HomeMy WebLinkAboutR-419705rn� V C) r) W m DocuSign Envelope ID: 3B1 B34D3-7EOA-476C-ADB3-4329FFEOC108 SURFACE WATER STANDARD PLAN NOTES: THE FOLLOWING IS A LISTING OF GENERAL NOTES THAT SHALL BE INCORPORATED IN THE DRAINAGE PLAN SET. ALL THE NOTES ON THE LIST MAY NOT PERTAIN TO EVERY PROJECT. THE APPLICANT OR OWNER, HEREBY REFERRED TO AS APPLICANT, MAY STRIKE OUT IRRELEVANT NOTES IF NOT APPLICABLE TO THE PROJECT. HOWEVER, THE APPLICANT SHALL NOT RENUMBER NOR EDIT THE REMAINING NOTES. IF ADDITIONAL NOTES ARE NEEDED FOR SPECIFIC ASPECTS, THEY SHALL BE ADDED AFTER THE SURFACE WATER STANDARD PLAN NOTES. 1, BEFORE ANY CONSTRUCTION OR DEVELOPMENT ACTIVITY OCCURS, A PRE -CONSTRUCTION MEETING SHALL BE HELD AMONG THE CITY OF RENTON, HEREBY REFERRED TO AS THE CITY, THE APPLICANT, AND THE APPLICANT'S CONTRACTOR. 2. THE APPLICANT SHALL BE RESPONSIBLE FOR SECURING ALL NECESSARY CITY, STATE, AND FEDERAL PERMITS PRIOR TO CONSTRUCTION. 3. ALL STORM DRAINAGE IMPROVEMENTS SHALL BE DESIGNED AND CONSTRUCTED IN ACCORDANCE WITH THE LATEST EDITION OF THE CITY OF RENTON SURFACE WATER DESIGN MANUAL (RENTON SWDM, RENTON MUNICIPAL CODE (RMC), AND THE STANDARD SPECIFICATIONS FOR ROAD, BRIDGE AND MUNICIPAL CONSTRUCTION PREPARED BY WSDOT AND THE AMERICAN PUBLIC WORKS ASSOCIATION (APWA). IT SHALL BE THE SOLE RESPONSIBILITY OF THE APPLICANT TO CORRECT ANY ERROR, OMISSION OR VARIATION FROM THE ABOVE REQUIREMENTS FOUND IN THE PLANS. ALL CORRECTIONS SHALL BE AT NO ADDITIONAL COST TO THE CITY. 4. APPROVAL OF THE ROAD, GRADING, PARKING, BUILDING, AND DRAINAGE PLAN DOES NOT CONSTITUTE AS APPROVAL OF ANY OTHER CONSTRUCTION (E.G. WATER, SEWER, GAS, ELECTRICAL. ETC.). PLANS FOR STRUCTURES SUCH AS BRIDGES, VAULTS, AND RETAINING WALLS REQUIRE A SEPARATE REVIEW AND APPROVAL BY THE CITY PRIOR TO CONSTRUCTION. THE SURFACE WATER DRAINAGE SYSTEM SHALL BE CONSTRUCTED ACCORDING TO THE APPROVED PLANS. ANY DEVIATION FROM THE APPROVED PLANS WILL REQUIRE COORDINATION FOLLOWED BY WRITTEN APPROVAL FROM THE CITY. 5. A COPY OF THE APPROVED PLANS SHALL BE ON THE JOB SITE WHENEVER CONSTRUCTION IS IN PROGRESS. 6. THE LOCATIONS OF ALL EXISTING UTILITIES SHOWN HEREON HAVE BEEN ESTABLISHED BY FIELD SURVEY OR OBTAINED FROM AVAILABLE RECORDS AND SHALL THEREFORE BE CONSIDERED APPROXIMATE ONLY AND NOT NECESSARILY COMPLETE. IT IS THE SOLE RESPONSIBILITY OF THE APPLICANT AND THE APPLICANTS CONTRACTOR TO INDEPENDENTLY VERIFY THE ACCURACY OF ALL UTILITY LOCATIONS SHOWN, AND TO FURTHER DISCOVER AND AVOID ANY OTHER UTILITIES NOT SHOWN HEREON THAT MAY BE AFFECTED BY THE IMPLEMENTATION OF THIS PLAN. THE APPLICANT SHALL RECORD ON THE AS -BUILT DRAWINGS ALL UNDOCUMENTED UTILITIES DISCOVERED AND ANY CHANGES TO THE APPROVED PLANS. THE APPLICANT SHALL IMMEDIATELY NOTIFY THE ENGINEER OF RECORD IF A CONFLICT EXISTS. 7. VERTICAL DATUM SHALL BE NAVD 88 AND HORIZONTAL DATUM SHALL BE NAD 83 (WA STATE PLANE, NORTH), UNLESS OTHERWISE APPROVED BY THE CITY. REFERENCE BENCHMARK, DATUM, AND ELEVATIONS SHALL BE NOTED ON THE PLANS. 8. ALL UTILITY TRENCH BACKFILL AND ROADWAY SUBGRADE SHALL BE COMPACTED TO 95% MAXIMUM DRY DENSITY PER SECTION 2-03.3(14)D - COMPACTION AND MOISTURE CONTROL TESTS OF THE WSDOT STANDARD SPECIFICATIONS. IN PERMEABLE PAVEMENT AND OTHER INFILTRATION AREAS, ALL TRENCH BACKFILL SHALL BE FIRM AND UNYIELDING BUT IN NO CASE SHALL BE COMPACTED TO MORE THAN 92% OF MAXIMUM DRY DENSITY. 9. OPEN CUTTING OF EXISTING ROADWAYS FOR STORM DRAINAGE WORK IS NOT ALLOWED UNLESS SPECIFICALLY APPROVED BY THE CITY AND NOTED ON THESE APPROVED PLANS. ANY OPEN CUT SHALL BE RESTORED IN ACCORDANCE WITH THE CITY TRENCH RESTORATION STANDARDS. 10. ALL PIPE AND STRUCTURES SHALL BE STAKED FOR SURVEY LINE AND GRADE PRIOR TO THE START OF CONSTRUCTION. WHERE SHOWN ON THE PLANS OR WHERE DIRECTED BY THE CITY, THE EXISTING MANHOLES, CATCH BASINS, OR INLETS SHALL BE ADJUSTED TO THE GRADE AS STAKED. 11. ALL FLOW CONTROL FACILITIES SHALL BE INSTALLED AND IN OPERATION PRIOR TO, OR IN CONJUNCTION WITH, ANY CONSTRUCTION ACTIVITY UNLESS OTHERWISE APPROVED BY THE CITY. 12. ALL PIPE AND APPURTENANCES SHALL BE LAID ON A PROPERLY PREPARED FOUNDATION IN ACCORDANCE WITH THE CURRENT STATE OF WASHINGTON STANDARD SPECIFICATION FOR ROAD AND BRIDGE CONSTRUCTION. THIS SHALL INCLUDE NECESSARY LEVELING OF THE TRENCH BOTTOM OR THE TOP OF THE FOUNDATION MATERIAL, AS WELL AS PLACEMENT AND COMPACTION OF REQUIRED BEDDING MATERIAL TO UNIFORM GRADE SO THAT THE ENTIRE LENGTH OF THE PIPE WILL BE SUPPORTED ON A UNIFORMLY DENSE, UNYIELDING BASE. ALL PIPE BEDDING AND BACKFILL SHALL BE AS SHOWN ON THE CITY STANDARD PLAN 220.00, 220.10, AND 220.20. 13. STEEL PIPE SHALL BE ALUMINIZED, OR GALVANIZED WITH ASPHALT TREATMENT 1, 2, OR 5 INSIDE AND OUTSIDE. 14. ALL DRAINAGE STRUCTURES SUCH AS CATCH BASINS AND MANHOLES SHALL BE FITTED WITH DUCTILE IRON, BOLT -LOCKING LIDS PER THE CITY STANDARD PLAN 204.10, 204.20, 204.30, 204.40, AND 204.50. STRUCTURES SHALL HAVE: • RECTANGULAR OR ROUND, SOLID LIDS WHEN NOT COLLECTING RUNOFF, AND OUTSIDE OF THE ROADWAY. • ROUND, SOLID LIDS WHEN NOT COLLECTING RUNOFF, AND LOCATED WITHIN THE ROADWAY, BUT OUTSIDE OF THE CURB/GUTTER LINE. • ROUND, SOLID LIDS DISPLAYING THE CITY LOGO WHEN WITHIN THE PUBLIC RIGHT-OF-WAY OR IN AN EASEMENT TO THE CITY. PRIVATE STRUCTURE LIDS OUTSIDE PUBLIC RIGHT-OF-WAY AND EASEMENTS TO THE CITY SHALL NOT DISPLAY THE CITY LOGO. 15. BUILDINGS AND OTHER STRUCTURES SHALL BE PLACED IN ACCORDANCE WITH TABLE 4.1 EASEMENT WIDTHS AND BUILDING SETBACKS LINES OF THE RENTON SWDM. 16. LIDS OF MANHOLES/CATCH BASINS WITHIN PUBLIC RIGHT-OF-WAY SHALL NOT BE ADJUSTED TO FINAL GRADE UNTIL AFTER PAVING. ALL MANHOLE/CATCH BASIN RIMS SHALL BE ADJUSTED TO BE FLUSH WITH FINAL FINISHED GRADES, UNLESS OTHERWISE SHOWN. 17. ALL DRIVEWAY CULVERTS LOCATED WITHIN CITY RIGHT-OF-WAY SHALL BE OF SUFFICIENT LENGTH TO PROVIDE A MINIMUM 3:1 SLOPE FROM THE EDGE OF THE DRIVEWAY TO THE BOTTOM OF THE DITCH. UNLESS OTHERWISE NOTED, DRAWING IS NOT TO SCALE (NTS) Adoftk STD. PLAN - 267.00 !A PUBLIC WORKS SURFACE WATER STANDARD PLAN e6s: 6Y: 7K DEPARTMENT NOTES (1 OF 2) artin Pastucha8/13/2020 n, DATE 1�36[3NRAA®D... DocuSign Envelope ID 345B681D-914F-4F2D-AB59-7C192D3B78A3 WASTEWATER UTILITY STANDARD NOTES 1 ALL WORK AND MATERIAL SHALL BE IN CONFORMANCE WITH THE STANDARDS AND SPECIFICATION OF THE CITY OF RENTON PUBLIC WORKS DEPARTMENT AND THE LATEST EDITION OF THE WSDOT/APWA STANDARDS AND SPECIFICATIONS, AS APPROVED AND MODIFIED BY THE CITY OF RENTON STANDARD PLANS & SPECIFICATIONS A SET OF APPROVED PLANS SHALL BE KEPT ON SITE AT ALL TIMES DURING CONSTRUCTION 2 DATUM FOR VERTICAL CONTROL SHALL BE NORTH AMERICAN VERTICAL DATUM 1988 HORIZONTAL CONTROL SHALL BE NORTH AMERICAN DATUM 1983/1991 UNLESS OTHERWISE APPROVED BY THE CITY BENCHMARKS AND MONUMENTS SHALL BE REFERENCED ON THE APPROVED PLANS 3 A PRE -CONSTRUCTION CONFERENCE AND A 24-HOUR NOTICE SHALL BE REQUIRED PRIOR TO STARTING NEW CONSTRUCTION IT SHALL BE THE CONTRACTOR'S RESPONSIBILITY TO SECURE ALL NECESSARY PERMITS, INCLUDING STREET USE PERMITS, PRIOR TO STARTING CONSTRUCTION INSPECTION WILL BE ACCOMPLISHED BY A REPRESENTATIVE OF THE CITY. IT SHALL BE THE CONTRACTOR'S RESPONSIBILITY TO NOTIFY THE PUBLIC WORKS INSPECTOR 24 HOURS IN ADVANCE OF BACKFILLING ALL CONSTRUCTION 4 THE HOURS OF WORK IN THE STREET RIGHT-OF-WAY SHALL BE PER CITY SPECIFICATIONS ON WEEKDAYS UNLESS OTHERWISE APPROVED IN WRITING BY THE PUBLIC WORKS DEPARTMENT AN APPROVED TRAFFIC CONTROL PLAN MUST BE OBTAINED PRIOR TO BEGINNING ANY WORK WITHIN THE PUBLIC RIGHT-OF-WAY 5 CONTRACTOR IS SOLELY RESPONSIBLE FOR THE MEANS, METHODS AND SEQUENCES OF CONSTRUCTION AND FOR THE SAFETY OF WORKERS AND OTHERS ON THE CONSTRUCTION SITE IN ACCORDANCE WITH LOCAL, STATE AND FEDERAL REQUIREMENTS. 6. ALL LOCATIONS OF EXISTING UTILITIES SHOWN ARE APPROXIMATE AND IT SHALL BE THE CONTRACTOR'S RESPONSIBILITY TO VERIFY THE TRUE AND CORRECT LOCATION SO AS TO AVOID DAMAGE OR DISTURBANCE THE CONTRACTOR SHALL COMPLY WITH THE REQUIREMENTS OF RCW 19 122 A DIG TICKET SHALL BE OBTAINED A MINIMUM OF TWO BUSINESS DAYS PRIOR TO STARTING ANY EXCAVATION THE CONTRACTOR SHALL HAVE A COPY OF THE DIG TICKET ON SITE AT ALL TIMES 7. BACKFILL SHALL BE PLACED EQUALLY ON BOTH SIDES OF THE PIPE IN LAYERS WITH A LOOSE AVERAGE DEPTH OF 12-INCHES, MAXIMUM DEPTH 18-INCHES, THOROUGHLY COMPACTING EACH LAYER TO 95 PERCENT OF MAXIMUM DENSITY THESE COMPACTED LAYERS MUST EXTEND FOR ONE PIPE DIAMETER ON EACH SIDE OF THE PIPE OR TO THE SIDE OF THE TRENCH MATERIALS TO COMPLETE THE FILL OVER THE PIPE SHALL BE EQUIVALENT TO BANK RUN GRAVEL FOR TRENCH BACKFILL (9-03.19). 8 SANITARY SEWER PIPE SHALL BE POLYVINYL CHLORIDE (PVC) RUBBER-GASKETED ASTM D 3034, SDR 35, C900/C905 OR DUCTILE IRON CLASS 50, UNLESS OTHERWISE APPROVED BY THE CITY 9 SANITARY SEWER PIPES SHALL NOT BE LOCATED UNDER ANY STRUCTURE (WALL, BUILDING FOUNDATION, ETC) UNLESS APPROVED BY THE CITY IF A SANITARY SEWER IS TO BE LOCATED UNDER ANY STRUCTURE (WALL, BUILDING FOUNDATION, ETC.), IT SHALL BE DESIGNED BY A PROFESSIONAL ENGINEER LICENSED IN THE STATE OF WASHINGTON IN ACCORDANCE WITH STANDARD DETAIL 412 10. OPEN -CUT ROAD CROSSINGS FOR UTILITY TRENCHES ON EXISTING TRAVELED ROADWAYS SHALL BE BACKFILLED WITH CRUSHED SURFACING AGGREGATE (WSDOT SPECIFICATION 9-03 9(3) AND MECHANICALLY COMPACTED UNLESS OTHERWISE APPROVED BY THE CITY 11 ALL PIPE AND APPURTENANCES SHALL BE LAID ON A PROPERLY PREPARED FOUNDATION IN ACCORDANCE WITH THE STANDARDS AND SPECIFICATION OF THE CITY AND THE LATEST EDITION OF THE WSDOT/APWA STANDARDS AND SPECIFICATION AS APPROVED AND MODIFIED BY THE CITY IN THE RENTON STANDARD PLANS & SPECIFICATIONS THIS SHALL INCLUDE NECESSARY LEVELING OF THE TRENCH BOTTOM OR THE TOP OF THE FOUNDATION MATERIAL TO A UNIFORM GRADE SO THAT THE ENTIRE LENGTH OF THE PIPE WILL BE SUPPORTED ON A UNIFORMLY DENSE, UNYIELDING BASE PIPE BEDDING SHALL BE IN ACCORDANCE WITH STANDARD PLAN 405 12 ALL DISTURBED AREAS SHALL BE SEEDED AND MULCHED OR OTHERWISE STABILIZED TO THE SATISFACTION OF THE CITY FOR THE PREVENTION OF ON -SITE EROSION BOTH DURING CONSTRUCTION AND AFTER THE COMPLETION OF CONSTRUCTION IN ACCORDANCE WITH THE CURRENT SURFACE WATER DESIGN MANUAL 13 THE CONTRACTOR SHALL PROVIDE THE CITY OF RENTON WITH A RECORD DRAWING OF THE SANITARY SEWER SYSTEM WHICH HAS BEEN STAMPED AND SIGNED BY A LICENSED PROFESSIONAL ENGINEER OR LICENSED PROFESSIONAL SURVEYOR ,,,alp.PLAN - 413 •n PUBLIC WORKS WASTEWATER UTILITY APPROVED DEPARTMENT STANDARD NOTES Martin PastuchaL0/26/2 rudowoes •am,x,v„o, DATE CONSTRUCTION RECORD DRAWING: AS -BUILT INFORMATION FOR RECORD DRAWINGS PROVIDED BY TERRANE, JULY 2023. THIRD DAY DESIGN CIVIL ENGINEERING 5918 WALLER RD E TACOMA, WA 98443 (253) 256-1812 18:4E DocuSign Envelope ID: 3131 B34D3-7EOA-476C-ADB3-4329FFEOC108 SURFACE WATER STANDARD PLAN NOTES: THE FOLLOWING IS A LISTING OF GENERAL NOTES THAT SHALL BE INCORPORATED IN THE DRAINAGE PLAN SET. ALL THE NOTES ON THE LIST MAY NOT PERTAIN TO EVERY PROJECT. THE APPLICANT OR OWNER, HEREBY REFERRED TO AS APPLICANT, MAY STRIKE OUT IRRELEVANT NOTES IF NOT APPLICABLE TO THE PROJECT. HOWEVER, THE APPLICANT SHALL NOT RENUMBER NOR EDIT THE REMAINING NOTES. IF ADDITIONAL NOTES ARE NEEDED FOR SPECIFIC ASPECTS, THEY SHALL BE ADDED AFTER THE SURFACE WATER STANDARD PLAN NOTES. 18. ROCK FOR EROSION PROTECTION OF ROADSIDE DITCHES, WHERE REQUIRED, SHALL BE OF SOUND QUARRY ROCK PLACED TO A MINIMUM DEPTH OF ONE (1) FOOT AND SHALL MEET THE FOLLOWING SPECIFICATIONS: • 4-8INCH ROCK 1140-70%PASSING; • 2-41NCH ROCK/30-40%PASS ING; AND • LESS THAN 2 INCH ROCK / 10 - 20% PASSING. 19. FOOTING DRAINAGE SYSTEMS AND ROOF DOWNSPOUT SYSTEMS SHALL NOT BE INTERCONNECTED AND SHALL SEPARATELY CONVEY COLLECTED FLOWS TO THE CONVEYANCE SYSTEM OR FLOW CONTROL FACILITY ON THE SITE, UNLESS APPROVED BY THE CITY. FOOTING DRAINS SHALL NOT BE CONNECTED TO ON -SITE BMPS. 20. THE END OF EACH STORM DRAIN STUB SHALL BE CAPPED. A CLEANOUT TOPPED WITH A BOLT -LOCKING LID MARKED "STORM" OR "DRAIN" SHALL BE LOCATED AT THE PROPERTY LINE OR AT THE POINT OF CONNECTION OF A PRIVATE STORM DRAINAGE CONVEYANCE SYSTEM PER THE CITY STANDARD PLAN 227.00. 21. ALL STORM SYSTEM EXTENSIONS SHALL BE STAKED FOR LINE AND GRADE BY A SURVEYOR LICENSED IN WASHINGTON STATE, AND CUT SHEETS SHALL BE PROVIDED TO THE CITY PRIOR TO CONSTRUCTION. 22. ALL NEWLY -INSTALLED AND NEWLY -REHABILITATED (PUBLIC AND PRIVATE) STORM CONVEYANCE SYSTEMS SHALL BE INSPECTED BY MEANS OF REMOTE CCTV ACCORDING TO THE CITY STANDARD PLAN 266.00. CCTV INSPECTIONS AND REPORTS SHALL BE SUBMITTED TO THE CITY PRIOR TO RECEIVING APPROVAL TO INSTALL PROJECT CURBS, GUTTERS AND/OR PAVEMENT. 23. ALL STORM SYSTEMS AND CONNECTIONS TO EXISTING MAINS SHALL BE TESTED IN ACCORDANCE WITH SECTION 7-04.3(1) OF THE WSDOT STANDARD SPECIFICATIONS AND IN THE PRESENCE OF A REPRESENTATIVE OF THE CITY. STORM DRAIN STUBS SHALL BE TESTED FOR ACCEPTANCE AT THE SAME TIME THE MAIN STORM IS TESTED. 24. FOR ALL DISTURBED PERVIOUS AREAS (COMPACTED, GRADED, LANDSCAPED, ETC.) OF THE DEVELOPMENT SITE, TO MAINTAIN THE MOISTURE CAPACITY OF THE SOIL EITHER STOCKPILE AND REDISTRIBUTE THE EXISTING DUFF LAYER AND NATIVE TOPSOIL OR AMEND THE SOIL WITH COMPOST IN ACCORDANCE WITH STANDARD PLAN 264.00. 25. ISSUANCE OF THE BUILDING OR CONSTRUCTION PERMITS BY THE CITY DOES NOT RELIEVE THE APPLICANT OF THE CONTINUING LEGAL OBLIGATION AND/OR LIABILITY CONNECTED WITH STORMWATER DISPOSAL. THE CITY DOES NOT ACCEPT ANY OBLIGATION FOR THE PROPER FUNCTIONING AND MAINTENANCE OF THE STORM SYSTEM PROVIDED DURING CONSTRUCTION. 26. ADEQUATE SAFEGUARDS, SAFETY DEVICES, PROTECTIVE EQUIPMENT, FLAGGERS, AND ANY OTHER ACTIONS NEEDED TO PROTECT THE LIFE, HEALTH, AND SAFETY OF THE PUBLIC, AND TO PROTECT PROPERTY IN CONNECTION WITH THE PERFORMANCE OF WORK SHALL BE PROVIDED. ANY WORK WITHIN THE TRAVELED RIGHT-OF-WAY THAT MAY INTERRUPT NORMAL TRAFFIC FLOW SHALL REQUIRE A TRAFFIC CONTROL PLAN APPROVED BY THE CITY. ALL SECTIONS OF THE WSDOT STANDARD SPECIFICATIONS 1-10 TEMPORARY TRAFFIC CONTROL SHALL APPLY. 27. PROJECTS LOCATED WITHIN THE CITY'S AQUIFER PROTECTION AREA (APA) SHALL COMPLY WITH SPECIAL REQUIREMENT #6 OF THE RENTON SWDM AND AQUIFER PROTECTION REGULATIONS (RMC 4-3-050). 28. PLACEMENT OF SURFACE APPURTENANCES (CATCH BASIN/MANHOLE LIDS, CLEANOUTS, INLETS, ETC.) IN THE STREET TRAVEL LANE WHEEL PATH, INTERSECTIONS OF STREET TRAVEL LANES, BIKE LANES, SIDEWALKS, AND CROSSWALKS SHALL BE AVOIDED WHENEVER POSSIBLE. ANY SURFACE APPURTENANCE PLACED IN A SIDEWALK OR CROSSWALK SHALL BE FITTED WITH A NON -SLIP OR NONSKID LID PER ADA REQUIREMENTS. 29. CLEARLY LABEL PUBLIC AND PRIVATE SYSTEMS ON THE PLANS. PRIVATE SYSTEMS SHALL BE MAINTAINED BY THE APPLICANT. 30. MINIMUM COVER OVER STORM DRAINAGE PIPE SHALL CONFORM TO TABLE 4.2.1.A2 OF THE RENTON SWDM. 31. CONSTRUCTED PERMEABLE PAVEMENT SHALL BE PERMEABLE ENOUGH TO ABSORB WATER AT A MINIMUM RATE OF 20 INCHES PER HOUR IMMEDIATELY AFTER THE PAVEMENT SURFACE HAS BEEN WETTED CONTINUOUSLY FOR AT LEAST 10 MINUTES. COMPLIANCE WITH THIS MINIMUM RATE SHALL BE CHECKED PRIOR TO CONSTRUCTION APPROVAL OF THE PAVEMENT. COMPLIANCE MAY BE CHECKED USING A SIMPLE BUCKET TEST IN WHICH 5 GALLONS OF WATER IS POURED ONTO THE PAVEMENT SURFACE ALL AT ONCE. IF ONLY A MINOR AMOUNT OF WATER PONDS OR RUNS OFF THE SURFACE, THEN THE PAVEMENT IS CONSIDERED TO MEET THE MINIMUM RATE OF ABSORPTION. AT LEAST ONE TEST SHALL BE CONDUCTED PER 1,000 SQUARE FEET OF PERMEABLE PAVEMENT. IF THIS TEST IS NOT CONCLUSIVE, THEN ANOTHER TEST PER ASTM C1701 SHALL BE CONDUCTED. FOR LARGE AREAS (E.G., PARKING AREAS), TESTING OBSERVATION MAY BE ACCOMPLISHED WHILE WALKING BEHIND A SLOWLY MOVING WATER TRUCK DISCHARGING WATER AT A RATE SIMILAR TO THE BUCKET TEST. PERMEABLE PAVERS SHALL BE TESTED USING ASTM C1781. UNLESS OTHERWISE NOTED, DRAWING IS NOT TO SCALE (NTS) STD. PLAN - 267.10 PUBLIC WORKS SURFACE WATER STANDARD PLAN[ I 618NifSl§B.0 by: `A DEPARTMENT NOTES (2 OF 2) artin PastuchJ/13/2020 Nkw n' 928$&hFD9a®&A8DATED... DocuSign Envelope ID: 6EECF5B6-602A-4E4A-B436-A317AA638878 1. ALL NEWLY -INSTALLED AND NEWLY -REHABILITATED (PUBLIC AND PRIVATE) SANITARY SEWER AND STORM DRAIN MAIN LINES SHALL BE INSPECTED BY MEANS OF REMOTE CCTV. CCTV INSPECTIONS AND REPORTS SHALL BE SUBMITTED TO THE CITY OF RENTON INSPECTOR ASSIGNED TO THE PROJECT PRIOR TO RECEIVING APPROVAL TO INSTALL PROJECT CURBS, GUTTERS, AND/OR PAVEMENT. 2. THE CONTRACTOR SHALL PERFORM ALL CCTV INSPECTIONS IN ACCORDANCE WITH THE NATIONAL ASSOCIATION OF SEWER SERVICE COMPANIES (NASSCO) PIPELINE ASSESSMENT CERTIFICATION PROGRAM (PACP). 3. ALL CCTV OPERATORS SHALL HAVE CURRENT NASSCO PACP CERTIFICATION. 4. CCTV INSPECTIONS SHALL BE RECORDED IN A GRANITENET COMPATIBLE FORMAT DATABASE USING THE LATEST SOFTWARE VERSION AND SUBMITTED WITH ELECTRONIC LINKS BETWEEN THE DATA AND THE VIDEO ON AN EXTERNAL HDD, DVD, OR FLASH DRIVE. 5. ALL CCTV INSPECTION REPORTS SHALL BE WITHIN +/- TWO (2) FEET OF THE MEASURED LINEAR FOOTAGE BETWEEN MANHOLES ALONG THE EXISTING PIPELINE CENTERLINE FROM THE START OF PIPE TO END OF PIPE. 6. ALL OWNER AND PACP REQUIRED HEADER INFORMATION MUST BE FULLY AND ACCURATELY ENTERED ON ALL CCTV REPORTS. WORK NOT FOLLOWING THESE SPECIFICATIONS WILL BE REJECTED AND THE CONTRACTOR SHALL BE REQUIRED TO RE -CCTV THE WORK. 7. THE DOCUMENTATION OF THE WORK SHALL CONSIST OF PACP CCTV REPORTS, PACP DATABASE, LOGS, ELECTRONIC REPORTS, ETC. NOTING IMPORTANT FEATURES ENCOUNTERED DURING THE INSPECTION. THE SPEED OF TRAVEL SHALL BE SLOW ENOUGH TO INSPECT EACH PIPE JOINT, TEE CONNECTION, STRUCTURAL DETERIORATION, INFILTRATION AND INFLOW SOURCES, AND DEPOSITS, BUT SHOULD NOT, AT ANY TIME, BE FASTER THAN 30 FEET PER MINUTE, EXCEPT AS NOTED OTHERWISE IN THIS DOCUMENT. 8. THE CAMERA MUST BE CENTERED IN THE PIPE TO PROVIDE ACCURATE DISTANCE MEASUREMENTS TO PROVIDE LOCATIONS OF FEATURES IN THE SEWER AND THESE FOOTAGE MEASUREMENTS SHALL BE DISPLAYED AND DOCUMENTED ON THE VIDEO. ALL PACP OBSERVATIONS SHALL BE IDENTIFIED BY AUDIO AND ON A PACP LOG. ALL VIDEO MUST BE CONTINUOUSLY METERED FROM MANHOLE TO MANHOLE. ALL VIDEO RECORDING SHALL BE CONTINUOUS FROM STRUCTURE TO STRUCTURE WITH NO "PAUSING" OF THE VIDEO RECORDING DURING EACH PIPELINE INSPECTION. THE PIPE SHALL BE CLEANED PRIOR TO THE CCTV INSPECTION TO ENSURE ALL DEFECTS, FEATURE, AND OBSERVATIONS ARE SEEN AND LOGGED. 9. JUST PRIOR TO BEGINNING THE CCTV INSPECTION, WHILE THE CCTV CAMERA IS IN PLACE AND RECORDING, WATER (CONTAINING DYE) SHALL BE INTRODUCED INTO THE UPSTREAM MANHOLE OF EACH PIPE SEGMENT UNTIL IT IS OBSERVED AND RECORDED FLOWING PAST THE CAMERA'S FIELD OF VISION IN ITS ENTIRETY. 10. THE CCTV CAMERA SHALL HAVE A WATER -LEVEL MEASURING DEVICE (BALL, CYLINDER, ETC.) ATTACHED THAT HAS 1/4" MARKINGS TO SHOW THE DEPTH OF WATER IN THE PIPE DURING THE CCTV INSPECTION. 11. ALL MANHOLES SHALL BE CHANNELED AND COATED PRIOR TO CCTV INSPECTION. 12. PER CITY OF RENTON SPECIFICATION 7-08.3(2)B, SEWER AND STORM DRAIN PIPELINE SHALL HAVE NO MORE THAN 1/2" OF PONDING TO BE CONSIDERED ACCEPTABLE. UNLESS OTHERWISE NOTED, DRAWING IS NOT TO SCALE (NTS) STD. PLAN - 266.00 .��� PUBLIC WORKS CCTV INSPECTION SPECIFICATIONS PPR D 9/28/2018 �„ DEPARTMENT GAZ roeu, wo,r name^rnmr DATE 8/14/2023 NO. REVISION 8:48 :45 AN DocuSign Envelope ID: 6EECF5B6-602A-4E4A-B436-A317AA638878 EROSION AND SEDIMENT CONTROL (ESC) STANDARD PLAN NOTES: THE FOLLOWING IS A LISTING OF GENERAL NOTES THAT SHALL BE INCORPORATED IN THE EROSION AND SEDIMENT CONTROL (ESC) PLAN SET. ALL THE NOTES ON THE LIST MAY NOT PERTAIN TO EVERY PROJECT. THE APPLICANT OR OWNER, HEREBY REFERRED TO AS APPLICANT, MAY STRIKE OUT IRRELEVANT NOTES IF NOT APPLICABLE TO THE PROJECT. HOWEVER, THE APPLICANT SHALL NOT RENUMBER NOR EDIT THE REMAINING NOTES. IF ADDITIONAL NOTES ARE NEEDED FOR SPECIFIC ASPECTS, THEY SHALL BE ADDED AFTER THE ESC STANDARD PLAN NOTES. 1. BEFORE ANY CONSTRUCTION OR DEVELOPMENT ACTIVITY OCCURS, A PRE -CONSTRUCTION MEETING SHALL BE HELD AMONG THE CITY OF RENTON, HEREBY REFERRED TO AS THE CITY, THE APPLICANT, AND THE APPLICANT'S CONTRACTOR. 2. THE APPLICANT IS RESPONSIBLE FOR OBTAINING THE WASHINGTON STATE DEPARTMENT OF ECOLOGY (ECOLOGY) CONSTRUCTION STORMWATER GENERAL PERMIT, IF IT IS REQUIRED FOR THE PROJECT. THE APPLICANT SHALL PROVIDE THE CITY COPIES OF ALL MONITORING REPORTS PROVIDED TO ECOLOGY ASSOCIATED WITH THE CONSTRUCTION STORMWATER GENERAL PERMIT. 3. THE ESC PLAN SET SHALL INCLUDE AN ESC CONSTRUCTION SEQUENCE DETAILING THE ORDERED STEPS THAT SHALL BE FOLLOWED FROM CONSTRUCTION COMMENCEMENT TO POST -PROJECT CLEANUP IN ORDER TO FULFILL PROJECT ESC REQUIREMENTS. 4. THE BOUNDARIES OF THE CLEARING LIMITS, SENSITIVE AREAS AND THEIR BUFFERS, AND AREAS OF VEGETATION PRESERVATION AND TREE RETENTION AS PRESCRIBED ON THE PLAN(S) SHALL BE CLEARLY DELINEATED BY FENCING AND PROTECTED IN THE FIELD IN ACCORDANCE WITH APPENDIX D OF THE CITY OF RENTON SURFACE WATER DESIGN MANUAL (RENTON SWDM) PRIOR TO THE START OF CONSTRUCTION. DURING THE CONSTRUCTION PERIOD, NO DISTURBANCE BEYOND THE CLEARING LIMITS SHALL BE PERMITTED. THE CLEARING LIMITS SHALL BE MAINTAINED BY THE APPLICANT/ESC SUPERVISOR FOR THE DURATION OF CONSTRUCTION. 5. STABILIZED CONSTRUCTION ENTRANCES SHALL BE INSTALLED AT THE BEGINNING OF CONSTRUCTION AND MAINTAINED FOR THE DURATION OF THE PROJECT. ADDITIONAL MEASURES, SUCH AS CONSTRUCTED WHEEL WASH SYSTEMS OR WASH PADS, MAY BE REQUIRED TO ENSURE THAT ALL PAVED AREAS ARE KEPT CLEAN AND TRACK -OUT TO ROAD RIGHT OF WAY DOES NOT OCCUR FOR THE DURATION OF THE PROJECT. IF SEDIMENT IS TRACKED OFFSITE, PUBLIC ROADS SHALL BE CLEANED THOROUGHLY AT THE END OF EACH DAY, OR MORE FREQUENTLY DURING WET WEATHER, AS NECESSARY TO PREVENT SEDIMENT FROM ENTERING WATERS OF THE STATE. 6. WASHOUT FROM CONCRETE TRUCKS SHALL BE PERFORMED OFF -SITE OR IN DESIGNATED CONCRETE WASHOUT AREAS ONLY. DO NOT WASH OUT CONCRETE TRUCKS ONTO THE GROUND, OR TO STORM DRAINS OR OPEN DITCHES. ON -SITE DUMPING OF EXCESS CONCRETE SHALL ONLY OCCUR IN DESIGNATED CONCRETE WASHOUT AREAS. 7. ALL REQUIRED ESC BMPS SHALL BE CONSTRUCTED AND IN OPERATION PRIOR TO LAND CLEARING AND/OR CONSTRUCTION TO PREVENT TRANSPORTATION OF SEDIMENT TO SURFACE WATER, DRAINAGE SYSTEMS AND ADJACENT PROPERTIES. ALL ESC BMPS SHALL BE MAINTAINED IN A SATISFACTORY CONDITION UNTIL SUCH TIME THAT CLEARING AND/OR CONSTRUCTION IS COMPLETE AND POTENTIAL FOR ON -SITE EROSION HAS PASSED. ALL ESC BMPS SHALL BE REMOVED AFTER CONSTRUCTION IS COMPLETED AND THE SITE HAS BEEN STABILIZED TO ENSURE POTENTIAL FOR ON -SITE EROSION DOES NOT EXIST. THE IMPLEMENTATION, MAINTENANCE, REPLACEMENT, ENHANCEMENT, AND REMOVAL OF ESC BMPS SHALL BE THE RESPONSIBILITY OF THE APPLICANT. 8. ANY HAZARDOUS MATERIALS OR LIQUID PRODUCTS THAT HAVE THE POTENTIAL TO POLLUTE RUNOFF SHALL BE DISPOSED OF PROPERLY. 9. THE ESC BMPS DEPICTED ON THIS DRAWING ARE INTENDED TO BE MINIMUM REQUIREMENTS TO MEET ANTICIPATED SITE CONDITIONS. AS CONSTRUCTION PROGRESSES AND UNEXPECTED OR SEASONAL CONDITIONS DICTATE, THE APPLICANT SHALL ANTICIPATE THAT MORE ESC BMPS WILL BE NECESSARY TO ENSURE COMPLETE SILTATION CONTROL ON THE PROPOSED SITE. DURING THE COURSE OF CONSTRUCTION, IT SHALL BE THE OBLIGATION AND RESPONSIBILITY OF THE APPLICANT TO ADDRESS ANY NEW CONDITIONS THAT MAY BE CREATED BY THE ACTIVITIES AND TO PROVIDE ADDITIONAL ESC BMPS, OVER AND ABOVE MINIMUM REQUIREMENTS, AS MAY BE NEEDED, TO PROTECT ADJACENT PROPERTIES AND WATER QUALITY OF THE RECEIVING DRAINAGE SYSTEM. 10. APPROVAL OF THIS PLAN IS FOR ESC ONLY. IT DOES NOT CONSTITUTE AN APPROVAL OF STORM DRAINAGE DESIGN, SIZE NOR LOCATION OF PIPES, RESTRICTORS, CHANNELS, OR STORMWATER FACILITIES. 11. ANY DEWATERING SYSTEM NECESSARY FOR THE CONSTRUCTION OF STORMWATER FACILITIES SHALL BE SUBMITTED TO THE CITY FOR REVIEW AND APPROVAL. 12. ANY AREAS OF EXPOSED SOILS, INCLUDING ROADWAY EMBANKMENTS, THAT WILL NOT BE DISTURBED FOR TWO DAYS DURING THE WET SEASON (OCTOBER 1 ST THROUGH APRIL 30TH) OR SEVEN DAYS DURING THE DRY SEASON (MAY 1ST THROUGH SEPTEMBER 30TH) SHALL BE IMMEDIATELY STABILIZED WITH THE APPROVED ESC COVER METHODS (E.G., SEEDING, MULCHING, PLASTIC COVERING, ETC.) IN CONFORMANCE WITH APPENDIX D OF THE RENTON SWDM. 13. WET SEASON ESC REQUIREMENTS APPLY TO ALL CONSTRUCTION SITES BETWEEN OCTOBER 1 ST AND APRIL 30TH, UNLESS OTHERWISE APPROVED BY THE CITY. 14. ANY AREA NEEDING ADDITIONAL ESC MEASURES, NOT REQUIRING IMMEDIATE ATTENTION, SHALL BE ADDRESSED WITHIN SEVEN (7) DAYS. 15. THE ESC BMPS ON INACTIVE SITES SHALL BE INSPECTED AND MAINTAINED AT A MINIMUM OF ONCE A MONTH OR WITHIN 24 HOURS FOLLOWING A STORM EVENT. INSPECTION AND MAINTENANCE SHALL OCCUR MORE FREQUENTLY AS REQUIRED BY THE CITY. 16. BEFORE COMMENCEMENT OF ANY CONSTRUCTION ACTIVITY, CATCH BASIN INSERTS PER THE CITY STANDARD PLAN 216.30 SHALL BE PROVIDED FOR ALL STORM DRAIN INLETS DOWNSLOPE AND WITHIN 500 FEET OF A DISTURBED OR CONSTRUCTION AREA, UNLESS THE RUNOFF THAT ENTERS THE INLET WILL BE CONVEYED TO A SEDIMENT POND OR TRAP. ALL CATCH BASIN INSERTS SHALL BE PERIODICALLY INSPECTED AND REPLACED AS NECESSARY TO ENSURE FULLY FUNCTIONING CONDITION. 17. AT NO TIME SHALL SEDIMENT ACCUMULATION EXCEED 2/3 OF THE CAPACITY OF THE CATCH BASIN SUMP. ALL CATCH BASINS AND CONVEYANCE LINES SHALL BE CLEANED PRIOR TO PAVING. THE CLEANING OPERATION SHALL NOT FLUSH SEDIMENT -LADEN WATER INTO THE DOWNSTREAM SYSTEM. 18. ANY PERMANENT STORMWATER FACILITY LOCATION USED AS A TEMPORARY SETTLING BASIN SHALL BE MODIFIED WITH THE NECESSARY ESC BMPS AND SHALL PROVIDE ADEQUATE STORAGE CAPACITY. IF THE TEMPORARY FACILITY IS TO ULTIMATELY FUNCTION AS AN INFILTRATION SYSTEM IN ITS PERMANENT STATE, THE TEMPORARY FACILITY SHALL BE ROUGH GRADED SO THAT THE BOTTOM AND SIDES ARE AT LEAST THREE FEET ABOVE THE FINAL GRADE OF THE PERMANENT FACILITY. 19. AREAS DESIGNATED ON THE PLAN(S) CONTAINING EXISTING STORMWATER FACILITIES OR ON -SITE BMPS (AMENDED SOILS, BIORETENTION, PERMEABLE PAVEMENT, ETC.) SHALL BE CLEARLY FENCED AND PROTECTED USING ESC BMPS TO AVOID SEDIMENTATION AND COMPACTION DURING CONSTRUCTION. 20. PRIOR TO THE BEGINNING OF THE WET SEASON (OCTOBER 1ST), ALL DISTURBED AREAS SHALL BE INSPECTED TO IDENTIFY WHICH ONES SHALL BE SODDED OR SEEDED IN PREPARATION FOR THE WINTER RAINS. DISTURBED AREAS SHALL BE SODDED OR SEEDED WITHIN ONE WEEK OF THE BEGINNING OF THE WET SEASON. AN EXHIBIT OF THOSE AREAS TO BE SODDED OR SEEDED AND THOSE AREAS TO REMAIN UNCOVERED SHALL BE SUBMITTED TO THE CITY FOR REVIEW. 21. PRIOR TO FINAL CONSTRUCTION ACCEPTANCE, THE PROJECT SITE SHALL BE STABILIZED TO PREVENT SEDIMENT -LADEN WATER FROM LEAVING THE PROJECT SITE, ALL ESC BMPS SHALL BE REMOVED, AND STORMWATER CONVEYANCE SYSTEMS, FACILITIES, AND ON -SITE BMPS SHALL BE RESTORED TO THEIR FULLY FUNCTIONING CONDITION. ALL DISTURBED AREAS OF THE PROJECT SITE SHALL BE VEGETATED OR OTHERWISE PERMANENTLY STABILIZED. AT A MINIMUM, DISTURBED AREAS SHALL BE SODDED OR SEEDED AND MULCHED TO ENSURE THAT SUFFICIENT COVER WILL DEVELOP SHORTLY AFTER FINAL APPROVAL. MULCH WITHOUT SEEDING IS ADEQUATE FOR AREAS TO BE LANDSCAPED BEFORE OCTOBER 1ST. 22. ROCKERIES ARE CONSIDERED TO BE A METHOD OF BANK STABILIZATION AND EROSION CONTROL. ROCKERIES SHALL NOT BE CONSTRUCTED TO SERVE AS RETAINING WALLS. ALL ROCKERIES IN CITY ROAD RIGHTS -OF -WAY SHALL BE CONSTRUCTED IN ACCORDANCE WITH CITY STANDARDS. ROCKERIES OUTSIDE OF ROAD RIGHTS -OF -WAY SHALL BE CONSTRUCTED IN ACCORDANCE WITH THE INTERNATIONAL BUILDING CODE. UNLESS OTHERWISE NOTED, DRAWING 15 NOT TO SCALE (HITS) STD. PLAN - 268.00 ,• PUBLIC WORKS EROSION AND SEDIMENT CONTROL [PPRCIVID PR`Jf1� DEPARTMENT GAZ 9/28/2018 1 STANDARD PLAN NOTES ­1,Wo A--t m, DATE SURVEYED: I SCALE. TERRANE DESIGNED: AE DRAWN: CHECKED: AE BY DATE APPR APPROVED: AE NTS ONE INCH AT FULL SCALE IF NOT ONE INCH SCALE ACCORDINGLY VERTICAL: NAVD 1988 HORIZONTAL: NAD 1983/1991 DATUM :45 Al\ WATER PLAN GENERAL NOTES Standard Plan No. 300 1. ALL WORK AND MATERIALS SHALL BE IN ACCORDANCE WITH THE LATEST EDITION OF THE CITY OF RENTON PUBLIC WORKS STANDARD SPECIFICATIONS AND SPECIAL PROVISIONS AND WSDOT / APWA STANDARD SPECIFICATIONS, LATEST EDITION AS AMENDED BY THE CITY OF RENTON. A SET OF CITY APPROVED PLANS SHALL BE KEPT AT THE JOB SITE WHENEVER CONSTRUCTION IS IN PROGRESS. A PRE -CONSTRUCTION CONFERENCE SHALL BE HELD PRIOR TO THE START OF CONSTRUCTION. THE CONTRACTOR AND OR DEVELOPER SHALL BE RESPONSIBLE FOR SECURING ALL NECESSARY PERMITS PRIOR TO CONSTRUCTION. 2. ALL EXISTING UTILITIES SHALL REMAIN IN SERVICE DURING CONSTRUCTION UNLESS OTHERWISE NOTED. THE CONTRACTOR SHALL CALL 1-800-424-5555 TO VERIFY UTILITY LOCATIONS BEFORE BEGINNING EXCAVATION. 3. ALL MATERIALS USED FOR THE CONSTRUCTION OF WATER SYSTEM IMPROVEMENTS SHALL BE NEW AND UNDAMAGED, AND "CATALOG CUTS" FOR ALL MATERIALS SHALL BE APPROVED IN WRITING BY THE CITY OF RENTON PRIOR TO BRINGING ANY MATERIALS ON -SITE. 4. ALL WATER MAIN PIPE MATERIALS SHALL BE CEMENT LINED DUCTILE IRON PIPE, THICKNESS CLASS 52 PER AWWA C 151 AND C 104. PIPE JOINTS SHALL BE PUSH -ON OR MECHANICAL JOINT. CAST IRON OR DUCTILE IRON PIPE FITTINGS SHALL BE CLASS 250 AS PER ANSI/AWWA C110/A21.10-82. ALL DUCTILE IRON PIPE AND FITTINGS SHALL BE WRAPPED WITH 8-MIL BLACK, TUBE -TYPE, POLYETHYLENE PLASTIC PER AWWA C105 STANDARDS. 5. MINIMUM COVER FROM TOP OF WATER MAINS TO FINISHED GRADE SHALL BE 36 INCHES FOR PIPE DIAMETER OF 10-INCH OR LESS AND 48 INCHES FOR PIPE DIAMETER OF 12-INCH AND LARGER. MAXIMUM COVER FOR ALL WATER MAINS SHALL BE 60 INCHES. ANY DEVIATIONS MUST BE APPROVED BY THE CITY OF RENTON PRIOR TO CONSTRUCTION. WHERE UTILITY CONFLICTS OCCUR, THE PROFILE OF THE WATER MAIN SHALL BE ADJUSTED AS NECESSARY TO CLEAR CONFLICTS AND TO PROVIDE MINIMUM COVER. PIPE DEFLECTION SHALL NOT EXCEED ONE-HALF OF PIPE MANUFACTURER'S SPECIFICATION FOR SIZE OF PIPE USED. ALL TRENCH BACKFILL SHALL BE COMPACTED TO 95 PERCENT MAXIMUM DRY DENSITY AS DETERMINED BY THE MODIFIED PROCTOR TEST METHOD (MDD) IN ROADWAYS, ROADWAY SHOULDERS, ROADWAY PRISM AND DRIVEWAYS, AND 85 PERCENT MDD IN UNPAVED AREAS. ALL PIPE ZONE COMPACTION SHALL BE 95 MDD- 6. CONCRETE BLOCKING FOR WATER MAINS SHALL BE DESIGNED, INSTALLED AND POURED IN PLACE IN ACCORDANCE WITH CITY OF RENTON STANDARD DETAILS AND SPECIFICATIONS AND SHALL BE INSTALLED AT ALL VERTICAL AND HORIZONTAL BENDS, FITTINGS AND BASE OF HYDRANTS. MEGA -LUGS (OR SIMILAR PRODUCT) MAY BE REQUIRED ON ALL MECHANICAL JOINTS IN ADDITION TO CONCRETE BLOCKING. 7. ALL NEW WATER MAIN PIPES AND FITTINGS SHALL HAVE A FOAM PIPE PIG RUN THROUGH THEM PRIOR TO BEING FLUSHED, DISINFECTED, AND TESTED. CLEANING, PRESSURE AND PURITY TESTING SHALL BE DONE IN THE PRESENCE OF AND UNDER THE SUPERVISION OF A CITY OF RENTON UTILITY INSPECTOR. THE CONTRACTOR SHALL SUPPLY, INSTALL AND REMOVE PLUGS, CORPORATION STOPS, BLOW -OFF ASSEMBLIES, AND THRUST RESTRAINT / BLOCKING FOR TESTING AND PURITY ACCEPTANCE. NO CONNECTION SHALL BE MADE BETWEEN THE NEW MAIN OR BETWEEN THE NEW WET -TAP VALVE TO AN EXISTING MAIN UNTIL THE NEW PIPING HAS BEEN FOAM -PIGGED, DISINFECTED, FLUSHED, AND PASSED BOTH PRESSURE AND PURITYTESTING. 8. NEW WATER MAINS INCLUDING SERVICE LATERALS SHALL BE TESTED AT A STATIC PRESSURE OF 150 PSI ABOVE WORKING PRESSURE WITH A MINIMUM OF 225 PSI TEST PRESSURE FOR 120 MINUTES WITH A MAXIMUM OF 5 PSI PRESSURE DROP DURING THE ENTIRE TEST PERIOD. UPON SATISFACTORY COMPLETION OF THE PRESSURE TEST, THE LINE SHALL BE DISINFECTED, FLUSHED, AND THEN WATER SAMPLES SHALL BE TAKEN FOR PURITY TESTING BY THE PUBLIC WORKS INSPECTOR. 9. THE CONTRACTOR SHALL NOTIFY THE CITY OF RENTON WATER UTILITY AND MAINTENANCE DEPARTMENTS AT LEAST 10 WORKING DAYS PRIOR TO MAKING CONNECTIONS TO THE EXISTING WATER SYSTEM. THE CONTRACTOR SHALL EXPOSE THE EXISTING WATER MAIN AND FITTINGS AT THE CONNECTION POINT BEFORE ORDERING THE NECESSARY ADAPTORS AND FITTINGS REQUIRED FOR THE FINAL CONNECTION. THE CONTRACTOR SHALL EXCAVATE, REMOVE ALL SURFACE MATERIALS, AND PROVIDE SHORING AND ALL MATERIALS REQUIRED FOR THE CITY OF RENTON TO PERFORM THE CONNECTION TO THE EXISTING WATER SYSTEM. THE CONTRACTOR SHALL PROVIDE AND INSTALL BACKFILL, CONCRETE BLOCKING, AND COMPLETE SURFACE RESTORATION. ti�Y o STD. PLAN - 300.0 �' A► PUBLIC WORKS WATER PLAN GENERAL NOTES "PF NTO� DEPARTMENT MARCH 2O10 Know what's below. Call before you dig. CITY OF V'R] RENTON Planning/Building/Public Works Dept. R-419705 IN COMPLIANCE WITH CITY OF RENTON STANDARDS STRAIGHT ARROW HOMES N 32ND ST SFR OFFSITE IMPROVEMENTS STANDARD NOTES 08/07/2023 FIELDBOOK: B PAGE: P DRAWING NC: R2.00 SHEET: OF: 5 9 of LL V ) '� V ) 0 z N C*e) z U) LU 2 0 2 0 0.r' Q (D 2 N\ �L/L V ) Al M/ 0 0 0 N ry n