Loading...
HomeMy WebLinkAboutR-40320321 MAX SLOPE 'PLOW SPG R _ 2S- MIN INSTALL DRFvIWA IS A ROADSIDE OF PER CITY ROADS DRIVEWAYS "LL HE P0.VEG TO THE EDGE OF R-O-W PRIORTO INSTALLATIONCF TK CONSTRUCTION ENTRANCE TO AVOID DAMAGING OF THE ROADWAY IT IS RECOPO ENDED THAT THE ENTRA14CE BE CRONNED SO THAT RUNOFF DRAINS OFF rHE PAD oe 12' MIN TkIpCNESS - PROVIDE FULL WIDTH OF NOTES ,EGRESS AREA 1, CONDITION OF USE 1,1, CONSTRUCTION ENTRANCE: SHALL BE STABILIZED WHEREVER TRAFFIC WILL BE LEAVING A CCNSTRUCTION SITE AND TRAVELING ON PAVED ROADS OR OTHER PAVED AREAS WITHIN I.OW FEET OF THE: SITE GRA5 TENSILE STREBNGTH A5TM 047511 200 PSI MIN, GRABTENSILEELONGATION ASTMDA632 V%MA11. MULLEN BURST STRENGTH ASTM D3196-a0A 400 PSI MIN, ADS ASTM D4751 2045 U.S. STANDARD SIEVE SIZE 2. DESIGN AND INSTALLATION SPECIFIGATION3 21 HOG FUEL (WOOD BASED MULCH) MAYBE SUSSTfTUTED FOR OR COAr1BINED WIThOLIAHRY 31°AUS IN ACE$ THAT VW, I FOR PERMANENT ROADS. HOG FUEL IS NOT RAIDED FOR ENTRANCE STABLIZATION IN LIMAN AREAS- THE INSPECTOR MAY AT ANY TIM REQUIM THE USE OF QUARRY SPALLS IF THE HOG FUEL IS HOT PREVENTING SEDMANT FF40M BEING TRACKED ONTO PAVEMENT OR IF THE FOG FUEL IS BEING CARRIED ONTO PAVEMENT 22 FENCING SHALL BE INSTALLED AS NECESSARY TO RESTRICT TRAFFIC TO THE CONSTRUC71ON ENTRANCE 23. WHENEVER POSSIBLE, THE EN(TRAHCE SHALL BE CONSTRUCTED ON A FIRM COMPACTED SuBGRADE THIS CAN SUBSTANTIALLY• INCREASE THE EFFECTIVENESS OF THE PAD AND REDl10E THE NEED FOR MAINTENANCE 3 MIJHTEIIiANCE STANDARD¢ 31 QUARRY SPALLS SHALL SE ADOED F THE PAD IS NO LONGER IN ACCORDANCE WITH THE SPECIFICATIONS 32 tF THE ENTRANCE IS NOT PREVENTING SEDdkNT BEING TRACKED ONTO PAVEMENT. THEN ALTERNATIVE MEASURES TO KEEP THE STREETS FREE OF SEDIMENT SMALL BE USED 71HIS MAY INCLUDE STREET SWEEPING. AN INCREASE IN THE DIMENSIONS OF THE ENTRANCE. OR THE INSTALLATION OF THE WHEEL WASH. IF WASHING IS USED. IT SHALL BE DONE ON AN AREA COVEJWD WITH CRUSHED ROCK. AND WASHED WATER SHALL DRAIN TO A SEDIMENT TRAP OR POND 33 ANY SEDIMFNT THAT IS TRACKED ONTO PAVEMENT SHALL OF REMOVED IMMEDIATELY BY SWEEPING THE. SEDIMENT COLLECTED 11111' SWEEP'FNG SHALL BE REMOVED OR STABILIZED ON SITE THE PAVEMENT SHALL NOT BE CLEANED BY WASHING DOWN THE STREET. EXCEPT WHEN $WEEPING 151NEFFIE CTWE AND THERE 1$ A THREAT TO PVBLIC SAFETY IF IT NECESSARY TO WASH THE STREETS. A SMALL SUMP MUST Be CONDUCTED THE SEDIMENT WCK" THEN BE WASHED INTO THE SUMP WHERE IT CAN BE CONTROLLELIA M.1 DISCHARGED APPROPRIATELY 34 ANY pUARRY &PALLS THAT ARE LOOSENED FROM THE PAD AND END UPON THE ROADWAY SHALL BE REMOVED IMMEDIATELY 35 W VEHICLES ARE ENTERING OR EXITING THE SITES AT POINTS OTHER THAN THE CONSTRVCTTON ENTRNVG£[S1 FENCING SHALL BE INSTALLED TO CONTROL TRAFFIC PUBIC WORK'& STABILIZED DEPARTMENT CONSTRUCTION ENTRANCE EROSION CONTROL NOTES M. PLAN - 215.10 MARCH 2008 1. THESE NOTES SHALL APPEAR FOR ALL PROJECTS - SITE IMPROVEMENTS, SURFACE WATER UTILITY, WASTEWATER UTILITY, WATER UTILITY, AND TRANSPORTATION PLANS.• 2. BEFORE ANY CONSTRUCTION OR DEVELOPMENT ACTIVITY OCCURS, A PRE -CONSTRUCTION MEETING MUST BE HELD WITH THE CITY OF RENTON, PUBLIC WORKS DESIGN ENGINEER. 3. THE BOUNDARIES OF THE CLEARING LIMITS AND AREAS OF VEGETATION PRESERVATION AS PRESCRIBED ON THE PLANES) SHALL BE CLEARLY FLAGGED BY SURVEY TAPE OR FENCING IN THE FIELD PRIOR TO CONSTRUCTION IN ACCORDANCE WITH APPENDIX D OF THE SURFACE WATER DESIGN MANUAL AND OBSERVED DURING CONSTRUCTION. DURING THE CONSTRUCTION PERIOD, NO DISTURBANCE BEYOND THE CLEARING LIMITS SHALL BE PERMITTED. THE CLEARING LIMITS SHALL BE MAINTAINED BY THE APPLICANT/ESE SUPERVISOR FOR THE DURATION OF CONSTRUCTION. 4. STABILIZED CONSTRUCTION ENTRANCES SHALL BE INSTALLED AT THE BEGINNING OF CONSTRUCTION AND MAINTAINED FOR THE DURATION OF THE PROJECT. ADDITIONAL MEASURES, SUCH AS CONSTRUCTED WHEEL WASH SYSTEMS OR WASH PADS, MAY BE REQUIRED TO ENSURE THAT ALL PAINED AREAS ARE KEPT CLEAN AND TRACK OUT TO ROAD RIGHT OF WAY DOES NOT OCCUR FOR THE DURATION OF THE PROJECT. 5. ALL REQUIRED SEDIMENTATION/EROSION CONTROL FACILITIES MUST BE CONSTRUCTED AND IN OPERATION PRIOR TO LAND CLEARING AND/OR CONSTRUCTION TO PREVENT TRANSPORTATION OF SEDIMENT TO SURFACE WATER, DRAINAGE SYSTEMS AND ADJACENT PROPERTIES. ALL EROSION AND SEDIMENT FACILITIES SHALL BE MAINTAINED IN A SATISFACTORY CONDITION UNTIL SUCH TIME THAT CLEARING AND/OR CONSTRUCTION IS COMPLETE AND POTENTIAL FOR ON -SITE EROSION HAS PASSED. THE IMPLEMENTATION, MAINTENANCE, REPLACEMENT AND ADDITIONS TO EROSION/SEDIMENTATION CONTROL SYSTEMS SHALL BE THE RESPONSIBILITY OF THE PERMITEE. 6. THE EROSION AND SEDIMENTATION CONTROL SYSTEMS DEPICTED ON THIS DRAWING ARE INTENDED TO BE MINIMUM REQUIREMENTS TO MEET ANTICIPATED SITE CONDITIONS. AS CONSTRUCTION PROGRESSES AND UNEXPECTED OR SEASONAL CONDITIONS DICTATE, THE PERMIT SHALL ANTICIPATE THAT MORE EROSION AND SEDIMENTATION CONTROL FACILITIES WILL BE NECESSARY TO ENSURE COMPLETE SITUATION CONTROL ON THE PROPOSED SITE. DURING THE COURSE OF CONSTRUCTION, IT SHALL BE THE OBLIGATION AND RESPONSIBILITY OF THE PERMIT TO ADDRESS ANY NEW CONDITIONS THAT MAY BE CREATED BY THE ACTI INN TIES AND TO PROVIDE ADDITIONAL FACILITIES, OVER AND ABOVE MINIMUM REQUIREMENTS, AS MAY BE NEEDED, TO PROTECT ADJACENT PROPERTIES AND WATER QUALITY OF THE RECEIVING DRAINAGE SYSTEM. 7. APPROVAL OF THIS PLAN IS FOR EROSION/SEDIMENTATION CONTROL ONLY. IT DOES NOT CONSTITUTE AN APPROVAL OF STORM DRAINAGE DESIGN, SIZE NOR LOCATION OF PIPES,RESTRICTIONS, CHANNELS, OR RETENTION FACILITIES. 8. ANY AREAS OF EXPOSED SOILS, INCLUDING ROADWAY EMBANKMENTS, THAT WILL NOT BE DISTURBED FOR TWO DAYS DURING THE WET SEASON (OCTOBER 1ST TROUGH MARCH 30TH) OR SEVEN DAYS DURING THE DRY SEASON (APRIL 1ST TOUGH SEPTEMBER 30) SHALL BE IMMEDIATELY STABILIZED WITH THE APPROVED ESE COVER METHODS (E.G., SEEDING, MULCHING, PLASTIC COVERING, ETC.). rl Pacific En J.rj � �y11� r Des. s r III I' r Chit En yineetin J s..= I€ ' Planning Cvn,rhar1s ; ;NFLOW NEV DIVIDER INT OM ^� PRElrf1NOT FLOW - TlAESTYE M�F� R�Vr�O�&� E�I� dVIDf;R EMERGENCY OVERFLC IN SPILLWAY IN HARGryE TO ST�*1DA1 1ZED LEY SPR�AdEq � RISER PIPE CREST OF 6' MIN. MDT14 IPRNCFAL SPILLWAYy EMER6ENCYSPILLWAY OPEN AT TOP WITH TRASH RACK J r i�}� _ 1' MIN. EMBAN KNEW OOMPACIED 96% 1 I " l l ivl PERVIOUS MATERIALS SUCH AS . DEWATERNGOEVICIF. - T' J GRAVEL OR CLEAN SAND SMALL (SEE RISER DETAIL] NOT BE USED. fF ` I ILIA{ l i-TI l --_-I iI , I� - - _ - I TI f-TI�I Y� I I- _ _ WORE -BACKED SRT FENCE. OR IF CE I- 'W11 -�S TARED HAYSAL ES WPAF'FEt] I - WrTH FILTER rABRIC_ OR DSOARC# To 3TABLUED EOUFVALENT DFVIDER CONCRETE BABE CONVEYANCE~ CUTLET OR LEVEL SPREADER NOTES 1. CONDITION OF USE I -. A SEDIMENT POND SHALL 13E USED WHERE THE CONTRIBUTING DRAINAGE AREA IS 3 ACRES OR MORE. 2. DESIGN AND INSTALLATION SPECIFICCATION$ 2A. THE POND SHALL BE DIVIDED INTO TWO ROUGHLY EQUAL VOLUME CELLS BY A PERMEABLE DIVIDERTHAT WILL REDUCE TURBULENCE nW�HILE ALLOWING MOVEMENT OF WATER BETWEEN CELLS. THE DIVIDER SHALL BE AT LEAST ONE HALF OF THE HEIGHT OF THE RISER WIRE - BAcP:F 2-TO 3 FOOT HIGH, EXTRA STRENGTH FILTER FABRIC SUPPORTED BY TREATED 4'K4's MAY BE USED AS A DIVIDER. ALTERNATIVELY, STAKED STRAW BALES WRAPPED WITH FILTER FABRIC MAY BE USED. 2.2 IF THE POND IS MORE THAN 0 FEET DEEP. A DIFFERENT MECHANISM MUST BE PROPOSED 2.3 TO AID IN DETERMINING SEDIMENT DEPTH. ONE -FOOT INTERVALS SHALL BE PROMINENTLY MARKED ON THE RISER, I IAINTENANCE STANDARDS 3.1- SEDIMENT SHALL EIE REMC)VE0 FROM THE POND WHEN IT REACHES 1 FOOT IN DEPTH- 3.2. ANY DAMAGES TO THE POND EMBANKMENTS OR SLOPES SHALL BE REPLACED. � ..._ PUBLIC' WORDS SEDIMENT POND PLAN VIEW STD, FLAN - 216,00 ;I+ DEPARTMENT AND CROSS SECTIONS N� MARCH 2008 POLYETHYLENE CAP PROVIDE ADEQUATE ` STRAPPING -=RFORATED POLYETHYLENE - DRAINAGE TUBING. DIAMETER CORRUGATED METAL RISER MIN. Y LARGER THAN DEWATERING ORIFICE TUBNO SHALL COMPLY WFTH ASTM FIN7 AND H ' AASHTO M294 NATEIiM'M DEWATERWG ORIFICE, S046OU E -"0UPLI ' TACK YVELD . - - 40 STEEL STUB MIN _ _ _ - DIAMETER AS PER CALCULATIONS 6' LIIPL - ALTERNATIVELY, METAL STAKES AND WIRE MAY BE USED TO ' CONCRETE BASE PREVENT FLOTATION DIA "IN `'• PUBLIC WORN;: SEDIMENT POND STD' PLAN - 216.10 DEPARTMENT RISER DETAIL MARCH 2 008 9. WET SEASON SEASONAL EROSION AND SEDIMENT CONTROL REQUIREMENTS APPLY TO ALL CONSTRUCTION SITES CLEARING BETWEEN OCTOBER 1 AND MARCH 30 INCLUSIVE, UNLESS OTHERWISE APPROVED BY THE CITY THROUGH AN ADJUSTMENT PROCESS. 10. COVER MEASURES WILL BE APPLIED IN CONFORMANCE WITH APPENDIX D OF THE SURFACE WATER DESIGN MANUAL. 11. ANY AREA NEEDING ESC MEASURES, NOT REQUIRING IMMEDIATE ATTENTION, SHALL BE ADDRESSED WITHIN SEVEN (7) DAYS. 12. THE ESC FACILITIES ON INACTIVE SITES SHALL BE INSPECTED AND MAINTAINED A MINIMUM OF ONCE A MONTH OR WITHIN 24 HOURS FOLLOWING A STORM EVENT. 13. AT NO TIME SHALL MORE THAN ONE (1) FOOT OF SEDIMENT BE ALLOWED TO ACCUMULATE WITHIN A CATCH BASIN. ALL CATCH BASINS AND CONVEYANCE LINES SHALL BE CLEANED PRIOR TO PAINING. THE CLEANING OPERATION SHALL NOT FLUSH SEDIMENT -LADEN WATER INTO THE DOWNSTREAM SYSTEM. 14. DURING THE TIME PERIOD OF OCTOBER 1ST THROUGH MARCH 30TH, ALL PROJECT DISTRIBUTED SOIL AREAS GREATER, THAT ARE TO BE LEFT UN- WORKED FOR MORE THAN 12 HOURS, SHALL BE COVERED BY MULCH, SODDING OR PLASTIC COVERING. 15. ANY PERMANENT RETENTION/DETENTION FACILITY USED AS A TEMPORARY SETTLING BASIN SHALL BE MODIFIED WITH THE NECESSARY EROSION CONTROL MEASURES AND SHALL PROVIDE ADEQUATE STORAGE CAPACITY. IF THE PERMANENT FACILITY IS TO FUNCTION ULTIMATELY AS AN INFILTRATION SYSTEM, THE TEMPORARY FACILITY MUST BE ROUGH GRADED SO THAT THE BOTTOM AND SIDES ARE AT LEAST THREE FEET ABOVE THE FINAL GRADE OF THE PERMANENT FACILITY. 16. PRIOR TO THE BEGINNING OF THE WET SEASON (OCT. 1), ALL DISTURBED AREAS SHALL BE REVIEWED TO IDENTIFY WHICH ONES CAN BE SEEDED IN PREPARATION FOR THE WINTER RAINS. DISTURBED AREAS SHALL BE SEEDED WITHIN ONE WEEK OF THE BEGINNING OF THE WET SEASON. A SKETCH MAP OF THOSE AREAS TO BE SEEDED AND THOSE AREAS TO REMAIN UNCOVERED SHALL BE SUBMITTED TO THE CITY OF RENTON FOR REVIEW. STRUCTURAL NOTES 1. THESE PLANS ARE APPROVED FOR STANDARD ROAD AND DRAINAGE IMPROVEMENTS ONLY. PLANS FOR STRUCTURES SUCH AS BRIDGES, VAULTS, AND RETAINING WALLS REQUIRE A SEPARATE REVIEW AND APPROVAL BY THE CITY PRIOR TO CONSTRUCTION. 2. ROCKERIES ARE CONSIDERED TO BE A METHOD OF BANK STABILIZATION AND EROSION CONTROL. ROCKER/ES SHALL NOT BE CONSTRUCTED TO SERVE AS RETAINING WALLS. ALL ROCKERIES IN CITY ROAD RIGHT-OF-WAY SHALL BE CONSTRUCTED IN ACCORDANCE WITH CITY STANDARDS ROCKER/ES OUTSIDE OF ROAD RIGHT-OF-WAY SHALL BE CONSTRUCTED IN ACCORDANCE WITH THE INTERNATIONAL BUILDING CODE. A. Dl- �F W t'4NA L O z ,t1 NO. REVISION Y IAA1C - DRAINAGE GRATE - RIM - GRATE FRA1v� `^` '- :. v M IMENT AND DEBRIS OVERFLOW BYPA$$ r �,.. BELOW INLET GRATE DEVICE FiLTERE�B • , WATER I I A A c 'a ` P G 6 P SEUTION VMiW DRAINAGE CRATE RECTA NGUL.AR GRATE SHOWN - BELOW In ISMETRIC VIIEW NOTES Size the Below Inlet Grate Device (BIGDI for ft storm water Structure it wlll SeNce. 2, Tfic BIGD shall have a badkn high- low relief systcm (overflow hypesa). 3. The relwval System must ellow removal d the BIGD witwt shilling 8w CgOvW ffoerW. 4. Perform mainlenanoe In scoordence with Standard Spgvflpauon 8-01.31.15). :® PUBLIC WORKS CATCH BASIN FILTER tll� DEPARTMENT SURVEYED: DESIGNED: J. HOPPER DRAWN: P. PATEL CHECKED: J. HOPPER BY DATE APPR APPROVED. J. HOPPER SCALE NOTED ONE INCH AT FULL SCALE IF NOT ONE INCH SCALE ACCORDINGLY VERTICAL NAVD 1988 HORIZONTAL: NAD t983/1991 DATUM LEVEL BOTTOM _ -- 1' MIN. _ _ _- 1-If1,=,1 1-111- LT i RAN. r r SWALE SPACINGCIE PENDS ON SLOPE GRADIENT NOTES 1. CONDITION OF USE 1.1. REQUIRED AT: 1.1.1. THE TOP OF ALL SLOPES IN EXCESS OF 3MAV AND WITH MORE THAN 20 FEET OF VERTICAL RELIEF. 1 12. AT INTERVALS ON ANY SLOPES THAT EXCEEDS THE 04MENSIONS SPECIFIED BELLOW. AVERAGESLOPE SLOPEPERCENT FLOWPATHLENGTH 701H IV 3-5% 300FEET L0T02 H:I'd 5-10% 200FEET 4TO101HAV I-D-25% 100FEET TO A H:1V 25-50% 50 FEET 2. DESIGN AND INSTALLATION SPECIFICATIONS 2.1. FOR SLOPES STEEPER THAN 2H.1 V WITH MORE THAN 10 FEET OF VERTICAL RELIEF, BENCHES MAY BE CONSTRUCTED OR CLOSER SPACED INTERCEPTOR SWALES MAY BE USED. THE DESIRE MEASURE MOST BE DESIGNED BY AN ENGINEER TO EFFECTIVELY INTERCEPT THE HIGH VELOCITY RUNOFF TO A SEDIMENT POND OR TRAP. 2.2. CONSTRUCTION TRAFFIC OVER TEMPORARY SWALES SHALL BE MINIMIZED- 3. MAINTENANCE STANDARDS 3.1. DAMAGE RESULTING FROM RUNOFF OR CONSTRUCTION ACTIVITY SHALL BE REPAIRED IMMEDIATELY. 3.2- IF THE FACILITY DO NOT REGULARLY RETAIN STORM RUNOFF, THE CAPACITY ANDfOR FREQUENCY OF THE SWALES SHALL BE INCREASED. -m {I♦r., PIJ'BLIC WORK'! INTERCEPTOR SWALE DEPARTIIEN7 MV.6UC+IPACTIOM SAC. 34X I'm I. pm aPAZ no T mo" ON Opt-% RUNS 4' WIX ON POOLING AREAS. 2 PO&T DEPTH AS MUCH BELOW DROUNO AB FABRIC ABOVE GROUND 3 PONDING HEGHT VAX. W ATTACH FABIIIC TO UPSTREAM SCDE OF POST 4 D4CVE OVER EACH SCE CIIIII' SILT FIERCE 2 TO A T"S WITH DEV" EXERTING E0 P,S.I, OR GREATER 5. NO MORE THAN W OF A 38' FABRIC S ALLOWED ABOVE GROUKD. 6. VIBRATORY PLOW N NOT ACCEPTABLE BECAUSE OF HORIZONTA' -- OPERA HORIZONTAL CHMEL PUNT tft- *MTN) PUBLIC WORKS i7EPARTMEN7MEhT SM. FIJfN - 81ILSO MARCH 2008 R-4 0 3 2 0 3 ASBUILTS CITY OF IWO RENTON Planning/Building/Public Works Dept. BID. FIAN - 817.10 MARCH 2O0H TOR OF FABtlC FOP v r CMA004AY A I TA¢d-iEW1 DCHJPI.FS STRFMOTIN IR AITTACM111lf1fT oa'T+aEI 1. [LATHER FABRIC AT PtlIBtr9. IF IEEDF:D 2- UTNM& THIF" TIES PEN 111,061. ALL W{TK" TOPC OF FABRIC 5, POWION EACH T* DIA001411M1LLY. PU NCTURNG HOLES VERTICALLY AMIHMUM OF I• APART 4. MOM EApE TIE ON A PONTI NPPIE AND 1FIGK M SEdIRELT. USE CABLE TES M0L8SI OF SOFT WME ROLL pr SALT KyjY IF PLO* E 7F10.7fJd.rn SILT FENCE INSTALLATION PLAN - 214,10 BY SLICING IN COMPLIANCE WITH CITY OF RENTON STANDARDS CHRISTELLE RIDGE SOUND BLDG & DEVELOPMENT, LLC 21222 132ND AVE SE KENT, WA 98042 TEMPORARY EROSION CONTROL DETAIL DATE 3-22-2018 Ma DBOOK: PAGE DRAWING NO: 03 SHIM OF: 03 24