Loading...
HomeMy WebLinkAboutR-419219N qT 0 w v'A -p O� Ul .pOl 93 i. q, vspy� 9 � qFN Asoy� s o ONE (E` pSp9�A ,9 p0 N� SG n jJp % ON�JT 090 r0 0 O of mU=m zoz —a E E E E E E E E E f f \ > \m Imn k I "o mE E } E E Eo f E E f E Q E E E E E E E E E { E E E E E E E IIti e of m �P INTERCEPTOR SWALE ROCK CHECK DAMS NECESSARY 0 50' OC \ rn x No i SILT FENCE ♦m -`- - _ - z(TYR) e u V I , >M I I m q o nsp-7,� o 9 20 0 10 20 40 O n O 9N z mn mJ m I_ 0 Scale 1'=20' ,6 `5 O- 'DISPERSE STORMWATER E a E w E ✓-- TEMPORARY DISPERSION 1 ENTRENCH phE E E E u TEMPORARY SEDIMENT TRAP W/ MOVABLE SUMP AND PUMP OR f F m SEDIMENT POND RISER �F E / / MINIMUM TOP SURFACE AREA- 840 SF' E E _SEDIMENT TRAP LOCATION IS APPROXIMATE AND SHALL BE E q1r _ ADJUSTED AS NECESSARY TO PROVIDE E ADEQUATE CONSTRUCTION ACCESS TO f WETLAND C PROPOSED SITE IMPROVEMENTS E E TO REMAIN___ 11� 10 11 E E E E tk \ I I 1 to E TREE PROTECTION III ✓ _ter m � SILT (FENCE � I � (TYP) 7 _ m. o Ill lal `\ REMOVE EX / / vv �> z4 =01 1 TREES (TYP)`/�//�1 v REMOVE EX FENCE (TYP) II _ m vb _ FM I1 T REMOVE EX \ II _�-- �v WALL (TYR) _ mo � s Oi Q C f a `g m PROPOSED SCHOOL MATCHLINE - SEE SHEET C1.1 N' m ,' I BUILDING \ \^' ��OUTLINE REMOVE EX WATER METER J\ \ \ \ r � D AND SERVICE LINE \ I \ REMOVE EX POWER LINES _ mp1-/-- AND JUNCTION BOXES 4) (TYR) V 1 �L ---- — MATCHLINE - SEE SHEET C1.3 Seattle, 01 m m M f20fi973.1211 5344 engineering pllc www.IpaenglneerIn9.om DATUM CITY OF RENTON Planning/Building/Public Works Dept. PERMIT SUBMITTAL 8/27/21 PERMIT RESUBM17AL I2/20/21 11 PERMIT RESUBM17AL 3/4/22 ago. swe Kwwona. NO. REVISION BY DATE APPR w=^ LEGEND — - - — PROPERTY LINE �230� EX CONTOUR (INDEX) -231- _ - _ EX CONTOUR EX BUILDING PROPOSED BUILDING OUTLINE BUILDING/STRUCTURE REMOVAL F SAWCUT LINE x x ASPHALT REMOVAL CONCRETE REMOVAL STABILIZED CONSTRUCTION OOOOOO ENTRANCE SILT FENCE (D EX TREE TO REMAIN V v EX TREE TO BE REMOVED TREE PROTECTION EX CURB TO BE REMOVED —�.--r�sD— EX UTILITY TO BE REMOVED CATCH BASIN INSERT LIMITS OF WORK -�-� INTERCEPTOR SWALE ROCK CHECK DAM `"�" S FORCE MAIN NOTES: 1) AT PROPOSED CONNECTION POINTS TO EXISTING UTILITIES, CONTRACTOR TO POTHOLE TO CONFIRM LOCATION AND ELEVATION OF UTILITIES PRIOR TO CONSTRUCTION 2) ALL TREES TO BE REMOVED THAT ARE GREATER THAN 20-INCHES IN DIAMETER SHALL BE SALVAGED AND STOCKPILED BY THE CONTRACTOR AND RELOCATED ONSITE PER THE LANDSCAPE AND WETLAND MITIGATION PLANS 3) UTILIZE EXISTING SITE FENCING AND/OR PROVIDE CONSTRUCTION FENCING AS NECESSARY TO SECURE SITE 4) PROVIDE INLET PROTECTION 300 FEET DOWNSTREAM OF SITE AND ALONG HAUL ROUTE 5) REFER TO SHEETS C1.1-C1.5 FOR DEMOLITION IN THE RIGHT-OF-WAY 6) THE ESC BMPS DEPICTED ON THIS DRAWING ARE INTENDED TO BE MINIMUM REQUIREMENTS TO MEET ANTICIPATED SITE CONDITIONS. AS CONSTRUCTION PROGRESSES AND UNEXPECTED OR SEASONAL CONDITIONS DICTATE, THE APPLICANT SHALL ANTICIPATE THAT MORE ESC BMPS WILL BE NECESSARY TO ENSURE COMPLETE SILTATION AND EROSION CONTROL ON THE PROPOSED SITE PER THE CONSTRUCTION STORMWATER POLLUTION PREVENTION PLAN (SWPPP) Is now what's below. Call before you dig. Dial 811 R-419218 IN COMPLIANCE WITH CITY OF RENTON STANDARDS DEVELOPMENT ENGINEERING iR rnsippo 04/13/2022 Q O O N Q J Gn O O Q O O N 7 0) W N V O O N ro F z w m NEW ELEMENTARY SCHOOL #16 1075 DUVALL AVE NE 04 MAR 2022 v o w RENTON, WA 98059 TESC AND DEMOLITION PLAN C 1.2 d 19 a747