Loading...
HomeMy WebLinkAboutR-4015100 0 v w L Know what's below. Call before you dia. NE 114 OF SE 114 OF SEC. 4, TWP. 23 N., RNG. 5 E., W.M. CITY OF RENTON, STATE OF WASHINGTON 97 M 2'x2' CALCULATED BEARING _ PAD (TYP BOTH ENDS) WI4x109 BEAM 2' MIN W14X109 BEAM 2' 58' 5'1 2 r PIPE SUPPORT PIPE SUPPORT T 2'x2' BEARING PAD 1 APPROVED SHIELD � 5' PIPELINE SHORING /�A �. X / 4 RA NI ON SUPPORT A A �� STRAPS SPACED 10" APART 2' MIN MINIMUM DEWA R PROPOSED 8" SANITARY SEVER 4-2" NYLON RATCHET STRAPS W/ 10,000 LB EX 36' WATER TR 5' RATING TRANSMISSIISS ON LINE "7�7, ' EX W' SPU WATER �6" MIN BEDDING MATERIAL TRANSMISSION LINE f PROPOSED 8" SANITARY SEVER 2' MIN SECTION B-B J PROPOSED SEWER CROSSING PLAN VIEW STA IO+U10, LO' RT I� 13' ZONE OF �I INFLUENCE I 1-1/8- PLYWOOD OR 4- TIMBER LAGGING (TYP) Q Q SHORING SHIELD (TYP) (D PROPOSED 8' SANITARY SEWER 0 5' W14xIO9 BEAM PIPE SUPPORT ON 2'x2' BEARING PAD nrnrinu A A Encompass/.� ENGINE ERING&SURVEYING nglon �/ WeAcm wiIIiawmm 4: 165 NEluniper SVeel, Sulte201 • Izemah, WA SMUT • Phme: (425) 392-0250 "Fu: (425) 391-3055 &Acm Wahivm DIuivon 4O7SmftmA BkAI "C'k Elum, WA 98922 "%mrle: (509) 674-7433 • TV. (509) 674-7419 C EXISTING PAVEMENT NOTE: STRAPS TO BE MONITORED USING BANJO TEST TO ENSURE STRAPS ARE CARRYING EQUAL TENSION 6' MIN BEDDING MATERIAL otiE E. VAyyV'1"G F aq ryAB NBST97 6 TONAL 8105119 I I I I NOT STOP WORK AND SUPPORT PIPE BEFORE TRENCHING WHIN 5" OF SPU WATER MAIN. I I I I I I I I I I I I I I ZONE OF INFLUENCE NO. I REVISION I BY I DATE I APPR 2k7 CALCULATED BEARING PAD (TYP BOTH ENDS) 1-1/8" PLYWOOD OR 4" PER PLAN TIMBER LAGGING (TYP) 10" MIN CONTRACTOR TO PROTECT EXISTING PIPE Q) APPROVED SHIELD PIPELINE SHORING MAXIM BEAM PIPE SUPPORT 2" NYLON RATCHET STRAP W/ MIN. 10,000 LB CAPACITY QUANTITY PER PLAN SINGLE BEAM W/ STRAPS PIPE SUPPORT SECTION DETAIL LOADING SEQUENCE: NOTES: 1, EXCAVATE ME APPROPRIATE TRENCH WDTH DOWN TO ME 1, ALL STRUCTURAL STEEL SHALL BE DETAILED AS PER AISC SPRINGLINE OF ME EXISTING SPU PIPELINE. STANDARDS MEMBER SIZES SHOWN ARE MINIMUM REQUIRED TO 2 PLACE BEARING PADS AND SUPPORT BEAM ALONG EXISTING SPU MINIMIZE DEFLECTION EQUIVALENT OR LARGER SIZES MAY BE WATER LINE, CENTERED AT ME LOCATION OF ME PROPOSED SUBSTITUTED WITH PRIOR APPROVAL. UTILITY BEARING PADS TO BE SET BACK FROM EDGE OF TRENCH 2 DESIGN LOADS: PER PLAN. PIPE WEIGHT = 250 PLF 3. EXCAVATE FOR AND INSTALL NYLON SUPPORT STRAPS MINIMIZING WATER WEIGHT = 441.26 PLF ACTUAL EXCAVATION UNDER ME EXISTING SPU WATER LINE. BEAM WEIGHT = 68 PLF 4. PRE -TENSION STRAPS TO SUPPORT PIPE, CLOSELY MONITORING SOIL W IGHT = 124 PCF FOR DEFLECTION OF ME EXISTING SPU WATER LINE AND SUPPORT 3, CONSTRUCTION MEMOS MUST BE EMPLOYED TO SUPPORT ME BEAM USING ON -SITE LASER CHECK EVERY 30-MINUTES PIPELINE DURING EXCAVATION. SUPPORTS SHALL BE INSTALLED ESTIMATED XaECRON OF SUPPORT BEAM: AS SOON AS ME PIPE IS EXPOSED AND REMAIN UNTIL TRENCH PROPOSED WATER CROSSING 0.008 INCH BEDDING AND BACKFlLL IS REPLACED TO SUPPORT PIPE IN ME 5. EXCAVATE TO FINAL GRADE, MINIMIZING BEDDING LOSS TRENCH. 6. BACKFlLL AND COMPACT TRENCH PRIOR TO REMOVING NYLON 4 EXIS➢NG SPU WATER ONE IS LIKELY BEDDED WM P-GRAVEL' STRAPS AND SUPPORT BEAM EFFORTS SHALL BE MADE TO MINIMIZE UNDERMINING ME SPU 7. CONTRACTOR TO PROVIDE BACKFlLL AND COMPACTION METHOD LINE DURING EXCAVATION AND INSTALLATION OF PROPOSED PRIOR TO CONSTRUCTION. CROSSING UTILITY 5. SPECIAL FILL AND/OR COMPACTION MAY BE REWIRED DEPENDING ON ME MEMO AND DEPTH OF EXCAVATION. 6 WBRADONS COULD DAMAGE ME SPU WATER ONE, THEREFORE PHASING NOTES; PILE DRAMS, PLASTIC AND OTHER VIBRATION PRODUCING WORK MAY BE RESTRICTED 1. MINIMUM WIDTH OF WENCH CONTRACTOR ESTIMATES 3' TO REDUCE 7 HEAVY LOADS COULD DAMAGE ME SPU WATER LINE, THEREFORE LOSS OF PEA GRAVEL. PIPE PROTECTION INCLUDING BRIDGING MAY BE NECESSARY IF 2. SPEED SHORE WM FINN FORM BOARDS TO BE USED TO MINIMIZE HEAVY EQUIPMENT CROSSES ME PIPE FLOW OF PEA GRAVEL UNDER PIPE. 8 SPU OPERATIONS IS TO BE OVEN AT LEAST 2 WEEKS' NOTICE TO 3. BACKFlLL WENCH WM CRUSHED ROCK AND BED SPU WATER LINE PARTICIPATE IN A PRE-CONSRUCRON MEETING W M NEW PEA GRAVEL. 9. SPU OPERATIONS OR ENGINEERING WILL NEED TO MONITOR AND INSPECT CONSTRUCTION AROUND THE SPU WATER LINE. 10. ANY WORK IN CLOSE PROXIMITY TO SPU'S WATER LINE, INCLUDING LOCATING BY POTHOING, MUST BE SUPERVISED BY SPU. CALL SPOTS LAKE POUNDS HEADQUARTERS W TH 72 HOURS' NOTICE AT 206-684-J933 OR SPU WATER OPERATIONS CENTER CROSSING NOTE: AT 20-733-9300. IL STRAPS TO BE MONITORED USING BANJO ZEST TO ENSURE STRAPS ARE CARRYING EQUAL TENSION 1. WHEN CROSSING SPU'S PIPELINE WM WATER OR SEWER MAINS, 12, STOP WORK AND SUPPORT PIPE BEFORE TRENCHING WHIN 5' ONE (16' OR 20) SECTION MUST BE CENTERED ON SPU PIPELINE OF SPU WATER MAIN. R-401510 IN COMPLIANCE WITH CITY OF RENTON STANDARDS Q Q- O 2 nnAna SDM " wu " CITY OF HUYNH SHORT PLAT s/Ds/Te �"INX" N/A EMW '� RENTON LUA17-000855 m TLK 17597 DnruM Planning/Building/Public Works Dept. SPU PIPE SUPPORT PLAN ""%FII EDM �� uue 4vvmi¢r gym,. EDM sar 10 m 10