RESOLUTION NO. 4314
A RESOLUTION OF THE CITY OF RENTON, WASHINGTON, UPDATING AND
EXTENDING RENTON'S SIX-YEAR TRANSPORTATION IMPROVEMENT PROGRAM
FOR 2018—2023.
WHEREAS, the City of Renton has adopted a Six-Year Transportation Improvement
Program ("TIP") pursuant to RCW 35.77.010 (Perpetual advanced six-year plans for coordinated
transportation program expenditures), and the TIP has been updated, amended and modified
from time to time as authorized and required by law; and
WHEREAS, the City Council held a duly noticed public hearing on June 26, 2017, for the
purpose of considering updates to the TIP; and
WHEREAS, the City Council has reviewed the work accomplished under the TIP,
considered any public testimony given at the public hearing held on June 26, 2017, considered
proposed updates to the TIP, and determined current City transportation needs;
NOW, THEREFORE, THE CITY COUNCIL OF THE CITY OF RENTON, WASHINGTON, DOES
RESOLVE AS FOLLOWS:
SECTION I. The above findings are true and correct in all respects.
SECTION II. The City of Renton's 2018-2023 Six-Year Transportation Improvement
Program, attached as Exhibit A and fully incorporated herein by this reference, is adopted as the
City's updated and extended TIP.
SECTION III. The updated and extended TIP, as attached, shall be and constitute
Renton's 2018-2023 Six-Year Transportation Improvement Program for purposes of compliance
1
RESOLUTION N0. 431 4
with RCW 35.77.010, and shall remain in full force and effect until further revised, amended, and
modified as provided by law.
SECTION IV. The Administrator of the Public Works Department and the City Clerk are
authorized and directed to file this resolution,together with Exhibit A,with the Washington State
Secretary of Transportation within 30 days of its adoption.
PASSED BY THE CITY COUNCIL this 26thday of June , 2017.
�
Jason A. Seth, City Clerk
APPROVED BY THE MAYOR this 26thday of June , 2017.
Denis Law, Mayor
���\\N111
Approved as to form: ����•.�.GREGp���i�
;� i
. C�P��``a`Oµ.��''��P4''� ��i
., �
!lL=;��tARy �'�,: i
��_� �! � . : i
Shane Moloney, City Attorney i � r •° �� '
i '�� pUe�=L�= �=
���i��'q�'''��8��2.��`�'���`,_
RES.1735:5/15/17:scr //�ll''E p\\W P5\���
2
RESOLUTION NO. 4314
EXHIBIT A
2018 - 2023
TRANSPORTATION IMPROVEMENT PROGRAM
RESOLUTION NO. 4314
ЋЉЊБΓЋЉЋЌ {Y
A
W
b9 Ͷ͵͵ ЋЉЊА
T I P
D P W
T S D
RESOLUTION NO. 4314
CR|2018Α2023TIP
ITYOFENTONRANSPORTATIONMPROVEMENTROGRAM
A
CKNOWLEDGEMENTS
M
AYOR
DenisLaw
CC
ITYOUNCIL
ArmondoPavone,CouncilPresident
EdPrince,CouncilPresidentProtem
RandyCorman
RyanMcIrvin
RuthPérez
DonPersson
CarolAnnWitschi
CAO
HIEFDMINISTRATIVEFFICER
JayCovington
PW
UBLICORKS
GreggZimmerman,Administrator
JimSeitz,TransportationSystemsDirector
VickiGrover,TransportationPlanning&ProgrammingManager
BobHanson,TransportationDesignManager
ChrisBarnes,TransportationOperationsManager
EricCutshall,TransportationMaintenanceManager
JulianaFries,ProgramDevelopmentCoordinator
RESOLUTION NO. 4314
CR|2018Α2023TIP
ITYOFENTONRANSPORTATIONMPROVEMENTROGRAM
TC
ABLEOFONTENTS
SOΑI1
ECTIONNENTRODUCTION
PurposeoftheTransportationImprovementProgram2
RentonBusinessPlan3
STΑML5
ECTIONWOAPANDOCATION
TransportationImprovementProgramMap6
MapIndex7
STΑDP9
ECTIONHREEEVELOPMENTANDRIORITIZATION
GeneralProgrammingCriteria10
SpecificTIPDevelopmentActivities13
SummaryofProjectsandPrograms15
SFΑER17
ECTIONOURXPENDITURESANDEVENUES
SummaryofProjectExpenditures18
CityofRentonFunds19
SummaryofFundingSources20
FundingSourcesΑItemized
VehicleFuelTax21
BusinessLicenseandBusiness&Occupation22
ProposedFundBalance23
GrantsInHand24
MitigationInHand25
OtherInHand26
FundingSourcesTBD27
SFΑPD29
ECTIONIVEROJECTESCRIPTIONS
SummaryofProjectsandCosts30
DetailedProjectDescriptions31
SSΑA71
ECTIONIXPPENDIX
AbbreviationsandAcronyms72
ResolutiontoAdoptSixYear20182023TIP74
RESOLUTION NO. 4314
CR|2018Α2023TIP
ITYOFENTONRANSPORTATIONMPROVEMENTROGRAM
SOΑI
ECTIONNENTRODUCTION
PTIP(TIP)2
URPOSEOFTHERANSPORTATIONMPROVEMENTROGRAM
RBP3
ENTONUSINESSLAN
VisionStatement
MissionStatement
SOΑI1
ECTIONNENTRODUCTION
RESOLUTION NO. 4314
CR|2018Α2023TIP
ITYOFENTONRANSPORTATIONMPROVEMENTROGRAM
PTIP
URPOSEOFTHERANSPORTATIONMPROVEMENTROGRAM
TheTransportationImprovementProgram(TIP)reflectstheinvolvementofCityCitizensandElected
Officials.
TheTIPimplementstheCityofRentonMissionStatement.
TheTIPisusedtocoordinateTransportationSystemsDivisionprojectsandprogramswithother
jurisdictionsandagencies.
TheTIPisamultiyearplanningtoolforthedevelopmentofthetransportationfacilitieswithintheCity.
TheTIPisrequiredforStateandFederalfundingprograms.
TheTIPisavitalpartofplanningundertheGrowthManagementAct.
TheTIPismandatedbyWashingtonStateLaw.
SOΑPTIP2
ECTIONNEURPOSEOFTHE
RESOLUTION NO. 4314
Business Plan
VISIONMISSION The City of Renton, in partnership and communication
with residents, businesses, and schools, is dedicated to:
Renton: The center
of opportunity in Providing a safe, healthy, welcoming atmosphere where people choose to live
the Puget Sound
Promoting economic vitality and strategically positioning Renton for the future
Region where
families and
Building an inclusive informed city with opportunities for all
businesses thrive
Meeting service demands through high quality customer service, innovation,
a positive work environment, and a commitment to excellence
20182023 GOALS
Provide a safe, Promote economic Support planned Building an inclusive Meet service demands
healthy, vibrant vitality and strategically informed city with and provide high
communityposition Renton for decisions that impact opportunities for all quality customer
the future the city service
Promote safety, health,
Improve access to city
and security through programs and
services,
Promote Renton as the Foster development Plan, develop, and
employment, and make
of vibrant, sustainable, maintain quality services,
progressive, opportunity-
and service deliveryresidents and businesses
rich city in the Puget attractive, mixed-use infrastructure, and
aware of opportunities
Sound region neighborhoods in urban
amenities
Facilitate successful
to be involved with their
centers
neighborhoods through
Capitalize on
Prioritize services at
community
community involvement
opportunities through Uphold a high standard levels that can be sustained
Build connections with
bold and creative of design and property by revenue
Encourage and partner
ALL communities that
economic development
maintenance
in the development of
Retain a skilled
strategies
quality housing choices
Advocate Rentons workforce by making
richness of the diversity
for people of all ages and
Recruit and retain interests through state and Renton the municipal
in our city
income levels
businesses to ensure employer of choice
Promote understanding
regional partnerships and
Promote a walkable,
Develop and maintain
and appreciation of
employment base other organizations
pedestrian and bicycle-
collaborative partnerships
our diversity through
friendly city with complete
and investment strategies
Nurture Pursue transportation
celebrations and festivals
streets, trails, and
entrepreneurship and other regional that improve services
connections between Provide critical and
and foster successful improvements and services
Respond to growing
neighborhoods and relevant information on a
partnerships with that improve quality of life
service demands through
community focal pointstimely basis and facilitate
businesses and
Balance development partnerships, innovation,
two-way dialogue between
community leaders
Provide opportunities
with environmental and outcome management
city government and the
for communities to be
Leverage public/
protection
community
better prepared for
private resources to
emergencies
focus development
on economic centers
RENTON. AHEAD OF THE CURVE.
RESOLUTION NO. 4314
CR|2018Α2023TIP
ITYOFENTONRANSPORTATIONMPROVEMENTROGRAM
STΑML
ECTIONWOAPANDOCATION
TIPM6
RANSPORTATIONMPROVEMENTROGRAMAP
MI7
APNDEX
STΑLM5
ECTIONWOOCATIONANDAP
RESOLUTION NO. 4314
� CITY OF RENTON � 2018— 2023 TRANSPORTATION IMPROVEMENT PROGRAM
—� � � , f�� � �, ;� �,.
x
�� � '�'": �, ;«� �� . �. =
��`�t���" '� 3 k a� t,i .� � ��'� ��t,, ������ �'� .
rt 3 " � t
�" �a�� � ��„ "i�` � ,� � ,� r � ��� � �
��'��,�� �r� � �` � � � �, : �:�,
� � 4 � b
� �:. �r ' '��'� �€,�.'�! ''��##�w� �p�a ^'C w
w" d'+�.,�..� � �. .� ��b 6P�t��f R,
p 4
,�"�t �-�¢yup�,.y w�' > ' , e;s'e'�'!-,h..
br�'" ' P°. . #"� b.a Y� �: yy �'"� �,�
Ca ��' � 2
� �� 36 � � �� a
� � �";
37 �"�' � .�
� �
'�� � .
�
�,z�
`���
>, . ,.
35 1 S ,,# � a
� � �
39 �36 � 16 � ,,� � �' �����,�e.; i�
�
�� - � "�`' '� �*,� I
.
, � � � ►
�,
. .
�. . . .
� �� �
��� � � �* •
���� 12 1 g� � ,,
� •
�_�� . . ., .
z
+
$ �� �,- "� �°"$ 38 � 2� �,.,,.� # . $ �
�a�„ ��� < 21 ��� ��� � ,
�.,� �,��� � � � _":f' �` � i
�. � � ��� � �
�""� 't a �i ;. '
_,� � ��
°�.�;=���s "`.q� � �
7 3 ;.
,
., .
�'� , � � '
;�`�,r�, �� 7 � �
9 5
�v�` ;
� ���. ' r ��
d
�_ " , � �, ,
���� 10 8� °":� a�r rs� x � � ± * �
�
, � a ���� � �
,'��°a. 11 ��` �r {^`� �� ;� "+� �,
,� ����f,� �
� 22 18 25 �" r �` ��'�-0�. �`� x��
�� �� ��'`' � ,�s � , �`r, ��. > `°� s �. � �
��� � � �� E�; _=�� �,.
�,�'� "` �_k�; c �, � � ,:; �
,:,�r��,^ 19 s. �� ` �;
_.�.
�,
� M1
a m .
p`;.: Y; - , ��. ,, �
,.. , r:�.�,. � ,'t'^. . �.� �� .a�. �_, .
`�A�`r-. � . . " �+ ��.�-. . . �
���� �. � �..„.� '� e: .
�`. ,� � �,`..
i a �,
>-��
F
.�� �
��°� € .` � 37 � �.�r� � ..,.,_��
�+ ��:: , �� . � �
,
� `� � 4 � �'i�t� ��,;.� � �
�. � 13 � ���*"« �r �
, �
� � �� . _'� � �� �
� �
,� �� '
#
``s�" .�.� ,�`. �� ,�" ��:
Y E �:, . � ��"
�� t � '5�,: a �.-�d�2 �k "�w9r�. ;.i ..
� � ".�°� ,�.....- . � a ,;,�',g � l�re!
�.. -� � � '`� �a � !y � �� �
� �*'g °^�`' ,� . �� �+ � �, m
�t c� � �- � �s ���, ,� �� ,�'r«� � � ��s"r"��,"+h,..
��_�`*�z r �� "� a a' 6 � � ���' -� � � �, r�'�r �
.� : � ����;��
�'�,��'�`� ;�, � �� � �� � ����� z ������t''�'_,
�
� � �, � � � �
.* �,
, M �� � �- �,„ #` �{
• • ' 6
RESOLUTION NO. 4314
CR|2018Α2023TIP
ITYOFENTONRANSPORTATIONMPROVEMENTROGRAM
MI
APNDEX
TIPN.PT
OROJECTITLE
1StreetOverlay
2ArterialRehabilitationProgram
3LoganAvenueNorthImprovements
th
4SW27Street/StranderBlvdConnection
5NE3 rd Street/NE4 th StreetCorridorImprovements
6DuvallAvenueNENE7th th StreettoSunsetBlvdNE
7RainierAvenueSouth/NorthPhase4ΑSouth3 rd StreettoNW3 rd Place
8WilliamsAvenueSouthandWellsAvenueSouthConversionProject
9South2ndStreetConversionProject
rd
10South3StreetConversionProject
11MainAveSouthAlley
12ParkAvenueNorthExtension
13116thAvenueSEImprovements
14CarrRoadImprovements
15NESunsetBlvd(SR900)CorridorImprovements
16SunsetAreaGreenConnections
17OakesdaleAvenueSW/MonsterRoadSW/68thAvenueSouthtoSR900
18South7thStreetRainierAvenueSouthtoTalbotRoadSouth
19SouthGradyWayTalbotRoadSouthtoRainierAvenueSouth
20HouserWayNorthNorth8thStreettoLakeWashingtonBlvd
21LakeWashingtonLoopTrail
22LaketoSound(L2S)Trail
23WalkwayProgram
24SidewalkRehabilitationandReplacementProgram
25MapleValleyHighwayAttenuator
26BridgeInspectionandRepairProgram
27RoadwaySafetyandGuardrailProgram
28IntersectionSafetyandMobilityProgram
29TrafficSafetyProgram
30TrafficOperationDevicesProgram
31IntelligentTransportationSystems(ITS)Program
32BarrierFreeTransitionPlanImplementation
33ProjectDevelopmentandPreDesignProgram
34ArterialCirculationProgram
351%fortheArtsProgram
36LakeWashingtonBlvdNorth(ParkAvenueNorthtoGeneCoulonMemorialPark)
37LindAvenueSE(SW16thStreettoSW43rdStreet)
38RainierAvenueNorthCorridorImprovements(Phase5)
39SouthLakeWashingtonTransitStop
STΑMI7
ECTIONWOAPNDEX
RESOLUTION NO. 4314
CR|2018Α2023TIP
ITYOFENTONRANSPORTATIONMPROVEMENTROGRAM
STΑDP
ECTIONHREEEVELOPMENTANDRIORITIZATION
GPC10
ENERALROGRAMMINGRITERIA
STIPDA13
PECIFICEVELOPMENTCTIVITIES
SPP15
UMMARYOFROJECTSANDROGRAMS
STΑDP9
ECTIONHREEEVELOPMENTANDRIORITIZATION
RESOLUTION NO. 4314
CR|2018Α2023TIP
ITYOFENTONRANSPORTATIONMPROVEMENTROGRAM
GPC
ENERALROGRAMMINGRITERIA
TheyearlyupdateoftheSixYearTransportationImprovementProgram(TIP)ispartofanongoingprocess
intrinsicallylinkedwiththedevelopmentofthe/źƷǤƭCapitalImprovementProgram.TheSixYearTIPisalso
linkedwithvariousstateandfederalfundingprograms,regional/interjurisdictionalplanningandcoordination
processesandthe/źƷǤƭGrowthManagementActComprehensiveLandUsePlan.
Projectsaredevelopedandprioritizedbasedoncommunityneeds,specificgoalstobeachievedandon
generalprogrammingconsiderations.Thegeneralprogrammingconsiderationsincludethefollowing:
PRIORITYΑ Asshownonpage15theprojectsandprogramsareprioritizedbytypepreparedbyCity
staffwithfinalapprovalbytheCityCouncilduringtheannualupdateoftheTIP.Theprioritization
assistsstaffinassigningthelimitedresourcestoprojectsandprogramsandreducingresourcesduring
fundingshortfalls.Ingeneral,staffexpendsmoreresourcesonhigherpriorityprojectsinthefirstthree
yearsoftheTIP,andwhenapplyingforgrantsstaffwillconsidertheseprojectsfirstunlessotherlower
priorityprojectsbettermeettheparticularcriteriaofagrantprogram.
PLANNINGΑ How,atalocalandregionallevel,aprojectfitswithoraddressesidentifiedfuture
transportationgoals,demandsandplanningprocessesmustbeevaluated.Thisisstronglyinfluenced
byongoinglandusedecisionsandbyregionalhighwayandtransitsystemplans.
FINANCINGΑ Manyprojectsaredependentuponexternalgrants,formationof\[L5ƭorthereceiptof
impactfees.Prioritizationhastotakeintoaccountthepeculiaritiesofeachofthevariousfundsources
theprobabilitiesofwhenandhowmuchmoneywillbeavailable.
and
SCHEDULINGΑ Ifaprojectisinterconnectedwith,orinterdependenton,otherprojectstakingplace,
thisisreflectedintheirrelativepriorities.
PASTCOMMITMENTΑ ThelevelofpreviouscommitmentmadebytheCityintermsofresources,
localagreementsmustbetakenintoconsiderationinprioritizingTIP
legislativeactionsorinter
projects.
STΑGPC10
ECTIONHREEENERALROGRAMMINGRITERIA
RESOLUTION NO. 4314
CR|2018Α2023TIP
ITYOFENTONRANSPORTATIONMPROVEMENTROGRAM
Inadditiontothegeneralconsiderationsdiscussedabove,therearefivespecificprojectcategoriesthrough
whichtheTIPisevaluatedandanalyzed.Thecategoriesincludethefollowing:
1.MaintenanceandPreservationofExistingInfrastructure
2.CorridorProjects
3.OperationsandSafety
4.NonMotorizedProjects
5.Others
Thesecategoriesprovideausefulanalysistoolandrepresentgoalsdevelopedthroughanevaluationofthe
/źƷǤƭtransportationprograminresponsetoinputfromcitizensandlocalofficialsandtostateandfederal
legislation.
Takenasawhole,thefivecategoriesprovideaframeworkforevaluatingprojectsbothindividuallyandaspart
ofincreasing
ofastrategythatseekstomeetandbalancethetransportationneedsofRentonduringatime
transportationdemand,decreasingrevenuesandgrowingenvironmentalconcerns.
Althougheachprojectcanbeidentifiedwithanimportantconcernthatallowsittobeclassifiedintooneof
tobecompatiblewithmultiple
thefivecategories,mostprojectsareintendedtoaddressandaredeveloped
goals.
MPEI isabasicneedthatmustbemetbytheprogram.
AINTENANCEANDRESERVATIONOFTHEXISTINGNFRASTRUCTURE
TheMayorandCityCouncilhaveemphasizedtheimportanceofsustainingstrongprogramsinthisproject
categoryandmaintainingourcurrentinfrastructure.Therefore,morethanhalfoftheƩğƓƭƦƚƩƷğƷźƚƓƭCity
Fundshavehistoricallybeenallocatedunderthiscategory.TheStateGrowthManagementActalsorequires
jurisdictionstoassessandaddressthefundingrequiredtomaintaintheirexistingtransportationsystems.The
CityofRentonownsandmaintains250centerlinemilesofstreets.
CP areorientedtowardmovingpeoplethroughabalancedtransportationsystemthatinvolves
ORRIDORROJECTS
multiplemodesoftransportation.Includedarefacilitiesthatfacilitatethemovementoftransitandcarpools.
TheMovingAheadforProgressinthe21 st CenturyAct(MAP21),theStateandFederalCleanAirlegislation
andtheStateCommuteTripReductionAct(CTR)haveaddedmomentumtoregionaleffortsandplaced
requirementsonlocaljurisdictionssuchasRentontopromotethesetransportationelements.
OS projectsandprogramsaredevelopedthroughongoinganalysesofthetransportation
PERATIONSANDAFETY
systemandaredirectedmainlytowardtrafficengineeringconcernssuchassafetyandcongestion.Projects
areidentifiednotonlybyanalysisoftrafficcounts,accidentrecordsandgeometricdata,butalsothrough
reviewandinvestigationofcitizencomplaintsandrequests.
STΑGPC11
ECTIONHREEENERALROGRAMMINGRITERIA
RESOLUTION NO. 4314
CR|2018Α2023TIP
ITYOFENTONRANSPORTATIONMPROVEMENTROGRAM
NMP havebeendevelopedwithmajoremphasisonaddressingcommunityqualityoflife
ONOTORIZEDROJECTS
issuesbyimprovingand/orprotectingresidentiallivabilitywhileprovidingnecessarytransportationsystem
improvements.Bicycleandpedestrianprojectsareincludedinthiscategory.
OP involveplanningoftransportationimprovementsnecessitatedbynewdevelopmentandnew
THERROGRAMS
transportationcapitalimprovements.
STΑGPC12
ECTIONHREEENERALROGRAMMINGRITERIA
RESOLUTION NO. 4314
CR|2018Α2023TIP
ITYOFENTONRANSPORTATIONMPROVEMENTROGRAM
STIPDA
PECIFICEVELOPMENTCTIVITIES
TIPprojectandfinancialdevelopmentactivitiesareintricatelyintertwinedandinvolveinteractionswithmany
groupsandagenciesatthelocal,regional,stateandfederallevels.WithintheTransportationSystemsDivision
oftheCityofRenton,projectdevelopmentinvolvesyearroundcoordinationbetweentheTransportation
OperationsandTransportationMaintenanceSection,theTransportationPlanningandProgrammingSection
andtheTransportationDesignSection.
TheTransportationOperationsandMaintenanceSectioncompilesaccidentandtrafficcountdata,performs
levelofservicecalculationsneededtoidentifyoperational/congestionproblemsandtracksalltransportation
relatedcomplaints,suggestionsandrequeststhatcomeintotheCity.
TheTransportationDesignSection,throughtheLtƭ OverlayProgram and BridgeInspectionandRepair
Program,workcloselywiththeMaintenanceServicesDivisiontoestablishstructuralratingsforthe/źƷǤƭ
roadsandbridges.
TheseandotherdataarebeingusedbythePlanningandProgrammingSectiontodeveloptransportation
improvementprojects,preparegrantapplications,interfacewithongoingstateandfederaltransportation
programsanddevelopaTIPthatsupportsthegoalsofthe/źƷǤƭlongrangeComprehensivePlanandcurrent
businessplan.
TheTransportationPlanningandProgrammingSectionworkswithKingCountyMetroTransit,PugetSound
RegionalCouncil,SoundTransitandothergroupsandagenciestoassureconsistencybetweenwĻƓƷƚƓƭ
transportationpoliciesandprogramsandthoseoftheregion.SuchconsistencyisrequiredbytheGrowth
ManagementActandrelatedlegislationandbyfederalandstategrantprograms.
Ongoingtransportationplanningactivities,suchasupdatingtheTransportationElementinthe
ComprehensivePlanandthedevelopmentofsubareaplans,playanimportantpartinidentifyingand
prioritizingtransportationimprovementprojects.
WithintheCityofRenton,thereareactionsandinteractionsinvolvingotherdepartmentsanddivisions,the
privatesector,theCityCouncilandAdministration,whichstronglyinfluencethedirectionofthe
transportationprogram.Forexample,thetransportationsystemissignificantlyimpactedbylanduse
decisions,privatedevelopmentproposalsandbypublicwaterandsewerextensionswhichincrease
transportationdemandbymakingpossiblehigherdensityand/orintensityoflanduses.Suchproposalsneed
STΑSTIPDA13
ECTIONHREEPECIFICEVELOPMENTCTIVITIES
RESOLUTION NO. 4314
CR|2018Α2023TIP
ITYOFENTONRANSPORTATIONMPROVEMENTROGRAM
tobemonitoredandanalyzedinregardtohowtheyindividuallyandcollectivelycreatetheneedfor
transportationimprovements.
AllCityofRentondepartmentsandCityCouncilaresolicitedeachyeartoprovideinput,discussandcomment
ontheSixYearTIP.Additionalinputisalsogatheredthroughinteractionswithotherpublicandprivate
organizationsandthroughpublicmeetingsheldinthecommunityconcerningspecifictransportationprojects
andprograms.
AttheCity,StateandFederallevelstherearenewlawsandregulationsthatcreatetheneedfornewor
differentkindsoftransportationprojectsandprograms.ExamplesincludetheMovingAheadforProgressin
the21CenturyAct(MAP21),theGrowthManagementAct,theCleanAirAct,theCommuteTripReduction
st
law,theEndangeredSpeciesActandtheSurfaceWaterManagementOrdinance.Allhavetremendousimpacts
onthedevelopmentandcostsoftransportationprojects.
d
Interconnectionand/orinterdependenceamongTIPprojectsandwithprojectsbyotherCitydepartmentsan
byotherjurisdictionsisanotherelementthataffectthedevelopment,theprioritizationandthetimingof
transportationprojects.Equallyimportantisthelikelihood,thetimeframeandtheamountofoutsidefunding
thatwillbeobtainabletofinancetransportationprojects.
Insummary,withitsheavydependenceonmanydifferentandunpredictablesourcesofexternalfundingand
withthesignificantimpactscreatedbyongoinglocalandregionallandusedecisions,transportationproject
developmentisacontinuousactivitycomprisedofamultitudeofdiverseelements.
STΑSTIPDA14
ECTIONHREEPECIFICEVELOPMENTCTIVITIES
RESOLUTION NO. 4314
SUMMARYOFPROJECTSANDPROGRAMS
SixYearTotalProject
TypeTIPPriorityProjectTitle201820192020202120222023PeriodTotalFundedUnfunded
StreetOverlay 1,790,0001,880,0001,970,0002,070,0002,170,0002,260,00012,140,0007,860,0004,280,000
11
ArterialRehabilitationProgram 1,273,500882,000930,000980,0001,030,0001,080,0006,175,5003,897,7002,277,800
22
TrafficOperationDevicesProgram 120,000120,000120,000120,000120,000120,000720,000720,000
303
BridgeInspection&RepairProgram 60,00090,000100,000100,000100,000100,000550,000340,000210,000
264
SidewalkRehabilitationandReplacementProgram 100,000100,000110,000110,000110,000110,000640,000640,000
245
MapleValleyHighwayAttenuator 181,000999,2001,180,2001,180,200
256
RoadwaySafetyandGuardrailProgram 15,00015,00020,00025,00025,00025,000125,000125,000
277
WilliamsAveSandWellsAveSConversionProject 1,045,0003,870,000785,0005,700,0004,750,000950,000
81
ParkAveNExtension 900,0009,100,00010,000,00010,000,000
92
RainierAveS/NPhase4S3rdStreettoNW3rdPl 500,000458,0003,500,0008,320,0005,730,0001,950,00020,458,000958,00019,500,000
73
MainAvenueSouthAlley 350,000350,00050,000300,000
114
SouthLakeWashingtonTransitStop 610,0002,400,0003,010,0003,010,000
395
NESunsetBoulevard(SR900)CorridorImprovements 700,0001,209,0002,000,0007,550,00010,600,0009,375,00031,434,000909,00030,525,000
156
South2ndStreetConversionProject 3,500,0007,800,0007,800,00019,100,00019,100,000
97
South3rdStreetConversionProject 4,000,0006,500,00010,700,00021,200,00021,200,000
108
LoganAveNorthImprovements 1,240,00010,000,0006,000,0007,440,00024,680,00024,680,000
39
116thAveSEImprovements 600,0001,600,0003,100,0002,600,0002,200,00010,100,00010,100,000
1310
NE3rdStreet/NE4thStreetCorridorImprovements 20,00020,000700,0003,540,0004,680,0002,700,00011,660,00040,00011,620,000
511
DuvallAveNENE7thSttoSunsetBlvdNE 375,0001,625,0002,000,0002,000,000
612
SunsetAreaGreenConnections 3,600,00010,700,0007,900,00022,200,00022,200,000
1613
SouthGradyWayTalbotRdSouthtoRainierAveSouth 550,0001,760,0001,690,0004,000,0004,000,000
1914
LakeWashingtonBlvdNParkAveNtoGeneCoulonPark 2,000,0002,000,0002,000,000
3615
HouserWayNorthNorth8thStreettoLakeWashingtonBlvd 1,065,0001,560,0002,340,0004,965,0004,965,000
2016
RainierAveNCorridorImprovementsPhase5 100,0002,000,0002,400,0004,500,0004,500,000
3817
LindAveSWSW16thSttoSW43rdSt 400,0001,650,0002,350,0004,400,0004,400,000
3718
OakesdaleAveSW/MonsterRoadSW/68thAveStoSR900 50,0008,000,0008,050,0008,050,000
1719
CarrRoadImprovements 200,000200,000200,000
1420
South7thStreetRainierAveSouthtoTalbotRoadSouth 200,0001,700,0001,300,0005,200,0001,300,0009,700,0009,700,000
1821
SW27thStreet/StranderBoulevardConnection
422
IntersectionSafety&MobilityProgram 250,000350,000350,000350,000350,000350,0002,000,0001,700,000300,000
281
TrafficSafetyProgram 130,000150,000150,000150,000150,000150,000880,000670,000210,000
292
LaketoSound(L2S)Trail 2,800,0002,800,0002,800,000
221
LakeWashingtonLoopTrail 327,0001,875,000125,0001,200,0002,750,0003,250,0009,527,0002,327,0007,200,000
212
BarrierFreeTransitionPlanImplementation 30,00030,00040,00040,00040,00040,000220,000220,000
323
WalkwayProgram 200,000250,000250,000250,000250,0001,200,0001,200,000
234
ArterialCirculationProgram 145,000145,000150,000150,000150,000150,000890,000890,000
341
ProjectDevelopment&PreDesignProgram 150,000150,000150,000150,000150,000150,000900,000900,000
332
IntelligentTransportationSystems(ITS)Program 30,00030,00030,00030,00030,00030,000180,000180,000
313
1%fortheArtsProgram 15,00015,00015,00015,00015,00015,00090,00090,000
354
TotalSources8,560,50029,620,00020,234,20056,025,00073,290,00072,195,000259,924,70033,466,700226,458,000
CityofRenton|20182023TransportationImprovementProgram
15
RESOLUTION NO. 4314
CR|2018Α2023TIP
ITYOFENTONRANSPORTATIONMPROVEMENTROGRAM
SFΑER
ECTIONOURXPENDITURESANDEVENUES
SPE18
UMMARYOFROJECTXPENDITURES
CRF19
ITYOFENTONUNDS
SFS20
UMMARYOFUNDINGOURCES
FSΑI
UNDINGOURCESTEMIZED
VehicleFuelTax 21
BusinessLicenseandBusiness&Occupation 22
ProposedFundBalance 23
GrantsInHand 24
MitigationInHand 25
OtherInHand 26
FundingSourcesTBD 27
SFΑER17
ECTIONOURXPENDITURESANDEVENUES
RESOLUTION NO. 4314
SUMMARYOFPROJECTEXPENDITURES*
Period
TIPProjectTitle201820192020202120222023TotalCommunityPlanningArea
1StreetOverlay 1,790,0001,880,0001,970,0002,070,0002,170,0002,260,00012,140,000Citywide
2ArterialRehabilitationProgram 1,273,500882,000930,000980,0001,030,0001,080,0006,175,500Citywide
3LoganAveNorthImprovements 1,240,00010,000,0006,000,0007,440,00024,680,000CityCenter
4SW27thStreet/StranderBoulevardConnection Valley
5NE3rdStreet/NE4thStreetCorridorImprovements 20,00020,000700,0003,540,0004,680,0002,700,00011,660,000Highlands&E.Plateau
6DuvallAveNENE7thSttoSunsetBlvdNE 375,0001,625,0002,000,000Highlands&E.Plateau
7RainierAveS/NPhase4S3rdStreettoNW3rdPl 500,000458,0003,500,0008,320,0005,730,0001,950,00020,458,000CityCenter
8 CityCenter
WilliamsAveSandWellsAveSConversionProject 1,045,0003,870,000785,0005,700,000
9South2ndStreetConversionProject CityCenter
3,500,0007,800,0007,800,00019,100,000
10South3rdStreetConversionProject CityCenter
4,000,0006,500,00010,700,00021,200,000
11MainAvenueSouthAlley CityCenter
350,000 350,000
12ParkAvenueNorthExtension 900,0009,100,00010,000,000CityCenter
13116thAveSEImprovements 600,0001,600,0003,100,0002,600,0002,200,00010,100,000Benson
14CarrRoadImprovements 200,000200,000Talbot&Benson
15NESunsetBoulevard(SR900)CorridorImprovements 700,0001,209,0002,000,0007,550,00010,600,0009,375,00031,434,000
CityCenter,Highlands&E.Plateau
16SunsetAreaGreenConnections 3,600,00010,700,0007,900,00022,200,000Highlands
17 50,0008,000,0008,050,000WestHill
OakesdaleAveSW/MonsterRoadSW/68thAveStoSR900
18 200,0001,700,0001,300,0005,200,0001,300,0009,700,000CityCenter
South7thStreetRainierAveSouthtoTalbotRoadSouth
19SouthGradyWayTalbotRdSouthtoRainierAveSouth 550,0001,760,0001,690,0004,000,000CityCenter
20 1,065,0001,560,0002,340,0004,965,000CityCenter
HouserWayNorthNorth8thStreettoLakeWashingtonBlvd
21LakeWashingtonLoopTrail 327,0001,875,000125,0001,200,0002,750,0003,250,0009,527,000CityCenter
22LaketoSound(L2S)Trail 2,800,0002,800,000CityCenter&Valley
23WalkwayProgram 200,000250,000250,000250,000250,0001,200,000Citywide
24SidewalkRehabilitationandReplacementProgram 100,000100,000110,000110,000110,000110,000640,000Citywide
25MapleValleyHighwayAttenuator 181,000999,2001,180,200CedarRiver
26BridgeInspection&RepairProgram 60,00090,000100,000100,000100,000100,000550,000Citywide
27RoadwaySafetyandGuardrailProgram 15,00015,00020,00025,00025,00025,000125,000Citywide
28IntersectionSafety&MobilityProgram 250,000350,000350,000350,000350,000350,0002,000,000Citywide
29TrafficSafetyProgram 130,000150,000150,000150,000150,000150,000880,000Citywide
30TrafficOperationDevicesProgram 120,000120,000120,000120,000120,000120,000720,000Citywide
31IntelligentTransportationSystems(ITS)Program 30,00030,00030,00030,00030,00030,000180,000Citywide
32BarrierFreeTransitionPlanImplementation 30,00030,00040,00040,00040,00040,000220,000Citywide
33ProjectDevelopment&PreDesignProgram 150,000150,000150,000150,000150,000150,000900,000N/A
34ArterialCirculationProgram 145,000145,000150,000150,000150,000150,000890,000N/A
351%fortheArtsProgram 15,00015,00015,00015,00015,00015,00090,000N/A
36 2,000,0002,000,000CityCenter
LakeWashingtonBlvdNParkAveNtoGeneCoulonPark
37LindAveSWSW16thSttoSW43rdSt 400,0001,650,0002,350,0004,400,000Valley
38RainierAveNCorridorImprovements(Phase5)100,0002,000,0002,400,0004,500,000CityCenter
39SouthLakeWashingtonTransitStop 610,0002,400,0003,010,000CityCenter
TotalExpenditures8,560,50029,620,00020,234,20056,025,00073,290,00072,195,000259,924,700
*Includingunfundedamounts.
CityofRenton|20182023TransportationImprovementProgram
18
RESOLUTION NO. 4314
CITYOFRENTONFUNDS
(FundBalance+VehicleFuelTax+BusinessLicense+B&O+ImpactFee+Other)
Period
TIPProjectTitle201820192020202120222023Total
1StreetOverlay 1,790,0001,100,0001,170,0001,220,0001,270,0001,310,0007,860,000
2ArterialRehabilitationProgram 436,000441,000470,000490,000510,000530,0002,877,000
3LoganAveNorthImprovements
4SW27thStreet/StranderBoulevardConnection
5NE3rdStreet/NE4thStreetCorridorImprovements 20,00020,00040,000
6DuvallAveNENE7thSttoSunsetBlvdNE
7RainierAveS/NPhase4S3rdStreettoNW3rdPl 67,50061,830129,330
8WilliamsAveSandWellsAveSConversionProject 400,000400,000
9South2ndStreetConversionProject
10South3rdStreetConversionProject
11MainAvenueSouthAlley 50,00050,000
12ParkAvenueNorthExtension
13116thAveSEImprovements
14CarrRoadImprovements 200,000200,000
15NESunsetBoulevard(SR900)CorridorImprovements 375,778112,197487,975
16SunsetAreaGreenConnections
17
OakesdaleAveSW/MonsterRoadSW/68thAveStoSR900
18South7thStreetRainierAveSouthtoTalbotRoadSouth
19SouthGradyWayTalbotRdSouthtoRainierAveSouth
20
HouserWayNorthNorth8thStreettoLakeWashingtonBlvd
21LakeWashingtonLoopTrail 25,5922,42516028,177
22LaketoSound(L2S)Trail
23WalkwayProgram 200,000250,000250,000250,000250,0001,200,000
24SidewalkRehabilitationandReplacementProgram 100,000100,000110,000110,000110,000110,000640,000
25MapleValleyHighwayAttenuator
26BridgeInspection&RepairProgram 60,00060,00070,00050,00050,00050,000340,000
27RoadwaySafetyandGuardrailProgram 15,00015,00020,00025,00025,00025,000125,000
28IntersectionSafety&MobilityProgram 250,000250,000300,000300,000300,000300,0001,700,000
29TrafficSafetyProgram 130,000140,000100,000100,000100,000100,000670,000
30TrafficOperationDevicesProgram 120,000120,000120,000120,000120,000120,000720,000
31IntelligentTransportationSystems(ITS)Program 30,00030,00030,00030,00030,00030,000180,000
32BarrierFreeTransitionPlanImplementation 30,00030,00040,00040,00040,00040,000220,000
33ProjectDevelopment&PreDesignProgram 150,000150,000150,000150,000150,000150,000900,000
34ArterialCirculationProgram 145,000145,000150,000150,000150,000150,000890,000
351%fortheArtsProgram 15,00015,00015,00015,00015,00015,00090,000
36
LakeWashingtonBlvdNParkAveNtoGeneCoulonPark
37LindAveSWSW16thSttoSW43rdSt
38RainierAveNCorridorImprovements(Phase5)
39SouthLakeWashingtonTransitStop
TotalSources4,209,8703,192,4522,995,1603,050,0003,120,0003,180,00019,747,482
CityofRenton|20182023TransportationImprovementProgram
19
RESOLUTION NO. 4314
SUMMARYOFFUNDINGSOURCES
Period
ITEM201820192020202120222023PeriodTotal
SIXYEARPROJECTCOSTS:
Planning295,00490,00275,00375,00325,00275,002,035,00
0000000
Design3,080,002,445,005,177,0014,862,003,162,007,562,0036,288,00
0000000
ROW(includesAdmin)500,005,025,007,425,0013,600,003,000,0029,550,00
000000
ConstructionContract4,072,0017,994,006,454,7022,067,0056,667,0048,607,00155,861,70
0000000
ConstructionManagement593,503,616,00867,505,086,0013,101,0012,716,0035,980,00
0000000
Other/PostConst.Services20,0050,0035,0035,0035,0035,00210,00
0000000
SubTOTALSIXYEARCOST8,560,50029,620,00020,234,20056,025,00073,290,00072,195,000259,924,700
SOURCEOFFUNDS:
VehicleFuelTax700,00710,00720,00730,00740,00750,004,350,00
0000000
BusinessLicenseFeeandB&OShare2,224,272,272,452,265,162,310,002,370,002,420,0013,861,89
8200000
FundBalance+Heldreserve475,592475,592
GrantsInHand2,364,185,359,94695,098,419,21
0808
FeeinLieuOf810,00210,0010,0010,0010,0010,001,060,00
f0000000
OtherInHand176,4505,123,5505,300,000
SubTOTALSIXYEARFUNDED
6,750,50013,675,9503,690,2503,050,0003,120,0003,180,00033,466,700
Undetermined1,810,0015,944,0516,543,9552,975,0070,170,0069,015,00226,458,00
0000000
SubTOTALSIXYEARUNFUNDED1,810,00015,944,05016,543,95052,975,00070,170,00069,015,000226,458,000
TOTALSOURCESFUNDED&UNFUNDED8,560,50029,620,00020,234,20056,025,00073,290,00072,195,000259,924,700
UnallocatedRevenue(ImpactFees)49,000435,000648,000661,000675,000689,0003,157,000
CityofRenton|20182023TransportationImprovementProgram
20
RESOLUTION NO. 4314
VEHICLEFUELTAX
Period
TIPProjectTitle201820192020202120222023Total
1StreetOverlay 700,000710,000720,000730,000740,000750,0004,350,000
2ArterialRehabilitationProgram
3LoganAveNorthImprovements
4SW27thStreet/StranderBoulevardConnection
5NE3rdStreet/NE4thStreetCorridorImprovements
6DuvallAveNENE7thSttoSunsetBlvdNE
7RainierAveS/NPhase4S3rdStreettoNW3rdPl
8WilliamsAveSandWellsAveSConversionProject
9South2ndStreetConversionProject
10South3rdStreetConversionProject
11MainAvenueSouthAlley
12ParkAvenueNorthExtension
13116thAveSEImprovements
14CarrRoadImprovements
15NESunsetBoulevard(SR900)CorridorImprovements
16SunsetAreaGreenConnections
17
OakesdaleAveSW/MonsterRoadSW/68thAveStoSR900
18South7thStreetRainierAveSouthtoTalbotRoadSouth
19SouthGradyWayTalbotRdSouthtoRainierAveSouth
20
HouserWayNorthNorth8thStreettoLakeWashingtonBlvd
21LakeWashingtonLoopTrail
22LaketoSound(L2S)Trail
23WalkwayProgram
24SidewalkRehabilitationandReplacementProgram
25MapleValleyHighwayAttenuator
26BridgeInspection&RepairProgram
27RoadwaySafetyandGuardrailProgram
28IntersectionSafety&MobilityProgram
29TrafficSafetyProgram
30TrafficOperationDevicesProgram
31IntelligentTransportationSystems(ITS)Program
32BarrierFreeTransitionPlanImplementation
33ProjectDevelopment&PreDesignProgram
34ArterialCirculationProgram
351%fortheArtsProgram
36LakeWashingtonBlvdNParkAveNtoGeneCoulonPark
37LindAveSWSW16thSttoSW43rdSt
38RainierAveNCorridorImprovements(Phase5)
39SouthLakeWashingtonTransitStop
TotalSources700,000710,000720,000730,000740,000750,0004,350,000
CityofRenton|20182023TransportationImprovementProgram
21
RESOLUTION NO. 4314
BUSINESSLICENSEANDBUSINESS&OCCUPATION
Period
TIPProjectTitle201820192020202120222023Total
1StreetOverlay 290,000390,000450,000490,000530,000560,0002,710,000
2ArterialRehabilitationProgram 436,000441,000470,000490,000510,000530,0002,877,000
3LoganAveNorthImprovements
4SW27thStreet/StranderBoulevardConnection
5NE3rdStreet/NE4thStreetCorridorImprovements 20,00020,00040,000
6DuvallAveNENE7thSttoSunsetBlvdNE
7RainierAveS/NPhase4S3rdStreettoNW3rdPl 67,50061,830129,330
8WilliamsAveSandWellsAveSConversionProject 250,000250,000
9South2ndStreetConversionProject
10South3rdStreetConversionProject
11MainAvenueSouthAlley
12ParkAvenueNorthExtension
13116thAveSEImprovements
14CarrRoadImprovements
15NESunsetBoulevard(SR900)CorridorImprovements 125,778112,197237,975
16SunsetAreaGreenConnections
17OakesdaleAveSW/MonsterRoadSW/68thAveStoSR900
18South7thStreetRainierAveSouthtoTal
botRoadSouth
19SouthGradyWayTalbotRdSouthtoRainierAveSouth
20HouserWayNorthNorth8thStreettoLakeWashingtonBlvd
21LakeWashingtonLoopTrail 2,4251602,585
22LaketoSound(L2S)Trail
23WalkwayProgram 200,000250,000250,000250,000250,0001,200,000
24SidewalkRehabilitationandReplacementProgram 100,000100,000110,000110,000110,000110,000640,000
25MapleValleyHighwayAttenuator
26BridgeInspection&RepairProgram 60,00060,00070,00050,00050,00050,000340,000
27RoadwaySafetyandGuardrailProgram 15,00015,00020,00025,00025,00025,000125,000
28IntersectionSafety&MobilityProgram 250,000250,000300,000300,000300,000300,0001,700,000
29TrafficSafetyProgram 120,000130,00090,00090,00090,00090,000610,000
30TrafficOperationDevicesProgram 120,000120,000120,000120,000120,000120,000720,000
31IntelligentTransportationSystems(ITS)Program 30,00030,00030,00030,00030,00030,000180,000
32BarrierFreeTransitionPlanImplementation 30,00030,00040,00040,00040,00040,000220,000
33ProjectDevelopment&PreDesignProgram 150,000150,000150,000150,000150,000150,000900,000
34ArterialCirculationProgram 145,000145,000150,000150,000150,000150,000890,000
351%fortheArtsProgram 15,00015,00015,00015,00015,00015,00090,000
36LakeWashingtonBlvdNParkAveNtoGeneCoulonPark
37LindAveSWSW16thSttoSW43rdSt
38RainierAveNCorridorImprovements(Phase5)
39SouthLakeWashingtonTransitStop
NotAllocatedToFundBalance
TotalSources2,224,2782,272,4522,265,1602,310,0002,370,0002,420,00013,861,890
CityofRenton|20182023TransportationImprovementProgram
22
RESOLUTION NO. 4314
PROPOSEDFUNDBALANCE+HELDINRESERVE
Period
TIPProjectTitle201820192020202120222023Total
1StreetOverlay
2ArterialRehabilitationProgram
3LoganAveNorthImprovements
4SW27thStreet/StranderBoulevardConnection
5NE3rdStreet/NE4thStreetCorridorImprovements
6DuvallAveNENE7thSttoSunsetBlvdNE
7RainierAveS/NPhase4S3rdStreettoNW3rdPl
8WilliamsAveSandWellsAveSConversionProject 150,000150,000
9South2ndStreetConversionProject
10South3rdStreetConversionProject
11MainAvenueSouthAlley 50,00050,000
12ParkAvenueNorthExtension
13116thAveSEImprovements
14CarrRoadImprovements
15NESunsetBoulevard(SR900)CorridorImprovements 250,000250,000
16SunsetAreaGreenConnections
17
OakesdaleAveSW/MonsterRoadSW/68thAveStoSR900
18South7thStreetRainierAveSouthtoTalbotRoadSouth
19SouthGradyWayTalbotRdSouthtoRainierAveSouth
20HouserWayNorthNorth8thStreettoLakeWashingtonBlvd
21LakeWashingtonLoopTrail 25,59225,592
22LaketoSound(L2S)Trail
23WalkwayProgram
24SidewalkRehabilitationandReplacementProgram
25MapleValleyHighwayAttenuator
26BridgeInspection&RepairProgram
27RoadwaySafetyandGuardrailProgram
28IntersectionSafety&MobilityProgram
29TrafficSafetyProgram
30TrafficOperationDevicesProgram
31IntelligentTransportationSystems(ITS)Program
32BarrierFreeTransitionPlanImplementation
33ProjectDevelopment&PreDesignProgram
34ArterialCirculationProgram
351%fortheArtsProgram
36LakeWashingtonBlvdNParkAveNtoGeneCoulonPark
37LindAveSWSW16thSttoSW43rdSt
38RainierAveNCorridorImprovements(Phase5)
39SouthLakeWashingtonTransitStop
TotalSources475,592475,592
CityofRenton|20182023TransportationImprovementProgram
23
RESOLUTION NO. 4314
GRANTSINHAND
Period
TIPProjectTitle201820192020202120222023Total
1StreetOverlay
2ArterialRehabilitationProgram 837,500183,2001,020,700
3LoganAveNorthImprovements
4SW27thStreet/StranderBoulevardConnection
5NE3rdStreet/NE4thStreetCorridorImprovements
6DuvallAveNENE7thSttoSunsetBlvdNE
7RainierAveS/NPhase4S3rdStreettoNW3rdPl 432,500396,170828,670
8WilliamsAveSandWellsAveSConversionProject 468,5502,811,200570,2503,850,000
9South2ndStreetConversionProject
10South3rdStreetConversionProject
11MainAvenueSouthAlley
12ParkAvenueNorthExtension
13116thAveSEImprovements
14CarrRoadImprovements
15NESunsetBoulevard(SR900)CorridorImprovements 324,22296,803421,025
16SunsetAreaGreenConnections
17OakesdaleAveSW/MonsterRoadSW/68thAveStoSR900
18South7thStreetRainierAveSouthtoTalbotRoadSouth
19SouthGradyWayTalbotRdSouthtoRainierAveSouth
20HouserWayNorthNorth8thStreettoLakeWashingtonBlvd
21LakeWashingtonLoopTrail 301,4081,872,575124,8402,298,823
22LaketoSound(L2S)Trail
23WalkwayProgram
24SidewalkRehabilitationandReplacementProgram
25MapleValleyHighwayAttenuator
26BridgeInspection&RepairProgram
27RoadwaySafetyandGuardrailProgram
28IntersectionSafety&MobilityProgram
29TrafficSafetyProgram
30TrafficOperationDevicesProgram
31IntelligentTransportationSystems(ITS)Program
32BarrierFreeTransitionPlanImplementation
33ProjectDevelopment&PreDesignProgram
34ArterialCirculationProgram
351%fortheArtsProgram
36LakeWashingtonBlvdNParkAveNtoGeneCoulonPark
37LindAveSWSW16thSttoSW43rdSt
38RainierAveNCorridorImprovements(Phase5)
SouthLakeWashingtonTransitStop
39
TotalSources2,364,1805,359,948695,0908,419,218
CityofRenton|20182023TransportationImprovementProgram
24
RESOLUTION NO. 4314
MITIGATIONINHAND(IMPACTFEES)
Period
TIPProjectTitle201820192020202120222023Total
1StreetOverlay 800,000800,000
2ArterialRehabilitationProgram
3LoganAveNorthImprovements
4SW27thStreet/StranderBoulevardConnection
5NE3rdStreet/NE4thStreetCorridorImprovements
6DuvallAveNENE7thSttoSunsetBlvdNE
7RainierAveS/NPhase4S3rdStreettoNW3rdPl
8WilliamsAveSandWellsAveSConversionProject
9South2ndStreetConversionProject
10South3rdStreetConversionProject
11MainAvenueSouthAlley
12ParkAvenueNorthExtension
13116thAveSEImprovements
14CarrRoadImprovements 200,000200,000
15NESunsetBoulevard(SR900)CorridorImprovements
16SunsetAreaGreenConnections
17OakesdaleAveSW/MonsterRoadSW/68thAveStoSR900
18South7thStreetRainierAveSouthtoTalbotRoadSouth
19SouthGradyWayTalbotRdSouthtoRainierAveSouth
20HouserWayNorthNorth8thStreettoLakeWashingtonBlvd
21LakeWashingtonLoopTrail
22LaketoSound(L2S)Trail
23WalkwayProgram
24SidewalkRehabilitationandReplacementProgram
25MapleValleyHighwayAttenuator
26BridgeInspection&RepairProgram
27RoadwaySafetyandGuardrailProgram
28IntersectionSafety&MobilityProgram
29TrafficSafetyProgram 10,00010,00010,00010,00010,00010,00060,000
30TrafficOperationDevicesProgram
31IntelligentTransportationSystems(ITS)Program
32BarrierFreeTransitionPlanImplementation
33ProjectDevelopment&PreDesignProgram
34ArterialCirculationProgram
351%fortheArtsProgram
36LakeWashingtonBlvdNParkAveNtoGeneCoulonPark
37LindAveSWSW16thSttoSW43rdSt
38RainierAveNCorridorImprovements(Phase5)
39SouthLakeWashingtonTransitStop
NotAllocatedToMitigationBalance 49,000435,000648,000661,000675,000689,0003,157,000
TotalSources859,000645,000658,000671,000685,000699,0004,217,000
Projectsnoneligibleforuseofmitigationfees
CityofRenton|20182023TransportationImprovementProgram
25
RESOLUTION NO. 4314
OTHERINHAND
(Includes:GeneralFund,WSDOTandDeveloperContributions)
Period
TIPProjectTitle201820192020202120222023Total
1StreetOverlay
2ArterialRehabilitationProgram
3LoganAveNorthImprovements
4SW27thStreet/StranderBoulevardConnection
5NE3rdStreet/NE4thStreetCorridorImprovements
6DuvallAveNENE7thSttoSunsetBlvdNE
7RainierAveS/NPhase4S3rdStreettoNW3rdPl
8WilliamsAveSandWellsAveSConversionProject 176,450323,550500,000
9South2ndStreetConversionProject
10South3rdStreetConversionProject
11MainAvenueSouthAlley
12ParkAvenueNorthExtension
13116thAveSEImprovements
14CarrRoadImprovements
15NESunsetBoulevard(SR900)CorridorImprovements
16SunsetAreaGreenConnections
17OakesdaleAveSW/MonsterRoadSW/68thAveStoSR900
18South7thStreetRainierAveSouthtoTalbotRoadSouth
19SouthGradyWayTalbotRdSouthtoRainierAveSouth
20HouserWayNorthNorth8thStreettoLakeWashingtonBlvd
21LakeWashingtonLoopTrail
22LaketoSound(L2S)Trail 2,800,0002,800,000
23WalkwayProgram
24SidewalkRehabilitationandReplacementProgram
25MapleValleyHighwayAttenuator
26BridgeInspection&RepairProgram
27RoadwaySafetyandGuardrailProgram
28IntersectionSafety&MobilityProgram
29TrafficSafetyProgram
30TrafficOperationDevicesProgram
31IntelligentTransportationSystems(ITS)Program
32BarrierFreeTransitionPlanImplementation
33ProjectDevelopment&PreDesignProgram
34ArterialCirculationProgram
351%fortheArtsProgram
36LakeWashingtonBlvdNParkAveNtoGeneCoulonPark 2,000,0002,000,000
37LindAveSWSW16thSttoSW43rdSt
38RainierAveNCorridorImprovements(Phase5)
LakeWashingtonTransitStop
39South
TotalSources176,4505,123,5505,300,000
CityofRenton|20182023TransportationImprovementProgram
26
RESOLUTION NO. 4314
FundingSources(ToBeDetermined)
Period
TIPProjectTitle201820192020202120222023Total
1StreetOverlay 780,000800,000850,000900,000950,0004,280,000
2ArterialRehabilitationProgram 257,800460,000490,000520,000550,0002,277,800
3LoganAveNorthImprovements 1,240,00010,000,0006,000,0007,440,00024,680,000
4SW27thStreet/StranderBoulevardConnection
5NE3rdStreet/NE4thStreetCorridorImprovements 700,0003,540,0004,680,0002,700,00011,620,000
6DuvallAveNENE7thSttoSunsetBlvdNE 375,0001,625,0002,000,000
7RainierAveS/NPhase4S3rdStreettoNW3rdPl 3,500,0008,320,0005,730,0001,950,00019,500,000
8WilliamsAveSandWellsAveSConversionProject 735,250214,750950,000
9South2ndStreetConversionProject 3,500,0007,800,0007,800,00019,100,000
10South3rdStreetConversionProject 4,000,0006,500,00010,700,00021,200,000
11MainAvenueSouthAlley 300,000300,000
12ParkAvenueNorthExtension 900,0009,100,00010,000,000
13116thAveSEImprovements 600,0001,600,0003,100,0002,600,0002,200,00010,100,000
14CarrRoadImprovements
15NESunsetBoulevard(SR900)CorridorImprovements 1,000,0002,000,0007,550,00010,600,0009,375,00030,525,000
16SunsetAreaGreenConnections 3,600,00010,700,0007,900,00022,200,000
17 50,0008,000,0008,050,000
OakesdaleAveSW/MonsterRoadSW/68thAveStoSR900
18South7thStreetRainierAveSouthtoTalbotRoadSouth 200,0001,700,0001,300,0005,200,0001,300,0009,700,000
19SouthGradyWayTalbotRdSouthtoRainierAveSouth 550,0001,760,0001,690,0004,000,000
20HouserWayNorthNorth8thStreettoLakeWashingtonBlvd 1,065,0001,560,0002,340,0004,965,000
21LakeWashingtonLoopTrail 187,000112,3181,200,0002,750,0003,250,0007,499,318
22LaketoSound(L2S)Trail
23WalkwayProgram
24SidewalkRehabilitationandReplacementProgram
25MapleValleyHighwayAttenuator 181,000999,2001,180,200
26BridgeInspection&RepairProgram 30,00030,00050,00050,00050,000210,000
27RoadwaySafetyandGuardrailProgram
28IntersectionSafety&MobilityProgram 100,00050,00050,00050,00050,000300,000
29TrafficSafetyProgram 10,00050,00050,00050,00050,000210,000
30TrafficOperationDevicesProgram
31IntelligentTransportationSystems(ITS)Program
32BarrierFreeTransitionPlanImplementation
33ProjectDevelopment&PreDesignProgram
34ArterialCirculationProgram
351%fortheArtsProgram
36LakeWashingtonBlvdNParkAveNtoGeneCoulonPark
37LindAveSWSW16thSttoSW43rdSt 400,0001,650,0002,350,0004,400,000
38RainierAveNCorridorImprovements(Phase5)100,0002,000,0002,400,0004,500,000
39SouthLakeWashingtonTransitStop 610,0002,400,0003,010,000
TotalUndetermined1,810,00016,131,05016,656,26852,975,00070,170,00069,015,000226,757,318
CityofRenton|20182023TransportationImprovementProgram
27
RESOLUTION NO. 4314
CR|2018Α2023TIP
ITYOFENTONRANSPORTATIONMPROVEMENTROGRAM
SFΑPD
ECTIONIVEROJECTESCRIPTIONS
SPC30
UMMARYOFROJECTSANDOSTS
DPD3169
ETAILEDROJECTESCRIPTIONS
TIPNo.ProjectTitle
1StreetOverlay 31
2ArterialRehabilitationProgram 32
3LoganAvenueNorthImprovements 33
4SW27 th Street/StranderBlvdConnection 34
rdth
5NE3Street/NE4StreetCorridorImprovements 35
th
6DuvallAvenueNE(NE4StreettoSunsetBlvdNE)36
rdrd
7RainierAvenueSouth/North(Phase4ΑSouth3StreettoNW3Place)37
8WilliamsAveSandWellsAveSConversionProject 38
9South2ndStreetConversionProject 39
10South3rdStreetConversionProject 40
11MainAvenueSouthAlley 41
12ParkAvenueNorthExtension 42
13116thAveSEImprovements 43
14CarrRoadImprovements 44
15NESunsetBoulevard(SR900)CorridorImprovements 45
16SunsetAreaGreenConnections 46
17OakesdaleAveSW/MonsterRoadSW/68thAveStoSR900 47
18South7thStreet(RainierAvenueSouthtoTalbotRoadSouth)48
19SouthGradyWay(TalbotRoadSouthtoRainierAvenueSouth)49
20HouserWayNorth(North8thStreettoLakeWashingtonBlvd)50
21LakeWashingtonLoopTrail 51
22LaketoSound(L2S)Trail 52
23WalkwayProgram 53
24SidewalkRehabilitationandReplacementProgram 54
25MapleValleyHighwayAttenuator 55
26BridgeInspectionandRepairProgram 56
27RoadwaySafetyandGuardrailProgram 57
28IntersectionSafetyandMobilityProgram 58
29TrafficSafetyProgram 59
30TrafficOperationDevicesProgram 60
31IntelligentTransportationSystems(ITS)Program 61
32BarrierFreeTransitionPlanImplementation 62
33ProjectDevelopmentandPreDesignProgram 63
34ArterialCirculationProgram 64
351%fortheArtsProgram 65
36LakeWashingtonBlvdNorth(ParkAvenueNorthtoGeneCoulonMemorialPark)66
37LindAveSWSW16thSttoSW43rdSt 67
38RainierAvenueNorthCorridorImprovements(Phase5)68
39SouthLakeWashingtonTransitStop 69
SFΑPD29
ECTIONIVEROJECTESCRIPTIONS
RESOLUTION NO. 4314
SUMMARYOFPROJECTSANDCOSTS(FUNDED+UNFUNDED)
SixYearTotalTotal
TIPProjectTitle201820192020202120222023PeriodTotalFundedUnfunded
StreetOverlay 1,790,0001,880,0001,970,0002,070,0002,170,0002,260,00012,140,0007,860,0004,280,000
1
ArterialRehabilitationProgram 1,273,500882,000930,000980,0001,030,0001,080,0006,175,5003,897,7002,277,800
2
LoganAveNorthImprovements 1,240,00010,000,0006,000,0007,440,00024,680,00024,680,000
3
SW27thStreet/StranderBoulevardConnection
4
NE3rdStreet/NE4thStreetCorridorImprovements 20,00020,000700,0003,540,0004,680,0002,700,00011,660,00040,00011,620,000
5
DuvallAveNENE7thSttoSunsetBlvdNE 375,0001,625,0002,000,0002,000,000
6
RainierAveS/NPhase4S3rdStreettoNW3rdPl 500,000458,0003,500,0008,320,0005,730,0001,950,00020,458,000958,00019,500,000
7
WilliamsAveSandWellsAveSConversionProject 1,045,0003,870,000785,0005,700,0004,750,000950,000
8
South2ndStreetConversionProject 3,500,0007,800,0007,800,00019,100,00019,100,000
9
South3rdStreetConversionProject 4,000,0006,500,00010,700,00021,200,00021,200,000
10
MainAvenueSouthAlley 350,000350,00050,000300,000
11
ParkAvenueNorthExtension 900,0009,100,00010,000,00010,000,000
12
116thAveSEImprovements 600,0001,600,0003,100,0002,600,0002,200,00010,100,00010,100,000
13
CarrRoadImprovements 200,000200,000200,000
14
NESunsetBoulevard(SR900)CorridorImprovements 700,0001,209,0002,000,0007,550,00010,600,0009,375,00031,434,000909,00030,525,000
15
SunsetAreaGreenConnections 3,600,00010,700,0007,900,00022,200,00022,200,000
16
OakesdaleAveSW/MonsterRoadSW/68thAveStoSR900 50,0008,000,0008,050,0008,050,000
17
South7thStreetRainierAveSouthtoTalbotRoadSouth 200,0001,700,0001,300,0005,200,0001,300,0009,700,0009,700,000
18
SouthGradyWayTalbotRdSouthtoRainierAveSouth 550,0001,760,0001,690,0004,000,0004,000,000
19
HouserWayNorthNorth8thStreettoLakeWashingtonBlvd 1,065,0001,560,0002,340,0004,965,0004,965,000
20
LakeWashingtonLoopTrail 327,0001,875,000125,0001,200,0002,750,0003,250,0009,527,0002,327,0007,200,000
21
LaketoSound(L2S)Trail 2,800,0002,800,0002,800,000
22
WalkwayProgram 200,00250,00250,00250,00250,001,200,001,200,00
0000000
23
SidewalkRehabilitationandReplacementProgram 100,000100,000110,000110,000110,000110,000640,000640,000
24
MapleValleyHighwayAttenuator 181,000999,2001,180,2001,180,200
25
BridgeInspection&RepairProgram 60,00090,000100,000100,000100,000100,000550,000340,000210,000
26
RoadwaySafetyandGuardrailProgram 15,00015,00020,00025,00025,00025,000125,000125,000
27
IntersectionSafety&MobilityProgram 250,000350,000350,000350,000350,000350,0002,000,0001,700,000300,000
28
TrafficSafetyProgram 130,000150,000150,000150,000150,000150,000880,000670,000210,000
29
TrafficOperationDevicesProgram 120,000120,000120,000120,000120,000120,000720,000720,000
30
IntelligentTransportationSystems(ITS)Program 30,00030,00030,00030,00030,00030,000180,000180,000
31
BarrierFreeTransitionPlanImplementation 30,00030,00040,00040,00040,00040,000220,000220,000
32
ProjectDevelopment&PreDesignProgram 150,000150,000150,000150,000150,000150,000900,000900,000
33
ArterialCirculationProgram 145,000145,000150,000150,000150,000150,000890,000890,000
34
1%fortheArtsProgram 15,00015,00015,00015,00015,00015,00090,00090,000
35
LakeWashingtonBlvdNParkAveNtoGeneCoulonPark 2,000,0002,000,0002,000,000
36
LindAveSWSW16thSttoSW43rdSt 400,0001,650,0002,350,0004,400,0004,400,000
37
RainierAveNCorridorImprovementsPhase5 100,0002,000,0002,400,0004,500,0004,500,000
38
SouthLakeWashingtonTransitStop 610,0002,400,0003,010,0003,010,000
39
TotalSources8,560,50029,620,00020,234,20056,025,00073,290,00072,195,000259,924,70033,466,700226,458,000
CityofRenton|20182023TransportationImprovementProgram
30
RESOLUTION NO. 4314
TIPNO.1STREETOVERLAY
StreetOverlay
FunctionalClassification:
N/A
P.M.JAE
Proj.Length:Proj:
N/A122108
CommunityPlanningArea:TIPNo.1
CONTACT:
N/APatrickZellner425.430.2270
DESCRIPTION:STATUS:
Annualprogramforrepairingandresurfacingexistingroadways.InstallationofADAcompliantcurbrampshasThe2016"PavementManagementProgramStateoftheStreetsReport"ratedtheaverage
beenincorporatedintotheStreetOverlayPrograminaccordancewithfederalrequirements.ThisprogramfundsPavementConditionIndex(PCI)as68.Accordingtothereport,$78Mwillneedtobeinvestedin
overlaysonneighborhoodstreetsandcollectorstreets.TheArterialRehabilitationProgramfundsprincipalandpavementrehabilitationinthenext10yearstobringthePCIto70andmaintainitatthatlevel.If
minorarterials.fundingiskeptatthe$2.0M/yeartoPCIwilldropto 56 inthenext10years.
Thisprogramallocates$100K/yrfortheoverlayofalleyways.
JUSTIFICATION:CHANGES:
Asphaltconcretepavement(ACP)overlayandslurrysealofstreetsprovideforimproveddrivingsurfaceandareThealleyfundingfor2016wasallocatedtothealleyatS2ndStandMainAveS.
highlycosteffectivewaysofavoidingexpensiverepairsandreconstruction.ThePavementManagementSystemAnewsourceoffundingwillneedtobeidentifiedtoaccommodateanyincreaseinexpenditures.
andbiennialsurveyofroadwayconditionsgreatlyimprovetheefficiencyoftheOverlayProgram.
Funded:9,507,44Unfunded:4,280,00
30
ProjectTotalsProgrammedPre2018SixYearProgram
ITEMProgrammedTotal201820192020202120222023
SpentIn20162017
EXPENSES:
Planning
PreliminaryEngineering28,004,00024,004,0004,0004,0004,0004,0004,000
00
ROW(includesAdmin)
Construction13,308,24408,2491,120,0011,780,001,730,001,820,001,910,002,010,002,110,002,200,00
900000000
ConstructionServices451,1959,1956,00336,0056,0056,0056,0056,0056,0056,00
4400000000
PostConstructionServices
TOTALEXPENSES
13,787,44467,4431,180,0012,140,001,790,001,880,001,970,002,070,002,170,002,260,00
300000000
SOURCEOFFUNDS:
VehicleFuelTax5,477,44467,443660,004,350,00700,00710,00720,00730,00740,00750,00
300000000
3,045,00335,002,710,00290,00390,00450,00490,00530,00560,00
Business&OccupationShare
000000000
ProposedFundBalance185,00185,00
00
GrantsInHand(1)
GrantsInHand(2)
MitigationInHand800,00800,00800,00
000
OtherInHand(1)
OtherInHand(2)
Undetermined4,280,004,280,00780,00800,00850,00900,00950,00
0000000
TOTALSOURCES
13,787,443467,4431,180,00012,140,0001,790,0001,880,0001,970,0002,070,0002,170,0002,260,000
CityofRenton|20182023TransportationImprovementProgram
31
RESOLUTION NO. 4314
TIPNO.2ARTERIALREHABILITATIONPROGRAM
ArterialRehabilitationProgram
FunctionalClassification:
Various
P.M.MARK
Proj.Length:Proj:
N/A122185,122186,122188,122189
CommunityPlanningArea:TIPNo.2
CONTACT:
N/APatrickZellner425.430.2270
DESCRIPTION:STATUS:
Thisprogramprovidesfortherehabilitationofprincipalandminorarterialstreets.InstallationofADAcompliantThe2016"PavementManagementProgramStateoftheStreetsReport"ratedtheaverage
curbrampshasbeenincorporatedintotheannualArterialRehabilitationandOverlayprogramsaccordingtonewPavementConditionIndex(PCI)as68.Accordingtothereport,$78Mwillneedtobeinvestedin
federalrequirements.pavementrehabilitationinthenext10yearstobringthePCIto70andmaintainitatthatlevel.
TheCitywasawardeda$1,020,700STPgrantin2016forRentonAveExt.Pavingschedule:2017
to2019RentonAveExt(S130thSttoTaylorAveNW).
JUSTIFICATION:CHANGES:
TheOverlayProgram(TIP#1)concentratestoagreatdegreeonmaintainingresidentialstreets,whererelatively
smalltrafficvolumesandlesstruckandbustrafficmakestandardasphaltoverlaysalongtermmeansof
maintenance.Arterialstreetscanoftendeteriorateratherquicklyandoftenrequiremorecostlyrehabilitation
measuresand/orcostlytemporaryrepairstoavoidmoreextensivedeterioration.
Funded:5,770,557Unfunded:2,277,800
ProgrammedPre2018SixYearProgram
ProjectTotals
ITEMProgrammedTotal201820192020202120222023
Spentin20162017
EXPENSES:
Planning1,2611,261
PreliminaryEngineering414,535134,535196,00084,00084,000
ROW(includesAdmin)
Construction7,037,6201,275,6205,762,000920,000822,000930,000980,0001,030,0001,080,000
ConstructionServices594,941190,44175,000329,500269,50060,000
PostConstructionServices
TOTALEXPENSES
8,048,3571,601,857271,0006,175,5001,273,500882,000930,000980,0001,030,0001,080,000
SOURCEOFFUNDS:
VehicleFuelTax
3,475,236327,236271,0002,877,000436,000441,000470,000490,000510,000530,000
Business&OccupationShare
ProposedFundBalance
2,295,3211,274,6211,020,700837,500183,200
GrantsInHand(STPPreservation)
GrantsInHand(2)
MitigationInHand
OtherInHand(1)
OtherInHand(2)
Undetermined2,277,8002,277,800257,800460,000490,000520,000550,000
TOTALSOURCES
8,048,3571,601,857271,0006,175,5001,273,500882,000930,000980,0001,030,0001,080,000
CityofRenton|20182023TransportationImprovementProgram
32
RESOLUTION NO. 4314
TIPNO.3LOGANAVENORTHIMPROVEMENTS
LoganAveNorthImprovements
FunctionalClassification:Fund:
PrincipalArterial317
P.M.LEE
Proj.Length:Proj:
0.76mi122303
CommunityPlanningArea:TIPNo.3
CityCenter CONTACT:
JamesWilhoit425.430.7319
DESCRIPTION:STATUS:
Phase1(CedarRiverBridgetoN6thSt)iscomplete.Phase2(N6thSttoParkAveN)willaddaNBlane,newPhases2and3arependingfuturegrantfundingavailability.
curb,gutter,sidewalks(ontheeastside),landscapedbuffer,andapedestrian/bicycletrail(westside),
streetlights,pedestrianscaleillumination,crosswalks,channelization.Phase3(S2ndSttotheCedarRiverBridge)
willhaveparkingonbothsides,bikelanesand2trafficlanes.ThedesignworkforthebicyclecrossingonCedar
RiverbridgehasbeenmovedtoTIP21LoopTrail.
JUSTIFICATION:CHANGES:
TheincreaseintrafficandthenewRapidRidetransithavewarrantedwideningtoaddanorthboundlane.
Includedwiththeimprovementsareurbanroadwayamenitiestoimplement"CompleteStreets"practiceperCity
code.
Funded:7,319,451Unfunded:24,680,000
ProjectTotalsProgrammedPre2018SixYearProgram
ITEMProgrammedTotal201820192020202120222023
SpentPre20172017
EXPENSES:
Planning39,76039,760
PreliminaryEngineering3,245,5441,005,5442,240,0001,240,0001,000,000
ROW(includesAdmin)9,033,26633,2669,000,0009,000,000
Construction16,311,2094,911,209200,00011,200,0005,000,0006,200,000
ConstructionServices3,369,6731,043,67386,0002,240,0001,000,0001,240,000
PostConstructionServices
TOTALEXPENSES
31,999,4517,033,451286,00024,680,0001,240,00010,000,0006,000,0007,440,000
SOURCESOFFUNDS:
VehicleFuelTax
27,06527,065
Business&OccupationShare
FundBalance24,49920,1114,388
GrantsInHand(STP)3,074,9432,988,94386,000
GrantsInHand(TIB)3,912,2423,716,630195,612
MitigationInHand200,000200,000
53,70253,702
OtherInHand(IntegraPhone)
27,00027,000
OtherInHand(BoeingParkingLot)
Undetermined24,680,00024,680,0001,240,00010,000,0006,000,0007,440,000
TOTALSOURCES
31,999,4517,033,451286,00024,680,0001,240,00010,000,0006,000,0007,440,000
CityofRenton|20182023TransportationImprovementProgram
33
RESOLUTION NO. 4314
TIPNO.4SW27THSTREET/STRANDERBOULEVARDCONNECTION
SW27thStreet/StranderBoulevardConnection
FunctionalClassification:
MinorArterial
P.M.LEE
Proj.Length:Proj:
1.27miles122239,122240
CommunityPlanningArea:TIPNo.4
Valley CONTACT:
KeithWoolley425.430.7318
DESCRIPTION:STATUS:
TheprojectwillprovideagradeseparatedcrossingattheUnionPacificRailroad(UPRR)andBurlingtonNorthernProjectincloseout.CityofTukwilahastakentheleadforfuturephases.
SantaFe(BNSF)railroadtracks.BicycleandpedestrianconnectionswillbeprovidedtotheTukwilaStationand
theInterurbanTrail.Phase1Seg2a2laneroadwayfromNachesAveSWtotheSounderStation,includinga
BNSFbridgeiscompleted.
JUSTIFICATION:
CHANGES:
Thisprojectprovidesacriticalfour/fivelanearterialthatwillserveasaconnectortoWestValleyHighway(SR
181)andEastValleyRoad,aswellasanarterialconnectortoSR167fromthesouth.Aneweastwestarterial
roadwaywillconnectthecitiesofRentonandTukwilaandprovidesignificantcongestionrelieftoexisting
arterials.ThenewroadwillprovideaccesstotheTukwilaTrain/SoundTransitStation.Thenewgradeseparated
arterial(UPRRandBNSFrailroads)willprovidesignificantbenefitstobothfreightmobilityandgeneralmotorists.
Funded:31,116,857Unfunded:
ProgrammedPre2018SixYearProgram
ProjectTotals
ITEMProgrammedTotal201820192020202120222023
SpentPre20172017
EXPENSES:
Planning
PreliminaryEngineering5,030,9125,030,912
ROW(includesAdmin)3,842,5633,842,563
Construction16,798,11116,748,11150,000
ConstructionServices2,435,8292,435,829
Phase1,Seg1design/constr.3,009,4423,009,442
TOTALEXPENSES 31,116,85731,066,85750,000
SOURCESOFFUNDS:
VehicleFuelTax
InterfundLoan700,000700,000
GenFund&Prop.FundBalance2,638,6982,588,69850,000
2,408,4222,408,422
GrantsInHand(State&Fed)
GrantsInHand(FMSIB)7,697,4257,697,425
MitigationInHand1,413,8351,413,835
Bonds2,799,5002,799,500
Other:SoundTransit+FRB4,687,4214,687,421
7,346,5367,346,536
GrantsInHand(STPGrant+TIB)
CityofTukwilaReimb.1,000,0001,000,000
425,020425,020
PWUtilites(Water&SurfWater)
Undetermined
TOTALSOURCES
31,116,85731,066,85750,000
CityofRenton|20182023TransportationImprovementProgram
34
RESOLUTION NO. 4314
TIPNO.5NE3RDSTREET/NE4THSTREETCORRIDORIMPROVEMENTS
NE3rdStreet/NE4thStreetCorridorImprovements
FunctionalClassification:
Principal
P.M.STEVE
Proj.Length:Proj:
2.2mi122176
CommunityPlanningArea:TIPNo.5
Highlands&EastPlateau CONTACT:
KeithWoolley425.430.7318
DESCRIPTION:STATUS:
ThisprojectinvolvesaseriesofimprovementsinthiscorridortoimprovetrafficoperationssuchasTheestimatedcostforallcorridorimprovements(SunsetBlvdNtotheeastCitylimits)is$46M.
rechannelizationandtrafficsignalmodifications,possibletransitprioritysignaltreatmentsandqueuejumps.ThisProgrammedexpenses(20202023)areplaceholdersforfuturephases.Programmedexpensesin
projectwillseektomeetpedestrian,transitandbicycleneeds.Phase1constructedanewsignalandother20182019arefordevelopingscope,costandschedulefornextphases.
improvementsatNE4thStandWhitmanAveNE.
JUSTIFICATION:CHANGES:
Thiscorridorhasastrongpotentialfortransitusageandisexperiencingrapidresidentialandretailgrowth.TheFuturephasesarependingfuturegrantfundingavailability.
NE3rd/4thCorridorStudywasadoptedinMay2005.Thestudyrefinedthecorridortransportationneedsand
costs,includingpedestrian,transit,bicycleimprovements,aswellasstreetscapeenhancement.
Funded:3,759,08Unfunded:11,620,00
50
ProjectTotalsProgrammedPre2018SixYearProgram
ITEMProgrammedTotal201820192020202120222023
SpentPre20172017
EXPENSES:
Planning258,42218,4240,0020,0020,00
00000
PreliminaryEngineering2,176,91776,911,400,00700,00700,00
77000
ROW(includesAdmin)584,0284,02500,00500,00
4400
Construction9,316,802,316,807,000,002,000,004,000,001,000,00
330000
ConstructionServices3,042,92322,9212,720,00340,00680,001,700,00
10000
PostConstructionServices
TOTALEXPENSES
15,379,083,719,0811,660,0020,0020,00700,003,540,004,680,002,700,00
550000000
SOURCEOFFUNDS:
VehicleFuelTax
462,831422,83140,0020,0020,00
Business&OccupationShare
000
ProposedFundBalance1,024,431,024,43
33
1,495,541,495,54
GrantsInHand(TIB)
22
GrantsInHand(2)
MitigationInHand373,70373,70
00
OtherInHand(KCWD#90)352,541352,541
OtherInHand(FranchiseReimb.)50,03850,038
Undetermined11,620,0011,620,00700,003,540,004,680,002,700,00
000000
TOTALSOURCES
15,379,0853,719,08511,660,00020,00020,000700,0003,540,0004,680,0002,700,000
CityofRenton|20182023TransportationImprovementProgram
35
RESOLUTION NO. 4314
TIPNO.6DUVALLAVENENE7THSTTOSUNSETBLVDNE
DuvallAveNENE7thSttoSunsetBlvdNE
FunctionalClassification:Fund:
MinorArterial317
P.M.LEE
Proj.Length:Proj:
0.67mi122702
CommunityPlanningArea:TIPNo.6
Highlands&EastPlateau CONTACT:
FloraLee425.430.7303
DESCRIPTION:STATUS:
Reconstruction/resurfacingofroadway,includingnewpavement,curb,gutter,sidewalk,streetlights,stormTheCitywasawardedaTIBgrantintheamountof$3,468,289(2015)fortheroadway
drainage,channelizationandbikelanesfromNE7thSttoSunsetBlvdNE.reconstructionbetweenNE10thStandNE12thSt,curb,gutter,sidewalkandstreetlightsonthe
westsideandchannelizationfromNE12thSttosouthoftheintersectionwithNESunsetBlvd.A
futurephasewillinstallnonmotorizedimprovementsalongtheeastsideofDuvallAveNE,from
NE7thSttoNE12thSt.
JUSTIFICATION:CHANGES:
Completeroadwayimprovements,bicyclelanesandsidewalksonDuvallAveNE,fromNE7thSttoSunsetBlvdAnticipateconstructionin2017.
NE.Conditionoftheexistingroadwaypavementrequiresroadreconstructioninsegmentsoftheroadway.
Projectwillenhancesafetyforpedestrians,bicyclistsandvehicularalongthiscorridor.
Funded:4,970,88Unfunded:2,000,00
50
ProjectTotalsProgrammedPre2018SixYearProgram
ITEMProgrammedTotal201820192020202120222023
SpentPre20172017
EXPENSES:
Planning
PreliminaryEngineering1,042,88163,885504,00375,00375,00
5000
ROW(includesAdmin)
Construction4,826,003,576,001,250,001,250,00
0000
ConstructionServices1,102,00727,00375,00375,00
0000
PostConstructionServices
TOTALEXPENSES
6,970,88163,8854,807,002,000,00375,001,625,00
50000
SOURCESOFFUNDS:
VehicleFuelTax
60,0060,00
Business&OccupationShare
00
FundBalance+Heldreserve692,59142,471550,125
6
GrantsInHand(TIB)3,468,2821,413,446,87
945
GrantsInHand(2)
MitigationInHand750,00750,00
00
OtherInHand(1)
OtherInHand(2)
Undetermined2,000,002,000,00375,001,625,00
0000
TOTALSOURCES
6,970,885163,8854,807,0002,000,000375,0001,625,000
CityofRenton|20182023TransportationImprovementProgram
36
RESOLUTION NO. 4314
TIPNO.7RAINIERAVES/NPHASE4S3RDSTREETTONW3RDPL
RainierAveS/NPhase4S3rdStreettoNW3rdPl
FunctionalClassification:
Principal
P.M.LEE
Proj.Length:Proj:
0.51mi122195
CommunityPlanningArea:TIPNo.7
CityCenter CONTACT:
DerekAkesson425.430.7337
DESCRIPTION:STATUS:
ThisisPhase4oftheRainierAveCorridorImprovements,andwillextendtheimprovementsfromS3rdSttoNWASTPgrantintheamountof$2,600,000wasawarded(2014)fordesignofPhase4.Designis
3rdPl.Projectelementsincludesidewalkwideningwithstreetscaping,addingpedestrianscaleillumination,underway.ThisprojectphaseisinaSTPcontingencylistforRightofWayfunds.
addingapedestrianactuatedtrafficsignal,upgradingexistingtrafficsignals,transitfacilityimprovements,planted
bufferstripsandlandscapedmedians.Alsoincludesaped/bikepathontheeastsideofRainierAveN,between
AirportWayandNW3rdPl.
JUSTIFICATION:
CHANGES:
RainierAveisacriticalcorridorincentralRentonwithexistingoperationalproblemsandinneedofinfrastructure
enhancementstoprovidegreatereaseofnonmotorizedandtransitbasedtravel.Italsoprovidesimproved
accesstoRentonAirportyandBoeing'sRentonPlant.Improvementswillenhancetrafficflowandreduce
accidents.
Funded:3,006,677Unfunded:19,500,000
ProgrammedPre2018SixYearProgram
ProjectTotals
ITEMProgrammedTotal201820192020202120222023
SpentPre20172017
EXPENSES:
Planning
PreliminaryEngineering3,006,677417,6771,631,000958,000500,000458,000
ROW(includesAdmin)3,500,0003,500,0003,500,000
Construction12,300,00012,300,0006,400,0004,400,0001,500,000
ConstructionServices3,700,0003,700,0001,920,0001,330,000450,000
PostConstructionServices
TOTALEXPENSES
22,506,677417,6771,631,00020,458,000500,000458,0003,500,0008,320,0005,730,0001,950,000
SOURCESOFFUNDS:
VehicleFuelTax
185,71756,387129,33067,50061,830
Business&OccupationShare
ProposedFundBalance220,960220,960
2,600,000361,2901,410,040828,670432,500396,170
GrantsInHand(STP)
GrantsInHand(2)
MitigationInHand
OtherInHand(1)
OtherInHand(2)
Undetermined19,500,00019,500,0003,500,0008,320,0005,730,0001,950,000
TOTALSOURCES
22,506,677417,6771,631,00020,458,000500,000458,0003,500,0008,320,0005,730,0001,950,000
CityofRenton|20182023TransportationImprovementProgram
37
RESOLUTION NO. 4314
TIPNO.8WILLIAMSAVESANDWELLSAVESCONVERSIONPROJECT
WilliamsAveSandWellsAveSConversionProject
FunctionalClassification:Fund:
Principal317
Proj.Length:Proj:
N/A122908
CommunityPlanningArea:TIPNo.
CityCenter 8CONTACT:
KeithWoolley425.430.7318
DESCRIPTION:STATUS:
Theprojectprovidespedestrianandbicyclistsfacilitiesandenhancements,trafficoperationandcirculationTheCitywasawardedaSTPgrantintheamountof$3,850,000in2016.Designstartingin2017
improvementsinDowntown.Theimprovementsincludeaddingraisedintersectionswithbulbouts,parklets,andconstructionisanticipatedtostartin2018.
pedestrianplaza,lighting,streetfurniture,streetscape,bikeracks,signage,wayfindingandconverting
WilliamsAveSandWellsAveStotwowaytrafficoperations.
JUSTIFICATION:
CHANGES:
ThisprojectisoneofthestrategiesidentifiedintheCityCenterCommunityPlan.Theprojectenhances
downtownRentonasadestinationarea,whileimprovingcirculation,reducingtrafficspeedsandenhancing
pedestriansafety.Afeasibilitystudy,includingaDowntownCirculationTrafficAnalysisfortheconversionto
twowayoperationswascompleted.
Funded:5,350,00Unfunded:950,00
00
ProjectTotalsProgrammedPre2018SixYearProgram
ITEMProgrammedTotal201820192020202120222023
SpentPre20172017
EXPENSES:
Planning
PreliminaryEngineering1,000,00600,00400,00400,00
0000
ROW(includesAdmin)
Construction4,110,004,110,00500,003,000,00610,00
00000
ConstructionServices1,190,001,190,00145,00870,00175,00
00000
PostConstructionServices
TOTALEXPENSES
6,300,00600,005,700,001,045,003,870,00785,00
000000
SOURCEOFFUNDS:
VehicleFuelTax
260,0010,00250,00250,00
Business&OccupationShare
0000
FundBalance540,00390,00150,00150,00
0000
GrantsInHand(1)
GrantsInHand(STP)3,850,003,850,00468,552,811,20570,25
00000
MitigationInHand
700,00200,00500,00176,45323,55
Other:WSDOTcontribution
00000
OtherInHand
Undetermined950,00950,00735,25214,75
0000
TOTALSOURCES
6,300,000600,0005,700,0001,045,0003,870,000785,000
CityofRenton|20182023TransportationImprovementProgram
38
RESOLUTION NO. 4314
TIPNO.9SOUTH2NDSTREETCONVERSIONPROJECT
South2ndStreetConversionProject
FunctionalClassification:Fund:
Principal317
Proj.Length:Proj:
N/A
CommunityPlanningArea:TIPNo.
CityCenter 9CONTACT:
KeithWoolley425.430.7318
DESCRIPTION:STATUS:
Theprojectprovidespedestrianandbicyclistsfacilitiesandenhancements,trafficoperationandcirculationThisprojectwillcontinuethedowntownimprovements.Projectispendingfuturegrantfunding
improvementsinDowntown.Theimprovementsincludeaddingraisedintersectionswithbulbouts,lighting,availability.
streetfurniture,streetscape,signange,wayfindingandconvertingS2ndSttotwowayoperations.
JUSTIFICATION:
CHANGES:
ThisprojectisoneofthestrategiesidentifiedintheCityCenterCommunityPlan.Theprojectenhances
Newproject
downtownRentonasadestinationarea,whileimprovingcirculationandenhancingpedestriansafetyand
environment.
Funded:Unfunded:19,100,00
0
ProjectTotalsProgrammedPre2018SixYearProgram
ITEMProgrammedTotal201820192020202120222023
SpentPre20172017
EXPENSES:
Planning
PreliminaryEngineering3,500,003,500,003,500,00
000
ROW(includesAdmin)
Construction12,000,0012,000,006,000,006,000,00
0000
ConstructionServices3,600,003,600,001,800,001,800,00
0000
FiberRelocation
TOTALEXPENSES
19,100,0019,100,003,500,007,800,007,800,00
00000
SOURCEOFFUNDS:
VehicleFuelTax
Business&OccupationShare
FundBalance
GrantsInHand(1)
GrantsInHand(2)
MitigationInHand
OtherInHand(1)
OtherInHand(2)
Undetermined19,100,0019,100,003,500,007,800,007,800,00
00000
TOTALSOURCES
19,100,00019,100,0003,500,0007,800,0007,800,000
CityofRenton|20182023TransportationImprovementProgram
39
RESOLUTION NO. 4314
TIPNO.10SOUTH3RDSTREETCONVERSIONPROJECT
South3rdStreetConversionProject
FunctionalClassification:Fund:
Principal317
Proj.Length:Proj:
N/A
CommunityPlanningArea:TIPNo.
CityCenter 10CONTACT:
KeithWoolley425.430.7318
DESCRIPTION:STATUS:
Theprojectprovidespedestrianandbicyclistsfacilitiesandenhancements,trafficoperationandcirculationThisisthelastprojectoftheDowntownConversiontoatwowayoperations.Itwillcontinuethe
improvementsinDowntown.Theimprovementsincludeaddingraisedintersectionswithbulbouts,parklets,downtownimprovements,furtherenhancingthepedestrianandbicyclistsenvironment.Projectis
pedestrianplaza,lighting,streetfurniture,streetscape,bicycleblvd,bikeracks,signange,wayfindingandpendingfuturegrantfundingavailability.
convertingS3rdSttotwowayoperations.
JUSTIFICATION:
CHANGES:
ThisprojectisoneofthestrategiesidentifiedintheCityCenterCommunityPlan.Theprojectenhances
Newproject
downtownRentonasadestinationarea,whileimprovingcirculation,reducingtrafficspeedsandenhancing
pedestriansafety.Afeasibilitystudy,includingaDowntownCirculationTrafficAnalysisfortheconversionto
twowayoperationswascompleted.
Funded:Unfunded:21,200,00
0
ProjectTotalsProgrammedPre2018SixYearProgram
ITEMProgrammedTotal201820192020202120222023
SpentPre20172017
EXPENSES:
Planning
PreliminaryEngineering4,000,004,000,004,000,00
000
ROW(includesAdmin)
Construction13,200,0013,200,005,000,008,200,00
0000
ConstructionServices4,000,004,000,001,500,002,500,00
0000
PostConstructionServices
TOTALEXPENSES
21,200,0021,200,004,000,006,500,0010,700,00
00000
SOURCEOFFUNDS:
VehicleFuelTax
Business&OccupationShare
FundBalance
GrantsInHand(1)
GrantsInHand(2)
MitigationInHand
OtherInHand(1)
OtherInHand(2)
Undetermined21,200,0021,200,004,000,006,500,0010,700,00
00000
TOTALSOURCES
21,200,00021,200,0004,000,0006,500,00010,700,000
CityofRenton|20182023TransportationImprovementProgram
40
RESOLUTION NO. 4314
TIPNO.11MAINAVENUESOUTHALLEY
MainAvenueSouthAlley
FunctionalClassification:Fund:
Principal317
Proj.Length:Proj:
N/A122708
CommunityPlanningArea:TIPNo.
CityCenter 11CONTACT:
KeithWoolley425.430.7318
DESCRIPTION:STATUS:
TheprojectprovidesimprovementstothealleyconnectingS2ndsttoMainAveS.$100,000wastransferredfromtheOverlayProgramtothisproject,aspartofthealley
maintenance.
JUSTIFICATION:
CHANGES:
Thisprojectimprovesaccesstothenewresidentialandbusinessesadjacenttothealley.
Funded:100,00Unfunded:300,00
00
ProjectTotalsProgrammedPre2018SixYearProgram
ITEMProgrammedTotal201820192020202120222023
SpentPre20172017
EXPENSES:
Planning
PreliminaryEngineering100,0050,0050,0050,00
0000
ROW(includesAdmin)
Construction250,00250,00250,00
000
ConstructionServices50,0050,0050,00
000
FiberRelocation
TOTALEXPENSES
400,0050,00350,00350,00
0000
SOURCEOFFUNDS:
VehicleFuelTax
Business&OccupationShare
FundBalance100,0050,0050,0050,00
0000
GrantsInHand(1)
GrantsInHand(2)
MitigationInHand
OtherInHand(1)
OtherInHand(2)
Undetermined300,00300,00300,00
000
TOTALSOURCES
400,00050,000350,000350,000
CityofRenton|20182023TransportationImprovementProgram
41
RESOLUTION NO. 4314
TIPNO.12PARKAVENUENORTHEXTENSION
ParkAvenueNorthExtension
FunctionalClassification:Fund:
N/A317
P.M.LEE
Proj.Length:Proj:
0.23mi122190
CommunityPlanningArea:TIPNo.12
CityCenter CONTACT:
BobHanson425.430.7225
DESCRIPTION:STATUS:
TheprojectwillextendParkAveNtothenorthofLoganAveN,toprovideaccesstoSouthport,PSEpropertyandFundsshownin2017areforaProjectAlternativesAnalysisandPreliminarydesign.Itis
TheBoeingCompany.Improvementsincludebicycleandpedestrianfacilities,illumination,landscaping.anticipatedtobecompletedbytheFallof2017.
JUSTIFICATION:CHANGES:
WiththeadditionaldevelopmentgrowthintheNorthRentonarea,whichincludesTheLandingandtheSouthportProjectispendingfundingavailability.
residential/hotel/officedevelopment,thisprojectwillconstructimprovementstoimproveaccessibility.
Funded:250,00Unfunded:10,000,00
00
ProgrammedPre2018SixYearProgram
ProjectTotals
ITEMProgrammedTotal201820192020202120222023
SpentPre20172017
EXPENSES:
Planning
PreliminaryEngineering1,150,00250,00900,00900,00
0000
ROW(includesAdmin)4,000,004,000,004,000,00
000
Construction4,000,004,000,004,000,00
000
ConstructionServices1,100,001,100,001,100,00
000
PostConstructionServices
TOTALEXPENSES
10,250,00250,0010,000,00900,009,100,00
00000
SOURCESOFFUNDS:
VehicleFuelTax
Business&OccupationShare
ProposedFundBalance
GrantsInHand(1)
GrantsInHand(2)
MitigationInHand250,00250,00
00
OtherInHand(1)
OtherInHand(2)
Undetermined10,000,0010,000,00900,009,100,00
0000
TOTALSOURCES
10,250,000250,00010,000,000900,0009,100,000
CityofRenton|20182023TransportationImprovementProgram
42
RESOLUTION NO. 4314
TIPNO.13116THAVESEIMPROVEMENTS
116thAveSEImprovements
FunctionalClassification:Fund:
Minorarterial317
P.M.BRYSON
Proj.Length:Proj:
2.5mi122117
CommunityPlanningArea:TIPNo.13
Benson CONTACT:
FloraLee425.430.7303
DESCRIPTION:STATUS:
Widenroadwaytoprovidea3laneroadwaywithbikelanesalong116thAveSEandEdmondsWaySE,includingThecorridorimprovementsisestimatedat$33M.Phase1Improvements(SEPetrovitskyRdtoSE
newpavement,curb,gutter,sidewalk,streetlights,trafficsignals,stormdrainage,channelizationandlandscaping168thSt)areshownasprogrammedfor20192023.Staffwillbedevelopingscope,costand
fromPugetDriveSEtothesouthernCitylimits.BensonHillCommunityPlanrecommendedimprovementsforascheduleforfuturephases.
firstphase,basedontheneighborhoodneeds.Thepriority,costandscheduleforthephasedimprovementswill
bedeterminedbasedonavailablefunding.
JUSTIFICATION:CHANGES:
116thAveSEisclassifiedasaminorarterial.Noncontinuoussegmentsofsidewalkexistalongtheroadway.Staffwillbedevelopingscopeandestimatesforfuturephases.
Improvementswillenhancevehicular,bicycleandpedestriansafetyalongthisimportantnorthsouth
transportationcorridor.
Funded:844,794Unfunded:10,100,000
ProjectTotalsProgrammedPre2018SixYearProgram
ITEMProgrammedTotal201820192020202120222023
SpentPre20172017
EXPENSES:
Planning
PreliminaryEngineering1,313,179113,1791,200,000600,000600,000
ROW(includesAdmin)2,800,0002,800,0001,000,0001,800,000
Construction5,248,783218,783330,0004,700,0001,000,0002,000,0001,700,000
ConstructionServices1,582,83152,831130,0001,400,000300,000600,000500,000
PostConstructionServices
TOTALEXPENSES
10,944,794384,794460,00010,100,000600,0001,600,0003,100,0002,600,0002,200,000
SOURCEOFFUNDS:
VehicleFuelTax
26,79418,9737,821
Business&OccupationShare
ProposedFundBalance
818,000365,821452,179
GrantsInHand(CMAQ+SRTS)
MitigationInHand
OtherInHand(1)
OtherInHand(2)
Undetermined10,100,00010,100,000600,0001,600,0003,100,0002,600,0002,200,000
TOTALSOURCES
10,944,794384,794460,00010,100,000600,0001,600,0003,100,0002,600,0002,200,000
CityofRenton|20182023TransportationImprovementProgram
43
RESOLUTION NO. 4314
TIPNO.14CARRROADIMPROVEMENTS
CarrRoadImprovements
FunctionalClassification:Fund:
MajorArterial317
P.M.BRYSON
Proj.Length:Proj:
122920
CommunityPlanningArea:TIPNo.14
Talbot&Benson CONTACT:
FloraLee425.430.7303
DESCRIPTION:STATUS:
AcorridorstudypreparedbyKingCountyin2003identifiedtheneedforroadwayimprovementsfromLindAveFutureroadwayimprovementoptionsincludespotsafetyimprovements,bicycleandpedestrian
SWandSW43rdStintersectionandextendeastcrossingSR167andendingat116thAveSE.Potentialimprovements,roadwaywideningandroadwayonnewalignment.Staffwillbedevelopingscope,
improvementsvaryfromroadwayrealignment/wideningatseverallocationstoaddressgeometricdeficiencies,costandscheduleforfuturephases.
wideningto5laneroadway(2laneswestbound,3laneseastbound),includingbicyclelanesonnewalignment.
Thetotalprojectcostisestimatedas$80M.
JUSTIFICATION:
CHANGES:
CarrRoadisclassifiedasaprincipalarterial.Ithasfourlanesoftrafficwithleftturnlanesatintersections.
Improvementsarenecessarytoenhancevehicletrafficcapacityandsafetyforvehicles,bicycles,andpedestrians
onthismajoreastwesttransportationcorridor.
Funded:919,937Unfunded:
ProjectTotalsProgrammedPre2018SixYearProgram
ITEMProgrammedTotal201820192020202120222023
SpentPre20172017
EXPENSES:
Planning200,000200,000200,000
PreliminaryEngineering719,93789,937630,000
ROW(includesAdmin)
Construction
ConstructionServices
PostConstructionServices
TOTALEXPENSES
919,93789,937630,000200,000200,000
SOURCEOFFUNDS:
VehicleFuelTax
Business&OccupationShare
ProposedFundBalance29,93729,937
660,00078,940581,060
GrantsInHand(FederalSafety)
GrantsInHand(2)
MitigationInHand230,00010,99719,003200,000200,000
OtherInHand(1)
OtherInHand(2)
Undetermined
TOTALSOURCES
919,93789,937630,000200,000200,000
1stDRAFT
CityofRenton|20182023TransportationImprovementProgram
44
RESOLUTION NO. 4314
TIPNO.15NESUNSETBOULEVARD(SR900)CORRIDORIMPROVEMENTS
NESunsetBoulevard(SR900)CorridorImprovements
FunctionalClassification:Fund:
Principal317
P.M.LEE
Proj.Length:Proj:
3.0mi122902
CommunityPlanningArea:TIPNo.15
CityCenter,Highlands&EastPlateau CONTACT:
KeithWoolley425.430.7318
DESCRIPTION:STATUS:
Thisprojectwillseektoaddresspedestrian,transitandbicycleneeds.ThiscorridorneedsaseriesofkeyTheprojecthasreceivedaSTP/CMAQgrantintheamountof$1,313,935fordesign.
improvementstoimprovetrafficoperationssuchaschannelization,trafficsignalmodifications,signaltreatments,
possiblequeuejumps,accessmanagementthroughinstallationofmedians.ThecorridorlimitsarefromI405on
thewestandtotheeastCitylimits.
JUSTIFICATION:CHANGES:
Thiscorridorhasstrongpotentialfornonmotorizedandtransitusage.TheSunsetareaisexperiencingresidential30%Designofthecorridorimprovementsiscompleted.
andretailgrowth.
TheSunsetAreaPlannedActionEISpreparedin2011delineatedtransportationneedsalongSunsetBlvdfromN
ParkDrtoMonroeAveNE(estimatedat$33M).
Funded:2,600,833Unfunded:30,525,000
ProjectTotalsProgrammedPre2018SixYearProgram
ITEMProgrammedTotal201820192020202120222023
SpentPre20172017
EXPENSES:
Planning200,000200,000
PreliminaryEngineering4,000,833491,8331,000,0002,509,000700,000209,0001,000,000600,000
ROW(includesAdmin)3,300,0003,300,0001,000,0002,000,000300,000
Construction20,500,00020,500,0005,000,0008,000,0007,500,000
ConstructionServices5,125,0005,125,0001,250,0002,000,0001,875,000
PostConstructionServices
TOTALEXPENSES
33,125,833691,8331,000,00031,434,000700,0001,209,0002,000,0007,550,00010,600,0009,375,000
SOURCESOFFUNDS:
VehicleFuelTax
240,3392,364237,975125,778112,197
Business&OccupationShare
846,559100,000496,559250,000250,000
FundBalance+Heldreserve
GrantsInHand(STP/CMAQ)1,313,935389,469503,441421,025324,22296,803
GrantsInHand(2)
MitigationInHand
OtherInHand(REET)200,000200,000
OtherInHandHeldinreserve
Undetermined30,525,00030,525,0001,000,0002,000,0007,550,00010,600,0009,375,000
TOTALSOURCES
33,125,833691,8331,000,00031,434,000700,0001,209,0002,000,0007,550,00010,600,0009,375,000
CityofRenton|20182023TransportationImprovementProgram
45
RESOLUTION NO. 4314
TIPNO.16SUNSETAREAGREENCONNECTIONS
SunsetAreaGreenConnections
FunctionalClassification:Fund:
N/A317
P.M.LEE
Proj.Length:Proj:
N/A
CommunityPlanningArea:TIPNo.16
Highlands CONTACT:
VickiGrover425.430.7393
DESCRIPTION:STATUS:
ThisprojectwillconstructmultimodalimprovementsidentifiedintheSunsetAreaCommunityPlannedActionThetotalcostofprojectisestimatedat$22.2M.Schedule,costandselectionofstreetstobe
Study.Roadwayswillbewidened/extended/realignedtoprovideforfuturetrafficflows.Severalresidentialimprovedtobedetermined.Significantcostparticipationwillberequiredfromdevelopment.
streetswillbedevelopedas"greenconnections"improvingpedestrianmobilityandenhancetheneighborhood.SurfaceWaterisleadingthisproject.
RoadwaysincludedareNE10thSt,NESunsetLane,HarringtonAveNE,NE12thSt,EdmondsAveNE,Jefferson
AveNE,KirklandAveNEandGlennwoodAveNE.
JUSTIFICATION:CHANGES:
ImprovementstothesestreetsarekeytosupporttheredevelopmentoftheSunsetAreaCommunityinthe
Highlandsarea,boundedbyNE21stStonthenorth,EdmondsAveNEonthewest,NE7thStonthesouth,and
MonroeAveNEontheeast.TheCityinpartnershipwiththeRentonHousingAuthorityaspirestoredevelopthe
SunsetTerracepublichousingcommunityandencourageprivatedelopmentinthePlannedActionStudyarea
overa20yearperiod.
Funded:Unfunded:22,200,00
0
ProjectTotalsProgrammedPre2018SixYearProgram
ITEMProgrammedTotal201820192020202120222023
SpentPre20172017
EXPENSES:
Planning
PreliminaryEngineering2,600,002,600,002,600,00
000
ROW(includesAdmin)1,000,001,000,001,000,00
000
Construction16,000,0016,000,009,200,006,800,00
0000
ConstructionServices2,600,002,600,001,500,001,100,00
0000
PostConstructionServices
TOTALEXPENSES
22,200,0022,200,003,600,0010,700,007,900,00
00000
SOURCESOFFUNDS:
VehicleFuelTax
Business&OccupationShare
ProposedFundBalance
GrantsInHand(1)
GrantsInHand(2)
MitigationInHand
OtherInHand(CED)
OtherInHand
Undetermined22,200,0022,200,003,600,0010,700,007,900,00
00000
TOTALSOURCES
22,200,00022,200,0003,600,00010,700,0007,900,000
CityofRenton|20182023TransportationImprovementProgram
46
RESOLUTION NO. 4314
TIPNO.17OAKESDALEAVESW/MONSTERROADSW/68THAVESTOSR900
OakesdaleAveSW/MonsterRoadSW/68thAveStoSR900
FunctionalClassification:Fund:
317
P.M.STEVE
Proj.Length:Proj:
0.92mi
CommunityPlanningArea:TIPNo.17
WestHill CONTACT:
BobMahn425.430.7322
DESCRIPTION:STATUS:
Widenexistingroadwaytofourlanesplustwowayleftturnlanewhereneededandbikelanes.RealignBeaconPhase1ofimprovementswilladdressdrainageproblemsbetweentheMonsterRdBridgeandthe
CoalMineRoadapproachtointersectionwiththeOakesdaleAveSWroadway.Includesnewroadway,curbs,Citylimits.Scope,costandimplementationscheduletobedetermined.Projectispendingfuture
sidewalk,drainage,streetlighting,trafficsignals,channelization,retainingwallsandwideningtheexistingbridge.grantfundingavailability.Costbeyond2023notshown.
JUSTIFICATION:CHANGES:
Willservegrowingnorthsouthtrafficdemand.Apreliminarydesignstudywascompletedin1999.Theproject
costisestimatedat$32M,withtheCity'sshareestimatedat$13MandKingCo.at$19M.
Funded:Unfunded:8,050,00
0
ProgrammedPre2018SixYearProgram
ProjectTotals
ITEMProgrammedTotal201820192020202120222023
SpentPre20172017
EXPENSES:
Planning50,0050,0050,00
000
PreliminaryEngineering5,000,005,000,005,000,00
000
ROW(includesAdmin)3,000,003,000,003,000,00
000
Construction
ConstructionServices
PostConstructionServices
TOTALEXPENSES
8,050,008,050,0050,008,000,00
0000
SOURCEOFFUNDS:
VehicleFuelTax
Business&OccupationShare
ProposedFundBalance
GrantsInHand(1)
GrantsInHand(1)
MitigationInHand
OtherInHand(1)
OtherInHand(1)
Undetermined8,050,008,050,0050,008,000,00
0000
TOTALSOURCES
8,050,0008,050,00050,0008,000,000
CityofRenton|20182023TransportationImprovementProgram
47
RESOLUTION NO. 4314
TIPNO.18SOUTH7THSTREETRAINIERAVESOUTHTOTALBOTROADSOUTH
South7thStreetRainierAveSouthtoTalbotRoadSouth
FunctionalClassification:Fund:
317
P.M.STEVE
Proj.Length:Proj:
0.38mi122151
CommunityPlanningArea:TIPNo.
CityCenter CONTACT:
18
KeithWoolley425.430.7318
DESCRIPTION:STATUS:
Wideningtheexistingroadwayto3lanes(2lanesEBand1laneWB)andaseparatedmultiusetrail.IncludesCostsincurredareforPhase1,whichaddedatrafficsignalandaneastboundrightturnlaneat
newcurb,gutter,widersidewalks,streetlighting,landscaping,channelizationandupgradestotrafficsignals.TheStheintersectionofS7thStandShattuckAveS.Projectispendingfuturegrantfundingavailability.
7thStProjectTrafficAnalysisReportprovidedalternativesforcorridorimprovementoptions.Theplanninglevel
costestimateis$11M.
JUSTIFICATION:CHANGES:
ThissegmentoftheS7thStcorridorconnectsTalbotRdS(SR515)withRainierAveS(SR167).ThissegmentofS
7thStispartofadesignatedeastwestped/bikeroutethroughtheCity'scommercialcoreandanimportantlink
betweenregionaltrails.TheSouthRentonNeighborhoodStudyhasidentifiedSouth7thStasneeding
streetscapeimprovements.
Funded:1,658,858Unfunded:9,700,000
ProgrammedPre2018SixYearProgram
ProjectTotals
ITEMProgrammedTotal201820192020202120222023
SpentPre20172017
EXPENSES:
Planning32,27032,270
PreliminaryEngineering1,811,842311,8421,500,000200,0001,000,000300,000
ROW(includesAdmin)1,725,12425,1241,700,000700,0001,000,000
Construction5,990,141975,14115,0005,000,0004,000,0001,000,000
ConstructionServices1,799,481299,4811,500,0001,200,000300,000
PostConstructionServices
TOTALEXPENSES
11,358,8581,643,85815,0009,700,000200,0001,700,0001,300,0005,200,0001,300,000
SOURCEOFFUNDS:
VehicleFuelTax
52,11552,115
Business&OccupationShare
72,16460,00012,164
ProposedFundBalance+Reserve
497,241494,4052,836
GrantsInHand(STP)
GrantsInHand(TIB)613,338613,338
MitigationInHand424,000424,000
OtherInHand(1)
OtherInHand(2)
Undetermined9,700,0009,700,000200,0001,700,0001,300,0005,200,0001,300,000
TOTALSOURCES
11,358,8581,643,85815,0009,700,000200,0001,700,0001,300,0005,200,0001,300,000
CityofRenton|20182023TransportationImprovementProgram
48
RESOLUTION NO. 4314
TIPNO.19SOUTHGRADYWAYTALBOTRDSOUTHTORAINIERAVESOUTH
SouthGradyWayTalbotRdSouthtoRainierAveSouth
FunctionalClassification:Fund:
317
P.M.STEVE
Proj.Length:Proj:
N/A
CommunityPlanningArea:TIPNo.
CityCenter CONTACT:
19
VickiGrover425.430.7393
DESCRIPTION:STATUS:
Thisprojectwillperformacomprehensiveanalysisofmultimodaltransportationimprovements,includingreviewProjectispendingfuturegrantfundingavailability.
ofpotentialtransitimprovementsalongGradyWay,suchasBusinessAccessandTransit(BAT)lanesandTraffic
SignalPriority(TSP).
JUSTIFICATION:CHANGES:
TheprojectwillremovetheislandsattheintersectionsofSGradyWaywithLakeAveSandShattuckAveS,to
allowforacontinuouseastboundlanefromRainierAveStoTalbotRdS.Includedaremodificationstothetraffic
signal,newpedestriancrossingsandchannelization.TheimprovementswilladdmuchneededcapacitytotheS
GradyWaycorridor.
Funded:Unfunded:4,000,00
0
ProgrammedPre2018SixYearProgram
ProjectTotals
ITEMProgrammedTotal201820192020202120222023
SpentPre20172017
EXPENSES:
Planning
PreliminaryEngineering750,00750,00550,00200,00
0000
ROW(includesAdmin)
Construction2,500,002,500,001,200,001,300,00
0000
ConstructionServices750,00750,00360,00390,00
0000
PostConstructionServices
TOTALEXPENSES
4,000,004,000,00550,001,760,001,690,00
00000
SOURCEOFFUNDS:
VehicleFuelTax
Business&OccupationShare
ProposedFundBalance
GrantsInHand(1)
GrantsInHand(1)
MitigationInHand
Other(proposedKCMetro)
OtherInHand(1)
4,000,00550,001,760,001,690,00
Undetermined4,000,00
00000
TOTALSOURCES
4,000,0004,000,000550,0001,760,0001,690,000
CityofRenton|20182023TransportationImprovementProgram
49
RESOLUTION NO. 4314
TIPNO.20HOUSERWAYNORTHNORTH8THSTREETTOLAKEWASHINGTONBLVD
HouserWayNorthNorth8thStreettoLakeWashingtonBlvd
FunctionalClassification:Fund:
N/A317
Proj.Length:Proj:
N/A
CommunityPlanningArea:TIPNo.
CityCenter CONTACT:
20
BobMahn425.430.7322
DESCRIPTION:STATUS:
ThisprojectwillwidenandrealigntheexistingonelaneroadwaytoatwolaneroadwayandincludesAconceptuallayoutofthetwowayapproachtotheintersectionofHouserWayandLakeWA
intersectionimprovementstoconvertHouserWayNtoatwowayoperation.Includesnewroadway,curbs,Blvdhasbeencompleted.ThisprojectwillcoordinatewiththeSouthportDevelopment
pedestrianbicyclepath,drainage,signals,lighting,signingandchannelization.improvementstotheSouthportentranceattheLakeWABlvd/CoulonParkintersection.
JUSTIFICATION:CHANGES:
TheCityofRentontraveldemandmodelpredictstrafficvolumesincreasingsignificantlyintheNorthRenton
Areainthenearfuture.OneoftherecommendationstoimprovenorthboundaccesstoLakeWashingtonBlvd
istoconvertHouserWayNtoatwowayoperations,betweenN8thStandLakeWashingtonBlvd.
Funded:Unfunded:4,965,000
ProjectTotalsProgrammedPre2018SixYearProgram
ITEMProgrammedTotal201820192020202120222023
Spentin20162017
EXPENSES:
Planning
PreliminaryEngineering900,000900,000900,000
ROW(includesAdmin)165,000165,000165,000
Construction3,000,0003,000,0001,200,0001,800,000
ConstructionServices900,000900,000360,000540,000
PostConstructionServices
TOTALEXPENSES
4,965,0004,965,0001,065,0001,560,0002,340,000
SOURCEOFFUNDS:
VehicleFuelTax
Business&OccupationShare
ProposedFundBalance
GrantsInHand(1)
GrantsInHand(2)
MitigationInHand
OtherInHand(1)
OtherInHand(2)
Undetermined4,965,0004,965,0001,065,0001,560,0002,340,000
4,965,0004,965,0001,065,0001,560,0002,340,000
TOTALSOURCES
CityofRenton|20182023TransportationImprovementProgram
50
RESOLUTION NO. 4314
TIPNO.21LAKEWASHINGTONLOOPTRAIL
LakeWashingtonLoopTrail
FunctionalClassification:Fund:
varies317
P.M.LEE
Proj.Length:Proj:
122802
CommunityPlanningArea:TIPNo.21
CityCenter CONTACT:
JamesWilhoit425.430.7319
DESCRIPTION:STATUS:
Theprojectwillconstructapproximately1.3milesofpedestrianandbicyclefacilitiestocompleteagapintheTheCitywasawardedthegrants:TAP=$346,000(2013);STPNonMotorized=$575,000(2015);
LakeWashingtontrailsystem.Improvementsincludea12footwidecombinedpedestrian/bicyclepath,aPed&Bike=$426,000(2015);STP=$1,694,278;Ped&BikeSafety=$430,000(under
landscapedbufferseparatingthepathfromthetravelledroadway,pedestrianlevellighting.Forthesegmentrecommendationfor2017).Constructionhasbeenimplementedinphases,withPhases1and2
locatedalongAirportWay,thefacilitieswillincludeabiketrackandsidewalk,whichwillinvolveremovingonecompleted.Phase4isfromAirportWay/RainierAveNintersectiontonorthCitylimits
westboundlaneoftrafficonAirportWay.(programmedin20202022).
JUSTIFICATION:CHANGES:
Theprojectwillseparatepedestriansandbicyclistsfromthevehiculartraffic,enhancingsafetyandencouragingPhase3(LoganAveN/CedarRivertoRainierAveN)designunderway.Constructiontostartinthe
residentstouseactivetransportationmodes.fallof2017.
Funded:3,708,30Unfunded:7,200,00
10
ProjectTotalsProgrammedPre2018SixYearProgram
ITEMProgrammedTotal201820192020202120222023
SpentPre20172017
EXPENSES:
Planning
PreliminaryEngineering2,261,30385,301326,001,550,00200,001,200,00150,00
100000
ROW(includesAdmin)670,00670,00
00
Construction6,200,006,200,00100,001,500,00100,002,000,002,500,00
0000000
ConstructionServices1,777,001,777,0027,00375,0025,00600,00750,00
0000000
DeveloperReimbursement
TOTALEXPENSES
10,908,30385,301996,009,527,00327,001,875,00125,001,200,002,750,003,250,00
100000000
SOURCESOFFUNDS:
VehicleFuelTax
76,99374,4082,5852,425160
Business&OccupationShare
FundBalance+Heldreserve65,0324,8414,59225,59225,592
06
2,615,27312,955608,0451,694,27101,1631,493,5499,57
GrantsInHand(TAP+STP)
8850
856,00251,455604,545200,245379,0325,27
GrantsInHand(Ped/BikeProgram)
000
MitigationInHand
95,0047,5047,50
000
OtherInHandAirportFundTransfer
OtherInHand
Undetermined7,200,007,200,001,200,002,750,003,250,00
00000
TOTALSOURCES
10,908,301385,301996,0009,527,000327,0001,875,000125,0001,200,0002,750,0003,250,000
CityofRenton|20182023TransportationImprovementProgram
51
RESOLUTION NO. 4314
TIPNO.22LAKETOSOUND(L2S)TRAIL
LaketoSound(L2S)Trail
FunctionalClassification:Fund:
N/A317
P.M.STEVE
Proj.Length:Proj:
N/A122903
CommunityPlanningArea:TIPNo.22
CityCenter&Valley CONTACT:
VickiGrover425.430.7393
DESCRIPTION:STATUS:
TheLaketoSound(L2S)TrailisajointpartnershipbetweenthecitiesofRenton,SeaTac,Tukwila,BurienandDesThisprojectreceiveda$950,000CMAQgrantforconstructionofPhaseA(NachesAveSWtoFort
Moines,incoordinationwithKingCounty.The17mileL2STrailwillprovideaneastwestconnectionbetweenDentParkinTukwila),in2014.NoCitymatchisrequired.KingCountyisleadingthedesign.
theshorelineofLakeWashington(Renton)andtheshorelineofPugetSound(DesMoines).Staffwillbedevelopingscope,costandscheduleforfuturephases.
JUSTIFICATION:CHANGES:
PhaseAwillconnectFortDent(Tukwila)tothelargersystemofregionaltrailsinSouthKingCounty,includingtheDesignoftheFortDentParkConnectionisanticipatedtobecompletedintheSummerof2017.
GreenRiverTrail,theInterurbanTrailandtheCedarRiverTrail.PhaseAgoesfromNachesAveSW(Renton)toConstructionofPhaseAisanticipatedtobecompletedintheSummerof2018.
FortDentPark(Tukwila).PhaseAwillprovidea12footwideasphaltpavedmultiusetrail,with2footgravel
shoulders.
Funded:3,710,00Unfunded:
0
ProjectTotalsProgrammedPre2018SixYearProgram
Total201820192020202120222023
ITEMProgrammed
SpentPre20172017
EXPENSES:
Planning
PreliminaryEngineering800,00800,00
00
ROW(includesAdmin)110,00110,00
00
Construction2,240,002,240,002,240,00
000
ConstructionServices560,00560,00560,00
000
PostConstructionServices
TOTALEXPENSES
3,710,00910,002,800,002,800,00
0000
SOURCEOFFUNDS:
VehicleFuelTax
Business&OccupationShare
ProposedFundBalance
GrantsInHand(1)
GrantsInHand(2)
MitigationInHand
Other(KC+CMAQgrant)3,710,00910,002,800,002,800,00
0000
OtherInHand
Undetermined
TOTALSOURCES
3,710,000910,0002,800,0002,800,000
CityofRenton|20182023TransportationImprovementProgram
52
RESOLUTION NO. 4314
TIPNO.23WALKWAYPROGRAM
WalkwayProgram
FunctionalClassification:Fund:
N/A317
P.M.STEVE
Proj.Length:Proj:
N/A120009
CommunityPlanningArea:TIPNo.23
Citywide CONTACT:
JamesWilhoit425.430.7319
DESCRIPTION:STATUS:
Thisprogramprovidesforthedesignandconstructionofnonmotorizedtransportationfacilitiesforpedestrians.TheComprehensiveCitywideWalkwayStudywascompletedin2009andisbeingusedtoselect
ProjectsareidentifiedandprioritizedusingcriteriafromtheComprehensiveCitywideWalkwayStudy,Councilprojectsthatmoveintothedesignandconstructionphases.
direction,andthroughcoordinationwiththeCity'sNeighborhoodProgram.
JUSTIFICATION:CHANGES:
Providingsafeandconvenientnonmotorizedfacilitiesisanintegralpartofacompletetransportationnetwork.
Specificimprovementswillrespondtotheneedsofschoolchildren,theagedandpersonswithdisabilities,and
supportincreaseduseoftransit.
Funded:1,438,08Unfunded:
8
ProgrammedPre2018SixYearProgram
ProjectTotals
ITEMProgrammedTotal201820192020202120222023
Spentin20162017
EXPENSES:
Planning30,005,00025,005,0005,0005,0005,0005,000
00
PreliminaryEngineering150,0025,00125,0025,0025,0025,0025,0025,00
00000000
ROW(includesAdmin)
Construction1,138,0873,088115,00950,00150,00200,00200,00200,00200,00
80000000
ConstructionServices120,0020,00100,0020,0020,0020,0020,0020,00
00000000
PostConstructionServices
TOTALEXPENSES
1,438,0873,08165,001,200,00200,00250,00250,00250,00250,00
880000000
SOURCEOFFUNDS:
VehicleFuelTax
1,438,0873,088165,001,200,00200,00250,00250,00250,00250,00
Business&OccupationShare
80000000
ProposedFundBalance
GrantsInHand(1)
GrantsInHand(2)
Mitigation(sidewalkfeeinlieu)
OtherInHand(1)
OtherInHand(2)
Undetermined
TOTALSOURCES
1,438,08873,088165,0001,200,000200,000250,000250,000250,000250,000
CityofRenton|20182023TransportationImprovementProgram
53
RESOLUTION NO. 4314
TIPNO.24SIDEWALKREHABILITATIONANDREPLACEMENTPROGRAM
SidewalkRehabilitationandReplacementProgram
FunctionalClassification:Fund:
N/A317
P.M.LEE
Proj.Length:Proj:
N/A122801
CommunityPlanningArea:TIPNo.24
Citywide CONTACT:
PatrickZellner425.430.2270
DESCRIPTION:STATUS:
Thisprogramprovidesforthereplacementofexistingcurbandgutter,sidewalks,andcurbrampswheresuchPlannedimprovementsfortheMaplewoodGlenNeighborhoodare:Phase2(SE5thSt)in2017
facilitieshavedeterioratedorhavebeendamaged.andPhase3(SE6thSt)in2018.
ImprovementsarebeingconductedattheMaplewoodGlenNeighborhood.In2016thisprogramfundedthereplacementofthepedestriancrosswalkattheDowntown
TransitCenter.
JUSTIFICATION:CHANGES:
Thisprogramwilladdressdeficienciesandprovidesafeandconvenientnonmotorizedfacilitiesforpedestriansin
neighborhoodswithdamagedordeterioratedcurbandgutter,sidewalks,andcurbramps.Therearesomeplaces
wherecurbrampsdonotexistorarenottocurrentADAstandardsandtheywillbeupgradedthroughthis
program.
Funded:1,217,02Unfunded:
9
ProgrammedPre2018SixYearProgram
ProjectTotals
ITEMProgrammedTotal201820192020202120222023
Spentin20162017
EXPENSES:
Planning
PreliminaryEngineering121,63232,63289,00
0
ROW(includesAdmin)
Construction1,038,10128,102270,00640,00100,00100,00110,00110,00110,00110,00
200000000
ConstructionServices57,292,29655,00
60
PostConstructionServices
TOTALEXPENSES 1,217,02163,02414,00640,00100,00100,00110,00110,00110,00110,00
9900000000
SOURCEOFFUNDS:
VehicleFuelTax
840,00100,00100,00640,00100,00100,00110,00110,00110,00110,00
Business&OccupationShare
0000000000
ProposedFundBalance377,02963,029314,00
0
GrantsInHand(1)
GrantsInHand(2)
MitigationInHand
OtherInHand(1)
OtherInHand(2)
Undetermined
TOTALSOURCES
1,217,029163,029414,000640,000100,000100,000110,000110,000110,000110,000
CityofRenton|20182023TransportationImprovementProgram
54
RESOLUTION NO. 4314
TIPNO.25MAPLEVALLEYHIGHWAYATTENUATOR
MapleValleyHighwayAttenuator
FunctionalClassification:Fund:
PrinciaplArterial317
P.M.STEVE
Proj.Length:Proj:
N/A
CommunityPlanningArea:TIPNo.25
CedarRiver CONTACT:
JamesWilhoit425.430.7319
DESCRIPTION:STATUS:
Thisprojectwillremoveanexistingconcretebarrierendtreatmentlocatedeastbound(eastoftheRivieraThedesignreportiscompleteandwasfundedbytheRoadwaySafetyandGuardrailProgram(TIP
Apartments).Anewconcretebarrierwillbeextendedwesterlyapproximately400feetandanewimpact#27).Finaldesignandconstructionpendingfundingavailability.
attenuatorwillbeinstalledattheendofthenewconcretebarrier.Theprojectwillalsoprovidea2footwide
shoulderalongSR169betweentheoutsidethroughlaneandthefaceofthebarrier.
JUSTIFICATION:CHANGES:
MapleValleyHighway(SR169)isaprincipalarterialcarrying44,000vehiclesperday.Thisprojectwillimprove
safetyforeastboundtrafficonMapleValleyHighway(SR169)atthislocation,whichhasbeenthesiteto
numerouscollisionimpacts.
Funded:Unfunded:1,180,20
0
ProjectTotalsProgrammedPre2018SixYearProgram
ITEMProgrammedTotal201820192020202120222023
SpentPre20172017
EXPENSES:
Planning
PreliminaryEngineering156,00156,00156,00
000
ROW(includesAdmin)85,0085,0025,0060,00
0000
Construction782,70782,70782,70
000
ConstructionServices156,50156,50156,50
000
PostConstructionServices
TOTALEXPENSES
1,180,201,180,20181,00999,20
0000
SOURCEOFFUNDS:
VehicleFuelTax
Business&OccupationShare
ProposedFundBalance
GrantsInHand(1)
GrantsInHand(2)
MitigationInHand
OtherInHand(1)
OtherInHand(2)
Undetermined1,180,201,180,20181,00999,20
0000
TOTALSOURCES
1,180,2001,180,200181,000999,200
CityofRenton|20182023TransportationImprovementProgram
55
RESOLUTION NO. 4314
TIPNO.26BRIDGEINSPECTION&REPAIRPROGRAM
BridgeInspection&RepairProgram
FunctionalClassification:Fund:
N/A317
P.M.JAE
Proj.Length:Proj:
N/A120106
CommunityPlanningArea:TIPNo.26
Citywide CONTACT:
DerekAkesson425.430.7337
DESCRIPTION:STATUS:
TheTransportationDivisioninspects25bridgestructuresownedbytheCityofRenton.InspectionoccureveryFundsshownunderconstructionareforminorrepairstobridgestructures.
twoyearstodeterminebridgesufficiencyandloadratings,andidentifyanyseismicretrofitneeded.Undertake
minorrepairsandpreventativemaintenanceasneeded.
JUSTIFICATION:CHANGES:
InspectionprogrammustbedoneforsafetyandfundingpurposesandaspartofWSBISProgramtodetermine
structuraldeficiencies,physicaldeterioration,orfunctionalobsolescenceandtoqualifyforfederalbridge
replacement(BRAC)grantfunding.Repairfundingisprovidedtoaccomplishlowercostimprovements,identified
throughtheinspectionprogram,thatwillincreasethesafetyandextendthelongevityofthestructures.
Funded:519,025Unfunded:210,00
0
ProjectTotalsProgrammedPre2018SixYearProgram
ITEMProgrammedTotal201820192020202120222023
Spentin20162017
EXPENSES:
Planning
PreliminaryEngineering174,02534,02560,0080,0020,0020,0010,0010,0010,0010,00
00000000
ROW(includesAdmin)
Construction275,0015,00260,0020,0020,0055,0055,0055,0055,00
000000000
ConstructionServices
PostConstructionServices/Othe280,0070,00210,0020,0050,0035,0035,0035,0035,00
r000000000
TOTALEXPENSES
729,02534,025145,00550,0060,0090,00100,00100,00100,00100,00
00000000
SOURCEOFFUNDS:
VehicleFuelTax
415,0025,0050,00340,0060,0060,0070,0050,0050,0050,00
Business&OccupationShare
0000000000
ProposedFundBalance104,0259,02595,00
0
GrantsInHand(FEMA)
GrantsInHand(StateShare)
MitigationInHand
OtherInHand
OtherInHand
Undetermined210,00210,0030,0030,0050,0050,0050,00
0000000
TOTALSOURCES
729,02534,025145,000550,00060,00090,000100,000100,000100,000100,000
CityofRenton|20182023TransportationImprovementProgram
56
RESOLUTION NO. 4314
TIPNO.27ROADWAYSAFETYANDGUARDRAILPROGRAM
RoadwaySafetyandGuardrailProgram
FunctionalClassification:Fund:
N/A317
P.M.JAE
Proj.Length:Proj:
N/A120110
CommunityPlanningArea:TIPNo.27
Citywide CONTACT:
VickiGrover425.430.7393
DESCRIPTION:STATUS:
Thisprogramwillprovideguardrailimprovementseachyearandimprovethesafetyoftheroadsideenvironment.ThisprogramwillconductahazardousobjectremovalprojectneartheAirport.
JUSTIFICATION:CHANGES:
Thisprogramwillimplementroadsidesafetyimprovementsincludingbarriersystemsandhazardousobject
removal.
Funded:140,00Unfunded:
0
ProjectTotalsProgrammedPre2018SixYearProgram
ITEMProgrammedTotal201820192020202120222023
Spentin20162017
EXPENSES:
Planning
PreliminaryEngineering21,003,00018,003,0003,0003,0003,0003,0003,000
00
ROW(includesAdmin)
Construction105,0010,0095,0010,0010,0015,0020,0020,0020,00
000000000
ConstructionServices14,002,00012,002,0002,0002,0002,0002,0002,000
00
PostConstructionServices/Othe
r
TOTALEXPENSES
140,0015,00125,0015,0015,0020,0025,0025,0025,00
000000000
SOURCEOFFUNDS:
VehicleFuelTax
140,0015,00125,0015,0015,0020,0025,0025,0025,00
Business&OccupationShare
000000000
ProposedFundBalance
GrantsInHand(1)
GrantsInHand(2)
MitigationInHand
OtherInHand
OtherInHand
Undetermined
TOTALSOURCES
140,00015,000125,00015,00015,00020,00025,00025,00025,000
CityofRenton|20182023TransportationImprovementProgram
57
RESOLUTION NO. 4314
TIPNO.28INTERSECTIONSAFETY&MOBILITYPROGRAM
IntersectionSafety&MobilityProgram
FunctionalClassification:Fund:
N/A317
P.M.LEE
Proj.Length:Proj:
N/A122601
CommunityPlanningArea:TIPNo.28
N/A CONTACT:
ChrisBarnes425.430.7220
DESCRIPTION:STATUS:
Thisprogramwillinstallnewtrafficsignals,softwaresystemstoimprovetrafficsignaltimingoperations,tacticsTrafficsignalshighonthewarrantprioritylistincludeSW41stSt&OakesdaleAveSW,SECarr
centralsignalsystemupgradesormakeimprovementstoexistingsignalsidentifiedbytheTransportationRoad&103rdAveSE,andSW34thSt&LindAveSW.
Systems'TrafficSignalPriorityList.ThePriorityListisdeterminedbycitizenconcerns,intersectionsafety,mobility
needs,andintersectionsthatmeetMUTCDtrafficsignalwarrants.
JUSTIFICATION:CHANGES:
Historically,onetrafficsignalisdesignedandconstructedeverytwothreeyearstomeetsafetyandmobility$150,000ofthe2017budgetwasreallocatedformatchtheWilliamsAveSandWellsAve
needs.Thisprogrambudgetsforprojectsneededtomeetincreasingdemand,andtheneedforsignalizedtrafficConversion(TIP#8)STPgrant.Fundingshownin2018havebeencommittedtotheWilliamsand
control.Elementsusedtoprioritizeprojectintersectionsmayincludevehicularapproachvolumes,accidentWellsAveConversionProject.
analysis,signalwarrantanalysis,andpedestrianvolume.
Funded:1,957,96Unfunded:300,00
40
ProjectTotalsProgrammedPre2018SixYearProgram
ITEMProgrammedTotal201820192020202120222023
Spentin20162017
EXPENSES:
Planning
PreliminaryEngineering271,262,260269,0044,0045,0045,0045,0045,0045,00
00000000
ROW(includesAdmin)
Construction1,675,70155,7090,001,430,00180,00250,00250,00250,00250,00250,00
4400000000
ConstructionServices311,0010,00301,0026,0055,0055,0055,0055,0055,00
000000000
PostConstructionServices
TOTALEXPENSES
2,257,96157,96100,002,000,00250,00350,00350,00350,00350,00350,00
4400000000
SOURCEOFFUNDS:
VehicleFuelTax
1,950,00150,00100,001,700,00250,00250,00300,00300,00300,00300,00
Business&OccupationShare
0000000000
ProposedFundBalance7,967,96
44
GrantsInHand(1)
GrantsInHand(2)
MitigationInHand
OtherInHand
OtherInHand
Undetermined300,00300,00100,0050,0050,0050,0050,00
0000000
TOTALSOURCES
2,257,964157,964100,0002,000,000250,000350,000350,000350,000350,000350,000
CityofRenton|20182028TransportationImprovementProgram
58
RESOLUTION NO. 4314
TIPNO.29TRAFFICSAFETYPROGRAM
TrafficSafetyProgram
FunctionalClassification:Fund:
N/A317
P.M.BRYSON
Proj.Length:Proj:
N/A122115
CommunityPlanningArea:TIPNo.29
Citywide CONTACT:
ChrisBarnes425.430.7220
DESCRIPTION:STATUS:
ThisongoingyearlyprogramprovidesfundingforspecialsmallscaletrafficsafetyimprovementsthatareProjectsincludedforsafety/speedreductionareUnionAveNE,EdmondsAveNE,HoquiamAve
identifiedandrequirematerials,labororequipment.ThisprogramincludesconvertingschoolzonesignstoNE.
electronicoperation,installationofpedestriansafetytrafficsignalsincludingRectangularRapidFlashingBeacons
(RRFB),andHawkhybridbeaconsignals,bulboutsandradarspeedsignsfortrafficcalming.
JUSTIFICATION:CHANGES:
Historically,thisleveloftrafficsafetyimprovementsarerequiredonanannualbasis.Thisprogrambudgetsfor
safetyprojectstoaddresstheseneeds.Projectsaretypicallyidentifiedthroughcitizenconcerns,analysisof
accidentrecordsorobservationbyCityTrafficOperationspersonnel.
Funded:965,58Unfunded:210,00
80
ProgrammedPre2018SixYearProgram
ProjectTotals
ITEMProgrammedTotal201820192020202120222023
Spentin20162017
EXPENSES:
Planning16,8116,81
44
PreliminaryEngineering142,733,73019,00120,0020,0020,0020,0020,0020,0020,00
000000000
ROW(includesAdmin)
Construction928,0470,04158,00700,00100,00120,00120,00120,00120,00120,00
4400000000
ConstructionServices88,0028,0060,0010,0010,0010,0010,0010,0010,00
000000000
PostConstructionServices
TOTALEXPENSES
1,175,5890,58205,00880,00130,00150,00150,00150,00150,00150,00
8800000000
SOURCEOFFUNDS:
VehicleFuelTax
715,0050,0055,00610,00120,00130,0090,0090,0090,0090,00
Business&OccupationShare
0000000000
ProposedFundBalance140,5840,588100,00
80
GrantsInHand(1)
GrantsInHand(2)
60,0060,0010,0010,0010,0010,0010,0010,00
MitigationInHand(feeinlieu)
00000000
OtherInHand(LandingReimb)50,0050,00
00
OtherInHand(2)
Undetermined210,00210,0010,0050,0050,0050,0050,00
0000000
TOTALSOURCES
1,175,58890,588205,000880,000130,000150,000150,000150,000150,000150,000
CityofRenton|20182023TransportationImprovementProgram
59
RESOLUTION NO. 4314
TIPNO.30TRAFFICOPERATIONDEVICESPROGRAM
TrafficOperationDevicesProgram
FunctionalClassification:Fund:
N/A317
P.M.BRYSON
Proj.Length:Proj:
N/A122904
CommunityPlanningArea:TIPNo.30
Citywide CONTACT:
EricCutshall425.430.7423
DESCRIPTION:STATUS:
TheCityofRentonownsandoperates135trafficsignals.ReplacefailedorfailingtrafficsignalvehicledetectionTrafficsignalcontrollercabinetsareinneedofreplacementforproperoperation.Theincreasein
loopsandvideodetection.Thisprogramalsoprovidesfornew/replacementofsignsthatareobsolete,fadedor$40,000inthebudgetwillallowfor2cabinetsbereplaced/year.
nolongerappropriate,replacementofdamagedluminaireandsignalpoles.Thisisanongoingyearlyprogram.
JUSTIFICATION:CHANGES:
MostofRenton'ssignalsrequireextensivevehicledetectionsystemstoprovidetrafficcountdataneededforthe
intersectioncontrollersandTACTISsignalcoordinationsystemtooperateeffectively.Pavementdeterioriation
duetoheavytrafficvolumes,trucks,andadverseweatherhasincreasedtheneedfordetectionloop
replacement.
Funded:939,405Unfunded:
ProjectTotalsProgrammedPre2018SixYearProgram
ITEMProgrammedTotal201820192020202120222023
SpentIn20162017
EXPENSES:
Planning
PreliminaryEngineering
ROW(includesAdmin)
Construction939,40592,405127,00720,00120,00120,00120,00120,00120,00120,00
00000000
ConstructionServices
PostConstructionServices
TOTALEXPENSES
939,40592,405127,00720,00120,00120,00120,00120,00120,00120,00
00000000
SOURCEOFFUNDS:
VehicleFuelTax
872,0090,0062,00720,00120,00120,00120,00120,00120,00120,00
Business&OccupationShare
0000000000
ProposedFundBalance67,4052,40565,00
0
GrantsInHand(1)
GrantsInHand(2)
MitigationInHand
OtherInHand(1)
OtherInHand(2)
Undetermined
TOTALSOURCES
939,40592,405127,000720,000120,000120,000120,000120,000120,000120,000
CityofRenton|20182023TransportationImprovementProgram
60
RESOLUTION NO. 4314
TIPNO.31INTELLIGENTTRANSPORTATIONSYSTEMS(ITS)PROGRAM
IntelligentTransportationSystems(ITS)Program
FunctionalClassification:Fund:
N/A317
P.M.BRYSON
Proj.Length:Proj:
N/A122162
CommunityPlanningArea:TIPNo.31
N/A CONTACT:
EricCutshall425.430.7423
DESCRIPTION:STATUS:
Providesforimprovementstotheoperationalefficiencyoftheroadwaysystem,includingdevelopmentandThisprogramisupdatingfibercommunications.
implementationofsignalcoordinationprograms,signingandchannelizationimprovements,surveillancecontrol
anddriverinformationsystem(SC&DI),transitsignalpriority,IntelligentTrafficSystems(ITS)MasterPlanand
signalimprovementssuchasprotective/permissivephasing.
JUSTIFICATION:CHANGES:
Improvingthecapacityandefficiencyoftheexistingroadwaysystemisaverycosteffectiveelementofthe
transportationprogram.
Funded:254,58Unfunded:
4
ProjectTotalsProgrammedPre2018SixYearProgram
ITEMProgrammedTotal201820192020202120222023
Spentin20162017
EXPENSES:
Planning
PreliminaryEngineering35,005,00030,005,0005,0005,0005,0005,0005,000
00
ROW(includesAdmin)
Construction184,5844,5820,00120,0020,0020,0020,0020,0020,0020,00
4400000000
ConstructionServices35,005,00030,005,0005,0005,0005,0005,0005,000
00
PostConstructionServices/Othe
r
TOTALEXPENSES
254,5844,5830,00180,0030,0030,0030,0030,0030,0030,00
4400000000
SOURCEOFFUNDS:
VehicleFuelTax
250,0040,0030,00180,0030,0030,0030,0030,0030,0030,00
Business&OccupationShare
0000000000
ProposedFundBalance4,584,58
44
GrantsInHand(1)
GrantsInHand(2)
MitigationInHand
OtherInHand(1)
OtherInHand(2)
Undetermined
TOTALSOURCES
254,58444,58430,000180,00030,00030,00030,00030,00030,00030,000
CityofRenton|20182023TransportationImprovementProgram
61
RESOLUTION NO. 4314
TIPNO.32BARRIERFREETRANSITIONPLANIMPLEMENTATION
BarrierFreeTransitionPlanImplementation
FunctionalClassification:Fund:
N/A317
P.M.LEE
Proj.Length:Proj:
N/A122705
CommunityPlanningArea:TIPNo.32
Citywide CONTACT:
DanHasty425.430.7217
DESCRIPTION:STATUS:
Thisprogramprovidesfundingfordesigningandbuildingfeaturesonan"asneeded"basisinresponsetoTheADASelfEvaluationwillbecompletedin2017.
individualrequeststoimproveaccessforindividualswithspecialneeds.Aprojectlisthasbeendevelopedbased
uponsitesidentifiedintheTransitionPlansectionoftheCityofRentonComprehensiveCitywideSidewalkStudy.
JUSTIFICATION:CHANGES:
ThisprogramimplementsprojectsthatsupporttheCity'sefforttotransitionpedestrianfacilitieswithintheright
ofwayintoconformitywithprovisionscontainedintheAmericanswithDisabilitiesAct(ADA)Guidelines.The
ADATransitionPlanhasbeenadoptedonMay182015.Aprogramaticapproachisrequiredtoensurecompliance
withfederallaw.
Funded:252,353Unfunded:
ProjectTotalsProgrammedPre2018SixYearProgram
ITEMProgrammedTotal201820192020202120222023
Spentin20162017
EXPENSES:
Planning35,005,00030,005,0005,0005,0005,0005,0005,000
00
PreliminaryEngineering2,3532,353
ROW(includesAdmin)
Construction194,0022,00172,0022,0022,0032,0032,0032,0032,00
000000000
ConstructionServices21,003,00018,003,0003,0003,0003,0003,0003,000
00
PostConstructionServices
TOTALEXPENSES
252,3532,35330,00220,0030,0030,0040,0040,0040,0040,00
00000000
SOURCESOFFUNDS:
VehicleFuelTax
252,3532,35330,00220,0030,0030,0040,0040,0040,0040,00
Business&OccupationShare
00000000
ProposedFundBalance
GrantsInHand(1)
GrantsInHand(1)
MitigationInHand
OtherInHand(1)
OtherInHand(2)
Undetermined
TOTALSOURCES
252,3532,35330,000220,00030,00030,00040,00040,00040,00040,000
CityofRenton|20182023TransportationImprovementProgram
62
RESOLUTION NO. 4314
TIPNO.33PROJECTDEVELOPMENT&PREDESIGNPROGRAM
ProjectDevelopment&PreDesignProgram
FunctionalClassification:Fund:
N/A317
P.M.LEE
Proj.Length:Proj:
N/A122150
CommunityPlanningArea:TIPNo.33
N/A CONTACT:
VickiGrover425.430.7393
DESCRIPTION:STATUS:
PerformcriticalactivitiesneededforthedevelopmentoffutureCapitalImprovementProjectsandforgrantThisprogramincludessmallstudiesfunding.
applications,includingscoping,costestimates,predesign,interlocalagreementsanddeficiencyanalysis.Also
providesforthemonitoringofactivegrantprojectsforcompliancewithStateandFederallaws,regulationsand
specifications.
JUSTIFICATION:CHANGES:
Analysesofexistingandprojectedtransportationproblems,infrastructuremaintenanceneeds,localandregionalTransportation,inpartnershipwithParksDivisionisupdatingtheTrailandBicycleMasterPlan.It
mobilitygoalsandrevenues/costsarevitaltothedevelopmentoftransportationprojectsthatwillbestservetheisanticipatedthattheMasterPlanwillbecompletedinthespringof2018.
needsofRentonandcompeteforgrants.Also,tomaintaineligibilityforgrantfunding,theCitymustassurethat
projectspecificationsandmanagementcomplywithcurrentStateandFederalstandardsandregulations.
Funded:1,256,82Unfunded:
2
ProjectTotalsProgrammedPre2018SixYearProgram
ITEMProgrammedTotal201820192020202120222023
Spentin20162017
EXPENSES:
Planning916,89591,895225,00600,00100,00100,00100,00100,00100,00100,00
00000000
PreliminaryEngineering339,9219,92720,00300,0050,0050,0050,0050,0050,0050,00
700000000
ROW(includesAdmin)
Construction
ConstructionServices
PostConstructionServices
TOTALEXPENSES
1,256,82111,82245,00900,00150,00150,00150,00150,00150,00150,00
2200000000
SOURCEOFFUNDS:
VehicleFuelTax
1,150,00100,00150,00900,00150,00150,00150,00150,00150,00150,00
Business&OccupationShare
0000000000
ProposedFundBalance106,82211,82295,00
0
GrantsInHand(1)
GrantsInHand(2)
MitigationInHand
OtherInHand
OtherInHand(2)
Undetermined
TOTALSOURCES
1,256,822111,822245,000900,000150,000150,000150,000150,000150,000150,000
CityofRenton|20182023TransportationImprovementProgram
63
RESOLUTION NO. 4314
TIPNO.34ARTERIALCIRCULATIONPROGRAM
ArterialCirculationProgram
FunctionalClassification:Fund:
N/A317
P.M.BOB
Proj.Length:Proj:
N/A120029
CommunityPlanningArea:TIPNo.34
N/A CONTACT:
VickiGrover425.430.7393
DESCRIPTION:STATUS:
ThisprogramprovidesfortheshortandlongrangeplanningandtrafficanalysesrequiredtoevaluateandupdateThisprojectwillfundtheongoingplanningworkwhichwillleadtorefinementand/oradjustment
proposedtransportationimprovementsprojects,toassesstheimpactsofnewdevelopmentproposals,andtooftheofimprovementprojectsonthearterialnetworkidentifiedinthe TransportationElement
recommendlocalandregionaltransportationsystemimprovementsforallmodesoftravel.oftheCity's2015ComprehensivePlan.
JUSTIFICATION:CHANGES:
CombinedStateandFederalCleanAirlegislation,the GrowthManagementAct(GMA),andtheincreasingPlanningworkforsegments/intersections/spotimprovementsalongtheNE3rd/4thStreet
importanceofmakingsurethatlocalandregionaltransportationplansarecoordinatedtothebenefitofRentoncorridor(TIP#5),116thAveSE(TIP#13),SCarrRd(TIP#14),willbeconductedin20172018.
makeongoingmultimodalplanningahighpriorityneed.ThisprogramwillalsoprovidecoordinationwiththeI
405projectteam,toassureitprovidesthemaximumbenefitsandminimumproblemsforRenton'stransportation
system.
Funded:1,176,19Unfunded:
7
ProjectTotalsProgrammedPre2018SixYearProgram
ITEMProgrammedTotal201820192020202120222023
SpentIn20162017
EXPENSES:
Planning1,176,19141,19145,00890,00145,00145,00150,00150,00150,00150,00
7700000000
PreliminaryEngineering
ROW(includesAdmin)
Construction
ConstructionServices
PostConstructionServices
TOTALEXPENSES
1,176,19141,19145,00890,00145,00145,00150,00150,00150,00150,00
7700000000
SOURCEOFFUNDS:
VehicleFuelTax
1,175,00140,00145,00890,00145,00145,00150,00150,00150,00150,00
Business&OccupationShare
0000000000
ProposedFundBalance1,1971,197
GrantsInHand(1)
GrantsInHand(2)
MitigationInHand
OtherInHand(1)
OtherInHand(2)
Undetermined
TOTALSOURCES
1,176,197141,197145,000890,000145,000145,000150,000150,000150,000150,000
CityofRenton|20182023TransportationImprovementProgram
64
RESOLUTION NO. 4314
TIPNO.351%FORTHEARTSPROGRAM
1%fortheArtsProgram
FunctionalClassification:Fund:
N/A317
P.M.JOE
Proj.Length:Proj:
N/A122112
CommunityPlanningArea:TIPNo.35
N/A CONTACT:
JulianaFries425.430.7232
DESCRIPTION:STATUS:
FundingistiedtothecalculatedshareofeligibletypesoftransportationprojectsandtransportationfundingProgramisnowbasedonactualdesignandconstructioncosts.
subjecttotheCity's1%fortheArtsProgram.Allgatewayprojectproposalsunderthisprogramaresubjectto$11,151wastransferredin2013for2012capitalexpenditures.
approvaloftheArtsCommission.$10,454wastransferredin2014for2013capitalexpenditures.
$9,344wastransferredin2015for2014capitalexpenditures.
$16,767wastransferredin2016for2015expenditures.
JUSTIFICATION:
CHANGES:
ThisprogramtransfersfundstoFund125,whichisbeingmanagedbytheDepartmentofCommunityand
EconomicDevelopment.
Funded:121,76Unfunded:
7
ProjectTotalsProgrammedPre2018SixYearProgram
ITEMProgrammedTotal201820192020202120222023
Spentin20162017
EXPENSES:
Planning121,76916,76915,0090,0015,0015,0015,0015,0015,0015,00
00000000
PreliminaryEngineering
ROW(includesAdmin)
Construction
ConstructionServices
PostConstructionServices
TOTALEXPENSES
121,7616,76915,0090,0015,0015,0015,0015,0015,0015,00
900000000
SOURCEOFFUNDS:
VehicleFuelTax
121,7616,76715,0090,0015,0015,0015,0015,0015,0015,00
Business&OccupationShare
700000000
ProposedFundBalance
GrantsInHand(1)
GrantsInHand(2)
MitigationInHand
OtherInHand(1)
OtherInHand(2)
Undetermined
TOTALSOURCES
121,76716,76715,00090,00015,00015,00015,00015,00015,00015,000
CityofRenton|20182023TransportationImprovementProgram
65
RESOLUTION NO. 4314
TIPNO.36LAKEWASHINGTONBLVDNPARKAVENTOGENECOULONMEMORIALPARK
LakeWashingtonBlvdNParkAveNtoGeneCoulonMemorialPark
FunctionalClassification:Fund:
Collector317
Proj.Length:Proj:
N/A122121
CommunityPlanningArea:TIPNo.36
CityCenter CONTACT:
JamesWilhoit425.430.7319
DESCRIPTION:STATUS:
Thisprojectincludesroadwidening,trafficsignals,railroadcrossings,drainage,curb,gutter,sidewalksandThehoteltowerisanticipatedtobecompletebyearly2018.Thisprojectwillbefundedbythe
bicyclelanes.Developertodesignandconstructimprovements,andgetcredittowardmitigationdevelopmentofSouthport.Thecostsshownbelowarefortheestimatedmitigationcredit,per
contribution.Thedeveloperiscompletingtheprojectin3phases.agreementwiththedeveloper.
JUSTIFICATION:CHANGES:
ThisprojectwillservethedevelopmentandaccessneedstoCoulonParkandtheSouthportDevelopment.LastPhaseunderway.DesignforLakeWashingtonBlvdiscomplete.Constructiontostartinthe
Agreementwithdevelopertocredittrafficmitigationtowardsthecostsofcertainimprovements.summerof2017andbecompletedbytheendoftheyear.
Funded:2,443,477Unfunded:
ProgrammedPre2018SixYearProgram
ProjectTotals
ITEMProgrammedTotal201820192020202120222023
SpentPre20172017
EXPENSES:
Planning14,89914,899
PreliminaryEngineering28,46028,460
ROW(includesAdmin)
Construction1,973,821373,8211,600,0001,600,000
ConstructionServices410,36310,363400,000400,000
PostConstructionServices15,93415,934
TOTALEXPENSES 2,443,477443,4772,000,0002,000,000
SOURCEOFFUNDS:
VehicleFuelTax2,8072,807
2,7342,734
Business&OccupationShare
ProposedFundBalance8,8288,828
149,501149,501
GrantsInHand(1)
GrantsInHand(2)
MitigationInHand258,353258,353
Other(DeveloperExpenditure)2,000,0002,000,0002,000,000
Other(DeveloperReimb)21,25321,253
Undetermined
TOTALSOURCES
2,443,477443,4772,000,0002,000,000
CityofRenton|20182023TransportationImprovementProgram
66
RESOLUTION NO. 4314
TIPNO.37LINDAVESWSW16THSTTOSW43RDST
LindAveSWSW16thSttoSW43rdSt
FunctionalClassification:Fund:
MinorArterial317
P.M.BOB
Proj.Length:Proj:
1.69miles120024
CommunityPlanningArea:TIPNo.37
Valley CONTACT:
BobMahn425.430.7322
DESCRIPTION:STATUS:
Widenexistingroadwaytofivelaneswhererequired.Includesnewroadway,curbs,sidewalks,drainage,signals,Theneeds,prioritiesandschedulesforimprovementsonLindAveSWwillbedeterminedthrough
lighting,signingandchannelization.ArterialCirculationstudies.
JUSTIFICATION:CHANGES:
IncreasingtrafficdemandsintheValleydueinparttodevelopmentwillcreatetheneedtoincreasethecapacity
ofthismajornorth/southarterial.ApotentialprojectisasignalinstallationattheintersectionatLindAveSW
andSW34thSt(currentlyunsignalized).Additionally,improvementsmayresultfromfutureWSDOTI405plans
whichincludeaninterchangeatLindAveSW(currentlyunfunded).
Funded:Unfunded:4,400,00
0
ProjectTotalsProgrammedPre2018SixYearProgram
ITEMProgrammedTotal201820192020202120222023
SpentPre20172017
EXPENSES:
Planning
PreliminaryEngineering650,00650,00400,00250,00
0000
ROW(includesAdmin)
Construction3,200,003,200,001,200,002,000,00
0000
ConstructionServices550,00550,00200,00350,00
0000
PostConstructionServices
TOTALEXPENSES
4,400,004,400,00400,001,650,002,350,00
00000
SOURCEOFFUNDS:
VehicleFuelTax
Business&OccupationShare
ProposedFundBalance
GrantsInHand(1)
GrantsInHand(2)
MitigationInHand
OtherInHand(1)
OtherInHand(2)
Undetermined4,400,004,400,00400,001,650,002,350,00
00000
TOTALSOURCES
4,400,0004,400,000400,0001,650,0002,350,000
CityofRenton|20182023TransportationImprovementProgram
67
RESOLUTION NO. 4314
TIPNO.38RAINIERAVENCORRIDORIMPROVEMENTS(PHASE5)
RainierAveNCorridorImprovements(Phase5)
FunctionalClassification:Fund:
N/A317
P.M.BOB
Proj.Length:Proj:
0.76mi
CommunityPlanningArea:TIPNo.38
CityCenter CONTACT:
VickiGrover425.430.7393
DESCRIPTION:STATUS:
ThisisPhase5oftheRainierAveCorridorImprovements,andwillextendtheimprovementsfromNW3rdPltoFundsshownin2021areforplanningtodeterminetheroadwaycrosssection.Projectcost
northCitylimits.Projectelementsincludewideningofsidewalkswithstreetscaping,addingpedestrianscaleestimatedat$31.5Mandisunfunded.Costsbeyond2023notshown.
illuminationandplantedbufferstrips.Thestreetmaybenarrowedfrom5to3laneswherefeasible.Ontheeast
sideofRainierAvethenewmultiusetrailwillbeinstalled(LakeWashingtonLoopTrail),asshownonTIP21.
JUSTIFICATION:CHANGES:
RainierAveisacriticalcorridorinRentonwithexistingoperationalproblemsandinneedofinfrastructure
enhancementstoprovidegreatereasefornonmotorizedandtransitbasedtravel.
Funded:Unfunded:4,500,00
0
ProgrammedPre2018SixYearProgram
ProjectTotals
ITEMProgrammedTotal201820192020202120222023
SpentPre20172017
EXPENSES:
Planning100,00100,00100,00
000
PreliminaryEngineering4,400,004,400,002,000,002,400,00
0000
ROW(includesAdmin)
Construction
ConstructionServices
PostConstructionServices
TOTALEXPENSES
4,500,004,500,00100,002,000,002,400,00
00000
SOURCEOFFUNDS:
VehicleFuelTax
Business&OccupationShare
ProposedFundBalance
GrantsInHand(Bridge)
GrantsInHand(2)
MitigationInHand
OtherInHand(CityFunds)
OtherInHand(2)
Undetermined4,500,004,500,00100,002,000,002,400,00
00000
TOTALSOURCES
4,500,0004,500,000100,0002,000,0002,400,000
CityofRenton|20182023TransportationImprovementProgram
68
RESOLUTION NO. 4314
TIPNO.39SOUTHLAKEWASHINGTONTRANSITSTOP
SouthLakeWashingtonTransitStop
FunctionalClassification:
N/A
P.M.BOB
Proj.Length:
N/A
CommunityPlanningArea:TIPNo.39
CityCenter CONTACT:
VickiGrover425.430.7393
DESCRIPTION:STATUS:
ThisprojectwillimplementaBusTransitStationatParkAve.NandGardenAveN.TheprojectincludesanewThepreliminaryplanningforthistransitprojectwillbeincorporatedintotheNParkAveExtension
transitstop,withpassengeramenitiessuchasshelters,lighting,benches,litterreceptacles,bicycleracksandProject(TIP#12).
lockers.
JUSTIFICATION:CHANGES:
Theprojectisproposedtomeetrecenttraveldemandgrowthintheareaandasapartoftheconnectivityofthe
regionaltransitsystem.Thistransithubwillprovideservicetoa17.5acremixedusesiteconsistingof730,000
sq.ft.ofofficespace,43,000sq.ft.ofmeetingspace,30,000sq.ft.ofretail,383apartmentunitsanda347unit
hotel.Othernewdevelopmentintheareaincludestwohotels.Inaddition,alargemanufacturingcompany's
employeeswillbenefitfromthetransithub'slocationaswellasvisitorstoTheLandingandthe57acreGene
CoulonPark.
Funded:Unfunded:3,010,00
0
ProjectTotalsProgrammedPre2018SixYearProgram
ITEMProgrammedTotal201820192020202120222023
SpentPre20172017
EXPENSES:
Planning10,0010,0010,00
000
PreliminaryEngineering200,00200,00100,00100,00
0000
ROW(includesAdmin)500,00500,00500,00
000
Construction2,200,002,200,002,200,00
000
ConstructionServices100,00100,00100,00
000
PostConstructionServices
TOTALEXPENSES
3,010,003,010,00610,002,400,00
0000
SOURCEOFFUNDS:
VehicleFuelTax
Business&OccupationShare
ProposedFundBalance
GrantsInHand(State&Fed)
GrantsInHand
MitigationInHand
OtherInHand(CityFunds)
OtherInHand(2)
Undetermined3,010,003,010,00610,002,400,00
0000
TOTALSOURCES
3,010,0003,010,000610,0002,400,000
CityofRenton|20182023TransportationImprovementProgram
69
RESOLUTION NO. 4314
CR|2018Α2023TIP
ITYOFENTONRANSPORTATIONMPROVEMENTROGRAM
SSΑA
ECTIONIXPPENDIX
AA72
BBREVIATIONSANDCRONYMS
RASY20182023TIP74
ESOLUTIONTODOPTIXEAR
SSΑA71
ECTIONIXPPENDIX
RESOLUTION NO. 4314
CR|2018Α2023TIP
ITYOFENTONRANSPORTATIONMPROVEMENTROGRAM
AA
BBREVIATIONSANDCRONYMS
Thefollowinglistdefinestheabbreviatedwordsand/oracronymsusedintheCityofwĻƓƷƚƓƭSixYear
TransportationImprovementProgram.
ACP AsphaltConcretePavement
ADA AmericanDisabilityAct
BAT BusinessAccessTransit
BNSF BurlingtonNorthernSantaFe
BRAC BridgeReplacementAdvisoryCommittee
CBD CentralBusinessDistrict
CIP CapitalImprovementProgram
CMAQ CongestionMitigationandAirQuality
CTR CommuteTripReduction(StateAct)
DOE DepartmentofEcology
EB Eastbound
ECL EastCityLimits
EIS EnvironmentalImpactStudy
ER EmergencyRelief
FHWA FederalHighwayAdministration
FMSIB FreightMobilityStrategicInvestmentBoard
GIS GeographicInformationSystem
GMA GrowthManagementAct
HOV HighOccupancyVehicles
ITS IntelligentTransportationSystem
LF LinearFeet
LID LocalImprovementDistrict
LOS LevelofService
MAP21 MovingAheadforProgressinthe21 st CenturyAct
METRO MunicipalityofMetropolitanSeattle
MOU MemorandumofUnderstanding
MUTCD ManualonUniformTrafficControlDevices
NCL NorthCityLimits
NB Northbound
PMS PavementManagementSystem
Precon PreconstructionEngineering/Administration(designphaseofproject)
PS&E Plans,Specifications,andEstimates
ROW Rightofway
SSΑAA72
ECTIONIXBBREVIATIONSANDCRONYMS
RESOLUTION NO. 4314
CR|2018Α2023TIP
ITYOFENTONRANSPORTATIONMPROVEMENTROGRAM
RTA RegionalTransitAuthority
SB Southbound
SCATBd SouthCountyAreaTransportationBoard
SCL SouthCityLimits
SOV SingleOccupantVehicle
ST SoundTransit
STP SurfaceTransportationProgram
TDM TransportationDemandManagementProgram
TIB TransportationImprovementBoard
TIP TransportationImprovementPlan
UPRR UnionPacificRailroad
UPS UninterruptiblePowerSupple
WB Westbound
WCL WestCityLimits
WSBIS WashingtonStateBridgeInventorySystem
WSDOT WashingtonStateDepartmentofTransportation
SSΑAA73
ECTIONIXBBREVIATIONSANDCRONYMS