b" x 4"
NOTES:
1- CONDFFLi7NS qF USE
I.I
I- PLASTIC COVERING MAY BE USED ON DISTURBED AREAS THAT REQUIRE COVMR MEASURES FOR LESS THAN 3D DAYs.
12. 'PLASTC IS PARTICULARLY USEFUL FOR PROTECTING CUT AND FILL SLOPES AND STOCKPILES
1.3. CLEAR PLASTIC SHEETING MAY BE USED OVER NEWLY -SEEDED AREAS TO CREATE A GREENHOUSE EFFECT AND ENCOURAGE GRASS GROWTH,
CLEAR PLASTIC SHOULD NOT BE USED FOR THIS PURPOSE DURING THE SUMMER MONTHS.
1.4, THIS METHOD SHALL NOT BE USED UPELOPE OF AREAS THAT MIGHT BE ADVERSELY IMPACTED BY RUNOFF. SUCH AREAS INCLUDE STEEP AND
UNSTABLE SLOPES.
2. DESIGN AND INSTALLATICIN SPECIFICATIONS
2.1. PLASTIC SHEETING SHOULD HAVE A MINIMUM THICKNESS OF D.OE MILLIMETERS.
2.2- IF EROSION AT THE TOE OF A SLOPE IS LIXELY, A GRAVEL BERM, RIPAAP, OR OTHn SUITABLE PROTECTION SHALL BE INSTALLED AT THE TOE
OF THE SLOPE IN ORDER TO REDUCE THE VELOCITY OF RUNOFF.
2.3 TIRES, SANDBAGS. OR EQUIVALENT MAYBE USED TO WEIGHT PLASTIC
2.4 SEAMS BETWEEN SHEETS MUST OVERLAP A MLNtMUM OF 12INCHES AND BE WEIGHTED OR TAPED,
3. MAINTENANCE STANDARDS
3.1. TORN SHEETS MUST BE REPLACED AND OPEN SEAMS REPAIRED.
3.2. IF THE PLASTIC BEGINS TO DETERIORATE DUE TO ULTRAVIOLET RADIAT014, IT MUST BE COMPLETELY REMOVED AND REPLACED.
3.3. WHEN THE PLASTIC IS NO LONGER NEEDED, IT SHALL BE COMPLETELY REMC VED-
VN LESS OTHERVRSE NOTED, DRAWING 15 NoT Tn kAkE (NTSI
STD. PLAN - 213.30
• PUBLIC WORKS PRO
DEPARTMENT PLASTIC COVERING GAZ/z$/2aia
G.
PATE
EROSION AND SEDIMENT CONTROL {ESC) STANDARD PLAN NOTES:
THE FOLLOWING ISA. LISTING OF GENERAL NOTES THAT SHALL BE INCORPORATED IN THE EROSION AND SEDIMENT CONTROL {ESC) PLAN SET. ALL THE NOTES ON THE
UST MAY NOT PERTAIN TD EVERY PROJECT THE APPLICANT OR OWNER, HEREBY REFERRED TO AS APPLICANT, MAY STRIKE OUT IRKLEVANT NOTES IF NOT
APPLICABLE TO THE PROJECT. HOWEVER- THE APPLICANT SHALL NOT RENUMBER NOR EDIT THE REMAINING NOTES. IF ADDITIONAL NOTES ARE NEEDED FOR SPECIFIC
ASPECTS, THEY SHALL BE ADDED AFTER THE ESC STANDARD PLAN NOTES.
1. BEFORE ANY CONSTRUCTION OR DEVELOPMENT ACTIVITY OCCURS, A PRE -CONSTRUCTION MEETING SHALL BE HELD AMONG THE CITY OF RENTON, HEREBY
REFERRED TO AS THE CITY, THE APPLICANT, AND THE APPLICANTS CONTRACTOR.
2, THE: APPLICANT IS RFSFONSIRLE FOR OBTAtNING THE WASHINGTON STATE DEPARTMENT OF ECOLOGY (ECOLOGYI CON$TRUCTIQK STORMWATFR r,ENSRAL
PERMIT, IF IT 1S REQUIRED FOR THE PROJECT, THE APPLICANT SHALL PROVIDE THE CITY COPIES OF ALL MONITORING REPORT'S PROVIDED TO ECOLOGY
ASSOCIATED WITH THE CONSTRUCTION STORMWATER GENERAL PERMIT
3. THE ESC PLAN SET SHALL INCLUDE AN ESC CONSTRUCTION SEQUENCE DETAILING THE ORDERED STEPS THAT SHALL BE FOLLOWED FROM CONSTRUCTION
COMMENCEMENT TO POST -PROJECT CLEANUP IN ORDER TO FULFILL PROJECT ESC REQUIRLMENTS-
4. THE BOUNDARIES OF THE CLEARING LIMITS, SENSITIVE AREAS AND THEIR BUFFERS, AND AREAS OF VEGETATION PRESERV,ATKIN AND TREE RETENTION AS
PRESCRIBED ON THE PLAN(S) SHALL BE CLEARLY DELI NEAT£D BY FENCING ANDI PROTECTED M THE FIELD IN ACCORDANCE VYFTH APPENDIX D OF THE CITY OF
RENTON $URFAGE WATER DESIGN MANUAL (RENTON SWDM) PRIOR TO THE START OF CONSTRUCTION- PQRING THE CONSTRUCTION PERIOD, NO DISTURBANCE
13FYON1) THE CLEARING LIMITS $HALL BE PERMTTTE-P. THE CLEARtNIG UM ITS SHALL BE MkNTAINED I3Y THE AFPLICANTfESG $UPFR"$QR FOR THE DURATION OF
CO N37RUCTION.
S. STABILIZED CONSTRUCTION ENTRANCES SHALL BE INSTALLED AT THE BEGINNING OF CONSTRUCTION AND MAINTAINED FOR THE DURA71ON Of THE PROJECT
ADDITIONAL MEASURES, SUCH AS CONSTRUCTED WHI_EL WASH SYSTEMS OR WASH PADS, MAY 8E RECUIRED TO ENSURE THAT ALL PAVED AREAS ARE KEPT
CLEAN AND TRACK -OUT TO ROAD RIGHT OF WAY DOES NOT OCCUR FOR THE DURATION OF THE PROJECT. IF SEDIMENT IS TRACKED OFFSITE, PUBLIC ROADS SHALL
BE CLEANED THOROUGHLY AT ThIE END OF EACH DAY, OR MORE FREOUENTLY DURING WET WEATHER, AS NECESSARY TO PREVENT SEDIMENT FROM ENTERING
WATERS OF THE STATE
S. WASHOUT FROM CONCRETE TRUCKS $HALL BE PERFORMED OFFSFTE OR IN DESIGNATED CONCRETE WASHOUT AREAS DNLY. DO NOT WASH CUT CONCRETE
TRUCKS ONTO THE GROUND, OR TO STORM DRAINS OR OPEN DITCHES. CRq-SITE DUMPING OF EXCESS CONCRETE SHALL ONLY OCCUR IN DESIGNATED CONCRETE
WASHOUTAREAS.
7. ALL REQUIRED ESC BMPS SHALL BE CONSTRUCTED AND IN OPERATION PRIOR TO LAND CLEARING ANDIOR CONSTRUCTION TO PREVENT TRANSPORTATION OF
SEDIMENT TO SURFACE WATER, DRAINAGE SYSTEMS AND ADJACENT PROPERTIES. ALL ESC BMPS SHALL BE MAINTAINED IN A SATISFACTORY CONDITION UNTIL
SUCH TIME THAT CLPARiNG ANDIOR CONSTRUCTION IS COMPLETE AND POTENTIAL FOR ON�SITE EROSION HAS PASSED. ALL ESC BMPS SHALL BE REMOVED AFTER
CONSTRUCTION IS COMPLETED AND THE SR£ HAS BEEN STABILIZED TO ENSURE POTENTIAL FOR ON -SITE EROSION DOES NOT EMST, THE IMPLEMEWATIOH,
MAINTENANCE, REPLACEMENT, ENHANCEMENT. AND REMOVAL OF ESC BMPS SHALL BE THE RESPONSIBILFTY OF THE APPLICANT-
S. ANY HAZARDOUS MATERIALS OR LIWIO PRODUCTS THAT HAVE THE POTENTIAL TO POLLUTE RU NOFF SHALL BE DISPOSED OF PROPERLY.
B, THE ESC BMPS DEPICTED ON THIS DRAWING ARE INTENDED TO BE MINIMUM RECOUIREMENTSTO MEET ANTICIPATED SITE CONDITIONS. AS CONSTRUCTION
PROGRESSES AND UNEXPECTED OR SEASONAL CONDITIONS DICTATE, THE APPLICANT SHALL ANTICIPATE THAT MORE ESC BMPS WILL BE NECESSARY TO ENSURE
COMPLETE SILTATION CONTROL ON THE PROPOSED SITE. DURING THE COURSE OF CONSTRUCTION, IT SHALL SE THE OBLIGATION AND RESPONSIBILITY OF THE
APPLICANT TO ADDRESS ANY NEW CONDITIONS THAT MAYBE CREATED BY THE ACTIVITIES AND TO PROVIDE ADDITIONAL ESC BMPS, OVER AND ABOVE MINIMUM
REQUIREMENTS, AS MAY BE NEEDED, TO PROTECT ADJACENT PROPERTIES AND WATER QUALITY OF THE RECEIVING ORAI:JAGE SYSTEM.
10. APPROVAL OF THIS PLAN IS FOR ESC ONLY. IT DOES NOT CONSTITUTE AN APPROVAL OF STORM DRAINAGE DESIGN- SIZE NOR LOCATION OF PIPES, RESTRJCTORS,
CHANNELS, OR STORMWATER FACILRIES-
11. ANY DEWATERING SYSTEM NECESSARY FQjR THE CONSTRUCTION OF $TORMWATER FACILITIES SHALL 5E SUE3MFFFED TO THE CITY FOR REVIEW AND APPROVAL.
12. ANY AREAS OF EXPOSED SOILS. INCLUDING ROADWAY EMBAN4MENTS. THAT WILL NOT BE DISTURBED FOR TWO DAYS DURING THE WET SEASON JOCTOBER 1ST
THROUGH APRIL 30TH) OR SEVEN DAYS DURING THE DRY SEASON IMAY 1ST THROUGH SEPTEMBER BOTH) SHALL BE IMMEDIATELY STABILIZED WITH THE APPROVED
ESC COVER METHODS (E.G.- SEEDING. MULCHING. PLASTIC COVERING- ETC.) IN CONFORMANCE WITH APPENDIX D OF THE RENTON SWDM.
13, WET SEASON EEC REQUIREMENTS APPLY TO ALL CONSTRUCTION SITES BETWEEN OCTOBER 1ST AND APRIL 30TH, UNLESS OTHERWISE APPROVED BY THE CITY,
14. ANY AREA NEEDING ADDITIONAL ESC MEASURES, NOT REOUIRING EMMEDIATI=ATTENTION. SHALL BE ADDRESSED WITHIN SEVEN (7) DAYS.
15. THE ESC BMPS ON INACTIVE SITES SHALL BE INSPECTED AND MAI NTAINED AT A MINIMUM OF ONCE A MONTH OR WITHIN 24 HOUR$ FOLLOWING A.STORNI EVENT.
INSPECTION AND MAINTI=NAUCE SHALL OCCUR MORE FREQUENTLY A$ REQUIRED BY THE CITY
16. BEFORE COMMENCEMENT OF ANY CONSTRUCTION ACTIVITY, CATCH BASIN INSERTS PER THE CITY STANDARD PUN 21S.30 SHALL BE PROVIDED FOR ALL STORM
DRAIN INLETS DOWNSLOPE AND WITHIN 500 FEET OF A DISTURBED OR CONSTRUCTION AREA, UNLESS THE RUNOFF THAT ENTERS THE INLET WILL BE CONVEYED
TO A SEDIMENT POND DR TRAP ALL CATCH BASIN INSERTS SHALL DE PERIODICALLY INSPECTED AND REPLACED AS NECESSARY TO ENSURE FULLY FUNCTIONING
CONDITION.
17. AT NO TIME SHALL SEDIMENT ACCUMULATION EXCEED 2V3 OF THE CAPACITY OF THE CATCH BASIN SUMP ALL CATCH BASINS AND CONVEYANCE LINES SHALL BE
CLEANED PRIOR TO PAVING. THE CLEANING OPERATION SHALL NOT FLUSH SEDIMENT -LADEN WATER INTO THE DOWNSTREAM SYSTEM.
19. ANY PERMANENT STORMWATER FACILITY LOCATION USED AS A TEMPORARY SETTLiNra BASIN SHALL BE MODIFIED WITH THE NECESSARY ESC BMPS AND SHALL
PROVIDE ADEQUATE STORAGE CAPACITY. IF THE TEMPORARY FACILITY IS TO ULTIMATELY fl-INCTION AS AN INFILTRATION SYSTEM LN ITS PERMANENT STATE. THE
TEMPORARY FAC ILTTY SHALL BE ROUGH GRADED SO THAT THE BOTTOM AND SIDES ARE AT LEAST THREE FEET ABOVE THE FINAL GRADE OF THE PERMANENT
FAC ILITY,
19. AREAS DESIGNATED ON THE PLANISI CONTAINING EXISTING STORMWATER FACILITIES OR ON -SITE IMPS tAMENDED SOILS, BIORETENTION, PERMEABLE PAVEMENT-
ETC,I SHALL BE CLEARLY FENCED AND PROTECTED USING ESC BMPS TO AVOID SEDIMENTATEDN AND COMPACTION DURING CONSTRUCTION
20. PRIOR TO THE HEGINNING OF THE WET S&MM (O6TOSER 1ST), ALL DISTURBED AREAS SHALL SE INSPECTED 70IDENTIFY wKICH ONES SHALL BE SODDED OR
SEEDED IN PREPARATION FOR THE WINTER RAINS. DISTUf36ED ARFAS SHALL B£ SOOD110 OR SEEDED WITHIN ONE WEEK OF THE BEGINNING OF THE WET SEASON.
AN EXHIBIT OF THOSE AREAS TO BE SODDED OR SEEDED AND THOSE AREAS TO REMAIN UNCOVERED SHALL BE SUBMITTED TO THE CITY FOR REVIEW.
21. PRIOR TO FINAL CONSTRUCTION ACCEPTANCE. THE PROJECT SITE SHALL BE STABILIZED TO PREVENT SEDIMENT -LADEN WATER FROM LEAVING THE PROJECT SITE.
ALL ESC BMPS SHALL BE REMOVED. AND STORMWATER CONVEYANCE SYSTEMS, FACILITIES. AND ON -SITE BMPS SHALL BE RESTORED TO THEIR FULLY
FUNCTIONING CONDITION. ALL DISTURBED AREAS OF THE PROJECT SITE SHALL BE VEGETATED OR OTHERWISE PERMANENTLY STABILIZED- AT A MINIMUM.
DISTURBED AREAS SHALL BE SODDED OR SEEDED AND MULCHED TO ENSURE THAT SUFFICIENT COVER WILL DEVELOP SHORTLY AFTER FINAL APPROVAL. MULCH
WITHOUT SEEDING IS ADEQUATE FOR AREAS TO BE LANDSCAPED BEFORE OCTOBER 1ST.
22 ROCKERIES ARE CONSIDERED TORE A METHOD OF BANK STABILIZ.ATLON AND EROSION CONTROL ROCKERIES SHALL NOT BE CONSTRUCTED TD SERVE AS
RETAINING WALLS. ALL ROCKERIES IN CITY ROAD RIGH7S-OF-WAY SHALL BE CONSTRUCTED IN ACCORDANCE WITH CRY STANDARDS. ROCKERIES OUTSIDE OF
ROAD RIGHTS -OF -WRY SHALL BE CONSTRUCTED IN ACCORDANCE WFTH THE INTERNATIONAL BUILDING CODE.
UNL555 PTHE RWISF NOTED, DRAWING 15 NOT TO WAL T ,NT'.;
STD. PLAN - 268.p0
URIPUBLIC WORKS EROSION AND SEDIMENT CONTROL
DEPARTMENT STANDARD PLAN NOTES GAZ 9/28/2018 1
Rdlti WwYr Adni•"svKa DATE
INFLOW
KEY DIVIDER INTO SLOPE TO
PREVENT FLOW AROUND 8115ES
_ POND LENGTH {3 TO 6
THE MAY POND WE
SILT FENCE OR
EQUIVALENT DIVIDER -
RISER
PIPE -
TESC NOTES AND DETAILS
OF
DALPAY SHORT PLAT
A
PORTION OF
THE N.E. 1/4 OF THE S.E. 1/4 OF
SECTION
47 TOWNSHIP
23
N., RANGE 5
E., W.M. CITY OF RENTON, KING
COUNTY,
WASHINGTON
F-IERGENCY
OVERFLOW
SPILLWAY
DISCHARGE TO STABILIZED
CONVEYANCE. OUTLET, OR
LEVEL SPREADER
CREST OF
RISER PIPE IPRINCIP,AL SPILLWAY}_ EMERGENCY
OPEN AT TOP WITH TRASH RACK SPILLWAY
6'MIN . 12"MIN.
DEWATERING DEVICE
ISEE RISER DETAIL.
STD. PLAN 216.10}
APERVIOUS MATEAL$ SUCK AS GRAVEL
12, RI
OR CLEAN SAND SHALL NOT BE USED
35 a
WIRE -BACKED SILT FENCE, STAKED MtN iAy
HAY BALES WRAPPED WFTH FILTER TY,
FABRIC. OR EQUIVALENT DIVIDER
DEWATERING ORIFIGE - / 1
DISCHARGE TO STABILIZED
CONCRETE BASE CONVEYANCE. OUTLET. OR
LEVEL SPREADER
NOTES:
1. coHo1TION OF USE
1 ; A SEDIMENT POND SHALL BE USED WHERE THE CONTRIBUTING DRAINAGE AREA IS S ACRES OR MORE.
2. DESIGN AND INSTALLATION SPEC IFLCATIONS
21 THE POND SHALL BE DIViDFO INTO TWO ROUGHLY EQUAL VOLUME CELLS Sr A PERMEABLE DIVIDER THAT WILL REDUCE TURBULENCE WHILE ALLOVWNG
MOVEMENT OF WATER BETWEEN CELLS. THE DIVIDER SHALL BE AT LEAST ONE HALF OF THE HEIGHT OF THE RISER. WIRE - BACKED- 2-TO 3 FOOT HIGH, EXTRA
13TRENGTH FILTER FABRIC SUPPORTED BY TREATED 4"X4^a MAYBE USED AS A DIVIDER, ALTERNATIVELY, STAKED STRAW SALES WRAPPED WITH FILTER
FABRIC MAY BE USED.
22. EF THE POND IS MORE THAN 6 FEET DEEP, A DIFFERENT MECHANISM MUST BE PROPOSED.
2.3. TO AID IN OF SEDIMENTDEPTH, ONE -FOOT INTERVALS SHALL BE PROMINENTLY MARKED ON THE RISER
3. MAINTENANCE STANDARDS
3-1. SEDIMENT SHALL BE REMOVED FROM THE POND WHEN FT REACHES 1 FOOT IN DEPTH,
3.2 ANY DAMAGES TO THE POND EMBANKMENTS OR SLOPES SHALL BE REPAIRED.
uNUS5 GIHERWIS[ N011D. PK AWM5IS Nut Tp SCALE ENT51
STD. PLAN - Z16.00
\ PUBLIC WORKS SEDIMENT POND PLAN VIEW AND PERDUE❑
DEPARTMENT CROSS SECTIONS GAZ 9/28/2018
. . ............
,i... DATE
PROVIDE ADEQUATE STRAPPING
POLYETHYLENE CAP --1
•I
PERFORATED POLYETHYLENE DRAINAGE
TUBING. DIAMETER 2" MIN. LARGER THAN CORRUGATED
DEWATERING ORIFICE. TUBING SHALL METAL RISER
COMPLY WITH ASTM F667 AND AA$HTO M294 ------ r
3.5' MIN.
WATERTIGHT COUPLING
r TACK WELD
/""TIT
DEWATERING ORIFICE SCH AO STEEL STUB, MIN. 6' MIN.
DIAMETER AS PER CALCULATIONS IN SECTION 0.2.1.5.2 OF
THE CITY OF R€NTC" SURFACE WATER DESIGN MANUAL.
C �
e A Y 1rMIN.
CONCRETE BASE
. {ALTERNATIVELY, METAL STARES AND WIRE
MAY BE USED TO PREVENT FLOTATION}
4
A -0 G a a
-� 2 x RISER DIA- MIN. �-
NOTES-
1. SEE CONSTRUCTION PLANS FOR EPECIRC PROJECT REQUIREMENTS.
UNLESS WKERWI5E NOTED, DRAWING 15 N1111 TO SCALE ENTS}
STD, PLAN - 216.10
a� PUBLIC WORKS PER❑ .17-
�11 DEPARTMENT SEDIMENT POND RISER DETAIL GAZ 9/28/2018 G
ruu��wmis aamnnramGATF
I IVI I14.
TEMPORARY ROAD X-ING SWALE
NOT TO SCALE
BENCHMARKS:
FOUND 1.5" BRASS DISK WITH 2" BRASS DISK WITH PUNCH MARK
PUNCH MARK IN CASE AT UNION IN CASE AT THE INTERSECTION OF 2 PER COR COMMENTS DATED 6/8/20 DC
AVENUE NORTHEAST AND NE 19TH NORTHEAST 19TH STREET AND 1 PER COR COMMENTS DATED 10/31/19 DC
STREET, KNOWN AS CITY OF DUVALL, KNOWN AS CITY OF
RENTON CONTROL POINT #716 RENTON CONTROL POINT #1996 NO. REVISION BY
�Y SPALLS
s MAX
DRAINAGE GRATE TRIM
GRATE FRAME _
OVERFLOW BYPASS
BELOW INLET GRATE DEVICE
SEDIMEWr AND DEBRIS '
FILTERED
WATER
SECTION VIEW
DRAINAGE GRATE
(RECTANGULAR GRATE SHOWNI RETRIEVALSYSTFAI (TYP.)
1 -
I
OVERFLOW BYPASS flYP.)
-BELOW INLET GRATE DEVICE
ISOMETRIC VIEW
NOTES:
1, PROTECTICN SHALL BE PROVIDED FOR ALL STORM DRAIN INI-ITS DOWN.SLOPE AND WITHIN Ep❑ FEET OF A DISTURBED OR
CONSTRUCTION AREA, UNLESS THE RUNOFF THAT FNTER5 THE CATCH BASIN WILL BE CONVEYED TO A SE41MEW POND OR TRAP,
2, INLET PROTECTION SHALL BE USED TO PROTECT THE DRAINAGE SYSTEM.
3, THE CONTRIBUTING DRAINAGE AREA MUST NOT BE LARGER THAN ONE ACRE.
4. SIZE THE BELOW INLET GRATE DEVICE IBIGDI FOR THE STORMWATER STRUCTURE IT WILL SERVICE
S. THE BIGD SHALL HAVE A BUILT-IN HIGH -FLOW RELIEF SYSTEM (OVERFLOW BYPASS).
S, THE RETRIEVAL SYSTEM MUST ALLOW REMOVAL OF THE BIGD WITHOUT SPILLING THE COLLECTED MATERIAL.
7, PERFORM MAINTENANCE IN ACCORDANCE WITH STANDARD SPECIFICATION"I.A15).
5, ANY SEDIMENT 1N THE CATCH BASIN INSERT SHALL BE REMOVED WHEN THE SEDIMENT HAS FILLED ONE•THIRD OF THE AVAILABLE
STORAGE THE FILTER MEDIA FOR THE INSERT SHALL BE CLEANED OR REPLACED AT LEAST MONTHLY.
LJNLE55 GTR ERWI5E NOTED, DRAWING 15 NOT TO SCALE INTSI
STD, PLAN - 216.30
PUBLIC WORKS ZONE);
DEPARTMENT CATCH BASIN INSERT GAZ 9/28/2018 1
r.uaw�u wKa�o.or DATE
2
2 MAX
LEVEL BOTTOM MAX.1
1
12' Mlw.
i
-�- SWALE SPACING DEPENDS ON SLOPE GRADIENT
NOTES:
1. CONDITIONS OF USE
1.1. REQUIRED AT-
1 1-1. THE TOP OF ALL SLOPES IN EXCESS OF 3H:1V AND WITH MORE THAN 20 FEET OF VERTICAL RELIEF.
1.12. AT INTERVALS ON ANY SLOPES THAT EXCEEDS THE DIMENSIONS SPECIFIED BELOW.
AWRAGE SLOPE
SLOPE PERCENT
FLOW PATH LENGTH
ZIIFI;1V(OR LESS)
3-5Y6
390 FEET
(10 TO 20)H:1V
5-11y96
200 FEET
I4 TO 19}1-1 iv
1♦}2$%
1013 FEET
i2 TO AN-1V
25-SD%
5O FEET
2. DESIGN AND INSTALLAMM SPECIFICATIONS
2.1. FOR SLOPES STEEPER THAN 2H;IV WLTH MORE THAN 10 FEETOF VERTICAL RELIEF BENCHES MAY RE CONSTRUCTER OR CLOSER SPACED
INTERCEPTOR SWALES MAY BE USED. THE DESIRED MEASURE MUST SE DESIGNED BY AN ENGINEER TO EFFECTIVELY INTERCEPT THE HIGH VELCICRY
RUNOFF TO A SEDIMENT POND OR TRAP.
2.2. CONSTRUCTION TRAFFIC OVER TEMPORARY SWAL£S SHALL BE MINIMIZED.
3. MAINTENANCE STANDARDS
3.1. DAMAGE RESULTING FROM RUNOFF OR CONSTRUCTION ACTIVITY SHALL BE REPAIRED IMNtEDIATELY-
3.2. IF THE FACILITIES DO NOT REGULARLY RETAIN STORM RUNOFF. THE CAPACITY ANDJOR FREQUENCY OF THE SWALES SHALL BE INCREASED.
UNLE55 OTHERWISE NOTE❑, URA WING 15 NDY 10 SCALE INTs;
STD. PLAN - I17.10
PUBLIC
• DEPARTMENT OINTERCEPTOR SWALE RKS PPGAZ 9/28/2018 1
ruu�Lwoil„Ior..,,uumi DA7F
R-409705
OFE. W D H
Cn
kSlo
42009/STA L ECG
9-21-20
ui
u
Y^^I
7-3
•
i
vi
'O
D
if
C
W
cN
�
C
M
Q
00
f V
�
Mc:
�
nOd1fV
Q
IA
C
L-0
+j,
N
/m
W
O
U
�
a)
Y
N
"t
I-
IN COMPLIANCE WITH CITY OF RENTON STANDARDS
L'
Po 00
00
DEVELOPMENT ENGINEERING o rZ'
Nathan Janders 11/12/2020
Q�(.
SURVEYED: SCALE: DATE: ^ O
TSL VERTICAL NAVD 1988
83/1 TESC NOTES AND DETAILS / /
HORIZONTAL, NAD 1983/1991 6 18 19
DESIGNED: N/A o CITY 0
DS`. FlELDBOOK:
DALPAY SHORT PLAT �-'
�RENTON
6/10/20 DD D": Dsc . DALPAY PROPERTIES LLC. PAGE:
ONE INCH
DATU M 1 DRAWING NO:
12/2/19 DD CHECKED: AT FULL SCALE Planning/Building/Public Works Dept. 4033 N.E. SUNSET BOULEVARD 1--4DD W
IF NOT ONE INCH
DATE APPR APPROVED: D �� SCALE ACCORDINGLY RENTON, WA 98059 SHEET: OF: 1^
a A 0i