Minor Franchise Permit: MFP22002432
IVR Number: 22002432
Permit Information
Permit Name: Comcast Cable Franchise Permit JB0000584661
Address/Location:05/09/2022Application Date:1923059043Parcel Number: 401 S GRADY WAY
Permit Type:05/23/2022Issue Date:Franchise
Permit Work Class:05/23/2023Expiration Date:Minor Utility
Job Number: 584661Franchise Type:Cable
Description: Comcast JB0000584661 TIE INTO EXISTING COAX WITH HARDLINE. PROOF & PULL (1) HARDLINE COAX
THROUGH EXISTING CONDUIT.
Contacts
Name Address PhoneTypeBilling
Annie Robertson
Cannon Construction LLC
406 Porter Way
Milton, WA 98354
ApplicantX
Sandra Castro
Comcast
C: (209) 561-4786Contact
Michael Cannon
Cannon Constructors Inc
406 Porter Way
Milton, WA 98354
B: (253) 922-2787Contractor
Business License Number: 41539Construction Contractor: CANNOCL791JK
CITY OF RENTON ROW 1055 S Grady Way
Renton, WA 98057-3232
Owner
Laurie Dietz
Comcast - Billing
1701 John F. Kennedy Blvd.
Philadelphia, PA 19103
H: (425) 741-5733Specialized
Billing
General Conditions & Signature
Permission is hereby given for the work described on this permit according to the conditions hereon and according to the
approved plans and specifications pertaining thereto, subject to compliance with the Ordinance of the City of Renton.
Ÿ
This permit and plans must be posted at the job site at all times.Ÿ
I hereby certify that no work is to be done except as described above and in approved plans, and that work is to conform to
Renton Trench Restoration and Street Overlay Requirements.
Ÿ
Call 425.430.7203 or go to: https://permitting.rentonwa.gov one working day in advance to schedule an inspections and for ANY
work in the Right of Way.
Ÿ
Call 8 1 1 to locate underground utilities at least two full business days prior to any excavation.Ÿ
In accordance with RCW 19.122.033(4) the permit holder is required to contact (Williams Northwest Pipeline at 425.868.1010)
(Olympic Pipeline at 206.510.0575) (Puget Sound Energy at 425.375.3397) to request a consultation with the transmission
pipeline company prior to performing any construction or excavation activities. This requirement to consult with the
transmission pipeline company is in addition to the requirement to Call before You Dig as required in RCW 19.122.
Ÿ
(Date)(Signature)
Page 1 of 1THIS PERMIT AND PLANS MUST BE POSTED AT THE JOB SITE AT ALL TIMES
DEPARTMENT OF COMMUNITY
AND ECONOMIC DEVELOPMENT
Page 1 of 1 | Published: 1/2/2019
Planning Division | 1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425-430-7200
Email: franchisepermits@rentonwa.gov Website: rentonwa.gov
FRANCHISE PERMIT APPLICATION
Published: 1/2/2019
TO THE APPLICANT: Submit an electronic copy of the plans with the Franchise Permit Application and the Site
Specific Traffic Control Application to franchisepermits@rentonwa.gov. Permit cost is $630.00. Inspection fee
for trenching more than 60 lineal feet or installation of 6 or more poles will be billed at $60.00 per hour.
Franchise Agency:
Franchise Job Number: Phone:
Contact Name: Email:
Job Site Address: Project Name:
Description of Work:
Please check all that apply:
☐ New Construction ☐ Repair/Relocate ☐ Underground ☐ Overhead ☐ Sidewalk ☐ Street
☐ Open Trench ☐ Bore # of feet:
Contractor Name: Phone:
State Contractors License #: City of Renton Business License #:
“I certify that I am the owner or applicant’s authorized agent and do hereby agree to abide to the terms and conditions set forth
under this permit and shall comply with the City of Renton’s Trench Restoration and Street Overlay Requirements. ”
Signature Date
INSPECTIONS SHALL BE REQUESTED 24 HOURS PRIOR TO COMMENCEMENT OF ALL WORK BY CALLING THE
INSPECTION LINE AT 425-430-7203 OR BY GOING TO MYBUILDINGPERMIT.COM
Jobs are required to be called in for job start, re-inspection and project final. Re-inspection fees are billed at
$125/hour. All Pre-Construction meetings shall be scheduled at a maximum of 14 days prior to the job start date.
Plan Review/Development Engineering Date Approved as submitted
Pre-Construction Meeting required
Site Construction Inspector Date Approved with comments or redlines
Camera inspection of utilities required
Development Engineering Manager Date
Note: The Applicant is responsible for compliance with all codes and regulations, whether or not described in this document.
DEPARTMENT OF PUBLIC WORKS
Page 1 of 3 | Published: 10/27/2021
Transportation Division | 1055 South Grady Way, 5th Floor | Renton, WA 98057 | 425-430-7380
Website: rentonwa.gov
TRAFFIC CONTROL PLAN APPLICATION
Published: 10/27/2021
TRAFFIC CONTROL PLAN (TCP) MUST BE SUBMITTED TO PUBLIC WORKS TRANSPORTATION DIVISION
FOR REVIEW/APPROVAL AT LEAST FIVE (5) WORKING DAYS BEFORE THE DATE OF WORK.
The City of Renton requires any contractor, firm, corporation, or other public/private agency to prepare a traffic control
plan (TCP) and obtain city's approval of that plan when construction, repair, or maintenance work is to be conducted
within the city's right-of-way.
1. Fill out the Traffic Control Plan (TCP) Application form and prepare required submittal documents.
2. The following items are all required for submittal of the TCP Application:
☐ Electronic Copy of the TCP Application
☐ Electronic Copy of the TCP Layout, on 11” X 17” paper size format, which shall:
Include map(s) showing the location of the project and work area.
Be legible lettering and clear, contrasting, symbols of viewing or printing.
Must indicate street names, and north arrow and scale.
Types of plans required:
o Work hour plan – show all mobility impacts during construction hours.
o Non-work plan - show all mobility impacts after work hours when limited or no work is
happening in the right-of-way (ROW), if applicable.
o Changing construction phases – show construction sequence and each construction phase
change even if the traffic control is not modified, if applicable.
o Pedestrian access/detour plan, if applicable.
- Shall conform to the Washington State Traffic Control Flagger Certification handbook, by the
Evergreen Safety Council.
3. Submit Application via email to TCP@rentonwa.gov with the subject line “TCP Application – [Project Name].”
Project Name: Permit #:
Site Address:
Work Date: From _____________ To _____________ Work Time: Start ______________ End ______________
Construction Company:
Contact Name: Phone/Cell: _________________________
Business Address: City/State: Zip:
Description of Work:
Approval By: _________________________________________________ Date:____________________
Transportation Engineering
Note: The Applicant is responsible for compliance with all codes and regulations, whether or not described in this document.
Page 2 of 3 | Published: 10/27/2021
PERMIT HOLDER AGREES TO ALL THE FOLLOWING:
Must have approved Traffic Control Plan (TCP) prior to commencing the work.
Maintain existing pedestrian access. The work on pedestrian facilities, shall be limited to one corner at a time,
with the least possible inconvenience or delay to pedestrians.
WORK TIME begins when any street or travel lane is fully or partially closed. This includes set up within the
traveled way.
Comply with all traffic regulations of the City of Renton and the State of Washington.
Prepare a traffic control plan and obtain City approval of that plan. That plan shall be implemented for all street
and lane closures, and the plan shall be performed in compliance with the Manual on Uniform Traffic Control
Devices.
Notify emergency services (253-852-2121) twenty-four (24) hours before any street or lane closures.
Contractor or entity must call Renton School District (425-204-4455) or any public/private agency, including public
transit, to be affected by a temporary lane or road closure a minimum of five business days (excluding weekends
and holidays) prior to starting any work.
Contractor or entity must notify King County Metro in writing at construction.coord@kingcounty.gov a minimum
of five business days (excluding weekends and holidays) prior to starting any work impacting bus stops, a
temporary lane or road closure. Work requiring removing a bus shelter or sign requires notification in writing a
minimum of 30 business days (excluding weekends and holidays). Please call King County Metro at 206-477-1140
with any questions.
Any lane or street closures not in conformance with the approved traffic control plan and/or without notification
of emergency services may result in receiving a citation for violation of R.C.W. 47.36.200 Signs or Flaggers at
thoroughfare work sites and R.C.W. 9A.36.050 Reckless Endangerment, and other applicable State and City codes.
Indemnify and hold harmless the City of Renton from any and all claims, actions, and judgments, including all
costs of defense and attorney’s fees incurred in defending against same, arising from and related to
implementation of the approved traffic control plans including claims arising from towing of private vehicles and
the acts of the Permit Holder’s agents and employees.
The City of Renton shall be entitled, in its reasonable discretion, to settle claims prior to suit or judgment, and in
such event shall indemnify and hold harmless the City for any such claims paid, including the City’s reasonable
attorney’s fees and litigation costs incurred resulting from such claim.
In the event any claim or suit is brought against City within the scope of this Agreement, Permit Holder will pay for
legal counsel chosen by the City to defend against same.
Flagger and sign placement are subject to revision by the City Inspector on site, if needed to address traffic or
pedestrian safety or travel.
All permit conditions shall be met.
NOTES:
Total road closure lasting more than twenty-four (24) hours is subject to the approval by the City Council.
Work Zone Traffic Control shall be in accordance with the Manual on Uniform Traffic Control Devices (MUTCD)
and shown by a traffic control plan layout or reference to WSDOT.
Approved Temporary Traffic Control Plan must be at the work site during work hours.
Complete assistance and accommodation shall be provided to all kinds of pedestrian traffic when sidewalk or
walkway is impeded to safely redirect pedestrians around a work zone.
Signage shall be used to warn motorcyclists/bicyclists of the potential hazards on any uneven surfaced or slippery
road conditions during work and non-work hours.
Any vehicle, equipment, barricade, or portable tow-away sign used within the work area must display a company
logo or any legally acceptable sign showing the company name, address, and telephone number at a conspicuous
place on the vehicle or equipment.
Note: The Applicant is responsible for compliance with all codes and regulations, whether or not described in this document.
Page 3 of 3 | Published: 10/27/2021
In the case of Temporary No Parking Zones, all the following apply in addition to previous:
Contractor must complete form to show limits of Temporary No Parking Zone identifying barricade locations for
vacate parking or curb lane usage.
Contractor must post notice of dates and time of Temporary No Parking Zone with at least two signs per block
seventy-two (72) hours in advance of effective date and time.
The cover sheet of this Traffic Control Plan form must be attached to each Temporary No Parking Sign on the
project site.
Temporary traffic control devices must be removed immediately when work is done or no construction activities
are going on. If deemed abandoned, City crews will remove and store them at the City’s maintenance shop (3555
NE 2nd Street).
I certify that the information on this application and within the submittal documents are accurate to the best of my
knowledge and I acknowledge all the requirements on this application.
Applicant’s Signature Date
Applicant’s Name (Print)
EOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOP601
S GRA
D
Y
W
A
YSHATTUCK AVE SROWROWROWROWROWROWROW
ROW
ROW
ROW
ROW
ROW
ROW
ROW
ROW
ROW
ROW
ROW
ROW
ROW
ROW
ROW
ROW
ROW
ROW
ROW ROWROWROWROWROW
ROW
ROW
ROW
ROW
ROW
ROW
ROW
ROW
ROW
ROW
ROW
ROW
ROW
ROW
ROW
ROW
ROW
ROW
ROW
ROW
ROW
ROW
EOP EOPEOPEOPEOPEOPEOPEOP
EOP
EOP
EOP
EOP
EOP
EOP
S GRAD
Y
W
A
Y
SIDEWA
L
K
SIDEWA
L
KSIDEWALKSIDEWALK
SIDEWA
L
K
SIDEWA
L
K
DRIVEWAYDRIVEW
A
Y
WT
W20-1
W4-2R
W20-5R
R2-1
W20-1
SIGN SPACING = X (FEET)
FREEWAYS & EXPRESSWAYS 50/70 MPH 1500' +/-(OR AS PER MUTCO)
RURAL HIGHWAYS 60/65 MPH 800' +/-
RURAL ROADS 45/55 MPH 500' +/-
RURAL ROADS & URBAN ARTERIALS 35/40 MPH 350' +/-
RURAL ROADS & URBAN ARTERIALS
RESIDENTAL & BUSINESS DISTRICTS
URBAN STREETS 25 MPH OR LESS 100' +/-
25/30 MPH 200' +/-
ALL SIGNS ARE 48"x48" BLACK ON ORANGE UNLESS OTHERWISE DESIGNATED
(1) ALL SIGN SPACING MAY BE ADJUSTED TO ACCOMMODATE INTERCHANGE RAMPS, AT GRADE
INTERSECTIONS AND DRIVEWAYS.
(2) THE SPACING MAY BE REDUCED IN URBAN AREAS TO FIT ROADWAY CONDITIONS.
DISCLAIMER
All traffic control setups, sign spacing, and procedures will conform
to the specifications stated in the federal Manual on Uniform Traffic
Control Devices (M.U.T.C.D)
Cities and various municipalities may have also adopted specialized
guidelines for traffic control within their jurisdiction. It is the
responsibility of the on-site traffic control personnel to verify if any
special conditions exist.
TRAFFIC CONTROL ADDITIONAL NOTES
-For aerial work, there will be a moving traffic control setup
-Will coordinate with businesses that will be affected by
construction
-Will have spotter on site to escort pedestrians through
work zone
-All work will stop while pedestrians are escorted through
work zones
-Will have no more than two work areas active at a time
SITE NOTES
-Maintain driveway access at all times
-Place temporary "NO PARKING" signs at least
72 hours prior to work
-Sidewalks to remain open during road work
unless noted otherwiseFLAGGER SPOTTERWT
LEGEND
Work Vehicle Work Area
Flagger Spotter
N
OF
APPROVED BY:
PROJECT CODE:
DRAWN BY:
DATE:
SCALE:PROJECT REVISIONSREVDESCRIPTION OF CHANGEDATEBYQCTCP SMBJB0000584661000
2
1
ZR
WK
5/9/2022
NTSRENTON, WA 98057401 S GRADY WAY DSR - MCDONALDS17-050
10 105 150 205 270 450 500 550 ---
11 115 160 225 295 495 550 605 660 --
12 125 180 245 320 540 600 660 720 780 840
LANEWIDTH 25 30 35 40 45 50 55 60 65 70
MINIMUM TAPER LENGTH IN FEET = L
POSTED SPEED LIMIT (MPH)
SPEED 25 30 35 45 50 55
155 200 250 360 425 495 570
LONGITUDINAL BUFFER SPACE = B
LENGTH
40
305
60 65 70
780 840
THE DESIGNED TRAFFIC CONTROLS CONTAINED WITHIN
THIS TCP WILL NOT BE IMPLEMENTED UNTIL APPROVED
BY THE PUBLIC AUTHORITY HAVING JURISDICTIONCONTROL TYPE:[UNDERGROUND WORK]SINGLE CLOSURE 6-LANE ROADSITE SPECIFIC TRAFFIC CONTROL PLAN
EOPEOPEOPEOPEOPEOPEOP355
ROW
ROW
ROW
ROW
ROW
ROW
ROW
ROW
ROW
ROW
ROW
ROW
ROW
ROW
ROW
ROW
ROW
ROW
ROW
ROW
ROW
ROW
ROW
ROW
ROW
ROW
ROW
ROW
ROW
ROW
ROW
ROW
ROW
ROW
ROW
ROW
ROW
ROW
ROW
ROW
ROW
ROW
ROW
ROW
ROW
ROW
ROW
ROW
ROW
ROW
ROW
EOPEOPEOPEOPEOPEOPEOPEOPEOP
EOPEOPEOPEOPEOPEOPEOP EOP
EOP
EOP
EOP
EOP
EOPEOPEOPS GRADY
W
A
Y
S GRADY
W
A
Y LAKE AVE SDRIVEWAYSIDEWALK
SIDEWALK
SIDEWALK
SIDEWALK
WT
W20-1
W4-2R
W20-5R
W20-1
SIGN SPACING = X (FEET)
FREEWAYS & EXPRESSWAYS 50/70 MPH 1500' +/-(OR AS PER MUTCO)
RURAL HIGHWAYS 60/65 MPH 800' +/-
RURAL ROADS 45/55 MPH 500' +/-
RURAL ROADS & URBAN ARTERIALS 35/40 MPH 350' +/-
RURAL ROADS & URBAN ARTERIALS
RESIDENTAL & BUSINESS DISTRICTS
URBAN STREETS 25 MPH OR LESS 100' +/-
25/30 MPH 200' +/-
ALL SIGNS ARE 48"x48" BLACK ON ORANGE UNLESS OTHERWISE DESIGNATED
(1) ALL SIGN SPACING MAY BE ADJUSTED TO ACCOMMODATE INTERCHANGE RAMPS, AT GRADE
INTERSECTIONS AND DRIVEWAYS.
(2) THE SPACING MAY BE REDUCED IN URBAN AREAS TO FIT ROADWAY CONDITIONS.
DISCLAIMER
All traffic control setups, sign spacing, and procedures will conform
to the specifications stated in the federal Manual on Uniform Traffic
Control Devices (M.U.T.C.D)
Cities and various municipalities may have also adopted specialized
guidelines for traffic control within their jurisdiction. It is the
responsibility of the on-site traffic control personnel to verify if any
special conditions exist.
TRAFFIC CONTROL ADDITIONAL NOTES
-For aerial work, there will be a moving traffic control setup
-Will coordinate with businesses that will be affected by
construction
-Will have spotter on site to escort pedestrians through
work zone
-All work will stop while pedestrians are escorted through
work zones
-Will have no more than two work areas active at a time
SITE NOTES
-Maintain driveway access at all times
-Place temporary "NO PARKING" signs at least
72 hours prior to work
-Sidewalks to remain open during road work
unless noted otherwiseFLAGGER SPOTTERWT
LEGEND
Work Vehicle Work Area
Flagger Spotter
N
OF
APPROVED BY:
PROJECT CODE:
DRAWN BY:
DATE:
SCALE:PROJECT REVISIONSREVDESCRIPTION OF CHANGEDATEBYQCTCP SMBJB0000584661000
2
2
ZR
WK
5/9/2022
NTSRENTON, WA 98057401 S GRADY WAY DSR - MCDONALDS17-050
10 105 150 205 270 450 500 550 ---
11 115 160 225 295 495 550 605 660 --
12 125 180 245 320 540 600 660 720 780 840
LANEWIDTH 25 30 35 40 45 50 55 60 65 70
MINIMUM TAPER LENGTH IN FEET = L
POSTED SPEED LIMIT (MPH)
SPEED 25 30 35 45 50 55
155 200 250 360 425 495 570
LONGITUDINAL BUFFER SPACE = B
LENGTH
40
305
60 65 70
780 840
THE DESIGNED TRAFFIC CONTROLS CONTAINED WITHIN
THIS TCP WILL NOT BE IMPLEMENTED UNTIL APPROVED
BY THE PUBLIC AUTHORITY HAVING JURISDICTIONCONTROL TYPE:[UNDERGROUND WORK]SINGLE CLOSURE 6-LANE ROADSITE SPECIFIC TRAFFIC CONTROL PLAN
R2-1
SHEET INDEX:
1 - COVER SHEET
2 -LEGEND
3 -GENERAL NOTES
4-5 -DESIGN
THIS IS PROPRIETARY INFORMATION AND NOT MEANT FOR GENERAL PUBLICATION. ALL RIGHTS RESERVED BY CANNON COMPANIES
HARDLINE COAX: 520 FT + 20% STORAGE = 624 FT
CONTACTS:
PROJECT MAP:
*ALL FOOTAGES AND MATERIALS ARE ESTIMATED
N
SCOPE OF WORK:
- TIE INTO EXISTING COAX WITH HARDLINE
- PROOF & PULL (1) HARDLINE COAX THROUGH EXISTING CONDUIT
BILL OF MATERIALS*:
NEW AERIAL =
OVERLASH =
NEW UNDERGROUND =
EXISTING UNDERGROUND =
RISER (0)=
TOTAL ROW FOOTAGE =
0 FT.
0 FT.
0 FT.
520 FT.
0 FT.
0 FT.
CANNON COMPANIES
SAFETY | QUALITY | INTEGRITY | TEAMWORK
Connecting The Future Since 1985
COMCAST
401 S GRADY WAY
RENTON, WA 98057DSR - MCDONALDS
JB0000584661
SMB
CANNON COMPANIES
Zack Rollins - (253)-922-2787 - zrollins@teamcannon.com
ROW FOOTAGES*:
NEW BUILDING PATHWAY =
EXISTING BUILDING PATHWAY =
NEW UNDERGROUND =
EXISTING UNDERGROUND =
TOTAL SITE FOOTAGE =
0 FT.
0 FT.
0 FT.
0 FT.
0 FT.
SITE FOOTAGES*:
TOTAL PROJECT FOOTAGE =520 FT.
POLE INFORMATION:
POLE COUNT =
POLES THAT NEED PERMIT =
POLES THAT NEED MAKE READY =
TRANSMISSION = 0
DISTRIBUTION = 0
0
0
0
5 4
520
OFAPPROVED BY:PROJECT CODE:DRAWN BY:DATE:SCALE:PROJECT REVISIONS
REV DESCRIPTION OF CHANGEDATE BY QC JB0000584661
DSR MCDONALDS
401 S GRADY WAY
RENTON, WA 98057
SMB17-0505/9/2022WKZRNTS00025LEGENDEDGE OF PAVEMENTFOGLINEPOWERCOMMUNICATIONSEWERDRAINDRAINAGE DITCHGASWATERTRAFFIC SIGNALTELCOMSTEAMUNKNOWN UTILITYRIGHT OF WAYTRAFFIC CONESPROPOSED NEW BORESTRAW WATTLESPLTCWRUTILITY POLEVAULT - SMALLPEDESTALSTREET LIGHTCROSSWALK LIGHTUTILITY RISERVVAULT - SMALL444LA MANHOLEVAULT - 25TACATCH BASINCATCH BASIN WITH SOCKGLULAM UTILITY POLECENTER LINELANE LINEFENCEHIGH VISIBILITY FENCE SSEWER MANHOLEDDRAIN MANHOLEWWATER MANHOLEVUTILITY VALVESHRUBBERYBORE PITVAULT - LARGEVAULT - 25TACCOMMUNICATION MANHOLEFIRE HYDRANTDISTANCE STATIONSTA 0+00CONSTRUCTION NOTE CALLOUT#X.XDISTANCE DIMENSIONASPHALT SURFACECONCRETE ROADWAY PANELHFH-FRAMEVAULT - LARGECABCABINETLEGENDLANE DIRECTION INDICATORPROPOSEDMARK-UP NOTATIONSRESTORATION TYPESEXISTING FEATURESLINE TYPESA7LANDSCAPECROSS SECTION SYMBOLCROSS SECTION IDCROSS SECTION PAGEFLFLPPTSTSCCDDDDDDDDDDDDGGWWTTSTSTROWROWSUKCBCBPPVVVVVVPROPOSED WORK1LOCATIONPHOTO NOTE CALLOUT#PHOTO LOCATOR SYMBOLPROPOSED NEW TRENCHEXISTING UNDERGROUND PATHWAYPROPOSED NEW AERIAL STRANDEXISTING AERIAL PATHWAYEXISTING SPLICE CASEPROPOSED SPLICE CASEEXISTING FIBER/COAX STORAGEPROPOSED FIBER/COAX STORAGETREEEOPVVAULT - SMALL444LA MANHOLEVAULT - 25TAVAULT - LARGEEXISTING - CONTINUED233LA MANHOLE233LA MANHOLE
OFAPPROVED BY:PROJECT CODE:DRAWN BY:DATE:SCALE:PROJECT REVISIONS
REV DESCRIPTION OF CHANGEDATE BY QC JB0000584661
DSR MCDONALDS
401 S GRADY WAY
RENTON, WA 98057
SMB17-0505/9/2022WKZRNTS00035GENERAL NOTES
EOPEOPEOPEOPEOP EOP EOP601401S GRADY WAYSHATTUCK AVE SROWROWROWROWROWROWROWROWROWROWROWROWROWROWROWROWROWROWROWROWROWROWROWROWROWROWROWROWROWROWROWEOP EOP EOPEOPEOPEOPEOPS GRADY WAYVMATCH LINE SEE SHEET 5
21CONSTRUCTION NOTES:TIE INTO EXISTING COAX WITH HARDLINEPROOF & PULL (1) HARDLINE COAX THROUGHEXISTING CONDUIT1520'2SIDEWALK
SIDEWALK SIDEWALKSIDEWALKSIDEWALK SIDEWALKDRIVEWAYDRIVEWAY
OFAPPROVED BY:PROJECT CODE:DRAWN BY:DATE:SCALE:PROJECT REVISIONS
REV DESCRIPTION OF CHANGEDATE BY QC JB0000584661
DSR MCDONALDS
401 S GRADY WAY
RENTON, WA 98057
SMB17-0505/9/2022WKZR1" = 30'015'30'45DESIGNN
EOPEOPEOPEOP375ROWROWROWROWROWROWROWROWROWROWROWROWROWROWROWROWROWROWROWROWROWROWROWROWROWROWROWROWROWROWEOP EOPEOPEOPEOPEOPEOPEOP S GRADY WAYLAKE AVE SDRIVEWAY
SIDEWALK
V1CONSTRUCTION NOTES:PROOF & PULL (1) HARDLINE COAX THROUGHEXISTING CONDUITMATCH LINESEE SHEET 4520'1SIDEWALK
OFAPPROVED BY:PROJECT CODE:DRAWN BY:DATE:SCALE:PROJECT REVISIONS
REV DESCRIPTION OF CHANGEDATE BY QC JB0000584661
DSR MCDONALDS
401 S GRADY WAY
RENTON, WA 98057
SMB17-0505/9/2022WKZR1" = 30'015'30'55DESIGNN