HomeMy WebLinkAboutR-419223C\I
C:)
qT
0
LU
1--
MATICHLINE — SEE SHEET C1.2
�11 M
W—W—W W: W — W -jr-- W
30,
HOW >
p Z>
L
rr
7
L
0 z
Ell
z Cr
REMOVE EX CONCREIE 0 0,
71
M
(TYR) 0 71 r7� 05\
0 � m 1>
F; F; 00 1 m:
<m >
TO EMOVE EX CONCREDE
00 <m
n�o 00 CURB, LIZ
H BASIN
Q I BERT (TYR) QL,7 > 7
PER TO z
T ANSPORTATION PLANS FT!
FOR DEMOLITION OF
71
< ELECTRICAL VAULTS AND
0
0 LINES (TYR)
— — — — — — FT!
SAWCUT AND
W
REMOVE EX
ASPHALT
SS Ss (TYR) G
R OV EX CONCREIE -AqFHALT
)6+00 CURB NO GUTTER 907+00 PAVEMENT
IT
71
m0>
> >
m>�m
W— W
L
Cd
W M WlA
Az
Onom
In
mo
Poz
W Oil 11
mc
Imc 15111 Q I
1932 Eno Ave
Sulte 201
Seal WA 98101
p. 206.725.1211
N M M f. 2G6.973,5344
engineering pIIcwww.IpdengIneel
PERMIT SUBM17AL 8/27/21
PERMIT RESUBM17AL 12/20/21
PERMIT RESUBM17AL 3/4/22 OH�—D
F N�
NO. REVISION BY DATE APPR wl`�m S� �m�y
DEMOLITION TO
�UR AT THE
ERSECTON OF
VALE AND NE 1 OTH
M- PERMIT.
ID WRITTEN CITY
M- REQUIRED
WORKCAN
20 0 10 20 40
Scale lw=20'
LEGEND
PROPERTY LINE
�230�
EX CONTOUR (INDEX)
—231—
EX CONTOUR
EX BUILDING
PROPOSED BUILDING OUTLINE
BUILDING/STRUCTURE REMOVAL
��ASPHALT
SAWCUT LINE
REMOVAL
CONCRETE REMOVAL
STABILIZED CONSTRUCTION
ENTRANCE
SILT FENCE
(D
EX TREE TO REMAIN
xEX
TREE TO BE REMOVED
TREE PROTECTION
EX CURB TO BE REMOVED
sD—
EX UTILITY TO BE REMOVED
CATCH BASIN INSERT
. . . .
LIMITS OF WORK
INTERCEPTOR SWALE
ROCK CHECK DAM
FM S
FORCE MAIN
1) AT PROPOSED CONNECTION POINTS TO EXISTING UTILITIES,
CONTRACTOR TO POTHOLE TO CONFIRM LOCATION AND
ELEVATION OF UTILITIES PRIOR TO CONSTRUCTION
2) CONSTRUCTION FENCING AS NECESSARY TO SECURE SITE
3) PROVIDE INLET PROTECTION 300 FEET DOWNSTREAM OF SITE
AND ALONG HAUL ROUTE
4) REFER TO SHREDS C1.1—C1.5 FOR DEMOLITION IN THE
RIGHT—OF—WAY
5) THE ESC BMPS DEPICTED ON THIS DRAWING ARE INTENDED
TO BE MINIMUM REQUIREMENTS TO MEET ANTICIPATED SITE
CONDITIONS. AS CONSTRUCTION PROGRESSES AND
UNEXPECTED OR SEASONAL CONDITIONS DICTATE, THE
APPLICANT SHALL ANTICIPATE THAT MORE ESC BMPS WILL BE
NECESSARY TO ENSURE COMPLETE SILTATION AND EROSION
CONTROL ON THE PROPOSED SITE PER THE CONSTRUCTION
STORMWATER POLLUTION PREVENTION PLAN (SWEEP)
now what's below.
Call before you dig.
R-419222 19 Dial 811
IN COMPLIANCE WITH CITY OF RENTON STANDARDS
DEVELOPMENT ENGINEERING
Fri 04/13/2022
0
.j
CD
CD
C\J
0)
00
N
r
o6j
DO
F-
z
UL!
CITY OF
NEW ELEMENTARY SCHOOL #16
04 MAR 2022
0
RENTON
1075 DUVALL AVE NE
RENTON, WA 98059
Planning/Building/Public Works Dept.
TESC AND DEMOLITION PLAN
C1.6
11-
W
cR�