Loading...
HomeMy WebLinkAbout20160674E002 Bethany Corner 2022-04-29 FR 036.pdf Kirkland | Tacoma | Mount Vernon 425-827-7701| www.aesgeo.com Date Mailed: Principal / PM: Matthew A. Miller, P.E. This document is considered a DRAFT until signed or initialed by an AESI Principal or Project Manager Page 1 of 2 v.7.20 FIELD REPORT Date Project Name Project No. Report No. 2022-04-29 Bethany Corner 20160674E002 036 Location Municipality AESI Project Manager AESI Field Rep 10964 SE 165th St. Renton Matthew A. Miller, P.E. Scott R. Hannah, L.G., L.E.G. Permit No. Client/Owner Attn Requested By B21005537 Mark Seek (Tiger Mountain Homes) Mark Seek Contractor Engineer/Architect General Contractor Earthwork Contractor Weather D.R. Strong Tiger Mountain Homes / Mark Tiger Mountain Sunny, 58 deg THE FOLLOWING WAS NOTED: Lot 6 ADU Building Foundation Subgrade, Permit #B21005537: AESI was onsite at 7:45am this morning to observe the finished backfill for the Lot 6, ADU building foundation. Upon our arrival, we met with Mark Seek of Tiger Mountain Homes. Footing corners were not staked yet. Previously, we observed the 3 to 5-foot-deep, over-excavated building area to consist of suitably firm, native soil or previously documented structural fill. The contractor reported to place and compact a layer of 2 to 4- inch concrete recycle (spalls) followed by the 1.25-inch minus, concrete recycle. In our opinion, the compacted concrete recycle materials placed over the firm, native soil will provide suitable foundation support of 1,500 psf, per plan. Lot 6 ADU Fdn Plan. North is up Lot 6 ADU stepped fdn. Looking SW Date Project Name Project No. Report No. 4/29/2022 Bethany Corner 20160674E002 036 Page 2 of 2 FIELD REPORT Lot 6 ADU Fdn SG looking S. Fdn corner in green Lot 6 ADU Fdn SG looking W.