Loading...
HomeMy WebLinkAboutMFP22002432.pdfDEPARTMENT OF COMMUNITY AND ECONOMIC DEVELOPMENT Minor Franchise Permit: MFP22002432 IVR Number: 22002432 Permit Information Permit Name: Comcast Cable Franchise Permit JB0000584661 Address/Location:05/09/2022Application Date:1923059043Parcel Number: 401 S GRADY WAY Permit Type:05/23/2022Issue Date:Franchise Permit Work Class:05/23/2023Expiration Date:Minor Utility Job Number: 584661Franchise Type:Cable Description: Comcast JB0000584661 TIE INTO EXISTING COAX WITH HARDLINE. PROOF & PULL (1) HARDLINE COAX THROUGH EXISTING CONDUIT. Contacts Name Address PhoneTypeBilling Annie Robertson Cannon Construction LLC 406 Porter Way Milton, WA 98354 ApplicantX Sandra Castro Comcast C: (209) 561-4786Contact Michael Cannon Cannon Constructors Inc 406 Porter Way Milton, WA 98354 B: (253) 922-2787Contractor Business License Number: 41539Construction Contractor: CANNOCL791JK CITY OF RENTON ROW 1055 S Grady Way Renton, WA 98057-3232 Owner Laurie Dietz Comcast - Billing 1701 John F. Kennedy Blvd. Philadelphia, PA 19103 H: (425) 741-5733Specialized Billing General Conditions & Signature Permission is hereby given for the work described on this permit according to the conditions hereon and according to the approved plans and specifications pertaining thereto, subject to compliance with the Ordinance of the City of Renton. Ÿ This permit and plans must be posted at the job site at all times.Ÿ I hereby certify that no work is to be done except as described above and in approved plans, and that work is to conform to Renton Trench Restoration and Street Overlay Requirements. Ÿ Call 425.430.7203 or go to: https://permitting.rentonwa.gov one working day in advance to schedule an inspections and for ANY work in the Right of Way. Ÿ Call 8 1 1 to locate underground utilities at least two full business days prior to any excavation.Ÿ In accordance with RCW 19.122.033(4) the permit holder is required to contact (Williams Northwest Pipeline at 425.868.1010) (Olympic Pipeline at 206.510.0575) (Puget Sound Energy at 425.375.3397) to request a consultation with the transmission pipeline company prior to performing any construction or excavation activities. This requirement to consult with the transmission pipeline company is in addition to the requirement to Call before You Dig as required in RCW 19.122. Ÿ (Date)(Signature) Page 1 of 1THIS PERMIT AND PLANS MUST BE POSTED AT THE JOB SITE AT ALL TIMES DEPARTMENT OF COMMUNITY AND ECONOMIC DEVELOPMENT Page 1 of 1 | Published: 1/2/2019 Planning Division | 1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425-430-7200 Email: franchisepermits@rentonwa.gov Website: rentonwa.gov FRANCHISE PERMIT APPLICATION Published: 1/2/2019 TO THE APPLICANT: Submit an electronic copy of the plans with the Franchise Permit Application and the Site Specific Traffic Control Application to franchisepermits@rentonwa.gov. Permit cost is $630.00. Inspection fee for trenching more than 60 lineal feet or installation of 6 or more poles will be billed at $60.00 per hour. Franchise Agency: Franchise Job Number: Phone: Contact Name: Email: Job Site Address: Project Name: Description of Work: Please check all that apply: ☐ New Construction ☐ Repair/Relocate ☐ Underground ☐ Overhead ☐ Sidewalk ☐ Street ☐ Open Trench ☐ Bore # of feet: Contractor Name: Phone: State Contractors License #: City of Renton Business License #: “I certify that I am the owner or applicant’s authorized agent and do hereby agree to abide to the terms and conditions set forth under this permit and shall comply with the City of Renton’s Trench Restoration and Street Overlay Requirements. ” Signature Date INSPECTIONS SHALL BE REQUESTED 24 HOURS PRIOR TO COMMENCEMENT OF ALL WORK BY CALLING THE INSPECTION LINE AT 425-430-7203 OR BY GOING TO MYBUILDINGPERMIT.COM Jobs are required to be called in for job start, re-inspection and project final. Re-inspection fees are billed at $125/hour. All Pre-Construction meetings shall be scheduled at a maximum of 14 days prior to the job start date. Plan Review/Development Engineering Date Approved as submitted Pre-Construction Meeting required Site Construction Inspector Date Approved with comments or redlines Camera inspection of utilities required Development Engineering Manager Date Note: The Applicant is responsible for compliance with all codes and regulations, whether or not described in this document. DEPARTMENT OF PUBLIC WORKS Page 1 of 3 | Published: 10/27/2021 Transportation Division | 1055 South Grady Way, 5th Floor | Renton, WA 98057 | 425-430-7380 Website: rentonwa.gov TRAFFIC CONTROL PLAN APPLICATION Published: 10/27/2021 TRAFFIC CONTROL PLAN (TCP) MUST BE SUBMITTED TO PUBLIC WORKS TRANSPORTATION DIVISION FOR REVIEW/APPROVAL AT LEAST FIVE (5) WORKING DAYS BEFORE THE DATE OF WORK. The City of Renton requires any contractor, firm, corporation, or other public/private agency to prepare a traffic control plan (TCP) and obtain city's approval of that plan when construction, repair, or maintenance work is to be conducted within the city's right-of-way. 1. Fill out the Traffic Control Plan (TCP) Application form and prepare required submittal documents. 2. The following items are all required for submittal of the TCP Application: ☐ Electronic Copy of the TCP Application ☐ Electronic Copy of the TCP Layout, on 11” X 17” paper size format, which shall:  Include map(s) showing the location of the project and work area.  Be legible lettering and clear, contrasting, symbols of viewing or printing.  Must indicate street names, and north arrow and scale.  Types of plans required: o Work hour plan – show all mobility impacts during construction hours. o Non-work plan - show all mobility impacts after work hours when limited or no work is happening in the right-of-way (ROW), if applicable. o Changing construction phases – show construction sequence and each construction phase change even if the traffic control is not modified, if applicable. o Pedestrian access/detour plan, if applicable. - Shall conform to the Washington State Traffic Control Flagger Certification handbook, by the Evergreen Safety Council. 3. Submit Application via email to TCP@rentonwa.gov with the subject line “TCP Application – [Project Name].” Project Name: Permit #: Site Address: Work Date: From _____________ To _____________ Work Time: Start ______________ End ______________ Construction Company: Contact Name: Phone/Cell: _________________________ Business Address: City/State: Zip: Description of Work: Approval By: _________________________________________________ Date:____________________ Transportation Engineering Note: The Applicant is responsible for compliance with all codes and regulations, whether or not described in this document. Page 2 of 3 | Published: 10/27/2021 PERMIT HOLDER AGREES TO ALL THE FOLLOWING:  Must have approved Traffic Control Plan (TCP) prior to commencing the work.  Maintain existing pedestrian access. The work on pedestrian facilities, shall be limited to one corner at a time, with the least possible inconvenience or delay to pedestrians.  WORK TIME begins when any street or travel lane is fully or partially closed. This includes set up within the traveled way.  Comply with all traffic regulations of the City of Renton and the State of Washington.  Prepare a traffic control plan and obtain City approval of that plan. That plan shall be implemented for all street and lane closures, and the plan shall be performed in compliance with the Manual on Uniform Traffic Control Devices.  Notify emergency services (253-852-2121) twenty-four (24) hours before any street or lane closures.  Contractor or entity must call Renton School District (425-204-4455) or any public/private agency, including public transit, to be affected by a temporary lane or road closure a minimum of five business days (excluding weekends and holidays) prior to starting any work.  Contractor or entity must notify King County Metro in writing at construction.coord@kingcounty.gov a minimum of five business days (excluding weekends and holidays) prior to starting any work impacting bus stops, a temporary lane or road closure. Work requiring removing a bus shelter or sign requires notification in writing a minimum of 30 business days (excluding weekends and holidays). Please call King County Metro at 206-477-1140 with any questions.  Any lane or street closures not in conformance with the approved traffic control plan and/or without notification of emergency services may result in receiving a citation for violation of R.C.W. 47.36.200 Signs or Flaggers at thoroughfare work sites and R.C.W. 9A.36.050 Reckless Endangerment, and other applicable State and City codes.  Indemnify and hold harmless the City of Renton from any and all claims, actions, and judgments, including all costs of defense and attorney’s fees incurred in defending against same, arising from and related to implementation of the approved traffic control plans including claims arising from towing of private vehicles and the acts of the Permit Holder’s agents and employees.  The City of Renton shall be entitled, in its reasonable discretion, to settle claims prior to suit or judgment, and in such event shall indemnify and hold harmless the City for any such claims paid, including the City’s reasonable attorney’s fees and litigation costs incurred resulting from such claim.  In the event any claim or suit is brought against City within the scope of this Agreement, Permit Holder will pay for legal counsel chosen by the City to defend against same.  Flagger and sign placement are subject to revision by the City Inspector on site, if needed to address traffic or pedestrian safety or travel.  All permit conditions shall be met. NOTES:  Total road closure lasting more than twenty-four (24) hours is subject to the approval by the City Council.  Work Zone Traffic Control shall be in accordance with the Manual on Uniform Traffic Control Devices (MUTCD) and shown by a traffic control plan layout or reference to WSDOT.  Approved Temporary Traffic Control Plan must be at the work site during work hours.  Complete assistance and accommodation shall be provided to all kinds of pedestrian traffic when sidewalk or walkway is impeded to safely redirect pedestrians around a work zone.  Signage shall be used to warn motorcyclists/bicyclists of the potential hazards on any uneven surfaced or slippery road conditions during work and non-work hours.  Any vehicle, equipment, barricade, or portable tow-away sign used within the work area must display a company logo or any legally acceptable sign showing the company name, address, and telephone number at a conspicuous place on the vehicle or equipment. Note: The Applicant is responsible for compliance with all codes and regulations, whether or not described in this document. Page 3 of 3 | Published: 10/27/2021  In the case of Temporary No Parking Zones, all the following apply in addition to previous:  Contractor must complete form to show limits of Temporary No Parking Zone identifying barricade locations for vacate parking or curb lane usage.  Contractor must post notice of dates and time of Temporary No Parking Zone with at least two signs per block seventy-two (72) hours in advance of effective date and time.  The cover sheet of this Traffic Control Plan form must be attached to each Temporary No Parking Sign on the project site.  Temporary traffic control devices must be removed immediately when work is done or no construction activities are going on. If deemed abandoned, City crews will remove and store them at the City’s maintenance shop (3555 NE 2nd Street). I certify that the information on this application and within the submittal documents are accurate to the best of my knowledge and I acknowledge all the requirements on this application. Applicant’s Signature Date Applicant’s Name (Print) EOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOP601 S GRA D Y W A YSHATTUCK AVE SROWROWROWROWROWROWROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROWROWROWROWROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW EOP EOPEOPEOPEOPEOPEOPEOP EOP EOP EOP EOP EOP EOP S GRAD Y W A Y SIDEWA L K SIDEWA L KSIDEWALKSIDEWALK SIDEWA L K SIDEWA L K DRIVEWAYDRIVEW A Y WT W20-1 W4-2R W20-5R R2-1 W20-1 SIGN SPACING = X (FEET) FREEWAYS & EXPRESSWAYS 50/70 MPH 1500' +/-(OR AS PER MUTCO) RURAL HIGHWAYS 60/65 MPH 800' +/- RURAL ROADS 45/55 MPH 500' +/- RURAL ROADS & URBAN ARTERIALS 35/40 MPH 350' +/- RURAL ROADS & URBAN ARTERIALS RESIDENTAL & BUSINESS DISTRICTS URBAN STREETS 25 MPH OR LESS 100' +/- 25/30 MPH 200' +/- ALL SIGNS ARE 48"x48" BLACK ON ORANGE UNLESS OTHERWISE DESIGNATED (1) ALL SIGN SPACING MAY BE ADJUSTED TO ACCOMMODATE INTERCHANGE RAMPS, AT GRADE INTERSECTIONS AND DRIVEWAYS. (2) THE SPACING MAY BE REDUCED IN URBAN AREAS TO FIT ROADWAY CONDITIONS. DISCLAIMER All traffic control setups, sign spacing, and procedures will conform to the specifications stated in the federal Manual on Uniform Traffic Control Devices (M.U.T.C.D) Cities and various municipalities may have also adopted specialized guidelines for traffic control within their jurisdiction. It is the responsibility of the on-site traffic control personnel to verify if any special conditions exist. TRAFFIC CONTROL ADDITIONAL NOTES -For aerial work, there will be a moving traffic control setup -Will coordinate with businesses that will be affected by construction -Will have spotter on site to escort pedestrians through work zone -All work will stop while pedestrians are escorted through work zones -Will have no more than two work areas active at a time SITE NOTES -Maintain driveway access at all times -Place temporary "NO PARKING" signs at least 72 hours prior to work -Sidewalks to remain open during road work unless noted otherwiseFLAGGER SPOTTERWT LEGEND Work Vehicle Work Area Flagger Spotter N OF APPROVED BY: PROJECT CODE: DRAWN BY: DATE: SCALE:PROJECT REVISIONSREVDESCRIPTION OF CHANGEDATEBYQCTCP SMBJB0000584661000 2 1 ZR WK 5/9/2022 NTSRENTON, WA 98057401 S GRADY WAY DSR - MCDONALDS17-050 10 105 150 205 270 450 500 550 --- 11 115 160 225 295 495 550 605 660 -- 12 125 180 245 320 540 600 660 720 780 840 LANEWIDTH 25 30 35 40 45 50 55 60 65 70 MINIMUM TAPER LENGTH IN FEET = L POSTED SPEED LIMIT (MPH) SPEED 25 30 35 45 50 55 155 200 250 360 425 495 570 LONGITUDINAL BUFFER SPACE = B LENGTH 40 305 60 65 70 780 840 THE DESIGNED TRAFFIC CONTROLS CONTAINED WITHIN THIS TCP WILL NOT BE IMPLEMENTED UNTIL APPROVED BY THE PUBLIC AUTHORITY HAVING JURISDICTIONCONTROL TYPE:[UNDERGROUND WORK]SINGLE CLOSURE 6-LANE ROADSITE SPECIFIC TRAFFIC CONTROL PLAN EOPEOPEOPEOPEOPEOPEOP355 ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW EOPEOPEOPEOPEOPEOPEOPEOPEOP EOPEOPEOPEOPEOPEOPEOP EOP EOP EOP EOP EOP EOPEOPEOPS GRADY W A Y S GRADY W A Y LAKE AVE SDRIVEWAYSIDEWALK SIDEWALK SIDEWALK SIDEWALK WT W20-1 W4-2R W20-5R W20-1 SIGN SPACING = X (FEET) FREEWAYS & EXPRESSWAYS 50/70 MPH 1500' +/-(OR AS PER MUTCO) RURAL HIGHWAYS 60/65 MPH 800' +/- RURAL ROADS 45/55 MPH 500' +/- RURAL ROADS & URBAN ARTERIALS 35/40 MPH 350' +/- RURAL ROADS & URBAN ARTERIALS RESIDENTAL & BUSINESS DISTRICTS URBAN STREETS 25 MPH OR LESS 100' +/- 25/30 MPH 200' +/- ALL SIGNS ARE 48"x48" BLACK ON ORANGE UNLESS OTHERWISE DESIGNATED (1) ALL SIGN SPACING MAY BE ADJUSTED TO ACCOMMODATE INTERCHANGE RAMPS, AT GRADE INTERSECTIONS AND DRIVEWAYS. (2) THE SPACING MAY BE REDUCED IN URBAN AREAS TO FIT ROADWAY CONDITIONS. DISCLAIMER All traffic control setups, sign spacing, and procedures will conform to the specifications stated in the federal Manual on Uniform Traffic Control Devices (M.U.T.C.D) Cities and various municipalities may have also adopted specialized guidelines for traffic control within their jurisdiction. It is the responsibility of the on-site traffic control personnel to verify if any special conditions exist. TRAFFIC CONTROL ADDITIONAL NOTES -For aerial work, there will be a moving traffic control setup -Will coordinate with businesses that will be affected by construction -Will have spotter on site to escort pedestrians through work zone -All work will stop while pedestrians are escorted through work zones -Will have no more than two work areas active at a time SITE NOTES -Maintain driveway access at all times -Place temporary "NO PARKING" signs at least 72 hours prior to work -Sidewalks to remain open during road work unless noted otherwiseFLAGGER SPOTTERWT LEGEND Work Vehicle Work Area Flagger Spotter N OF APPROVED BY: PROJECT CODE: DRAWN BY: DATE: SCALE:PROJECT REVISIONSREVDESCRIPTION OF CHANGEDATEBYQCTCP SMBJB0000584661000 2 2 ZR WK 5/9/2022 NTSRENTON, WA 98057401 S GRADY WAY DSR - MCDONALDS17-050 10 105 150 205 270 450 500 550 --- 11 115 160 225 295 495 550 605 660 -- 12 125 180 245 320 540 600 660 720 780 840 LANEWIDTH 25 30 35 40 45 50 55 60 65 70 MINIMUM TAPER LENGTH IN FEET = L POSTED SPEED LIMIT (MPH) SPEED 25 30 35 45 50 55 155 200 250 360 425 495 570 LONGITUDINAL BUFFER SPACE = B LENGTH 40 305 60 65 70 780 840 THE DESIGNED TRAFFIC CONTROLS CONTAINED WITHIN THIS TCP WILL NOT BE IMPLEMENTED UNTIL APPROVED BY THE PUBLIC AUTHORITY HAVING JURISDICTIONCONTROL TYPE:[UNDERGROUND WORK]SINGLE CLOSURE 6-LANE ROADSITE SPECIFIC TRAFFIC CONTROL PLAN R2-1 SHEET INDEX: 1 - COVER SHEET 2 -LEGEND 3 -GENERAL NOTES 4-5 -DESIGN THIS IS PROPRIETARY INFORMATION AND NOT MEANT FOR GENERAL PUBLICATION. ALL RIGHTS RESERVED BY CANNON COMPANIES HARDLINE COAX: 520 FT + 20% STORAGE = 624 FT CONTACTS: PROJECT MAP: *ALL FOOTAGES AND MATERIALS ARE ESTIMATED N SCOPE OF WORK: - TIE INTO EXISTING COAX WITH HARDLINE - PROOF & PULL (1) HARDLINE COAX THROUGH EXISTING CONDUIT BILL OF MATERIALS*: NEW AERIAL = OVERLASH = NEW UNDERGROUND = EXISTING UNDERGROUND = RISER (0)= TOTAL ROW FOOTAGE = 0 FT. 0 FT. 0 FT. 520 FT. 0 FT. 0 FT. CANNON COMPANIES SAFETY | QUALITY | INTEGRITY | TEAMWORK Connecting The Future Since 1985 COMCAST 401 S GRADY WAY RENTON, WA 98057DSR - MCDONALDS JB0000584661 SMB CANNON COMPANIES Zack Rollins - (253)-922-2787 - zrollins@teamcannon.com ROW FOOTAGES*: NEW BUILDING PATHWAY = EXISTING BUILDING PATHWAY = NEW UNDERGROUND = EXISTING UNDERGROUND = TOTAL SITE FOOTAGE = 0 FT. 0 FT. 0 FT. 0 FT. 0 FT. SITE FOOTAGES*: TOTAL PROJECT FOOTAGE =520 FT. POLE INFORMATION: POLE COUNT = POLES THAT NEED PERMIT = POLES THAT NEED MAKE READY = TRANSMISSION = 0 DISTRIBUTION = 0 0 0 0 5 4 520 OFAPPROVED BY:PROJECT CODE:DRAWN BY:DATE:SCALE:PROJECT REVISIONS REV DESCRIPTION OF CHANGEDATE BY QC JB0000584661 DSR MCDONALDS 401 S GRADY WAY RENTON, WA 98057 SMB17-0505/9/2022WKZRNTS00025LEGENDEDGE OF PAVEMENTFOGLINEPOWERCOMMUNICATIONSEWERDRAINDRAINAGE DITCHGASWATERTRAFFIC SIGNALTELCOMSTEAMUNKNOWN UTILITYRIGHT OF WAYTRAFFIC CONESPROPOSED NEW BORESTRAW WATTLESPLTCWRUTILITY POLEVAULT - SMALLPEDESTALSTREET LIGHTCROSSWALK LIGHTUTILITY RISERVVAULT - SMALL444LA MANHOLEVAULT - 25TACATCH BASINCATCH BASIN WITH SOCKGLULAM UTILITY POLECENTER LINELANE LINEFENCEHIGH VISIBILITY FENCE SSEWER MANHOLEDDRAIN MANHOLEWWATER MANHOLEVUTILITY VALVESHRUBBERYBORE PITVAULT - LARGEVAULT - 25TACCOMMUNICATION MANHOLEFIRE HYDRANTDISTANCE STATIONSTA 0+00CONSTRUCTION NOTE CALLOUT#X.XDISTANCE DIMENSIONASPHALT SURFACECONCRETE ROADWAY PANELHFH-FRAMEVAULT - LARGECABCABINETLEGENDLANE DIRECTION INDICATORPROPOSEDMARK-UP NOTATIONSRESTORATION TYPESEXISTING FEATURESLINE TYPESA7LANDSCAPECROSS SECTION SYMBOLCROSS SECTION IDCROSS SECTION PAGEFLFLPPTSTSCCDDDDDDDDDDDDGGWWTTSTSTROWROWSUKCBCBPPVVVVVVPROPOSED WORK1LOCATIONPHOTO NOTE CALLOUT#PHOTO LOCATOR SYMBOLPROPOSED NEW TRENCHEXISTING UNDERGROUND PATHWAYPROPOSED NEW AERIAL STRANDEXISTING AERIAL PATHWAYEXISTING SPLICE CASEPROPOSED SPLICE CASEEXISTING FIBER/COAX STORAGEPROPOSED FIBER/COAX STORAGETREEEOPVVAULT - SMALL444LA MANHOLEVAULT - 25TAVAULT - LARGEEXISTING - CONTINUED233LA MANHOLE233LA MANHOLE OFAPPROVED BY:PROJECT CODE:DRAWN BY:DATE:SCALE:PROJECT REVISIONS REV DESCRIPTION OF CHANGEDATE BY QC JB0000584661 DSR MCDONALDS 401 S GRADY WAY RENTON, WA 98057 SMB17-0505/9/2022WKZRNTS00035GENERAL NOTES EOPEOPEOPEOPEOP EOP EOP601401S GRADY WAYSHATTUCK AVE SROWROWROWROWROWROWROWROWROWROWROWROWROWROWROWROWROWROWROWROWROWROWROWROWROWROWROWROWROWROWROWEOP EOP EOPEOPEOPEOPEOPS GRADY WAYVMATCH LINE SEE SHEET 5 21CONSTRUCTION NOTES:TIE INTO EXISTING COAX WITH HARDLINEPROOF & PULL (1) HARDLINE COAX THROUGHEXISTING CONDUIT1520'2SIDEWALK SIDEWALK SIDEWALKSIDEWALKSIDEWALK SIDEWALKDRIVEWAYDRIVEWAY OFAPPROVED BY:PROJECT CODE:DRAWN BY:DATE:SCALE:PROJECT REVISIONS REV DESCRIPTION OF CHANGEDATE BY QC JB0000584661 DSR MCDONALDS 401 S GRADY WAY RENTON, WA 98057 SMB17-0505/9/2022WKZR1" = 30'015'30'45DESIGNN EOPEOPEOPEOP375ROWROWROWROWROWROWROWROWROWROWROWROWROWROWROWROWROWROWROWROWROWROWROWROWROWROWROWROWROWROWEOP EOPEOPEOPEOPEOPEOPEOP S GRADY WAYLAKE AVE SDRIVEWAY SIDEWALK V1CONSTRUCTION NOTES:PROOF & PULL (1) HARDLINE COAX THROUGHEXISTING CONDUITMATCH LINESEE SHEET 4520'1SIDEWALK OFAPPROVED BY:PROJECT CODE:DRAWN BY:DATE:SCALE:PROJECT REVISIONS REV DESCRIPTION OF CHANGEDATE BY QC JB0000584661 DSR MCDONALDS 401 S GRADY WAY RENTON, WA 98057 SMB17-0505/9/2022WKZR1" = 30'015'30'55DESIGNN