Loading...
HomeMy WebLinkAboutCM_Construction_Mitigation_Description_220210_v1Preliminary Plat Application Page 1 of 1 Wang Short Plat 19016 116th AVE SE Renton, WA 98007 Construction Mitigation Description Proposed Construction Dates The previous preliminary plat approval has expired (LUA18-000280) while this project was in construction. The Grading and road construction were started upon approval of previously approved construction plans in the fall of 2018. Hours of Operation for Single Family Construction Site Per City of Renton: Monday – Friday: 7am – 8pm Saturday: 9am – 8pm Sunday: None Proposed Hauling/Transportation Routes All equipment materials and laborers will enter the site off N 116th Ave SE. A detailed haul route will be provided by the contractor selected to construct the improvements. It is anticipated that the haul route would be via HWY 167 to Exit S 180th St and SW 43rd St. From here vehicles will head east from the off ramp. Heading east on S 43rd St the roadway turns into SE Carr RD. Vehicles would then right on HWY 515, then left on SE 192nd St, and then left on 116th Ave SE. Measures to be implemented to minimize dust, traffic and transportation impacts, mud, noise, and other noxious characteristics Dust: Best management practices will be used to minimize dust on the construction site. Water trucks or metered fire hoses will be used as needed to wet down the areas used by construction equipment. Disturbed slopes will be hydroseeded per the Erosion/Sedimentation Control Plan to control dust. Traffic: During road and building construction, the traffic entering and leaving the site will consist of subcontractors and deliveries. When arriving for work, the subcontractors will be travelling opposite the majority of traffic entering the residential areas as most commuters are leaving, and materials are primarily delivered at off peak hours during the day. None of these operations are anticipated to have a significant impact on the peak or non-peak hour traffic in the area. The anticipated hauling and transportation route avoids passing in front of Benson Hill Elementary School. Any special hours proposed for construction or hauling There are no special hours proposed for construction or hauling without prior approval from the City of Renton. Preliminary Traffic Control Plan General access to the property will be from 116th Ave SE. It is anticipated that the existing roadway will remain open during construction and access to the properties along 116th Ave SE will be maintained. Traffic Control is anticipated to consist of occasional single lane closures along 116th Ave SE. A standard one-lane, two-way traffic control with flaggers may be used similar to WSDOT Plan TC1.