Loading...
HomeMy WebLinkAboutMFP22002197.pdfDEPARTMENT OF COMMUNITY AND ECONOMIC DEVELOPMENT Minor Franchise Permit: MFP22002197 IVR Number: 22002197 Permit Information Permit Name: Puget Sound Energy - Electric Address/Location:04/26/2022Application Date:7231501420Parcel Number: 516 WELLS AVE S Permit Type:05/10/2022Issue Date:Franchise Permit Work Class:05/10/2023Expiration Date:Minor Utility Job Number: 101148691Franchise Type:Electric Description: Puget Sound Energy Electric CREW TO REPLACE EXISTING BAD ORDER POLE AT P01 (317673 166085) AND OH TRANSFORMER. CREW TO REMOVE 1 SPAN OH SERVICE WIRE AT P01 AND INSTALL 2 NEW OH TPX RUNS. NO HS CUTS. RESTORATION PER CITY OF RENTON STANDARDS. Contacts Name Address PhoneTypeBilling Corrie Rydberg Puget Sound Energy 3702 71st Ave W University Place, WA 98466 C: (253) 905-5031ApplicantX Vicki Henson Potelco Inc 8001 212th St S Kent, WA 98032 B: (253) 863-0484Contractor Business License Number: 5109Electrical Contractor: POTELI*344O4 Construction Contractor: POTELI*227PL KAM EVA & CARPIO FAMILY TRU 840 HINCKLEY RD STE 221 BURLINGAME , CA 94010 Owner Corrie Rydberg Puget Sound Energy 3702 71st Ave W University Place, WA 98466 C: (253) 905-5031Specialized Billing General Conditions & Signature Permission is hereby given for the work described on this permit according to the conditions hereon and according to the approved plans and specifications pertaining thereto, subject to compliance with the Ordinance of the City of Renton. Ÿ This permit and plans must be posted at the job site at all times.Ÿ I hereby certify that no work is to be done except as described above and in approved plans, and that work is to conform to Renton Trench Restoration and Street Overlay Requirements. Ÿ Call 425.430.7203 or go to: https://permitting.rentonwa.gov one working day in advance to schedule an inspections and for ANY work in the Right of Way. Ÿ Call 8 1 1 to locate underground utilities at least two full business days prior to any excavation.Ÿ In accordance with RCW 19.122.033(4) the permit holder is required to contact (Williams Northwest Pipeline at 425.868.1010) (Olympic Pipeline at 206.510.0575) (Puget Sound Energy at 425.375.3397) to request a consultation with the transmission pipeline company prior to performing any construction or excavation activities. This requirement to consult with the transmission pipeline company is in addition to the requirement to Call before You Dig as required in RCW 19.122. Ÿ (Date)(Signature) Page 1 of 1THIS PERMIT AND PLANS MUST BE POSTED AT THE JOB SITE AT ALL TIMES Note: The Applicant is responsible for compliance with all codes and regulations, whether or not described in this document. DEPARTMENT OF PUBLIC WORKS Page 1 of 3 | Published: 10/27/2021 Transportation Division | 1055 South Grady Way, 5th Floor | Renton, WA 98057 | 425-430-7380 Website: rentonwa.gov TRAFFIC CONTROL PLAN APPLICATION Published: 10/27/2021 TRAFFIC CONTROL PLAN (TCP) MUST BE SUBMITTED TO PUBLIC WORKS TRANSPORTATION DIVISION FOR REVIEW/APPROVAL AT LEAST FIVE (5) WORKING DAYS BEFORE THE DATE OF WORK. The City of Renton requires any contractor, firm, corporation, or other public/private agency to prepare a traffic control plan (TCP) and obtain city's approval of that plan when construction, repair, or maintenance work is to be conducted within the city's right-of-way. 1. Fill out the Traffic Control Plan (TCP) Application form and prepare required submittal documents. 2. The following items are all required for submittal of the TCP Application: ☐Electronic Copy of the TCP Application ☐Electronic Copy of the TCP Layout, on 11” X 17” paper size format, which shall: Include map(s) showing the location of the project and work area. Be legible lettering and clear, contrasting, symbols of viewing or printing. Must indicate street names, and north arrow and scale. Types of plans required: o Work hour plan – show all mobility impacts during construction hours. o Non-work plan - show all mobility impacts after work hours when limited or no work is happening in the right-of-way (ROW), if applicable. o Changing construction phases – show construction sequence and each construction phase change even if the traffic control is not modified, if applicable. o Pedestrian access/detour plan, if applicable. - Shall conform to the Washington State Traffic Control Flagger Certification handbook, by the Evergreen Safety Council. 3. Submit Application via email to TCP@rentonwa.gov with the subject line “TCP Application – [Project Name].” Project Name: Permit #: Site Address: Work Date: From _____________ To _____________ Work Time: Start ______________ End ______________ Construction Company: Contact Name: Phone/Cell: _________________________ Business Address: City/State: Zip: Description of Work: Approval By: _________________________________________________ Date:____________________ Transportation Engineering PLEASE SEE ATTACHED POTELCO, INC 6905 S 228TH ST KENT, WA 98032 101148691 516 WELLS AVE S JENNY CHAU 253-208-9480 MFP22002197 Monday - Friday 8:00AM - 3:00PM Scott Warlick CED 5/10/2022 Note: The Applicant is responsible for compliance with all codes and regulations, whether or not described in this document. Page 2 of 3 | Published: 10/27/2021 PERMIT HOLDER AGREES TO ALL THE FOLLOWING: Must have approved Traffic Control Plan (TCP) prior to commencing the work. Maintain existing pedestrian access. The work on pedestrian facilities, shall be limited to one corner at a time, with the least possible inconvenience or delay to pedestrians. WORK TIME begins when any street or travel lane is fully or partially closed. This includes set up within the traveled way. Comply with all traffic regulations of the City of Renton and the State of Washington. Prepare a traffic control plan and obtain City approval of that plan. That plan shall be implemented for all street and lane closures, and the plan shall be performed in compliance with the Manual on Uniform Traffic Control Devices. Notify emergency services (253-852-2121) twenty-four (24) hours before any street or lane closures. Contractor or entity must call Renton School District (425-204-4455) or any public/private agency, including public transit, to be affected by a temporary lane or road closure a minimum of five business days (excluding weekends and holidays) prior to starting any work. Contractor or entity must notify King County Metro in writing at construction.coord@kingcounty.gov a minimum of five business days (excluding weekends and holidays) prior to starting any work impacting bus stops, a temporary lane or road closure. Work requiring removing a bus shelter or sign requires notification in writing a minimum of 30 business days (excluding weekends and holidays). Please call King County Metro at 206-477-1140 with any questions. Any lane or street closures not in conformance with the approved traffic control plan and/or without notification of emergency services may result in receiving a citation for violation of R.C.W. 47.36.200 Signs or Flaggers at thoroughfare work sites and R.C.W. 9A.36.050 Reckless Endangerment, and other applicable State and City codes. Indemnify and hold harmless the City of Renton from any and all claims, actions, and judgments, including all costs of defense and attorney’s fees incurred in defending against same, arising from and related to implementation of the approved traffic control plans including claims arising from towing of private vehicles and the acts of the Permit Holder’s agents and employees. The City of Renton shall be entitled, in its reasonable discretion, to settle claims prior to suit or judgment, and in such event shall indemnify and hold harmless the City for any such claims paid, including the City’s reasonable attorney’s fees and litigation costs incurred resulting from such claim. In the event any claim or suit is brought against City within the scope of this Agreement, Permit Holder will pay for legal counsel chosen by the City to defend against same. Flagger and sign placement are subject to revision by the City Inspector on site, if needed to address traffic or pedestrian safety or travel. All permit conditions shall be met. NOTES: Total road closure lasting more than twenty-four (24) hours is subject to the approval by the City Council. Work Zone Traffic Control shall be in accordance with the Manual on Uniform Traffic Control Devices (MUTCD) and shown by a traffic control plan layout or reference to WSDOT. Approved Temporary Traffic Control Plan must be at the work site during work hours. Complete assistance and accommodation shall be provided to all kinds of pedestrian traffic when sidewalk or walkway is impeded to safely redirect pedestrians around a work zone. Signage shall be used to warn motorcyclists/bicyclists of the potential hazards on any uneven surfaced or slippery road conditions during work and non-work hours. Any vehicle, equipment, barricade, or portable tow-away sign used within the work area must display a company logo or any legally acceptable sign showing the company name, address, and telephone number at a conspicuous place on the vehicle or equipment. Note: The Applicant is responsible for compliance with all codes and regulations, whether or not described in this document. Page 3 of 3 | Published: 10/27/2021 In the case of Temporary No Parking Zones, all the following apply in addition to previous: Contractor must complete form to show limits of Temporary No Parking Zone identifying barricade locations for vacate parking or curb lane usage. Contractor must post notice of dates and time of Temporary No Parking Zone with at least two signs per block seventy-two (72) hours in advance of effective date and time. The cover sheet of this Traffic Control Plan form must be attached to each Temporary No Parking Sign on the project site. Temporary traffic control devices must be removed immediately when work is done or no construction activities are going on. If deemed abandoned, City crews will remove and store them at the City’s maintenance shop (3555 NE 2nd Street). I certify that the information on this application and within the submittal documents are accurate to the best of my knowledge and I acknowledge all the requirements on this application. Applicant’s Signature Date Applicant’s Name (Print) CORRIE RYDBERG P01WELLS AVE S S 5TH STSTOP FLAGGER M01W20-7AROADWORKAHEADW20-1 BEPREPAREDTOSTOPW3-4 100'100'100'3636ONE WAY FLAGGERS SHALL STOP TRAFFICIN ALL DIRECTIONS (SHORT DURATION:APPROX 10 MINUTES) FOR LINE DROP.RESIDENT(S) WILL BE INFORMEDOF POSSIBLE TEMPORARYDRIVEWAY CLOSUREPLACE SIGNS ALONG WORK AREAFROM TO TOW AWAY AREA PHONE 888-9999 INFRASOURCE LLC 000 0000000 NO PARKING NO-PARK TEMPORARY TRAFFIC CONTROL PLAN28" TRAFFIC CONELEGENDTRAFFIC FLOWSIGN LOCATIONFLAGGERSTOPPOLEWORK VEHICLE/FLASHING LIGHTSRIGHT OF WAYSIGN SPACINGMPH60/6545/5535/403025"X"1000'500'350'200'100'CHANNELIZATIONDEVICE SPACINGMPH55/7035/4525/30TAPER403020TANGENT806040Notes:1. All signs and spacing to conform to theMUTCD and City of Renton standards.2. All sidewalks, driveways, exits and egressesshall be completely clear unless otherwise indicated.3. Channelizing devices are 28" traffic cones.Use traffic drums (barrels) with steady burningType C lights on all State State Routes and Hwys.4. Sign size can be a minimum of 36" x 36" andshall not obstruct pedestrian access.5. Crew is required to leave a minimum of 11' fortraveling lane width.6. Alert affected residents and businesses.7. Work to take place between 9 a.m. and 4 p.munless otherwise specified. All work for arterialsand major roadways will be from 9 a.m. to 3 p.m.NProject Address:PagePSEPUGETSOUNDENERGYDesigner:Job #REV04/06/2022 1011486910516 Wells Ave S, Renton, WAKali-Jamal Collins425-424-6425Kali-Jamal.Collins@pse.com1 OF 1Puget Sound EnergyTraffic Control Supervisor:Gregory HarwoodCard No. 012238Card Exp. 09/30/2023gregory.harwood@pse.com(425)424-6425MFP22002197 909 506 919 913 509 513 523 516 520 522 501 819 505 507 515 517 516 521 525 527528 526 530 536 S 5TH STS 5TH ST WELLS AVE S317673-166085 37.5 kVA (A) SLAG6836 317662-166084 15 kVA (A) SLAG6835 GRA 17 R/W 60'#2 CU(A)317688-166085 R/W 60' SITE PLAN N Vicinity Map 47.4761, -122.2051 Owner / Developer Contact Info officeATTN: Renovation Resolutions LLC 14209 29th St E #104 Sumner, WA, 98390 Gina Casey 253-750-3859 Xmfr Removal Superior ORDER#NOTIF# PWR PROJECT PHASE FOREMAN (CHECK BOX WHEN COMPLETED) PSE Equipment LOCKED/SECURED & Work Area left in CLEAN/SAFE Condition. Grid, Cable, and Switch numbers INSTALLED & VERIFIED. Field Changes RED-LINED on As-built. Indicate correct FUSE SIZE on As-built & VERIFY proper PHASE. Foreman's Signature _______________________________________________ Print Name ___________________________________ Date ______________ Material VERIFIED and CHANGES noted on Paperwork. Total PRIMARY Cable noted on As-built. Company ID#'s RECORDED in correct location on As-built. Deviations noted on the As-built and their reason. I certify that the work performed meets PSE's standards and procedures and that all quality requirements are met. E-Mail: Cell Phone: Project Manager Contact Information: Manager:Jenny Chau 253-208-9480 jenny.chau@pse.com SCALE: 1" = 50'101148691THIS SKETCH NOT TO BE RELIED UPON FOR EXACT LOCATION OF EXISTING FACILITIES CALL 811 TWO BUSINESS DAYS BEFORE YOU DIG For contacts below dial 1-888-CALL PSE (225-5773) 101148691 UTILITIES CONTACT PHONE# COUNTY 1/4 SEC U-MAP NO (POWER) OP MAP Emer Sect Gas Wk Ctr POWER WK CTR PLAT MAP JOINT FACILITIES ARRANGEMENTS DRAWN BY CHECKED BY APPROVED BY FOREMAN #1 FOREMAN #2 MAPPING INCIDENT MAOP Gas Order Elect Order SCALE PAGE ENGR - POWER ENGR - GAS FUNCTION PROJECT MGR PERMITREAL ESTATE/EASEMENT 2 1 REV# 3 DATE DESCRIPTIONBY CONTACT PHONE NO DATE OH CKT MAP CIRCUIT NOUG CKT MAP Jenny Chau 253-208-9480 2/28/2022 Ray Reynolds 253-262-7409 2/28/2022 N/A N/A N/A Ray Reynolds -2/28/2022 RW-_____RENTON WU CONNECT AND SET REPL B/O POLE & OH XFMR, CONNECT NEW SVC 516 WELLS AVE S RENTON, WA. 98057 N/A N/A N/A 101148691 AS NOTED 1 OF 1 KING N/A N/A CSPSKEPM SW-17-23-5 N/A N/A 2305E067 2305E088 2305E067 GRA-17 N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A 511350610 SITE SPECIFIC NOTES P01 REPLACE #317673-166085: -REPLACE B.O. 1966 40' CL 3 POLE W/ NEW 45' POLE W/GND 6010.1000(PD453) -INSTALL SINGLE PHASE TOP PIN 6031.1010(TAN115) -REPLACE B.O. 37.5KVA, 120/240V OH W/ 37.5KVA OH XFMR 6025.1000(TRFPXF) -REMOVE EXISTING SPOOL RACK AND REPLACE WITH RIGID CLEVIS -INSTALL L/B C/O ON C/O BRACKET, FUSE @15T -INSTALL STIRRUP TAP A PHASE -INSTALL 3/8" SPAN GUY WITH HELI GRIP FROM P02 6013.0170(GYD3OW) -TRANSFER STREET LIGHT SLAG6836 -RECONNECT OH SVC'S -INST GRID# P02 EXISTING #317662-166084: -EXISTING POLE TO REMAIN M01 REMOVE: -PSE TO REMOVE METER X150775236 -PSE TO REMOVE METER X150775235 -PSE TO REMOVE METER X150775237 M02 NEW: -INSTALL (5) 200A METERS SPAN SPECIFIC NOTES -SEE SITE PLAN, TABLES AND ONE LINES DIAGRAMS Mod Service #A-C UTILITY POLE EROSION CONTROL DETAIL TOP VIEW FLOWING DITCH or BODY OD WATER SLOPE Secure bottom of fence with gravel bags Place straw mulch on disturbed areaExcavated or Augered Hole Pole SLOPE Not to scale Adjacent to flowing ditches or bodies of water Install silt fence around pole excavation Removed at site: Grid Number: kVA Rating: Foreman to redline the following information TRANSFORMER REMOVAL Company ID#: Primary phase connected to: Tested Secondary Voltage P01 317673-166085 37.5 POLE RETIREMENT TABLE TEMP TRANSFERS ST. LIGHT TRANSFERS SITE # POLE DATA POLE TEL TV FIBER TRAN RMVD ID NUMBER GRID #HEIGHT CLASS YEAR TOPPED RMVD P01 317673-166085 45 3 1966 SCALE: 6" = 1 MILE OVERHEAD CIRCUIT MAP POWER GENERAL NOTES - RESIDENTIAL PROJECT 1.All materials to be installed in accordance with Puget Sound Energy's (PSE) standards. Any deviation from this work sketch must be AUTHORIZED by PSE's Project Manager and NOTED on the Foreman's Copy. 2.All switching arrangements and/or outage arrangements are to be made with the Project Manager at least three (3) working days in advance. CUSTOMER NOTES Customer is responsible for all trenching, select backfill, compaction & restoration per Puget Sound Energy Standards & Local Municipality (See PSE Electric Service Handbook for more details). 1.Contact the Utilities Underground Location Center (1-800-424-5555) at least 48 hours prior to commencing work to get the underground facilities located. 2.STAKING: The customer will provide all staking (transformer, handhole, trench, grade, lot, pole, sidewalk, etc.). See sketch and details for locations. Equipment locations must be approved by the Project Manager. 3.SITE PREPARATION: The work area will be at or near finished grade, clear of trench spoils or construction materials which would restrict construction and/or equipment access, before work can begin. 4.Roads shall be paved or have a compacted , crushed rock base in place. 5.CLEARANCES: Transformers require a minimum of 6 feet from fire fighting equipment, 10 feet from combustible walls, overhangs, doors, and windows, and a minimum of 5 feet from the back of curb (or guard posts will be required per PSE standards). All conduits and vaults are to be at least 5 feet away from water, storm and sewer lines when paralleling them in the right of way, and at least 1 foot when crossing them. 6. All work is to be done in accordance with local municipal and county permit requirements as applicable. 7.Inclement weather conditions may cause delays in construction times and dates. 8.EXCAVATION: The customer is to provide all trenching, backfill, vault excavations, compaction and restoration per this sketch and per PSE standards. A minimum protective cover of 36" is required over PSE's primary voltage equipment and 24" is required of PSE's secondary voltage equipment. The customer will provide any and all shoring or they will side slope the trench to 1:1. 9.EROSION & SEDIMENT CONTROL: Erosion & sediment control shall be per PSE standard practice 0150.3200 techniques for temporary erosion & sediment control & any additional local jurisdiction requirements. (Local jurisdiction may have additional requirements including notes detailing where erosion or sediment control structures are to be installed, cross section details of the typical erosion structures, & special requirements for work in sensitive areas.) 10.Customer is required to have meter inspected and approved by L&I/City prior to construction. Pole Removal Misc. OH Installed at site: Grid Number: kVA Rating: TRANSFORMER INSTALLATION (OH) Company ID#: Primary phase connected to: Tested Secondary Voltage Material ID#: Foreman to redline the following information 37.5kVA 120/240v 6211300 P01 317673-166085 583069416 101148692 593244336 593244337512726174 PSE Locates Req'd Developer Locates Req'd No No Yes YesFlagging Req'd Outages Req'd POLE TABLE (NEW) Work Location Pole Data Grid #Height Class Year Remarks / Location Ref. P01 317673-166085 40 CL-3 JOB SITE JOB SITE SERVICE LINE(UTILITY OWNED) SERVICE MAST CONNECTION POINT 26' 17-1/2' 12'13' STATE HIGHWAYS STREETS, ALLEYS, COUNTY ROADS,DRIVEWAYS, AND PARKING AREAS RESIDENTIAL PROPERTY OVERHEAD SERVICE CLEARANCE DETAIL SCALE: NONE WIRE REMOVAL TABLE Location Wire Size & Type Quantity Length (per conductor)RemarksFromTo P01 M01 1/0 SEC TPX 1 100 Total 100' 1/0 SEC TPX Removed WIRE STRINGING PRIMARY & SECONDARY Location Pri Sec Wire Size & Type Quantity Length (Per conductor)Total ActualFromTo P01 M02 X 1/0 SEC TPX 2 100 200 LRC: % V. Drop: % Flicker: Sq. Footage: Panel Size: Heat Type: Est. Demand: TOTAL 3,520SQ FT 100A ELECTRIC 14.0 80 2.5% 2.1% 00 1"2" 00 50'100' CUSTOMER DEVELOPMENT NOTES: A PRE CONSTRUCTION MEETING IS REQUIRED WITH YOUR PROJECT MANAGER PRIOR TO STARTING ANY SITE WORK. CUSTOMER IS RESPONSIBLE FOR ALL TRENCHING, SELECT BACKFILL, COMPACTION & RESTORATION PER PUGET SOUND ENERGY STANDARDS & LOCAL MUNICIPALITY. **DEVELOPER NEEDS TO FOLLOW ALL TRENCH DETAILS ON SELECT BACKFILL** CUSTOMER IS RESPONSIBLE FOR THE FOLLOWING: CROSSING/BORING. -OPEN TRENCH OR BORING FOR CROSSINGS ARE ALLOWED PER LOCAL MUNICIPALITY PERMIT REQUIREMENTS. -CROSSINGS IN RIGHT OF WAY MUST BE SCHEDULED WITH PROJECT MANAGER PRIOR TO CONSTRUCTION. -PROJECT MANAGER OR DESIGNATED REPRESENTATIVE MUST BE ON SITE DURING CONSTRUCTION WORK IN RIGHT OF WAY. -EXCAVATION CONTRACTOR MUST BE LICENSED AND BONDED TO PERFORM WORK IN RIGHT OF WAY. VAULTS & WORK PITS. - PROVIDE 4'X4' WROKPIT AND JOB SITE READINESS. -JOB SITE NEEDS TO BE 100% READY FOR INSPECTION 5 BUSINESS DAYS PRIOR TO CONSTRUCTION DATE. -ALL WORK IN RIGHT OF WAY MUST BE COORDINATED WITH PROJECT MANAGER AND LOCAL MUNICIPALITY. -ALL TRENCH, AND LOCAL ELECTRICAL MUNICIPALITIES AKA "L&I, CITY", INSPECTIONS MUST BE COMPLETED 5 BUSINESS DAYS PRIOR TO SCHEDULED CONSTRUCTION DATE. -REQUIRED TO OPERATE AND PROVIDE EQUIPMENT TO PUMP OUT WATER FOR WORK PITS, VAULTS & TRENCH AT ALL TIMES. -REQUIRED TO HAVE EXCAVATION EQUIPMENT AND BE ON SITE THE DAY OF CONSTRUCTION TO COMPLETE BACKFILLING. - IF A SECOND INSPECTION IS REQUIRED, ADDITIONAL FEE'S WILL BE APPLIED. -PLEASE REVIEW THE CITY OR KING COUNTY TRENCHING REQUIREMENTS UNDER THE PERMIT. -IF A PRE-CON IS REQUIRED BY THE CITY, COUNTY OR W.S. DOT A PSE PROJECT MANAGER WILL SET-UP AND SCHEDULE A MEETING WITH THE MUNICIPALITY BEFORE ANY EXCAVATION OR INSTALLATION BEGINS . CIRCUIT LOADING TABLE AS OF EXIST. PEAK LOAD EST. NEW LOAD TOTAL CIRCUIT: A PHASE B PHASE C PHASE GRA-17 2/28/2022 167 179 185 0.83 0 0 167.83 179 185MAST HEIGHT BELOW 26" METER SURFACE MOUNTED, U-BOLTS SECURE MAST SERVICE BRACKET WEATHERHEAD FLASHING 18" MIN18" MIN 24" MAX *FLASHING IN COURSESOF SHINGLES MINIMUM 2" x 6" INSTALLED SOLIDLY BETWEEN RAFTERSOR STUDS WITH HOLE BORED FOR SNUG FIT 2" x 6" INSTALLEDSOLIDLY BETWEEN RAFTERS AND AGAINSTROOF SHEATHING RIGID STEELCONDUIT STRUCTURALFRAMING AND FINISHMATERIALS STUD GROUND * ADDITIONAL SUPPORT GUYS REQUIRED FOR ATTACHMENTS GREATER THAN 24" ABOVE ROOFLINE OR IF SERVICE LINE EXCEEDS 100' IN LENGTH MAST HEIGHT BELOW 26" METER SURFACE MOUNTED, GALVANIZED LAG BOLTS SECURE MAST SERVICE BRACKET WEATHERHEAD FLASHING FRONT VIEW GALVANIZED LAG-BOLTINTO FRAMING MEMBER HEAVY-WALL STRUT-TYPECHANNELHEAVY-WALLSTRUT-TYPE CHANNEL 18" MIN 24" MAX * SERVICE DROP DETAIL BLOCKING BETWEEN MAST AND BUILDING 5/16" U-BOLTS2" x 6" BACKING SHIM METER BASE/SOCKET AND FASTEN WITHSCREWS FLUSHMETER SOCKET GROUND RIGID STEEL STRUCTURALFRAMING AND FINISH MATERIALS 24" MAX * SERVICE DROP SERVICE BRACKET FLASHING MAST HEIGHT BELOW 26" METER FLUSH MOUNTED SERVICE DROP WEATHERHEAD MINIMUM 2' x 6" BETWEEN RAFTERS WITH HOLEBORED FOR SNUG FIT RIGID STEEL CONDUIT UN-GUYED SERVICE MAST DETAIL SCALE: NONE Mod Service Mod Service 512726178 512726210 Meter Set Only #D 512726211 104344397 512726214MROO A-D 3001862877 Meter Set #HSE 512726316 104344399 MFP22002197 RESTORATION PER CITY OF RENTON STANDARDS CAUTION: This email originated from outside the City of Renton. Do not click links, reply or open attachments unless you know the content is safe. From:Ryan Puddy To:Gina Casey; Chau, Jenny; Reynolds, Raymond Jason; Matt Jackson; Yen Chen Subject:Re: Wells Ave Project Date:Friday, February 11, 2022 12:43:50 PM CAUTION - EXTERNAL EMAIL Phishing? Click the PhishAlarm "Report Phish" button. Gina, Yes, an overhead connection will be allowed at this address. Underground service connections are only required for new construction. ThanksRyan Puddy 206-999-1821 Get Outlook for iOS From: Gina Casey <gina@renovationresolutions.com> Sent: Friday, February 11, 2022 11:59:22 AM To: Ryan Puddy <rpuddy@Rentonwa.gov>; Chau, Jenny <Jenny.Chau@pse.com>; Reynolds, Raymond Jason <Raymond.Reynolds@pse.com>; Matt Jackson <renovationresolutions@gmail.com>; Yen Chen <yenchen@usa.net> Subject: Wells Ave Project Hi Ryan Per my conversation with you moments ago we are requesting written confirmation that it isapproved to connect the service at the project located at 516 Wells Ave S, Renton, WA via overhead lines which are now existing. Please reply all when responding with your confirmation. Thank you so much for your help in this matter. Gina Casey 253.750.385914209 29th Street E, Ste 104Sumner, WA 98390 www.renovationresolutions.com Virus-free. www.avast.com