HomeMy WebLinkAboutC_OnholdLetter_LUA22-000122
May 6, 2022
KPFF Consulting Engineers
Attn: Timothy Prusa
1601 Fifth Avenue, Suite 1600
Seattle, WA 98101
SUBJECT: "On Hold" Notice
Maple Highlands Preliminary Plat / LUA22-000122, ECF, PP
Dear Mr. Prusa,
The Planning Division of the City of Renton accepted the above master application for review on April 20, 2022.
During our review, staff has determined that additional information is necessary in order to proceed further.
The following information will need to be submitted so that we may continue the review of the above subject
application:
The Master Application lists Theresa Bagnell and Paula Chambers as the property owners and Timothy
Prusa as the authorized representative. Please provide proof of authorization from the property
owners that Timothy Prusa is authorized to act as their representative.
Within the R-4 zone the minimum lot width for a corner lot is 80 feet. (RMC 4-2-110A) Lot 4 is only 77
feet in width and needs to be increased to at least 80 feet.
Protected trees that do not contribute to a lot’s required minimum tree density shall be held in
perpetuity within a tree protection tract pursuant to RMC 4-4-130H.2. (RMC 4-4-130H.1). Fifteen trees
are proposed for retention on Lot 4. Four (4) trees are required to meet minimum tree density. All
trees above the minimum required need to be placed in a tree protection tract meeting the
requirements of RMC 4-4-130H.2.
The grade level around any tree to be retained may not be lowered within the greater of the following
areas: (i) the area defined by the drip line of the tree, or (ii) an area around the tree equal to one and
one-half feet in diameter for each one inch of tree caliper. (RMC 4-4-130H.9.e). Trees 110 and 111
would have grade lowering associated with the stormwater pond within area identified by (ii). As
currently proposed Planning will not support the retention of them.
Significant trees shall be retained in the order of priority presented in RMC 4-4-130H.1.b. The first two
(2) items for Priority One is (i) landmark trees, and (ii) significant trees that form a continuous canopy.
Trees 97 through 102 meet both items and are of the highest priority to preserve. Preservation of
trees 97 through 102 in place of other proposed trees as they meet criteria (i) and (ii) of Priority One
tree retention is a priority for Planning.
Please see attachments with comments from Development Engineering.
At this time, your project has been placed “on hold” pending receipt of the requested information. The maximum
time for resubmittal shall be within 90 days of this notice. Please contact me at (425) 430-7286 if you have any
questions.
Sincerely,
Andrew Van Gordon
Associate Planner
cc: Theresa Bagnell, Paula Chambers / Owners
Aron Golden / Applicant
Marv Bettes, Paula Chambers, Scott Christensen, Roger Overa / Party(ies) of Record
DEPARTMENT OF COMMUNITY
AND ECONOMIC DEVELOPMENT
M E M O R A N D U M
DATE: May 3, 2022
TO: Andrew Van Gordon, Planning
FROM: Jonathan Chavez, Development Engineering
SUBJECT: Maple Highlands Plat
13818 152nd Avenue SE & 13929 154th Avenue SE
LUA22-000122
I have completed the review for the above-referenced proposal located at parcel 1463400021 &
1463400020. The following comments are based on the land use application submittal made to the City
of Renton by the applicant.
EXISTING SITE CONDITIONS
Water The site is located in the King County Water District 90 Utility District service area.
Sewer The site is located in the City of Renton sewer service area. There is existing 8-inch diameter
sewer main within the subject property.
Storm The topography slopes moderately from northeast to southwest. There is a conveyance system
on 152nd Avenue SE owned by King County. Any connection to the existing stormwater conveyance
system along 152nd Ave SE must be approved by King County.
Streets The proposed development fronts 152nd Avenue SE along the west property line. 152nd Ave SE
is classified as a residential access street with an existing Right-of-Way (ROW) width of 60 feet. The
proposed development fronts 154th Avenue SE along the east property line. 154th Avenue SE is
classified as a residential access street with an existing Right-of-Way (ROW) width of 60 feet.
CODE REQUIREMENTS
WATER
1. Water availability certificate should be provided to the City with the land use application.
a. Water availability was not submitted with the Land Use Application. Applicant must
provide a water availability certificate from Water District 90 with Civil Permit
Application.
2. Fire hydrants and fire flow requirements should meet the requirements of Renton Fire Authority
(RFA).
Maple Highlands Plat - LUA22-000112
May 3, 2022
Page 2 of 6
3. Approved water plans from Water District 90 Utility District should be provide to the City during
Construction permit stage.
SEWER
1. A sewer main extension will be required to serve the proposed project.
a. A new 8” PVC sewer main is being proposed to serve the new lots, within the new
internal streets.
2. A sewer main extension will be required to the north and south property lines, along the street
frontage on 154th and 152nd Avenue SE.
a. A sewer extension is not shown on the Civil Plans, as part of the Land Use Application.
Applicant shall extend the sewer to the south property line, along 154th Avenue SE.
Civil Plans shall be updated to reflect this additional sewer main work and be
submitted with the Civil Permit Application.
3. A 15-foot utility easement will be required for the new sewer mains and manholes within
private property.
4. A separate side sewer will be required for each new lot. All new side sewers shall be a minimum
of 6”. All side sewers shall flow by gravity to the main at a minimum slope of 2%.
5. The development is subject to a wastewater system development charge (SDC) fee. SDC fee for
sewer is based on the size of the new domestic water to serve the project. Current fees can be
found in the 2022 Development Fees Document on the City’s website. Fees will be charged
based on the rate at the time of construction permit issuance.
a. The 2022 Wastewater fees are $3,500.00 per 1-inch meter.
b. Sewer Special Assessment District (SAD) fee is applicable on the project. The Central
Plateau Interceptor SAD fee will be applicable for the project. The underlying parcel has
paid the SAD fee for existing lot and would receive credit for the one lot. The SAD fee
should be charged on each additional lot for a total of 9 lots x $351.95+interest per lot.
SURFACE WATER
1. A drainage report complying with the current Renton Surface Water Design Manual (RSWDM)
will be required. Based on the City’s flow control map, the site falls within the City’s Flow Control
Duration Standard (Forested Site Conditions). The site falls within the Lower Cedar Drainage
Basin. Refer to Figure 1.1.2.A – Flow chart to determine the type of drainage review required in
the RSWM. All stormwater improvements as per the drainage review along with stormwater
improvements in the frontage are required to be provided by the developer.
a. A preliminary technical information report (TIR) by KPFF, dated March 2022, was
submitted by the Applicant with the Land Use Application.
b. Core Requirement #2:
i. A letter was also submitted on April 26, 2022, by the property owner directly
south of the proposed project. The property owner of 13929 154th Avenue SE
has expressed concerns about the current drainage issues adjacent to his
property. Due to this, the Applicant shall provide a Level 2 Downstream
analysis, taking the submitted drainage complaint into account and providing
mitigation downstream of the project site. Address Type 3 – Severe Flooding
Problem and evaluate mitigation as specified in Section 1.2.2.2 under
“Drainage Problem-Specific Mitigation Requirements”.
c. Core Requirement #3:
Maple Highlands Plat - LUA22-000112
May 3, 2022
Page 3 of 6
i. Update TIR modeling calculations to account for additional impervious surface
areas in existing City Right-of-Way (sidewalks and expanded pavement
widths). If it is not possible to capture flows from 152nd Avenue SE, propose a
mitigation for this additional area.
ii. Provide detention pond sizing and volume. Specify credits, if any, used for flow
control.
iii. Based on flooding issues at the discharge point, update TIR and flow control
modeling based on Flood Problem Flow Control Standard, matching forested
site conditions for the 2-year through the 100-year return frequencies.
iv. The detention pond access road has a cross slope. This is not allowed. Update
grading to show access road contours perpendicular to direction of travel.
Update size of pond accordingly, see screenshot below:
1. v. Interior slopes cannot exceed 3:1. Update grading plan accordingly.
d. Core Requirement #4:
i. Provide conveyance calculations for downstream conveyance system.
2. Storm drainage improvements along all public street frontages are required to conform to the
City’s street and stormwater conveyance standards. Any new storm drain installed on or off-site
shall be designed and sized in accordance with standards found in Chapter 4 of the 2017
RSWDM and shall account for the total upstream tributary area, assuming developed conditions
for onsite tributary areas and existing conditions for any offsite tributary areas.
a. Applicant shall update the Civil Construction Plans to meet the minimum catch basin
spacing standards and minimum pipe diameter sizing, per Chapter 4.2 of the Renton
Surface Water Design Manual. Refer to table 4.2.1A1 for pipe diameter and catch
basin spacing standards.
3. Maintenance access is required for any proposed stormwater tracts and shall be designed and
installed in accordance with the City adopted SWDM. a. A fence is proposed with the submitted landscape plan and access to the proposed
stormwater tract is limited by a gate, per RMC 4-6-030.G.2.
4. If the new plus replaced pollution generating impervious surface exceeds 5,000 SF, the applicant
will be required to provide basic water quality treatment. Any proposed detention and/or water
quality vault shall be designed in accordance with the RSWDM that is current at the time of civil
construction permit application. Separate structural plans will be required to be submitted for
review and approval under a separate building permit for the detention and/or water quality
vault.
Maple Highlands Plat - LUA22-000112
May 3, 2022
Page 4 of 6
a. The Applicant is proposing to use a water quality pond to satisfy this requirement.
Applicant shall update TIR to address the PGIS areas not being captured by the wet
pond facility. These areas include, but are not limited to, the new roadway widening
on 152nd Avenue SE and 154th Avenue SE.
5. Appropriate on-site BMPs satisfying Core Requirement #9 will be required to help mitigate the
new runoff created by this development to the maximum extent feasible. On-site BMPs shall be
evaluated as described in Section C.1.3 of the 2017 RSWDM. A preliminary drainage plan,
including the application of on-site BMPs, shall be included with the land use application, as
applicable to the project. The final drainage plan and drainage report must be submitted with
the utility construction permit application.
a. Given the size of the new lots, basic dispersion seems feasible for this project.
Vegetated flow paths of 25-feet in length can be achieved. Please address this in the
updated, final TIR and Civil Construction Plans.
6. A geotechnical soils report for the site is required per the 2017 Renton Surface Water Design
Manual Section C.1.3. Information on the water table and soil permeability (measured
infiltration rates), with recommendations of appropriate on-site BMPs per Core Requirement #9
and Appendix C shall be included in the report. The report should also include information
concerning the soils, geology, drainage patterns and vegetation present shall be presented in
order to evaluate the drainage, erosion control and slope stability for site development of the
proposed plat. The applicant must demonstrate the development will not result in soil erosion
and sedimentation, landslide, slippage, or excess surface water runoff.
a. A geotechnical report by Riley Group, dated June 14, 2021, was submitted by the
Applicant with the Land Use Application. No infiltration tests were provided in the
report, the soil classification determined by the soil test was determined to be
“Vashon-age lodgment till”.
i. Provide infiltration tests to determine BMP feasibility and support conclusion that infiltration is not feasible.
7. A Construction Stormwater Permit from Department of Ecology is required since clearing and
grading of the site exceeds one acre. Applicant must obtain permit and provide proof prior to
Civil Permit issuance.
a. This permit must be active prior to civil permit issuance.
8. Erosion control measures to meet the City requirements shall be provided.
a. Applicant shall submit a full Stormwater Pollution Prevention Plan with the Civil
Permit Application.
9. The current City of Renton Surface Water Standard Plans that shall be used in all drainage
submittals are available online at the City of Renton website.
10. Effective July 1, 2022, the City of Renton will be adopting a new stormwater manual which will
be based on the 2021 King County Surface Water Design Manual. All projects vested on or
after July 1, 2022 will be subject to these new stormwater requirements. Please refer to RMC
4-1-045 for information regarding project vesting.
11. The 2022 Surface water system development fee is $2,100 per new single-family lot. Fees that
are current will be charged at the time of permit issuance.
TRANSPORTATION
1. The proposed development fronts 152nd Avenue SE along the west property line. 152nd Ave SE
is classified as a residential access street with an existing Right-of-Way (ROW) width of 60 feet.
To meet the City’s complete street standards for residential access streets, the minimum right of
Maple Highlands Plat - LUA22-000112
May 3, 2022
Page 5 of 6
way width is 53 feet. The following improvements will be required to be provided by the
developer: a minimum pavement width of 26 feet, 0.5 foot wide curbs, gutter, 8 foot wide
landscaped planters, and 5 foot wide sidewalks. Street frontage improvements including paved
travel roadway width of 26 feet or paved width to match existing paved width along the
corridor.
a. These improvements are shown on the preliminary civil construction plans.
2. The proposed development fronts 154th Avenue SE along the east property line. 154th Avenue SE
is classified as a residential access street with an existing Right-of-Way (ROW) width of 60 feet.
To meet the City’s complete street standards for residential access streets, the minimum right of
way width is 53 feet. The following improvements will be required to be provided by the
developer: a minimum pavement width of 26 feet, 0.5 foot wide curbs, gutter, 8 foot wide
landscaped planters, and 5 foot wide sidewalks. Street frontage improvements including paved
travel roadway width of 26 feet or paved width to match existing paved width along the
corridor.
a. These improvements are shown on the preliminary civil construction plans.
3. New Residential Access Street: Per RMC 4.6.060, the minimum requirement for public
residential street ROW width is 53 feet. The minimum pavement width is 26 feet which includes
on-street parking on one side. 0.5 feet wide curbs with drainage, 8 feet wide landscaped
planters, and 5 feet wide sidewalks are required on both sides of the street. Street lighting is
also required on public streets. Curb bulb-outs are required where on-street parking is located
on streets. The minimum requirement of a public half street is 35 feet with a paved width of 20
feet. A 0.5 feet wide curb, 8 feet wide landscaped planter, 5 feet wide sidewalk, drainage, and
street lighting is required to be provided on the side of the project fronting the development.
a. These improvements are shown on the preliminary civil construction plans.
4. A minimum intersection radius of 25 feet is required at the intersection of residential streets.
5. ADA access ramps shall be installed at all street crossings. Ramps shall be shown at each
intersection. Ramps shall be oriented to provide direct pedestrian crossings.
a. Curb ramp placement at intersections needs to be updated to ensure that curb ramps
are as close to the intersection as possible.
6. Property corner dedication meeting City code is required to be provided.
a. Dedication shall be recorded with the plat.
7. Street grades shall not exceed 15 percent.
8. Refer to City code 4-4-080 regarding driveway regulations:
a. Maximum driveway slope is 15%. Driveways which exceed 8% shall provide slotted
drains at the lower end with positive drainage discharge to restrict runoff from entering
the garage.
b. The maximum width of a single loaded garage driveway is 9-feet and the maximum
width of a double loaded garage driveway is 16-feet. If a garage is not present, the
maximum driveway width is 16-feet.
c. Driveways shall not be closer than 5-feet to any property line.
9. Lighting plans and photometrics are required to be submitted with the land use application and
will be reviewed during the construction utility permit review. Street lighting and street trees
are required to meet current city standards.
a. Street lighting plans were not submitted with the Land Use Application. Applicant
shall submit a lighting plan showing new residential street lights spaced 100-feet
apart, but alternating every 50-feet with the lights on the opposite side of the street.
Maple Highlands Plat - LUA22-000112
May 3, 2022
Page 6 of 6
10. Paving and trench restoration shall comply with the City’s Trench Restoration and Overlay
Requirements.
11. The transportation impact fee is based on the type of land use. For a single-family homes, the
2022 transportation impact fee is $10,861.69 per lot. Transportation impact fees are subject to
change based on the year the building permit is applied for.
GENERAL COMMENTS
1. All existing and proposed utility lines (i.e. electrical, phone, and cable services, etc.) along
property frontage or within the site must be underground. The construction of these franchise
utilities must be inspected and approved by a City of Renton inspector.
2. Adequate separation between utilities as well as other features shall be provided in accordance
with code requirements:
a. 7-ft minimum horizontal and 1-ft vertical separation between storm and other utilities is
required with the exception of water lines which require 10-ft horizontal and 1.5-ft
vertical.
b. The stormwater line should be minimum 5 feet away from any other structure or wall or
building.
c. Trench of any utility should not be in the zone of influence of the retaining wall or of the
building.
3. All civil construction permits for utility and street improvements will require separate plan
submittals. All utility plans shall confirm to the Renton Drafting Standards. A licensed Civil
Engineer shall prepare the civil plans. Please visit the Development Engineering Forms page for
the most up-to-date plan submittal requirements:
http://rentonwa.gov/business/default.aspx?id=42473
4. A landscaping plan and tree retention shall be included with the civil plan submittal. Each plan
shall be on separate sheets.
5. Additional Building Permit Applications will be required for the following:
a. Any retaining walls that exceed 4 feet in height, as defined by RMC 4-4-040.
b. Detention vaults for storm water flow control.
c. Demo of any existing structures on the project site(s).
6. Fees quoted in this document reflect the fees applicable in the year 2022 only and will be
assessed based on the fee that is current at the time of the permit application or issuance, as
applicable to the permit type. Please visit www.rentonwa.gov for the current development fee
schedule.