HomeMy WebLinkAboutMFP22001143DEPARTMENT OF COMMUNITY
AND ECONOMIC DEVELOPMENT
Minor Franchise Permit: MFP22001143
IVR Number: 22001143
Permit Information
Permit Name: Verizon - MCI (1801BFZY.7_ROWI_REN_2829)
Address/Location:03/09/2022Application Date:3343301125Parcel Number: 1755 NE 48TH ST
Permit Type:05/17/2022Issue Date:Franchise
Permit Work Class:05/17/2023Expiration Date:Minor Utility
Job Number: 1801BFZY.7_ROWI_REN_2829Franchise Type:Telephone
Description: Verizon Business MCI Metro
Placement of strand and fiber (414 LF) on existing PSE poles with 1 anchor.
Previously approved under permit ID#MFP19005666
Contacts
Name Address PhoneTypeBilling
HOLLY NORTH
MGC TECHNICAL CONSTULTING, INC
8521 154th Ave NE
REDMOND, WA 98052
B: (206) 618-0651Applicant
MasTec Representative
MasTec
151 Stewart Rd SW
Pacific, WA 98047
ApplicantX
William Jenness
MCIMetro
3245 158th Ave SE
Bellevue, WA 98008
Contact
Louise Popelka
Verizon MCI Buisness
3245 158th Ave SE
Bellevue, WA 98008
B: (425) 240-0238Contact
Matthew Sapp
Verizon - MCI
Contact
MasTec Representative
MasTec
151 Stewart Rd SW
Pacific, WA 98047
Contact
PUBLIC STORAGE PO BOX 25025
GLENDALE , CA 91201
Owner
Amy Ledvina
Verizon - MCImetro
3245 158 Ave SE
Bellevue, WA 98008
H: (425) 505-5651Specialized
Billing
General Conditions & Signature
Permission is hereby given for the work described on this permit according to the conditions hereon and according to the
approved plans and specifications pertaining thereto, subject to compliance with the Ordinance of the City of Renton.
Ÿ
This permit and plans must be posted at the job site at all times.Ÿ
I hereby certify that no work is to be done except as described above and in approved plans, and that work is to conform to
Renton Trench Restoration and Street Overlay Requirements.
Ÿ
Call 425.430.7203 or go to: https://permitting.rentonwa.gov one working day in advance to schedule an inspections and for ANY
work in the Right of Way.
Ÿ
Call 8 1 1 to locate underground utilities at least two full business days prior to any excavation.Ÿ
In accordance with RCW 19.122.033(4) the permit holder is required to contact (Williams Northwest Pipeline at 425.868.1010)
(Olympic Pipeline at 206.510.0575) (Puget Sound Energy at 425.375.3397) to request a consultation with the transmission
pipeline company prior to performing any construction or excavation activities. This requirement to consult with the
transmission pipeline company is in addition to the requirement to Call before You Dig as required in RCW 19.122.
Ÿ
(Date)(Signature)
Page 1 of 1THIS PERMIT AND PLANS MUST BE POSTED AT THE JOB SITE AT ALL TIMES
DEPARTMENT OF COMMUNITY
AND ECONOMIC DEVELOPMENT
Page 1 | Published: 3/30/2017
Planning Division | 1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425-430-7200
Email: franchisepermits@rentonwa.gov Website: rentonwa.gov
FRANCHISE PERMIT APPLICATION
Published: 3/30/2017
TO THE APPLICANT: Submit an electronic copy of the plans with the Franchise Permit Application and the
Traffic Control Application to franchisepermits@rentonwa.gov. Permit cost is $360.50. Inspection fee for
trenching more than 60 lineal feet or installation of 6 or more poles will be billed at $60.00 per hour.
Franchise Agency:
Franchise Job Number: Phone:
Contact Name: Email:
Job Site Address: Project Name:
Description of Work:
Please check all that apply:
☐ New Construction ☐ Repair/Relocate ☐ Underground ☐ Overhead ☐ Sidewalk ☐ Street
☐ Open Trench ☐ Bore # of feet:
Contractor Name: Phone:
State Contractors License #: City of Renton Business License #:
“I certify that I am the owner or applicant’s authorized agent and do hereby agree to abide to the terms and conditions set forth under this permit and shall comply with the City of Renton’s Trench Restoration and Street Overlay Requirements. ”
Signature Date
INSPECTIONS SHALL BE REQUESTED 24 HOURS PRIOR TO COMMENCEMENT OF ALL WORK BY CALLING THE
INSPECTION LINE AT 425-430-7203 OR BY GOING TO MYBUILDINGPERMIT.COM
Jobs are required to be called in for job start, re-inspection and project final. Re-inspection fees are billed at $75/hour.
All Pre-Construction meetings shall be scheduled at a maximum of 14 days prior to the job start date.
Plan Review/Development Engineering Date Approved as submitted
Pre-Construction Meeting required
Site Construction Inspector Date Approved with comments or redlines
Camera inspection of utilities required
Development Engineering Manager Date
MCIMETRO ACCESS TRANSMISSION SERVICES CORP.
AARON LEDVINA
206.715.6372
ALEDVINA@FG-INC.NET
RIGHT-OF-WAY AT NE 48th St.1801BFZY.7_ROWI_REN_2829
PULL FIBER (414 LF) CABLE IN THE RIGHT-OF-WAY OF NE 48th St.
MASTEC, INC. 2537971936
MASTENA991KJ
3/3/22
MFP22001143
Scott Warlick 5/10/2022
Note: The Applicant is responsible for compliance with all codes and regulations, whether or not described in this document.
DEPARTMENT OF PUBLIC WORKS
Page 1 of 3 | Published: 10/27/2021
Transportation Division | 1055 South Grady Way, 5th Floor | Renton, WA 98057 | 425-430-7380
Website: rentonwa.gov
TRAFFIC CONTROL PLAN APPLICATION
Published: 10/27/2021
TRAFFIC CONTROL PLAN (TCP) MUST BE SUBMITTED TO PUBLIC WORKS TRANSPORTATION DIVISION
FOR REVIEW/APPROVAL AT LEAST FIVE (5) WORKING DAYS BEFORE THE DATE OF WORK.
The City of Renton requires any contractor, firm, corporation, or other public/private agency to prepare a traffic control
plan (TCP) and obtain city's approval of that plan when construction, repair, or maintenance work is to be conducted
within the city's right-of-way.
1. Fill out the Traffic Control Plan (TCP) Application form and prepare required submittal documents.
2. The following items are all required for submittal of the TCP Application:
☐ Electronic Copy of the TCP Application
☐ Electronic Copy of the TCP Layout, on 11” X 17” paper size format, which shall:
Include map(s) showing the location of the project and work area.
Be legible lettering and clear, contrasting, symbols of viewing or printing.
Must indicate street names, and north arrow and scale.
Types of plans required:
o Work hour plan – show all mobility impacts during construction hours.
o Non-work plan - show all mobility impacts after work hours when limited or no work is
happening in the right-of-way (ROW), if applicable.
o Changing construction phases – show construction sequence and each construction phase
change even if the traffic control is not modified, if applicable.
o Pedestrian access/detour plan, if applicable.
- Shall conform to the Washington State Traffic Control Flagger Certification handbook, by the
Evergreen Safety Council.
3. Submit Application via email to TCP@rentonwa.gov with the subject line “TCP Application – [Project Name].”
Project Name: Permit #:
Site Address:
Work Date: From _____________ To _____________ Work Time: Start ______________ End ______________
Construction Company:
Contact Name: Phone/Cell: _________________________
Business Address: City/State: Zip:
Description of Work:
Approval By: _________________________________________________ Date:____________________
Transportation Engineering
1801BFZY.7_ROWI_REN_2829
1755 NE 48TH ST
MASTEC NORTH AMERICA, INC
MATTHEW SMITH 253-736-5107
151 STEWART RD SW, BLDG A PACIFIC, WA 98047
PLACE FIBER ON EXISTING STRAND PREVIOUSLY CONSTRUCTED
Monday - Friday 8:00AM - 3:00PM
MFP22001143
Scott Warlick CED 5/10/2022
Note: The Applicant is responsible for compliance with all codes and regulations, whether or not described in this document.
Page 2 of 3 | Published: 10/27/2021
PERMIT HOLDER AGREES TO ALL THE FOLLOWING:
Must have approved Traffic Control Plan (TCP) prior to commencing the work.
Maintain existing pedestrian access. The work on pedestrian facilities, shall be limited to one corner at a time,
with the least possible inconvenience or delay to pedestrians.
WORK TIME begins when any street or travel lane is fully or partially closed. This includes set up within the
traveled way.
Comply with all traffic regulations of the City of Renton and the State of Washington.
Prepare a traffic control plan and obtain City approval of that plan. That plan shall be implemented for all street
and lane closures, and the plan shall be performed in compliance with the Manual on Uniform Traffic Control
Devices.
Notify emergency services (253-852-2121) twenty-four (24) hours before any street or lane closures.
Contractor or entity must call Renton School District (425-204-4455) or any public/private agency, including public
transit, to be affected by a temporary lane or road closure a minimum of five business days (excluding weekends
and holidays) prior to starting any work.
Contractor or entity must notify King County Metro in writing at construction.coord@kingcounty.gov a minimum
of five business days (excluding weekends and holidays) prior to starting any work impacting bus stops, a
temporary lane or road closure. Work requiring removing a bus shelter or sign requires notification in writing a
minimum of 30 business days (excluding weekends and holidays). Please call King County Metro at 206-477-1140
with any questions.
Any lane or street closures not in conformance with the approved traffic control plan and/or without notification
of emergency services may result in receiving a citation for violation of R.C.W. 47.36.200 Signs or Flaggers at
thoroughfare work sites and R.C.W. 9A.36.050 Reckless Endangerment, and other applicable State and City codes.
Indemnify and hold harmless the City of Renton from any and all claims, actions, and judgments, including all
costs of defense and attorney’s fees incurred in defending against same, arising from and related to
implementation of the approved traffic control plans including claims arising from towing of private vehicles and
the acts of the Permit Holder’s agents and employees.
The City of Renton shall be entitled, in its reasonable discretion, to settle claims prior to suit or judgment, and in
such event shall indemnify and hold harmless the City for any such claims paid, including the City’s reasonable
attorney’s fees and litigation costs incurred resulting from such claim.
In the event any claim or suit is brought against City within the scope of this Agreement, Permit Holder will pay for
legal counsel chosen by the City to defend against same.
Flagger and sign placement are subject to revision by the City Inspector on site, if needed to address traffic or
pedestrian safety or travel.
All permit conditions shall be met.
NOTES:
Total road closure lasting more than twenty-four (24) hours is subject to the approval by the City Council.
Work Zone Traffic Control shall be in accordance with the Manual on Uniform Traffic Control Devices (MUTCD)
and shown by a traffic control plan layout or reference to WSDOT.
Approved Temporary Traffic Control Plan must be at the work site during work hours.
Complete assistance and accommodation shall be provided to all kinds of pedestrian traffic when sidewalk or
walkway is impeded to safely redirect pedestrians around a work zone.
Signage shall be used to warn motorcyclists/bicyclists of the potential hazards on any uneven surfaced or slippery
road conditions during work and non-work hours.
Any vehicle, equipment, barricade, or portable tow-away sign used within the work area must display a company
logo or any legally acceptable sign showing the company name, address, and telephone number at a conspicuous
place on the vehicle or equipment.
Note: The Applicant is responsible for compliance with all codes and regulations, whether or not described in this document.
Page 3 of 3 | Published: 10/27/2021
In the case of Temporary No Parking Zones, all the following apply in addition to previous:
Contractor must complete form to show limits of Temporary No Parking Zone identifying barricade locations for
vacate parking or curb lane usage.
Contractor must post notice of dates and time of Temporary No Parking Zone with at least two signs per block
seventy-two (72) hours in advance of effective date and time.
The cover sheet of this Traffic Control Plan form must be attached to each Temporary No Parking Sign on the
project site.
Temporary traffic control devices must be removed immediately when work is done or no construction activities
are going on. If deemed abandoned, City crews will remove and store them at the City’s maintenance shop (3555
NE 2nd Street).
I certify that the information on this application and within the submittal documents are accurate to the best of my
knowledge and I acknowledge all the requirements on this application.
Applicant’s Signature Date
Applicant’s Name (Print)
05/05/2022
AARON LEDVINA
CAPITAL PROJECT #: 072443-001(KENNYDALE CRAN) ROWI RENTONMCI PERMIT NUMBER: 1801BFZY.7_ROWI_REN_2829PROJECT STATUS: PERMITTINGSTATUS DATE: 10/05/2019MCImetroACCESS TRANSMISSION SERVICES CORPOUTSIDE PLANT CONSTRUCTIONPOLE ATTACHMENTSITE CODE: 1801BFZY.7ENGINEERING SERVICESRENTON, WASHINGTONTRAFFIC CONTROL PLANPlease note that all pages that containthe name MCImetro AccessTransmissions Services, Corp., it isunderstood that MCI has gone through aname change to be as follows: MCImetroAccess Transmission Services, LLC.MFP22001143
10/05/2019
A-01
PROJECT LOCATION:
PERMITTING ENTITY:
PROJECT ID NUMBER:OUTSIDE PLANT CONSTRUCTIONSHEET:
VERTICAL:
HORIZONTAL:
DRAWN BY:
ENGINEER:
DATE:
EXCEPT AS MAY BE OTHERWISE PROVIDED BY CONTRACT,
THESE DRAWINGS AND SPECIFICATIONS SHALL REMAIN THE
PROPERTY OF MCI COMMUNICATIONS SERVICES, INC.. BOTH
BEING ISSUED IN STRICT CONFIDENCE AND SHALL NOT BEREPRODUCED, COPIED, OR USED FOR ANY PURPOSE
WITHOUT SPECIFIC WRITTEN PERMISSION.
SCALE
REVISIONS
PROJECT:
RENTON
N/A
F. Colon
S. Dickson
DATE DESCRIPTION INITIALKENNYDALE CRANAERIAL INSTALLATION
RENTON, WA
1801BFZY.7_ROWI_REN_2829
N/A
SHEET INDEX
GENERAL PROJECT INFORMATION (A-SERIES)
COVER SHEET
SHEET INDEX
CONTACT INFORMATION (B-SERIES)
CONTACT INFORMATION SHEET
CONSTRUCTION PLANS (C-SERIES)
KEY MAP SHEET
SITE PLAN SHEET(S)
ADDITIONAL INFORMATION (D,E-SERIES)
GENERAL AERIAL CONSTRUCTION DETAILS
TRAFFIC CONTROL PLAN DETAILS
A-00
A-01
B-01
C-00
N/A
D-01
E-01
MFP22001143
10/05/2019
B-01
PROJECT LOCATION:
PERMITTING ENTITY:
PROJECT ID NUMBER:OUTSIDE PLANT CONSTRUCTIONSHEET:
VERTICAL:
HORIZONTAL:
DRAWN BY:
ENGINEER:
DATE:
EXCEPT AS MAY BE OTHERWISE PROVIDED BY CONTRACT,
THESE DRAWINGS AND SPECIFICATIONS SHALL REMAIN THE
PROPERTY OF MCI COMMUNICATIONS SERVICES, INC.. BOTH
BEING ISSUED IN STRICT CONFIDENCE AND SHALL NOT BEREPRODUCED, COPIED, OR USED FOR ANY PURPOSE
WITHOUT SPECIFIC WRITTEN PERMISSION.
SCALE
REVISIONS
PROJECT:
RENTON
N/A
F. Colon
S. Dickson
DATE DESCRIPTION INITIALKENNYDALE CRANAERIAL INSTALLATION
RENTON, WA
1801BFZY.7_ROWI_REN_2829
N/A
CONTACT INFORMATION
ONE CALL SYSTEM (UTILITY LOCATES)
MCI METRO INC.
UTILITIES
MCI UTILITY LOCATE
RAILROADS
FEDERAL GOVERNMENT
COUNTY GOVERNMENT
STATE GOVERNMENT
1-800-624-9675
CITY GOVERNMENT
OUTSIDE PLANT ENGINEERING:
OUTSIDE PLANT CONSTRUCTION:
RIGHT-OF-WAY:
CONTRACTS:
OTHERS:
ENGINEERING CONTRACTOR:
CONSTRUCTION CONTRACTOR:
SENIOR PROJECT ENGINEER:
LOUISE POPELKA
PROJECT ENGINEER:
BRAD LANDIS
PROJECT SUPERVISOR:
FIELD CONSTRUCTION SUPERINTENDENT:
MANAGER:
AGENT:
MANAGER:
NAME OF FIRM:
MASTEC
PROJECT MANAGER:
ERIKA YOUNG
PROJECT SUPERVISOR:
CASEY CHRISTLIEB
NAME OF FIRM:
FORESITE GROUP
PROJECT MANAGER:
LUKE RICKEL
PROJECT ENGINEER:
ARNALDO BLANCO
(210)722-6429
(787)349-2960
(267)969-0345
(509)823-0965
(425)240-0238
(425)229-3123
AT&T LONG DISTANCE: DANIEL MCGEOUGH
AT&T METRO: CLIFF ROBERTS
(425)896-9830
(425)896-9851
AT&T MOBILITY/SINGULAR (SOUTH OF I-90): GARY TOPORKE
AT&T MOBILITY/CINGULAR: BILL LACOUNT
(253)680-2403
(360)395-5425
CENTURY LINK: IVAN ESMERAL
COMCAST: JILL LOOK
(425)427-9903
(206)396-6032
COAL CREEK UTILITY DISTRICT: PATRICK MARTIN
ELI/INTEGRA: ERIC LAYTON
(206)255-1961
(425)970-7763
FRONTIER COMMUNICATIONS NW: JAY SCHWAB (425)263-4019
LEVEL 3 COMMUNICATIONS: KRISHNA MITCHELL
ONEFIBER COMMUNICATIONS: BILL BODIN
(720)387-3342
(916)765-2074
OLYMPIC PIPELINE CO.: TIMOTHY FEHR
PUDGET SOUND ENERGY: ANDY SWAYNE
(425)427-9903
(425)462-3852
PUDGET SOUND ENERGY EMERGENCY DISPATCH
PSE/INFRASOURCE: AURELIE JOHANNSON
(888)225-5773
(425)466-4771
PSE/POTELCO: BOB CARLSEN
SEATTLE PUBLIC UTILITIES: RICHARD COX
(425)864-0496
(206)900-4434
T-MOBILE USA: NOTICE ADDRESS
VERIZON WIRELESS NW: LELAH VAGA
1-877-373-0093
(425)603-8275
XO COMMUNICATIONS/VERIZON WIRELESS: CHRISTOPHER MAPES
ZAYO FIBER SOLUTIONS: JOSEPH MORTON
(206)315-5014
(253)255-1917
PROJECT MANAGER:
CIARA MCDONNELL-RAY (425)606-7704
1-800-424-5555
CITY OF RENTON (425)430-6400
MFP22001143
C-01
S
T.24N R.05E
33 NW S
T.24N R.05E
33
S
T.24N R.05E
32 NW S
T.24N R.05E
32 NE
S
T.24N R.05E
31 NE
S
T.24N R.05E
30 SE
S
T.24N R.05E
30 NE
S
T.24N R.05E
29 SW S
T.24N R.05E
29 SE
S
T.24N R.05E
29 NW S
T.24N R.05E
29 NE
S
T.24N R.05E
28 SW S
T.24N R.05E
S
T.24N R.05E
28 NW T.24N R.05E
10/05/2019
C-00
PROJECT LOCATION:
PERMITTING ENTITY:
PROJECT ID NUMBER:OUTSIDE PLANT CONSTRUCTIONSHEET:
VERTICAL:
HORIZONTAL:
DRAWN BY:
ENGINEER:
DATE:
EXCEPT AS MAY BE OTHERWISE PROVIDED BY CONTRACT,
THESE DRAWINGS AND SPECIFICATIONS SHALL REMAIN THE
PROPERTY OF MCI COMMUNICATIONS SERVICES, INC.. BOTH
BEING ISSUED IN STRICT CONFIDENCE AND SHALL NOT BEREPRODUCED, COPIED, OR USED FOR ANY PURPOSE
WITHOUT SPECIFIC WRITTEN PERMISSION.
SCALE
REVISIONS
PROJECT:
RENTON
N/A
F. Colon
S. Dickson
DATE DESCRIPTION INITIALKENNYDALE CRANAERIAL INSTALLATION
RENTON, WA
1801BFZY.7_ROWI_REN_2829
N/A
MFP22001143
MCI CONSTRUCTION DETAILS/TYPICALS
GENERAL AERIAL CONSTRUCTION DETAILS
BUT NO LESS
LASHING WIRE GRIP AND CLAMP
TYPICAL DETAIL "H"
FROM POLE - 5 FEET OR MORE
SUSPENSION STRAND - PULL AWAY
TYPICAL DETAIL "E"
OR HANDHOLE LOCATION
POLE ARRANGEMENT FOR REPEATER
TYPICAL DETAIL "B"
18'' PREFERABLY
6'' MIN.
SHOULDER
BOLT
CURVED WASHER
AND STUD SHOULDER.
AND BETWEEN THE SECOND WASHER
STRAND AND PLACE IT BELOW THE STUD
FORM THE LASHING WIRE AROUND THE
AROUND STRAND
FORMING LASHING WIRE
JOINING 045 LASHING WIRE
TYPICAL DETAIL "G"
.625''
FORMING WIRE OVER
WIRE OFF .75'' BEYOND THE END OF THE
CUT THE FREE END OF THE LASHING
THE STUD AND TIGHTEN THE NUT.
SHARPLY. THEN FORM THE WIRE OVER
WIRE AND TAPPING THE STRAND
WIRE BY MAINTAINING A PULL ON THE
REMOVE ANY SLACK IN THE LASHING
CLAMP.
STUD OF CLAMP
CABLE SUSPENSION
CLAMP
GUY
SPACER NUT
WIRE GRIP
C LASHING
SHOULD FOLLOW LAY
OF STRAND WIRES UNDER
GRIP.
LASHING WIRE
NOTE:
THREADED STUD
GROOVED PLATES
CLAMPING NUT
CABLE SUSPENSION
X 2'' ROUND.8125''
CORNER SUSPENSION
CLAMP
WASHER
CABLE SUSPENSIONBOLT
CURVED WASHER
POLE TOP
GROUND LEVEL
POLE TOP VIEW
CURVED WASHER
CONDUIT ADAPTER.
BELOW SURFACE TO
2. FOR CONDUIT PL. U-GUARD
BELOW GROUND LEVEL
1. EXTEND U-GUARD MIN. 6''
POLE ARRANGEMENT FOR
POLE - LESS THAN 5 FEET
SUSPENSION STRAND - PULL TOWARD
TYPICAL DETAIL "D"
TYPICAL DETAIL "A"
2'' GALV. STEEL
2 GUY HOOK
CABLE SUSPENSION
BOLT
8''
CONDUIT
U-GUARD
NOTES:
AERIAL TO BURIED
24''
2''
GUY
BLACK IN COLOR
FIBER OPTIC CABLE
CAUTION TAG
CABLE SUPPORT AND .50'' SPACER
STAINLESS STEEL LASHER
(36'' RADIUS)
OR REPEATER
CONDUIT TO HH
CABLE
CABLE CLAMP
U-GUARD
GROUND LEVEL
4'' PVC BENDMIN.
42''
X X 24''X
WIRE CLAMP
CABLE LASHING 2''X X
E/W 10" SCREW ANCHOR
.75" X 8' DEAD END
ANCHOR & DOWN GUY
TYPICAL DETAIL "I"
1ST LASHING WIRE
2ND LASHING WIRE
TERMINATING NUT
2ND WASHER
1ST WASHER
EX. GRADE
10'
TO CABLE REEL
GUY
SPACER NUT
2 GUY HOOK
THAN 10''
CABLE
GUY
SNAP
PULLING LINE
CABLE
GUY
BLACK IN COLOR
FIBER OPTIC CABLE
CAUTION TAG
INSTALLATION
TYPICAL CABLE & HARDWARE
CABLE LASHER AND CABLE GUIDE
TYPICAL ARRANGEMENT OF
TYPICAL DETAIL "F"
TYPICAL DETAIL "C"
MILE
AT STRAND TO SHEATH
CABLE LASHER
#6 INSULATED COPPER WIRE
POLE TOP VIEW
REPEATER OR SPLICE H.H.
ON POLE NEAREST
CONDUIT ON QUARTER
THE CABLE DIA.)
(X=MIN. OF 20 TIMES
POLE
CABLE GUIDE 4''APPROX.
.50'' SPACER
CABLE SUPPORT AND
STAINLESS STEEL LASHER
GROUND ROD
AND 10'X.75'' COPPER CLAD
BOND LOCATION
GROUND EVERY .25
2''GROUND WIRE CLAMP
10''
12''
10''
12''
GROUND LEVEL
POLE
WIRE CLAMP
CABLE LASHING
10/05/2019
D-01
PROJECT LOCATION:
PERMITTING ENTITY:
PROJECT ID NUMBER:OUTSIDE PLANT CONSTRUCTIONSHEET:
VERTICAL:
HORIZONTAL:
DRAWN BY:
ENGINEER:
DATE:
EXCEPT AS MAY BE OTHERWISE PROVIDED BY CONTRACT,
THESE DRAWINGS AND SPECIFICATIONS SHALL REMAIN THE
PROPERTY OF MCI COMMUNICATIONS SERVICES, INC.. BOTH
BEING ISSUED IN STRICT CONFIDENCE AND SHALL NOT BEREPRODUCED, COPIED, OR USED FOR ANY PURPOSE
WITHOUT SPECIFIC WRITTEN PERMISSION.
SCALE
REVISIONS
PROJECT:
RENTON
N/A
F. Colon
S. Dickson
DATE DESCRIPTION INITIALKENNYDALE CRANAERIAL INSTALLATION
RENTON, WA
1801BFZY.7_ROWI_REN_2829
N/A
MFP22001143
10/05/2019
E-01
PROJECT LOCATION:
PERMITTING ENTITY:
PROJECT ID NUMBER:OUTSIDE PLANT CONSTRUCTIONSHEET:
VERTICAL:
HORIZONTAL:
DRAWN BY:
ENGINEER:
DATE:
EXCEPT AS MAY BE OTHERWISE PROVIDED BY CONTRACT,
THESE DRAWINGS AND SPECIFICATIONS SHALL REMAIN THE
PROPERTY OF MCI COMMUNICATIONS SERVICES, INC.. BOTH
BEING ISSUED IN STRICT CONFIDENCE AND SHALL NOT BEREPRODUCED, COPIED, OR USED FOR ANY PURPOSE
WITHOUT SPECIFIC WRITTEN PERMISSION.
SCALE
REVISIONS
PROJECT:
RENTON
N/A
F. Colon
S. Dickson
DATE DESCRIPTION INITIALKENNYDALE CRANAERIAL INSTALLATION
RENTON, WA
1801BFZY.7_ROWI_REN_2829
N/ARURAL ROADS & URBAN ARTERIALS
URBAN STREETS 25 MPH OR LESS 100' +/- (2)
200' +/- (2)
35 / 40 MPH
25 / 30 MPH
350'
(1) ALL SPACING MAY BE ADJUSTED TO ACCOMMODATE
INTERSECTIONS AND DRIVEWAYS.(2) THIS SPACING MAY BE REDUCED IN URBAN AREAS TO FIT
ROADWAY CONDITIONS.
SIGN SPACING = X (1)
RURAL ROADS, URBAN ARTERIALS,
RESIDENTIAL & BUSINESS DISTRICTS 25 30 35 40 45 50 55 60 65 70
SHOULDERWIDTH
(feet)
10'
8'40 -
--
--
-
-
-
-
-
-
-40
40
60
60
90
90
90
USE A 3 DEVICES TAPER FOR SHOULDERS LESS THEN 8'
MPH
35/40
25/30
TAPER TANGENT
30
20
60
40
CHANNELIZATION DEVICESPACING (feet)
SPEED (MPH)25 30 35 40 45 50 55 60 65 70
LENGTH (feet)250 305 360 425 495 570 645 730155200
TRANSPORTABLE ATTENUATOR ROLL AHEAD DISTANCE = R
HOST VEHICLE WEIGHT9,900 TO 22,000 lbs.HOST VEHICLE WEIGHT> 22,000 lbs.
PROTECTIVE VEHICLE (WORK VEHICLE) = R
GENERAL NOTES:
1.EACH SHEET REPRESENTS A
COMPLETE WORK EFFORT.
PROGRESSIVE WORK IS SPECIFIED
BY MATCH LINE CONTINUATION
ON SHEET
2.ALL DRIVEWAY ACCESS SHALL
REMAIN OPEN DURING WORK
ACTIVITY
3.SEPARATION DEVICES WILL BE
ADJUSTED TO MAINTAIN ACCESS
TO BUSINESS AND RESIDENTIAL
PROPERTIES DURING WORK
ACTIVITY
4.ALL WORK TO BE PERFORMED
DURING DAYTIME HOURS, UNLESS
TRAFFIC VOLUMES OR
MUNICIPALITY DICTATE
OTHERWISE
5.ALL SIGNS ARE 48”X48” BLACK ON
FLUORESCENT ORANGE UNLESS
OTHERWISE NOTED
6.WORK DURATION TO AVERAGE 15
MINUTES PER POLE WORK ZONE
7.IF NEEDED PEDESTRIAN WILL BE
ACCOMMODATED THROUGH THE
WORK ZONE
8.WORK AREA TO INCLUDE STAGING
AREA
SHOULDER WORK ALONG 76TH STREET
TRAFFIC CONTROL PLAN
SHORT TERM STATIONARY WORK ZONE FOR NEW AERIAL REFERENCE PLAN SET
MFP22001143
CAPITAL PROJECT #: 072443-001(KENNYDALE CRAN) ROWI RENTONMCI PERMIT NUMBER: 1801BFZY.7_ROWI_REN_2829PROJECT STATUS: PERMITTINGSTATUS DATE: 09/02/2019MCImetroACCESS TRANSMISSION SERVICES CORPOUTSIDE PLANT CONSTRUCTIONPOLE ATTACHMENTSITE CODE: 1801BFZY.7ENGINEERING SERVICESRENTON, WASHINGTONMAKE READY ENGINEERINGPlease note that all pages that containthe name MCImetro AccessTransmissions Services, Corp., it isunderstood that MCI has gone through aname change to be as follows: MCImetroAccess Transmission Services, LLC.MFP22001143
09/02/2019
A-01
PROJECT LOCATION:
PERMITTING ENTITY:
PROJECT ID NUMBER:OUTSIDE PLANT CONSTRUCTIONSHEET:
VERTICAL:
HORIZONTAL:
DRAWN BY:
ENGINEER:
DATE:
EXCEPT AS MAY BE OTHERWISE PROVIDED BY CONTRACT,
THESE DRAWINGS AND SPECIFICATIONS SHALL REMAIN THE
PROPERTY OF MCI COMMUNICATIONS SERVICES, INC.. BOTH
BEING ISSUED IN STRICT CONFIDENCE AND SHALL NOT BEREPRODUCED, COPIED, OR USED FOR ANY PURPOSE
WITHOUT SPECIFIC WRITTEN PERMISSION.
SCALE
REVISIONS
PROJECT:
RENTON
N/A
F. Colon
S. Dickson
DATE DESCRIPTION INITIALKENNYDALE CRANAERIAL INSTALLATION
RENTON, WA
1801BFZY.7_ROWI_REN_2829
N/A
SHEET INDEX
GENERAL PROJECT INFORMATION (A-SERIES)
COVER SHEET
SHEET INDEX
CONTACT INFORMATION (B-SERIES)
CONTACT INFORMATION SHEET
CONSTRUCTION PLANS (C-SERIES)
KEY MAP SHEET
SITE PLAN SHEET(S)
ADDITIONAL INFORMATION (D,E-SERIES)
GENERAL AERIAL CONSTRUCTION DETAILS
A-00
A-01
B-01
C-00
C-01
D-01
MFP22001143
09/02/2019
B-01
PROJECT LOCATION:
PERMITTING ENTITY:
PROJECT ID NUMBER:OUTSIDE PLANT CONSTRUCTIONSHEET:
VERTICAL:
HORIZONTAL:
DRAWN BY:
ENGINEER:
DATE:
EXCEPT AS MAY BE OTHERWISE PROVIDED BY CONTRACT,
THESE DRAWINGS AND SPECIFICATIONS SHALL REMAIN THE
PROPERTY OF MCI COMMUNICATIONS SERVICES, INC.. BOTH
BEING ISSUED IN STRICT CONFIDENCE AND SHALL NOT BEREPRODUCED, COPIED, OR USED FOR ANY PURPOSE
WITHOUT SPECIFIC WRITTEN PERMISSION.
SCALE
REVISIONS
PROJECT:
RENTON
N/A
F. Colon
S. Dickson
DATE DESCRIPTION INITIALKENNYDALE CRANAERIAL INSTALLATION
RENTON, WA
1801BFZY.7_ROWI_REN_2829
N/A
CONTACT INFORMATION
ONE CALL SYSTEM (UTILITY LOCATES)
MCI METRO INC.
UTILITIES
MCI UTILITY LOCATE
RAILROADS
FEDERAL GOVERNMENT
COUNTY GOVERNMENT
STATE GOVERNMENT
1-800-624-9675
CITY GOVERNMENT
OUTSIDE PLANT ENGINEERING:
OUTSIDE PLANT CONSTRUCTION:
RIGHT-OF-WAY:
CONTRACTS:
OTHERS:
ENGINEERING CONTRACTOR:
CONSTRUCTION CONTRACTOR:
SENIOR PROJECT ENGINEER:
LOUISE POPELKA
PROJECT ENGINEER:
BRAD LANDIS
PROJECT SUPERVISOR:
FIELD CONSTRUCTION SUPERINTENDENT:
MANAGER:
AGENT:
MANAGER:
NAME OF FIRM:
MASTEC
PROJECT MANAGER:
ERIKA YOUNG
PROJECT SUPERVISOR:
CASEY CHRISTLIEB
NAME OF FIRM:
FORESITE GROUP
PROJECT MANAGER:
LUKE RICKEL
PROJECT ENGINEER:
ARNALDO BLANCO
(210)722-6429
(787)349-2960
(267)969-0345
(509)823-0965
(425)240-0238
(425)229-3123
AT&T LONG DISTANCE: DANIEL MCGEOUGH
AT&T METRO: CLIFF ROBERTS
(425)896-9830
(425)896-9851
AT&T MOBILITY/SINGULAR (SOUTH OF I-90): GARY TOPORKE
AT&T MOBILITY/CINGULAR: BILL LACOUNT
(253)680-2403
(360)395-5425
CENTURY LINK: IVAN ESMERAL
COMCAST: JILL LOOK
(425)427-9903
(206)396-6032
COAL CREEK UTILITY DISTRICT: PATRICK MARTIN
ELI/INTEGRA: ERIC LAYTON
(206)255-1961
(425)970-7763
FRONTIER COMMUNICATIONS NW: JAY SCHWAB (425)263-4019
LEVEL 3 COMMUNICATIONS: KRISHNA MITCHELL
ONEFIBER COMMUNICATIONS: BILL BODIN
(720)387-3342
(916)765-2074
OLYMPIC PIPELINE CO.: TIMOTHY FEHR
PUDGET SOUND ENERGY: ANDY SWAYNE
(425)427-9903
(425)462-3852
PUDGET SOUND ENERGY EMERGENCY DISPATCH
PSE/INFRASOURCE: AURELIE JOHANNSON
(888)225-5773
(425)466-4771
PSE/POTELCO: BOB CARLSEN
SEATTLE PUBLIC UTILITIES: RICHARD COX
(425)864-0496
(206)900-4434
T-MOBILE USA: NOTICE ADDRESS
VERIZON WIRELESS NW: LELAH VAGA
1-877-373-0093
(425)603-8275
XO COMMUNICATIONS/VERIZON WIRELESS: CHRISTOPHER MAPES
ZAYO FIBER SOLUTIONS: JOSEPH MORTON
(206)315-5014
(253)255-1917
PROJECT MANAGER:
CIARA MCDONNELL-RAY (425)606-7704
1-800-424-5555
CITY OF RENTON (425)430-6400
MFP22001143
C-01
S
T.24N R.05E
33 NW S
T.24N R.05E
33
S
T.24N R.05E
32 NW S
T.24N R.05E
32 NE
S
T.24N R.05E
31 NE
S
T.24N R.05E
30 SE
S
T.24N R.05E
30 NE
S
T.24N R.05E
29 SW S
T.24N R.05E
29 SE
S
T.24N R.05E
29 NW S
T.24N R.05E
29 NE
S
T.24N R.05E
28 SW S
T.24N R.05E
S
T.24N R.05E
28 NW T.24N R.05E
09/02/2019
C-00
PROJECT LOCATION:
PERMITTING ENTITY:
PROJECT ID NUMBER:OUTSIDE PLANT CONSTRUCTIONSHEET:
VERTICAL:
HORIZONTAL:
DRAWN BY:
ENGINEER:
DATE:
EXCEPT AS MAY BE OTHERWISE PROVIDED BY CONTRACT,
THESE DRAWINGS AND SPECIFICATIONS SHALL REMAIN THE
PROPERTY OF MCI COMMUNICATIONS SERVICES, INC.. BOTH
BEING ISSUED IN STRICT CONFIDENCE AND SHALL NOT BEREPRODUCED, COPIED, OR USED FOR ANY PURPOSE
WITHOUT SPECIFIC WRITTEN PERMISSION.
SCALE
REVISIONS
PROJECT:
RENTON
N/A
F. Colon
S. Dickson
DATE DESCRIPTION INITIALKENNYDALE CRANAERIAL INSTALLATION
RENTON, WA
1801BFZY.7_ROWI_REN_2829
N/A
MFP22001143
414 ft.
POLE PROPOSED IN
SEPARATE PACKAGE
POLE FOR EVALUATION
SEPARATE PACKAGE
STRAND PROPOSED IN
SEPARATE PACKAGE
ANCHOR PROPOSED IN
PROPOSED ANCHOR
PARCELS
LEGEND:
PROPOSED STRAND
EDGE OF PAVEMENT (EOP)
RIGHT OF WAY (ROW)
09/02/2019
C-01
PROJECT LOCATION:
PERMITTING ENTITY:
PROJECT ID NUMBER:OUTSIDE PLANT CONSTRUCTIONSHEET:
VERTICAL:
HORIZONTAL:
DRAWN BY:
ENGINEER:
DATE:
EXCEPT AS MAY BE OTHERWISE PROVIDED BY CONTRACT,
THESE DRAWINGS AND SPECIFICATIONS SHALL REMAIN THE
PROPERTY OF MCI COMMUNICATIONS SERVICES, INC.. BOTH
BEING ISSUED IN STRICT CONFIDENCE AND SHALL NOT BEREPRODUCED, COPIED, OR USED FOR ANY PURPOSE
WITHOUT SPECIFIC WRITTEN PERMISSION.
SCALE
REVISIONS
PROJECT:
NORTH
RENTON
N/A
F. Colon
S. Dickson
DATE DESCRIPTION INITIALKENNYDALE CRANAERIAL INSTALLATION
RENTON, WA
1801BFZY.7_ROWI_REN_2829
1" = 100'
C-01
MFP22001143
MCI CONSTRUCTION DETAILS/TYPICALS
GENERAL AERIAL CONSTRUCTION DETAILS
BUT NO LESS
LASHING WIRE GRIP AND CLAMP
TYPICAL DETAIL "H"
FROM POLE - 5 FEET OR MORE
SUSPENSION STRAND - PULL AWAY
TYPICAL DETAIL "E"
OR HANDHOLE LOCATION
POLE ARRANGEMENT FOR REPEATER
TYPICAL DETAIL "B"
18'' PREFERABLY
6'' MIN.
SHOULDER
BOLT
CURVED WASHER
AND STUD SHOULDER.
AND BETWEEN THE SECOND WASHER
STRAND AND PLACE IT BELOW THE STUD
FORM THE LASHING WIRE AROUND THE
AROUND STRAND
FORMING LASHING WIRE
JOINING 045 LASHING WIRE
TYPICAL DETAIL "G"
.625''
FORMING WIRE OVER
WIRE OFF .75'' BEYOND THE END OF THE
CUT THE FREE END OF THE LASHING
THE STUD AND TIGHTEN THE NUT.
SHARPLY. THEN FORM THE WIRE OVER
WIRE AND TAPPING THE STRAND
WIRE BY MAINTAINING A PULL ON THE
REMOVE ANY SLACK IN THE LASHING
CLAMP.
STUD OF CLAMP
CABLE SUSPENSION
CLAMP
GUY
SPACER NUT
WIRE GRIP
C LASHING
SHOULD FOLLOW LAY
OF STRAND WIRES UNDER
GRIP.
LASHING WIRE
NOTE:
THREADED STUD
GROOVED PLATES
CLAMPING NUT
CABLE SUSPENSION
X 2'' ROUND.8125''
CORNER SUSPENSION
CLAMP
WASHER
CABLE SUSPENSIONBOLT
CURVED WASHER
POLE TOP
GROUND LEVEL
POLE TOP VIEW
CURVED WASHER
CONDUIT ADAPTER.
BELOW SURFACE TO
2. FOR CONDUIT PL. U-GUARD
BELOW GROUND LEVEL
1. EXTEND U-GUARD MIN. 6''
POLE ARRANGEMENT FOR
POLE - LESS THAN 5 FEET
SUSPENSION STRAND - PULL TOWARD
TYPICAL DETAIL "D"
TYPICAL DETAIL "A"
2'' GALV. STEEL
2 GUY HOOK
CABLE SUSPENSION
BOLT
8''
CONDUIT
U-GUARD
NOTES:
AERIAL TO BURIED
24''
2''
GUY
BLACK IN COLOR
FIBER OPTIC CABLE
CAUTION TAG
CABLE SUPPORT AND .50'' SPACER
STAINLESS STEEL LASHER
(36'' RADIUS)
OR REPEATER
CONDUIT TO HH
CABLE
CABLE CLAMP
U-GUARD
GROUND LEVEL
4'' PVC BENDMIN.
42''
X X 24''X
WIRE CLAMP
CABLE LASHING 2''X X
E/W 10" SCREW ANCHOR
.75" X 8' DEAD END
ANCHOR & DOWN GUY
TYPICAL DETAIL "I"
1ST LASHING WIRE
2ND LASHING WIRE
TERMINATING NUT
2ND WASHER
1ST WASHER
EX. GRADE
10'
TO CABLE REEL
GUY
SPACER NUT
2 GUY HOOK
THAN 10''
CABLE
GUY
SNAP
PULLING LINE
CABLE
GUY
BLACK IN COLOR
FIBER OPTIC CABLE
CAUTION TAG
INSTALLATION
TYPICAL CABLE & HARDWARE
CABLE LASHER AND CABLE GUIDE
TYPICAL ARRANGEMENT OF
TYPICAL DETAIL "F"
TYPICAL DETAIL "C"
MILE
AT STRAND TO SHEATH
CABLE LASHER
#6 INSULATED COPPER WIRE
POLE TOP VIEW
REPEATER OR SPLICE H.H.
ON POLE NEAREST
CONDUIT ON QUARTER
THE CABLE DIA.)
(X=MIN. OF 20 TIMES
POLE
CABLE GUIDE 4''APPROX.
.50'' SPACER
CABLE SUPPORT AND
STAINLESS STEEL LASHER
GROUND ROD
AND 10'X.75'' COPPER CLAD
BOND LOCATION
GROUND EVERY .25
2''GROUND WIRE CLAMP
10''
12''
10''
12''
GROUND LEVEL
POLE
WIRE CLAMP
CABLE LASHING
09/02/2019
D-01
PROJECT LOCATION:
PERMITTING ENTITY:
PROJECT ID NUMBER:OUTSIDE PLANT CONSTRUCTIONSHEET:
VERTICAL:
HORIZONTAL:
DRAWN BY:
ENGINEER:
DATE:
EXCEPT AS MAY BE OTHERWISE PROVIDED BY CONTRACT,
THESE DRAWINGS AND SPECIFICATIONS SHALL REMAIN THE
PROPERTY OF MCI COMMUNICATIONS SERVICES, INC.. BOTH
BEING ISSUED IN STRICT CONFIDENCE AND SHALL NOT BEREPRODUCED, COPIED, OR USED FOR ANY PURPOSE
WITHOUT SPECIFIC WRITTEN PERMISSION.
SCALE
REVISIONS
PROJECT:
RENTON
N/A
F. Colon
S. Dickson
DATE DESCRIPTION INITIALKENNYDALE CRANAERIAL INSTALLATION
RENTON, WA
1801BFZY.7_ROWI_REN_2829
N/A
MFP22001143
May 17, 2022
Michael Kinney
SEFNCO Communications.
151 Stewart RD SW, BLDG A
Pacific, WA 98047
Via Email: mkinney@sefnco.com
SUBJECT: Request for Undergrounding Exemption (1801BFZY.7_ROWI_REN_2829, MFP22001143,
1755 NE 48th St)
Dear Mr. Kinney,
The City of Renton has reviewed your request to grant Verizon an exemption from Renton Municipal Code
(RMC) 4-6-090(C) which states that all new electrical or communication facilities shall be required to be
installed underground, pursuant to the standards of the section of RMC.
Verizon proposes to have Mastec overlash fiber for a total of approximately 414 lineal feet to existing
Puget Sound Energy (PSE) poles along NE 48th St within the City. See the enclosed Site Plan showing the
proposed overlashing limits and provided photos of aerial path.
ANALYSIS: The proposal would utilize existing poles and attach to the existing aerial path. Ordinance
5845 grants MCImetro Access Transmission Services Corp., the right to construct, remove, replace, repair,
and/or restore any Facility, and may include, but are not limited to, digging and/or excavating to construct,
remove, replace, repair, and restore pipeline(s) and/or Facilities with the Franchise area.
The proposal would utilize existing poles and attach to the existing communication aerial paths. As
minimum vertical height clearance of 15’-6” would need to be provided for, and any existing obsolete
cable would need to be removed. Staff recommends these as conditions of approval. Therefore, the city
is granting an exemption with conditions, Per RMC 4-6-090(D)(h)(ii) which states when there are existing
overhead electrical or communication facilities that will not be removed (such as high tension wires), the
electrical and communication facilities to be removed by undergrounding are parallel to facilities that will
not be removed.
DECISION: The requested exemption from underground utility installation requirements RMC4-6-090 in
accordance with RMC 4-6-090(D)(h)(ii), exemption due to other existing overhead electrical or
communication facilities that will not be removed (high tension wires), as requested by the applicant is
approved with conditions subject to the conditions below.
Verizon Job 1801BFZY.7_ROWI_REN_2829
Page 2 of 2
May 17, 2022
Conditions of Approval:
1. Any existing height violations within the Project Reach must be resolved at the time of
construction. New aerial lines within the Project Reach must have a minimum vertical clearance
of 15’-6”.
2. Any abandoned or unused lines within the Project Reach must be removed at the time that
construction is taking place.
3. A traffic control plan must be separately submitted to the City, and no construction may take
place until the City has approved a traffic control plan.
4. The new aerial fiber lines within the Project Reach must be converted to underground facilities in
the future, at the Applicant’s cost, when any one of the following events occurs: (1) any other
utilities are undergrounded within the Project Reach, (2) a joint use trench is proposed by a
franchisee within the Project Reach, in which case the Applicant shall participate in the joint use
trench installation for the purpose of undergrounding its aerial lines, or (3) a conduit is made
available within the Project Reach that will accommodate the aerial lines. The new aerial lines
must be undergrounded within one year, or approved otherwise by the City of Renton Community
and Economic Development Administrator or designee, from the first event triggering the
requirement to underground the aerial lines.
This decision to approve the exemption with conditions is subject to a fourteen (14) day appeal period
from the date of this letter per RMC 4-8-110. Any appeals of the administrative decision must be filed
with the City Clerk, along with the required appeal fee, by 5:00 pm, May 31, 2022. Due to the ongoing
state of emergency enacted by Governor’s Proclamation 20-05, the City Clerk’s Office is working remotely.
For that reason, appeals must be submitted electronically to the City Clerk at cityclerk@rentonwa.gov or
delivered to City Hall 1st floor Lobby Hub only on Tuesdays and/or Wednesdays. The appeal fee, normally
due at the time an appeal is submitted, will be collected at a future date if your appeal is submitted
electronically. Appeals to the Hearing Examiner are governed by RMC 4-8-110 and additional information
regarding the appeal process may be obtained from the City Clerk’s Office, cityclerk@rentonwa.gov.
Sincerely,
Brianne Bannwarth, PE
Development Engineering Director
cc: C.E. “Chip” Vincent, CED Administrator
Vanessa Dolbee, Planning Director
Justin Johnson, Construction Manager
Scott Warlick, Engineering Specialist III
Holly Powers, Permit Technician
Franchise Permits
Enclosures: Site Plan
Photos Aerial Path
CAPITAL PROJECT #: 072443-001(KENNYDALE CRAN) ROWI RENTONMCI PERMIT NUMBER: 1801BFZY.7_ROWI_REN_2829PROJECT STATUS: PERMITTINGSTATUS DATE: 09/02/2019MCImetroACCESS TRANSMISSION SERVICES CORPOUTSIDE PLANT CONSTRUCTIONPOLE ATTACHMENTSITE CODE: 1801BFZY.7ENGINEERING SERVICESRENTON, WASHINGTONMAKE READY ENGINEERINGPlease note that all pages that containthe name MCImetro AccessTransmissions Services, Corp., it isunderstood that MCI has gone through aname change to be as follows: MCImetroAccess Transmission Services, LLC.MFP22001143
C-01
S
T.24N R.05E
33 NW S
T.24N R.05E
33
S
T.24N R.05E
32 NW S
T.24N R.05E
32 NE
S
T.24N R.05E
31 NE
S
T.24N R.05E
30 SE
S
T.24N R.05E
30 NE
S
T.24N R.05E
29 SW S
T.24N R.05E
29 SE
S
T.24N R.05E
29 NW S
T.24N R.05E
29 NE
S
T.24N R.05E
28 SW S
T.24N R.05E
S
T.24N R.05E
28 NW T.24N R.05E
09/02/2019
C-00
PROJECT LOCATION:
PERMITTING ENTITY:
PROJECT ID NUMBER:OUTSIDE PLANT CONSTRUCTIONSHEET:
VERTICAL:
HORIZONTAL:
DRAWN BY:
ENGINEER:
DATE:
EXCEPT AS MAY BE OTHERWISE PROVIDED BY CONTRACT,
THESE DRAWINGS AND SPECIFICATIONS SHALL REMAIN THE
PROPERTY OF MCI COMMUNICATIONS SERVICES, INC.. BOTH
BEING ISSUED IN STRICT CONFIDENCE AND SHALL NOT BEREPRODUCED, COPIED, OR USED FOR ANY PURPOSE
WITHOUT SPECIFIC WRITTEN PERMISSION.
SCALE
REVISIONS
PROJECT:
RENTON
N/A
F. Colon
S. Dickson
DATE DESCRIPTION INITIALKENNYDALE CRANAERIAL INSTALLATION
RENTON, WA
1801BFZY.7_ROWI_REN_2829
N/A
MFP22001143
414 ft.
POLE PROPOSED IN
SEPARATE PACKAGE
POLE FOR EVALUATION
SEPARATE PACKAGE
STRAND PROPOSED IN
SEPARATE PACKAGE
ANCHOR PROPOSED IN
PROPOSED ANCHOR
PARCELS
LEGEND:
PROPOSED STRAND
EDGE OF PAVEMENT (EOP)
RIGHT OF WAY (ROW)
09/02/2019
C-01
PROJECT LOCATION:
PERMITTING ENTITY:
PROJECT ID NUMBER:OUTSIDE PLANT CONSTRUCTIONSHEET:
VERTICAL:
HORIZONTAL:
DRAWN BY:
ENGINEER:
DATE:
EXCEPT AS MAY BE OTHERWISE PROVIDED BY CONTRACT,
THESE DRAWINGS AND SPECIFICATIONS SHALL REMAIN THE
PROPERTY OF MCI COMMUNICATIONS SERVICES, INC.. BOTH
BEING ISSUED IN STRICT CONFIDENCE AND SHALL NOT BEREPRODUCED, COPIED, OR USED FOR ANY PURPOSE
WITHOUT SPECIFIC WRITTEN PERMISSION.
SCALE
REVISIONS
PROJECT:
NORTH
RENTON
N/A
F. Colon
S. Dickson
DATE DESCRIPTION INITIALKENNYDALE CRANAERIAL INSTALLATION
RENTON, WA
1801BFZY.7_ROWI_REN_2829
1" = 100'
C-01
MFP22001143
DEPARTMENT OF COMMUNITY
AND ECONOMIC DEVELOPMENT
Conditions for Permit MFP22001143
Engineering
1 A traffic control plan must be separately submitted to the City, and no construction may take place until the City
has approved a traffic control plan.
2 Any abandoned or unused lines within the Project Reach must be removed at the time that construction is taking
place.
3 The new aerial fiber lines within the Project Reach must be converted to underground facilities in the future, at the
Applicant’s cost, when any one of the following events occurs: (1) any other utilities are undergrounded within the
Project Reach, (2) a joint use trench is proposed by a franchisee within the Project Reach, in which case the
Applicant shall participate in the joint use trench installation for the purpose of undergrounding its aerial lines, or
(3) a conduit is made available within the Project Reach that will accommodate the aerial lines. The new aerial
lines must be undergrounded within one year, or approved otherwise by the City of Renton Community and
Economic Development Administrator or designee, from the first event triggering the requirement to underground
the aerial lines.
4 Any existing height violations within the Project Reach must be resolved at the time of construction. New aerial
lines within the Project Reach must have a minimum vertical clearance of 15'-6".
Page 1 of 1