Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
R-419271
04 C\1 CY) C\I CNJ I C) CL q4t 0 LU ASPHAC� HM'A 4 0 )GL,�, -22 0 STA 12+57.48, 11+47' LT R TEE + + CONCRETE SIDEWALK -0� G PER 0 t + + 102 +-, P:1 A t— so W W W— W —W f F ,,r� - - - - - - - - - - - - - - - - - - ASPHALT - - - - - - - - - - - -- P� 0 CHELAN ALEJ12HE PAVEMENT 1 00 On3 48 W 329.13 LOTs—SS—SS SS ss—ss� �,Ss— —ss— > '03'48" W 329 12' CALCID 03 OnV48" W 329A3 R2) A 00, QQT1 4�� W 12q 12 R5) STA. 11 +93.97, 15.53' RSTZ� S BEGIN CUR .1 t I STA+ 12+57.57, 26.00' RT o -P�e CENTER OF DRIVEWAY 702� L6 7� SEE THIS SHEET FOR > � DRIVEWAY GRADING DETAIL A > �i � I m El CO.00 N jz-esv m 1"2t, END CURB & CUTTER 4 :L I,- -L- r F�o 14+37.38, 2.04' LT GRAVEL DRIVEWAY < _:zv ` 6 �T L. 6 m .......... .......... .......... .......... .......... .......... .......... .......... 1. ...................... ........ ........ ........ .......... :1 .......... i . . . . . I .......... . . . . . I . . . . . . .......... I .......... . . . . . . . . . . . . . . . . . . . . . . .......... .......... .......... .......... I .......... I .... . . ...... ...... ................... ......... ................... ... ................ ............. ........ ......... ......... ......... .......... .......... .......... .......... .......... .......... 1. ...................... ...................... ......... .......... I .......... I .......... I .... ......................... ......... .......... ...... .................. ............ ::::::::: - --------- ..... 14LF. 12" S. 0 0.7% ..................... .......................... .................. 7 ... ................... ..................... ... .................... . . ...... . . ............................. ......... ......... .......... ..................... .................. ....... .......... ................ ............................ ................ A .............. ........ ............. ............. .................................. ........................... ............................ ................................ I .................................... ...... ..... ...... ............................ J.......................... :::::......................... ............................ ..................... F� ....... ......... ... ............................ ........... ......... ... . . . . . . ...................... : : : : : 30� WATER ................. .......... ......... ............ ............................. ................ ................. ........................... ........ : RIM 432 2 78DOElJYPE . . . . . . . . . . . . . . . . ................. EA2.9..23 ... I I ... ................. ................ ......... ............................. FX SID ..................... ............................ ............................ ---------- - --- .......... .................... ................. I .............................. IF 429,96. C N) :MT. ... .............. . STA� A+08.78, 13:%� . RT ............... K SEWER ...................... .. ........................... .............. ............................ .......... ............... I .......... RIM. 431� 29 ............... ........ ............................. :::: ..... ............................. ............................ ...... .......... I .......... I 1. IE: 429 k: (12' F :E) :IN ... ...... .......... ............................. ............................ I ............... .......... .......... .......... 1. IE: 4N V.2: (12� ...................... :S) OU.11: :: :: : : : : ................. ............................. ............................. ...... ............................ . . .......... .......... 1. ........................ E:422+14 ............................ N �p ...... r go ......... Q .... ........ 0 .......... . ........ ......... .......... ..... ......... . ........ d b wuj� ow 12+00 13+00 14+00 14+60 PROFILE H: 1 20' - — — — — — — — — — — — — — — — — — — — ASPIPALT — — — — — — — — V: 1 5' N 13215 -T + 0 1 N+F PAVEMENT R '2% A VP L ��48" W 32413' P A SS ss _SS —SS — Ss—ss-TcgN�5 —ss— s -67�� LC'D cc) 0 (D 0 �u GO -0 > 1932 Flmt Ave SuIte 201 Seattle, WA 98101 p. 206.725.1211 m m M f. 2G6.973,5344 engineering pIIcwww.IpdengIneerIng.om 1 6.0' 34.1 6.0'� 1.03% " \1.29% 00%� ;z 7D 4 L 6.0' 1.41% -1.00% 0 0 - - - - - - - - - - - - - - - - - - - - - NO. REVISION �4 DRIVEWAY DETAIL A SCALE: 1 " = 10 P BYY DATE APPR — — — — — — — — — — — — — — — — — — TC 432 97 13+00 ss— 0 43.4' ��433.5 �ju�- 20 0 10 20 40 Scale lw=20' �Im H�W� � imp "'19 CITY OF RENTON Planning/Building/Public Works Dept. 0 C) C) LEGEND PROPERTY LINE EX CONTOUR (INDEX) j EX CONTOUR PROPOSED CONTOUR (INDEX) 231 PROPOSED CONTOUR SPOT ELEVATION FF 78.0 FINISHED FLOOR ELEVATION EX BUILDING PROPOSED BUILDING CY) CONCRETE PAVEMENT 0 CD HEAVY DUTY CONCRETE CD 3PRC/EPRC BEGIN PAINTED RED CURB/ END PAINTED RED CURB CNJ ASPHALT (AC) PAVEMENT L HEAVY ASPHALT (AC) PAVEMENT 0- GRAVEL SURFACING GRASS PAVE SITE WALL VERTICAL CURB CATCH BASIN TYPE 1 CATCH BASIN TYPE 2 GO �STORM DRAIN PIPE CD 0 ............... FOOTING/SUBSURFACE DRAIN DISPERSION TRENCH Ea C�o DETENTION/WATER QUALffY C) 0 STORM DRAIN CLEANOUT DS. DOWNSPOUTS SIDE SEWER PIPE SEWER CLEANOUT SIDE SEWER CONNECTION SANITARY SEWER MANHOLE SOLLARS FIRE HYDRANT WATER F171NGS WATER SERVICE LINES WATER METER WATER SERVICE LINES FIRE SERVICE LINE FIRE SERVICE VAULT FIRE SERVICE CONNECTION now what's below. Call before you dig. Dial 811 R-419270 IN COMPLIANCE WITH CITY OF RENTON STANDARDS DEVELOPMENT ENGINEERING msippo 04/13/2022 01 U) F- z T ILL! NEW ELEMENTARY SCHOOL #16 1075 DUVALL AVE NE 0 RENTON, WA 98059 FRONTAGE PLAN C6.1 CHELAN AVE NE 71 W, 147