FIELD REPORT
Date Project Name Project No. Report No.
2022-04-29 Bethany Corner 20160674E002 036
Location Municipality AESI Project Manager AESI Field Rep
10964 SE 165th St. Renton Matthew A. Miller, P.E. Scott R. Hannah, L.G., L.E.G.
Permit No. Client/Owner Attn Requested By
B21005537 Mark Seek (Tiger Mountain Homes) Mark Seek Contractor
Engineer/Architect General Contractor Earthwork Contractor Weather
D.R. Strong Tiger Mountain Homes / Mark Tiger Mountain Sunny, 58 deg
THE FOLLOWING WAS NOTED:
Lot 6 ADU Building Foundation Subgrade, Permit #B21005537:
AESI was onsite at 7:45am this morning to observe the finished backfill for the Lot 6, ADU building foundation. Upon our
arrival, we met with Mark Seek of Tiger Mountain Homes. Footing corners were not staked yet.
Previously, we observed the 3 to 5-foot-deep, over-excavated building area to consist of suitably firm, native soil or
previously documented structural fill. The contractor reported to place and compact a layer of 2 to 4- inch concrete
recycle (spalls) followed by the 1.25-inch minus, concrete recycle. In our opinion, the compacted concrete recycle
materials placed over the firm, native soil will provide suitable foundation support of 1,500 psf, per plan.
Lot 6 ADU Fdn Plan. North is up
Lot 6 ADU stepped fdn. Looking SW
Date Project Name Project No. Report No.
4/29/2022 Bethany Corner 20160674E002 036
Page 2 of 2
FIELD REPORT
Lot 6 ADU Fdn SG looking S.
Fdn corner in green
Lot 6 ADU Fdn SG looking W.