HomeMy WebLinkAboutW-406304M
Q0
O
O
d'
0
w
M
O
N
M
O
N
L'J
m
Q
m
0
N
N
CD
N
i
rn
00
QD
U)
0
i
00
0
0
CD
00
n
POWER EASEMENT
KC REC NO. 9410201209
TO BE RELINQUISHED
PROPOSED SANITARY —
SEWER, SEE SHEET C8.0
10' GAS EASEMENT
KC REC NO. 20130411001089
PROPOSED STORM
DRAIN, SEE SHEET C5.0
15' X 100'
SEWER EASEMENT
® REC NO. 9708110700
SANITARY SEWER EASEMENT -
KC REC NO. 9708110701,,
^PERJ SHORT PLAT
�S
SO — SO —
i
RECORD COMPOSITE UTILITY PLAN
FOR
UTILITY PROTECTION NOTE:
UTILITY LOCATE DATA INDICATES THE EXISTENCE AN
CHICK=FIL=A RENTON EXISTING GAS SERVICE LOCATED UNDER THE SIDEWALK
AND CURB RETURN OF RAINIER AVENUE. THE
SECTION 18, TWP. 23 N., RGE 5 EAST, W. M. CONTRACTOR SHALL ORDER INDEPENDENT UTILITY
CITY OF RENTON, KING COUNTY, STATE OF WASHINGTON LOCATES AND TAKE ANY OTHER NECESSARY ACTIONS To
CONFIRM THE HORIZONTAL AND VERTICAL LOCATIONS.
EXISTING GAS SERVICE TO BE PROTECTED.
10' GAS EASEMENT aso
ADJUST VALVE COVER TO FINISHED GRADE
's� a
KC REC. N0. 20130411001089 �
\ \hk
ADJUST FRAMES LID TO FINISHED GRADE
AND REPLACE WITH TRAFFIC RATED LID
26. 42„E 6l 42
I o0
SLOPES & UTILITIES EASEMENT\
PER 20110620001119 \\
\� POWER EASEMENT
KC REC. NO. 9410201209
m 2 �
\\
\ +
4 G O
4 0
�m \SLOPES & UTILITIES EASEMENT Q
2 KC REC NO. 20110811001003
2 \\
A \
✓C% 6 7
10' GAS EASEMENT
KC REC NO. 2013041 1001089 i
(TO BE REVISED)
c+ o
S
\ c G c,/ \
9. T
ACCESS EASEMENT
PER SHORT PLAT
f
I
2
a. V
10' PROPOSED
GAS EASEMENT
,__S10'53'15-W
,r. 42.03'
UTILITY NOTES:
O CONTRACTOR IS TO PROVIDE A MINIMUM OF 1.5' VERTICAL
SEPARATION BETWEEN SANITARY SEWER AND WATER, A MINIMUM OF
0.5' VERTICAL SEPARATION FOR DRY UTILITIES. CONTRACTOR SHALL
NOTIFY BARGHAUSEN CONSULTING ENGINEERS, INC. OF ANY
CONFLICTS.
O THE CIRCLED LOCATIONS ARE REQUIRED TO BE POTHOLED TO
CONFIRM WHETHER OR NOT UTILITY CONFLICTS NEED TO BE
RESOLVED. POTHOLING SHOULD OCCUR PRIOR TO CONSTRUCTION.
CONTRACTOR SHALL NOTIFY BARGHAUSEN CONSULTING ENGINEERS,
INC. OF ANY CONFLICTS.
® DRY UTILITIES CONSTRUCTION NOTES:
1. APPROXIMATE LOCATION OF GAS METER AND SERVICE.
COORDINATE METER LOCATION AND SERVICE WITH PURVEYOR AND
MEP PLANS.
2. APPROXIMATE CONNECTION FOR GAS SERVICE. CONFIRM SIZE,
LOCATION, AND CONTRACTOR SCOPE OF WORK WITH PURVEYOR
PRIOR TO CONSTRUCTION.
3. APPROXIMATE LOCATION OF PROPOSED TRANSFORMER.
COORDINATE CONDUIT SIZE, METER LOCATION AND CONTRACTOR
SCOPE OF WORK WITH PURVEYOR AND MEP PLANS PRIOR TO
CONSTRUCTION.
4. APPROXIMATE LOCATION OF PRIMARY POWER SERVICE FROM
EXISTING VAULT TO PROPOSED TRANSFORMER. COORDINATE
CONDUIT SIZE, AND CONTRACTOR SCOPE OF WORK WITH
PURVEYOR AND MEP PLANS PRIOR TO CONSTRUCTION.
CONTRACTOR TO VERIFY THAT NO CONFLICT EXISTS BETWEEN
POWER SERVICE AND WALL FOOTINGS PRIOR TO CONSTRUCTION.
5. APPROXIMATE LOCATION OF TELEPHONE/ISP CONDUIT CONNECTION
TO BUILDING. COORDINATE LOCATION, MATERIAL AND CONTRACTOR
SCOPE OF WORK WITH PURVEYOR AND ELECTRICAL PLANS PRIOR
TO CONSTRUCTION.
6. TWO 2" TELEPHONE SERVICE ENTRANCE CONDUIT(S). EXTEND
WITH PULL STRING FROM TELEPHONE SERVICE J-BOX TO UTILITY
SOURCE. REFER TO SHEET ES1.1 FOR ADDITIONAL INFORMATION.
7. ONE 3" ISP SERVICE CONDUIT. EXTEND WITH PULL STRING FROM
THE J-BOX TO THE SUPPLIER'S SOURCE. REFER TO SHEET ES1.1
FOR ADDITIONAL INFORMATION.
8. APPROXIMATE LOCATION OF POWER SERVICE TO TRASH
ENCLOSURE. COORDINATE CONDUIT SIZE, METER LOCATION AND
CONTRACTOR SCOPE OF WORK WITH MEP PLANS PRIOR TO
CONSTRUCTION.
9. APPROXIMATE CANOPY CONNECTION FOR GAS/POWER SERVICE.
CONFIRM SIZE, LOCATION, AND CONTRACTOR SCOPE OF WORK
WITH PURVEYOR AND CANOPY PLANS PRIOR TO CONSTRUCTION.
10. APPROXIMATE LOCATION OF POWER SERVICE BETWEEN PROPOSED
TRANSFORMER AND EXISTING VAULT. EXISTING VAULT TO BE
REPLACED WITH HAND HOLE FOR POWER CONNECTION TO 351
RAINIER AVE. COORDINATE ANY WORK REQUIREMENTS WITH
ADJACENT PROPERTY OWNER PRIOR TO CONSTRUCTION.
COORDINATE CONDUIT SIZE, LOCATION AND CONTRACTOR SCOPE
OF WORK WITH PURVEYOR AND MEP PLANS PRIOR TO
CONSTRUCTION.
11. APPROXIMATE LOCATION OF POWER SERVICE BETWEEN PROPOSED
TRANSFORMER AND BUILDING. COORDINATE CONDUIT SIZE, METER
LOCATION AND CONTRACTOR SCOPE OF WORK WITH PURVEYOR
AND MEP PLANS PRIOR TO CONSTRUCTION.
12. APPROXIMATE LOCATION OF GAS LINE RELOCATION. PSE
RELOCATED LINE RECENTLY. SEE SHEET C3.0 FOR ADDITIONAL
NOTES ON GASLINE AND POTENTIAL CONFLICTS. COORDINATE SIZE,
LOCATION AND CONTRACTOR SCOPE OF WORK WITH PURVEYOR
PRIOR TO CONSTRUCTION.
13. PROVIDE POWER TO PROPOSED MONUMENT SIGN. COORDINATE
CONDUIT SIZE AND CONTRACTOR SCOPE OF WORK WITH MEP
PLANS PRIOR TO CONSTRUCTION.
14. APPROXIMATE LOCATION OF GAS LINE RELOCATION. COORDINATE
SIZE, LOCATION AND CONTRACTOR SCOPE OF WORK WITH
PURVEYOR PRIOR TO CONSTRUCTION,
15. CONTRACTOR TO PROVIDE ELECTRICAL SERVICE TO RELOCATED
LUMINAIRE FROM EXISTING ELECTRICAL BOX.
R CROSSING TABLE 0 Know what's below.
p Call before you dig.
1 Dial 811
S-406303 '
_W-406304 R-406313
IN COMPLIANCE WITH CITY OF RENTON STANDARDS
SIN s\ % / i ` / �/i • 1% . % �S��NA��N�, ,5i��h�
2 J
Barghausen
Consulting Engineers, Inc.
18215 72nd Avenue South
Kent, WA98032
425.251.6222 barghausen.com
RLH
1�=20'
VE
HORIZON
CITY OF
'R R E N T O N
Planning/Building/Public WorKs Dept.
O
o RECORD COMPOSITE UTILITY PLAN
0 FOR
CHICK-FIL-A RENTON
375 RAINIER AVE S RENTON, WA 98055
STORE NO.: 04249
12/19/2019
DLSiGNL_ JC
F,ELDBOOK:
PAGE
DRAWING Nt
DRAWN: CMS
AS -BUILT PLANS
MM
3/15/21
CRJ
AEM
I ONE NCH I
AT FULL SCALE
IF NOT ONE INCH
SCALE ACCORDINGLY
C 10.0
REVISION
CRJ
SHEET: 18OF: 24