Loading...
HomeMy WebLinkAboutR-4192140o W - 425 = \ 497 Fr., 49719m AJ 07FY I- 620.00 PG\ \ \ \ \ \ \ dm.m IE V A \ V \ \ \\ \\ \F\ 428.27 FG \ \ 4 .PIE \ \ 427.0 IE -v 425.20 Is F mY \ \ \ \2 \ \ 4zd.57 CIE \ 24,86 1E 428.81 FG ,44.BS CIE 427.311E - i - \ 42513 CIE x \ 426031E \42541 CIE \ \426.601E / 62i89CIE 626OB FG \ 6.9]BIE\ 425.941E 42).SB IE \ 4226I\\ - '4016IFX- - - 420281E - 42625CIE Ijr,531 \ d28.5] IE 42653 CIE �/ �9 426.891E� \ 4n.21 IE aq \ m 4n.53Is\ \ \ Q6.71 CIE 429.08 FG \ 428.81 F( 427.0 IE 427.31 IEi jCLEAN OUT, FLUSH WITH PAVING TYP. K-3 L5.0 \ .747E V 417721E / 429. FG CONTRACTOR 1 427.30 LINE LOCATION / FOOTINGS AND / SPACING OF LA I ry W 4 9 427.351E o� ,.,i \ TIE LATERALS INTO STORM CHAMBER SYSTEM 12" ROCK LAYER SHOWN ON CIVIL DRAINAGE PLANS, TYP.. LATERAL TO STORM 45" % SYSTEM ROCK LAYER T%n 423.581E IF \ \ \ \ TOP OF CHAMBER 422.50 RREEF/ERI TO CIVIL GRADING SHEE 425,33 PC 425.391E 1 19An7IP I � 8FG 981E 426.65 FG / /Q1 s�51E1E N SCALE:1 "=30'4' 0' 15' 30' 60' 120' LAWN OR SYNTHETIC TURF, SEE LANDSCAPE PLANS FINISH GRADE MOUND BACKFILL IN TRENCH AS SHOWN COMPACT SUBGRADE TO 90% NATIVE BACKFILL COMPACTED TO 95% 8" TIGHTLINE COLLECTOR \ �\ AS SHOWN ON PLANS, SEE PLAN FOR INVERT ELEVATIONS, SEE SPECS / FOR SIZE 2" CLR. MIN 6" MIN. TIGHTLINE COLLECTOR PIPE a Scale: 1 1/2"=1'-0' SUBDRAINAGE LEGEND SYMBOL DESCRIPTION 3 6 ® 8'COLLECTOR TIGHT LINE L5.0/ �L5.0/�q�� - - - - - - LATERAL LINE -SEE SPECIFICATIONS/ FOR SIZE, TYPE, AND DETAIL L5.0 L5.0 • POINT OF CONNECTION TO STORM ROCK LAYER L5.0 O CLEAN OUT 4 L5.0 IF LATERAL LINE INVERT ELEVATION CIE COLLECTOR INVERT ELEVATION FINISH GRADE PER CIVIL DRAWINGS SUBDRAINAGE NOTES 1. DO NOT SCALE DRAWINGS. 2. THIS SHEET CONTAINS FIELD SUBDRAINAGE INFORMATION ONLY. FOR SURFACE GRADING AND STORM DRAINAGE INFORMATION SEE CIVIL DRAWINGS. 3. VERIFY LOCATION OF ALL OVERHEAD AND UNDERGROUND UTILITIES BEFORE 4 BEGINNING WORK. \ 4. DRAINLINE LENGTHS AND LOCATION ARE APPROXIMATE. STAKE LOCATIONS IN THE FIELD AND ADJUST AS NECESSARY OR AS DIRECTED BY THE LANDSCAPE ARCHITECT. COORDINATE DRAIN LINES WITH PLAY EQUIPMENT FOOTING. 5. NOTIFY THE LANDSCAPE ARCHITECT IMMEDIATELY OF ANY DISCREPANCIES FOUND IN PLANS OR DEVIATIONS FROM ASSUMED ON -SITE CONDITIONS. FAILURE TO NOTIFY THE LANDSCAPE ARCHITECT IN A TIMELY MANNER SHALL RESULT IN CONTRACTOR TAKING RESPONSIBILITY FOR ANY AND ALL -- REMEDIAL MEASURES REQUIRED. FINISH GRADE LAWN OR SYNTHETIC MOUND BACKFILL IN TURF, SEE LANDSCAPE TRENCH AS SHOWN AND SITE PLANS zi�3/8" PEA GRAVEL d PERFORATED PIPE SEE PLAN FOR bi INVERT ELEVATIONS, °G O SEE SPECS FOR haimis 0 a _�_�= SIZE. CENTER PIPE 0 ° _�_�_ = IN TRENCH. CAP ALL O O - II1=1ll= -lll= ENDS rc____COMPACT SUBGRADE A >°Off11�fflff1TO 90% >1 �.0 II v ,V-12" MIN. PERFORATED LATERAL PIPE ' Scale: 1 1/2"=1'-0" SEE PLAN FOR LE. LAWN OR SYNTHETIC TURF, SEE LANDSCAPE li .. ... ..,..a i,i., ,i_, ,i...,3.,., 1.1 i1 .0 L. k AND SITE PLANS 6. REFER TO SPECIFICATIONS FOR ADDITIONAL INFORMATION. 6 0 Q° B ° D° •&1 Q, 00 ° bG c90 ° O°a9�,,, -I I COMPACT SUBGRADE TO FINISH GRADE 1.: :. 10" ROUND VAULT BOX, FLUSH WITH :PAVING IN LOCATION NOTED ON PLAN 6" OR 8" WYE, 45 BEND WHERE SHOWN ON PLAN 3/8" PEA GRAVEL ADS PERFORATED PIPE NON -PERFORATED TIGHTLINE COLLECTOR 45 DEGREE SNAP Y AND REDUCING COUPLING AS REQUIRED (NO SADDLE TEES) DIVE DOWN INTO STORM SYSTEM ROCK LAYER. BURY PIPE MIN. 6" WITHIN ROCK. NOTES: 2 MIN. DEPTH, 3/8 PEA A. SLOPE CLOSEST 10' OF PERF. PIPE TO MAKE GRAVEL BENEATH PIPE, TYP. CONNECTION TO STORM SYSTEM ROCK LAYER. B. BACKFILL COLLECTOR TRENCH AS SHOWN IN DETAIL. (2) TWO WRAPS OF DUCT TAPE REQUIRED AT ALL CONNECTIONS. LATERAL TO STORM SYSTEM ROCK LAYER 2 Scale: 3/4"=1'-0" COLLECTOR LINE AS SHOWN ON PLAN NOTES: 1. EXTEND CAP TO SUBGRADE AS SHOWN AND LOCATE ON AS-BUILTS. 2. LOCATE CLEANOUT OUTSIDE OF TRACK OR INFIELD LIMITS AS SHOWN ON PLANS. CLEAN OUT w Scale: l"=1'-0' R-4192139 IN COMPLIANCE WITH CITY OF RENTON STANDARDS DEVELOPMENT ENGINEERING O msippo 04/13/2022 WEISMANDESIGNGROUP (*7� °M"•° " CITY OF NEW ELEMENTARY SCHOOL#16 RENTON CHELAN AVE NE RENTON, WA 98059 NCSGPF 329 E MADISON Sf 322-1]32KG DATUM SUBDRAINAGE PLAN acx11ECTJR m'^N112 � N0. REVISION BY DATE APPR BAR � Planning/Building/Public Works Dept. n 0 CD CD Q N a m F- z w 2 U 04 MAR 2022 0 0 90 K. GL5.0 w D_