PROPOSED SANITARY —
SEWER, SEE SHEET C8.0
10' GAS EASEMENT
KC REC NO. 20130411001089
PROPOSED STORM
DRAIN, SEE SHEET C5.0
RECORD COMPOSITE
UTILITY PLAN
FOR
UTILITY PROTECTION
NOTE:
C HI KCFILA
RENTONUTILITY
LOCATE DATA INDICATES
THE EXISTENCE AN
EXISTING GAS SERVICE LOCATED
UNDER THE SIDEWALK
AND CURB RETURN OF RAINIER
AVENUE. THE
SECTION 18, TWP. 23 N., RGE 5 EAST, W. M.
CONTRACTOR SHALL ORDER INDEPENDENT UTILITY
CITY OF RENTON, KING COUNTY,
STATE OF WASHINGTON
LOCATES AND TAKE ANY OTHER
NECESSARY ACTIONS TO
CONFIRM THE HORIZONTAL AND
VERTICAL LOCATIONS.
EXISTING GAS SERVICE TO BE PROTECTED.
10' GAS EASEMENT ° ,.sD
KC REC. NO. 20130411001089 °s aADJUST VALVE COVER TO FINISHED GRADE
/
\Whk
\
POWER EASEMENT
ADJUST FRAMES LID TO FINISHED GRADE
KC REC NO. 9410201209 42+�
\ AND REPLACE WITH TRAFFIC RATED
LID
TO BE RELINQUISHED _, .,,„G 16�
G
G
°
15' X 100'
SEWER EASEMENT
® REC NO. 9708110700
V
SANITARY SEWER EASEMENT
KC REC NO. 97081 10701 �
/"1l.r l-LJJ Ll1JL�V�L�Y �
PER SHORT PLAT
/ SS
S
SD — SD
POSER ��
SLOPES & UTILITIES EASEMENT �\
PER 20110620001119
\� � POWER EASEMENT
KC REC. NO. 9410201209
2\2 o
f � o
�\ 0
\SLOPES & UTILITIES EASEMENT Q
2 KC REC NO. 20110811001003
2 �\
I Q �
s =\
10' GAS EASEMENT
KC REC NO. 2013041 1001089 i
s� (TO BE REVISED)
ca 0
c C,
ACCESS EASEMENT
PER SHORT PLAT
10' PROPOSED
GAS EASEMENT
�'—s 10.53' 15"N
_,o 42.03'
UTILITY NOTES:
O CONTRACTOR IS TO PROVIDE A MINIMUM OF 1.5' VERTICAL
SEPARATION BETWEEN SANITARY SEWER AND WATER, A MINIMUM OF
0.5' VERTICAL SEPARATION FOR DRY UTILITIES. CONTRACTOR SHALL
NOTIFY BARGHAUSEN CONSULTING ENGINEERS, INC. OF ANY
CONFLICTS.
O THE CIRCLED LOCATIONS ARE REQUIRED TO BE POTHOLED TO
CONFIRM WHETHER OR NOT UTILITY CONFLICTS NEED TO BE
RESOLVED. POTHOLING SHOULD OCCUR PRIOR TO CONSTRUCTION.
CONTRACTOR SHALL NOTIFY BARGHAUSEN CONSULTING ENGINEERS,
INC. OF ANY CONFLICTS.
< DRY UTILITIES CONSTRUCTION NOTES:
1. APPROXIMATE LOCATION OF GAS METER AND SERVICE.
COORDINATE METER LOCATION AND SERVICE WITH PURVEYOR AND
MEP PLANS.
2. APPROXIMATE CONNECTION FOR GAS SERVICE. CONFIRM SIZE,
LOCATION, AND CONTRACTOR SCOPE OF WORK WITH PURVEYOR
PRIOR TO CONSTRUCTION.
3. APPROXIMATE LOCATION OF PROPOSED TRANSFORMER.
COORDINATE CONDUIT SIZE, METER LOCATION AND CONTRACTOR
SCOPE OF WORK WITH PURVEYOR AND MEP PLANS PRIOR TO
CONSTRUCTION.
4. APPROXIMATE LOCATION OF PRIMARY POWER SERVICE FROM
EXISTING VAULT TO PROPOSED TRANSFORMER. COORDINATE
CONDUIT SIZE, AND CONTRACTOR SCOPE OF WORK WITH
PURVEYOR AND MEP PLANS PRIOR TO CONSTRUCTION.
CONTRACTOR TO VERIFY THAT NO CONFLICT EXISTS BETWEEN
POWER SERVICE AND WALL FOOTINGS PRIOR TO CONSTRUCTION.
5. APPROXIMATE LOCATION OF TELEPHONE/ISP CONDUIT CONNECTION
TO BUILDING. COORDINATE LOCATION, MATERIAL AND CONTRACTOR
SCOPE OF WORK WITH PURVEYOR AND ELECTRICAL PLANS PRIOR
TO CONSTRUCTION.
6. TWO 2" TELEPHONE SERVICE ENTRANCE CONDUIT(S). EXTEND
WITH PULL STRING FROM TELEPHONE SERVICE J—BOX TO UTILITY
SOURCE. REFER TO SHEET ES1.1 FOR ADDITIONAL INFORMATION.
7. ONE 3" ISP SERVICE CONDUIT. EXTEND WITH PULL STRING FROM
THE J—BOX TO THE SUPPLIER'S SOURCE. REFER TO SHEET ES1.1
FOR ADDITIONAL INFORMATION.
8. APPROXIMATE LOCATION OF POWER SERVICE TO TRASH
ENCLOSURE. COORDINATE CONDUIT SIZE, METER LOCATION AND
CONTRACTOR SCOPE OF WORK WITH MEP PLANS PRIOR TO
CONSTRUCTION.
9. APPROXIMATE CANOPY CONNECTION FOR GAS/POWER SERVICE.
CONFIRM SIZE, LOCATION, AND CONTRACTOR SCOPE OF WORK
WITH PURVEYOR AND CANOPY PLANS PRIOR TO CONSTRUCTION.
10. APPROXIMATE LOCATION OF POWER SERVICE BETWEEN PROPOSED
TRANSFORMER AND EXISTING VAULT. EXISTING VAULT TO BE
REPLACED WITH HAND HOLE FOR POWER CONNECTION TO 351
RAINIER AVE. COORDINATE ANY WORK REQUIREMENTS WITH
ADJACENT PROPERTY OWNER PRIOR TO CONSTRUCTION.
COORDINATE CONDUIT SIZE, LOCATION AND CONTRACTOR SCOPE
OF WORK WITH PURVEYOR AND MEP PLANS PRIOR TO
CONSTRUCTION.
11. APPROXIMATE LOCATION OF POWER SERVICE BETWEEN PROPOSED
TRANSFORMER AND BUILDING. COORDINATE CONDUIT SIZE, METER
LOCATION AND CONTRACTOR SCOPE OF WORK WITH PURVEYOR
AND MEP PLANS PRIOR TO CONSTRUCTION.
12. APPROXIMATE LOCATION OF GAS LINE RELOCATION. PSE
RELOCATED LINE RECENTLY. SEE SHEET C3.0 FOR ADDITIONAL
NOTES ON GASLINE AND POTENTIAL CONFLICTS. COORDINATE SIZE,
LOCATION AND CONTRACTOR SCOPE OF WORK WITH PURVEYOR
PRIOR TO CONSTRUCTION.
13. PROVIDE POWER TO PROPOSED MONUMENT SIGN. COORDINATE
CONDUIT SIZE AND CONTRACTOR SCOPE OF WORK WITH MEP
PLANS PRIOR TO CONSTRUCTION.
14. APPROXIMATE LOCATION OF GAS LINE RELOCATION. COORDINATE
SIZE, LOCATION AND CONTRACTOR SCOPE OF WORK WITH
PURVEYOR PRIOR TO CONSTRUCTION.
15. CONTRACTOR TO PROVIDE ELECTRICAL SERVICE TO RELOCATED
LUMINAIRE FROM EXISTING ELECTRICAL BOX.
R CROSSING TABLE p Know what's below.
p Call before you dig.
1 Dial 811
S-406303
W-406306 R-406350
IN COMPLIANCE WITH CITY OF RENTON STANDARDS
2
5I\
Ba rg ha usen
SURVEYE1 RLH
SC° VERTICAL: NAVD 1988 •
///��� 0
���_/0� HORIZONTAL: NAD 1983/1991 CITY OF o
12 /19 /2019
Consulting Engineers, Inc.
DESIGNED JC
(_
RECORD COMPOSITE UTILITY PLAN
FIELDBOOK:
DRAWN:
• RENTON 0
FOR
PAGE:
18215 72nd Avenue South
CMS
I ONE INCH I
CHICK-FIL-A RENTON
DRAWING NO:
Kent, WA98032
AS -BUILT PLANS MM 3/15/21 CRJ cHECKED: AEM
AT FULL SCALE Planning/Building/Public Works Dept.
375 RAINIER AVE S RENTON, WA 98055
C 10.0
425.251.6222 barghausen.com
NO. REVISION )ATE APPR I APPROV, CRJ
IF NOT ONE INCH
SCALE ACCORDINGLY
STORE NO.: 04249
'"LLI: 18 u': 24