Loading...
HomeMy WebLinkAboutMFP22002033.pdfDEPARTMENT OF COMMUNITY AND ECONOMIC DEVELOPMENT Minor Franchise Permit: MFP22002033 IVR Number: 22002033 Permit Information Permit Name: Puget Sound Energy - Electric Address/Location:04/18/2022Application Date:3224059049Parcel Number: 4350 LAKE WASHINGTON BLVD N Permit Type:04/28/2022Issue Date:Franchise Permit Work Class:04/28/2023Expiration Date:Minor Utility Job Number: 101147808Franchise Type:Electric Description: Puget Sound Energy Electric CREW TO UPGRADE TRANSFORMER ON EXISTING P01 (319685 16612) AND CONNECT R RUN OF CUSTOMER OWNED WIRE. RESTORATION PER CITY OF RENTON STANDARDS. Contacts Name Address PhoneTypeBilling Corrie Rydberg Puget Sound Energy 3702 71st Ave W University Place, WA 98466 C: (253) 905-5031ApplicantX Vicki Henson Potelco Inc 8001 212th St S Kent, WA 98032 B: (253) 863-0484Contractor Business License Number: 5109Electrical Contractor: POTELI*344O4 Construction Contractor: POTELI*227PL KENNYALE GATEWAY LLC 505 5TH AVE S SUITE 900 SEATTLE , WA 98104 Owner Corrie Rydberg Puget Sound Energy 3702 71st Ave W University Place, WA 98466 C: (253) 905-5031Specialized Billing General Conditions & Signature Permission is hereby given for the work described on this permit according to the conditions hereon and according to the approved plans and specifications pertaining thereto, subject to compliance with the Ordinance of the City of Renton. Ÿ This permit and plans must be posted at the job site at all times.Ÿ I hereby certify that no work is to be done except as described above and in approved plans, and that work is to conform to Renton Trench Restoration and Street Overlay Requirements. Ÿ Call 425.430.7203 or go to: https://permitting.rentonwa.gov one working day in advance to schedule an inspections and for ANY work in the Right of Way. Ÿ Call 8 1 1 to locate underground utilities at least two full business days prior to any excavation.Ÿ In accordance with RCW 19.122.033(4) the permit holder is required to contact (Williams Northwest Pipeline at 425.868.1010) (Olympic Pipeline at 206.510.0575) (Puget Sound Energy at 425.375.3397) to request a consultation with the transmission pipeline company prior to performing any construction or excavation activities. This requirement to consult with the transmission pipeline company is in addition to the requirement to Call before You Dig as required in RCW 19.122. Ÿ (Date)(Signature) Page 1 of 1THIS PERMIT AND PLANS MUST BE POSTED AT THE JOB SITE AT ALL TIMES Note: The Applicant is responsible for compliance with all codes and regulations, whether or not described in this document. DEPARTMENT OF PUBLIC WORKS Page 1 of 3 | Published: 10/27/2021 Transportation Division | 1055 South Grady Way, 5th Floor | Renton, WA 98057 | 425-430-7380 Website: rentonwa.gov TRAFFIC CONTROL PLAN APPLICATION Published: 10/27/2021 TRAFFIC CONTROL PLAN (TCP) MUST BE SUBMITTED TO PUBLIC WORKS TRANSPORTATION DIVISION FOR REVIEW/APPROVAL AT LEAST FIVE (5) WORKING DAYS BEFORE THE DATE OF WORK. The City of Renton requires any contractor, firm, corporation, or other public/private agency to prepare a traffic control plan (TCP) and obtain city's approval of that plan when construction, repair, or maintenance work is to be conducted within the city's right-of-way. 1. Fill out the Traffic Control Plan (TCP) Application form and prepare required submittal documents. 2. The following items are all required for submittal of the TCP Application: ☐Electronic Copy of the TCP Application ☐Electronic Copy of the TCP Layout, on 11” X 17” paper size format, which shall: Include map(s) showing the location of the project and work area. Be legible lettering and clear, contrasting, symbols of viewing or printing. Must indicate street names, and north arrow and scale. Types of plans required: o Work hour plan – show all mobility impacts during construction hours. o Non-work plan - show all mobility impacts after work hours when limited or no work is happening in the right-of-way (ROW), if applicable. o Changing construction phases – show construction sequence and each construction phase change even if the traffic control is not modified, if applicable. o Pedestrian access/detour plan, if applicable. - Shall conform to the Washington State Traffic Control Flagger Certification handbook, by the Evergreen Safety Council. 3. Submit Application via email to TCP@rentonwa.gov with the subject line “TCP Application – [Project Name].” Project Name: Permit #: Site Address: Work Date: From _____________ To _____________ Work Time: Start ______________ End ______________ Construction Company: Contact Name: Phone/Cell: _________________________ Business Address: City/State: Zip: Description of Work: Approval By: _________________________________________________ Date:____________________ Transportation Engineering PLEASE SEE ATTACHED POTELCO, INC 6905 S 228TH ST KENT, WA 98032 101147808 4350 Lake WA BLVD KELLY.PECK@PSE.COM 253-395-6815 MFP22002033 Monday - Friday 8:00AM - 3:00PM Scott Warlick CED 4/28/2022 Note: The Applicant is responsible for compliance with all codes and regulations, whether or not described in this document. Page 2 of 3 | Published: 10/27/2021 PERMIT HOLDER AGREES TO ALL THE FOLLOWING: Must have approved Traffic Control Plan (TCP) prior to commencing the work. Maintain existing pedestrian access. The work on pedestrian facilities, shall be limited to one corner at a time, with the least possible inconvenience or delay to pedestrians. WORK TIME begins when any street or travel lane is fully or partially closed. This includes set up within the traveled way. Comply with all traffic regulations of the City of Renton and the State of Washington. Prepare a traffic control plan and obtain City approval of that plan. That plan shall be implemented for all street and lane closures, and the plan shall be performed in compliance with the Manual on Uniform Traffic Control Devices. Notify emergency services (253-852-2121) twenty-four (24) hours before any street or lane closures. Contractor or entity must call Renton School District (425-204-4455) or any public/private agency, including public transit, to be affected by a temporary lane or road closure a minimum of five business days (excluding weekends and holidays) prior to starting any work. Contractor or entity must notify King County Metro in writing at construction.coord@kingcounty.gov a minimum of five business days (excluding weekends and holidays) prior to starting any work impacting bus stops, a temporary lane or road closure. Work requiring removing a bus shelter or sign requires notification in writing a minimum of 30 business days (excluding weekends and holidays). Please call King County Metro at 206-477-1140 with any questions. Any lane or street closures not in conformance with the approved traffic control plan and/or without notification of emergency services may result in receiving a citation for violation of R.C.W. 47.36.200 Signs or Flaggers at thoroughfare work sites and R.C.W. 9A.36.050 Reckless Endangerment, and other applicable State and City codes. Indemnify and hold harmless the City of Renton from any and all claims, actions, and judgments, including all costs of defense and attorney’s fees incurred in defending against same, arising from and related to implementation of the approved traffic control plans including claims arising from towing of private vehicles and the acts of the Permit Holder’s agents and employees. The City of Renton shall be entitled, in its reasonable discretion, to settle claims prior to suit or judgment, and in such event shall indemnify and hold harmless the City for any such claims paid, including the City’s reasonable attorney’s fees and litigation costs incurred resulting from such claim. In the event any claim or suit is brought against City within the scope of this Agreement, Permit Holder will pay for legal counsel chosen by the City to defend against same. Flagger and sign placement are subject to revision by the City Inspector on site, if needed to address traffic or pedestrian safety or travel. All permit conditions shall be met. NOTES: Total road closure lasting more than twenty-four (24) hours is subject to the approval by the City Council. Work Zone Traffic Control shall be in accordance with the Manual on Uniform Traffic Control Devices (MUTCD) and shown by a traffic control plan layout or reference to WSDOT. Approved Temporary Traffic Control Plan must be at the work site during work hours. Complete assistance and accommodation shall be provided to all kinds of pedestrian traffic when sidewalk or walkway is impeded to safely redirect pedestrians around a work zone. Signage shall be used to warn motorcyclists/bicyclists of the potential hazards on any uneven surfaced or slippery road conditions during work and non-work hours. Any vehicle, equipment, barricade, or portable tow-away sign used within the work area must display a company logo or any legally acceptable sign showing the company name, address, and telephone number at a conspicuous place on the vehicle or equipment. Note: The Applicant is responsible for compliance with all codes and regulations, whether or not described in this document. Page 3 of 3 | Published: 10/27/2021 In the case of Temporary No Parking Zones, all the following apply in addition to previous: Contractor must complete form to show limits of Temporary No Parking Zone identifying barricade locations for vacate parking or curb lane usage. Contractor must post notice of dates and time of Temporary No Parking Zone with at least two signs per block seventy-two (72) hours in advance of effective date and time. The cover sheet of this Traffic Control Plan form must be attached to each Temporary No Parking Sign on the project site. Temporary traffic control devices must be removed immediately when work is done or no construction activities are going on. If deemed abandoned, City crews will remove and store them at the City’s maintenance shop (3555 NE 2nd Street). I certify that the information on this application and within the submittal documents are accurate to the best of my knowledge and I acknowledge all the requirements on this application. Applicant’s Signature Date Applicant’s Name (Print) CORRIE RYDBERG P01P02ISLAND1213121112 221521N 44TH ST SEAHAWKS WAY1214 405 EXIT405 ENTRANCE 131312N 44TH ST ARRW-BRD 1419ROADWORKAHEADW20-1 100'ROADWORKAHEADW20-1100'100'ROAD WORK AHEAD W20-1ROADWORKAHEADW20-1X'I-405 ONRAMPTA30' MIN-100' MAXWITH TMABLL/3VICINITY MAPWORK AREAINTERSTATE405 SRMP7.39TEMPORARY TRAFFIC CONTROL PLANSIGN SPACINGMPH60/6545/5535/403025"X"1000'500'350'200'100'CHANNELIZATIONDEVICE SPACINGMPH55/7035/4525/30TAPER403020TANGENT806040Notes:1. Notify WSDOT (206) 440-4454 at least 72 hoursprior to scheduled projects.2. All advanced warning signs and spacing to conform to theMUTCD and WSDOT standards.3. Channelizing devices shall be traffic drums (barrels) withsteady burning Type C lights on all State Routes andHwys.4. All signs are 48" x 48", Black legend on Orange background.Use class B signs unless otherwise specified.5. Flaggers shall be in radio contact with each other at alltimes; flagger stations shall be illuminated during hoursof darkness with minimum 150w lights6. All lane closures shall not infringe upon adjacentlanes.7. Alert affected residents and businesses if existing onWSDOT roadways. All sidewalks, driveways, exits andegresses shall be completely clear unless otherwiseindicated.8. Work areas will be noted as per distances betweenState Route milepost markers.9. See sheet X for WSDOT Notes and Tables.0'80'40'PRINT ON11X17" SHEETS ONLYNProject Address:PagePSEPUGETSOUNDENERGYDesigner:Job #REV03/23/2022 10114780804350 Lake WA Blvd, Renton, WA 98056 Safaa Al Neema (425) 398-6077 safaa.alneema@pse.com1 OF 2Puget Sound EnergyTraffic Control Supervisor:Safaa Al NeemaCard No. 012611Card Exp. 10/31/2024Safaa.alneema@pse.com(425)398-6077WORK VEHICLE/FLASHING LIGHTSTRAFFIC BARRELSWITH BEACONSTRAFFIC FLOWSIGN LOCATIONSTOPFLAGGERLEGENDPOLECHEVRONARROW BOARDRIGHT OF WAYTATMA TRUCKMFP22002033This work will requireadditional approvalfrom WSDOT for workin their ROW. TEMPORARY TRAFFIC CONTROL PLAN WSDOT NOTES & TABLES ”” – Project Address: Page PSE PUGETSOUNDENERGY Designer: Job # REV 03/23/2022 101147808 0 4350 Lake WA Blvd, Renton, WA 98056 Safaa Al Neema (425) 398-6077 safaa.alneema@pse.com 2 OF 2 Puget Sound Energy Traffic Control Supervisor: Safaa Al Neema Card No. 012611 Card Exp. 10/31/2024 Safaa.alneema@pse.com (425)398-6077 MFP22002033 XX X X XX X X X XX X XXX XXX X XXX X X 319685 166309 25kVA 120/240v P01 319685 166312 EXIST ABC#2 ACSRCBAN"WSDOT SUA 874" 319618 166417 25kVA 100kVA 240/480v 100T T81307 I-405 S ON-RAMPEX UG SVCEX 3Ø UG #2 ACSRHAZELWOOD LN EX 3Ø UG EX 3 Ø U G 101147808THIS SKETCH NOT TO BE RELIED UPON FOR EXACT LOCATION OF EXISTING FACILITIES CALL (800) 424-5555 2 BUSINESS DAYS BEFORE YOU DIG For contacts below dial 1-888-CALL PSE (225-5773) N Vicinity Map UTILITIES CONTACT PHONE# COUNTY 1/4 SEC U-MAP NO (POWER) OP MAP Emer Sect Gas Wk Ctr POWER WK CTR PLAT MAP JOINT FACILITIES ARRANGEMENTS DRAWN BY CHECKED BY APPROVED BY FOREMAN #1 FOREMAN #2 MAPPING INCIDENT MAOP Gas Order Elect Order SCALE PAGE ENGR - POWER ENGR - GAS FUNCTION PROJECT MGR PERMITREAL ESTATE/EASEMENT 2 1 REV# 3 DATE DESCRIPTIONBY CONTACT PHONE NO DATE OH CKT MAP CIRCUIT NOUG CKT MAP Kelly Peck 206-867-0674 9/1/21 Keang Lim 206-475-5503 9/1/21 N/A N/A N/A Keang Lim 206-475-5503 9/1/21 NER NPR WSDOT SUA 874 MP 7.47 TRANSFORMER UPGRADE 4350 LAKE WA BLVD RENTON, WA 98056 N/A N/A N/A 101147808 AS NOTED 1/1 King N/A N/A CSPSKEPI T24 R05E S29 N/A N/A 2405E115 2405E136 N/A HAZ-15 N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A Owner / Developer Contact Info officeATTN: WSDOT rhodesj@consultant.wsdot.wa.gov Jim Rhodes 425-213-9930 THIS SKETCH NOT TO BE RELIED UPON FOR EXACT LOCATION OF EXISTING FACILITIES CALL (800) 424-5555 2 BUSINESS DAYS BEFORE YOU DIG For contacts below dial 1-888-CALL PSE (225-5773) FOREMAN (CHECK BOX WHEN COMPLETED) PSE Equipment LOCKED/SECURED & Work Area left in CLEAN/SAFE Condition. Grid, Cable, and Switch numbers INSTALLED & VERIFIED. Field Changes RED-LINED on As-built. Indicate correct FUSE SIZE on As-built & VERIFY proper PHASE. Foreman's Signature _______________________________________________ Print Name ___________________________________ Date ______________ Material VERIFIED and CHANGES noted on Paperwork. Total PRIMARY Cable noted on As-built. Company ID#'s RECORDED in correct location on As-built. Deviations noted on the As-built and their reason. I certify that the work performed meets PSE's standards and procedures and that all quality requirements are met. E-Mail: Cell Phone: Project Manager Contact Information: Manager:Kelly Peck 206-867-0674 kelly.peck@pse.com ARE TO BE INSTALLED, CROSS SECTION DETAILS OF THE TYPICAL EROSION STRUCTURES, & SPECIAL REQUIREMENTS FOR WORK IN SENSITIVE AREAS.) EROSION & SEDIMENT CONTROL REQUIREMENTS NOTES DETAILING WHERE EROSION OR SEDIMENT CONTROL STRUCTURES (LOCAL JURISDICTIONS MAY HAVE ADDITIONAL REQUIREMENTS INCLUDING 0150.3200 TECHNIQUES FOR TEMPORARY EROSION & SEDIMENT CONTROL EROSION & SEDIMENT CONTROL SHALL BE PER PSE STANDARD PRACTICE & ANY ADDITIONAL LOCAL JURISDICTION REQUIREMENTS. UNIVERSAL MAP (2405E115-126) SCALE: NONE SUA 874 MP 7.47 WSDOT I-405 EXPANSION SITE PLAN SCALE:1" = 20' ELECTRIC SYMBOLS LEGEND S EXISTING PSE PULL VAULT EXISTING PSE SWITCH VAULT NEW PSE VAULT P NEW PSE TRENCH / DUCT BANK INSTALLATION EXISTING PSE DUCT BANK LIMITS OF EXCAVATION DUCT INTERCEPT POINT CIRCUIT REMOVAL EXISTING 3Ø 750 MCM EXISTING 3Ø 1/0 NEW 750MCM FEEDER NEW 1/0 PRIMARY & 4" CONDUIT P No No No Yes Yes Yes No Yes "Flagging Required" "Outages Required" "Locates Required" X X X X X X X X HP Svc/MSA HP Main Distribution ORDER#NOTIF# PWR PROJECT PHASE N/AN/A N/AN/A N/AN/A N/AN/A N/AN/A N/AN/A N/AN/A 583069121N/A 101147808512636469 CABLE TV PHONE GAS OH Expense Relocation Removal Temporary Job Order Superior C. 6' Separation between Power vaults & Fire Hydrants. A. 1' Separation crossing over City Utilities. 5. REQUIREMENTS AROUND CITY WATER, SEWER & STORM LINES. COVER WITH LANDSCAPING. 4. THE DEVELOPER SHALL NOT OBSTRUCT ACCESS TO PSE'S EQUIPMENT OR F. Backfill of trench shall be completed prior to energizing. that workers will enter. E. Ditch sloping or shoring per Washing State Law for excavations deeper than 4' D. Removal and disposal of material not suitable for backfill. C. Compaction, restoration and any backfill required within the property covered with 6" of washed sand. B. All PSE'S conduits or direct buried cables are required to be bedded in 3" AND A. A minimum of 36 inches of cover is required for PSE'S Electrical system. 3. TRENCHING AND RESTORATION material which would restrict construction access before work begins. Work area shall be at of near final grade, clear of spoils or construction 2. SITE PREPERATION be met. (see 0700.1600) when the minimum clearance requirements to vehicular traffic cannot driveways or roadways) (see 0700.1600) Customers shall supply guardposts surface normally used by vehicular traffic (parking lots, parking spaces, alleys front (must allow 10' min workspace) - 10feet. Clearance are measured to any minimum clearances requirements: From the back & sides - 5 feet: From the E. When Transformers are exposed to vehicular traffic they must meet the following clear of all obstructions D. An area 10 foot in front of all transformer locations shall be reasonably level and C. Transformers shall not be located under any building eves. equipment. B. Transformers shall be a minimum of 6 feet from any gas meter and/or fire fighting a minimum of 10 feet from any door, window opening or combustible wall. A. Transformers shall be located a minimum of 3 feet from a noncombustible wall or 1. STAKING OF GRADES AND VAULT LOCATION. THE FOLLOWING ON PRIVATE PROPERTY. THE DEVELOPER IS RESPONSIBLE FOR, BUT NOT LIMITED TO DEVELOPER NOTES: jurisdiction requirements. "Techniques for Temporary Erosion and Sediment Control" and any additional local 3. Erosion and sediment control shall be per PSE Standard Practice 0150.3200 delivery (The Transformer of PSE Secondary Handhole). 2. Tag customer owned service on secondary(s) at the meter base and at the point of work sketch must be authorized by PSE'S Engineering and noted on the Foreman's Copy. 1. All materials to be installed in accordance with PSE Standards. Any deviation from this PSE NOTES: POWER GENERAL NOTES B. 5' Separation paralleling City Utilities. GENERAL UNDERGROUND NOTES: CONSTRUCTION OF ELECTRICAL SYSTEM MUST COMPLY TO PUGET SOUND ENERGY STANDARDS. OWNER/DEVELOPER RESPONSIBILITIES: PROVIDE ALL TRENCHING, BACKFILL (SELECT BACKFILL AND COMPACTION TO 95% OF ORIGINAL DENSITY IN CROSSINGS) AND RESTORATION WITHIN THIS PROJECT. LOCATE: THE ONE CALL CENTER (1-800-424-5555) MUST BE NOTIFIED 48 HOURS IN ADVANCE OF CONSTRUCTION SO ALL UTILITIES CAN BE LOCATED PRIOR TO ANY DIGGING. INSTALLED BY PSE MUST BE 18 INCHES MINIMUM IN WIDTH & SHALL HAVE A MINIMUM OF 36 INCHES COVER OVER THE TOP OF THE CONDUCTOR OR FROM THE TOP OF THE CONDUIT TO THE POINT OF FINAL GRADE. PROVIDE 3 INCHES OF SAND BEDDING BELOW & 6 INCHES OF SAND BACKFILL. THE REMAINING BACKFILL MAY CONSIST OF NATIVE MATERIALS IF SUITABLE (I.E.; FREE FROM ROCKS, SHARP OBJECTS OR CORROSIVE MATERIALS THAT MAY DAMAGE CABLES OR CONDUITS). IF NATIVE MATERIALS ARE UNSUITABLE, AS DETERMINED BY PSE OR ITS INSPECTOR, SELECT BACKFILL SHALL BE SUPPLIED BY THE CUSTOMER. BACKFILL THE EXCAVATION TO FINISHED GRADE AT 2 INCHES BELOW THE VAULT TOP AS SOON AS PRACTICAL AFTER FACILITIES ARE PLACED AND INSPECTED.THE SPOILS PILE MUST BE LOCATED A MINIMUM OF 24 INCHES FROM THE OPEN TRENCH.THE TRENCH SHALL PROVIDE ADDITIONAL WIDTH AS NEEDED TO MAINTAIN A 12 INCH MINIMUM HORIZONTAL SEPARATION BETWEEN POWER CONDUITS OR CABLE & ADJACENT UTILITY SERVICES. TRENCHING-SERVICE: THE CUSTOMER'S SERVICE TRENCH MUST MEET STATE & LOCAL REGULATORY REQUIREMENTS. SECONDARY TRENCHES SHALL HAVE A MINIMUM OF 24 INCHES COVER. PROVIDE 3 INCHES OF SAND BEDDING BELOW & 6 INCHES OF SAND BACKFILL. A 48 SQUARE INCH WORK PIT MUST BE PROVIDED AT THE METER BASE. THE TRENCH SHALL PROVIDE ADDITIONAL WIDTH AS NEEDED TO MAINTAIN A 12 INCH MINIMUM HORIZONTAL SEPARATION BETWEEN CONDUITS OR CABLE & ADGACENT UTILITY SERVICES. THE SPOILS PILE MUST BE LOCATED A MINIMUM OF 24 INCHES FROM THE OPEN TRENCH. VAULT EXCAVATION: SIX INCHES (6") OF CRUSHED ROCK IS TO BE USED AS THE VAULT BASE. BACKFILL AROUND VAULTS SHOULD CONSIST OF GOOD COMPACTIBLE MATERIAL SUCH AS CLEAN EARTH FILL, CRUSHED ROCK, OR SAND. NO VOIDS SHOULD REMAIN BETWEEN THE VAULT WALLS & THE SIDES OF THE EXCAVATION. STAKING: PRIOR TO CONSTRUCTION, LOT LINE AND GRADE STAKES WILL BE PROVIDED BY THE CUSTOMER/DEVELOPER. SITE PREPARATION: PRIOR TO CONSTRUCTION, THE WORK AREA WILL BE AT OR NEAR FINISHED GRADE AND CLEAR OF ANY SPOILS OR CONSTRUCTION MATERIALS WHICH WOULD RESTRICT CONSTRUCTION ACCESS. TRENCHING-PRIMARY: TRENCHES SUPPLIED FOR PRIMARY SYSTEMS OWNED & EQUIPMENT ACCESS: ADEQUATE SPACE IS TO BE MAINTAINED AROUND PSE'S FACILITIES, UNIMPEDED BY FENCES, ROCKERIES, WALLS, STRUCTURES, ETC. SITE NOTES: P01 319685-166312 UPSIZE EX 25kVA TO 100kVA OH XFMR 240/480v (MID 6213300) CONNECT 1 NEW RUN OF CUSTOMER OWNED 600 MCM WIRE JOB SITE Installed at site: Grid Number: kVA Rating: Foreman to redline the following information TRANSFORMER INSTALLATION Company ID#: Primary phase connected to: Tested Secondary Voltage Material ID#: P01 319685-166312 100 6213300 Removed at site: Grid Number: kVA Rating: Foreman to redline the following information TRANSFORMER REMOVAL Company ID#: Primary phase connected to: Tested Secondary Voltage P01 319685-166312 25 JOB SITE OVERHEAD CIRCUIT MAP (2405E136) SCALE: NONE JOB SITE HONG NGUYEN 03/07/2022WSDOT R /WRENTON R /W