING:
Must have approved Traffic Control Plan (TCP) prior to commencing the work.
Maintain existing pedestrian access. The work on pedestrian facilities, shall be limited to one corner at a time,
with the least possible inconvenience or delay to pedestrians.
WORK TIME begins when any street or travel lane is fully or partially closed. This includes set up within the
traveled way.
Comply with all traffic regulations of the City of Renton and the State of Washington.
Prepare a traffic control plan and obtain City approval of that plan. That plan shall be implemented for all street
and lane closures, and the plan shall be performed in compliance with the Manual on Uniform Traffic Control
Devices.
Notify emergency services (253-852-2121) twenty-four (24) hours before any street or lane closures.
Contractor or entity must call Renton School District (425-204-4455) or any public/private agency, including public
transit, to be affected by a temporary lane or road closure a minimum of five business days (excluding weekends
and holidays) prior to starting any work.
Contractor or entity must notify King County Metro in writing at construction.coord@kingcounty.gov a minimum
of five business days (excluding weekends and holidays) prior to starting any work impacting bus stops, a
temporary lane or road closure. Work requiring removing a bus shelter or sign requires notification in writing a
minimum of 30 business days (excluding weekends and holidays). Please call King County Metro at 206-477-1140
with any questions.
Any lane or street closures not in conformance with the approved traffic control plan and/or without notification
of emergency services may result in receiving a citation for violation of R.C.W. 47.36.200 Signs or Flaggers at
thoroughfare work sites and R.C.W. 9A.36.050 Reckless Endangerment, and other applicable State and City codes.
Indemnify and hold harmless the City of Renton from any and all claims, actions, and judgments, including all
costs of defense and attorney’s fees incurred in defending against same, arising from and related to
implementation of the approved traffic control plans including claims arising from towing of private vehicles and
the acts of the Permit Holder’s agents and employees.
The City of Renton shall be entitled, in its reasonable discretion, to settle claims prior to suit or judgment, and in
such event shall indemnify and hold harmless the City for any such claims paid, including the City’s reasonable
attorney’s fees and litigation costs incurred resulting from such claim.
In the event any claim or suit is brought against City within the scope of this Agreement, Permit Holder will pay for
legal counsel chosen by the City to defend against same.
Flagger and sign placement are subject to revision by the City Inspector on site, if needed to address traffic or
pedestrian safety or travel.
All permit conditions shall be met.
NOTES:
Total road closure lasting more than twenty-four (24) hours is subject to the approval by the City Council.
Work Zone Traffic Control shall be in accordance with the Manual on Uniform Traffic Control Devices (MUTCD)
and shown by a traffic control plan layout or reference to WSDOT.
Approved Temporary Traffic Control Plan must be at the work site during work hours.
Complete assistance and accommodation shall be provided to all kinds of pedestrian traffic when sidewalk or
walkway is impeded to safely redirect pedestrians around a work zone.
Signage shall be used to warn motorcyclists/bicyclists of the potential hazards on any uneven surfaced or slippery
road conditions during work and non-work hours.
Any vehicle, equipment, barricade, or portable tow-away sign used within the work area must display a company
logo or any legally acceptable sign showing the company name, address, and telephone number at a conspicuous
place on the vehicle or equipment.
Note: The Applicant is responsible for compliance with all codes and regulations, whether or not described in this document.
Page 3 of 3 | Published: 10/27/2021
In the case of Temporary No Parking Zones, all the following apply in addition to previous:
Contractor must complete form to show limits of Temporary No Parking Zone identifying barricade locations for
vacate parking or curb lane usage.
Contractor must post notice of dates and time of Temporary No Parking Zone with at least two signs per block
seventy-two (72) hours in advance of effective date and time.
The cover sheet of this Traffic Control Plan form must be attached to each Temporary No Parking Sign on the
project site.
Temporary traffic control devices must be removed immediately when work is done or no construction activities
are going on. If deemed abandoned, City crews will remove and store them at the City’s maintenance shop (3555
NE 2nd Street).
I certify that the information on this application and within the submittal documents are accurate to the best of my
knowledge and I acknowledge all the requirements on this application.
Applicant’s Signature Date
Applicant’s Name (Print)
4/18/2022
Fahm Saelee
Fahm Saelee
stop light -
House Way N Bronson Way NBronson Way NRRRRRRROADWORKAHEADW20-1100'ANORTH
NOT TO SCALE
KENNY'S TRAFFIC ZONE PLANSTRAFFIC CONTROL PLAN PREPARATION
PH # 425-223-7689TRAFICPLAYR@AOL.COMLongview, Wa STOP
KENNY STERTZ
TRAFFIC CONTROL SUPERVISOR
Washington Oregon
((ID# WA016416 SJ833BD.O.E 03/29/2026 5/31/2024
Prince telecom
telecommunications
installation
Fahm Salee
206-743-2173
JOB # CSG 422167
sidewalk
Driveway5'x2'Open cut
Pole
TYPICAL PROTECTIVEVEHICLE TYPEWITH TMA
TYPICAL PROTECTIVE VEHICLE(WITH TMA) LOADED WEIGHT
(LBS)
STATIONARYOPERATION(ft)
30 MIN.
100 max.
MINUMIM WEIGHT 16000 LBS(MAXIMUM WEIGHT SHALL BE IN ACCORDANCEWITH MANUFACTURER RECOMMENDATION
4 YARD DUMP TRUCKSERVICE TRUCKFLAT BED, ETC
PROTECTIVE VEHICLE WITH TMA ROLL AHEAD DISTANCE
LONGITUDINAL BUFFER SPACE = B
ROLL AHEAD STOPPING DISTANCE ASSUMES DRY PAVEMENT
A PROTECTIVE VEHICLE IS RECOMMENDED REGARDLESS IF A TMA IS AVAILABLE IF NO TMA IS USED,THE PROTECTIVE VEHICLE SHALL BE STRATEGICALLY LOCATED IN THE FIELD TO SHIELD WORKERS ANDNO ROLL AHEAD DISTANCE IS SPECIFIED. REFER TO CHAPTER 1.5.5 FOR ADDITIONAL INFORMATION
CHANNELIZING DEVICE SPACING CHART (FEET)
50/70
35/45
20/30
mph *Half-Spacing*TAPER TANGENT
20
N/A
40
30
20
80
60
40N/A
BUFFER DATALONGITUDINAL BUFFER SPACE = B
SPEED (mph)
LENGTH (ft)25 30 35 40 45 50 55 60 65 70
155 200 250 305 360 425 495 570 645 730
MINIMUM TAPER LENGTH = L (feet)
POSTED SPEED (mph)
25 30 35 40 45 50 55 60 65 70
LANEWIDTH(feet)
1011
12
105115125
150165180
205225245
270
295
320
450
495
540
500
550
600
550605
660
660
720
-----780 840
SIGN SPACING = X (FEET) (1)
FREEWAYS & EXPRESSWAYS
RURAL HIGHWAYS
RURAL ROADS
RURAL ROADS and URBAN ARTERIALS
RURAL ROAD, URBAN ARTERIALSRESIDENTIAL & BUSINESS DISTRICTS
URBAN STREETS
ALL SIGNS ARE 48" x 48" BLACK ON ORANGE UNLESS OTHERWISE DESIGNATED
55/70 mph
60/65 mph
45/55 mph
35/40 mph
25/30 mph
25mph or less
1500ft +/-
800ft +/-
500ft +/-
350ft +/-
200ft +/-(2)
100ft +/-(2)
(1) All spacing may be adjusted to accomodate interchange ramps, at-gradeintersections, and driveways.
(2) This spacing may be reduced in urban areas to fit roadway conditions.
MERGING, SHIFTING, and SHOULDER TAPER LENGTHSand NUMBER OF CHANNELIZATION DEVICES USED
10ft LANE 11ft LANE 12ft LANE
L L L1/2L 1/2L 1/2L
Lanewidth
MPH Merging Merging MergingDevicesShiftingDevicesDevicesDevicesDevices DevicesShiftingShifting
SHOULDER TAPERS(assume 10ft shoulders)
1/3L Devices(FT)LengthMPH
20
25303540455055606570
70105150205270
450500550600650700
6
68
810161415161719
355575105135225250275300325350
34556
9889910
75
115165225295495550605660715770
679911181516181920
406085115150250285305330370
385
34
5569899
1011
80125
180245320540600660720
780840
6
71091219161819
2122
406590125160270
300330360
390420
34556109
9101112
20
2530
3540
455055606570
253550
7090
150170185200220235
333
4466667
7
Shoulder tapers equalsshoulder Width x Speed/3
Driveway
1408Bronson Way N
<30'>
<12'>SWB
parkingparking
NO PARKING7 AM -6 PMFROMTOTOW AWAY AREAPHONE 685-5444YOUR COMPANY NAME 555-5555
R7-T38 cones -
SPOTTER -
parking
parking parking parkingparkingparkingplanter strip
ONE WAY
-Minimum 10' Lane-Sidewalk shall be open
-Spotter will be onsite to Guide any
Pedestrians pass the work area
NOTES :
-No Parking signs shall be placed 24hrs
in advance of work
www.invarion.com
MFP22002038
Place Large Photo Detail Here
CSG 422167 0 1408 Bronson Way N Renton, WA 98057 SOW Detail Overview
Requesting to bore 42' and open cut 5 x 2 in r/w and place 2" PVC. Begin at pole East of
111's property bore 30' then bore 12' under sidewalk and open cut 5 x 2 to private
property. Utility crossing to be potholed to ensure required separation is maintained,
locations to be identified at pre con inspection. All substructures have a 36 inch cover.
Date:
ENGINEERED FOR:DROP BURY
REVISION
Comcast ESS
DatePrepared By:Fahm Saelee 206-743-2173 Rev
POLE
30' ROW BORE
12' SIDEWALK BORE
5 X 2 OPEN CUT
MFP22002038
POTHOLE ALL EXISTING UTILITIES RESTORATION PER CITY OF RENTON STANDARDS
Requesting to bore 42' and open cut 5 x 2 in r/w and place 2" PVC. Begin at pole East of
111's property bore 30' then bore 12' under sidewalk and open cut 5 x 2 to private
property. Utility crossing to be potholed to ensure required separation is maintained,
locations to be identified at pre con inspection. All substructures have a 36 inch cover.
Date:
ENGINEERED FOR:DROP BURY
REVISION
Comcast ESS
Prepared By:Fahm Saelee 206-743-2173 Rev Date
Place Large Photo Detail Here
CSG 422167 0 1408 Bronson Way N Renton, WA 98057 SOW Detail Overview
POLE
30' ROW BORE
12' SIDEWALK BORE
5 X 2 OPEN CUT
MFP22002038