Loading...
HomeMy WebLinkAboutR-408533,WWI HOOD FE TO N( VINYL FE TO S( 6'H VI FE co erra ENGINEERING PLLC 6413 Phinney Ave North Seattle, Washington 98103 ph 206.596.7115 coterraengineering.com T Ado! !N 0) 0 rn 1 20 0 20 T U SCALE: 1 " = 20' DATUM NAVD 88 APN 092305-9061 TRI C & L LTD PTSHP ROOF ELEV. LEGEND =371.84' EXISTING BUILDING - PARTIAL FOOTPRINT 5 ° GATE rr rir rii rir r� ROCKERY CONCRETE CURB o WHEELSTOP S883_56' 4"E . 7' ----------------- �-- 334.00 PROPOSED F.G. ELEVATION / NDOW 4 2 wE7L BW 339 174.62' 334 ADA SYMBOL TWJ34 U 8, CAPPROPOSED F.G. CONTOURBW1 L 618 cTW 335 T BW 333 338.90 RT 1 R Q0 TW 342 - SAWCUT LINE 3 ADA LOADING C)BW 339 I � \ 338 0 339338.29338.30 _ SLOPE DIRECTION C5. C) APN 722780-1370 8 C) 33 PERRINE C RETAINING WALL � 33.90 90 REBAR CAP TC 333.0 I I `3 ? M LS 4 1� T C 332.55 I 74 2 3 TREE PROTECTION Q 33 .10 0 CORNER B 332.45 .1 it �� S8 °55'49 "145 E TW 332.5 �36 ` p/ TW 3 GAT PARK BENCH r 6 ' ASPHALT CONC. 335 5 2 J BW 32.0 1 - ` (TYP.) _-_ PAVEMENT C5 7 SEE NOTE 5 BW 33 .o \ ` 33 .15 I �r� 6r/R•R_TIE WALL_ I/ TW 341 rrrrrriiirrrnnniii 331.0 R25\ \ 336.90 FF33 j 0 BW 339 HEAT MPrr 336.52 °'a 1 TW 332.5 BW 336.00 335.90� OCKERY (TYP) ° . ° CEM CONC WALK C5.7 BW 330. 1011, \ i z TC 332.73 W c �- � / 336.47 .23 c� 33336. TW .40 6 0 lriii iiiii� 4 0 � � 2,,. 336.00 3 .40 330.50 PO 25' TW 336. CEM CONC PAVEMENT rrnn TW 336.5 BW 335. CONC AIN] g0- 375 C5.7 VJ 5.50 36.00 TW 338. 336. 2 WAL ND RAILIN 33647 B337 E LIE 0 T 1 .0 ffNTON I A ORITY ; -�_. > TW 3 .5 332.40 0 22.83' 2 .1 /�� TH F TR 38 3 5 o PE PLAN POROUS ASPHALT 3 W 33 .0 BW 33 .52 Y36 1( ° /T :• ", ' 33 0 45.0 N89' 58 31.1 W 4 RF 4 LSK-01 9 rrr - �:= ; PAVEMENT C5 7 W TC 32.50 � W 3 80 335.47 � 337.0ofi9qPLAYGROUND rim BW 337.0 TW 33 .92 ° / V 5436.52 MAX. P 8.3% MAX. BW 33 .50 • VERTIC U WIT Al N a° NOTES YP) BC 2.02 V I + �3 .50 3 8.0 33 .92 �- (V fTl \ BW 3 7.9 33 ,27, 338.30 5 0 .' P F�li� H °° ° T 336.90 338.3 riii C 333.40 TW 7.0 39.92 ° �\ EW GRA ES 1. AN AUTOCAD FILE WILL BE PROVIDED TO THE CONTRACTOR FOR LAYOUT. G 332.90 BW 33s.5 33s.9 \`� G / \ 338.10 33 . 7 342. 2 „ O 2. COORDINATE WORK WITH ARCHITECTURAL AND LANDSCAPE ARCHITECTURAL DRAWINGS. TW 340.0 .q � 5% AX. °. ? TW 338.0 BW 337.5 W 42.9 3 3.2 a C 333.E BW 33 0 / 335.5 6 ` 42.ss 3. SEE ARCHITECTURAL SITE PLAN FOR ADDITIONAL SITE INFO. T BW 335. TC 333.40 uj C 333. \ ) 3 3. ^ . C p�32.9 ?� �o ® (E 4. SEE SHEET C1 FOR GENERAL NOTES. � O � 34 Ex°•'• 3 5. SEE SHEET L1.3, LANDSCAPE PAVING PLAN, FOR ASPHALT PAVEMENT TEXTURE DETAILS. A P 0 TC 3. 'S ( ) RE TO HOSIIN THO ITY ^"4 0 3 1 LOT L 3 .80 Tw 344.0 I I Yr R25 I / \ 33632 I� (TYP) 2.15 342.75 GRADING NOTES 0 I t173 .50 ...�;:.- s• _ ' _ 6. 2 A P I I / 333.90 33.9017 3 4.903 s.a • r. = ° ' 1. ALL EARTHWORK AND SUBGRADE PREPARATION SHALL BE PERFORMED IN ACCORDANCE WITH I < / wC43 I '' =` '' '' THE REQUIREMENTS AND RECOMMENDATIONS OF THE GEOTECHNICAL REPORT PREPARED z 20 As FOR THIS PROJECT. I 335. 0 ";'' •s ; 3`' .90 / I ACCESS TYP) �' I: I 336.9 o 2. FINISH GRADE INDICATED IS FINAL SURFACE ELEVATION FOLLOWING PLACEMENT OF ALL / SURFACING MATERIALS. SPHALII 3t \' q U 3 4.50I o P ���0 OUS(�'4'�I, ,,.• .� •• .ti ::.. 6 H, . 0 . d� 333.65 NCE 3. GRADE ALL AREAS TO PROVIDE DRAINAGE AWAY FROM THE BUILDING. FINE GRADE AREAS TO DIRECT DRAINAGE TO DRAINAGE STRUCTURES. 2: MAX P) \ \ �\ � nlj• I )�v� ' 10 (E) 6 7 (E) 343.28 E , N6 . o3 33 50 " '"'` i F 4. WALKWAYS SHALL HAVE MAXIMUM LONGITUDINAL SLOPE OF 5% AND MAXIMUM CROSS SLOPE L I bNCRETE MRB (TYP OF 2%. rrr^^ 15 WIDE Q,w 4'ty I I v! ' ECESS CURB '` .: .. 339.10 .I I I 5. IMPORTED FILL MATERIAL SHALL BE OBTAINED FROM A WASHINGTON DEPARTMENT OF z 334.90 ILT RA EX ARE TRANSPORTATION APPROVED SOURCE. SUBMIT CERTIFICATE 14 DAYS PRIOR TO •'••'•b .•.':•• • I � 4' 4 FRVMJL � ''-.1 MATCFII RTY 335.90 W/ TINU X AE `\ IROOF E CONSTRUCTION. 0 34.40 T E.S 69; ►' I I \ F :• p�N / 6 IE 0mi �s C t 1 334.5 3 7.90 337.90 s D , °' EARTHWORK (AGENCY REVIEW ONLY) J f F:F,= 6" CS C GRAVEL N 1 I 33 90 w\ MAINTE ANCE DRIVE w �9 :4• O� cp a APPROX QUANTITIES: FILL 1800 CY 5so / Q �- ,3 , I E FILL VARIES 0-5 FT HIGH U 38.00 S LANE NO P •90 ROUS 9� ALT 18 _ CONTRACTOR SHALL PROVIDE LOCATION OF ORIGINAL OF ALL FILL SOIL AND LOCATION OF SOIL CL NO w\0w w _ _ REMOVED FROM THE SITE (SEE NOTE 5 GRADING NOTE) Fg §bo EBA C FIRE LANE ARKING w O M S 4 8 .1` �. FIRE w- w o I\ \� co 1.26\ ENO PARKIN SITE AREAS (AGENCY REVIEW ONLY) SIN LINK FENCE O 3 CD�/ 12 N83°55'49"7.36' �r`.: \ o d.° PHASE 1 (EASTERN HOMESTEAD TOWNHOME DEVELOPMENT) - 31,187 SF APN 722780-1385�ARP°I 328.00 - - - x - - X x _x SEE UTILITY PLANS FOR ADDITIONAL PROPOSED UTILITY EASEMENTS. VI S S E R �rrrrri EXISTING GARAGE FOUND REBAR &CAP r EXISTING H li A A n G n n Cl) APN 092305-9161 PARTIAL SSM LS #43612, 43618 dSIEH INVESTMENTS FOOTPRINT ON SOUTH LINE 2 DO RECORD DRAWINGS REVISION 4/9/21 SURVEYED: DESIGNED: MB DRAWN: MB CHECKED: PA BY DATE APPR APPROVED: 1.1'W OF CORNER CONSTRUCTION RECORD DRAWING THE INFORMATION ON THIS DRAWING INDICATES CHANGES MADE TO THE CONSTRUCTION DOCUMENTS BASED UPON UTILITY AS -BUILT SURVEY PREPARED BY DAVID EVANS & ASSOCIATES, INC., DATED 3/23/21, AND TRANSFERRED TO THE REPRODUCIBLE DRAWINGS BY THE ENGINEER. SCALE: 1"=20' VERTICAL HORIZONTAL- NAVD CITY 0 F IZONTAL• NAD 1983/183/1991 RENTON ONE INCH DATUM AT FULL SCALE Planning/Building/Public Works Dept. IF NOT ONE INCH SCALE ACCORDINGLY n'f-FVOJJJ I � IN COMPLIANCE WITH CITY OF RENTON STANDARDS O >z O cn W WILLOWCREST TOWNHOMES DAM 7/29/19 U EDMONDS AVE NE, RENTON, WA FIELDBDDK: PAGE: O DRAWING NO: PAVING AND GRADING PLAN C3.0 J SHEET: OF: 12 35