HomeMy WebLinkAboutR-409704U I I I I X Ln LJ Q CD CD U Ln 75 Q CD CV 0 CV CV :_ 0 3 0 LJ I 00 00 i 00 Ca CD CD CD uj z J iz CITY OF RENTON EROSION AND SEDIMENT CONTROL NOTES 1. CLEARING LIMITS: A. PRIOR TO ANY SITE CLEARING OR GRADING, AREAS TO REMAIN UNDISTURBED DURING PROJECT CONSTRUCTION SHALL BE DELINEATED. AT A MINIMUM, CLEARING LIMIT DELINEATION FLAGGING SHALL BE PROVIDED AT THE EDGES OF ALL VE AREA BUFFERS. 2. KEEP THE GROUND COVERED: A. MINIMIZE THE AMOUNT OF EXISTING VEGETATION THAT YOU MUST DISTURB FOR CONSTRUCTION. KEEP OFF SENSITIVE AREAS AND THEIR BUFFERS. B. ALL DISTURBED AREAS SHALL BE COVERED AND/OR MULCHED WITHIN 12 HOURS, IF THEY ARE TO REMAIN UNWORKED FOR MORE THAN 7 DAYS FROM MAY 1ST TO SEPTEMBER 30TH. DURING THE MONTHS OF OCTOBER 1ST THROUGH APRIL 30TH, DISTURBED AREAS MUST BE COVERED OR MULCHED IF LEFT UNWORKED WITHIN 2 DAYS C. ACCEPTED MULCH MATERIAL INCLUDES STRAW, WOOD FIBER AND CELLULOSE. D. AREAS NOT BEING WORKED FOR 30 DAYS OR MORE SHALL BE VEGETATED, UNLESS THE CITY DETERMINES THAT WINTER WEATHER MAKES VEGETATION ESTABLISHMENT INFEASIBLE. IF THIS IS THE CASE, IT MUST STILL BE MORE PERMANENTLY STABILIZED, USING METHODS SUCH AS BONDED FIBER MATRIX OR OTHER MORE STABLE BMP'S. E. SLOPES AND STOCKPILES 3H:1V OR STEEPER AND MORE THAN 10 FEET OF VERTICAL RELIEF SHALL BE COVERED IF THEY ARE UNWORKED FOR MORE THAN 12 HOURS. F. ALL AREAS NOT BEING WORKED PRIOR TO OCTOBER 1, AND ARE BEING SEEDED, SHALL BE SEEDED BY SEPTEMBER 23. MULCHING IS REQUIRED TO PROTECT ALL SEEDED AREAS UNTIL AN ADEQUATE GROWTH IS ESTABLISHED. G. AREAS THAT ARE BEING HYDRO SEEDED SHALL HAVE A TACKIFIER MIXED INTO THE HYDRO SEED TO HELP STABILIZE MIXTURE ONTO THE SOIL. H. ENOUGH COVER MATERIAL TO SUFFICIENTLY PROTECT ALL DISTURBED AREAS SHALL BE STOCKPILED ON THE SITE AT THE BEGINNING OF THE WET SEASON. 3. DUST CONTROL: A. DUST IS TO BE CONTROLLED ON THE CONSTRUCTION SITE. B. WATER TRUCK WILL BE USED TO CONTROL DUST ON DIRT/GRADED AREAS ONLY. C. NO SITE RUN OFF IS TO BE GENERATED BY OVER USE OF WATERING. D. CONTROLLING DUST ON PAVED ROADWAYS WILL BE DONE BY THE USE OF A SWEEPER WITH WATER -JET SPRAYERS. NO RUN OFF FROM SPRAYERS SHALL REACH THE CATCH BASINS. 4. PERIMETER PROTECTION: A. PERIMETER PROTECTION TO FILTER SEDIMENT FOR SHEETWASH SHALL BE LOCATED DOWNSLOPE OF ALL DISTURBED AREAS AND PROPERLY INSTALLED PRIOR TO UPSLOPE GRADING. B. 50 LINEAR FEET OF SILT FENCE PER ACRE AND THE NECESSARY STAKES TO HOLD THE FENCE IN PLACE SHALL BE STORED ON SITE. 5. TRAFFIC AREA STABILIZATION: A. UNSURFACED DRIVEWAY ENTRANCES, ACCESS ROADS AND PARKING AREAS USED BY CONSTRUCTION TRAFFIC WILL BE STABILIZED TO MINIMIZE EROSION AND PREVENT TRACKING MUD. B. STABILIZED CONSTRUCTION ENTRANCES WILL BE INSTALLED AS THE FIRST STEP OF CLEARING AND GRADING. C. CONSTRUCTION ENTRANCES WILL BE SET UP SO THAT ALL TRAFFIC LEAVING A JOB SITE IS REQUIRED TO TRAVEL THE ENTIRE LENGTH OF ENTRANCE. D. ROADS AND PARKING AREAS WILL BE STABILIZED IMMEDIATELY AFTER THE INITIAL GRADING. E. CONSTRUCTION ENTRANCES WILL BE STABILIZED WHEREVER TRAFFIC WILL BE LEAVING A CONSTRUCTION SITE AND TRAVELING ON PAVED ROADS OR OTHER PAVED AREAS WITHIN 1,000 FEET OF THE SITE. F. ANY SEDIMENT THAT IS TRACKED ONTO PAVEMENT WILL BE REMOVED IMMEDIATELY BY SWEEPING. THE SEDIMENT COLLECTED BY SWEEPING SHALL BE REMOVED OR STABILIZED ON -SITE. G. IF NON-VACTOR TYPE SWEEPERS ARE USED, THE DEPOSITION OF THESE SWEEPERS MUST BE REMOVED FROM SIDEWALKS AND GUTTERS. THE SEDIMENT COLLECTED BY SWEEPING SHALL BE REMOVED OR STABILIZED ON -SITE. H. THE PAVEMENT SHALL NOT BE CLEANED BY WASHING STREETS. TEMPORARY EROSION CONTROL SEED MIX (CONTINUED) EROSION AND SEDIMENT CONTROL NOTES TESC NOTES AND DETAILS 6. SEDIMENT RETENTION: OF A. SEDIMENT RETENTION IS REQUIRED UNLESS NO OFF -SITE DISCHARGE IS ANTICIPATED FOR THE SPECIFIED DESIGN FLOW. PLAT B. SEDIMENT RETENTION FACILITIES WILL BE INSTALLED BEFORE GRADING. DALPAY SHORT C ADDITIONAL NPONDS/TRAPS/SYSTEMS ITO ACCOMMODATE ON FACILITIES NEED TO BE RESTORAGE MOVED OCAPACITY DNEED TO BE A PORTION OF THE N.E. 1/4 OF THE S.E. 1/4 OF SECTION 47 TOWNSHIP INSTALLED ON SITE. THIS WILL BE DONE PRIOR TO REMOVAL OF EXISTING FACILITY. 7. SURFACE WATER CONTROL: 23 N., RANGE 5 E., W.M. CITY OF RENTON, KING COUNTY, WASHINGTON A. SURFACE WATER CONTROLS ARE REQUIRED UNLESS NO OFF -SITE DISCHARGE IS ANTICIPATED FOR THE SPECIFIED DESIGN FLOW. 8. SENSITIVE AREA RESTRICTIONS: A. PHASING AND MORE CONSERVATIVE BEST MANAGEMENT PRACTICES (BMP'S) MUST BE EVALUATED FOR CONSTRUCTION ACTIVITIES NEAR SURFACE WATERS.. 9. MAINTENANCE REQUIREMENTS: A. LARGE PROJECTS WITHIN SENSITIVE AREAS MAY BE REQUIRED BY THE CITY TO HAVE A DESIGNATED ESC SUPERVISOR WHO WILL BE RESPONSIBLE FOR ESC REVIEW, B. MAINTENANCE AND COMPLIANCE. C. ESC WILL BE INSPECTED A MINIMUM OF ONCE A WEEK DURING THE WET SEASON AND WITHIN 24 HOURS OF SIGNIFICANT STORMS (.5 INCHES/24 HOUR, OR WHERE RUN-OFF IS GENERATED). D. THE ESC SUPERVISOR MUST BE AVAILABLE, 24 HOURS, FOR RAPID RESPONSE TO ESC PROBLEMS AND EMERGENCIES. E. A 24-HOUR PHONE NUMBER FOR THE ESC SUPERVISOR WILL BE POSTED IN A CLEARLY VISIBLE LOCATION ON THE PROJECT SITE. 10. FINAL STABILIZATION: PRIOR TO FINAL CONSTRUCTION APPROVAL, THE FOLLOWING CONDITIONS MUST BE MET: A. ALL DISTURBED AREAS OF THE SITE WILL BE VEGETATED OR OTHERWISE PERMANENTLY STABILIZED; B. STRUCTURAL MEASURES SUCH AS SILT FENCE, SLOPE DRAINS, ETC. WILL BE REMOVED FROM SITE; C. ALL PERMANENT SURFACE WATER FACILITIES INCLUDING CATCH BASINS, PIPES, ETC. WILL BE CLEANED; D. ANY OFF -SITE CATCH BASINS THAT REQUIRED PROTECTION WILL ALSO BE CLEANED; AND E. IF ONLY THE INFRASTRUCTURE OF THE SITE HAS BEEN DEVELOPED SUCH AS SHORT PLATS AND SUBDIVISIONS, WITH BUILDING CONSTRUCTION TO OCCUR UNDER A DIFFERENT F. PERMIT, THEN THE SENSITIVE AREA BUFFERS, TRACTS, AND SETBACKS WILL BE CLEARLY MARKED. CITY OF RENTON, DEVELOPMENT SERVICES STAFF IS AVAILABLE TO ANSWER ANY QUESTIONS YOU MAY HAVE ABOUT EROSION AND SEDIMENT CONTROL AND WET SEASON STABILIZATION MEASURES FOR PERMITTED ACTIVITIES IN THE CITY OF RENTON. PLEASE CALL 425-430-7300. MATERIAL % WEIGHT % PURITY % GERMINATION CHEWINGS OR RED FESCUE 40 98 90 FESTUCA RUBRA VAR. COMMUTATA OR FESTUCA RUBRA ANNUAL OR PERENNIAL RYE 40 98 90 LOLIUM MULTIFLORUM OR LOLIUM PERENNE REDTOP OR COLONIAL BENTGRASS AGROSTIS ALBA OR AGROSTIS TENUIS 10 92 85 WHITE DUTCH CLOVER TRIFOLIUM REPENS 10 98 90 BEST MANAGEMENT PRACTICES (BMP) ALTERNATIVES MULCH MATERIAL otmury STANDARDS APPUCAT1&q /1000 SF APPLICATION ACRE DEPTH OF APPLICATION II �� STEEL FENCE POST 6' HIGH MIN. u NOTE: 1: CLIP FENCE TO GALVANIZED WIRE ® 5 FOOT ON -CENTER SPACING 2. WIRE FENCE TO STEEL FENCE POST TEMPORARY N.G.P.E. FENCE DETAIL NOT TO SCALE I:i#!F_%',A-] GRAVEL, SLAG, OR WASHED, 3/4 -1-1/2 9 CU YDS 3 INCHES FOR SHORT SLOPES AND AROUND WOODY PLANTS & ORNAMENTALS CRUSHED STONE SIZE USE WHERE SUBJECT TO FOOT TRAFIC. APPDX. 2000 LBS/CU YD. AIR DRIED, FREE FROM 75-100LBS OR 1-1/2 TO 2-1/2 MINIMUM OF 2 IN USE WHERE THE MULCHING EFFECT IS TO BE MAINTAINED FOR LESS HAY OR STRAW UNWANTED SEEDS & 2-3 BALES TONS OR 90-120 DEPTH, GREATER ON THAN 3 MONTHS. ANCHOR BY CRIMPING, COVERING WITH NETTING COARSE MATERIAL BALES STEEP AREAS OR NEAR SPRAYING WITH TACKIFIER AND/OR KEPT MOIST. PROTECTED AREAS) PLASTIC SHEETING MINIMUM 6-MIL PER CITY OF RENTON STANDARD DETAIL 213.30 ON SHEET C5 THICKNESS JUTE MAT, WOVEN N/A N/A USE ON STEEP SLOPES GREATER THAN 2:1 IN ADDITION STRAW BLANKET TO HYDROSEED OR WOOD FIBER WITH TACKIFIER. SYNTHETIC FIBER BLANKET WOOD FIBER DYED GREEN SHOULD 25-30 LBS. 1000-1500LBS IF USED ON CRITICAL AREAS, OR STEEP SLOPES, DOUBLE THE CELLULOSE (PARTIALLY NOT CONTAIN GROWTH NORMAL APPLICATION RATE. APPLY W/HYDROMULCHER. NO DIGESTED WOOD INHIBITING FACTORS TIE -DOWN REQUIRED. FIBERS) WOOD FIBER APPLIED 1.25 TONS PER USE 90 GAL/ACRE TACKIFIER FOR STEEP SLOPES LESS THAN WITH HYDROSEEDING ACRE; 2:1; 120 GAL/ACRE FOR STEEPER THAN 2:1 OR ALONE :11:atyall WOOD CHIPS TREAT WITH 12LBS (HOG FUEL) NITOGEN FERTILIZER/TON HYDROSEED USE MIX RECOMMENDED ABOVE OF 2 IN. DEPTH I DO NOT USE ON SLOPES STEEPER THAN 6% OF 2 IN. DEPTH I DO NOT USE ON SLOPES STEEPER THAN 15% USE DOT SLOPE MIX FOR STEEP SLOPES. Z 4 GRAB TENSILE STRENGTH (ASTM D4532) 2T1O LBS. MIN. GRAB TENSILE ELONGATION (ASTM D4632) 310% MAX. (WOVEN) CBR PUNCTURE STRENGTH (ASTM W241) 495 LBS. MIN. ADS [ASTM 04T511 12N45 (U.S. STANDARD SIEVE 81ZE) 2.2. DO NOT USE CRUSHED CONCRETE, CEMENT, OR CALCIUM CHLORIDE FOR CONSTRUCTION ENTRANCE STABILIZATION BECAUSE THESE PRODUCTS RAISE pH LEVELS IN STCRMWATER AND CONCRETE DISCHARGE TO SURFACE WATERS OF THE STATE IS PROHIBfTED. 2.1 HOG FUEL ( WOOD BASED MULCH; MAY BE SUBSTITUTED FOR OR COMBINED WITH DUARRY SPALLS IN AREAS THAT WILL NOT BE USED FOR PERMANENT ROADS. HOG FUEL IS NOT RECOMMENDED FOR ENTRANCE STABILIZATION EN URBAN AREAS. THE INSPECTOR MAY AT ANY TIME REQUIRE THE USE OF QUARRY SPALLS IF THE HOG FUEL IS NOT PREWENTING SEDIMENT FROM BEING TRACKED DWO PAVEMF NT OR IF THE HOG FUEL IS BEING CARRIED ONTO PAVEMENT. 2.4- FENCING SHALL BE INSTALLED AS NI-CESSARY TO RESTRICT TRAFFIC TO THE CONSTRUCTION ENTRANCE 2.5 WHENEVER POSSiBL£. THE ENTRANCE SHALL BE CONSTRUCTED ON A FIRM. COMPACTED SUBGRADE THIS CAN SUBSTANTIALLY INCREASE THE EFFECTWENESS OF THE PAD BAND REDUCE THE NEED FOR MAINTENANCE 3. MAINTENANCE STANDARDS 3.1. QUARRY SPALLS SHALL 43E ADDED IF THE PAD IS NO LONOER IN ACCORDANCE WITH THE SPECWiCATIDNS. 32- IF THE ENTRANCE IS NOT PREVENTING SEDIMENT FROM BEING TRACKED ONTO PAVEMENT, THEN ALTERNATIVE MEASURES TO KEEP THE STREETS FREE O.z SEDIMENT $HALL W U$FO. THIS MAY INOLUDE STREET SWEEPING, AN INCREASE IN THE DI3,1I;N$IQN$ OF THS ENTRANCE, OR THE INSTALLATION OF A WHEEL 1 IN N R T 1 T N WASH, F WASHING 8 USED IT SHALL BE D4 E 41-F AN AREA COVERED WITH CRUSHER RACK, AND WASH WATER SHALL DRAIN O A SEDIMENT RAP OR P4 P 3.3. ANY SEDIMENT THAT USED' TRACKED ONTO PAVEMENT SHALL BE REMOVED IMMEDIATELY BY SWEEPING, THE SEDIMENT COLLECTED BY SWEEPING SHALL BE REMOVED OR STABILIZED ON SITE THE PAVEMENT SHALL NOT BE CLEANED BY WASHING DOWN THE STREET, EXCEPT WHEN SWEEPING IS INEFFECTIVE AND THERE M A THREAT TO PUBLIC SAFETY. IF IT IS NECESSARY TO WASH THE STREETS, A SMALL SUMP MUST BE CONSTRUCTED. THE SEDIMENT WOULD THEN BB WA,gm8D INTO THE SUMP WHEtRE 11 CAN BE CONTROLLED AND DISCKMGED APPROPRIATELY. WASH WRIER MUST 13E PUMPED BACK ONTO THE SITE AND CANNOT DISCHARGE TO SYSTEMS TRIBUTARY TO SURFACE WATERS. 3,4- ANY QUARRY SPALLS THAT ARE LQQSENEP FRAM THE PAD AND END UP ON THE ROADWAY SHALL EW REMOVED IMMEDLgTELY. 3,5- IF VEHICLES ARE ENTERINQ CR EXITING THE SETE$ AT POINTS OTHER THAN THE CONSTRUCTIQH ENTRANCE(S), FENCING SHALL BE INSTALLED To CONTROL TRAFFIC. UNLESS OTNERWISf N01#4. imLAWFNU 1S Net TO SCALE (NTS; 4 STD. PLAN - � �, 5.10 � ti PUBLIC WORKS PPROVEO DEPARTMENT STABILIZED CONSTRUCTION[ ENTRANCE GAZ 9/28/2018 1 rmswo-�>nm r::nc, oAtl 1. ANY SITE WITH EXPOSED SOILS DURING THE WET SEASON (OCTOBER 1 TO APRIL 30) SHALL BE SUBJECT TO THE SPECIAL PROVISIONS BELOW. THESE SPECIAL PROVISIONS ARE REQUIRED IN ADDITION TO THE STANDARD ESC COVER MEASURES. THESE PROVISIONS INCLUDE COVERING ANY NEWLY SEEDED AREAS WITH MULCH AND IDENTIFYING AND SEEDING AS MUCH DISTURBED AREA AS POSSIBLE PRIOR TO SEPTEMBER 23 IN ORDER TO PROVIDE GRASS COVER FOR THE WET SEASON. 2. THE ALLOWED TIME THAT A DISTURBED AREA CAN REMAIN UNWORKED WITHOUT COVER MEASURES IS REDUCED TO TWO (2) DAYS, RATHER THAN SEVEN (7) DAYS. 3. STOCKPILES AND STEEP CUT AND FILL SLOPES ARE TO BE PROTECTED IF UNWORKED FOR MORE THAN 12 HOURS. 4. COVER MATERIALS (PLASTIC, MATTING, ETC.) SUFFICIENT TO COVER ALL DISTURBED AREAS SHALL BE STOCKPILED ON SITE. 5. ALL AREAS THAT ARE TO BE UNWORKED DURING THE WET SEASON SHALL BE SEEDED WITHIN ONE WEEK OF THE BEGINNING OF THE WET SEASON. 6. MULCH IS REQUIRED TO PROTECT ALL SEEDED AREAS. 7. FIFTY LINEAR FEET OF SILT FENCE (AND THE NECESSARY STAKES) PER ACRE OF DISTURBANCE MUST BE STOCKPILED ON SITE. 8. CONSTRUCTION ROAD AND PARKING LOT STABILIZATION ARE REQUIRED FOR ALL SITES UNLESS THE SITE IS UNDERLAIN BY COARSE -GRAINED SOIL. BENCHMARKS: FOUND 1.5" BRASS DISK WITH 2" BRASS DISK WITH PUNCH MARK PUNCH MARK IN CASE AT UNION IN CASE AT THE INTERSECTION OF AVENUE NORTHEAST AND NE 19TH NORTHEAST 19TH STREET AND STREET, KNOWN AS CITY OF DUVALL, KNOWN AS CITY OF RENTON CONTROL POINT #716 RENTON CONTROL POINT #1996 2 PER COR COMMENTS DATED 6/8/20 DC 6/10/20 1 PER COR COMMENTS DATED 10/31/19 DC 12/2/19 NO. REVISION BY DATE 9. SEDIMENT RETENTION IS REQUIRED UNLESS NO OFFSITE DISCHARGE IS ANTICIPATED FOR THE SPECIFIED DESIGN FLOW. 10. PROPERLY INSTALLED SILT FENCING IS MANDATORY ALONG THE DOWNSLOPE OF ALL DISTURBED AREAS OF THE SITE. PERIMETER PROTECTION FILTERS RUNOFF AND REDUCES THE AMOUNT OF SEDIMENT THAT MAY LAVE THE SITE. 11. SURFACE WATER CONTROLS ARE REQUIRED UNLESS NO OFFSITE DISCHARGE IS ANTICIPATED FOR THE SPECIFIED DESIGN FLOW. 12. PHASING AND MORE CONSERVATIVE BMPS MUST BE EVALUATED FOR CONSTRUCTION ACTIVITY NEAR SURFACE WATERS. 13. ANY RUNOFF GENERATED BY DEWATERING SHALL BE TREATED THROUGH CONSTRUCTION OF A SEDIMENT TRAP WHEN THERE IS SUFFICIENT SPACE OR BY RELEASING THE WATER TO A WELL -VEGETATED, GENTLY SLOPING AREA. SINCE PUMPS ARE USED FOR DEWATERING, IT MAY BE POSSIBLE TO PUMP THE SEDIMENT -LADEN WATER WELL AWAY FROM THE SURFACE WATER SO THAT VEGETATION CAN BE MORE EFFECTIVELY UTILIZED FOR TREATMENT. A STRAW BALE FILTER SHALL BE PLACED AROUND THE DISCHARGE FROM THE DEWATERING PUMP. IF THERE IS NOT SPACE FOR A SEDIMENT TRAP OR 25 FEET OF SUITABLE VEGETATION, OTHER FILTRATION METHODS SHALL BE REQUIRED. 14. THE FREQUENCY OF MAINTENANCE REVIEW SHOULD BE INCREASED FROM WEEKLY TO DAILY WHERE WARRANTED. SURVEYED: TSL DESIGNED: DSC DD DRAWN: DSC DD CHECKED: DD A P P R APPROVED: DD SCALE: VERTICAL, NAVD 1988 N/A HORIZONTAL, NAD 1983/1991 ONE INCH DATU M AT FULL SCALE IF NOT ONE INCH SCALE ACCORDINGLY JOINTS IN FILTER FABRIC SHALT. BE SPLICED AT POSTS. USE STAPLES, WIRE RINGS, OR EQUIVALENT TO ATTACH FABRIC TO POSTS 2-.F 14 GAUGE WIRE, OR EQUIVALENT, IF STANDARD STRENGTH FABRICUSEP { FILTER FABRIC III 2 MIN, 5' NL4lC. - I I POST SPACING MAY BE INCREASED I 12' MIN. TO8' IF WIRE BACKING IS USED I I 4'x4' MIN, TRENCH I ;ul BACKFILLTRENCH WITH NATIVE SOIL Li OR 3W TO 9.lW WASHED GRAVEL 2'XA' WOOD POSTS, STEEL FENCE POSTS, OR EQUIVALENT (TYP.) NOTE: CONTRACTOR SHALL USE BRIGHT ORANGE SILT FENCE IN ALL LOCATIONS. NOTES: 1. CONDITIONS OF USE 1.1- SILT FENCE MAY BE USED DOWNBLOPE OF ALL DISTURBED AREAS. IZ SILT FENCE IS NOT INTENDED 70 TREAT CONCENTRATED FLOWS. NOR IS IT INTENDED TO TREAT SUBSTANTIAL AMOUNTS OF OVERLAND FLOW, ANY CONCENTRATED FLOW MUST BE CONVEYED THROUGH THE DRAINAGE SYSTEM TO A SEDIMENT TRAP OR PCN D. Z DESIGN AND INSTALLATION SPEQRCATKMS 2.1. THE GEOTEXTILE USED MUST MEET THE_ STANDARD LISTED BELLOW. A COPY OF THE MANUFACTURER'S FABRIC SPECIFICATIONS MUST BE AVAILABLE ON SITE. ADS (ASTM L74751I 30400 $1EVI= $I2E 18.E59-8.15mm1 FQR $ILT FILM 50-F00 SIEVE SIZE 14.30-4,15mmj FQR OTHER FABRICS WATER PERMTTRVFTY(ASTM D4491) OD2SECa1MINiMUM GRAB TENSILE STRENGTH (ASTM Q46321 160 USE.. MIN. FOR EXTRA STRENGTH FABRIC 10D LB.S. MIN. FOR STANDARD STRENGTH FABRIC GRAB TENSILE ELONGATION (ASTM 3952) 30%MAX. (WOVEN} ULTRAVIOLET RESISTANCE (ASTM D4S55) 70% MIN. 2.2. STANDARD STRENGTH FABRIC REQUIRES WIRE BACKING TO INCREASE THE STRENGTH OF THE FENCE WIRE BACKING OR CLOSER POST SPACING MAY BE REQUIRED FOR EXTRA STRENGTH FABRIC IF FIELD PERFORMANCE WARRANTS A STRONGER FENCE 2.3. WHERE THE FENCE IS FN$TALLEC, THE SLOPE SHALL NOT BE STIFFER THAN 2H:1V 2.4. IF A TYPICAL SILT FENCE IS USED, THE STANDARD 4'X4" TRENCH MAY BE REDUCED AS LONG AS THE BOTTOM 81NCHES OF THE SILT FENCE FABRIC 15 WELL BURIED AND SECURE IN A TRENCH THAT STABILIZES THE FENCE AND DOES NM ALLOW WATER TO BYPASS OR UNDERMINE THE SILT FENCE. 25. FILTER FABRIC FENCES SHALL BE INSTALLED ALONG CDNTOURS WHENEVER POSSIBLE 3. MAINTENANCE STANDARDS 3.1. ANY DAMAGE SHALL SE REPAIRED IMMEDIATELY. 3.2. IF CONCENTRATED FLOWS ARE EVIDBNT UPHILL OF THE FENCE, THEY MUST BE INTERCEPTED AND CONVEYED TO A SEDIMENT TRAP OR POND. 5.3. IT IS IMPORTANT TO CHECK THE UPHILL SIDE OF THE FENCE FOR SIGNS OF THE FENCE CLOGGING AND ACTING AS A BARRIER TO FLOW AND THEN CAUSING CHANNE LIZATIQN OF FLAW$ PRRALI.FL TO THE FENCS. IF THIS OCCUR$, R£PLAC F THE FENCE QR REMOVE THE TRAPPED SEDIMENT 3A. SEDIMENT MUST BE REMOVED WHEN SEDIMENT IS 6 INCHES HIGH. 3.5. IF THE FILTER FABRIC (GEOTEXTILE) HAS DETERIORATEO DUE TO ULTRAVIOLET BREAKDOWN, rT SHALL BE REPLACED UNLESS OTHERWISE NUTEO, DRAWING IS NdT TO SCALE (NTS) STD. PLAN - 214.00 a� PUBLIC WORKS SILT FENCE om 912812019 1 "-IN DEPARTMENT 1p GAZ .vo-x wur mmmxraln RATE FILTER FABRIC FENCE INSTALLATION NOTES: 1. THE FILTER FABRIC SHALL BE PURCHASED IN A CONTINUOUS ROLL CUT TO THE LENGTH OF THE BARRIER TO AVOID USE OF JOINTS. WHEN JOINTS ARE NECESSARY, FILTER CLOTH SHALL BE SPLICED TOGETHER ONLY AT A SUPPORT POST, WITH A MINIMUM 6-INCH OVERLAP, AND BOTH ENDS SECURELY FASTENED TO THE POST 2. THE FILTER FABRIC FENCE SHALL BE INSTALLED TO FOLLOW THE CONTOURS (WHERE FEASIBLE). THE FENCE POSTS SHALL BE SPACED A MAXIMUM OF 6 FEET APART AND DRIVEN SECURELY INTO THE GROUND (MINIMUM OF 30 INCHES) 3. A TRENCH SHALL BE EXCAVATED, ROUGHLY 8 INCHES WIDE AND 12 INCHES DEEP, UPSLOPE AND ADJACENT TO THE WOOD POST TO ALLOW THE FILTER FABRIC TO BE BURIED 4. WHEN STANDARD STRENGTH FILTER FABRIC IS USED, A WIRE MESH SUPPORT FENCE SHALL BE FASTENED SECURELY TO THE UPSLOPE SIDE OF THE POSTS USING HEAVY DUTY WIRE STAPLES AT LEAST 1 INCH LONG, TIE WIRES OR HOG RINGS. THE WIRE SHALL EXTEND INTO THE TRENCH A MINIMUM OF 4 INCHES AND SHALL NOT EXTEND MORE THAN 36 INCHES ABOVE THE ORIGINAL GROUND SURFACE 5. THE STANDARD STRENGTH FILTER FABRIC SHALL BE STAPLED OR WIRED TO THE FENCE, AND 20 INCHES OF THE FABRIC SHALL BE EXTENDED INTO THE TRENCH. THE FABRIC SHALL NOT EXTEND MORE THAN 36 INCHES ABOVE THE ORIGINAL GROUND SURFACE. FILTER FABRIC SHALL NOT BE STAPLED TO EXISTING TREES 6. WHEN EXTRA STRENGTH FILTER FABRIC AND CLOSE POST SPACING ARE USED, THE WIRE MESH SUPPORT FENCE MAY BE ELIMINATED. IN SUCH A CASE, THE FILTER FABRIC IS STAPLED OR WIRED DIRECTLY TO THE POSTS WITH ALL OTHER PROVISIONS OF STANDARD NOTE 5 APPLYING 7. THE TRENCH SHALL BE BACKFILLED WITH 3/4-INCH MINIMUM DIAMETER WASHED GRAVEL 8. FILTER FABRIC FENCES SHALL BE REMOVED WHEN THEY HAVE SERVED THEIR USEFUL PURPOSE, BUT NOT BEFORE THE UPSLOPE AREA HAS BEEN PERMANENTLY STABILIZED 9. FILTER FABRIC FENCES SHALL BE INSPECTED IMMEDIATELY AFTER EACH RAINFALL AND AT LEAST DAILY DURING PROLONGED RAINFALL. ANY REQUIRED REPAIRS SHALL BE MADE IMMEDIATELY CITY OF IR"I RENTON valliv Planning/Building/Public Works Dept. R-409704 OE.Dq (n G 42009 F6'/STE�� S/08 A L ECG 9-21-20 V E !C V � � r .= O 7 .Q C W cN M ul c Q00N � i • � N dl Q 11A L\3: Lr) C Lf) +j, N /m W O V � 1- (3)N Y "t. IN COMPLIANCE WITH CITY OF RENTON STANDARDS 130 00 DEVELOPMENT ENGINEERING o 'R I w 00 r r Nathan Janders 11/12/2020 - 0 �(. TESC NOTES AND DETAILS DATE: 6/18/19 ,j. ^ v) DALPAY SHORT PLAT FIELDBOOK: DALPAY PROPERTIES, LLC. PAGE: DRAWING N0: /1 _ ~aYy W 4033 N.E. SUNSET BOULEVARD RENTON, WA 98059 C) SHEET: C4 OF: 18