Press Alt + R to read the document text or Alt + P to download or print.
This document contains no pages.
HomeMy WebLinkAboutCouncil 08/15/2005AGENDA
RENTON CITY COUNCIL
REGULAR MEETING
August 15, 2005
Monday, 7:30 p.m.
CALL TO ORDER AND PLEDGE OF ALLEGIANCE
2. ROLL CALL -
3. SPECIAL PRESENTATIONS:
a. Update from Port of Seattle Board President Bob Edwards
b. Sound Transit Phase II Briefing
c. Renton River Days Recap
4. PUBLIC HEARING
Akers Farms Annexation - 60% Notice of Intent to annex petition and R-8 zoning for 13.3 acres
located south of Puget Dr. S. and east of 108th Ave. SE, if extended
5. ADMINISTRATIVE REPORT
6. AUDIENCE COMMENT (Speakers must sign up prior to the Council meeting. Each speaker is
allowed five minutes. The comment period will be limited to one-half hour. The second audience
comment period later on in the agenda is unlimited in duration.)
When you are recognized by the Presiding Officer, please walk to the podium and state your name
and address for the record, SPELLING YOUR LAST NAME.
7. CONSENT AGENDA
The following items are distributed to Councilmembers in advance for study and review, and the
recommended actions will be accepted in a single motion. Any item may be removed for further
discussion if requested by a Councilmember.
a. Approval of Council meeting minutes of 8/8/2005. Council concur.
b. City Clerk reports bid opening on 8/4/2005 for CAG-05-114, Riverview Park Bridge Renovation;
six bids; engineer's estimate $185,000; and submits staff recommendation to authorize the use of
excess budget from completed projects and award the contract to the low bidder, Marine Vacuum
Service, Inc., in the amount of $207,500. Council concur.
c. Development Services Division recommends adoption of the Federal National Incident
Management System (NIMS), which provides a consistent nationwide approach to responding to
and recovering from domestic incidents and is required by all local governments for future grant
eligibility. Council concur. (See 10.d. for resolution.)
d. Economic Development, Neighborhoods and Strategic Planning Department recommends a
public hearing be set on 9/12/2005 to consider the proposed Park Terrace Annexation and future
zoning, the boundaries of which were expanded by the Boundary Review Board from 7.65 to 80
acres. The site is located south of SE 112th St., if extended, and east of Anacortes Ave. NE to
144th Ave. SE. Council concur.
e. Finance and Information Services Department recommends authorizing capital expenditures on
the South Lake Washington roadway and SW 27th St. and Strander Blvd. extension projects in
anticipation of reimbursement from the proceeds of tax-exempt bonds or other obligations. Refer
to Finance Committee.
f. Human Services Division recommends setting a public hearing on 9/19/2005 to consider the
allocation of 2006 Community Development Block Grant funds as recommended by the Human
Services Advisory Committee. Refer to Community Services Committee; set public hearing on
9/ 19/2005.
(CONTINUED ON REVERSE SIDE)
-g. Transportation Systems Division recommends approval of an agreement with Washington State
Department of Transportation to accept funds in the amount of $38,435 for the Commute Trip
Reduction program. Council concur. (See 10.c. for resolution.)
h. Transportation Systems Division recommends approval of an agreement in the amount of
$35,828 with King County Department of Transportation to provide Commute Trip Reduction
services to 21 affected employers in the City of Renton for 2005-2006. Council concur.
i. Transportation Systems Division recommends approval of the list of prioritized projects within
Renton for inclusion in the Sound Transit Phase II work plan. Refer to Transportation (Aviation)
Committee.
j. Transportation Systems Division recommends approval of Supplemental Agreement No. 3 to
CAG-03-033, agreement with Perteet Engineering, Inc. for the Strander Blvd. extension project,
for construction management services in the amount of $110,846. Approval is also sought for a
budget adjustment to the Transportation Fund to cover the construction costs. Refer to
Transportation (Aviation) Committee.
k. Utility Systems Division recommends approval of an agreement with R112 Engineering, Inc. in
the amount of $229,608 to design the Hazen 565 Pressure Zone Reservoir, which will serve the
Renton Highlands by providing 1 million gallons of additional water storage., Council concur.
8. CORRESPONDENCE
9. UNFINISHED BUSINESS
Topics listed below were discussed in Council committees during the past week. Those topics
marked with an asterisk (*) may include legislation. Committee reports on any topics may be held by
the Chair if further review is necessary.
a. Finance Committee: Vouchers; Financial Management Policies
b. Public Safety Committee: Valley Special Response Team Interlocal Agreement Addendum*
c. Transportation (Aviation) Committee: Cedar River Hangar Building Reversion to City
Ownership
10. RESOLUTIONS AND ORDINANCES
Resolutions:
a. Federal Aviation Administration grant application for Airport Layout Plan update (Council
approved via consent agenda on 7/18/2005)
b. Set minimum daily rate for housing of jail inmates and authorize interlocal agreements (Council
approved via Public Safety Committee report on 4/25/2005)
c. WSDOT agreement for Commute Trip Reduction program (see 7.g.)
d. Federal National Incident Management System (see 7.c.)
e. Valley Special Response Team interlocal agreement addendum (see 9.b.)
11. NEW BUSINESS (Includes Council Committee agenda topics; call 425-430-6512 for recorded
information.)
12. AUDIENCE COMMENT
COMMITTEE OF THE WHOLE
-AGENDA
(Preceding Council Meeting)
Council Chambers
6:00 p.m.
I-405 Corridor Program Update;
2006-2011 Capital Improvement Projects
r
RENTON CITY COUNCIL
Regular Meeting
August 15, 2005
Council Chambers
Monday, 7:30 p.m.
MINUTES Renton City Hall
CALL TO ORDER
Mayor Kathy Keolker-Wheeler called the meeting of the Renton City Council
to order and led the Pledge of Allegiance to the flag.
ROLL CALL OF
TERRI BRIERE, Council President; DENIS LAW; DAN CLAWSON; TONI
COUNCILMEMBERS
NELSON; RANDY CORMAN; DON PERSSON; MARCIE PALMER.
CITY STAFF IN
KATHY KEOLKER-WHEELER, Mayor; JAY COVINGTON, Chief
ATTENDANCE
Administrative Officer; LAWRENCE J. WARREN, City Attorney; BONNIE
WALTON, City Clerk; GREGG ZIMMERMAN, Planning/Building/Public
Works Administrator; SANDRA MEYER, Transportation Systems Director;
LESLIE BETLACH, Parks Director; MIKE WILSON, Interim Finance and
Information Services Administrator; ALEX PIETSCH, Economic Development
Administrator; LINDA HERZOG, Interim Assistant to the CAO; SONJA
MEJLAENDER, Community Relations Specialist; COMMANDER TIM
TROXEL, Police Department.
SPECIAL
Bob Edwards, Port of Seattle Commission President, gave an update on the
PRESENTATIONS
following Port of Seattle issues: the resolution of the third runway litigation at
Transportation: Port of Seattle
Seattle -Tacoma International Airport and creation of the Highline Forum; the
Update
opening of the new airport central terminal in May; the impacts of the potential
relocation of Southwest Airlines to Boeing Field and the Port of Seattle's
opposition to this action; the light rail airport link connection; the increase in
cargo container and cruise ship business at Seaport; and the upgrade of
Fishermen's Terminal and the Shilshole Bay Marina. Commissioner Edwards
noted the 17% increase in the port's net revenues in 2004, and the potential of
exceeding those 2004 revenues in 2005. He concluded that overall, the Port of
Seattle is in good shape.
In response to Council inquiries, Commissioner Edwards reported that the
Seaport is able to handle a capacity of three cruise ships at a time, and
explained that the advancements in cruise ship technology have increased the
cruise ship business. Mr. Edwards further reported that the airport's third
runway project is on course to be completed in 2008.
Sound Transit: Phase 2 Update Sandra Meyer, Transportation Systems Director, reported that on August 12th,
the Eastside Transportation Partnership (ETP) recommended approval of the
Sound Transit amendments to Sound Move to allocate $19 million to the
Rainier/Hardie and SW 27th St./Strander Blvd. projects, and the proposal will
be presented to the South County Area Transportation Board (SCATBd) on
August 17th. She introduced Joni Earl, Sound Transit Chief Executive Officer,
who presented an overview of Sound Transit and Sound Transit 2.
Ms. Earl reviewed the project list of all the capital programs at Sound Transit,
and noted the growth in ridership since 2004. In regards to light rail, she
reported that there are currently 14 miles under construction, and the Seattle -
Tacoma International Airport link connection was recently approved. Ms. Earl
also reported that of the 25 projects in the East King County Subarea, five
projects are completed and in operation, seven projects are in construction, and
the balance are in engineering and design.
August 15, 2005 Renton City Council Minutes Page 289
Continuing with Sound Transit 2 (ST2), Ms. Earl stated that on July 7th, after
many public hearings, the Sound Transit Board adopted six changes to its long-
range plan, which was originally adopted in 1996. The changes increase the
emphasis on serving the designated urban centers, and stick with commuter rail,
light rail, and bus rapid transit transportation technologies. She reviewed the
ST2 preliminary project lists for the East and South King County Subareas, and
the timeline for setting the ST2 project priorities, determining the financial
needs, and bringing the package to a public vote.
Ms. Earl concluded by reviewing the project evaluation criteria, such as
ridership, costs, reliability, system integration and customer experience, which
the Sound Transit Board must consider when making a choice among
competing transportation technologies.
Mayor Keolker-Wheeler expressed her appreciation to Councilmembers
Persson and Palmer for serving on SCATBd and ETP. Councilman Corman
noted that the Transportation Committee will review on 9/1/2005 the list of
prioritized projects within Renton for inclusion in the ST2 work plan.
In response to Councilman Persson's inquiry regarding annexing areas to the
Sound Transit District, Ms. Earl explained that per Sound Transit's policy,
jurisdictions must want to be annexed.
Community Event: Renton Community Relations Specialist Sonja Mejlaender introduced Bill Hulten,
River Days Recap IKEA Renton River Days Board of Directors Chairman, who presented a report
on the 2005 City of Renton community festival held during the week of July
19th through July 24th. Mr. Hulten thanked the City of Renton, the sponsors
and contributors, the media partners, and the Renton service clubs for their
assistance and support. He reviewed the festival events, activities,
entertainment, and exhibitions that took place, such as Kids' Day, Art in the
Park, Nibble of Renton, Library Book Sale, and the Skate Park Exhibition. In
conclusion, Mr. Hulten expressed his appreciation for the many volunteers who
contributed over 9,500 hours in planning for and assisting with the festival.
PUBLIC HEARING This being the date set and proper notices having been posted and published in
Annexation: Akers Farms, accordance with local and State laws, Mayor Keolker-Wheeler opened the
108th Ave SE & Puget Dr S public hearing to consider the 60% Notice of Intent to annex petition and R-8
zoning for the proposed 13.3-acre Akers Farms Annexation, located south of
Puget Dr. S. and east of 108th Ave. SE, if extended.
Alex Pietsch, Economic Development Administrator, reported that the site
contains five single-family dwellings, and slopes downward from the southwest
corner to the northern point at a 3% slope. The northern portion of the site
contains an unclassified coal mine hazard area. In regards to the public
services, he indicated that the site is within Fire District #40, the sewer service
areas of Renton and the Soos Creek Water and Sewer District, the water service
area of Soos Creek Water and Sewer District, and the Renton School District.
Mr. Pietsch noted that the site is currently zoned R-8 (eight dwelling units per
gross acre) in King County. Renton's Comprehensive Plan designation for the
site is Residential Single Family, for which R-8 (eight dwelling units per net
acre) zoning is proposed. Reviewing relevant City policies and Boundary
Review Board criteria, he explained that this smaller than normal annexation is
limited to the future development of 84 or fewer single-family lots and has poor
connectivity to the City because of the power line corridor to the northeast.
However, the annexation proposal is a potential catalyst for the annexation of a
August 15, 2005 Renton City Council Minutes Page 290
larger area to the east, and will facilitate upgrading this portion of Benson Hill
under City development standards.
Continuing, Mr. Pietsch said the fiscal impact analysis indicates a surplus of
$25,990 at full development, and an estimated one-time parks acquisition and
development cost of $33,708. He noted that staff suggests Level 2 flow control
for new development, and that the cumulative impact of recent annexations will
eventually require more police staff. Mr. Pietsch concluded that the proposed
annexation serves the best interests and general welfare of the City, particularly
if the annexation facilitates higher quality development near Nelsen Middle
School.
Public comment was invited.
Robert Ableidinger, 10908 SE 164th St., Renton, 98055, expressed his
opposition to the inclusion of his property in the annexation proposal, which
consists of approximately 2.5 acres and is located on the eastern edge of the
site. He explained that he has been out of town for over three years, and did not
have any input into whether he wanted to be a part of the annexation or not.
Mr. Ableidinger asked that his property be removed from the annexation area.
Additionally, he noted that it is difficult to afford and obtain building permits
from the City of Renton.
Mayor Keolker-Wheeler countered that Renton is known for its quick, easy,
and predictable permit activity. Councilman Corman also noted the City's fast
permit issuance process, and stated that he does not want to force Mr.
Ableidinger to come into the City if he objects.
Mr. Ableidinger noted the potential of developing more units on his property if
it remained in King County. Mr. Pietsch stated that there may be a net
reduction in Mr. Ableidinger's ability to develop his property if it were in
Renton; however, the City's development fees are approximately an eighth of
the cost of the fees in King County.
In response to Mr. Corman's inquiry, City Attorney Larry Warren confirmed
that at this point in the process, property can be withdrawn from a proposed
annexation. Councilman Clawson expressed concerns regarding setting a
precedence and creating holes or irregular boundaries if property were to be
removed from an annexation area, in this instance or in any other, unless there
were extreme circumstances.
There being no further public comment, it was MOVED BY NELSON,
SECONDED BY PALMER, COUNCIL CLOSE THE PUBLIC HEARING.
CARRIED.
Moved by Clawson, seconded by Law, Council accept the Akers Farms 60%
Direct Petition to annex, support future zoning consistent with the
Comprehensive Plan's Residential Single Family land use designation, and
authorize the Administration to submit the Notice of Intent package to the
Boundary Review Board and prepare the relevant ordinances.*
Councilman Corman noted the number of unanswered questions regarding Mr.
Ableidinger's property and suggested staff review of the matter. Mayor
Keolker-Wheeler pointed out that the Boundary Review Board is likely to add
property to the boundaries of annexations, since King County is trying to divest
itself of unincorporated areas.
August 15, 2005 Renton City Council Minutes Page 291
City Clerk Bonnie Walton confirmed that at staffs recommendation, Council
agreed to expand the Akers Farms annexation area to include the subject
eastern parcel and abutting street right-of-way when the 10% petition was
accepted and the circulation of the 60% petition was authorized on April 18th.
Councilman Clawson urged Council to support the annexation as presented.
Councilman Corman indicated there may be extenuating circumstances in this
particular case.
*MOVED BY PERSSON, SECONDED BY NELSON, COUNCIL TABLE
THE MOTION UNTIL THE NEXT COUNCIL MEETING ON 9/12/2005.
CARRIED.
ADMINISTRATIVE
Chief Administrative Officer Jay Covington reviewed a written administrative
REPORT
report summarizing the City's recent progress towards goals and work
programs adopted as part of its business plan for 2005 and beyond. Items noted
included:
• The annual Kennydale Splash Day, organized by Recreation Division
lifeguards, was held on August I Ith. Eighty swimmers, 16 years and
younger, competed in races and contests, in and out of the water.
• The 39th session of the Renton Police Department Citizen's Academy
begins September 13th. The academy meets for 12 weeks on Tuesdays,
from 7:00 p.m. to 9:00 p.m., and interested individuals must apply by
September 2nd.
RECESS
MOVED BY NELSON, SECONDED BY CORMAN, COUNCIL RECESS
FOR FIVE MINUTES. CARRIED. Time: 8:52 p.m.
The meeting was reconvened at 8:57 p.m.; roll was called; all Councilmembers
present.
AUDIENCE COMMENT
T.C. Davis, 1615 S. Puget Dr., #D, Renton, 98058, referenced unfinished
Citizen Comment: Davis -
business item 9.c., the Transportation (Aviation) Committee report concerning
Airport Hangar Buildings
the recommendation to revert the Cedar River Hangar Limited Partnership's
Reversion to City Ownership
airport hangar buildings to City ownership. Mr. Davis expressed his opposition
from Cedar River Hangar
to the reversion, saying that the City should not be in the retail business. He
Limited Partnership
asked that the recommendation to approve this action be reconsidered, and that
the City's related financial information be reviewed. (See page 294 for
committee report.)
Citizen Comment: Gannett -
Jim Gannett, 14443 NE 61st St., Redmond, 98052, referring to the same topic
Airport Hangar Buildings
as the previous speaker, reviewed the proposed 15-year lease submitted by
Reversion to City Ownership
Cedar River Hangar Limited Partnership in May, and questioned the soundness
from Cedar River Hangar
of the City's financial information concerning the matter. He indicated that the
Limited Partnership
reversion will put the partnership out of business, and noted the revenue the
City has received from the business over the course of its lease. Mr. Gannett
stated his concerns regarding the reversion of private enterprises to public
ownership, and expressed his unhappiness with the reversion recommendation
and the City's handling of businesses as the Airport. (See page 294 for
committee report.)
CONSENT AGENDA
Items on the consent agenda are adopted by one motion which follows the
listing.
Council Meeting Minutes of
Approval of Council meeting minutes of 8/8/2005. Council concur.
8/8/2005
August 15, 2005 Renton City Council Minutes Page 292
CAG: 05-114, Riverview Park City Clerk reported bid opening on 8/4/2005 for CAG-05-114, Riverview Park
Bridge Renovation, Marine Bridge Renovation; six bids; engineer's estimate $185,000; and submitted staff
Vacuum Service recommendation to authorize the use of excess budget from completed projects
and award the contract to the low bidder, Marine Vacuum Service, Inc., in the
amount of $207,500. Council concur.
Development Services: Federal Development Services Division recommended adoption of the Federal National
National Incident Management Incident Management System (NIMS), which provides a consistent nationwide
System approach to responding to and recovering from domestic incidents and is
required by all local governments for future grant eligibility. Council concur.
(See page 295 for resolution.)
Annexation: Park Terrace, SE Economic Development, Neighborhoods and Strategic Planning Department
112th St & Anacortes Ave NE recommended a public hearing be set on 9/12/2005 to consider the proposed
Park Terrace Annexation and future zoning, the boundaries of which were
expanded by the Boundary Review Board from 7.65 to 80 acres. The site is
located south of SE 112th St., if extended, and east of Anacortes Ave. NE to
144th Ave. SE. Council concur.
Finance: Bond Proceed
Finance and Information Services Department recommended authorizing capital
Reimbursement, S Lake WA
expenditures on the South Lake Washington roadway and SW 27th St./Strander
Roadway & SW 27th
Blvd. extension projects in anticipation of reimbursement from the proceeds of
SdStrander Blvd Extension
tax-exempt bonds or other obligations. Refer to Finance Committee.
Capital Expenditures
Human Services: 2006 CDBG
Human Services Division recommended setting a public hearing on 9/19/2005
Funds Allocation
to consider the allocation of 2006 Community Development Block Grant funds
as recommended by the Human Services Advisory Committee. Refer to
Community Services Committee; set public hearing on 9/19/2005.
Transportation: Commute Trip
Transportation Systems Division recommended approval of an agreement with
Reduction Program Grant,
Washington State Department of Transportation to accept funds in the amount
WSDOT
of $38,435 for the Commute Trip Reduction program. Council concur. (See
page 295 for resolution.)
Transportation: Commute Trip
Transportation Systems Division recommended approval of an agreement in the
Reduction Program Services,
amount of $35,828 with King County Department of Transportation to provide
King County
Commute Trip Reduction services to 21 affected employers in the City of
Renton for 2005-2006. Council concur.
Sound Transit: Phase H Work
Transportation Systems Division recommended approval of the list of
Plan, Renton Prioritized
prioritized projects within Renton for inclusion in the Sound Transit Phase 2
Project List
(ST2) work plan. Refer to Transportation (Aviation) Committee.
CAG: 03-033, SW 27th
Transportation Systems Division recommended approval of Supplemental
SdStrander Blvd Extension
Agreement No. 3 to CAG-03-033, agreement with Perteet Engineering, Inc. for
Design, Perteet Engineering
the SW 27th St./Strander Blvd. extension project, for construction management
services in the amount of $110,846. Approval was also sought for a budget
adjustment to the Transportation Fund to cover the construction costs. Refer to
Transportation (Aviation) Committee.
Utility: Hazen 565 Pressure
Utility Systems Division recommended approval of an agreement with RH2
Zone Reservoir Design, R112
Engineering, Inc. in the amount of $229,608 to design the Hazen 565 Pressure
Engineering
Zone Reservoir, which will serve the Renton Highlands by providing 1 million
gallons of additional water storage. Council concur.
August 15, 2005 Renton City Council Minutes Page 293
MOVED BY BRIERE, SECONDED BY LAW, COUNCIL APPROVE THE
CONSENT AGENDA AS PRESENTED. CARRIED.
UNFINISHED BUSINESS Council President Briere presented a Committee of the Whole report
Committee of the Whole recommending concurrence in adoption of the following annexation policies
Annexation: Policy and strategies:
1. Council affirmed the strategy in the 2006-2011 City Business Plan and
Goals to "Promote annexation where and when it is in the best interest of
Renton."
2. The City should institute a fee for annexations to help cover administrative
costs.
3. Develop a methodology to address levels of services (and proportionate
staffing) through a review of annexation growth during the annual budget
process.
4. The City should continue to work with the State Legislature to identify
tools to reduce the negative financial impacts of annexation.
5. The City should continue the practice of requesting that the Boundary
Review Board expand the boundaries of petition -driven annexations.
6. On the East Renton Plateau:
• Incremental annexation of the area should continue at the adopted
density and development standards.
• Staff should develop a strategy for annexation and provision of services
to this area in the most efficient and cost-effective manner.
7. Incremental annexation of the Talbot Ridge/Springbrook Watershed areas
should continue at the adopted density and development standards,
particularly in areas where the City owns park lands or is the established
provider of sewer service.
8. The City should work with the Boundary Review Board to expand the
boundaries of the proposed Maplewood Addition annexation to include the
entire SR-169 Corridor, including Maplewood Ridge Estates. At a
minimum, the City should ask the Boundary Review Board to remove this
area from the proposed Fairwood incorporation.
9. The Council would like more information about the long-term fiscal
impacts of annexing the West Hill before any decisions are made about
annexation or establishing this area as a new potential annexation area.
10. The Council would like more information about the long-term fiscal
impacts of annexing the Fairwood/Cascade area before any annexation of
this area occurs. Staff should not actively promote annexations east of the
Benson Rd. S./108th Ave. SE commercial area until the financial analysis is
complete.
MOVED BY BRIERE, SECONDED BY CLAWSON, COUNCIL CONCUR
IN THE COMMITTEE REPORT. CARRIED.
August 15, 2005 Renton City Council Minutes Page 294
Public Safety Committee Public Safety Committee Chair Law presented a report recommending
Police: Valley Special concurrence in the staff recommendation to approve an addendum to the Valley
Response Team Interlocal Special Response Team interlocal agreement for the purpose of establishing a
Agreement Addendum, CAG- process that will assist the participating agencies in processing and responding
03-080 to claims and lawsuits. The Committee further recommended that the
resolution authorizing the Mayor and City Clerk to sign the addendum be
presented for reading and adoption. MOVED BY LAW, SECONDED BY
BRIERE, COUNCIL CONCUR IN THE COMMITTEE REPORT. CARRIED.
(See page 295 for resolution.)
Finance Committee Finance Committee Chair Persson presented a report recommending
Finance: Financial concurrence in the staff recommendation to approve the Financial Management
Management Policies Policies, and to annually review the policies to identify any needed changes.
The Committee further recommended that these policies be included in the
Mayor's proposed 2006 Budget document that will be presented to the City
Council at the end of October 2005. MOVED BY PERSSON, SECONDED
BY NELSON, COUNCIL CONCUR IN THE COMMITTEE REPORT.
CARRIED.
Councilman Persson invited Mike Wilson, Interim Finance and Information
Services Administrator, to give a briefing on the Financial Management
Policies. Mr. Wilson emphasized that the financial health and welfare of the
City is highly dependent upon establishing and maintaining sound, financial -
planning objectives and strategies of implementation. He explained that the
policies contain ten sections that address the financial philosophy of the City
from the budget process to policies concerning revenues, expenditures, fund
balances, debt management, and cash flow.
Mr. Wilson noted the amount of time and effort that went into the development
of the policies, and stated that the policies are not only comprehensive but will
address the future health and financial welfare of the City for a long, time to
come. Mayor Keolker-Wheeler expressed her appreciation to Mr. Wilson for
all his hard work in getting things in order for the new Finance and Information
Services Administrator.
Transportation (Aviation) Transportation (Aviation) Committee Chair Palmer presented a report
Committee
recommending concurrence in the staff recommendation to approve the
Airport: Hangar Buildings
reversion of Cedar River Hangar Limited Partnership's hangar buildings to City
Reversion to City Ownership
ownership on 9/l/2005, and apply the City's monthly hangar rental rates to the
from Cedar River Hangar
Cedar River Hangars. MOVED BY PALMER, SECONDED BY PERSSON,
Limited Partnership
COUNCIL CONCUR IN THE COMMITTEE REPORT. CARRIED.
RESOLUTIONS AND
The following resolutions were presented for reading and adoption:
ORDINANCES
Resolution #3764
A resolution was read authorizing the Mayor and City Clerk to execute the
Airport: Layout Plan Update,
Federal Aviation Administration's Airport Improvement Program grant
FAA Grant
application and acceptance documents to help implement the Airport Layout
Plan and update of the Airport Base Map, and authorize the airport manager as
the City's official representative in this matter. MOVED BY PALMER,
SECONDED BY NELSON, COUNCIL ADOPT THE RESOLUTION AS
READ. CARRIED.
August 15, 2005 Renton City Council Minutes Page 295
Resolution #3765 A resolution was read setting a minimum daily rate of $70 for the housing of
Police: Jail Booking Fee, Jail jail inmates from other King County cities. MOVED BY LAW, SECONDED
Booking Interlocal BY NELSON, COUNCIL ADOPT THE RESOLUTION AS READ.
Agreements CARRIED.
Resolution #3766 A resolution was read authorizing the Mayor and City Clerk to enter into an
Transportation: Commute Trip interlocal cooperative agreement with the Washington State Department of
Reduction Program Grant, Transportation entitled "Commute Trip Reduction Implementation Agreement."
WSDOT MOVED BY BRIERE, SECONDED BY PALMER, COUNCIL ADOPT THE
RESOLUTION AS READ. CARRIED.
Resolution #3767 A resolution was read adopting the Federal National Incident Management
Development Services: Federal System (NIMS) for the City of Renton. MOVED BY LAW, SECONDED BY
National Incident Management CLAWSON, COUNCIL ADOPT THE RESOLUTION AS READ. CARRIED.
System
Resolution #3768
A resolution was read authorizing the Mayor and City Clerk to enter into an
Police: Valley Special
addendum to the interlocal cooperative agreement for the Valley Special
Response Team Interlocal
Response Team, regarding the processing of claims. MOVED BY LAW,
Agreement Addendum, CAG-
SECONDED BY CORMAN, COUNCIL ADOPT THE RESOLUTION AS
03-080
READ. CARRIED.
NEW BUSINESS
MOVED BY BRIERE, SECONDED BY CORMAN, COUNCIL REVISE THE
Council: Committee Meeting
MONDAY COMMITTEE MEETING TIMES STARTING 9/19/2005 AS
Date & Times, Council &
FOLLOWS: FINANCE COMMITTEE NEW REGULAR START TIME AT
COW Meeting Time
5:30 P.M. THE SECOND AND FOURTH MONDAY OF EACH MONTH,
COMMUNITY SERVICES COMMITTEE NEW REGULAR START TIME
AT 5:00 P.M. THE SECOND AND FOURTH MONDAY OF EACH MONTH,
AND PUBLIC SAFETY COMMITTEE NEW REGULAR START TIME AT
5:30 P.M. THE FIRST AND THIRD MONDAY OF EACH MONTH.
COUNCIL ALSO AUTHORIZE THE IMPLEMENTATION OF THE NEW
COMMITTEE OF THE WHOLE (6:00 P.M.) AND COUNCIL MEETING
(7:00 P.M.) START TIMES ON 9/19/2005. COUNCIL CONCUR.
Appeal: Sunset Bluff City Attorney Larry Warren announced that he received a proposed settlement
Preliminary Plat, SR 900 LLC agreement from SR 900 LLC and Quarry Industrial Park LLC, and Herons
& Herons Forever, PP-04-002 Forever regarding the Sunset Bluff development project (PP-04-002), which
changes three of the conditions imposed by City Council as part of the project's
approval process. He explained that the first condition concerning seeding of
the area with various grasses, wildflowers, and forbs will now include the
actual planting of trees and shrubs. The second condition concerns the fencing
around the property, and the third condition concerns the stormwater detention
and treatment.
Continuing, Mr. Warren explained that if the conditions are acceptable the
lawsuit will be dismissed, which includes not only the Land Use Petition Act
but also the present pending appeal to the court of appeals that was filed by the
project developer.
MOVED BY LAW, SECONDED BY CORMAN, COUNCIL AUTHORIZE
THE MAYOR TO SIGN THE SETTLEMENT AGREEMENT. CARRIED.
Transportation: Monster Rd Councilman Persson requested an update on the Monster Rd. Bridge repair
Bridge Repair Project project and whether the insurance company has paid.
August 15, 2005 Renton City Council Minutes Page 296
Community Services: Thomas Councilman Persson requested review of whether a gate is needed for security
Teasdale Park Gate Installation purposes at Thomas Teasdale Park. Mayor Keolker-Wheeler assured that the
Administration is reviewing the matter.
AUDIENCE COMMENT Jim Gannett, 14443 NE 61st St., Redmond, 98052, spoke on the Council's
Citizen Comment: Gannett - decision to approve the reversion of the Cedar River Hangar Limited
Airport Hangar Buildings Partnership's airport hangar buildings to City ownership. Mr. Gannett stated
Reversion to City Ownership that the partnership never received a counter offer from the City to be able to
from Cedar River Hangar determine what the City wanted.
Limited Partnership
ADJOURNMENT MOVED BY PERSSON, SECONDED BY NELSON, COUNCIL ADJOURN.
CARRIED. Time: 9:35 p.m.
ij. UJQ�
Bonnie I. Walton, CMC, City Clerk
Recorder: Michele Neumann
August 15, 2005
•
RENTON CITY COUNCIL COMMITTEE MEETING CALENDAR
Office of the City Clerk
COUNCIL COMMITTEE MEETINGS SCHEDULED AT CITY COUNCIL MEETING
August 15, 2005
COMMITTEE/CHAIRMAN DATE/TIME AGENDA
COMMITTEE OF THE WHOLE
(Briere)
COMMUNITY SERVICES
(Nelson)
FINANCE
(Persson)
PLANNING & DEVELOPMENT
(Clawson)
PUBLIC SAFETY
(Law)
TRANSPORTATION (AVIATION)
(Palmer)
UTILITIES
(Gorman)
MON., 8/22 No Meeting (Council Holiday)
MON., 8/29 No Meeting (5th Monday)
MON., 9/05 No Meeting (Labor Day)
MON., 9/12 Highlands Sub -Area Plan
6:30 p.m.
MON., 9/12 CANCELLED
MON., 9/12 Vouchers;
5:30 p.m. Morris Ave. Townhomes Fee Waiver
Request
THURS., 8/18
THURS., 9/01
THURS., 8/18
CANCELLED
CANCELLED
CANCELLED
THURS., 9/01 Trans -Valley Intelligent Transportation
3:00 p.m. Systems Project Interlocal Agreement;
Sound Transit Phase II Work Plan Renton
Prioritized Projects List;
SW 27th St./Strander Blvd. Extension
Supplemental Agreement with Perteet
THURS., 8/18 CANCELLED
THURS., 9/01 BDJS Associates Request for Utilities
4:00 p.m. Oversizing Reimbursement
NOTE: Committee of the Whole meetings are held in the Council Chambers unless otherwise noted. All other committee meetings are held in the Council
Conference Room unless otherwise noted.
2005 1 KEA
Renton
river River Days
dw
e14pMkMMfAbMRW
SIJ(
Thanks to the following City
'F Departments for their support:
3"
-Community Services
(Parks, Recreation, Maintenance, Facilities)
-Planning, Building, & Public works
(City Shops, Transportation, Development
Services)
-Mayor's Office
-Fire
-Police
am t.es
d ye
Slide S
Sponsors and New Contributors
100% retention of sponsor contributions from 2004
to 2005
We welcomed new event sponsors in 2005:
,Creative Workspace
-Delidous Dish
Hyogo Business and Cultural Center
Marcie Ma)rwell. Windermere Realtor
,Qwcst
Seafair/Boeing Community Grant
.Swedish Pediatric Specialty Care
-Valley Medical Center Children's Therapy
WAR tvv
_ Valley Orthopedic Associates-Proliance
.,�-� a
Surgeons. Inc.
SI�F 2
2005 IKEA Renton River Days
Board of Directors
x.
Bill Hutten, Penton School District, Chairman
Dennis Culp. City of Renton
,. Vicki Hart, Banner Bank
Mark Kottan, Dunn Lumber
Victor Karpiak. First Savings Bank of Renton
a Jerry K.avesh. Renton Western Wear
T. Toni Nelson, Penton City Council
- Marc Ogren, Accent Print
Bonnie Rerecich, City of Renton
r Tim Seaing. RSM McGladrey, Festiva! Treasurer
Suzanne Thompson, McLendon Hardware
t.er
=Sonia Mejlaentler, Festival Coordinator
Thanks to the following 2005
festival sponsors:
2005 TITLE SPONSOR
2005 CO-SPONSORS
First Savings Bank of Renton
McLendon Hardware
Rotary Club of Renton
Waste Management
FREE SHUTTLE SERVICE
Shuttle Express
i tii0 day
•su+m,Weevewra
Ilk
Media Partners
Print Media
Renton Reporter
King County Journal Newspapers
Radio
KJR 950 AM
KUBE 93 FM
KJR 95.7 FM
STAR 101.5 FM — Parade Announcer. Kent Phillips
I[T
H.er
a+e+du. sd+m�i�e
I
S Ide -7
'{"TM Sponsor a Child
• The Sponsor a Child program, in its
third year, raised $465
!�+`ai.aa ddi aro Miy f:yip.Yrs ., .
-At $5 a child, the
contributions sponsored
93 children
Vim �y�v rimier
i1RY d ny
Slue 9
Kick -Off Banquet
".�
Awards
Outstanding Service Award
Recipient
• Pat O'Dell, chairperson Art in the
Pak (Arts and Crafts booths)
• $1,000 Scholarship
Recipient
• Carrie Pofter. 2005 Hazen High
School Graduate, received the
Doug Kyes Art Scholarship
Award sponsored by Creative
Workspace
E.M
pv#rimier
S I3e I(
Free Events and Activities
for Kids
-Fire Department Activities
-Chalk Art Contest. Piazza Renton,
Allied Arts & Savren Escrow Services
.Caricaturist
-Pony Rides; Renton Western Wear
-Magician
-Dance- Entertainment
-Kids'Photo ID Cards. Savren
Escrow and Puget Sound Energy,
over 1,800 free photo ID cards
produced
SI ( de 8
Kick -Off Banquet
sponsored by Southport SECO
Development
-Banquet Location
-Attendees boarded the Waterways Cruises
yacht Emerald Star from the dock at The
Bristol at Southport. The cruse lasted three
hours. traveling around Mercer Island and
north to Medina.
-Banquet Attendance
-Approximately 150 attendees, most of whom
participated in this year's theme by wearing
nautical clothing or their favorite Renton River
Days tee shirt.
6- (Je I0
Free Events and Activities
for Kids
•Old McLendon Petting Zoo
-Lego Piayzone, Marne Maxwell& s
Renton Community Foundation
-Lowe's Kids' Clinic Booth
- -Strolling Balloon Artist
-Strolling Stilt Walkers
•Inflatables -�
•Children's Arts and Crafts Booth f,N ^+`
i'
-Junk Chimes xi
�n� riper
Ci�,,k- IM days
Free Events and Activities
for Kids
-Kids' Day. Wizards of the Coast
Wenatchee Youth Circus, Bank of Amenra
Pacific Science Center Blood and Guts Exhibit, Baze
Chiropractic
-Face Painting, Back to Health Chiropractic
-Trout Pond, Freddie's Club
� f
JMYVMWw 'RM'b R?.ems.. .�>.... ,e..S,
2
SIje 13
Pony Rides
sponsored by Renton Western
Wear
230 rides per day, with some
people going more than once
or multiple times
Watered down the infield,
which made it cooler For the
horses and kept dust down for
the kids on ponies and the
n. Sunday car show attendees
t, also using Cedar River Park
Art Events
r. > All Teen Musical
,,. Grease
Art in the Park:
Alaska USA Federal Credit Union
• 115 arts and crafts booths
Chalk Art Contest:
Allied Arts, Piazza Renton &
E k Savren Escrow Services
�2 ; • 30 youth participants
• 3 dozen adult participants
Entertainment
Over 55 different entertainment
-�'
groups contracted to perform,
featuring 413 performers at the
`
festival
'
ridgy+
R ¢ n
!p0 &�r7ryala Scar - r
Celebrating 20 Years!
River Days Parade
Sponsored by Saturn of Renton
V
SO-e IG
.s
s ive`
�''.i>_u day
�en•¢w>r.•:.ovw•d
•125 entries
•4,000 participants
• Many colorful and
unique floats, including
the Mayor's Trophy
winner, the Daffodil
Festival Float, the
Filipino Youth
Association Drill Team,
and the Seafair Pirates,
More Art Events
Renton Annual Art Show
276 entries lured. 102 accepted into show
• $4,000 of art sold
Quilt Exhibition:
Cedar River Quilters
• Over 50 items on display including quilts,
table runners, placemats, vests, bags and
other quilted gift items
• Four possible ca:egones to enter. Large.
small, Guild Challenge. and People's Choice
Entertainment Sponsors
Main Stage Entertainment:
Bob Bridge Auto Center
Art in the Park Stage:
Renton Village Merchants Association
Jazz at the Piazza:
Hudson Designer Portraits &
Piazza Renton
Slide (9
Skate Park Exhibition
sponsored by Skate Barn West
On Friday afternoon
pro -skateboarders and
inline skate pro -riders
took to the Skate Park
ramps and wowed
crowds with their
amazing tricks!
Boatstock and
Wakeboard Invitational
There were 20 exhibitors and approximately
50 boats
More than 700 boat rides and 2,000
passengers, doubling participation from 2004
P,t1 s.er
NA VW
S1,dc c2,C)
Urban Energy and
Entertainment
Friday evening
entertainment planned
with urban feel in mind
Teen rock `n' roll band,
�� _ break dancing; a
cappella group, and hip
hop performance
appealed to a younger
crowd while maintaining
a family feel
(S0C C� 0/�
"j
Sports Events
22i
River Days Run 4 Kids:
Swedish. Pediatnc Specia ty Care
Valley Medcal Center Children's Therapy
Valley Orthopedics Associates-Proriance Surgeons, Inc.
Wizards of the Coast, tnc.
175 runners
Sam Chastain Memorial Golf Tournament:
US Bank
82 goiters (23 teams)
Soccer Tournament:
The Delicious )Ash
64 teams. 648 competitors
Estimated 2,500 spectators
Volkssport 5km & 10km Fun Walks:
Pacific Medical Centers
Interlaken Trailblazers
Cat
yypp+���r rime r
258 partiaparts
i!l614ti days
,�nrrnye.t+is
q,
Boatstock and
Wakeboard Invitational
•14 wakeboarders
competed in this year's
invitational
-Competitors ranged
from professional to
amateur and included
a Renton resident
2
.t�
"
Vintage Lincoln
Mini Concours
F
• 25 cars; featuring Lincoln
Zephyrs, Lincoln Continentals,
Town Cars and Mark Series from
1937 through 1987.
�silil�it day• -� '�
ar Nam,.
F ,(•�dda a
xs�c•or�we�.:a
s1(de aR
Exhibitors
• 38 Kids' Day Exhibitors
• 50
Weekend Exhibitors
I
Best Decorated Booth Contest
&, `
Winners:
First Place: Freddie's Club
Second Place: American Legion
Third Place: Azteca Boxing Club
People's Choice: St. Anthony's
iia Lions Club Health
Screening Van
- 9
Offered at Kids' Day, Senior
Picnic, and throughout the
weekend in Liberty Park
• Served 398 people
• PIMA Medical students
volunteered 80+ hours
kR+''a f�9li
(5/11( q �
BMW Club's 25th
Annual Concours
d'Elegance
150 BMWs on display
300 BMW Club members and guests
in attendance
Event donation of
$600 to the Renton
Lions Club.
z"
k,matV
Library Book Sale
R E
`✓ -i
-Revenue of $4,890
-Record Sales
-Rewarding, but all consuming project
for Friends of the Library volunteers
..�.��
ti.w
and staff.
5/,J,r 30
Rubber Ducky Derby
a a sponsored by Rotary Club of Renton
Now
a
More than 3,400 tickets
sold
you
$16,250 raised to be used to support the
Renton community
Beneficiaries include
•NW Burn Foundation
PAR
c ad.ar
-Salvation Army Food Bank
-Communities In Schools of Renton
5
50e 31
Thank you to Renton
' Service Clubs!
Renton Rotary - Rubber Ducky
,.> Derby
Renton Lions Club - Pancake
Breakfast and Health Screening Van
Renton Kiwanis and
Greater Renton Kiwanis -
Providing food vendor booths on
Kids' Day
ri.or Renton Key Club - Monitoring
dining tent
is WY 33
An Amazing Event
Volunteer Planning and Participation
(Festival Volunteer Program sponsored by
EZ Cash Super Pawn)
200 committee volunteers, and 2,500 hours
of time planning the festival
650 volunteers during festival week,
contributing 7,000 hours
Volunteers help set up art shows, sell
souvenirs, coordinate recreational events.
and assist small children through inflatables.
During festival weekend, Renton Historical
Museum volunteers host an early morning
�a y;
coffee, juice and pastry table.
river
'yidey
Mark Your
Calendars...
The dates for the
21 St Annual
IKEA Renton River
Days are:
July 18-23, 2006!
81 J-C 3g,
'
Festival Evaluation
-Evaluation form given to attendees in the
[
park, participants, exhibitors, food vendors,
entertainers, volunteers, and committees
-Feedback and suggestions extremely
important and valuable
-These 'report cards' help festival planners
and volunteer committees with new ideas,
special features and improving logistics
showcasing Renton at its best
-Form can be accessed on the website at
I.er
ivww.rentonriverdays.org
Estimated Net Proceeds
1
$37,025.00 Charitable Donations
Communities in Schools or Renton
Sam Chastain rdemoral Scholarship Fund
w--�- -*-. ALS Foundation
Renton KiwanisXey Club
And more..
$8,350.00 Juried Art Awards, Art Scholarships,
Contest Awards and Prizes
Art it the Park .Awards
Annual An Show Awards
Doug Kyes Art Scholarship
Municipal Arts Commission Coloring Contest Prizes
Chalk Art Prizes
Quitt Show Prizes
P-mvd•y $45,375.00 Total
w
C
Y
AKERS FARMS ANNEXATION PUBLIC HEARING
COUNCIL CONSIDERATION OF PROPOSED ANNEXATION
WITH R-8 ZONING
August 15, 2005
The City is in receipt of a 60% Direct Petition to annex from property owners in the proposed
Akers Farms annexation area. This petition has signatures representing 60% of the area's 13.3-
acres. The subject site is within the City's Potential Annexation Area and is designated
Residential Single Family (RS) on the City's Comprehensive Plan Land Use Map. It is bordered
by the City limits on its southern and western boundaries and lies generally between 140th
Avenue SE, if extended, on the west and north by the City of Renton. Nelson Middle School is
immediately to the west (1081h Avenue SE, if extended) and Puget PowerBPA power line
easements define its northern boundary. Major vehicular access is from Benson Road South and
SE 1681h Street.
This site currently has King County's R-8 zoning and there are five single-family detached
dwellings on it. The City's proposed zoning is R-8 (8 units per net acre). This zoning is
somewhat less dense than that of County's R-8 zone. The latter can be easily bonused up to 12
units per gross acre, which is more than 50% denser than Renton's 8 units per net acre. Renton's
R-8 zone only allows single-family detached dwellings whereas King County's R-8 zone also
allows attached dwellings such as townhouses.
The King County Department of Assessments certified the 60% Direct Petition to Annex on June
7, 2005. Council is now being asked to consider whether it wants to accept the certified 60%
Direct Petition to Annex and, if so, whether it wants to consider R-8 zoning for the subject area,
assuming it is approved by the Boundary Review Board.
Specifically, the Administration is asking Council, if it accepts the 60% Petition, to support R-8
zoning, authorize it to forward the Notice of Intent package to the Boundary Review Board for
King County for their mandatory 45-day review and, authorize it to begin preparing ordinances
for the rezoning and annexation of the site for later Council consideration.
Hearing Handout 8-15-05.doc\
S 18th
S 27th St
161st St
� 11■iil MANOR
■ ■wit:■■. ©��
Proposed Akers Farms Annexation o 600 1200
Figure 1: Vicinity Map
A,
Laxuwnuolk��kg+sn:,�t.kei; .k.x?taadak` sryuclYaacgc — cli Units I : 7200
"`` n°"* ," "'•
� Proposed Amex. Area
e_..
�•r+ay nm
Hearing Handout 8-15-05.doc\
Existing Conditions - Vicinity
r. Located immediately
east of Nelson Middle
School
Located east of City
boundary at 108"'
Avenue SE, if extended
Vicinity Map
Existing Conditions
• PAA - Within Renton's Potential Annexation Area
e Location — East of Benson Road S and south of
Puget Drive SE
• Size -± 12.42 acres, excluding abutting street ROW
• Uses - Five existing single-family dwellings
• Boundaries - site abuts Renton on its western,
northern and northeastern boundaries. It abuts SE
164'^ Street on the south
Existing Conditions
- Structures
a Currently five single-
z;
family detached
houses on site NI
t
l�
Structures Map
z. ,o
Existing Conditions
- Topography
Site slopes
downward from SW
. t-
comer to northern
point at 3% slope
V+,
Topography Map
i t ii
Existing Conditions - Environmental
■ Topography — ± 3°/. slope
from south to north
■ Environmental constraints
— Unclassified coal mine
hazard area on northern
portion of site
V 1
Looking northeast at western
edge of site from Nelson Middle
School showing slope to north
View looking bolting northeast towards site from corner of
S 276 Street and 108° Avenue SE
Existing Conditions - Public Services
.LIM
• District 40
• Utilities
• Sewer provided by both Renton
Wastewater Wiliy and Soos Creek
Water a Sewer District
• Water provided by Soos Creek
Water & Sewer District
ls
■ Wi hin Renton
School District
FA
King County Comp Plan Designation
and Current Zoning
K.C. Land Use Map - '_
Urban Residential, 4.12du/ac _ 1
K.C. Zoning -
R-8 - Residential 8 du/Loss ac
Site
County Zoning Map
Relevant Comprehensive Plan
Annexation Policies
• Policy LU-378. Encourage annexation of all territory
within City's PAA as shown on adopted land use map
• Policy LU-386. Promote annexation for those who
use City services or would impact City infrastructure
• Policy LU-388. Area should include entire
neighborhood rather than dividing it between
jurisdictions
Issues
+ Disadvantages:
Smaller than normal annexation (13.3 acres)
* Future development limited to 84 or fewer s.f. lots
• Poo connectivity to rest of City because of power line corridor to
northeast
• Advantages:
Potential catalyst for annexation of larger un-incorporated area to
the east (last annexation in 1983)
* Would facilitate upgrading this portion of Benson Hill under City
development standards
Renton Comp Plan Designation and
Proposed Zoning
Renton Comp Plan Land
Use Map - Residential
Single Family
Likely Renton zoning
- R-8 (8 du/net acre)
Site
Renton Comprehensive Plan
Relevant Boundary Review Board Criteria
■ Preservation of natural neighborhoods — more likely to
create new neighborhood than preserve existing area
■ Use of physical boundaries including highways and
land contours — uses existing City boundaries and energy
transmission corridor
■ Creation and preservation of logical service areas —
many service areas do not change as a result of this annexation
■ Prevention of abnormally Irregular boundaries — no
abnormally irregular boundaries result from annexation
■ Incorporation or annexation to cities of unincorporated
areas which are urban in character — area is within urban
growth boundary and therefore considered to be urban in character
Fiscal Impact Analysis
■ General cost and revenue implications
Assumes potential of ± 84 single-family
homes at full development based upon R-8
zoning
Assumes five existing homes will be replaced
Assumes average new dwelling assessed
value of $350,000
•
Fiscal Impact Analysis as Proposed
Estimated one-time Parks Acquisition and Development Cost
of $33,708 attributable to this annexation.
Conclusion, continued
* Surface Water suggests "Level 2" flow control for
new development
* No major service issues identified although Police
and others note cumulative impact of recent
annexations will eventually require more staff
* Best interests and general welfare of City served,
particularly if it facilitates higher quality development
near Nelson Middle School
Conclusion
• Generally consistent with City annexation policies
• Consistent with City policies for medium density
single-family rezones
• Generally consistent with Boundary Review Board
criteria
• Potential catalyst for further redevelopment of area
• Projected revenue surplus at build -out
The Administration recommends that Council:
■ Accept the Akers Fame Annexation 600/6 Direct Petition to
Annex for the 13.3 acre site,
n Support future zoning consistent with the Comprehensive
Plan Residential Single Family land use designation,
■ Authorize Administration to forward Notice of Intent package
to the Boundary Review Board for its 45-day mandatory
review, and
n Authorize Administration to begin preparing relevant zoning
and annexation ordinances for future Council consideration if
the BRB approves this annexation
0
CITY OF RENTON
MEMORANDUM
DATE: August 15, 2005
TO: Terri Briere, Council President
Members of the Renton City Council
FROM: Kathy Keolker-Wheeler, Mayor
Jay Covington, Chief Administrative Officer
SUBJECT: Administrative Report
In addition to our day-to-day activities, the following items are worthy of note for this week:
ADMINISTRATIVE/JUDICIAL/LEGAL SERVICES DEPARTMENT
• Election Day is coming; don't forget to register to vote. To be eligible to vote, you must be 18 years
of age or older, a citizen of the U.S., a resident of the state, county, and precinct for 30 days
immediately preceding the election, and registered for 30 days before the election. Voter registration
forms and absentee ballot request forms are available at the City Clerk's Office in Renton City Hall,
Renton Public Libraries, public schools, fire stations, and on the City's website at
www.ci.renton.wa.us. For more information about voting call the City Clerk's Office at 425-430-
6510.
COMMUNITY SERVICES DEPARTMENT
• McKnight Middle School was the site of the annual tennis carnival on Tuesday, August 9th. Sixty
tennis players, ages 7 to 16, participated in drills, games, and contests. This event is funded through
the Pacific Northwest Chapter of USTA.
• The annual Kennydale Splash Day, organized by Recreation Division lifeguards, was held on
Thursday, August 11`h. Eighty swimmers, 16 years and younger, competed in races and contests, in
and out of the water. The event is always a favorite with the neighborhood and day camps.
• The Lake Washington Lifeguard Challenge Cup will be held Thursday, August 181h, at Madison
Park. Recreation Division will be represented by two teams competing in races and skills
challenges. Last year, Renton lifeguards took first place in the first aid challenge.
• The community is invited to view the Final Master Plan for Heather Downs Park at a meeting on
Tuesday, August 16th, at 7:00 p.m., at Highlands Neighborhood Center, located at 800 Edmonds
Avenue NE. The plan's design has incorporated community, Park Board, and City Council input, as
well as suggestions from previous public meetings. Come view the master plan of this new park and
let the City know what you think. For more information, call 425-430-6617.
• Members of the Kennydale Neighborhood Association will take part in a volunteer effort to help
install new playground equipment at Kennydale Lions Park on Saturday, August 271h. The final
playground structure will be dedicated during the Kennydale neighborhood picnic on Wednesday,
September 71h, and representatives from the City, Starbucks, and other partnering agencies will be on
hand to participate.
Administrative Report
August 15, 2005
Page 2
PLANNINGBUILDING/PUBLIC WORKS DEPARTMENT
• On Friday, August 12th, the Eastside Transportation Partnership (ETP) heard a presentation given by
Sound Transit on the Change to Sound Move to allocate $19 million to the Hardie/Rainier and the
SW 27`h/Strander projects. Councilman Persson, the City of Renton's ETP representative, spoke in
favor of this proposal. ETP passed a unanimous motion to send a letter to Sound Transit supporting
the proposal. On August 17`h, the proposal will be presented to the South County Area
Transportation Board (SCATBd) for their support, and is scheduled to be presented to the Sound
Transit Board on or around September 151h for final adoption.
POLICE DEPARTMENT
• Have you ever been interested in how the Police Department really works or wonder what officers do
during their shift? You are invited to find out. The 391h session of the Renton Police Department
Citizen's Academy begins September 13`h. The academy will meet for 12 weeks on Tuesdays, from
7:00 to 9:00 p.m. Individuals interested in participating must apply by September 2nd. For more
details, call 425-430-7520.
CITY OF RENTON COUNCIL AGENDA BILL
SUBMITTING DATA:
Dept/DivBoard... City Clerk
Staff Contact...... Bonnie Walton
SUBJECT:
Bid opening on 8/4/2005 for CAG-05-114,
Riverview Park Bridge Renovation Project
EXHIBITS:
Staff Recommendation
Bid Tabulation Sheet (six bids)
AI #: ;
OF: August 15,
AGENDA STATUS:
Consent......... X
Public Hearing..
Correspondence..
Ordinance.......
Resolution......
Old Business....
New Business....
Study Session...
Other...........
RECOMMENDED ACTION: APPROVALS:
Legal Dept......
Council concur Finance Dept....
Other.
IIFISCAL IMPACT:
Expenditure Required... $207,500 Transfer/Amendment..
Amount Budgeted........ $165,000 Revenue Generated...
II Total Project Budget... $236,880 City Share Total Project...
SUMMARY OF ACTION:
Engineer's Estimate: $185,000
In accordance with Council procedure, bids submitted at the subject bid opening met the following
criteria: There was more than one bid, and there were no irregularities. Because the low bid submitted by
Marine Vacuum Service, Inc. in the amount of $207,500 was not within the project budget, Council
approval is sought to use excess budget from projects in the Major Maintenance/Parks Maintenance fund
($21,183) and the Repaving fund ($50,697) to add to the $165,000 budgeted for this project. The funding
originally allocated to this project is insufficient since Berger/Abam Engineers' engineering services
contract, in the amount of $28,650, plus the bid will bring the total project cost to $236,880.
I STAFF
Authorize the use of excess budget from completed projects, accept the low bid submitted by Marine
Vacuum Service, Inc. for the Riverview Park Bridge Renovation project, and authorize the Mayor
and City Clerk to execute the contract in the amount of $207,500.
�Y
COMMUNITY SERVICES DEPARTMENT
M E M O R A N D U M
DATE: August 10, 2005
TO: Bonnie Walton, City Clerk
FROM: Dennis Culp, Community Services Administrator
STAFF CONTACT: Leslie Betlach, Parks Director (ext. 6619)
SUBJECT: Acceptance of Bid for Riverview Park Bridge Renovation
Project, CAG-05-114
A bid opening was held Thursday, August 4, 2005, for the Riverview Park Bridge
Renovation Project. The scope of work for this project includes lead abatement; removal,
renovation, and reinstallation of handrails and guardrails; repair of pilings; and replacement
of wood deck with concrete deck panels. The engineer's estimate was $185,000.00. A total
of six bids were received, with Marine Vacuum Service, Inc., of Seattle, WA, as the apparent
low bidder, submitting a bid of $207,500.00 (including Washington State Sales Tax).
The project budget amount is $165,000. Funding for this project comes from the Major
Maintenance/Parks Maintenance fund(316.000000.020.5940.0076.63.000001) for capital
improvements. Berger/Abam Engineers, Inc. was contracted to provide professional
engineering services for the project in the amount of $28,650.00. Other expenses (in the
amount of $730) included lead paint inspection report, advertising costs for Call for Bids, and
copying costs for bid document drawings. The funding originally allocated for this project is
insufficient, since the mentioned expenditures plus Marine Service Inc.'s bid will bring the
total project cost to approximately $236,880, and with a $15,000 contingency, the project
costs total $251,880.
Ilowever, funds are available to use, upon approval, for the Riverview Park Bridge
Renovation Project. There are remaining funds from projects that were carried forward and
completed in 2005, and remaining funds from projects programmed and completed in 2005
as part of the Major Maintenance/Parks Maintenance fund, totaling $21,183
(316.000000.020.5940.0076.63.000001). In addition, there are remaining funds from
projects programmed and completed in 2005 as part of the Repaving fund, totaling $65,697
(316.000000.020.5940.0076.63.020034).
These funds ($86,880) plus the project budget amount ($165,000) would cover the entire
project cost of $251,880 for engineering design services, bid award, and contingency. No
interfund transfer is required as all the monies noted above are in the 316 fund.
Finally, several grant sources were utilized as part of the Riverview Park development. At
least three of the grants require that the grantee operate and maintain facilities consistent with
the development plans approved by the grantor in perpetuity (see attached letter).
We are requesting that the Council award the bid to Marine Vacuum Service, Inc. in the
amount of $207,500.
2005-164aa
, AM-09-2005 TUE 02:59 PH OIAC SRFB FAX NO. 360 902 3026 P. 02/03
Interagency Committee for Outdoor Recreation
--1/902-3000
1902-3026 (fax)
.ail: info@iac.wa.gov
STATE OF WASHINGTON
OFFICE OF THE INTERAGENCY COMMITTEE
1111 Washington Street SE
PO BOX 40917
Olympia, WA 98504-0917
August 9, 2005
Leslie Betlach, Parks Director
City of Renton
1055 South Grady Way
Renton, WA 98055
Re: Riverview Park IAC #79-038A
IAC #89-041 D
IAC #92-297D
Salmon Recovery Funding Board
360/902-2636
360/902-3026 (fax)
email: salmon@iac.wa.gov
Cedar River Trail System
Riverview Park
Cedar River Trail and Pedestrian Bridge
Dear Ms. B �61
�rlw
I am writing this letter as a follow up to a question regarding long term maintenance
responsibility of projects funded with grant assistance from the IAC, and in particular
Riverview Park, formerly known as Cedar River Interpretive Park. Our records indicate that
Riverview Park has benefited from IAC grant assistance through at least three separate
grants referenced above.
One area comprising this park was acquired to replace property converted along the Cedar
River Regional Trail and is now utilized as the vehicular and pedestrian ingress and egress
to the park, landscape improvements and parking area. This area immediately adjoins a
bridge that provides the primary access to a majority of the park and serves as a trailhead
for the regional trail located on the south side of the river. Justification for this site during
the conversion process was that it would serve as parking to access the Cedar River for
non -motorized boating and as trailhead parking.
Additionally, WWRP grant funding was utilized in development of the park including
amenities/structures, walking paths and a regional trail connection from the park to the
Cedar River Trail. And finally, while not administered by the kAd at the time this park was
developed with funding from the Aquatic Lands Enhancement Account (ALEA). Funding
was utilized to develop Riverview Park with the understanding that there would be parking
available immediately across the river off Highway 169. Having been to the site on several
occasions, I am aware of the frequent use and Importance of the access across the Over via
this bridge.
Funding administered by the IAC was clearly utilized to develop the entire park facility. Our
policy for parks funded with IAC administered grant funds is for the Grantee, in this instance
Renton, to develop and maintain parks that are operated and maintained in perpetuity and
r
AUG-09-2005 TUE 02:59 PM OIAC SRFB FAX NO. 360 902 3026 P. 03/03
City of Renton
Riverview Paris
August 9, 2005 Page 2
consistent with the development plans that were approved by the IAC as part of the grant
funding process. Our understanding is the development plans for Riverview Park included
paved parking, landscaping, non -motorized boat access, bridge structure, interpretive
signage, restrooms, picnic shelter, paved and soft -surface walking paths, irrigation, picnic
areas and a regional trail connection.
I anticipate this letter adequately addresses your question regarding the long-term
maintenance responsibilities for IAC funded projects. Should you have questions or require
additional information, please contact me at (360) 902-3020 or by sending an email to
darrell' iac.wa. ov.
Sincerely,
Darrell Jen s
Project nager
cc: Terrence Flatley, Parks Maintenance Manager
Bill Rasmussen, Project Manager
'The 2003 Washington State Legislature transferred programmatic responsibility for the ALEA grant program to IAC
effective July 1.2003.
CITY OF RENTON
BID TABULATION SHEET
PROJECT: Riverview Park Bridge Renovation; CAG-05-114
DATE: August 4, 2005
FORMS
BID
BIDDER
Bid
Triple
Includes 8.8 % Sales Tax
Bond
Form
Advanced Construction, Inc.
X
X
$325,000.00
12322 Hwy. 99, Suite #104
Everett, WA 98204
A.J. Smith
Epic Construction, LLC
X
X
$298,000.00
40 Lake Bellevue Dr., Suite 100
Bellevue, WA 98005
Doug Zylstra
KLM Construction, Inc.
X
X
$267,700.00
1011 E. Main, Suite 408
Puyallup, WA 98372
Daniel Casey
Marine Vacuum Service, Inc.
X
X
$207,500.00
PO Box 24263
Seattle, WA 98124
Charles Campbell
McConnell Construction
X
X
$278,942.00
194 Protection Ridge Rd.
Port Townsend, WA 98368
Tom L. McConnell
Road Construction Northwest, Inc.
X
X
$229,000.00
PO Box 188
Renton, WA 98055-0188
Peter J. Kenney
ENGINEER'S ESTIMATE
TOTAL: $185,000.00
LEGEND:
Forms: Triple Fonn: Non -Collusion Affidavit, Anti -Trust Claims, Minimum Wage
CITY OF RENTON COUNCIL AGENDA BILL
Al N:
Submitting Data:
For Agenda of:
Dept/Div/Board.. Emergency Management
August 15, 2005
Agenda Status
Staff Contact...... Neil Watts, x-7218
Consent .............. X
Public Hearing..
Subject:
Adoption of Federal National Incident Management
Correspondence..
System (NIMS)
Ordinance .............
Resolution........... .
Old Business........
New Business.......
Exhibits:
Issue Paper
Study Sessions......
Resolution
Information........ .
Recommended Action:
Council concur.
Approvals:
Legal Dept.........
Finance Dept......
Other ...............
X
Fiscal Impact: None
Expenditure Required... $0 Transfer/Amendment....... $0
Amount Budgeted....... $0 Revenue Generated......... $0
Total Project Budget $0 City Share Total Project.. $0
SUMMARY OF ACTION:
The proposed Resolution adopts the federal National Incident Management System (NIMS) for
the City of Renton and incorporates NIMS into the City of Renton Emergency Operations Plan.
Adoption of NIMS is required by the federal government as a condition for receiving Federal
preparedness assistance and Homeland Security grant funds.
STAFF RECOMMENDATION:
Approve the Federal National Incident Management System for the City of Renton and adopt the
related Resolution.
Rentonnet/agnbill/ bh
�`SY O� PLANNING/BUILDING/
.41 ♦ PUBLIC WORKS DEPARTMENT
��1
M E M O R A N D U M
DATE: August 4, 2005
TO: Terri Briere, Council President
Mem
VIA: j�#Kathy
'4
FROM: Lee
STAFF CONTACT: Ndil V
x-7,718
of the Renton City Council
, Mayor
of Emergency Management
Section Leader, Emergency Management,
SUBJECT: Adoption of Federal National Incident Management System
ISSUE:
Formal adoption of the Federal National Incident Management System (NIMS) is
required by all local governments for minimum compliance standards required for future
grant eligibility.
RECOMMENDATION:
Council approve adoption by resolution of the Federal National Incident Management
System for the City of Renton.
BACKGROUND SUMMARY:
The proposed Resolution adopts the federal NIMS for the City of Renton and
incorporates NIMS into the City of Renton Emergency Operations Plan. Adoption of
NIMS is required by the federal government as a condition for receiving Federal
preparedness assistance and Homeland Security grant funds.
In Homeland Security Presidential Directive (HSPD) 5, Management of Domestic
Incidents, the President directed the development of the NIMS. The NIMS provides a
consistent nationwide approach for Federal, State, territorial, tribal, and local
governments to work effectively and efficiently together to prepare for, prevent, respond
to, and recover from domestic incidents, regardless of cause, size, or complexity. All
Federal departments and agencies are required to adopt the NIMS and use it in their
individual domestic incident management and emergency prevention, preparedness,
response, recovery, and mitigation activities, as well as in support of all actions taken to
assist State or local entities.
NL'VIS
Page 2 of 3
August 4, 2005
The NIMS provides the framework for locals, tribes, territories, States, and the Federal
Government to work together to respond to any domestic incident. Many of the NIMS
requirements are specific to local jurisdictions. Given the importance and urgency of this
effort, Federal, State, territorial, tribal, and local entities have begun efforts to implement
the NIMS. Implementation of and compliance with the NIMS is critical to ensuring full
and robust preparedness across our nation.
HSPD-5 established ambitious deadlines for NIMS adoption and implementation. FY
2005 is a start up year for NIMS implementation and full compliance with the NIMS was
not required for local governments to receive FY 2005 grant funds. To the maximum
extent possible, States, territories, tribes, and local entities are encouraged to achieve full
NIMS implementation and institutionalization across the entire response system during
FY 2005.
The NIMS is the nation's first -ever standardized approach to incident management and
response. The NIMS unifies Federal, State, territorial, tribal, and local lines of
government into one coordinated effort. This integrated system makes America safer by
establishing a uniform set of processes, protocols, and procedures that all emergency
responders, at every level of government, will use to conduct response actions. This
system ensures that those involved in emergency response operations understand what
their roles are and have the tools they need to be effective.
This system encompasses much more than the Incident Command System (ICS),
although ICS is a critical component of the NIMS. It also provides a common foundation
for training and other preparedness efforts, communicating and sharing information with
other responders and with the public, ordering resources to assist with a response effort,
and for integrating new technologies and standards to support incident management. For
the first time, all of the nation's emergency responders will use a common language, and
a common set of procedures when working individually and together to keep America
safe. The NIMS ensures that they will have the same preparation, the same goals and
expectations, and most importantly, they will be speaking the same language.
Minimum FY 2005 NIMS Compliance Requirements:
State efforts to implement the NIMS must include the following:
• Incorporating NIMS into existing training programs and exercises
• Ensuring that Federal preparedness funding (including DHS Homeland Security
Grant Program, Urban Area Security Initiative (UASI) funds) support NIMS
implementation at the State and local levels (in accordance with the eligibility and
allowable uses of the grants)
• Incorporating NIMS into Emergency Operations Plans (EOP)
• Promotion of intrastate mutual aid agreements
• Coordinating and providing technical assistance to local entities regarding NIMS
• Institutionalizing the use of the ICS
NIMS
Page 3 of 3
August 4, 2005
At the State, territorial, tribal, and local levels, jurisdictions should support NIMS
implementation by:
• Completing the NIMS Awareness Course: "National Incident Management System
(NIMS), An Introduction" IS 700. This independent study course developed by the
Emergency Management Institute (EMI) explains the purpose, principles, key
components and benefits of NIMS.
• Formally recognizing the NIMS and adopting the NIMS principles and policies.
States, territories, tribes, and local entities should establish legislation, executive
orders, resolutions, or ordinances to formally adopt the NIMS.
Establishing a NIMS baseline by determining which NIMS requirements you already
meet. The DHS recognizes that State, territorial, tribal, and local entities have
already implemented many of the concepts and protocols identified in the NIMS. The
2004 DHS Homeland Security Grant Program encouraged grantees to begin utilizing
the NIMS concepts, principles, terminology, and technologies.
Establishing a timeframe and developing a strategy for full NIMS implementation.
States, territories, tribes, and local entities are encouraged to achieve full NIMS
implementation during FY 2005. To the extent that full implementation is not
possible during FY 2005, Federal preparedness assistance must be leveraged to
complete NIMS implementation by FY 2006. By FY 2007, Federal preparedness
assistance will be conditioned by full compliance with the NIMS.
Institutionalizing the use of the ICS. The 9/11 Commission Report recommended
national adoption of the Incident Command System (ICS) to enhance command,
control, and communications capabilities. All Federal, State, territory, tribal, and
local jurisdictions will be required to adopt ICS in order to be compliant with the
NIMS.
FY 2006 and FY 2007 Requirements:
In order to receive FY 2006 preparedness funding, the minimum FY 2005 compliance
requirements described above must be met. Applicants will be required to certify as part
of their FY 2006 grant applications that they have met the FY 2005 NIMS requirements.
CITY OF RENTON, WASHINGTON
RESOLUTION NO.
A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF RENTON,
WASHINGTON, ADOPTING THE FEDERAL NATIONAL INCIDENT
MANAGEMENT SYSTEM (`'NDIS") FOR THE CITY OF RENTON.
WHEREAS, the President in Homeland Security Directive (HSPD)-5, directed the
Secretary of the Department of Homeland Security to develop and administer a National
Incident Management System (NIMS), which would provide a consistent nationwide
approach for federal, state, local, and tribal governments to work together more
effectively and efficiently to prevent, prepare for, respond to and recover from domestic
incidents, regardless of cause, size or complexity; and
WHEREAS, the collective input and guidance from all federal, state, local, and tribal
homeland security partners has been, and will continue to be, vital to the development,
effective implementation and utilization of a comprehensive NIMS; and
WHEREAS, it is necessary and desirable that all federal, state, local and tribal
emergency agencies and personnel coordinate their efforts to effectively and efficiently
provide the highest levels of incident management, and
WHEREAS, to facilitate the most efficient and effective incident management it is
critical that federal, state, local, and tribal organizations utilize standardized terminology,
standardized organizational structures, interoperable communications, consolidated action plans,
unified command structures, uniform personnel qualification standards, uniform standards for
planning, training, and exercising, comprehensive resource management, and designated incident
facilities during emergencies or disasters; and
RESOLUTION NO.
WHEREAS, NIMS establishes a federally recognized standard incident management
processes, protocols, and procedures that all responders — federal, state, tribal, and local — will
use to coordinate and conduct response actions; and
WHEREAS, the NIMS standardized procedures for managing personnel,
communications, facilities and resources will improve the State's ability to utilize federal
funding to enhance local and state agency readiness, maintain first responder safety,
and streamline incident management processes; and
WHEREAS, the Incident Command System components of NIMS are already an
integral part of various incident management activities throughout the State, including
current emergency management training programs; and
WHEREAS, responders using the same standardized procedures will all share a
common focus and will be able to place full emphasis on incident management when an incident
occurs, whether it is terrorism or a natural disaster. In addition, national preparedness and
readiness in responding to and recovering from an incident are enhanced since all of the nation's
emergency teams and authorities are using a common language and set procedures; and
WHEREAS, the National Commission on Terrorist Attacks (9-11 Commission)
recommended adoption of a standardized Incident Command System; and
WHEREAS, Homeland Security Presidential Directive-5 states that NIMS must be
adopted by state and local organizations as a condition for federal preparedness assistance after
October 1, 2005;
NOW, THEREFORE, THE CITY COUNCIL OF THE CITY OF RENTON,
WASHINGTON, DOES RESOLVE AS FOLLOWS:
SECTION L The above findings are true and correct in all respects.
2
RESOLUTION NO.
SECTION IIe The City Council hereby adopts the National Incident Management
System CNIMS"), which shall be utilized for all incident management in the City.
SECTION III. The City of Renton shall incorporate NIMS into the City of Renton
Emergency Operations Plan.
PASSED BY THE CITY COUNCIL this day of , 2005.
Bonnie I. Walton, City Clerk
APPROVED BY THE MAYOR this day of 2005.
Approved as to form:
Lawrence J. Warren, City Attorney
RES. 1126:8/5/05:ma
Kathy Keolker-Wheeler, Mayor
3
CITY OF RENTON COUNCIL AGENDA BILL
AI #:
Submitting Data:
Dept/Div/Board.. EDNSP/Strategic Planning
Staff Contact...... Don Erickson (X-6581)
Subject:
Park Terrace - Expanded Annexation Public Hearing
Exhibits:
Issue Paper
Boundary Review Board Resolution and Decision
Recommended Action:
Council concur
For Agenda of: August 15, 2005
Agenda Status
Consent ..............
Public Hearing..
Correspondence..
Ordinance .............
Resolution........... .
Old Business........
New Business.......
Study Sessions......
Information........ .
Approvals:
Legal Dept.........
Finance Dept......
Other ...............
Fiscal Impact:
Expenditure Required... Transfer/Amendment.......
Amount Budgeted....... Revenue Generated.........
Total Project Budget N/A City Share Total Project..
M
SUMMARY OF ACTION:
Council accepted the 60% Direct Petition to Annex for this annexation on December 20, 2004,
and authorized staff to forward the Notice of Intent Package to the Boundary Review Board. It
also authorized the Administration to invoke the Board's jurisdiction by requesting that it
include the unincorporated peninsula to the north along 138' Avenue SE. On March 22, 2005,
the Administration did this, arguing in its brief that this unincorporated area resulted in an
inefficient service area for both it and the County. The BRB held public hearings on this
request on May 24, 2005, and issued its decision on June 16, 2005, expanding the boundaries
of the original Park Terrace annexation, located at SE 121" Street and Duvall Avenue NE, from
7.65 acres to approximately 80 acres.
State law requires that the Council hold two public hearings before it can rezone the enlarged
annexation site. Staff is requesting that Council set September 12, 2005, for the first of these
two required public hearings on the enlarged annexation area.
STAFF RECOMMENDATION:
Council set a public hearing date for September 12, 2005, to consider the decision of the Boundary
Review Board expanding the Park Terrace Annexation from 7.65 acres to approximately 80 acres,
as well as future zoning related to this expanded annexation area.
Rentonnet/agnbill/ bh
y ECONOMIC DEVELOPMENT,
NEIGHBORHOODS, AND STRATEGIC
_AIN' PLANNING DEPARTMENT
M E M O R A N D U M
DATE: August 3, 2005
TO: Terri Briere, Council President
City Councilmembers
VIA: �� Kathy Keolker-Wheeler, Mayor
FROM: Alex Pietsch, Administrator ki L'o
STAFF CONTACT: Don Erickson (6581)
SUBJECT: Park Terrace — Expanded Annexation
ISSUE:
Whether Council wishes to accept the decision of the Boundary Review Board for King
County to expand the Park Terrace annexation from 7.65-acres to approximately 80-acres
and, if it does, whether it wishes to consider zoning for this enlarged area consistent with
the Comprehensive Plan land use designations shown for it?
RECOMMENDATION
On the basis of the following analysis, the Administration recommends that Council
accept the decision of the Boundary Review Board expanding the boundaries of the Park
Terrace Annexation from 7.65-acres to approximately 80-acres and consider future City
zoning for it consistent with the Comprehensive Plan Land Use Map designations shown
for it. Specifically, these are Residential Medium Density at the northern tip of the
enlarged area and Residential Single Family for the area to the south and including the
original 7.65-acre site.
If Council concurs with this recommendation, the Administration also recommends that
it:
• Authorize the Administration to prepare zoning ordinances for the rezoning of the
non -street portions of the enlarged annexation site to R-8 zone, south of SE 113th Street,
if extended, and to R-10, north of SE 113th Street, if extended, consistent with the
Comprehensive Plan Land Use Map;
• Authorize the Administration to prepare an ordinance for the effectuation of the
enlarged annexation itself, and,
h:\ednsp\paa\annexations\park terrace\expanded area issue paper.doc
Park Terrace — Expanded Annexation
Page 2 of 6
August 3, 2005
• Set a second public hearing date for October 3, 2005 to further consider the proposed
R-8 prezone and, if it concurs, accept the annexation by adopting the effectuation and
rezoning ordinances concurrently.
BACKGROUND SUMMARY:
The City is now in receipt of the Resolution and Hearing Decision of the Boundary
Review Board unanimously supporting the expansion of the original annexation by
approximately 73-acres pursuant to the request of the City on March 22, 2005, when it
invoked the Board's jurisdiction pursuant to RCW 36.93.100. Council must now decide
whether it wants to continue to support this enlarged area
Location: The 80-acre annexation site is located south of SE 112th Street, if
extended and east of Anacortes Avenue NE to 1441h Avenue SE. It abuts the City
boundary on its west, north, east and south boundaries (Figure 1, Vicinity Map).
2. Assessed value: The assessed value based upon current development is
$30,951,700.
3. Natural features: The site generally slopes down from 1401h Avenue SE to Duvall
Avenue NE at about a 3% slope (Figure 3, Topography).
4. Existing land uses: Existing development includes 124 medium -to -large lots, of
which approximately half have single-family dwellings (Figure 4, Existing
Structures).
5. Existing zoning_ King County zoning is R-4 along the west side of Duvall
Avenue NE (138th Avenue SE), south of NE 8th Street, if extended, and east of
1401h Avenue. King County zoning is R-6 between Duvall Avenue NE and
Hoquiam Avenue NE, north of NE 8'h Street, if extended. Because County
zoning allows a bonus density of at least two units per net acre, above their base
density of four or six units per gross acre, their overall density would be higher
than what would be allowed under Renton's R-8 and R-10 zoning.
6. Comprehensive Plan: Renton's Comprehensive Plan designates 90% of the
subject parcels Residential Single Family (RS) and about 10% Residential
Medium Density (RM). Potential zoning under the RS designation is R-8, 8 units
per net acre, and under the RM designation is, R-10, 10 units per net acre.
7. Public services: All responding departments and divisions noted that the
annexation represents a logical extension of their respective services and systems.
Water Utility. The expanded area is within the water service area of both Water
District #90 and the City of Renton. The portion west of Duvall Avenue NE
(138th Avenue SE) is served by the City and the portion east of Duvall Avenue
NE is served by Water District #90 per agreement under the East King County
h:\ednsp\paa\annexations\park terrace\expanded area issue paper.doc
Park Terrace — Expanded Annexation
Page 3 of 6
August 3, 2005
Coordinated Water System Plan. A certificate of water availability from the
District will be required prior to the issuance of development permits for those
areas east of Duvall Avenue NE, following annexation to the City. The City
would not assume ownership or responsibility for facilities owned or managed by
another jurisdiction.
Sewers. The area is not currently served by sewer. Renton is the designated
sewer service provider for this area. Sewers would be extended by a combination
of developer extension, local improvement districts and City capital improvement
projects.
Surface Water. Staff notes the expanded annexation is located in two drainage
basins. Most of the proposed expanded area is located in the upper Maplewood
Creek Sub -basin of the Cedar River Basin. About a third of the area (north of NE
1 Oth Street) is located in the Honey Creek Sub -basin. Because of existing
problems with flooding, erosion and degradation of fish habitat, future
development in the proposed annexation site should be required to provide Level
2 flow control and Basic Water Quality treatment per the 2005 King County
Surface Water Design Manual or more restrictive or equivalent City standard, at
that time. Staff note that the drainage ditches along SE 138th Place SE at SE 121"
Street are overgrown and flow out across private property. Staff is recommending
a down stream analysis prior to any development in this area. Also, there are two
existing King County owned and maintained storm water detention facilities that
the Surface Water Utility of the City would have to assume ownership and
operation of upon annexation. At full development, staff estimates operation and
maintenance costs of $238 per acre or $19,000 per year. Capital improvement
costs, based on citywide averages, could add another $18,000, if pro -rated for this
80-acre area. Estimated surface water revenues from existing and new
development would be approximately $14,500 per year, creating an annual
shortfall of $22,500 per year.
Parks. The City has a shortfall of both neighborhood and community parkland in
this area. The nearest park is Kiwanis Park, approximately %2 mile to the west.
King County's May Valley Park is approximately 3/4 mile to the northeast on the
rural side of the Urban Growth Area boundary. Staff estimates a one-time cost of
$142,860, above what the City receives from parks mitigation fees from new
housing, as this area's proportionate share to bring the area up to City standards
for recreational space. These estimates do not take into consideration possible
recreational land transfers from King County.
Fire. The majority of the expanded area is currently served by the City under the
contract with Fire District #25. A small portion east of Hoquiam Avenue NE is in
Fire District No. 10.
Transportation. Staff saw no unique or significant problems, but they did indicate
that future right-of-way dedication might eventually be required along some
streets to bring them up to City standards. This includes sections of 140th Avenue
h:\ednsp\paa\annexations\park terrace\expanded area issue paper.doc
Park Terrace — Expanded Annexation
Page 4 of 6
August 3, 2005
SE, a section of NE 1 Oth east of Duvall Avenue NE, and sections of partial streets
elsewhere in the expanded area. In addition, staff notes that neither the City nor
County have plans for improving the existing streets, with the exception of Duvall
Avenue NE, within the expanded annexation area. Previously, the City has
proposed to the County roadway widening of Duvall Avenue NE from four to five
lanes with curbs, gutters, sidewalks and street lighting at an estimated cost of
$2,500,000. King County has shown no interest in participating in the cost of
such improvements. Upgrading other existing streets within the expanded
annexation area to City standards as well as the cost of new streets would be at the
expense of existing property owners and/or new development.
Public Works Maintenance. Maintenance staff noted that the only organized
drainage is roadside ditches, which are in many cases overgrown and will need
maintenance. They also estimate a one-time cost for repairing existing streets,
particularly Duvall Avenue NE, at $483,725. King County has indicated that it
would possibly include resurfacing in their 2006 contract for overlay work, but
would not do so if 138th Avenue SE (Duvall Avenue NE) were already in the
City. Staff is currently looking at options that would possibly leave portions of
the expanded annexation out if no agreement were reached with the County for
their undertaking or paying for this resurfacing work. One option would be to
phase the annexation so that properties abutting SE 1381h would not be brought
into the City until after the County had completed its resurfacing work.
ANALYSIS OF THE PROPOSED ANNEXATION:
Consistency with the Comprehensive Plan:
City annexation policies generally support the proposed annexation. The subject
properties are within Renton's Potential Annexation Area and are subject to
development pressure (Policies LU-37.3). The area is available for urbanization
under the King County Comprehensive Plan, zoning, and subdivision regulations
(Policy LU-37.5). Renton is the logical provider of urban infrastructure and
services to the area (Policy LU-37.6). And, Policy LU-56 states that, in general,
annexations should be expanded if they include areas surrounded by the City on
three or more sides, as in this case. The expanded annexation area is adjacent to
the city limits along approximately 90% of its perimeter.
2. Consistency with the Boundary Review Board Objectives:
(from RCW 36.93.180)
a. Preservation of natural neighborhoods and communities;
The proposed annexation would include the whole Park Terrace
neighborhood as well as 89 homes left in an isolated unincorporated
peninsula of King County. The latter is difficult for that jurisdiction to serve.
As currently proposed no neighborhoods are split or left out.
h:\ednsp\paa\annexations\park terrace\expanded area issue paper.doc
Park Terrace — Expanded Annexation
Page 5 of 6
August 3, 2005
b. Use of physical boundaries, including but not limited to bodies of water,
highways, and land contours;
Boundaries follow physical features including streets and existing City edges.
C. Creation and preservation of logical service areas;
Not applicable.
d. Prevention of abnormally irregular boundaries;
The revised boundaries are now conterminous with City boundaries to the
west, north, east, and south and represent logical boundaries.
e. Discouragement of multiple incorporations of small cities and
encouragement of incorporations of cities in excess of ten thousand
population in heavily populated urban areas;
Not applicable.
f. Dissolution of inactive special purpose districts;
Not applicable.
g. Adjustment of impractical boundaries;
The expanded area eliminates a peninsula of unincorporated King County
that penetrates the middle of the northeast section of the City. The proposed
new boundaries are much more practical and will result in the more efficient
delivery of urban services to the area.
h. Incorporation as cities or towns or annexation to cities or towns of
unincorporated areas which are urban in character; and,
King County has designated this area for urban development and it is
proposed to be annexed to the City of Renton.
i. Protection of agricultural and rural lands which are designated for long
term productive agricultural and resource use by a comprehensive plan
adopted by the county legislative authority.
Not applicable. No portions of the proposed Annexation area are rural or
designated for long-term productive agricultural use in the King County
Comprehensive Plan.
3. Consistency with the Comprehensive Plan Land Use Map
Upon annexation the non -street portions of the subject site will need to be rezoned
from the County's R-4 zone to zoning consistent with the City's Comprehensive
Plan Land Use Map designation for this area. The area is currently designated
Residential Single Family (RS) and would be rezoned R-8, eight units per net
acre, upon annexation to be consistent with this land use designation.
4. Estimated Fiscal Impact:
h:\ednsp\paa\annexations\park terrace\expanded area issue paper.doc
Park Terrace — Expanded Annexation
Page 6 of 6
August 3, 2005
Based upon the full development of the existing vacant parcels in the expanded
annexation area, including the vacant lots in the original 7.65-acre proposal, staff
estimates net fiscal revenue of $481 per year for the expanded annexation site at
its current level of development, and a surplus of $27,258 per year in 2005 dollars
at full development. One time costs include those for resurfacing Duvall Avenue
NE, at an estimated $483,725 and those to provide parks at City standards, at an
estimated one-time cost of $142,860.
CONCLUSION:
The expanded annexation site is within the City's PAA and is surrounded by the City
now on virtually all sides. Approximately half of it is already developed with 112 homes
and approximately 94 additional homes could be built under proposed zoning. All of the
area is within Renton's sewer service area and most of it, in terms of fire suppression, is
served by the City, under contract with Fire District No. 25. The County has deferred
maintenance in the area and it would clearly benefit from City services.
None of the ten departments/divisions reviewing this expanded annexation indicated that
they were opposed to the annexation or thought that the proposed boundaries were not a
logical extension of City services. No impediments to the provision of City services to
the area were identified although staff did note a deficiency of existing parks in the area
and Public Works staff estimated a one-time cost of $483,725 to bring streets up to City
roadway standards.
As noted earlier, the proposal is generally consistent with City annexation policies and
the Boundary Review Board, in making its findings and decision supporting the
expanded annexation area, found it generally consistent with the provisions of RCW
36.93.180, objectives for annexation.
Attachments
h:\ednsp\paa\annexations\park terrace\expanded area issue paper.doc
u
Z
LLL LLLLI
� 9M
w
1�II911Li!�w►�� : ��
111111
111111 !'_
ark Terrace Annexation
Figure 1: Vicinity Map
Gti2 0{, Economic Development, Neighborhoods & Strategic Planning
*O' Alex Pietsch, Administrator
G. Del Rosario
�AN r0� I August 2005
St
my
0 600 1200
1 : 7200
o Proposed Annexation Area
o Proposed Hoquiam Annexation Area
a
IF
�
�
0
_
00
s
1
-------------------
j Y"
��
11
r
}
4'
}
K'
x
c
� S
St
r
- try
114
S
�7
1-
ilk
,y
.r V`i'
•
�'AY''..� t •� � i Q i S- s r
x t
� �- {�3'.`?y,�
�
_
1.4
q
M
L
6th S.t
ark Terrace Annexation
0
500 loon
Figure 2: Aerial Map
---
o{
1 6000
Economic Development, Neighborhoods & Strategic Planning
Alex Ptetsch, Administrator
Proposed Annexation Area
G_ Del Etosnnu
I August 2005
.irk Terrace Annexation
Figure 3: Topography Map
Uti�Y {, Economic Development, Neighborhoods & Strategic Planning
♦ ♦ Alex Pietsch, Administrator
G. Del Rosario
CANT Z I August 2005
---- 1m Interval Contour 1 : 6000
o Proposed Annexation Area
l� Proposed Hoquiam Annexation Area
p
o o
�
0000
�0
OV
6 q
U q
uc� �❑
o
o
p
(�
Ud
❑ Bt�
0
�'
o
fl
a
o
°
�'
o o
°
�j
P
00
p
4
r-7
LTjq
AT
St
CJ
ZE]�7
q
Cl
J"�
F? Lrf
1❑ic
�3
P
fl
�y
4 0
—k
a
o
11
o
0 0 o
C:)
L
nn
❑ LJ
Q
,�
�o
E. h Str-
4 9
6 (I
CIP
7t
o
a
Q
p
o°
o
13
o
q
aQ
A
o
i'1 p
th S
o
ati
D°o
00 0
ED
a
fl g
o
4
d O
❑
u
❑]
ark Terrace Annexation
0
500
1000
Figure 4: Existing Structures Map
GtiT ot, Economic Development, Neighborhoods &Strategic Planning
Alex Pietsch, Administrator
G. Del Rosario
o
Structure
Proposed Annexation
Area
1 : 6000
I August 2005
o
Proposed Hoquiam Annexation
Area
PARK TERRACE - EXPANDED ANNEXATION FISCAL ANALYSIS SHEET
Units
Population
AV
Existing dev.
112
280
$30,951,700
Full dev.
206
515
$63,851,700
Assumptions: 2.5 persons / household
$350,000 AV / new unit
$215,000 AV /existing unit
...................
....................
Revi3iis
......n' ...........
.......:...........
Existing
Full
Rate
Regular levy
$97,188
$200,494
3.14
Excesslevy
$2,433
$5,019
0.07861
State shared revenues
Rate (per cap)
Existing
Full
Liquor tax
$4.00
$1,120.00
$2,060.00
Liquor Board profits
$7.43
$2,080.40
$3,826.45
Fuel tax - roads
$15.47
$4,331.60
$7,967.05
Fuel tax - arterials
$7.48
$2,094.40
$3,852.20
MVET
$0.00
$0.00
$0.00
Camper excise
$0.00
$0.00
$0.00
Criminal justice
$0.36
$100.80
$185.40
Total
$9,727.20
$17,891.10
Miscellaneous revenues
Rate
Existing
Full
Real estate excise*
$48.57
$13,599.60
$25,013.55
Utility tax**
$133.20
$14,918.40
$27,439.20
Fines & forfeits*
$17.53
$4,908.40
$9,027.95
Total
1
$33,426.401
$61,480.70
" Per capita
** Per housing unit - based on $2,220 annual utility billing @ 6% tax rate
Per capita
Existing
Full
Contracted Services
Alcohol
$0.19
$53.20
$97.85
Public Defender
$4.68
$1,310.40
$2,410.20
Jail
$8.56
$2,396.80
$4,408.40
Subtotal
$3,760.40
$6,916.45
Court/le al/admin.
$66.92
$18,737.60
$34,463.80
Parks maintenance*
$14.90
$4,172.00
$7,673.50
Police
$276.89
$77,529.20
$142,598.35
Road maintenance**
N/A
$8,985.00
$11,981.00
Fire***
$1.25
$38,689.63
$79,814.63
Total
$151,873.83
$283,447.73
See Sheet Parks FIA
** See Sheet Roads FIA
*** Rate per $1,000 of assessed valuation (FD#25 contract)
e=tirriir costs> Parks acquisition & development (from Sheet Parks FIA):
Total revenues
............. ......
....................
Existing $1275(15
Full :::::$284 88552
....................
Total ongoing costs
Existing9 5 (8383
Full
Net fiscal impact
Existing 9(33877
Total one-time costs
Other one-time costs:
Kesurfacing of 138th Avenue SE between NE 8th Street and NE 12th Street, if extdended
..................
.................
S1 G9 ..........
$483,725
Revised 8-03-05 per Finance
PROCEEDINGS OF THE
WASHINGTON STATE BOUNDARY REVIEW BOARD
FOR KING COUNTY
RESOLUTION AND HEARING DECISION
IN RE: CITY OF RENTON FILE NO. 2186
Park Terrace
Proposed Annexation
King County, Washington
I. PUBLIC HEARING OVERVIEW
In February of 2005 the City of Renton submitted to the Washington State Boundary Review Board a
Notice of Intention (File No. 2186) to annex a certain 7.86 acre portion of territory based upon an
annexation petition by property owners, pursuant to RCW 35A.14. Renton City Council adopted the
petition for annexation in December of 2004.
The City of Renton described the Park Terrace Annexation as follows:
■ The northern boundary is generally formed by NE 8th Street and contiguous with the
City of Renton.
• The southern boundary is generally formed by NE 7th Street/SE 122"d Street and contiguous with the
City of Renton.
• The western boundary is formed by Duvall Avenue NE.
■ The eastern boundary is formed by 140t" Avenue SE.
On March 22, 2005, the City of Renton invoked the Board's jurisdiction pursuant to RCW 36.93.100.
The City sought modification of the annexation to add approximately 80 acres. The proposed .Park
Terrace Area (Expanded) would then total 88 acres. The request for review was based upon the
following:
■ The City of Renton Comprehensive Plan and the King County Comprehensive Plan intend
the annexation of the entire Park Terrace Area.
• An action to consolidate the entire Park Terrace Area under a single jurisdiction at this time
would enable uniform local governance and coordinated services.
■ Renton has pending new legislation that will provide for the Park Terrace Area appropriate
levels of development, services, and environmental protection for the natural community.
• Renton is capable of immediately providing accessible local government and a full array of
services to the entire Potential Annexation Area.
A public hearing was conducted on May 23, 2005 before a quorum of the Boundary Review Board in
order to consider the original proposal by the City of Renton to incorporate the Park Terrace
Annexation Area (7.86 acres).
At the conclusion of that hearing, the Boundary Review Board voted unanimously to continue the
public hearing to May 24, 2005 to consider Renton's request to modify the original proposal. The
Board determined that this review would be consistent with the requirements of state law (RCW
36.93, RCW 36.70A, et al.).
The proposed boundaries of the Park Terrace Area (if modified) are described as follows:
• The northern boundary is generally formed by SE 112ih Place.
■ The southern boundary is generally formed by NE 6th Place.
■ The western boundary of the annexation area is formed by Anacortes Avenue and by
Duvall Avenue NE.
• The eastern boundary is primarily formed by 142"d Avenue SE and Duvall Avenue NE.
Legal notice having been duly given, a modification hearing was held on May 24, 2005 before a
quorum of the Boundary Review Board.
The Board is responsible, under State of Washington law, to: (1) examine the record (e.g., application
materials; technical studies; fiscal studies; regulatory analyses; other documents, exhibits, statements
and testimony); (2) determine the specific policies and guidelines are applicable to the proposed
action; (3) review and balance these elements; and (4) take the action that best advances those
elements.
As prescribed by the state law, the Board reviewed File No. 2186 in accord with RCW 36.93. (Local
Governments — Boundaries — Review Boards). The Board directed particular attention to RCW
36.93.170 (Factors) and RCW 36.93.180 (Objectives). The Board also considered RCW 36.93.150,
which establishes the authority for modification of annexation proposals. In accord with the law, the
Board also considered RCW 36.70.A, the Growth Management Act, the King County Comprehensive
Plan, the City of Renton Comprehensive Plan, together with other applicable state, regional, and local
regulations and guidelines.
On the basis of the testimony, evidence and exhibits presented at said hearing, and the matters on
record in said File No. 2186, it is the decision of the Board that the action proposed in said Notice of
Intention be, and the same is, hereby approved with modifications to include the Park Terrace
(Expanded) Annexation Area (approximately 88 acres). The legal description of the Park Terrace
(Expanded) Annexation Area, as approved with modifications, is attached hereto and marked as
"Exhibit I", together with a map showing the boundaries of the area herein marked as "Exhibit II."
11. FINDINGS
RCW 36.93.170 FACTORS AFFECTING THIS PROPOSAL
The Boundary Review Board finds the following_ Factors (RCW 36.93.170) to be applicable to the City
of Renton's initially proposed Park Terrace Annexation (7.86 acres) and to the Park Terrace Area
(Expanded) Annexation (88 acres). Additional authorities applicable to the Park Terrace/Park
Terrace Area (Expanded) include, but are not limited to: RCW 36.70A, RCW 35.13, King County
Comprehensive Plan/Countywide Policies, the Renton Comprehensive Plan and its enabling
regulations (e.g., zoning code). These State and local authorities are intended to ensure reasonable
development regulations and adequate public services to local communities
A brief review of key issues related to each applicable element is presented below:
RCW 36.93.170 (1) POPULATION AND TERRITORY
The Board considered the following factors to be applicable: Population Density; Proximity to Other
Populated Areas; Land Area/Land Uses; Comprehensive Land Use Plans; Topography, Natural
Boundaries and Drainage Basins; Likelihood of Significant Growth in the Area During the Next Ten
Years; and Population Density/Proximity to Other Populated Areas/Land Area/Land Uses. Following
is a brief review of key issues related to these factors.
The entire Park Terrace Area (Expanded) lies within the Urban Growth Area delineated by King
County. The community is unified with respect to its specific physical elements (e.g., geographic
features) and social elements.
The King County Comprehensive Plan anticipates transfer of the Park Terrace Area (Expanded) to a
local jurisdiction. County Comprehensive Plan/Countywide Policies call for contiguous orderly growth
of local jurisdictions (e.g., U-304, U-208, U-301, U-304.). Policies also establish cities as the
appropriate providers of local governance and urban services (e.g., FW-13, CO-1, CO-3; LU-31 - LU-
34, LU-36). King County Policy LU-31 requires cities to designate potential annexation areas to
include adjacent urban lands and to eliminate unincorporated islands between cities. Policy LU-32
calls upon cities to incorporate lands within annexation areas into city boundaries. Similarly, the Plan
supports cities as basic governing units and service providers (e.g., FW-13, LU-31).
Z
Further, the Renton Comprehensive Plan "Annexation Element" addresses the annexation of the Park
Terrace Area (Expanded). The Park Terrace Area (Expanded) is consistent with City's
Comprehensive Plan policies addressing annexation of urban areas (e.g., LU-378 — LU-380) and
provision of services to incorporated areas (e.g., LU-383; LU-386, LU-392).
More particularly, the evidence demonstrates that the Park Terrace Area (Expanded) will likely
experience continuing urban growth over the next ten years. Park Terrace currently hosts substantial
residential development. However, there is considerable land that is suitable and permitted for
redevelopment or new development with residential uses. Evidence further demonstrates that the
City of Renton has planned for growth at urban levels of density in the Park Terrace Area
(Expanded). City plans establish standards to guide ongoing uses in this Area following annexation.
Future residential development would reportedly be generally similar to and essentially compatible
with existing housing density requirements.
The Park Terrace Area (Expanded) includes sloped terrain and vegetated lands. Upon annexation,
the City of Renton plans to manage these lands (e.g., open spaces, storm water/flood programs)
under regulatory controls designed to protect environmentally sensitive areas.
With annexation of the Park Terrace Area (Expanded), there would be an opportunity to immediately
provide consistent and coordinated development plans, environmental protection standard, and public
services throughout the entire Park Terrace Area community.
RCW 36.93.170 (2) MUNICIPAL SERVICES
RCW 36.93.170 (2) directs the Board to evaluate factors related to Municipal Services. The Board
considered the following factors to be applicable: need for municipal services; effects of ordinances,
governmental codes, regulations and resolutions on existing uses; present cost and adequacy of
governmental services and controls in area; probable future need for such services; costs; effect on
the finance, debt structure and contractual obligations; and prospects of government services from
other sources, and rights of other affected governmental units. Following is a brief review of key
issues related to these factors.
The evidence demonstrates that the Park Terrace Area and Park Terrace Area (Expanded) require
municipal services and facilities. Service policies are established by the State Growth Management
Act and the King County Comprehensive Plan. For example, King County FW-13 states that cities
are the appropriate provider of local urban services to Urban Areas. FW-29 and
FW-30 address the need for jurisdictions to plan for and coordinate services. Additionally,
annexation is appropriate under Countywide Policy CO-1, when a jurisdiction has "identified and
planned for (a) full range of urban services".
Pursuant to the State Growth Management Act and the King County Plan, the City of Renton
developed policies — through the City's Comprehensive Land Use Plan, Comprehensive Service
Plans, and other regulatory authorities — for serving all properties within its corporate boundaries.
Upon annexation, the City of Renton would include the newly incorporated area in the municipality's
Service Area. Then, as is customary, the City can provide — either directly or by contract — a full array
of specific service plans and programs for public services including: water service, surface water
management, sewer service, fire service, police service, emergency medical services, utilities, road
maintenance, law and justice services, human services, libraries, and parks and recreation services.
The School District would continue to administer school assignments.
Fiscal studies have been conducted for Park Terrace Area (Expanded). Study findings indicate that
the City would be able to sustain levels of service at reasonable customer rates. Residents would
also cease to pay County taxes for services.
King County supports annexation of the Park Terrace Area (Expanded). This consolidated action
provides for a more logical municipal service area. The City can provide more cohesive policies,
standards, programs, cohesive operations, and efficient, economic control of services than would
3
occur with the more limited Park Terrace Annexation (7.86 acres). A limited Park Terrace Annexation
would result in inconsistent service provision as various County providers and local providers will be
required to serve areas that are not clearly delineated. Service availability may be fragmented as
well. Thus, services will be less effective, less efficient, and more costly to both the government and
the citizens.
RCW 36.93.170 (3) EFFECTS OF PROPOSAL_
RCW 36.93.170(3) directs the Board to evaluate issues related to effects of a proposed action. For
File No. 2186, the Board considered the following factors to be applicable: mutual economic and
social interests, and local government structure. Below is a brief review of key issues.
The record for File No. 2186 supports incorporation of the entire Park Area (Expanded). The Park
Terrace Area (Expanded) is contiguous to — and shares mutual social and economic profiles with —
the City of Renton. Renton officials testified that the City is prepared to govern and to provide full
services to this community.
Annexation of the Park Terrace Area (Expanded) would promote a viable community because new
citizens would be able to participate in local governance — including land use planning, service
planning, fiscal planning and planning for public amenities to serve the community. Coordinated
integration of citizens of the Park Terrace Area (Expanded) into Renton would preserve social
organization, support economic health, and protect public safety and welfare.
King County supports the Park Terrace Area (Expanded) Annexation as the action that is in the best
interests of all parties. State law, the King County Comprehensive Plan, and the City of Renton
Comprehensive Plan each encourage local governance of communities.
Annexation of the Park Terrace Area (Expanded) is also consistent with the King County Executive's
Annexation Initiative, which calls for annexation of urban lands to local jurisdictions at the earliest
feasible date. Immediate annexation of the Park Terrace Area (Expanded) better promotes balanced
governance than incremental incorporation proposed in the initial Park Terrace Annexation.
Incorporation of the Park Terrace Area (Expanded) into the City of Renton promotes strong and
unified local government.
CONSISTENCY WITH THE GROWTH MANAGEMENT ACT
State law provides in RCW 36.93.157 that Boundary Review Board decisions must be consistent with
three sections of the Growth Management Act:
■ RCW 36.70A.020 Planning Goals
■ RCW 36.70A.110 Urban Growth Areas
• RCW 36.70A.210 Countywide Planning Policies
With respect to File No. 2186, the key Growth Management issues involve the Countywide Planning
Policies pertaining to land use and municipal services (RCW 36.70A.020 and RCW 36.70A.110). The
Growth Management Act policies that guide the provision of public services and that are relevant to
the proposed Annexation include:
❑ RCW 36.70A.020 (1) Urban Growth: Encourages development in urban areas where adequate public
facilities and services exist or can be provided efficiently.
❑ RCW 36.70A.020 (2) Reduce Sprawl: Reduce inappropriate conversion of undeveloped land into
sprawling low -density development.
❑ RCW 36.70A.020 (10) Environment: Protect and enhance the environment and quality of life.
❑ RCW 36.70A.020 (11) Citizen Participation and coordination in the planning process and ensure
coordination between communities/jurisdictions to reconcile conflicts.
❑ RCW 36.70A.020 (12) Public Facilities and services: Ensures that adequate public services and
facilities are available to serve land developments.
❑ RCW 36.70A.110 (1/6) calls for each county to designate an urban growth area.
❑ RCW 36.70A.110 (3) directs urban growth to areas with existing or available public services and
facilities
CI
O RCW 36.70A.110 (4) states that "(in) general, cities are the units of local government most appropriate
to provide urban ...services."
O RCW 36.70A.210 (1) calls for cities to be primary providers of governmental services in urban growth
areas.
Incorporation of the Park Terrace Area (Expanded) into the City of Renton would effectively address
Growth Management Act criteria for incorporation of urban areas.
RCW 36.93.180 OBJECTIVES
The Boundary Review Board has considered RCW 36.93.180 (Objectives), as follows:
RCW 36.93.180 (1) PRESERVATION OF NATURAL NEIGHBORHOODS AND COMMUNITIES
The record for File No. 2186 confirms that the Park Terrace Area (Expanded) is considered to be a
neighborhood — based upon the definition of neighborhood, under case law, as "either geographically
distinct areas or socially... distinct groups of residents". The Park Terrace Area (Expanded), in its
entirety, exhibits many features that support its link with the City. Both Park Terrace and the adjacent
City lands are residential in character. Demographic profiles are similar. Residents of the City and
the Park Terrace Area use common community facilities — schools, roadways, libraries, shopping
centers, parks, and recreation facilities.
The City of Renton Comprehensive Plan anticipates annexation of the Park Terrace Area
(Expanded). The City has already included the Park Terrace Area (Expanded) in community planning
programs in order to guide its growth and to provide coordinated services. Annexation of the Park
Terrace Area (Expanded) is consistent with the objective of preserving the natural neighborhood
because this action would provide stronger links within the greater community and would encourage a
more effective connection to the City of Renton.
Renton officials testified that the Park Terrace Area (Expanded) Annexation would, provide all
property owners/residents a voice and a vote in planning for the future preservation and development
of their community. Community representatives demonstrate plans to effectively govern and serve
this area as a part of a unified community.
King County representative Michael Thomas stated that the County supports the annexation of the
entire Park Terrace Area (Expanded) because this incorporation would be consistent with state,
regional and local guidelines. Further, annexation at this time will benefit the citizens by providing
uniform governance of the Area.
RCW 36.93.180 (2) USE OF PHYSICAL BOUNDARIES, INCLUDING BUT NOT LIMITED TO BODIES OF WATER,
HIGHWAYS, AND LAND CONTOURS
The record for File No. 2186 defines the Park Terrace Area (Expanded) as territory that, based upon
its physical boundaries, is appropriate for a single action to effect annexation to Renton. City of
Renton representatives stated that the proposed Park Terrace Area (Expanded) Annexation is based
upon reasonable physical boundaries, including co -terminus borders, rights -of way, and individual
property lines.
"Social neighborhoods" may also constitute boundaries. The evidence shows that the City and the
entire Park Terrace Area (Expanded) share a social affiliation. The communities form a single social
neighborhood.
Annexation of the entire Park Terrace Area (Expanded) furthers progress toward incorporation of the
greater unincorporated area in King County. This comprehensive annexation would provide for an
immediately unified community with established physical and social boundaries. Annexation of the
limited Park Terrace Area is based upon less discernible physical boundaries creating confusion with
respect to community identification.
5
RCW 36.93.180 (3) CREATION AND PRESERVATION OF LOGICAL SERVICE AREAS
Annexation of Park Terrace Area (Expanded) into the City of Renton will advance the creation and
preservation of logical service areas. The King County Comprehensive Plan and Renton's
Comprehensive Plan establish the City as the provider of services for the entire Park Terrace Area
(Expanded). More specifically, Renton has authority and responsibility to provide public services to
all of its citizens under city plans and regulations including the Comprehensive Sewer and Water
Plans, Transportation Element of the Comprehensive Plan, Comprehensive Storm Water
Management Plan).
Renton representatives testified that the Park Terrace Area (Expanded) creates and preserves logical
service areas by including a greater number of properties in the City of Renton's service area thereby
enabling the design and the implementation of efficient, consistent, consolidated service programs
throughout the Park Terrace Area. These services (e.g., upgrades to rights -of -way; provision of
storm water and surface water management systems) will also help to protect the built environment.
King County officials state that incorporation of the entire Park Terrace Area (Expanded) to the City of
Renton will provide citizens with more effective, efficient governance. A single, unified annexation
would permit coordinated development plans, unified service areas and service systems, and
environmental protection standards. A more limited, incremental annexation plan will further
complicate an already complex service system. The County supports annexation of small isolated
urban areas, such as the Park Terrace Area, as King County does not have the resources to
efficiently manage and serve unincorporated islands.
RCW 36.93.180 (4) PREVENTION OF ABNORMALLY IRREGULAR BOUNDARIES
Annexation of the Park Terrace Area (Expanded) would provide a reasonable and regular boundary
consistent with the Renton Comprehensive Plan Annexation Element/Potential Annexation Area
mapping of the Park Terrace community. Annexation of the entire Park Terrace Area (Expanded) is
desirable to achieve the boundaries necessary to facilitate coordinated land uses and offer a more
effective, efficient solution to provision of services.
The Park Terrace Area Annexation, as initially proposed, would create a more discontinuous than
regular boundary. This boundary would not promote effective governance.
RCW 36.93.180 (5) DISCOURAGEMENT OF MULTIPLE INCORPORATIONS
RCW 36.93.180 (5) is not applicable to File No. 2186.
RCW 36.93.180 (6) DISSOLUTION OF INACTIVE SPECIAL PURPOSE DISTRICTS
RCW 36.93.180 (6) is not applicable to File No. 2186.
RCW 36.93.180 (7) ADJUSTMENT OF IMPRACTICAL BOUNDARIES
Annexation of the Park Terrace Area (Expanded) would create more practical boundaries with
respect to preservation of the community, governance, and planning activities (e.g., establishment of
uniform land uses and development standards.)
The Board finds that the initially proposed limited Park Terrace Annexation area does not create a
practical boundary. Rather, annexation of this limited area fragments community borders and thus
splinters community identity. Further, the proposed boundaries will complicate the provision of public
facilities and public services. For example, the proposed boundary will create confusion for
emergency service providers.
Annexation of the Park Terrace Area (Expanded) will enable coordinated governance. Annexation
would place the natural environment and built environment under City jurisdiction, thus creating more
practical boundaries for the provision of public facilities and services.
0
RCW 36.93.180 (8) INCORPORATION AS CITIES OR ANNEXATION TO CITIES OF UNINCORPORATED AREAS
WHICH ARE URBAN IN CHARACTER
The entire Park Terrace Area (Expanded) is located within the Urban Growth Area established by the
King County Comprehensive Plan. This definition addresses both existing land characteristics and
future designation/use plans for the Park Terrace Area (Expanded). The Park Terrace Area
(Expanded) designation as "urban" area is also supported by the State Growth Management Act.
The City of Renton Comprehensive Plan includes the entire Park Terrace Area (Expanded) in its
Potential Annexation Area and designates Park Terrace as an urban area. Immediate annexation of
the Park Terrace Area (Expanded) into Renton would promote uniform governance, development,
and services appropriate for this urban territory.
RCW 36.93.180 (9) PROTECTION OF AGRICULTURAL AND RURAL LANDS FOR LONG TERM PRODUCTIVE
AGRICULTURAL/RESOURCE USE
The Park Terrace Area does not include or concern any agricultural lands. This entire Park Terrace
Area (Expanded) is within the Urban Growth Area as established by King County and approved by
the State of Washington.
III. BOUNDARY REVIEW BOARD FINDINGS AND DECISIONS
The Boundary Review Board conducted review and deliberation of File No. 2186 based upon the
record of written documents and oral testimony, in keeping with applicable state, regional and local
regulations. The Board focused upon RCW 36.93 (Boundary Review Board Enabling Act); RCW
36.70A (Growth Management Act); King County Comprehensive Plan/Countywide Policies; City of
Renton Comprehensive Plans, RCW 35.13 (Annexation of Cities); and other relevant regulations and
guidelines. The role of the Boundary Review is to implement these existing laws; the Board does not
have the authority to make law or policy.
As prescribed by statutory mandate, the Boundary Review Board considered the following options:
■ The Park Terrace Annexation could be accepted as initially proposed by the City of Renton, if
this action achieves the provisions of RCW 36.93 and other applicable regulations (e.g., State
Growth Management Act, the King County Comprehensive Plan and the Renton
Comprehensive Plan).
• The Park Terrace Annexation could be modified as proposed by the City of Renton to
incorporate 88 acres, if the proposed expansion achieves the basic requirements of RCW
36.93 and other applicable regulations (e.g., the State Growth Management Act, the King
County Comprehensive Plan, and the Renton Comprehensive Plan). Such a modification
can be accomplished pursuant to RCW 36.93.150, which establishes the standard by which
the Board may revise annexation boundaries to cities. This alternative would require all
properties within the Park Terrace Area (Expanded) to immediately be incorporated into the
City of Renton.
■ The Park Terrace/Park Terrace Area (Expanded) Annexation could be denied in its entirety if
incorporation would be inconsistent with RCW 36.93 and other applicable regulations. .
The record for File No. 2186 is detailed and extensive. The parties provided considerable materials
supporting their positions. The Board has deliberated upon the complete record in order to come to a
decision for the proposed Park Terrace Annexation and the proposed alternative Park Terrace Area
(Expanded). The Board finds that:
■ Annexation of the Park Terrace Area (Expanded) achieves/advances the provisions of RCW
36.93. For example, the Park Terrace Area (Expanded) annexation addresses criteria
established in RCW 36.93.170 with respect to population, territory, the natural environment,
service needs and service capacity, and mutual social and economic needs, et al. The initially
proposed Park Terrace Area (7.86 acres) is not consistent with the provisions of RCW 39.63.170.
7
Additionally, Park Terrace Area/Park Terrace Area (Expanded) annexation proposals were
evaluated according to the criteria established in RCW 36.93.180 as follows:
RCW 36.93.180
OBJECTIVE 1 - PRESERVATION OF
NATURAL NEIGHBORHOODS AND
COMMUNITIES
OBJECTIVE 2 - USE OF PHYSICAL
BOUNDARIES
OBJECTIVE 3 - CREATION AND
PRESERVATION OF LOGICAL SERVICE
AREAS
OBJECTIVE 4 -PREVENTION OF
ABNORMALLY IRREGULAR BOUNDARIES
OBJECTIVE 5 - DISCOURAGEMENT
OF MULTIPLE INCORPORATIONS
OBJECTIVE 6 - DISSOLUTION OF
INACTIVE SPECIAL PURPOSE
DISTRICTS
OBJECTIVE 7 - ADJUSTMENT OF
IMPRACTICAL BOUNDARIES
OBJECTIVE 8 - INCORPORATION
...OR ANNEXATION TO CITIES .... OF
UNINCORPORATED URBAN AREAS
PARK TERRACE AREA (EXPANDED)
(88 ACRES)
ADVANCES CRITERION BY
ANNEXATION OF PROPERTIES
INCLUDED IN A NATURAL COMMUNITY
ADVANCES CRITERION BY ACHIEVING
ESTABLISHED COMPREHENSIVE PAA
BOUNDARIES
ADVANCES BASIC CRITERION BY
ENABLING COORDINATED SERVICES
TO ADDRESS PUBLIC HEALTH &
WELFARE.
ADVANCES CRITERION BY CREATING
REGULAR BOUNDARY LINES
DOES NOT APPLY
DOES NOT APPLY
ADVANCES CRITERION BY CREATING
PRACTICAL BOUNDARY LINES
ADVANCES CRITERION AS ENTIRE
URBAN AREA IS INCORPORATED INTO
A LOCAL JURISDICTION.
OBJECTIVE 9 - PROTECTION OF I DOES NOT APPLY
AGRICULTURAL AND RURAL LANDS ...
PARK TERRACE AREA (8 ACRES)
FAILS TO ADVANCE BASIC CRITERION
FAILS TO ADVANCE BASIC CRITERION
FAILS TO ADVANCE BASIC CRITERION
FAILS TO ADVANCE BASIC CRITERION y
DOES NOT APPLY
DOES NOT APPLY
FAILS TO ADVANCE BASIC CRITERION
FAILS TO ADVANCE BASIC CRITERION
DOES NOT APPLY
■ Annexation of the Park Terrace Area (Expanded) achieves/advances the provisions of the Growth
Management Act (RCW 36.70A). The Board finds that annexation of the Park Terrace Area
(Expanded) meets the provisions of the King County Comprehensive Plan, and the City of Renton
Comprehensive Plan.
RCW 36.70A, the King County Comprehensive Plan, and the Renton Comprehensive Plan
contemplate logical, orderly growth of communities. These plans support annexation of the Park
Terrace Area (Expanded) to assure balanced, sound, cost-effective governance for community
members. Annexation of the Park Terrace Area (Expanded) would achieve that balance that the
County seeks from incorporations
• State Growth Management Act policies and King County Comprehensive Plan/Countywide
Planning Policies require logical and orderly growth. In keeping with those guidelines, RCW
36.93.150 permits the Board to modify an annexation (e.g., increase the territory incorporated into
a city) to address to promote logical and orderly growth — e.g., effective governance, efficient
service provision.
E:3
IV. CONCLUSIONS
The Board finds by unanimous vote that annexation of the Park Terrace Area, as modified to include
the Park Terrace Area (Expanded) (88 acres), would advance the standards established in the
Boundary Review Board Act (RCW 36.93), Growth Management Act (RCW 36.70A), King County
Comprehensive Plan, City of Renton Comprehensive Plan, and other state and local guidelines for
incorporation of urban areas.
The Boundary Review Board approval of the City of Renton Notice of Intention to annex the Park
Terrace Area with modifications to include the Park Terrace Area (Expanded) is timely based upon
the City of Renton's current and historical commitment to guide development and provide municipal
services to this area. Annexation will enable the City of Renton to provide a harmonious efficient plan
for the governance of the built community, preserving the environment, and protecting public health
and welfare.
(Note: Under state law, the City of Renton must adopt an Ordinance or Resolution affirming the Park Terrace Area
Annexation following action by the Boundary Review Board. Under state law, the City must confirm the action as approved
by the Boundary Review Board. Alternatively, the Council may decide not to pursue the action. However, the City cannot
modify the boundaries that have been approved by the Boundary Review Board.)
E
NOW, THEREFORE,
BE IT RESOLVED BY THE WASHINGTON STATE BOUNDARY REVIEW BOARD FOR
KING COUNTY THAT, for the above reasons, the action proposed in the Notice of Intention
contained in said File No. 2186 be, and the same is, hereby approved with modifications as
described in Exhibits attached hereto and incorporated herein by reference.
ADOPTED BY SAID WASHINGTON STATE OUNDARY REVIEW BOARD FOR KING
COUNTY by a vote of _F in favor , in opposition, and z
abstentions, on this day of July, 2005, and signed by me in authentication of its said adoption on
said date.
WASHINGTON STATE BOUNDARY REVIEW BOARD FOR KING COUNTY
Jud essandore, Chair
FILED this day of J-U r�� 2005 BY:
Lenora Blauman, Exe utive Secretary
10
EXHIBITS
EXHIBIT I CITY OF RENTON PARK TERRACE (EXPANDED): LEGAL DESCRIPTION OF MODIFIED
ANNEXATION AREA BOUNDARIES
EXHIBIT 11 CITY OF RENTON PARK TERRACE (EXPANDED: MAP OF MODIFIED ANNEXATION AREA
BOUNDARIES
11
EXHIBIT I
PARK TERRACE ANNEXATION — EXPANDED
LEGAL DESCRIPTION
That portion of the northeast quarter of the southwest quarter of Section 10, Township 23
North, Range 5 East, W.M., King County, Washington, lying northerly and easterly of
the existing City Limits of Renton as annexed by Ordinance No. 3553;
TOGETHER WITH that portion of the northwest quarter of the northwest quarter of the
southeast quarter of said Section 10, lying westerly and southerly of the existing City
Limits of Renton as annexed by Ordinance No. 5097, EXCEPT the south 30 feet thereof;
and
TOGETHER WITH the south 165 feet of the northeast quarter of the northwest quarter of
the southeast quarter of said Section 10, EXCEPT the west 30 feet of the south 30 feet
thereof; and
TOGETHER WITH that portion of the west half (1/2) of the southwest quarter of the
northeast quarter of said Section 10, lying westerly of the existing City Limits of Renton
as annexed by Ordinance No. 5097, and lying southerly and westerly of the existing City
Limits of Renton as annexed by Ordinance No. 4215; and
TOGETHER WITH that portion of the east half (1/2) of the northwest quarter of said
Section 10, lying easterly of the existing City Limits of Renton as annexed by Ordinance
No. 2000, No. 5012, No. 2210, No. 4383 and No. 3058, lying westerly of the existing
City Limits of Renton as annexed by Ordinance No. 2945, and lying southerly and
westerly of the existing City Limits of Renton as annexed by Ordinance No. 4215.
CITY OF RENTON COUNCIL AGENDA BILL
Submitting Data:
Dept/Div/Board. .
Staff Contact......
Subject:
Finance & IS Department
Michael R. Wilson, Interim
Finance/IS Administrator
Reimbursement Resolution for the South Lake
Washington Roadway and SW 27th Street/Strander
Boulevard Capital Projects
Exhibits:
Memorandum
Resolution
Al X:
For Agenda of:
August 15, 2005
Agenda Status
Consent .............. X
Public Hearing..
Correspondence..
Ordinance .............
Resolution............ X
Old Business........
New Business.......
Study Sessions......
Information........ .
Recommended Action: Approvals:
Legal Dept.........
Refer to Finance Committee Finance Dept......
Other ...............
Fiscal Impact:
Expenditure Required... Transfer/Amendment.......
Amount Budgeted....... Revenue Generated.........
Total Project Budget City Share Total Project..
SUMMARY OF ACTION:
Work on the South Lake Washington Roadway and SW 27th Street/Strander Boulevard Capital
Projects will begin before debt financing is completed by issuance of tax-exempt Bonds or other
obligations. The proposed Resolution enables the City to make capital expenditures on these
projects in anticipation of expenditure reimbursement from the proceeds of the Bonds.
STAFF RECOMMENDATION:
Authorize capital expenditures on South Lake Washington Roadway and SW 27th
Street/Strander Boulevard Capital Projects prior to completion of debt financing, and adopt the
related Resolution.
C:\Documents and Settings\mpetersen\Local Settings\Temp\Reimbursement Resolution_Bonds.doc
rt`R
FINANCE AND INFORMATION SERVICES
♦DEPARTMENT
1
M E M O R A N D U M
DATE: August 8, 2005
TO: Terri Briere, Council President
Members of the Renton City Council
VIA: Kathy Keolker-Wheeler, Mayor
CC:{ Jay Covington, Chief AdministLtive Officer
FROM: Michael R. Wilson, Interim Adtj
SUBJECT: Reimbursement Resolution for the South Lake Washington
Roadway and SW 27th Street/Strander Boulevard Capital Projects
The City of Renton is in the process of undertaking two sizable capital improvement
projects that will be debt financed through the issuance of general obligation bonds:
South Lake Washington Roadway/Utilities Capital Improvement Project and the SW 27th
Street/Strander Blvd. Capital Improvement Project. Since the City is likely to proceed
with one or more of these upcoming capital projects before the issuance of any bonds, the
City should have a reimbursement resolution in place before ground is broken on these
projects. By having a reimbursement resolution in place prior to work on these projects,
the City will be able to be reimbursed from the bond proceeds once the bonds are issued.
A draft of the proposed Resolution is attached.
MRW/dlf
Attachment, as stated
cc: Linda Herzog, Interim Assistant to the CAO
Bonnie Walton, City Clerk
Gregg Zimmerman, Planning/Building/Public Works Administrator
Linda Parks, Fiscal Services Director
h:\finance\adminsup\02_issuepapers memos to council or mayor\reimbursement resolution.doc
CITY OF RENTON, WASHINGTON
RESOLUTION NO.
A RESOLUTION OF THE CITY OF RENTON, WASHINGTON
DECLARING ITS INTENT THAT CERTAIN CAPITAL EXPENDITURES
SHALL BE REIMBURSED FROM THE PROCEEDS OF TAX EXEMPT
BONDS OR OTHER OBLIGATIONS.
WHEREAS, the City of Renton (the "City") plans to undertake the following capital
projects: the Southwest 270' Street/Strander Boulevard Capital Improvement Project and the
South Lake Washington Roadway/Utilities Capital Improvement Project (the "Projects"); and
WHEREAS, the City plans to finance the Projects through the issuance of tax-exempt
bonds or other obligations of the City in one or more issues in an amount not to exceed
$31,400,000 (the "Bonds");
NOW, THEREFORE, THE CITY COUNCIL OF THE CITY OF RENTON,
WASBINGTON, DOES RESOLVE AS FOLLOWS:
SECTION L The above findings are true and correct in all respects.
SECTION H. For the purpose of complying with the provisions of the Treasury
Regulation Section 1.150-2 with respect to qualification of reimbursement allocations as
expenditures of bond proceeds, pending the issuance of the Bonds, the City may make capital
expenditures in furtherance of the Projects, in anticipation of reimbursement for such expenditures
from the proceeds of the Bonds, when issued.
PASSED BY TBE CITY COUNCIL this - day of
Bonnie I. Walton, City Clerk
2005.
RESOLUTION NO.
APPROVED BY THE MAYOR this day of , 2005.
Approved as to fonn:
Lawrence J. Warren, City Attorney
RES. 1127:8/8/05:ma
Kathy Keolker-Wheeler, Mayor
2
CITY OF RENTON COUNCIL AGENDA BILL
Al #:
Submitting Data:
Dept/Div/Board.. Community Services/Human Services
Staff Contact...... Dianne Utecht, ext 6655
Subject:
2006 Community Development Block Grant (CDBG)
Funding Recommendations.
Exhibits:
1. Issue Paper
2. 2006 Funding Recommendations
3. Contingency Plan
For Agenda of: August 15, 2005
Agenda Status
Consent .............. X
Public Hearing.. X
Correspondence..
Ordinance .............
Resolution........... .
Old Business........
New Business.......
Study Sessions......
Information........ .
Recommended Action: Approvals:
Refer to Community Services Committee; schedule Legal Dept........
public hearing on September 19, 2005. Finance Dept....
Other ...............
Fiscal Impact:
Expenditure Required... $283,361 Transfer/Amendment.......
Amount Budgeted....... $283,361 Revenue Generated......... $283,361
Total Project Budget $283,361 City Share Total Project..
SUMMARY OF ACTION:
The Human Services Advisory Committee is recommending that the 2005 Community
Development Block Grant public service agency contracts be extended to 2006. They
recommend funding for three on -going capital projects. Planning and administration will be
funded to the amount allowable. Estimated amounts available are: $48,855 for public services,
$185,651 for capital, and $48,855 for planning and administration.
The Human Services Advisory Committee decided at their June 21, 2005, meeting that the
CDBG funding cycle for public services would be the same as that of the general fund. The
next general fund cycle is for 2007/2008. Applications will be taken in 2006 for 2007 and 2008
funding. This funding cycle is consistent with King County and other South King County
cities. It also allows time for the Ad Hoc Committee, contemplated by City Council last year
during their review of this process, to develop comprehensive funding criteria before the next
funding cycle.
STAFF RECOMMENDATION:
Set a public hearing date of September 19, 2005 to consider allocation of CDBG funds, approve
distribution of the 2006 CDBG funds according to the Human Services Advisory Committee
recommendations, and adopt the contingency plan as presented.
Rentonnet/agnbill/ bh
COMMUNITY SERVICES DEPARTMENT
- 11
111 M E M O R A N D U M
DATE: August 8, 2005
TO: Terri Briere, Council President
Members of the Renton City Council
VIA: _;6' Kathy Keolker-Wheeler, Mayor
FROM: Dennis Culp, Community Services Administrator���
STAFF CONTACT: Dianne Utecht, Contract Specialist ext. 6655
SUBJECT: 2006 Community Development Block Grant (CDBG)
Funding Recommendations
ISSUE:
Funding recommendations for 2006 Community Development Block Grant funding.
RECOMMENDATION:
Human Services Advisory Committee and staff recommend approval of $48,855 for public
services funding to six agencies, $185,651 in capital funds to three projects, $48,855 for planning
and administration, and adoption of the contingency plan.
CKGROUND INFORMATION:
The Human Services Advisory Committee made the decision not to hold a competitive
application process for 2006. They recommend the 2005 public service contracts be extended
through 2006. Due to the estimated reduction in public services funding, the 2006 contract
amounts were proportionately reduced to the amount available. There were several reasons that
factored into this decision.
The Human Services Advisory Committee decided at their June 21, 2005, meeting that
the CDBG funding cycle for public services would be the same as that of the general
fund. The next general fund cycle is for 2007/2008. Applications will be taken in 2006
for 2007 and 2008 funding.
Beginning in 2007, a maximum of four public service programs can be funded. In 2005
we funded six. By extending the contracts one year, it will give the Ad -Hoc Committee
time to develop funding criteria before the next funding cycle. This information, in
turn, will be used to decide which agencies are more appropriately funded by CDBG
funds and which by the general fund.
King County and the cities in South King County extended the 2005 CDBG public
service contracts through 2006 to allow transition time to develop a more
comprehensive and cohesive Human Service application process after significant
changes in the way King County CDBG funds will be distributed. Renton's funding
h Ahuman_se\council\05issuepapers\issuepaper06cdbgfunding3.doc
Terri Briere, Council President
Page 2 of 2
July 11, 2005
cycle will coincide with the rest of the county. It was felt that if we were on a different
cycle, we would receive many more applications for funding. Additionally, the cities in
South King County are trying to standardize the application process; having a different
funding cycle would not support that endeavor.
Due to the estimated reduction in capital funding, the 2006 funding recommendations were
proportionately reduced to the amount available to fund the Housing Repair Assistance Program,
HomeSight, and the Multi -Service Center. The reasons for this recommendation include:
• The anticipated capital funds available for 2006 are approximately $200,000 less than
available in 2005. This is a significant reduction in funding, and funding levels had to be
reduced. 1
• In 2005 there were seven capital projects funded. Four are on -going programs: City of
Renton Housing Repair Program, HomeSight First -Time Homebuyer Program, King
County Housing Repair Deferred Home Loans, and the Multi Service Center Employee
Development Program. Beginning in 2006, the King County Housing Repair program
will receive 25% of all the King County Consortium CDBG funds. The remaining on-
going programs were recommended for funding.
The estimated amount that Renton will receive for planning and administration is $48,855. This
is applied to the cost of the CDBG contract specialist's salary and benefits.
The contingency plan calls for any increases in CDBG public service funding to be
proportionally applied to the following programs: Communities in Schools of Renton/Family
Liaison Program; Community Health Centers of King County Dental Program; Domestic Abuse
Women's Network Shelter Program, ElderHealth/Connection Day Health Program, and the
Emergency Feeding Program of Seattle and King County. If there is a decrease in public
services funding, any decrease will be applied proportionally to all funded public service
programs.
For any increases in capital funding, any increase will be allocated to the Housing Repair
Assistance Program, with funding not to exceed $166,000. Any additional funds will be
allocated to the Multi -Service Center Employee Development Program. Any decrease in capital
funding will be shared equally between the Multi -Service Center and HomeSight. There will be
no decrease to the Housing Repair Assistance Program.
CDBG Planning and Administration funds will be increased or decreased to the funds available.
C: Jay Covington, Chief Administrative Officer
Larry Warren, City Attorney
Mike Wilson, Interim Finance/IS Administrator
Karen Bergsvik, Human Services Manager
' This is based on a projected 10% reduction from Congress, the reduced amount of funds to be recaptured by
Renton that can be reallocated ($23,684 in 2006 versus $70,088 for 2005), and twenty-five percent of the
allocation going to the King County Housing Repair program.
h:\human_se\council\05issuepapers\issuepaper06cdbgfunding3.doc
2006 CDBG Funding Recommendations
Renton Public Services
Proportionate 06 funding Difference 05-06
Current 2005 Funding
based on estimated amounts
Communities in Schools of Renton
$9,460
$7,176,-$2,284
Community Health Centers of King County
$13,284
$10,077-$3,207
Domestic Abuse Women's Network
$10,424
$7,907;-$2,517
ElderHealth/Connection
$9,460
$7,176;-$2,284
Emergency Feeding Program
$12,318
$9,344-$2,974
Visiting Nurse Service of the NW
$9,460
$7,176-$2,284
Total
$64,406
$48,855
I
Estimated 06 Amount Available
$48,855
Capital Projects
City of Renton Housing Repair
$192,582
$141,644-$50,938
Multi Service Center
$28,694
$21,104
-$7,590
HomeSight
$31,140
$22,903
-$8,237
Lutheran Community Services Northwest
$5,837
$0
N/A
Pediatric Interim Care Center
$24,020
$0 N/A
King County Housing Repair Program
$47,878
$0 N/A
Downtown Action to Save Housing
$47,877
$0 N/A
Total
$378,028
$185,651
Estimated 06 Capital Amount
$185,651_
Planning and Administration
$48, 5
Estimated 06 Planning & Administration Amount $48,855
Grand Total
$283,361
06 Estimates assume a 10%
decrease in CDBG Funds
,Updated 715/05 with current program income figures.
06funding calcs2updated.xls
VO-06Community Development Block Grant CDBG Contingency Pla
The Human Services Advisory Committee recommends adoption of the following contingency funding
plan should the amount of CDBG funds for 2006 change from the June 2005 estimated amount.
Public Services
Should there be an increase in CDBG public services funding, the Committee recommends any
increase be applied proportionally to:
• Communities in Schools of Renton/Family Liaison Program
• Community Health Centers of King County/Dental Program
• Domestic Abuse Women's Network/Shelter Program
• ElderHealth/Connection Day Health Program
• Emergency Feeding Program of Seattle & King County
Should there be a decrease in CDBG public services funding, the Committee recommends any
decrease be applied proportionally to all funded programs.
Capital
If there is an increase in CDBG capital funding, the Committee recommends any increases be allocated
to the Housing Repair Assistance Program, with funding not to exceed $166,000. Any additional
funds will be allocated to the Multi -Service Center Employee Development Program.
If there is a decrease in capital funding, the decrease will be shared equally between the Multi -Service
Center and HomeSight. There will be no decrease to the Housing Repair Assistance program.
Plannine and Administration
If there is an increase in CDBG Planning and Administration funds, the Committee recommends that
the City take the maximum amount allowable, to plan and administer the Community Development
Block Grant Program.
If there is a decrease in CDBG Planning and Administration funds, funding for Planning and
Administration will be decreased by that amount.
CITY OF RENTON COUNCIL AGENDA BILL
Al #: -�
Submitting Data: Planning/Building/Public Works
For Agenda of:
Dept/Div/Board.. Transportation Systems
August 15, 2005
Agenda Status
Staff Contact...... Nathan A. Jones, x7217
Consent .............. X
Public Hearing..
Subject:
Citywide Commute Trip Reduction (CTR) Program
Correspondence..
Funding Agreement with Washington State Department
Ordinance .............
of Transportation (WSDOT)
Resolution............ X
Old Business........
New Business.......
Exhibits:
Issue Paper
Study Sessions......
Resolution
Information.........
Agreement
Recommended Action: Approvals:
Legal Dept......... X
Council concur Finance Dept......
Other ...............
Fiscal Impact:
Expenditure Required... Transfer/Amendment...
Amount Budgeted....... Revenue Generated.. $38,435 State
funding
Total Project Budget $64,200 City Share Total Project.
SUMMARY OF ACTION:
This agreement releases State funds to support activities the City is required to do under the
State of Washington CTR Law. This is an ongoing program and the contract is renewed every
two years.
STAFF RECOMMENDATION:
Approve the resolution and authorize the Mayor and City Clerk to enter into the agreement with
the State for the implementation of the Citywide CTR Program in the amount of $38,435.
H:ATRANSVADM1N\AGENDA 2005 WSDOT AGENDA HILL.d-
PLANNING/BUILDING/
PUBLIC WORKS DEPARTMENT
\�-NT�o� MEMORANDUM
DATE: August 15, 2005
TO: Terri Briere, President
Members of the Renton City Council
VIA: Kathy Keolker-Wheeler, Mayor
FROM: Gregg Zimd4iftx8trator
STAFF CONTACT: Nathan A. Jones, Transportation Planning
Project Manager, x7217
SUBJECT: Commute Trip Reduction (CTR) Program Funding
Agreement with Washington State Department of
Transportation (WSDOT)
ISSUE:
Should the City enter into an agreement with the State of Washington Department of
Transportation to accept funding from the State to support the City efforts to carry out the
activities mandated by the Washington CTR Law?
RECOMMENDATION:
Approve the resolution and authorize the Mayor and City Clerk to enter into the
agreement with the State for the implementation of the Citywide CTR Program in the
amount of $38,435.
BACKGROUND:
The City implements a program in accordance with the State and local CTR Law to
monitor Renton employers with CTR-affected worksites for progress and compliance.
This law was enacted as part of the Washington State Clean Air Act to provide measures
that would improve air quality and also manage congestion by encouraging the use of
alternatives to single occupancy vehicle (SOV) commute travel through the use of
incentives to employees at businesses with 100 or more employees arriving to work
between 6:00 AM and 9:00 AM.
The City contracts each year with King County Department of Transportation Metro
Transit Division to provide staff to offer technical assistance to Renton businesses
Terri Briere, President
Members of the Renton City Council
Page 2 of 2
August 15, 2005
RE: 2005-2007 WSDOT Commute Trip Reduction (CTR) Contract
affected by the CTR Law. King County staff assists with the notification of new sites,
employee surveys, program review, records maintenance, and more. The amount of the
contract between the City of Renton and King County is based on the number of
worksites being monitored. Currently, there are 21 CTR-affected employer work sites in
the City of Renton. King County is requesting $35,828 to cover the expenses of the
above -mentioned activities from July 1, 2005 to June 30, 2006. The prior contract
covered the same activities at 22 CTR-affected work sites and the prior contract was for
$36,342. (The number of work sites dropped when an employer relocated staff from
leased office space.)
Funding provided by the State of Washington covers the expenses of the King County
contract and a portion of City staff administrative labor. The amount of funding
distributed by the State of Washington is determined by two variables: the number of
CTR-affected worksites within a jurisdiction and a performance incentive. In the current
proposed contract, the State of Washington will give the City of Renton a fixed $1,260
per CTR-affected work site for required activities plus $570.23 per site for employer
services. The amount of money given for employer services varies year to year; it is
based on the number of trips reduced per day. King County jurisdictions generally did a
good job of reducing vehicle trips, and thus, received more money per site for employer
services.
The Six -Year Transportation Improvement Program (TIP) each year lists a planning
budget of $64,200 to cover the expenses above and beyond the King County contract, and
to cover staff time to monitor programs, perform reviews of the annual employer program
reports, and attend trip reduction regional coordinating meetings, for example. A portion
of the funds may be utilized to create a special promotions program for employers who
are interested in creating trip reduction transportation programs for their employees.
H:Trans/Admin/Agenda Bills 2005/CTR Issue Paper WSDOT 2005
CITY OF RENTON, WASHINGTON
RESOLUTION NO.
A RESOLUTION OF THE CITY OF RENTON, WASHINGTON,
AUTHORMING THE MAYOR AND CITY CLERK TO ENTER INTO AN
IN1 MLOCAL COOPERATIVE AGREEMENT WITH THE
WASHINGTON STATE DEPARTMENT OF TRANSPORTATION
(WSDOT) ENTITLED "COMMUTE TRIP REDUCTION
IMPLFMF.NTATION AGREEMENT."
WHEREAS, the ' City of Renton, pursuant to the Commute Trip Reduction Act, is
required to develop and implement commute trip reduction plans; and
WHEREAS, the Legislature has appropriated funds to provide technical assistance
funding to the City, and
WHEREAS, the Washington State Department of Transportation (WSDOT), by law,
distributes these funds; and
WHEREAS, it is necessary to document the terms and conditions under which the
WSDOT will distribute commute trip reduction funds to the City;
NOW, THEREFORE, THE CITY COUNCIL OF THE CITY OF RENTON,
WASHINGTON, DOES RESOLVE AS FOLLOWS:
SECTION I, The above recitals are found to be true and correct in all respects.
SECTION II. The Mayor and City Clerk are hereby authorized to enter into an
interlocal cooperative agreement with WSDOT entitled "Commute Trip Reduction
Implementation Agreement" and later similar contracts that have the same general purpose, terms
and funding.
1
RESOLUTION NO.
PASSED BY THE CITY COUNCIL this day of )2005.
Bonnie I. Walton, City Clerk
APPROVED BY THE MAYOR this day of
Approved as to form:
Lawrence J. Warren, City Attorney
RES. 1123:7/20/05:ma
Kathy Keolker-Wheeler, Mayor
PITI
2
Commute Trip Reduction Implementation Agreement
Washington State
Contractor
Department of Transportation
City of Renton
310 Maple Park Avenue
Renton City Hall, 5�h Floor
PO Box 47387
1055 South Grady Way
Olympia, WA 98504-7387
Renton, WA 98055
Key Contact Person: Robin Hartsell
Key Contact Person: Nathan A. Jones
Employer Federal ID #91-6001271
Project Amount
Project Amount
July 1, 2005 through June 30, 2006
July 1, 2006 through June 30, 2007
$38,435
Will be allocated as set forth in Exhibit I,
Funding Allocation Methodology
Agreement Start Date Completion
. Project Title
Number Date
Commute Trip Reduction Implementation
GCA4569 July 1, 2005 June 30, 2007
This AGREEMENT is entered into by the Washington State Department of Transportation
(hereinafter referred to as "WSDOT") and the Contractor identified above (hereinafter referred
to as "CONTRACTOR"), and/or individually referred to as the "PARTY" and collectively
referred to as the "PARTIES."
WHEREAS, RCW 70.94.521 through 70.94.551 requires counties, cities and towns containing
"major employers," in counties with populations over 150,000, to develop ordinances, plans and
programs to reduce Vehicle Miles Traveled (VMT) and Single Occupant Vehicle (SOV)
commute trips, and thereby reduce vehicle -related air pollution, traffic congestion and energy
use, and
WHEREAS, RCW -70.94.541 (2) provides for technical assistance to counties, cities, and towns
in developing and implementing Commute Trip Reduction (CTR) plans and programs, and
WHEREAS, RCW 70.94.544 provides for distribution of funds for local CTR implementation
efforts, and
WHEREAS, WSDOT desires to achieve trip reduction in order to improve the efficiency of the
state transportation system and the quality of life for citizens of the State of Washington, and
WHEREAS, WSDOT hereby desires to engage and the CONTRACTOR so agrees to perform
all tasks as hereinafter agreed upon by both PARTIES, and
NOW, THEREFORE, in consideration of covenants, conditions, performances and promises
herein contained and Exhibits I, II and 111, attached hereto and made a part hereof, the PARTIES
agree to the terms and conditions following:
Page I of 16 GCA4569
Section 1
Purpose of Agreement
The purpose of this AGREEMENT is for WSDOT to provide funding to the CONTRACTOR to
be used solely for activities undertaken to fulfill the requirements of RCW 70.94.521 through
.551 and to implement tasks as described in Exhibit Il, Scope of Work.
Section 2
Scope of Work
The CONTRACTOR and WSDOT agree to perform all designated tasks under this
AGREEMENT as described in Exhibit I1, Scope of Work.
Section 3
Time for Beginning and Completion
The work to be performed under this AGREEMENT shall commence on July 1, 2005, and
terminate on June 30, 2007, unless terminated sooner as provided herein.
Section 4
Reimbursement and Payment
WSDOT shall reimburse the CONTRACTOR for eligible expenditures not to exceed $38,435
during the AGREEMENT period. The maximum amount of funding for the CONTRACTOR
was determined using the methodology contained in Exhibit I, Funding Allocation Methodology.
WSDOT will reimburse the CONTRACTOR only for actual and eligible direct and related
indirect project costs. Payment will be made on a reimbursable basis. Payment is subject to the
submission to and approval by WSDOT of properly prepared invoices accompanied by progress
reports as provided in Section 6 and financial summaries. The CONTRACTOR shall submit an
invoice (state form A-19) or WSDOT approved invoice format to WSDOT in order to receive
reimbursement. The CONTRACTOR may submit invoices, not more than once per month,
during the course of this AGREEMENT. The CONTRACTOR shall submit a final invoice to
WSDOT no later than July 15, 2007. Any invoice received after July 15, 2007 will not be
eligible for reimbursement. Within 30 days after receiving an invoice and upon approval,
WSDOT shall remit payment to the CONTRACTOR. All invoices and payments shall be based
on and paid on actual work performed and actual costs incurred up to the maximum amount
identified in this AGREEMENT.
Section 5
Project Records
The CONTRACTOR agrees to establish and maintain for the project either a separate set of
accounts or accounts within the framework of an established accounting system, in order to
sufficiently and properly reflect all eligible direct and related indirect project costs claimed to
have been incurred in the performance of this AGREEMENT. Such accounts are referred to
herein collectively as the "Project Account". All costs claimed against the Project Account must
Page 2 of 16 GCA4569
be supported by properly executed payrolls, time records, invoices, contracts, and payment
vouchers evidencing in sufficient detail the nature and propriety of the costs claimed.
Section 6
Progress Reports
The CONTRACTOR shall submit to WSDOT progress reports as described in Exhibit II, Scope
of Work, so that WSDOT may adequately and accurately assess the progress made under the
terms of this AGREEMENT. Progress reports shall be submitted to WSDOT along with every
invoice request for reimbursement submitted pursuant to Section 4, Reimbursement and
Payment.
Section 7
Audits, Inspections, and Records Retention
WSDOT, the State Auditor, and any of their representatives, shall have full access to and the
right to examine, during normal business hours and as often as they deem necessary, all of the
CONTRACTOR's records with respect to all matters covered by this AGREEMENT. Such
representatives shall be permitted to audit, examine and make excerpts or transcripts from such
records, and to make audits of all contracts, invoices, materials, payrolls, and other matters
covered by this AGREEMENT. In order to facilitate any audits and inspections, the
CONTRACTOR shall retain all documents, papers, accounting records, and other materials
pertaining to this AGREEMENT for six (6) years from the date of completion of the project or
the project final payment date. However, in case of audit or litigation extending past that six (6)
years period, then the CONTRACTOR must retain all records until the audit or litigation is
completed. The CONTRACTOR shall be responsible to assure that it, WSDOT, the State
Auditor, and any of their representatives, retain comparable audit rights with respect to
subcontractors to the CONTRACTOR within the scope of this AGREEMENT.
Section 8
Agreement Modifications
A. Either PARTY may request changes to this AGREEMENT, including changes in the
Scope of Work. Such changes that are mutually agreed upon shall be incorporated as written
amendments to the AGREEMENT. No variation or alteration of the terms of this
AGREEMENT shall be valid unless made in writing and signed by authorized representatives of
the PARTIES hereto.
B. Any additional funding secured by WSDOT beyond the amount identified in Section 4,
Reimbursement and Payment will be allocated to the CONTRACTOR for the period July 1,
2005 to June 30, 2007 in accordance with the methodology described in Exhibit I, Funding
Allocation Methodology. If an increase in funding by the funding source augments the
CONTRACTOR's allocation of funding under this AGREEMENT, the CONTRACTOR and
WSDOT agree to enter into an amendment to this AGREEMENT, providing for an appropriate
change in the Scope of Work and/or the project amount in order to reflect any such increase in
funding.
Page 3 of 16 GCA4569
C. if a reduction of funding by the funding source reduces the CONTRACTOR's allocation
of funding under this AGREEMENT, the CONTRACTOR and WSDOT agree to enter into an
amendment to this AGREEMENT providing for an appropriate change in the Scope of Work
and/or the AGREEMENT amount in order to reflect any such reduction of funding.
Section 9
Recapture Provision
In the event that the CONTRACTOR fails to expend state funds in accordance with state law
and/or the provisions of this AGREEMENT, WSDOT reserves the right to recapture state funds
in an amount equivalent to the extent of noncompliance. Such right of recapture shall exist for a
period not to exceed three (3) years following termination or expiration of this AGREEMENT.
The CONTRACTOR agrees to repay such state funds under this recapture provision within 30
days of demand.
Section 10
Disputes
A. Disputes. Disputes, arising in the performance of this AGREEMENT, which are not
resolved by agreement of the PARTIES, shall be decided in writing by the authorized
representative of WSDOT Public Transportation and Commute Options (PT&CO) Office. If the
PARTIES cannot resolve a dispute by mutual agreement, the CONTRACTOR may submit a
written detailed description of the dispute to the PT&CO Program Manager who will issue a
written decision within ten (10) days of receipt of the written description of the dispute. This
decision shall be final and conclusive.
B. Performance During Dispute. Unless otherwise directed by WSDOT, the CONTRACTOR
shall continue performance under this AGREEMENT while matters in dispute are being
resolved.
Section 11
Termination
WSDOT, at its sole'discretion, may suspend or terminate this AGREEMENT in whole, or in
part, for the reasons following:
A. The CONTRACTOR materially breaches, or fails to perform any of the requirements of, this
AGREEMENT, and after fourteen (14) days written notice, has failed to cure the condition(s)
causing that breach. Conditions of breach may include, but are not be limited to:
• Any action taken by the CONTRACTOR without WSDOT approval, which under the
provisions of this AGREEMENT, required WSDOT approval;
• Failure to perform in the manner called for under this AGREEMENT; or
• Failure to comply with any provision of this AGREEMENT;
B. The CONTRACTOR is prevented from proceeding with the AGREEMENT by reason of a
temporary preliminary, special, or permanent restraining order or injunction of a court of
competent jurisdiction where the issuance of such order or injunction is primarily caused by the
acts or omissions of persons or agencies other than the CONTRACTOR;
C. The requisite state or federal funding is reduced or becomes unavailable through failure of
appropriation or otherwise;
Page 4 of 16 GCA4569
D. WSDOT determines that the continuation of the project would not produce beneficial results
commensurate with the further expenditure of funds;
E. WSDOT, at its sole discretion, determines to accept a request made in writing by the
CONTRACTOR to terminate the AGREEMENT in whole or in part; or
F. WSDOT determines that suspension or termination is in the best interests of the state.
If this AGREEMENT is terminated under subsections B, C, D, E, and/or F of this Section, the
CONTRACTOR may be reimbursed only for actual and eligible direct and related indirect
expenses incurred prior to the date of termination, and then only to the extent of appropriated
funds. If this AGREEMENT is terminated under subsection A of this Section, the WSDOT shall
not be obligated to provide any additional reimbursement, and WSDOT shall retain all rights to
seek recapture or damages from the CONTRACTOR.
Section 12
Forbearance by WSDOT Not a Waiver
Any forbearance by WSDOT in exercising any right or remedy hereunder, or otherwise afforded
by applicable law, shall not be a waiver of or preclude the exercise of any such right or remedy.
Section 13
Waiver
In no event shall any WSDOT payment of grant funds to the CONTRACTOR constitute or be
construed as a waiver by WSDOT of any CONTRACTOR breach, or default which and shall in
no way impair or prejudice any right or remedy available to WSDOT with respect to any breach
or default.
Section 14
Independent Contractor
The CONTRACTOR shall be deemed an independent CONTRACTOR for all purposes, and the
employees of the CONTRACTOR or any of its subcontractors and the employees thereof, shall
not in any manner be deemed to be employees of WSDOT.
Section 15
WSDOT Advice
The CONTRACTOR bears complete responsibility for the administration and success of the
work as it is defined in this AGREEMENT and any amendments thereto. Although the
CONTRACTOR is allowed to seek the advice of WSDOT, the offering of WSDOT advice shall
not modify the CONTRACTOR's rights and obligations under this AGREEMENT, and WSDOT
shall not be held liable for offering advice to the CONTRACTOR.
Section 16
Limitation of Liability and Indemnification
No liability shall attach to WSDOT or the CONTRACTOR by reason of entering into this
AGREEMENT, except as expressly provided herein. This AGREEMENT is not intended to
Page 5 of 16 GCA4569
benefit any third party. The CONTRACTOR shall indemnify and hold WSDOT, its agents,
employees, and/or officers harmless from, and shall process and defend at its own expense, any
and all claims, demands, suits, penalties, losses, damages (both to persons and property), or costs
of whatsoever kind or nature (hereafter "claims") brought against WSDOT arising out of or
incident to the execution, performance or failure to perform under this AGREEMENT; provided,
however, that if such claims are caused by or result from the concurrent negligence of (a) the
CONTRACTOR, its agents, employees, and/or officers and (b) WSDOT, its agents, employees,
and/or officers, this indemnity provision shall be valid and enforceable only to the extent of the
negligence of the CONTRACTOR, its agents, employees, and/or officers; and provided further
that nothing herein shall require the CONTRACTOR to hold harmless or defend WSDOT, its
agents, employees, and/or officers from any claims arising from the sole negligence of WSDOT,
its agents, employees, and/or officers.
Section 17
Hold Harmless
It is understood and agreed that this AGREEMENT is solely for the benefit of the PARTIES
hereto and gives no right to any other party. No joint venture or partnership is formed as a result
of this AGREEMENT. Each PARTY hereto agrees to be responsible and assumes liability for
its own negligent acts or omissions, or those of its officers, agents or employees. Each
agreement, contract or subcontract for services or activities to further the terms of this
AGREEMENT u shall include an indemnification and hold harmless providing that WSDOT and
the State of Washington are not liable for damages or claims for damages arising from any city,
town, designee or subcontractor's performance or activities under the terms of those agreements,
contracts or subcontracts.
Section 18
Governing Law, Venue, and Process
This AGREEMENT shall be construed and enforced in accordance with, and the validity and
performance thereof shall be governed by the laws of the State of Washington. In the event that
either PARTY deems it necessary to institute legal action or proceedings to enforce any right or
obligation under this AGREEMENT, the PARTIES hereto agree that any such action shall be
initiated in the Superior Court of the State of Washington situated in Thurston County. The
CONTRACTOR hereby accepts service of process by registered mail consistent with RCW
4.28.080(1). Each PARTY shall bear its own legal costs and expenses, including attorney fees,
in any such litigation.
Section 19
Compliance with Laws and Regulations
The CONTRACTOR agrees to abide by all applicable state and federal laws and regulations,
including, but not limited to, those concerning employment, equal opportunity employment,
nondiscrimination assurances, project record keeping necessary to evidence AGREEMENT
compliance, and retention of all such records. The CONTRACTOR will adhere to all of the
nondiscrimination provisions in Chapter 49.60 RCW. The CONTRACTOR will also comply
with the Americans with Disabilities Act (ADA), Public Law 101-336, which provides
Page 6 of 16 GCA4569
comprehensive civil rights protection to individuals with disabilities in the areas of employment
public accommodations, state and local government services and telecommunication.
Section 20
Section Headings
All section headings are inserted for convenience only and shall not affect any construction or
interpretation of this AGREEMENT.
Section 21
Severability
If any covenant or provision of this AGREEMENT shall be adjudged void, such adjudication
shall not affect the validity or obligation of performance of any other covenant or provision, or
part thereof, that in itself is valid if such remainder conforms to the terms and requirements of
applicable law and the intent of this AGREEMENT. No controversy concerning any covenant or
provision shall delay the performance of any other covenant or provision except as herein
allowed.
Section 22
Execution and Acceptance
This AGREEMENT may be executed in several counterparts, each of which shall be deemed to
be an original having identical legal effect. The CONTRACTOR does hereby ratify and adopt
all statements, representations, warranties, covenants, and agreements and their supporting
materials contained and/or mentioned herein, and does hereby accept State funds and agrees to
all of the terms and conditions thereof.
Section 23
Execution
This AGREEMENT is executed by the Director of the Public Transportation and Rail Division,
State of Washington, Department of Transportation or the Director's designee, not as an
individual incurring personal obligation and liability, but solely by, for, and on behalf of the
State of Washington, Department of Transportation, in his/her capacity as Director of the Public
Transportation and Rail Division.
This space intentionally left blank.
Page 7 of 16 GCA4569
IN WITNESS WHEREOF, the PARTIES hereto have executed this AGREEMENT the day and
year first above written.
WASHINGTON STATE CONTRACTOR
DEPARTMENT OF TRANSPORTATION
In
Judith Giniger, Director
Public Transportation and Rail Division Print Name:
Date:
Approved as to form only:
By: Ann E. Salay
Assistant Attorney General
Date: June 21, 2005
Title:
Who certifies proper authority to
execute this Agreement on behalf of
the Contractor
Date:
Page 8 of 16
GCA4569
Exhibit I
Funding Allocation Methodology
Funding allocated by WSDOT for local implementation of CTR activities is based on the
formula following:
1. Each county is provided $1,260 per affected worksite as a base allocation to ensure sufficient
funding to meet jurisdiction obligations pursuant to RCW.70.94.521-.551. The number of
affected worksites in each county shall be based on information contained in WSDOT's
database as of May 1 st of each year.
2. The remaining funding will be allocated based on the number of commute trips reduced per
day in each county, between each worksite's base year survey and its most recent survey,
provided that every county receives at least $80,000 per year. For the period July 1, 2005
through June 30, 2006, the most recent survey period will be 2003. For the period July 1,
2006 through June 30, 2007, the most recent survey period will be 2005.
July 1, 2005 - June 30, 2006 Allocation
County
Number
of Sites
Trips
Reduced/Day
Worksite
Base
Allocation
Performance
Allocation
Additional to
Achieve
$80,000 Floor
Total
Allocation
Benton
$50,000
Clark
48
1,157
$60,480
$29,309
$0
$89,789
King
527
11,863
$664,020
$300,511
$0
$964,532
Kitsap
31
1,522
$39,060
$38,555
$2,385
$80,000
Pierce
80
2,900
$100,800
$73,462
$0
$174,262
Snohomish
88
806
$110,880
$20,417
$0
$131,297
Spokane
100
1,562
$126,000
$39,568
$0
$165,568
Thurston
62
550
$78,120
$13,932
$0
$92,052
Whatcom
23
421
$28,980
$10,665
$40,355
$80,000
Yakima
23
122
$28,980
$3,0901
$47,930
$80,000
TOTAL
982
20,03[$1,237,3201
$529,5101
$90,670
$1,907,500
Any distribution of funds to jurisdictions within a county shall be done on the basis of the
number of affected worksites in each jurisdiction. For example, if there are two (2) jurisdictions
in a county, each with fifty percent (50%) of the total number of affected worksites in the county,
any division of funds within the county should provide each of the two (2) jurisdictions with fifty
percent (50%) of the total county funding allocation.
Page 9 of 16 GCA4569
EXHIBIT II
SCOPE OF WORK
Implementation of Commute Trip Reduction (CTR)
Plans and Program
1. CONTRACTOR AGREES TO:
1.1. Work to be Performed
1.1.1. The county or city, whichever applies, has enacted a Commute Trip Reduction
(CTR) ordinance in compliance with RCW 70.94.521-.551. Said ordinance
requires, for example, the submission of employee commuter surveys, employer
annual reports, and other provisions for the tracking of certain vehicle miles traveled
(VMT) and single occupant vehicle (SOV) commute trips, as well as provisions to
assist in the reduction of VMT and SOV. Therefore, the CONTRACTOR agrees to
implement a CTR program and to comply with all provisions of the applicable
county or city ordinance, which is incorporated herein by reference and made a part
of this AGREEMENT and this Scope of Work.
1.2. Funding Distribution and Reporting
1.2.1. The CONTRACTOR may distribute funds to its eligible contracting partner(s)
who are implementing CTR plans and ordinances as authorized by RCW 70.94.544,
by entering into agreements with other jurisdictions, local transit agencies, regional
transportation planning organizations, or other eligible organizations. The
CONTRACTOR shall submit to WSDOT within 30 days of execution of any
agreement between the CONTRACTOR and is eligible contracting partner(s): (a) a
list of dollar amounts to be disbursed by the CONTRACTOR to its eligible
contracting partner(s), or (b) a fund dispersion methodology.
1.3. Implementation Plans
1.3.1. In addition to complying with Section 1, above, the CONTRACTOR shall
implement all CONTRACTOR provisions in this Scope of Work. Further, the
CONTRACTOR shall incorporate Sections 1 and 3 of the Scope of Work in all
agreements with eligible contracting partner(s), as necessary, to coordinate the
development, implementation, and administration of CTR plans and compliance
with applicable ordinances.
1.3.2. Appeals, Exemptions, and Modifications
1.3.3. The CONTRACTOR shall maintain an appeals process consistent with RCW
70.94.534(6), applicable ordinances, and procedures contained in the Commute Trip
Reduction Task Force Guidelines, which may be obtain from the WSDOT or found
at http://www.wsdot.wa.gov/tdm/tripreduction/CTRguide/default.cfm. The
CONTRACTOR, or its eligible contracting partner(s), shall submit requests for
CTR exemptions or goal modifications to WSDOT for review and comment within
five (5) days of receiving such requests, and shall provide WSDOT five (5) working
days to comment prior to approving or denying the request.
Page 10 of 16 GCA4569
1.3.4. Survey Processing
1.3.5. The CONTRACTOR shall notify WSDOT prior to sending employee commuter
surveys to the University of Washington, Office of Educational Assessment, for
processing. The notification must include the name of the worksite, employer
identification code, and type of survey for each survey being submitted for
processing. The notification shall be submitted as an electronic spreadsheet via
electronic mail. The CONTRACTOR agrees not to deliver or send surveys for
processing unless authorized to do so by WSDOT.
1.3.6. Database Updates
1.3.7. The CONTRACTOR agrees to provide WSDOT with updated lists of affected
worksites and jurisdiction contacts on a quarterly basis. These updates shall be
submitted electronically in a format specified by WSDOT.
1.3.8. Employer Annual Reports
1.3.9. The CONTRACTOR agrees to, within 30 days from the date of filing, submit to
WSDOT one (1) electronic or hard copy of all employer annual report(s).
1.3.10. Employer Exemptions and Goal Modifications
1.3.11. The CONTRACTOR agrees to, within 30 days from the date of official
administrative decision, submit to WSDOT the name and employer identification
code for any worksite that has been granted an exemption or goal modification,
including information about the duration of all exemptions and information on the
type of goal modification granted.
1.3.12. Progress Report and Invoice
1.3.13. The CONTRACTOR agrees to submit to WSDOT periodic progress reports, as
specified in Exhibit III, Progress Report Format, with all invoices in accordance
with Section 4 of this AGREEMENT.
2. WSDOT AGREES TO:
2.1. General Technical Assistance
2.1.1. WSDOT will provide support to the CONTRACTOR, or its eligible contracting
partner(s), in developing and implementing CTR plans and programs, including
providing training, informational materials, and assistance in CTR evaluation.
WSDOT will also assist with overall CTR marketing and promotion on a statewide
basis.
2.2. Exemptions and Modifications
2.2.1. WSDOT will review and comment on employer requests for exemptions from
CTR requirements and/or goal modifications, within five (5) working days after
receipt. Failure to review and comment on such requests within five (5) working
days after receipt shall be considered a waiver of WSDOT's right to comment.
Page 1 l of 16 GCA4569
2.3. Database Management
2.3.1. WSDOT will maintain a current database of all affected worksites in Washington
State. WSDOT will input new and/or updated worksite information within fifteen
(15) working days after receipt from CONTRACTOR. WSDOT will employ an
internal verification process to ensure all new and/or updated information is input in
a timely and accurate manner. Information from the WSDOT database will be
used to determine funding allocation consistent with the methodology contained in
Exhibit 1, Funding Allocation Methodology.
2.4. Training
2.4.1. WSDOT will maintain training materials to support implementation of CTR
programs.
2.5. Public Awareness
2.5.1. WSDOT will develop and implement statewide public awareness and recognition
programs to support local implementation of CTR programs.
2.6. Annual Reporting Assistance
2.6.1. WSDOT will distribute in sufficient quantities the State "Program Description &
Employer Annual Report" form to the CONTRACTOR, or other eligible recipients,
if requested. WSDOT will also maintain an intemet-based annual report system and
will provide information and ongoing technical assistance to employers and
jurisdictions using the system.
2.7. Survey Assistance
2.7.1. WSDOT will:
2.7.1.1. Provide the CONTRACTOR, or its eligible contracting partner(s), with
summary survey information if requested.
2.7.1.2. Distribute the Employee Questionnaires in sufficient numbers to the
CONTRACTOR, its eligible contracting partner(s)if requested.
2.7.1.3. Maintain an internet-based survey tool, and provide information and
ongoing technical assistance to employers and jurisdictions using the system.
2.7.1.4. Provide survey processing at no cost to the CONTRACTOR, or its eligible
contracting partner(s), and affected employers, during the base year and all
subsequent surveys.
2.7.1.5. Provide technical assistance to the CONTRACTOR, or its eligible
contracting partner(s), and employers, on surveying, if requested.
2.7.1.6. Work with the CONTRACTOR, or its eligible contracting partner(s), to
calculate goal measurement information and track measurement survey history
for all CTR affected worksites.
Page 12 of 16 GCA4569
2.7.1.7. Return the processed employee commuter survey and reports to the
CONTRACTOR, or its eligible contracting partner(s), within thirty (30) days
of the date the forms are delivered for processing
2.7.1.8. Maintain and periodically update the "CTR Guide for Employer
Surveys." WSDOT will review survey guide/instructional materials developed
by the CONTRACTOR or its eligible contracting partner(s) for consistency
with the state -developed "CTR Guide for Employer Surveys," which may be
obtained from WSDOT.
2.7.1.9. Review all electronically submitted survey notifications and respond to the
CONTRACTOR within five (5) working days after receipt.
Page 13 of 16 GCA4569
Exhibit III
Progress Report Format
• Name of the Organization Submitting Report:
• Submitted on behalf of following Jurisdiction(s):
• Contact Name:
• Contact Phone and Fax Number:
• Contact E-mail:
1. CTR Activities
Prepare a brief summary of activities undertaken during the period for which
reimbursement is requested.
2. State CTR Funds Disbursed
Jurisdiction
Disbursed
Since Last Report
Total Disbursed
Fiscal Year to Date
Jurisdiction A
$
$
Jurisdiction B
$
$
(etc)
Total Disbursement
$
$
This space intentionally left blank.
Page 14 of 16 GCA4569
3. Expenditures This Period
Under `Categories' listed below, indicate either the actual expenditures, or estimated
expenses if actual costs for these categories are not known. List the actual total
expenditures on the last line of the following table.
Local
Fiscal Year
Other
Fiscal Year
Funds
to Date
Funds
to Date
State CTR
Fiscal Year
Spent on
Local
Spent on
Other
Funds
To Date
CTR
Funds
CTR
Funds
Spent
State CTR
Activities
Spent on
Activities
Spent on
Since Last
Funds
Since Last
CTR
Since Last
CTR
Categories
Report
Sent
Report
Activities
Report
Activities
Required Activities,
$
$
$
$
$
$
including:
1. Notification of
New Worksites
2. Administering
CTR Surveys
3. Employer
Annual Report
Review
4. Exemptions and
Modifications
5. Record
Maintenance
6. Enforcement
Employer Service Activities
Employer Training
$
$
$
$
$
$
Incentives
$
$
$
$
$
$
Promotion and
$
$
$
$
$
$
Marketing
Guaranteed Ride
$
$
$
$
$
$
Home
Other (Specify)
$
$
$
$
$
$
Totals
$
$
$
$
$
is
4. Jurisdiction(s) Contact Names, Address, and Phone Numbers
Jurisdiction A John Who City of X PO Box 1234 X, WA 98000 Phone (206) 999-9999
5. List of contact information for effected worksites in the Jurisdiction.
The information will be submitted in the electronic format approved by WSDOT.
6. Employer Annual Reports Approved During This Period
Provide the name and worksite identification number for all employer annual reports
accepted during this period. Attach a hard copy or electronic (disc) copy of all employer
annual reports accepted by the jurisdiction during the quarter. If the jurisdiction accepted
employer annual reports submitted via WSDOT's web -based reporting system, indicate
the name and worksite identification number for each worksite report accepted.
Page 15 of 16 GCA4569
7. Employer Exemptions and Goal Modifications Granted During This Period
Provide the name and worksite identification number for any worksite that has been
granted a CTR exemption or goal modification during the period, including information
about the duration of all exemptions and information on the type of goal modification
granted.
Page 16 of 16 GCA4569
CITY OF RENTON COUNCIL AGENDA BILL
Submitting Data: Planning/Building/Public Works
Dept/Div/Board.. Transportation Systems
Staff Contact...... Nathan A. Jones, x7217
Subject:
2005-2006 King County Commute Trip Reduction
(CTR) Contract
Exhibits:
Issue Paper
Resolution 3712, dated August 23, 2004
Commute Trip Reduction Act Implementation
For Agenda of:
Agenda Status
Consent ..............
Public Hearing..
Correspondence..
Ordinance .............
Resolution........... .
Old Business........
New Business.......
Study Sessions......
Information........ .
15.2005
0
Recommended Action: Approvals:
Legal Dept......... X
Council Concur Finance Dept......
Other. . .
Fiscal Impact:
Expenditure Required $35,828 Transfer/Amendment
Revenue Generated. $38,435
$35,108 (King County charges) (State funding)
+ $720 (workshop expenses)
Total Project Budget $64,200/year City Share Total Project.
SUMMARY OF ACTION:
This agreement authorizes King County Department of Transportation staff to conduct work in
support of activities the City of Renton is required to do under the State of Washington
Commute Trip Reduction (CTR) Law. This is an ongoing program and the contract is renewed
every year.
STAFF RECOMMENDATION:
Authorize the Mayor and City Clerk to enter into the agreement with King County as allowed
under Resolution 3712 for implementation of the Citywide CTR Program in the amount of
$35,828.
Trans\Admin\Agenda 2005\ CTR_KC_Agenda bill.doc
PLANNING/BUILDING/
ti
PUBLIC WORKS DEPARTMENT
1
M E M O R A N D U M
DATE: August 15, 2005
TO: Terri Briere, President
Members of the Renton City Council
VIA: )Kathy Keolker-Wheeler, Mayor
FROM: ' Gregg Zin n A"iistrator
STAFF CONTACT: Nathan A. Jones, Transportation Planning
Project Manager, x7217
SUBJECT: 2005-2006 King County Commute Trip Reduction (CTR)
Contract
ISSUE:
Should the City enter into an agreement with the King County Department of
Transportation to allow Metro Transit Division staff to perform the State -mandated duties
specified by the Washington State CTR Law on behalf of the City?
RECOMMENDATION:
Authorize the Mayor and City Clerk to enter into the agreement with King County as
allowed under Resolution 3712 for implementation of the Citywide CTR program in the
amount of $35,828.
BACKGROUND:
The City implements a program in accordance with the State and local CTR Law to
monitor Renton employers with CTR-affected worksites for progress and compliance.
This law was enacted as part of the Washington State Clean Air Act to provide measures
that would improve air quality and also manage congestion by encouraging the use of
alternatives to single occupancy vehicle (SOV) commute travel through the use of
incentives to employees at businesses with 100 or more employees arriving to work
between 6:00 AM and 9:00 AM.
The City contracts each year with King County Department of Transportation Metro
Transit Division to provide staff to offer technical assistance to Renton businesses
affected by the CTR Law. King County staff assists with the notification of new sites,
Terri Briere, President
Members of the Renton City Council
Page 2 of 2
August 15, 2005
RE: 2005-2007 WSDOT Commute Trip Reduction (CTR) Contract
employee surveys, program review, records maintenance, and more. The amount of the
contract between the City of Renton and King County is based on the number of
worksites being monitored. Currently, there are 21 CTR-affected employer work sites in
the City. King County is requesting $35,828 to cover the expenses of the above -
mentioned activities from July 1, 2005 to June 30, 2006. The prior contract covered the
same activities at 22 CTR-affected work sites and the prior contract was for $36,342.
(The number of work sites dropped when an employer relocated staff from leased office
space.)
Funding provided by the State of Washington covers the expenses of the King County
contract and a portion of City staff administrative labor. Within the current two-year
contract, the amount of funding distributed by the State of Washington is determined by
two variables: the number of CTR-affected worksites within a jurisdiction and a
performance incentive. The State of Washington gives the City of Renton a fixed $1,260
per CTR-affected work site for required activities plus $570.23 per site for employer
services. The amount of money given for employer services varies year to year; it is
based on the number of trips reduced per day. King County jurisdictions generally did a
good job of reducing vehicle trips, and thus, received more money per site for employer
services.
The Six -Year Transportation Improvement Program (TIP) each year lists a planning
budget of $64,200 to cover the expenses above and beyond the King County contract, and
to cover City of Renton staff time to monitor programs, perform reviews of the annual
employer program reports, and attend trip reduction regional coordinating meetings, for
example. A portion of the funds may be utilized to create a special promotions program
for employers who are interested in creating trip reduction transportation programs for
their employees.
Cc: Nathan Jones, Transportation Planner
I I:Trans/Admin/Agenda Bills 2005/CTR Issue Paper WSDOT 2005
CITY OF RENTON, WASIIINGTON
RESOLUTION NO. 3 712
A RESOLUTION OF THE CITY OF RENTON, WASHINGTON,
AUTHORIZING THE MAYOR AND CITY CLERK TO ENTER INTO AN
INTERLOCAL COOPERATIVE AGREEMENT WITH KING COUNTY
ENTITLED "COMMUTE TRIP REDUCTION ACT IMPLEMENTATION
AGREEMENT."
WHEREAS, the City of Renton, pursuant to the Commute Trip Reduction Act, is
required to develop and implement commute trip reduction plans; and
WHEREAS, the Legislature has appropriated funds to provide technical assistance
funding to the City; and
WHEREAS, the Washington State Department of Transportation, by law, distributes
these funds to the counties, which in turn distributes the funds to the cities; and
WHEREAS, the County and the City desire to have the County perform certain tasks on
behalf of the City; and
WHEREAS, it is necessary to document the terms and conditions under which the
County will perform such tasks on behalf of the City;
NOW, THEREFORE, THE CITY COUNCIL OF THE CITY OF RENTON,
WASHINGTON, DO RESOLVE AS FOLLOWS:
SECTION I. The above recitals are found to be true and correct in all respects.
SECTION H. The Mayor and City Clerk are hereby authorized to enter into an
interkwA cooperative agreement with King County entitled "Commute Trip Reduction Act
Implementation Agreement' and later similar contracts that have the same general purpose, terms
and funding.
1
COMMUTE TRIP REDUCTION ACT IMPLEMENTATION AGREEMENT
An Agreement between King County, through its Department of Transportation,
(hereinafter called "King County ") and the City of Renton ("City"), hereinafter jointly
referred to as the "Parties," for the purpose of implementing the Washington State
Commute Trip Reduction Act of 1991.
WHEREAS, the Washington State Legislature enacted the Commute Trip Reduction Act
(Chapter 202, Laws of 1991, codified as RCW 70.94.521-551) to require local governments in
those counties experiencing the greatest automobile -related air pollution and traffic congestion to
develop and implement plans to reduce vehicle miles traveled per employee and single occupant
vehicle commute trips; and
WHEREAS, the City has within its boundaries one or more "major employers" and is
required by RCW 70.94.527 to develop and implement a commute trip reduction plan; and
WHEREAS, the Parties hereto are authorized to enter into this Agreement pursuant to
RCW 70.94.527 (6); and
WHEREAS, the King County Code 28.94.110 authorizes the execution and administration
of Agreements with state and local agencies for assistance in implementing the Commute Trip
Reduction Act; and
WHEREAS, the local jurisdiction commute trip reduction plans are required to be
coordinated and consistent with plans of adjacent jurisdictions and applicable regional plans; and
WHEREAS, the City and King County desire to implement the Commute Trip Reduction
Act consistent with the guidelines established by the state Commute Trip Reduction Task Force and
with King County and other cities within the county; and
WHEREAS, the City can achieve cost efficiencies and administrative consistency by
contracting with King County for CTR implementation;
NOW THEREFORE, in consideration of the mutual promises and covenants herein, it is
hereby agreed:
SECTION 1.0 PURPOSE.
The purpose of this Agreement is to assign certain tasks to be undertaken by King County on behalf
of the City to implement the CTR Act.
Page 2
SECTION 2.0 DEFINITIONS.
The following definitions shall apply for purposes of this Agreement:
"Administrative Representative" means the primary administrative contact for issues related to
this Agreement as designated in Section 3.5 of the Agreement.
"Affected Employer" means an employer required by RCW 70.94.521 and the City's CTR Plan to
implement a CTR program (see also "major employer").
"Commute Trip Reduction Plan (CTR Plan)" means a plan adopted by the City designed to
reduce the proportion of single occupant vehicle commute trips and vehicle miles traveled per
employee, as described in RCW 70.94.527.
"Commute Trip Reduction Program (CTR Program)" means a program designed by an
affected employer to reduce the proportion of single occupant vehicle commute trips and the
commute trip vehicle miles traveled by employees at a worksite, as described in RCW 70.94.531.
"CTR Funds" means state funds authorized by RCW 70.94.544 and Section 301 of the Natural
Resources biennial budget to help counties and cities implement commute trip reduction plans.
"Major Employer" means a private or public employer that employs one hundred or more full-
time employees at a single worksite who are scheduled to begin their regular workday between 6:00
a.m. and 9:00 a.m. on weekdays for at least twelve continuous months during the year, as provided
in RCW 70.94.521 (herein also known as an "affected employer").
"State" is the Washington State Department of Transportation (WSDOT) unless otherwise noted.
SECTION 3.0 SCOPE OF WORK
3.1 Scope of Work: The scope of work to be completed by King County and the City in
accordance with this Agreement is described in "Exhibit A: Scope of Work", which by
reference is made a part of this Agreement. Funds provided by the City to King County
under this Agreement shall be used solely for activities undertaken to fulfill the provisions
of the scope of work as provided in Exhibit A.
3.2 Regional Cooperation: Some tasks in the Scope of Work are subarea or county -wide and
assume that the City will participate with other contracting cities and try to the extent
possible to develop policies and products consistent throughout the county to take
advantage of economies of scale and cost efficiencies.
3.3 Schedule: The schedule for tasks is specified in Exhibit A: Scope of Work. A quarterly
review of progress to date and anticipated activities will be held with jurisdiction
representatives. On -going review of issues and materials will be conducted with the
jurisdiction representatives.
Page 3
3.4 Project Organization: The contract -funded position will conduct contractual activities for
the jurisdiction. The position will work in a single division which includes other contract
staff and report to the CTR Services Supervisor.
3.5 Administrative Representatives: King County and the City shall each designate an
administrative representative for matters pertaining to this Agreement.
King County shall be represented by the Manager of Sales and Customer Service or his
designee. The City shall be represented by the Director, Transportation System Division or
his/her designee.
3.6 State Requirements: At the request of the City, King County shall provide information to
the State for monitoring or evaluation activities as outlined in the Interlocal Agreement.
SECTION 4.0 DISBURSEMENT OF FUNDS
4.1 Budget: The budget for work to be performed through June 30, 2006 is specified in Exhibit
B.
4.2 Equipment: Equipment to be purchased under this Agreement shall be used exclusively for
the purpose of CTR administration for the City and other jurisdictions in King County. King
County shall own all such equipment and maintain it at no additional cost to the City.
4.3 Payment Process: King County shall submit the City's invoice and a quarterly progress
report to the City per the following schedule. The City shall make payment to King County
within 45 days of receipt of the invoice.
Payment Fixed Invoice Submitted
Payment No Earlier Than
1St payment $8,777.50 September 30, 2005
2nd payment $8,777.50 December 31, 2005
3rd payment $8,777.50 March 31, 2006
4th payment $8,777.50 June 30, 2006
Total $35,108.00
4.4 Payment Amounts: Each payment shall consist of the fixed amount specified above in
Section 4.3, plus reimbursement of workshop expenses estimated to $720.00. The City
shall pay a percentage share of workshop expenses based on the percentage of the total
registrants for the workshop representing worksites in the City.
Page 4
The workshop expenses to be shared by the City shall consist of a fixed labor element plus
actual non -labor expenditures. The fixed labor element shall be as follows:
- ETC Orientation
- Program Implementation
- Survey Briefing
- Additional Workshops
$491.50 fixed labor charge per workshop
$491.50 fixed labor charge per workshop
$167.11 fixed labor charge per workshop
$49.15 fixed labor charge per hour for King
County trainers
SECTION 5.0 AUDITING OF RECORDS, DOCUMENTS, AND REPORTS
The State Auditor and any of its representatives shall have full access to and the right to examine
during normal business hours and as often as the state Auditor may deem necessary, all the records
of the City and King County with respect to all matters covered in this Agreement. Each Party to
the Agreement shall have similar access and rights with respect to the records of the other Party.
Such representatives shall be permitted to audit, examine, and make excerpts or transcripts from
such records and to make audits of all contracts, invoices, materials, payrolls, and records of matters
covered by this Agreement. Such rights last for three (3) years from the date final payment is made
hereunder.
SECTION 6.0 EQUAL EMPLOYMENT OPPORTUNITY.
King County agrees to abide by all applicable federal and state statutes and regulations prohibiting
employment discrimination.
SECTION 7.0 WAIVER OF DEFAULT
Waiver of any default shall not be deemed to be a waiver of any subsequent default. Waiver of
breach of any provision of the Agreement shall not be deemed to be a waiver of any other or
subsequent breach and shall not be construed to be a modification of the terms of the Agreement
unless stated to be such in writing, signed by an authorized representatives of the County, and
attached to the original Agreement.
SECTION 8.0 SEVERABILITY
Should any clause, phrase, sentence or paragraph of this Agreement be declared invalid or void, the
remaining provisions of this Agreement shall remain in full force and effect if such remainder
continues to conform to the terms and requirements of applicable law and the intent of this
Agreement.
Page 5
SECTION 9.0 INDEMNIFICATION AND HOLD HARMLESS
It is understood and agreed that this Agreement is solely for the benefit of the Parties hereto and
gives no right to any other Party. No joint venture or partnership is formed as a result of this
Agreement. Each Party hereto agrees to be responsible and assumes liability for its own negligent
acts or omissions, and those of its officers, agents or employees, while performing work pursuant to
this Agreement, to the fullest extent required by law, and agrees to save, indemnify, defend, and
hold the other Parties harmless from any such liability. In the case of negligence of multiple
Parties, any damages allowed shall be assessed in proportion to the percentage of negligence
attributable to each Party, and each Party shall have the right to seek contribution from the other
Parties in proportion to the percentage of negligence attributable to the other Parties.
The City acknowledges it is solely responsible for its compliance with the CTR Act, and for the
adoption, implementation, and enforcement of any ordinances, plans, and programs related to the
CTR Act. The City shall indemnify and hold King County harmless from, and shall process and
defend, at its own expense, any and all claims, demands, suits at law of equity, actions, penalties,
losses, damages, or costs arising out of, in connection with, or incidental to any act or omission of
the City or any of its officers, employees, subcontractors or agents in adopting or enforcing any
ordinances, plans and programs related to the CTR Act.
The Parties hereto acknowledge that the State of Washington is not liable for damage or claims
from damages arising from any act or omission of King County or the City under this Agreement.
SECTION 10.0 AGREEMENT PERIOD
This Agreement is effective from July 1, 2005. The expiration date for purposes of performing
substantive work as described in Exhibit A (Scope of Work) and for incurring costs is
June 30, 2006, and for final accounting purposes is July 31, 2006, unless the Parties agree to an
extension. Termination of this Agreement does not relieve any of the Parties from any obligations
incurred through the date of termination as a result of this Agreement.
SECTION 11.0 AGREEMENT MODIFICATIONS
This Agreement may be amended, altered, clarified or extended only by written Agreement of the
designated administrative representative of the City and King County.
SECTION 12.0 TERMINATION
12.1 Either Party to this Agreement may terminate the Agreement, in whole or in part, upon
thirty (30) days advance written notice of the termination to the other Party. If this
Agreement is so terminated prior to fulfillment of the terms stated herein, King County shall
be reimbursed for all actual direct and related indirect expenses and noncancellable
obligations incurred to date of termination.
Page 6
12.2 If at any time during the Agreement period the State acts to terminate, reduce, modify, or
withhold CTR Grant Funds allotted to the City pursuant to RCW 79.94.544 then either
Party may terminate this Agreement by giving thirty (30) days' advance written notice to the
other Party.
Dated this day of , 2005.
IN WITNESS WHEREOF, the Parties hereto have executed this Agreement as of the day first
above mentioned.
KING COUNTY:
By
Kevin Desmond
General Manager
Metro Transit
Approved as to form: CITY OF RENTON
By
City Attorney
By
Director
City of Renton — Exhibit A
Commute Trip Reduction Services Contract
Scope of Work
Period: July 1, 2005, through June 30, 2006
Work Activities — 21 current sites
A. Notification of new sites
1. Identify contact for potential sites
2. Send notification inquiry
3. Confirm status
4. Secure state code
5. Create timeline and legal file
B. Survey
1. Alert employer to survey timeline
2. Track survey completion and processing
3. Send survey results to employer
C. Program review
1. Remind employers of submittal deadlines
2. Monitor program report receipt
3. Review revised programs for sites that did not make progress and evaluate the
potential for progress toward SOV reduction
4. Review program reports for completeness for new sites and for sites that
made progress toward goal
5. Recommend action to jurisdiction
6. Generate approval letter for City signature
D. Exemptions & Modifications
1. Inform new sites about process and criteria
2. Receive requests and copy to city
3. Copy request to state for comment
4. Review and analyze request and provide comments to City
5. Contact employer as needed, generate and send response per city
E. Records maintenance
1. Maintain database and master file records on all affected sites
2. On a quarterly basis, provide WSDOT with hard copy of each employer
program report approved within the quarter
3. Provide WSDOT with an electronic copy of the CTR database of the City's
CTR-affected employers, quarterly or as required by WSDOT
4. Provide quarterly report information for jurisdiction to conduct state funds
billing
Schedule
As needed
First quarter and
as necessary
Ordinance
schedule by
Site
As needed
On -going
Exhibit A
F. Program Development As needed
New Sites
1. Provide written information on basic requirements of the CTR Ordinance,
CTR Zones, and an explanation of how the plan is intended to achieve its
goals
2. Provide materials that explain a range of measures and activities that may
help the employer achieve the CTR goals of the local ordinance
3. Assist with voluntary baseline survey. Analyze survey data and make
programs recommendations.
G. New ETC Consultation/Briefing As needed
1. Provide written information on basic requirements of the CTR Ordinance,
CTR Zones, and an explanation of how the plan is intended to achieve its
goals
2. Provide materials that explain a range of measures and activities that may
help the employer achieve the CTR goals of the local ordinance
H. Program Implementation Assistance As needed
Provide assistance in the following categories:
1. Identify resources and implementation requirements
2. Coordinate/attend network group meetings
3. Communicate with ETCs about transportation issues, including Sound
Transit, Metro Transit, Special events and items of interest (e.g.: construction
and road closures, Air Quality alerts, WSRO bulletins)
4. Provide promotion/incentive support and coordination (e.g.: planning,
develop materials, implement and evaluate, includes Rideshare campaign and
Relax campaign)
I. Training Quarterly
Provide county -wide basic training to new ETCs
1. Basic Training part 1: ETC orientation
2. Basic Training -part 2: Program Implementation and Promotion
3. Survey briefing
CITY OF RENTON
Period: July 1, 2005 through June 30, 2006
FUNDING
State CTR Funds (estimated)
$1,260 per site for Required Activities
$570.23 per site for Employer Services
TOTAL FUNDS AVAILABLE
NUMBER OF SITES
Exhibit B
$
26,460.00
$
11,974.83
$
38,434.83
21
CTR SERVICES CONTRACT
Required Activities
1. New Site Notification / Site status change
$
147
2. Data Management & Survey Processes
$
4,838
3. Program Review & Site Analysis
$
11,870
4. Exemptions, Modifications and Compliance Issues
$
1,180
5. Records Maintenance
$
3,096
Total Required Activities
$
21,131
Employer Service
1. Employer Training
$
720
2. Incentives
$
1,050
3. Promotions & Marketing
$
2,064
4. Program Development
$
1,573
5. Program Implementation
$
9,289
Total Employer Service
$
14,696
CONTRACT TOTAL
$
359828
CITY OF RENTON COUNCIL AGENDA BILL
Al #:
Submitting Data: Planning/Building/Public Works
For Agenda of: August 15, 2005
Dept/Div/Board.. Transportation Systems Division
Agenda Status
Staff Contact...... Nick Afzali, x7245
Consent ..............
Public Hearing..
Subject:
Correspondence..
Prioritization of Sound Transit Phase 2 (ST2) Renton
Ordinance .............
Projects List
Resolution............
Old Business........
New Business....... X
Exhibits:
Study Sessions......
Issue Paper
Information.........
Recommended Action: Approvals:
Legal Dept........
Refer to Transportation/Aviation Committee Finance Dept......
Other ...............
Fiscal Impact:
Expenditure Required... $0 Transfer/Amendment.......
Amount Budgeted....... Revenue Generated.........
Total Project Budget $0 City Share Total Project.. N/A
SUMMARY OF ACTION:
Sound Transit (ST) staff requested all jurisdictions within the Regional Transit Authority (RTA)
boundary submit prioritized lists of projects the jurisdictions would like to see incorporated into
Sound Transit's Phase 2 (ST2) work plan. The City has provided Sound Transit with a list of
projects, but as of yet, has not weighed in with a prioritization of this list.
STAFF RECOMMENDATION:
Approve with the list of prioritized projects within Renton for inclusion in the ST2 project list.
H:\TRANS\ADMIN\AGENDA 2005\ ST2 Agenda Bill 8-15-05
�Y 0� PLANNING/BUILDING/
PUBLIC WORKS DEPARTMENT
M E M O R A N D U M
DATE: August 15, 2005
TO: Terri Briere, Council President
Members of the Renton City Council
VIA: J/"'dKathy Keolker-Wheel-, Mayor
/�
FROM: �' Gregg Zimmermaf�;-Afmd inistrator
STAFF CONTACT: Nick Afzali, Transportation Planning & Programming Manager,
x7245
SUBJECT: Prioritization of Sound Transit Phase 2 (ST2) Renton
Projects List
ISSUE:
Sound Transit (ST) staff requested all jurisdictions within the Regional Transit Authority
(RTA) boundary submit prioritized lists of projects the jurisdictions would like to see
incorporated into Sound Transit's Phase 2 (ST2) work plan. The City of Renton has
provided ST with a list of projects, but as of yet, has not weighed in with a prioritization
of this list.
RECOMMENDATION:
Concur with the list of prioritized projects within Renton for inclusion in the ST2 project
list.
BACKGROUND SUMMARY:
ST staff, upon the adoption of a Supplemental Environmental Impact Statement (SEIS)
for the Sound Transit plan in July 2005, has been gearing up for the second phase of
Sound Move projects (ST2). The ST staff has conducted a public outreach process to
jurisdictions within the RTA via the subarea transportation boards (SCATBd, ETP, etc.)
and has requested these jurisdictions provide prioritized projects lists. Initially, lists were
solicited without priorities, and over 500 projects were turned in.
ST staff is tasked with collecting prioritized lists in order to whittle down the list of 500
projects into something more manageable and realistic. ST staff made an attempt to do
this and provided a list of projects for the reaction of jurisdictions, specifically to get at
the priorities and preferences of jurisdictions.
Terri Briere, Council President
Members of the Renton City Council
Page 2 of 2
August 15, 2005
Re: Prioritization of ST2 Renton Projects List
We believe ST's goal is to get ST2 to the voters (needs to gain voter approval) in
November of 2006 on a joint ballot with the Regional Transportation Investment District
(RTID). In order to do this, ST staff needs to get a list trimmed down as soon as possible.
ST wants to bring their plan out to the public for reaction and comment; however, much
work needs to be done before that can happen.
None of these projects have undergone fiscal analysis for revenues and expenditures; also
the funding scenario is unknown. Would the funding resources be based on existing
sources and levels or would there be a different mix of funding sources considered and
adjusted (high/low) funding percentages? It is not known whether this would be a 10-
year, 15-year, or longer plan. The criteria for measuring performance of these projects is
established. However, these criterions have not been applied to the projects to measure
the performance, i.e. speed, reliability, ridership, or other factors.
Once the list of 500 plus projects has been trimmed down to a manageable size, then ST
staff will perform the fiscal analysis outlined above and also factor the performance and
fiscal issues described.
Staff recommends the projects be prioritized as follows:
1. New HOV/Bus Rapid Transit (BRT) line from Bellevue to Renton includes:
• Completion Sound Move Project -N 81h HOV direct access @ I-405
• Transit Station and structured parking at N.81h and Logan
• Connection to Longacres Commuter Rail Station and completion of SW 271h /
Strander Boulevard
2. HOV Direct Access at SW 271h/SR 167
3. HOV Direct Access at Rainier/SR 167/I-405
4. BRT Station at Lind Ave SW
5. In -line Station at NE 44th
Cc. Jay Covington, Chief Administrative Officer
Sandra Meyer, Transportation Director
Nick Afzali, Transportation Planning & Programming Manager
File
h:\divisions\transpor.tat\admin\agenda 2005\s12 issue paper 8-10-05.doc
CITY OF RF.NTON COUNCIL AGENDA BILL
Submitting Data: Transportation Systems
Dept/Div/Board.. Planning/Building/Public Works
Staff Contact...... Rob Lochmiller, x7303
Subject:
Strander Boulevard Extension West Valley I11ghway
(SR 181) to East Valley Road, CAG 03-033
Supplemental Avreeinent No. 3
Exhibits:
Issue Paper
Supplemental Agreement
2005 Reallocation Summary
Phase 1, Segment 1 Project Costs
Reimbursement Resolution
For Agenda of:
Augu,
Agenda Status
Consent ..............
Public Bearing..
Correspondence..
Ordinance .............
Resolution............
Old Business........
New Business.......
Study Sessions......
Information.........
Recommended Action: Approvals:
Legal Dept.........
Refer to Transportation Committee Finance Dept......
15, 2005
Fiscal Impact: 317.12239.016.5950.0000.67.000000
Expenditure Required... $ 110, 846 Transfer/Amendment....... $3,000,000'
Amount Budgeted....... $ 210,000' Revenue Generated......... $ 556,225
Total Project Budget $50,532,727 City Share Total Project.. $3,210,000
SUMMARY OF ACTION:
M
This supplemental agreement with Perteet, Inc. will provide construction management services for
the Strander Boulevard/SW 27th Street Connection: Phase 1, Segment 1.
A budget adjustment is also required to pay for both the Supplemental Agreement and
construction. The adjustment would increase the 2005 Strander Boulevard Project budget up to
$3,766,225. Funding will initially come from the current 317 ending fund balance that will be
used as a `bridge loan' until bonding for the South bake Washington Roadway Improvements
Project is secured. Up to $3,000,000 will be bonded for the construction, construction
engineering/administration and City share for land costs of Tract D.
STAFF RECOMMENDATION:
1. Authorize the Mayor and City Clerk to execute Supplemental Agreement 43 with Perteet, Inc. in
the amount of $1 10,846.
2. Authorize Finance to process a budget adjustment to the Transportation Fund and budget in order
to fund Phase I, Segment 1 of the Strander Boulevard project construction costs.
1 Spent on design phms. Remaining dollars will he moved to construction.
Maximum transfer requestcd. Recommend transl`en ing what is actually required once the lowest responsible hid is secured.
Fund 317 will be amended at the end of the vcar thnrugh an amending'00l budget ordinance to r0lret this hud-ct adjustment.
II Iian, Adinin Ape [I,L '001 0�0'" Arcnde Rill supp 3
PLANNING/BUILDING/
PUBLIC WORKS DEPARTMENT
MEMORANDUM
DATE:
August 15, 2005
TO:
Terri Briere, Council President
Members of the Renton City Council
VIA:�
c.
Kathy Keolker-Wheel r, Mayor
FROM:
Gregg Zimmerma('Aministrator
STAFF CONTACT: Robert Lochmiller, Transportation Systems Design
Project Manager, x7243
SUBJECT:
Strander Boulevard Extension — West Valley Highway (SR
181) to East Valley Road, CAG 03-033
Supplement Agreement No. 3
ISSUE:
1. Should a supplemental agreement with Perteet, Inc. be authorized to provide
construction management services for the Strander Boulevard Extension, SW 27th
Street, Phase 1, Segment 1 portion?
2. Should Council authorize the transfer of up to $3,000,000 to the Strander
Boulevard Extension — West Valley Highway (SR 181) to East Valley Road
Project from the 2005 ending fund balance?
RECOMMENDATIONS:
1. Authorize the Mayor and City Clerk to execute Supplemental Agreement #3 with
Perteet, Inc. in the amount of $110,846.
2. Authorize Finance to process a budget adjustment to the Transportation Fund and
budget in order to fund Phase I, Segment 1 of the Strander Boulevard project
construction costs.
BACKGROUND:
This phase of the project will construct a new east -west arterial roadway between
Oakesdale Avenue SW and the east side of the Burlington Northern Santa Fe Railroad
Terri Briere, Council President
Members of the Renton City Council
Page 2 of 2
August 15, 2005
Re: Strander Boulevard Extension — West Valley Highway (SR l 81) to East Valley Road, CAG 03-033
(BNSF) tracks where the future overcrossing will begin. This first phase project will
provide access to the southern end of the Boeing Longacres site and to the new Federal
Reserve Bank. It will match the future alignment of the Strander Boulevard extension
that will be constructed in future phases.
Development Services has determined that they do not have adequate staff time to
provide inspection for this project due to the large amount of CIP, TIP and developer
projects. This supplement will provide construction inspection as well as construction
engineering/review and archeological monitoring in accordance with our NEPA
documents.
Construction was originally slated to start in 2006, but to keep ahead of the Federal
Reserve Bank's schedule and due to heavy construction scheduled for TIP projects in
2006 construction will begin in September 2005. No construction budget had been
appropriated for 2005. Funding will initially come from the current 317 ending fund
balance that would be used as a `bridge loan' until the bonding for the South Lake
Washington Roadway Improvements Project is secured. Up to three million dollars
will be bonded for the construction, construction engineering/administration and City
share for land costs of Tract D. We will bond only what is actually required.
cc: Sandra Meyer, Transportation Systems Director
Leslie Lahndt, Transportation Design Supervisor
Robert Lochmiller, Transportation Project Manager
Sharon Griffin, Transportation Program Development Coordinator
H/Trans/Admin/agenda bills 2005/050727 Issue Paper — Supp 3
CWWashington State
Department of Transportation
Organization and Address
Supplemental Agreement No. 3
Perteet, Inc.
Agreement Number
2707 Colby Ave., #900
CAG-03-033
Everett, WA 98201
Project Number
Phone
(425) 252-7700
Project Title
New Maximum Amount Payable
Strander Boulevard Extension
West Valley Highway (SR 181) to East
Valley Road
$2,521,632
Description of Work
Construction management services for the Strander Boulevard project.
The Local Agency of City of Renton
desires to supplement the agreement entered into with Perteet, Inc.
and executed on March 26, 2003 and identified as Agreement No. CAG-03-033
all provisions in the basic agreement remain in effect except as expressly modified by this supplement.
The changes to the agreement are described as follows:
Section 1, SCOPE OF SERVICES, is hereby changed to read:
The original scope of services is amended to include additional services as described in detail in the
attached Exhibit "B"
11
Section IV, TIME FOR BEGINNING AND COMPLETION, is amended to change the number of calendar days for completion of the work
to read: Completion Date — June 31, 2006
III
Section V, PAYMENT, shall be amended as follows:
of One Hu
Dollars ($2,521,632).
Two
If you concur with this supplement and agree to the changes as stated above, please sign in the appropriate spaces below and return to this office for
final action.
Dated this day of 2005.
By: Kevin E. Weed, President By:
Consultant Signature
Supplemental Agreement No. 2
Prepared by Perteet, Inc.
Page 1
Approving Authority Signature
Strander Blvd Extension — Phase 1 PS&E
C VJec —W, anA Settings4locAmillerU,oca1 Settings\Temp\Sltlple—tks Strande FT 1 CmM_I Am
Exhibit `B" — Supplemental Agreement No. 2
SCOPE OF SERVICES
CITY OF RENTON
Strander Boulevard Extension
OAKESDALE AVENUE TO BOEING ACCESS — PHASE 1, PS&E
INTRODUCTION
This work effort (Work Order 3) was identified as requiring a supplement in the original
Strander Boulevard Extension agreement. This phase of the project will construct a new east -
west arterial roadway between Oakesdale Avenue and the east side of the Burlington Northern
Railroad (BNSF) tracks where the future overcrossing will begin. This first phase project will
provide access to the southern end of the Boeing Longacres site. It will match the future
alignment of the Strander Boulevard Extension anticipated to be constructed in future phases.
GENERAL SCOPE OF SERVICES
This supplemental agreement provides for construction management services for the Strander
Boulevard project . All provisions in the Engineering Consulting Agreement remain in effect
except as expressly modified by this supplement. The changes to the agreement are described as
follows:
WORK ORDER 3 — Construction Observation, Phase 1, Stage 1.
1.0 PROJECT MANAGEMENT
Provide continuous project management administration (billing invoices, monthly progress
reports, consultant/subconsultant coordination) throughout this phase of the project's duration.
2.0 CONSTRUCTION ADMINISTRATION
Assist the City of Renton in providing engineering and record documentation in compliance with
State and City of Renton funding requirements as specified in the contract plans and
specifications. Work will include assisting the city in managing the project as necessary to
support the project. Items of work may include the following:
1. Participate in the Pre -Construction Conference including taking of meeting minutes.
2. Provide necessary construction engineering services to manage field changes and design
revisions.
3. Assist in the preparation of change orders.
4. Provide the services of the Project Engineer on an "on -call basis" to assist in the construction
observation, review of field modifications and design changes.
5. Review and recommend approval of the Contractor's Progress Schedule including updates.
6. Review and recommend action on Contractor submittals for City of Renton's Approval
including: Request to Sublet, Certifications, working drawings, and Request for Material
Supplemental Agreement No. 2 Strander Blvd Extension — Phase I PS&E
Prepared by Perteet, Inc. C:\D-.—.0 nd �� v ��m»«� �a S ttm s\Tp1S 1,1tN3SU..da A I C.S_,.aa
Page 2
Sources.
7. Attend weekly project site meetings with the Contractor, City staff, utilities, and others
associated with the project construction. Prepare meeting minutes for each of the meetings.
The Consultant will endeavor to protect the City of Renton against defects and deficiencies in
the work of the Contractor, but cannot guarantee the Contractor's performance and shall not be
responsible for construction means, methods, techniques, sequences, procedures for safety
precautions and programs in connection with the work.
The scope of this contract is based upon the contractor working a 100 working day contract. The
schedule also includes 4 weeks of work prior to notice to proceed and 4 weeks of project closure
work after completion of construction. If the work schedule changes and the construction
activity extends, the Consultant shall inform the City immediately. If the City requires additional
construction management services by the Consultant the fee shall be adjusted accordingly by a
supplement to this contract. The additional services will be billed at the rates established in the
base agreement, including overhead and fee.
3.0 ARCHAEOLOGICAL MONITORING
Through qualified subconsultant (LAAS), the consultant shall provide the services of
archaeological monitor to support the monitoring plan prepared as part of the earlier contract.
Items of work may include the following:
Preconstruction Meeting. A LAAS Principal Investigator and the monitoring archaeologist will attend a
preconstruction meeting to discuss protocols, to introduce the archaeologist to the construction contractor
and City of Renton inspectors, to identify the chain of command, and to explain procedures for
inadvertent discoveries.
Archaeological Monitoring. Archaeological monitoring will be conducted for the City of Renton's 271h
Street/Strander Blvd. Project in accordance with the Contract Documents. The archaeologist will
coordinate with the City of Renton personnel and the construction contractor to identify dates for
monitoring, to determine acceptable protocols on -site, and the archeologist will keep daily notes to
document his observations. Monitoring will be discontinued if assumptions regarding probability change
once the archaeologist is able to observe subsurface soils. The archaeologist will cease monitoring once
the excavation has reached a level below native soils where archaeological deposits would be expected to
occur.
Draft Letter Report of Findings. A draft letter report of findings will be prepared for submission to
Perteet, the City of Renton and WSDOT that documents monitoring methods and results with
accompanying figures and photos of stratigraphy. Relevant comments received from the City of Renton
and WSDOT, will be incorporated into the Final Letter Report of Findings.
Final Letter Report of Findings. A final letter report of findings will be prepared for submission to the
City of Renton, WSDOT, the Department of Archaeology and Historic Preservation, and the Muckleshoot
and Duwamish Tribes.
Supplemental Agreement No. 2 Strander Blvd Extension — Phase 1 PS&E
Prepared by Perteet, Inc. C.Da rnm sod SdtingsVlxhnflcr\Local Sr �ngs, �,„ ,,,Y, �Knu ; Wa da Ph I C—t-Ldm
Page 3
TIME FOR COMPLETION:
The work under Supplement 3 of this contract shall be completed by June 31, 2006. The City
may authorize additional time for revisions to the construction contract plans after that date as
may be required by project funding and/or construction sequencing.
ITEMS TO BE PREPARED AND/OR FURNISHED BY THE CONSULTANT:
1. Copies of minutes of meetings.
2. Monthly progress reports and invoices.
3. Response to RFI's
4. Comments and recommendation on material submittals
5. Inspector Daily Reports.
6. Draft Archeological Letter Report of Findings
7. Final Archeological Letter Report of Findings
Supplemental Agreement No. 2 Strander Blvd Extension — Phase 1 PS&E
Prepared by Perteet, Inc. COm—ts and &ttinp)rImhmi1ler lLma, Seu6ngs\TerrVlSi,pP,cnent#3 83—da Ph l Cmd_ ,.am
Page 4
Project: Strander Blvd. Stage 1 - Boeing Access to Oaksdale
Client: Renton
Classification
Hours
Rate
Cost
Associate (E-6)
20
x $47.12 =
$942
Senior Project Manager (E-5)
138
x $42.30 =
$5,837
Design Engineer (E-2)
660
x $27.00 =
$17,820
CADD Operator/Tech (T3)
30
x $27.50 =
$825
Clerical
18
x $20.00 =
$360
TOTAL DSC =
$25,785
OVERHEAD (OH COST - including Salary Additives):
OH Rate x DSC 179.72%
x $25,785 =
$46,340
FIXED FEE (FF):
FF Rate X DSC 35%
x $25,785 =
$9,025
REIMBURSABLES:
Mileage @ Current Federal Rate
$1,600
CADD Station @$10/hr
$300
_
$1,900
SUBCONSULTANTS
Larson Anthropological Archaeological Services Limited = $ 17,719
MANGEMENT RESERVE _ $10,077
GRAND TOTAL: _ $110,846
PREPARED BY: Dan Hansen/Peter De Boldt DATE: 26-Jul-05
Supplemental Agreement No. 2 Strander Blvd Extension — Phase 1 PS&E
Prepared by Perteet, Inc. CADocnments and SCLUngsV1ochnWJerU-1 SetU,gsV1'enip\Snpplenrnt#3 Strands Ph l Cmst_I Am
Page 5
Amends ORD: 5110
CITY OF RENTON, WASHINGTON
ORDINANCE NO. 5134
AN ORDINANCE OF THE CITY OF RENTON, WASHINGTON,
AMENDING ORDINANCE NO. 5110 RELATING TO THE CITY OF
RENTON 2005 ANNUAL BUDGET BY APPROPRIATING FUNDS
FROM THE TRANSPORTATION CAPITAL IMPROVEMENT FUND
BALANCE, INCREASING THE 2005 BUDGET, AND
REALLOCATING THE EXPENDITURES IN SPECIFIC
TRANSPORTATION IMPROVEMENT PROJECTS.
WHEREAS, the City Council passed the 2005 Annual Budget Ordinance (Ordinance
No. 5110) on December 20, 2004; and
WHEREAS, it is necessary and advisable to amend the 2005 budget to accommodate
new grants and other revenue and corresponding expenditures to complete transportation
projects;
NOW, THEREFORE, THE CITY COUNCIL OF THE CITY OF RENTON,
WASHINGTON, DOES ORDAIN AS FOLLOWS:
SECTION L The following adjustments are hereby allowed and established in
fund listed below:
Fund
2005 Budget
Beginning Fund Balance, Jan. 1, 2005
$ 10,539,176
Total New Revenue
6,145,200
Total Committed Expenditures
(7,986,500
Budget Adjustments Per this Ordinance
2,382,300
Total Adjusted Budget
$ 10,368,800
.Ending Fund Balance, Dec. 31, 2005
$ 6,315,576
SECTION H. A list of all individual budget adjustments in the Transportation
Capital Fund is hereby attached as Attachment A, and is available for public review in the
office of the City Clerk, Renton City Hall.
ORDINANCE NO. 5134
Transportation Capital Fund
Attachment A
Project
Proposed
TIP
Project Title
Number
2005 Budget
Change
2005 Budget
Comment
Additional funding needs + 2005
1
Street Overlay ram
317.012108
$ 405,000
$ 300,000
$ 705,000
budge(. See Note 1.
2
SR 167/SW 27th St/Strander By
317.012138
10,000
5,000
5,000
Reduced request $5.000 for 2005.
Completes 30% design for entire
project Recent federal award of
3a
Strander Bv/SW 27th St Connect
317.012239
800,000
10,000
810,000
$750,000. See Note 2.
Complete final for Ph.1
3b
Strander Bv, Phase 1, Segment 1 '
317.012239
210,000
210,000
ment 1 S Note ,
TO and Metro mitigation funding.
Construct Ph 1 in 2005. Prepare PS&E
package for Ph 2 with possible
4
SR 169 HOV -140th to SR900
317.012175
10,000
1,107.800
1,117,800
additional design ($10010 due to
Maintenancefacil . See Note 3.
5
Renton Urban Shuttle RUSH
317.012163
5,000
-
5,000
Same as 2005 budget.
6
Transit Program
317.012109
20.400
-
20,400
Same as 2005 budget_
$12,000 for additional work required to
7
Rainier Av Corridor Study/ improv.
317.012193
20,000
63,100
83,100
coordinate with Sound Transit and for
additional project needs.
Reduced M,300 from 2005 budget.
INEWINEMhCmMor
final report. public outreach
8
317.012176
315,300
305,300
10,000
project.
$166,000 Metro mitigation funding for
9
Walkwayram
317.000009
236,600
263,400
500,000
Note lands.. added. See
New developer. Site plan being
10
S Lake Wash. RoadwayIm
317.012306
-
1,100,000
1,100,000
1 design.
+ 11
SR 169 Corridor Study
317.012401
50,000
-
50,000
same as 2005 budget.
Construction was underfunded; new
12
South Renton Project
317.012194
18,200
246,800
265,000
construction estimate; includes $60,000
reserve; includes railroad cost.
13
1-405 Improvements in Renton
317.012210
30,000
-
30,000
Same as 2005 budget.
14
Project Developmen n
317.012150
175,000
-
175,000
Same as 2oos budget.
Same as 2005 ^�
15
NE 4th St/H ulam Av NE
317.012209
344,900
-
344,900
or increase at project bide
16
Rainier Av - SW 7th to 4th PI
317.012308
585,000
265,000
320.000
Reduced request for Zoos.
TIS funding. Construction 2005.
Protect scope reduced to coordinate17
Benson Rd - S 26th to Main
317.012309
459,400
(244,000)
215,400
WSDOT nickel project.
18
Arterial Circulation Program
317.000029
200,000
-
200,000
Same as 2005 budget.
Bridge inspections this year, load rate
19
Bridge ins & Re
317.000106
40,000
6,300
46,300
WeNs
g�A �' afire May Creek
For project Funding
20
LoopRe Program
317.000016
20,000
12,000
32,000
^�billpending,
21
Sign Replacement Program
317.012113
7,5W
-
7,500
Same as 2005 budget.
22
Pole Program
317.000091
25,000
-
25,000
Same as 2oo5 budget.
23
Sound Transit HOV Direct Access
317.012171
10,000
-
10,000
Same as 2005 budget.
24
Traffic Safety Program
317.012115
80,000
40,000
40,000
Reduced s4o,0oo in 2oo5.
25
Traffic Efftlency Program
317.012162
251,900
-
251,900
same as Zoos budget.
26
CBD Bike & Ped. Connections
317.012185
50,000
(200)
49,800
Finish upgrading as ramps.
27 lArtefial
Rehab. Prog.
317.012186
195,000
-
195,000
A dare on Average e�erd' Program.
28
DuvaN Ave NE
317.012123
1,258,700
408,700
850,000
Defer additional costs to 2o06.
Federal HES grant or $3%,000.
Construction cost estimate increase.
29
Sunset/DuvaH intersection
317.012301
381,000
437,700
818,700
Bids will determine actual construction
funding needs.
30
RR Crossing afety Pr .
317.012166
5,000
-
5,000
Same as 2005 budget.
TDM ram
317.012135
64,200
-
64,200
Sam as 2005 budget.
me
L
Trans Concurrent
„rum ^
317.012107
40,000
-
40,000
same as Zoos budget; update LOS
program.
F
ORDINANCE NO. 5134
Transportation Capital Fund
Attachment A
TIP
Project Title
Project
Number
2005 Budget
Change
Proposed
2005 Budget
Comment
33
Missing Links Program
317.012106
30,000
-
30,000
Same as 20o5 budget.
34
GIS Needs Assessment
317.012206
35,000
15,000
. 20,000
Reduced $15,000 in ZOOS; do in-house,
no consultant.
35
Grady Wy Corridor Study
317.012127
35,000
15,000
20,000
Reduced $15,000 in 2005.
36
Bicycle Route Dev. Program
317.012173
20,000
-
20,000
Same as 2005 budget.
37
Lake Wash. By -Park to Coulon Pk
317.012121
79,500
8,000
1,500
Defer W,000 to 2006 or later,
remaining construction delayed.
38
Interagency Signal Coord.
31 T012140
12,000
,000)
5.000
Reduced request $7.000 for 2005.
39
Environmental Monitoring
317.012187
85,000
-
85,000
Maintenance continues on both Phase 1
and 2.
40
Trans -Valley & Soos Creek Corr.
317.012191
5,000
(3,000)
2,000
Reduced $3,000 in 2005.
41
WSDOT Coordination Program
317.012146
10,000
5,000
15,000
Need input on needs for 2005.
42
1 % for the Arts
317.012112
50,000
20,000
30,000
Reduced $20,000 in 20o5.
43
Arterial HOV Program
317.012160
10,000
(5,000)
5,000
Reduced $5,000 in 2005.
44
Park -Sunset Corridor
317.012177
25,000
10,000
15,000
Reduced $10,000 in 2005; initiate in-
house corridor study.
45
Lind Av-SW 16th - SW 43rd
317.000024
5,000
-
5,000
Sam as 2005
corridor study. budget; initiate in house
46
Benson Rd S / S 31 st St
317.012129
61,500
61,500)
-
Co. lead;
h� 6. schedule unlrrawrr see
47
Logan Av Concrete Panel Repair
317.012303
-
-
-
Programmed for 2008.
48
CarrfMIIl Signal
317.012304
5,000
3,000
2,000
Reduced $3,000 in 2005.
49
Transit Priority Signal System
317.012174
30,000
22,600)
7,400
Reduced $22,600 in 2005; IGng Co.
e>pend ture no longer included.
50
Transit Center Video
317.012208
10,000
-
10,000
Same as 2005 budget.
51
Houser Wy S - Main to Burnett
317.012213
-
-
-
Prograrmmed for 2008.
52
Trans Valle ITS
317.012211
5,000
45,000
50,000
from 2004 ng Co. lead; R P ocontribution
P.O. mprocess.
53
Lake Wash. By Slip Plane
317.012302
10,600
526,500
537,100
Go to ad and construct this year.
Design is complete.
54
Monster Road Bridge
317.012307
12,000
456,700
468,700
Construction will continue until May
2005.
55
SW 7th SUI-Ind Ave SW
317.012153
26,500
23,500
3,000
Reduced $23,500. Completed. Federal
wW State audit passed. Need funds�
project closeout and wsDOT b lings.
56
Duvall Ave NE - King County
317.012305
1,311,300
(876,200)
435,100
Reductions: -$9M,600 Right-of-way
(F(ing County vAl do directly); most
costs deferred to 2006.
Increased design costs.
Strander Reserve
-
Reserved for currently uMawwn capital
w ject-
Total Sources
$ 7,986 500
$ 2,382,300
$ 10,368,800
• ff funding received for Strander, Ph. 1, Segment 1 construction. $ 3,000,000 General fund or bonding
$ 13,368,800 ^
NOTES
1. The 2W5 overiaY Project requires additional funding due to poorer condition of streets.
2. Total request for 3a and 315 is $1,020,000 (construction not included).
3. Phase 1. Will adjust allocation based upon actual low bid when known.
4. Maplewood Glen sidewalk replacement added to 2005 program.
5. Design contract for full design likely to occur this year. Timing unknown. $1 million or more is estimated to complete design
District 1. Bonding anticipated.
6. City has committed an upper limit of 200,000. Will return to Council should project materialize in 2005.
7. The Dec. 31, 2005, fund balance is projected to be $6,315,576.
1:Vrnn\budgefl2005\2 Realbcabw Summary
ORDINANCE NO. 5134
SECTION M. This ordinance shall be effective upon its passage, approval, and
five days after publication.
PASSED BY THE CITY COUNCEL this 18 th day of April , 2005.
y.
Bonnie I. Walton, City Clerk
APPROVED BY THE MAYOR this 18 th day of April , 2005.
?� --0
Kathy K er-Wheeler, Mayor
Approved as to form:
Lawrence 1. Warren, ity Attorney
Date of Publication: 4/ 2 2/ 2 0 0 5 (summary)
ORD: 1172:4/7/05: ma
2
TRANSPORTATION CAPITAL IMPROVEMENT FUND
(Fund 317)
FY 2005
Strander Bv. Capital Project - Phase 1, Segment 1 (317.012239)
Amended
REVENUES
2005 BUDGET
2005 BUDGET
CHANGE
- Bond proceeds
0
3,000,000
3,000,000
- Reimbursement (FRB)
0
556,225
556,225
- Fund Balance
210,000
210,000
0
TOTAL REVENUES
$210,000
$3,766,225
3,556,225
EXPENDITURES
- Administration/construction engineering
10,000
306,000
296,000
- Professional Services - Design 1
200,000
200,000
0
- Construction -roadway, water, sewer, detention pond
2,878,857
2,878,857
- Property Purchase/ROW
381,368
381,368
TOTAL EXPENDITURES
$210,0001
$3,766,225
3,556,225
CITY OF RENTON
PLANNING/BUILDING/PUBLIC WORKS
TRANSPORTATION SYSTEMS DIVISION
2006 - 2011 SIX -YEAR TIP
Strander Boulevard / SW 27th Street Connection Functional Classification: Minor arterial Fund: 317
Proj. Length: 1.27 miles Proj: 12239
RANK: 3 CONTACT: Rob Lochmiller 425.430.7303
DESCRIPTION:
This project provides a critical four/five lane arterial that will serve as a connector to West Valley Highway
(SR-181) and East Valley Road, as well as an arterial connector to SR-167 from the south. The project will
provide a grade -separated crossing at the Union Pacific Railroad (UPRR) and Burlington Northern Sante
Fe (BNSF) railroad tracks. Segments 1 and 2 include from West Valley Hwy to East Valley Road.
JUSTIFICATION:
A new east -west arterial roadway will connect the Cities of Renton and Tukwila, and provide significant
congestion relief to existing arterials. The new road will provide direct access to the new Tukwila Station,
a multi -modal center being developed immediately north of the new alignment, and to the Boeing
Longacres site. The eventual direct HOV connections to southbound SR-167 will provide significant
advantages to HOV and transit usage. By crossing under the UPRR and BNSF railroads, the new arterial
will provide significant benefits to both freight mobility and to general motorists.
STATUS:
Up to 30% design was contracted in March 2003 for $2,213,349. It includes the
environmental documents, base -mapping, road sections, and project phasing by June
2005. $1,000,000 was received from the General Fund in 2003. $745,563 TEA-21 was
obligated in May 2003 with an additional $2,398 obligated in May 2005. The design and
construction costs reflect Phases 1 and 2. Based upon staff discussions, Sound Transit is
anticipated to be a key funding partner.
CHANGES:
*The City is in the process of applying for bonds. Nearing completion of 30% design for all
phases. Engineering estimates are lower than the planning level estimates. Phase 1,
Segment 1, is in full design with construction to start late 2005, early 2006 paid for with
approximately $3 million in bonds. A shared -use detention pond with the developer will
lower the costs of construction. $500,000 Metro mitigation reserve is pending Council
approval. New fuel tax 2010.
Funded:1 13 753 927 Unfunded : 36 778 800
Project Totals
Programme Pre-2006
Six Year Program
ITEM
Programmed
Sent Pre-2005
2005
Total
2006
2007
2008
2009
2010
2011
EXPENSES:
Project Development
Precon En /Admin
6,199,727
1,471,727
1,020,000
3,708,000
850,000
21350,000
508,000
R-O-W includes Admin
4,543,000
4,543,000
2,243,000
2,300,000
Construction Contract Fee
35 900,000
35,900,000
2,970,000
1,570,000
26,760,000
4,600 000
Construction En /Admin
31890,000
31890,000
306,000
180,000
2,764,000
640,000
Other
TOTAL EXPENSES
50,532,727
1,471,727
1,020,000
48,041,000
6,369,000
1,750,000
34,174,000
5,748,000
SOURCES OF FUNDS:
Vehicle Fuel Tax
240,000
240,000
240,000
Business License Fee
237,349
237,349
82,749
114,600
40,000
Proposed Fund Bal./Reserve
772,617
243,766
528,851
156,600
140,651
231,600
Grants In -Hand State & Fed
51243,961
554,799
193,162
4,496,000
969,400
1,526,600
2,000,000
Mitigation In -Hand
760,000
500,000
260,000
100,000
160,000
Bonds/L.I.D.'s Formed
3,000,000
3,000,000
3,000 000
Other In -Hand GF & Boeing)
3,500,000
416,928
583,072
2,500 000
21243,000
257,000
Grants Proposed Earmarks
1,254,000
1,254,000
1,254 000
Mitigation Proposed
L.I.D.'s Proposed
Other Proposed (S.Transit)
4,000,000
41000,000
4,000 000
Undetermined
31,524,8001
31,524,800
26,216 800
5,308 000
TOTAL SOURCES
1 50,532,7271
1 471 727
1 020 000
48,041,000
1 6,369,0001
1,750,0001
34 174 000
5 748 000
s"�rconr cbo
08I0&2W5 3.06 PM
5-3 FINAL
Gregg Zimmerman - reimbursement resolution1 - form.doc Pa e 1
CITY OF RENTON
RESOLUTION NO.
A RESOLUTION of the City of Renton, Washington declaring its intent that
certain capital expenditures to be made shall be reimbursed from the proceeds of
tax-exempt bonds or other obligations
WHEREAS, the City of Renton (the "City") plans to undertake the following capital
projects: Southwest 27`h Street/Strander Blvd. Capital Improvement Project and the South Lake
Washington Roadway/Utilities Capital Improvement Project (the "Projects"); and
WHEREAS, the City plans to finance the Projects through the issuance of tax-exempt
bonds or other obligations of the City in one or more issues in an amount not to exceed
$31,400,000 (the "Bonds");
NOW, THEREFORE, THE CITY COUNCIL OF THE CITY OF RENTON,
WASHINGTON HEREBY RESOLVES that, for the purpose of complying with the provisions
of the Treasury Regulation Section 1.150-2 with respect to qualification of reimbursement
allocations as expenditures of bond proceeds, pending the issuance of the Bonds, the City may
make capital expenditures in furtherance of the Projects, in anticipation of reimbursement for
such expenditures from the proceeds of the Bonds, when issued.
RESOLVED by the City Council this day of 12005.
Bonnie Walton, City Clerk
APPROVED BY THE MAYOR this day of , 2005.
Kathy Keolker-Wheeler, Mayor
fArenton\]tgo
7th St
Phase
rander Blvd Conn
1, Segment 1
t*i o n
.�l
CITY OF RENTON COUNCIL AGENDA BILL
Al #:
Submitting Data: Planning/Building/Public Works
For Agenda of:
Dept/Div/Board.. Utility Systems/Water Utility
August 15, 2005
Agenda Status
Staff Contact...... Abdoul Gafour (ext. 7210)
Tom Malphrus (ext. 7313)
Consent .............. X
Public Hearing..
Subject:
Consultant Agreement with RH2 Engineering, Inc., for
Correspondence..
the Design of the Hazen 565 Pressure Zone Reservoir
Ordinance .............
Resolution............
Old Business........
New Business.......
Exhibits:
Issue Paper
Study Sessions......
Consultant Contract with RH2 Engineering, Inc.
Information.........
Recommended Action:
Council Concur
Approvals:
Legal Dept......... X
Finance Dept...... X
Other ...............
Fiscal Impact:
Expenditure Required $229,608.00 Transfer/Amendment N/A,
Amount Budgeted $230,000.00 Revenue Generated N/A
Total Project Budget $300,000.00 City Share Total Project $229,608.00
(2005 budget for design contract)
Account No. 421.000500.018.5960.0034.65.055515
SUMMARY OF ACTION:
The Water Utility requests the approval of a Consultant Agreement with RH2 Engineering, Inc.
for the design of the Hazen 565 Pressure Zone Reservoir. The proposed Hazen Reservoir will
provide 1 million gallons of additional storage capacity in the Highlands 565 pressure zone for
normal operations and emergency reserve.
STAFF RECOMMENDATION:
Approve and execute the consultant contract with RH2 Engineering, Inc., in the amount of
$229,608.00, to design the Hazen 565 Pressure Zone Reservoir.
H:Al-ile Sys\WTR - Drinking Water Utility\WTR-27 - Water Project Files\WTR-27-3214 Construct 565 Zone
Reservoir\Cons u I tan tContract\AgendaB it 1. doc\TMtp
*t)'�
PLANNING/BUILDING/
PUBLIC WORKS DEPARTMENT
,M E M O R A N D U M
DATE: August 2, 2005
TO: Terri Briere, Council President
Members of the Renton City Council
VIA: } Kathy Keolker-Wheeler, Mayor
FROM: �'Gregg Zimmerman, Administrator �\
STAFF CONTACT: Abdoul Gafour, Water Utility Supervisor (ext. 7210)
Tom Malphrus, Water Utility Engineer (ext. 7313)
SUBJECT: Consultant Agreement with RH2 Engineering, Inc., for the
Design of the Hazen 565 Pressure Zone Reservoir
ISSUE:
The Water Utility requests the approval of a Consultant Agreement with RH2
Engineering, Inc. for the design of the Hazen 565 Pressure Zone Reservoir. The Hazen
Reservoir will serve the Renton Highlands by providing I million gallons of additional
water storage for normal operation, standby storage for emergencies and storage to meet
fire flow requirements. The Hazen Reservoir will be located on City -owned property,
adjacent to Hazen High School.
The Water Utility has budgeted sufficient funds in the 2005 Capital Improvement
Program budget for this contract.
RECOMMENDATION:
Approve and execute a Consultant Agreement with RH2 Engineering, Inc., in the amount
of $229,608, for the design of the Hazen 565 Pressure Zone Reservoir.
BACKGROUND SUMMARY:
Water users in the Highlands 565 pressure zone service area consume 22% of the water
delivered by the Renton Water Utility. The 565 pressure zone is currently served by one
reservoir, the Highlands Elevated Reservoir, which was constructed in 1960. The
Highlands Elevated Reservoir has a capacity of 750,000 gallons, which is well below the
storage requirement identified in the Water System Design Standards (2001), published
by the Washington State Department of Health. In addition, the Water Utility is
concerned about the reliability of operating only one reservoir in the high demand 565
pressure zone. In order to take the existing Highlands Elevated Reservoir out of service,
Council/565 Pressure Zone
August 2, 2005
Page 2 of 2
the Water Utility can only feed the 565 pressure zone by booster pumps. However, due
to the sudden and excessive pressure changes that the zone will experience as the pumps
turn on and off, feeding the zone strictly by pumps is not advisable. A second reservoir
in the 565 pressure zone will allow the Water Utility to keep one reservoir on-line as the
other reservoir is brought down for maintenance.
Under this contract, RH2 Engineering, Inc., will prepare the civil, structural, mechanical,
electrical and instrumentation design plans and specifications, and provide assistance
with permitting, public outreach and bid phase services.
The Water Utility advertised for professional services to design the reservoir in
accordance with City Policy 250-02 and received proposals from seven consulting firms.
After reviewing the proposals, the selection committee invited four firms to interview and
selected RH2 Engineering, Inc., as the consulting firm most highly qualified to design the
reservoir.
Funding for this project is available from the Water Utility 2005 Capital Improvement
Program budget account number 421.000500.018.5960.0034.65.055515.
CONCLUSION:
In an effort to continue to improve our water system reliability, the Water Utility plans to
construct a second reservoir to serve the 565 pressure zone. The second reservoir will
provide additional storage in this zone for normal operations and emergency use, and will
provide more flexibility in maintaining the reservoirs in the zone. Under this contract,
RH2 Engineering, Inc., will prepare the plans and specifications for the construction of
the new Hazen Reservoir to serve the 565 pressure zone.
cc: Lys Hornsby, Utility Systems Director
H:\File Sys\WTR - Drinking Water Utility\WTR-27 - Water Project Files\WTR-27-3214 Construct 565
Zone Reservoir\ConsultantContract\lssuePaper.doc\TMtp
Emergency Power Generation Facilities 2006
ENGINEERING
ANNUAL CONSULTANT AGREEMENT
THIS AGREEMENT, made and entered into on this , day of , 2005, by and between the CITY
OF RENTON, WASHINGTON, A MUNICIPAL CORPORATION HEREINAFTER CALLED THE "CITY," and
R112 Engineering, Inc., whose address is 12100 NE 195th St., Ste 100, Bothell, WA 98011, at which work will be
available for inspection, hereinafter called the "CONSULTANT."
PROJECT NAME: Hazen 565 Zone Reservoir
WHEREAS, the City has not sufficient qualified engineering employees to provide the engineering within a
reasonable time and the City deems it advisable and is desirous of engaging the professional services and assistance
of a qualified professional consulting firm to do the necessary engineering work for the project, and
WHEREAS, the Consultant has represented and by entering into this Agreement now represents, that it is in full
compliance with the statutes of the State of Washington for registration of professional engineers, has a current valid
corporate certificate from the State of Washington or has a valid assumed name fling with the Secretary of State and
that all personnel to be assigned to the work required under this Agreement are fully qualified to perform the work to
which they will be assigned in a competent and professional manner, and that sufficient qualified personnel are on
staff or readily available to Consultant to staff this Agreement.
WHEREAS, the Consultant has indicated that it desires to do the work set forth in the Agreement upon the terms
and conditions set forth below.
NOW THEREFORE, in consideration of the terms, conditions, covenants and performances contained herein below,
the parties hereto agree as follows:
I
SCOPE OF WORK
The Consultant shall furnish, and hereby warrants that it has, the necessary equipment, materials, and professionally
trained and experienced personnel to facilitate completion of the work described in Exhibit A, Scope of Work,
which is attached hereto and incorporated into this Agreement as though fully set forth herein.
The Consultant shall perform all work described in this Agreement in accordance with the latest edition and
amendments to local and state regulations, guidelines and policies.
The Consultant shall prepare such information and studies as it may deem pertinent and necessary, in order to pass
judgment in a sound engineering manner on the features of the work. The Consultant shall make such minor
changes, amendments or revisions in the detail of the work as may be required by the City. This item does not
constitute an "Extra Work" item as related in Section VIII of the Agreement.
The work shall be verified for accuracy by a complete check by the Consultant. The Consultant will be held
responsible for the accuracy of the work, even though the work has been accepted by the City.
II
DESIGN CRITERIA
The City will designate the basic premises and criteria for the work needed. Reports and plans, to the extent
feasible, shall be developed in accordance with the latest edition and amendments of local and State regulations,
guidelines, and specifications, including, but not limited to the following:
HAFile Sys\W7'R - Drinking Water Utility\WTR-27 - Water Project Files\WTR-27-3214 Construct 565 Zone Reservoir\ConsultantContract\Contract.doe
/2000_C011su1tant.doc bb
Emergency Power Generation Facilities 2006
Washington State Department of Transportation/American Public Works Association (WSDOT/APWA),
"Standard Specifications for Road, Bridge, and Municipal Construction," as amended by Renton
Standard Specification.
2. WSDOT/APWA, "Standard Plans for Road, Bridge and Municipal Construction."
3. Washington State Department of Transportation, "Highway Design Manual."
4. American Association of State Highway and Transportation Officials, "Standard Specifications for
Highway Bridges."
Washington State Department of Transportation, "Bridge Design Manual, Volumes 1 and 2."
6. Washington State Department of Transportation, "Manual of Highways Hydraulics," except hydrologic
analysis as described in item 14.
7. Washington State Department of Transportation, "Materials Laboratory Outline."
Transportation Research Board, "Highway Capacity Manual."
9. U.S. Department of Transportation, Federal Highway Administration, "Manual on Uniform Traffic
Control Devices for Streets and Highways."
10. Washington State Department of Transportation, "Construction Manual."
11. Washington State Department of Transportation, "Local Agency Guidelines."
12. Standard drawings prepared by the City and furnished to the Consultant shall be used as a guide in all
cases where they fit design conditions. Renton Design Standards, and Renton Specifications shall be
used as they pertain.
13. Metro Transit, design criteria.
14. King County Surface Water Design Manual, Sections 1.2 and 1.3 of Chapter 1, and Chapters 3, 4,
and 5.
15. American Association of State Highway and Transportation Officials, "A Policy on Geometric Design of
Highways and Streets."
III
ITEMS TO BE FURNISHED TO THE CONSULTANT
BY THE CITY
The City will furnish the Consultant copies of documents which are available to the City that will facilitate the
preparation of the plans, studies, specifications, and estimates within the limits of the assigned work.
All other records needed for the study must be obtained by the Consultant. The Consultant will coordinate with
other available sources to obtain data or records available to those agencies. The Consultant shall be responsible for
this and any other data collection to the extent provided for in the Scope of Work. City will provide to Consultant
all data in City's possession relating to Consultants services on the project. Consultant will reasonably rely upon the
accuracy, timeliness, and completeness of the information provided by the City. Should field studies be needed, tho
Consultant will perform such work to the extent provided for in the Scope of Work. The City will not be obligate(
to perform any such field studies.
ILT- le Sys\W I R - Drinking �katcr t tility\W"fR-27 - Water Project Files' W IR-27-3214 Construct 565 Lome Reservoir`Consultant('on tract\Con tract. doe
2000 ('unsultant.doc bh
Emergency Power Generation Facilities 2006
IV
OWNERSHIP OF PRODUCTS AND
DOCUMENTS TO BE FURNISHED BY THE CONSULTANT
Documents, exhibits or other presentations for the work covered by this Agreement shall be furnished by the
Consultant to the City upon completion of the various phases of the work. All such material, including working
documents, notes, maps, drawings, photo, photographic negatives, etc. used in the project, shall become and remain
the property of the City and may be used by it without restriction. Any use of such documents by the City not
directly related to the project pursuant to which the documents were prepared by the Consultant shall be without any
liability whatsoever to the Consultant.
All written documents and products shall be printed on recycled paper when practicable. Use of the chasing -arrow
symbol identifying the recycled content of the paper shall be used whenever practicable. All documents will be
printed on both sides of the recycled paper, as feasible.
V
TIME OF BEGINNING AND COMPLETION
The work detailed in the Scope of Work will be performed according to Exhibit B, Time Schedule of Completion,
attached hereto and incorporated herein as though fully set forth. It is agreed that all the Consultant's services are to
be completed and all products shall be delivered by the Consultant unless there are delays due to factors that are
beyond the control of the Consultant. The Consultant shall not begin work under the terms of this Agreement until
authorized in writing by the City. If, after receiving Notice to Proceed, the Consultant is delayed in the performance
of its services by factors that are beyond its control, the Consultant shall notify the City of the delay and shall
prepare a revised estimate of the time and cost needed to complete the Project and submit the revision to the City for
its approval. Time schedules are subject to mutual agreement for any revision unless specifically described as
otherwise herein.
Delays attributable to or caused by one of the parties hereto amounting to 30 days or more affecting the completion
of the work may be considered a cause for renegotiation or termination of this Agreement by the other party.
H:\File Sys\WTR - Drinking Water Utility\WTR-27 - Water Project Files\WTR-27-3214 Construct 565 Zone Reservoir\ConSultantContract\Contract.doc
/2000_Consultant.doc bh
Emergency Power Generation Facilities 2006
V1
PAYMENT
The Consultant shall be paid by the City for completed work for services rendered under this Agreement as providk
hereinafter as specified in Exhibit D. Such payment shall be full compensation for work performed or services
rendered and for all labor, materials, supplies, equipment, and incidentals necessary to complete the work. All
billings for compensation for work performed under this Agreement will list actual time (days and/or hours) and
dates during which the work was performed and the compensation shall be figured using the rates in Exhibit C.
Payment for this work shall not exceed $ 229,608 without a written amendment to this contract, agreed to and signed
by both parties.
Cost Plus Net Fee
Payment for work accomplished shall be on the basis of the Consultant's actual cost plus a net fee. The actual cost
includes direct salary cost, overhead, and direct non -salary cost.
The direct salary cost is the salary expense for professional and technical personnel and principals for the
time they are productively engaged in the work necessary to fulfill the terms of this Agreement. The
direct salary costs are set forth in the attached Exhibit C and by this reference made a part of this
Agreement.
2. The overhead costs as identified on Exhibit E are determined as 186.72 percent of the direct salary cost
and by this reference made a part of this Agreement. The overhead cost rate is an estimate based on
currently available accounting information and shall be used for all progress payments over the period of
the contract.
The direct non -salary costs are those costs directly incurred in fulfilling the terms of this Agreement,
including, but not limited to travel, reproduction, telephone, supplies, and fees of outside consultants.
The direct non -salary costs are specified in Exhibit D. Billings for any direct non -salary costs shall be
supported by copies of original bills or invoices. Reimbursement for outside consultants and services
shall be on the basis of times the invoiced amount.
4. The net fee, which represents the Consultants profit shall be 12.0 percent of direct salary plus overhead
costs. This fee is based on the Scope of Work and the estimated labor hours therein. In the event a
supplemental agreement is entered into for additional work by the Consultant, the supplemental
agreement will include provision for the added costs and an appropriate additional fee. The net fee will
be prorated and paid monthly in proportion to the percentage of the project completed as estimated in the
Consultant's monthly progress reports and approved by the City. Any portion of the net fee not
previously paid in the monthly payments shall be included in the final payment, subject to the provisions
of Section XI entitled TERMINATION OF AGREEMENT.
Progress payments may be claimed monthly for direct costs actually incurred to date as supported by
detailed statements, for overhead costs and for a proportionate amount of the net fee payable to the
Consultant based on the estimated percentage of the completion of the services to date. Final payment of
any balance due the Consultant of the gross amount earned will be made promptly upon its verification
by the City after completion and acceptance by the City of the work under this Agreement. Acceptance,
by the Consultant of final payment shall constitute full and final satisfaction of all amounts due or
claimed to be due.
Payment for extra work performed under this Agreement shall be paid as agreed to by the parties hereto in writing at
the time extra work is authorized. (Section VIII "EXTRA WORK").
}I: ,File Sys W iR - Drinking Water [ itiIity\WTR-27 -Water Project Files\W I R-27-3214 Construct 505 /one ReservoirConsuItantContract\Contract.doc
2000 C'onsultant.doc bh
Emergency Power Generation Facilities 2006
A short narrative progress report shall accompany each voucher for progress payment. The report shall include
discussion of any problems and potential causes for delay.
To provide a means of verifying the invoiced salary costs for consultant employees, the City may conduct employee
interviews.
Acceptance of such final payment by the Consultant shall constitute a release of all claims of any nature, related to
this Agreement, which the Consultant may have against the City unless such claims are specifically reserved in
writing and transmitted to the City by the Consultant prior to its acceptance. Said final payment shall not, however,
be a bar to any claims that the City may have against the Consultant or to any remedies the City may pursue with
respect to such claims.
The Consultant and its subconsultants shall keep available for inspection, by the City, for a period of three years
after final payment, the cost records and accounts pertaining to this Agreement and all items related to, or bearing
upon, these records. If any litigation, claim or audit is started before the expiration of the three-year retention
period, the records shall be retained until all litigation, claims or audit findings involving the records have been
resolved. The three-year retention period starts when the Consultant receives final payment.
VII
CHANGES IN WORK
The Consultant shall make all such revisions and changes in the completed work of this Agreement as are necessary
to correct errors appearing therein, when required to do so by the City, without additional compensation.
Should the City find it desirable for its own purposes to have previously satisfactorily completed work or parts
thereof revised, the Consultant shall make such revisions, if requested and as directed by the City in writing. This
work shall be considered as Extra Work and will be paid for as provided in Section VIII.
VIII
EXTRA WORK
The City may desire to have the Consultant perform work or render services in connection with the Project in
addition to or other than work provided for by the expressed intent of the Scope of Work. Such work will be
considered as Extra Work and will be specified in a written supplement which will set forth the nature and scope
thereof. Work under a supplement shall not proceed until authorized in writing by the City. Any dispute as to
whether work is Extra Work or work already covered under this Agreement shall be resolved before the work is
undertaken. Performance of the work by the Consultant prior to resolution of any such dispute shall waive any claim
by the Consultant for compensation as Extra Work.
IX
EMPLOYMENT
The Consultant warrants that it has not employed or retained any company or person, other than a bona fide
employee working solely for the Consultant, to solicit or secure this contract and that he has not paid or agreed to
pay any company or person, other than a bona fide employee working solely for the Consultant, any fee,
commission, percentage, brokerage fee, gifts or any other consideration, contingent upon or resulting from the award
or making of this contract. For breach or violation of this warranty, the City shall have the right to annul this
Agreement without liability, or in its discretion to deduct from the Agreement price or consideration or otherwise
recover, the full amount of such fee, commission, percentage, brokerage fee, gift or contingent fee.
Any and all employees of the Consultant, while engaged in the performance of any work or services required by the
Consultant under this Agreement, shall be considered employees of the Consultant only and not of the City and any
and all claims that may or might arise under the Workman's Compensation Act on behalf of said employees, while so
FU+ile Sys`W I - Drinking Water UtdityMTR-27 - Water Project Files\W"IR-27-3214 Construct 565 Zone Reservoir`d'unsultant('ontract`+('ontract.doc
.2000 Consultant doc bh
Emergency Power Generation Facilities 2006
engaged and any and all claims made by a third party as a consequence of any negligent act or omission on the part
of the Consultant's employees, while so engaged on any of the work or services provided to be rendered herein, shall
be the sole obligation and responsibility of the Consultant.
The Consultant shall not engage, on a full or part-time basis, or other basis, during the period of the contract, any
professional or technical personnel who are, or have been at any time during the period of this contract, in the
employ of the City except regularly retired employees, without written consent of the City.
If during the time period of this Agreement, the Consultant finds it necessary to increase its professional, technical,
or clerical staff as a result of this work, the Consultant will actively solicit minorities through their advertisement
and interview process.
X
NONDISCRIMINATION
The Consultant agrees not to discriminate against any client, employee or applicant for employment or for services
because of race, creed, color, national origin, marital status, sex, age or handicap except for a bona fide occupational
qualification with regard to, but not limited to the following: employment upgrading; demotion or transfer;
recruitment or any recruitment advertising; layoff or termination's; rates of pay or other forms of compensation;
selection for training; rendition of services. The Consultant understands and agrees that if it violates this Non -
Discrimination provision, this Agreement may be terminated by the City and further that the Consultant shall be
barred from performing any services for the City now or in the future, unless a showing is made satisfactory to the
City that discriminatory practices have terminated and that recurrence of such action is unlikely.
XI
TERMINATION OF AGREEMENT
A. The City reserves the right to terminate this Agreement at any time upon not less than ten (10) days
written notice to the Consultant, subject to the City's obligation to pay Consultant in accordance with
subparagraphs C and D below.
B. In the event of the death of a member, partner or officer of the Consultant, or any of its supervisory
personnel assigned to the project, the surviving members of the Consultant hereby agree to complete the
work under the terms of this Agreement, if requested to do so by the City. This section shall not be a bar
to renegotiations of this Agreement between surviving members of the Consultant and the City, if the
City so chooses.
In the event of the death of any of the parties listed in the previous paragraph, should the surviving
members of the Consultant, with the City's concurrence, desire to terminate this Agreement, payment
shall be made as set forth in Subsection C of this section.
HAFile Sys\WTR - Drinking Water Utility\WTR-27 - Water Project Files\WTR-27-3214 Construct 565 Lone Reservoir\ConsultantContract`('ontract.doc
l2000 Consultant.doc bh
Emergency Power Generation Facilities 2006
C. In the event this Agreement is terminated by the City other than for fault on the part of the Consultant, a
final payment shall be made to the Consultant for actual cost for the work complete at the time of
termination of the Agreement, plus the following described portion of the net fee. The portion of the net
fee for which the Consultant shall be paid shall be the same ratio to the total net fee as the work complete
is to the total work required by the Agreement. In addition, the Consultant shall be paid on the same
basis as above for any authorized extra work completed. No payment shall be made for any work
completed after ten (10) days following receipt by the Consultant of the Notice to Terminate. If the
accumulated payment made to the Consultant prior to Notice of Termination exceeds the total amount
that would be due as set forth herein above, then no final payment shall be due and the Consultant shall
immediately reimburse the City for any excess paid.
D. In the event the services of the Consultant are terminated by the City for fault on the part of the
Consultant, the above stated formula for payment shall not apply. In such an event the amount to be paid
shall be determined by the City with consideration given to the actual costs incurred by the Consultant in
performing the work to the date of termination, the amount of work originally required which was
satisfactorily completed to date of termination, whether that work is in a form or of a type which is
usable to the City at the time of termination, the cost to the City of employing another firm to complete
the work required and the time which may be required to do so, and other factors which affect the value
to the City of the work performed at the time of termination. Under no circumstances shall payment
made under this subsection exceed the amount which would have been made if the formula set forth in
subsection C above had been applied.
E. In the event this Agreement is terminated prior to completion of the work, the original copies of all
Engineering plans, reports and documents prepared by the Consultant prior to termination shall become
the property of the City for its use without restriction. Such unrestricted use not occurring as a part of
this project, shall be without liability or legal exposure to the Consultant.
F. Payment for any part of the work by the City shall not constitute a waiver by the City of any remedies of
any type it may have against the Consultant for any breach of this Agreement by the Consultant, or for
failure of the Consultant to perform work required of it by the City. Forbearance of any rights under the
Agreement will not constitute waiver of entitlement to exercise those rights with respect to any future act
or omission by the Consultant.
XII
DISPUTES
Any dispute concerning questions of facts in connection with work not disposed of by agreement between the
Consultant and the City shall be referred for determination to the Director of Planning/ Building/Public Works or
his/her successors and delegees, whose decision in the matter shall be final and conclusive on the parties to this
Agreement.
In the event that either party is required to institute legal action or proceedings to enforce any of its rights in this
Agreement, both parties agree that any such action shall be brought in the Superior Court of the State of
Washington, situated in King County.
XIII
LEGAL RELATIONS
The Consultant shall comply with all Federal Government, State and local laws and ordinances applicable to the
work to be done under this Agreement. This contract shall be interpreted and construed in accordance with the laws
of Washington.
11 File Sys' W IR - Drinking Water I Itility`•.WTR-27 -Water Project Files\WTR-27 .1214 Construct 565 Zone ReservonVonsultant( on tract ('ontract.doc
,2000 ConsLJItant.doc bh
Emergency Power Generation Facilities 2006
The Consultant agrees to indemnify, defend and hold the City and its officers and employees harmless from and
shall process and defend at its own expense all claims, demands or suits at law or equity arising in whole or part
from the Consultant's errors, omissions, or negligent acts under this Agreement provided that nothing herein shall
require the Consultant to indemnify the City against and hold harmless the City from claims, demands or suits base
upon the conduct of the City, its officers or employees and provided further that if the claims or suits are caused by
or result from the concurrent negligence of (a) the Consultant's agents or employees and (b) the City, its agents,
officers and employees, this provision with respect to claims or suits based upon such concurrent negligence shall be
valid and enforceable only to the extent of the Consultant's negligence or the negligence of the Consultant's agents or
employees except as limited below.
The Consultant shall secure general liability, property damage, auto liability, and professional liability coverage in
the amount of $1.0 million, with a General Aggregate in the amount of $2.0 million, unless waived or reduced by the
City. The Consultant shall submit a completed City of Renton Insurance Information Form, and the Standard Acord
Certification Form prior to the execution of the contract. The City of Renton shall be named as an "Additional
Insured" on all contracts/projects. The Consultant's insurance policy shall be endorsed to add the City of Renton as
an Additional Insured. A copy of the endorsement shall be provided to the City. The Consultant shall also submit
copies of the declarations pages of relevant insurance policies to the City within 30 days of contract acceptance if
requested. The Certification and Declaration page(s) shall be in a form as approved by the City. If the City's Risk
Manager has the Declaration page(s) on file from a previous contract and no changes in insurance coverage has
occurred, only the Certification Form will be required.
The limits of said insurance shall not, however, limit the liability of Consultant hereunder.
All coverages provided by the Consultant shall be in a form, and underwritten by a company acceptable to the City.
The City will normally require carriers to have minimum A.M. Best rating of A XH. The Consultant shall keep all
required coverages in full force and effect during the life of this project, and a minimum of forty five days' written
notice shall be given to the City prior to the cancellation of any policy.
The Consultant shall verify, when submitting first payment invoice and annually thereafter, possession of a current
City of Renton business license while conducting work for the City. The Consultant shall require, and provide
verification upon request, that all subconsultants participating in a City project possess a current City of Renton
business license. The Consultant shall provide, and obtain City approval of, a traffic control plan prior to
conducting work in City right-of-way.
The Consultant's relation to the City shall be at all times as an independent contractor.
H:\File Sys\W'IR - Drinking Water Utihty`•W TR-27 - Water Projcct files'+WTR-27-3214 Construct 565 'Lone Reservoir\ConsuItantContracC Con tract. doc
2000 Consultant.doc bh
Emergency Power Generation Facilities 2006
XIV
SUBLETTING OR ASSIGNING OF CONTRACTS
The Consultant shall not sublet or assign any of the work covered by this Agreement without the express consent of
the City.
XV
ENDORSEMENT OF PLANS
The Consultant shall place their certification on all plans, specifications, estimates or any other engineering data
furnished by them in accordance with RCW 18.43.070.
XVI
COMPLETE AGREEMENT
This document and referenced attachments contain all covenants, stipulations, and provisions agreed upon by the
parties. Any supplements to this Agreement will be in writing and executed and will become part of this Agreement.
No agent, or representative of either party has authority to make, and the parties shall not be bound by or be liable
for, any statement, representation, promise, or agreement not set forth herein. No changes, amendments, or
modifications of the terms hereof shall be valid unless reduced to writing and signed by the parties as an amendment
to this Agreement.
The invalidity or unenforceability of any provision in this Agreement shall not affect the other provisions hereof,
and this Agreement shall be construed in all respects as if such invalid or unenforceable provision were omitted.
XVII
EXECUTION AND ACCEPTANCE
This Agreement may be simultaneously executed in several counterparts, each of which shall be deemed to be an
original having identical legal effect. The Consultant does hereby ratify and adopt all statements, representations,
warranties, covenants, and agreements contained in the Request for Qualifications, and the supporting materials
submitted by the Consultant, and does hereby accept the Agreement and agrees to all of the terms and conditions
thereof.
IN WITNESS WHEREOF, the parties hereto have executed this Agreement as of the day and year first above
written.
CONSULTANT
Signature
type or print name
Title
CITY OF RENTON
Date Kathy Keolker-Wheeler, Mayor Date
ATTEST:
Bonnie I. Walton, City Clerk
HAFile Sys\WTR - Drinking Water Utility\WTR-27 - Water Project Files\WTR-27-3214 Construct 565 Zone Reservoir\Con sultan tContract\Contract. doc
/2000_Consultant.doc bh
Emergency Power Generation Facilities 2006
RESOLUTION NO. 3229
CITY OF RENTON
SUMMARY OF FAIR PRACTICES POLICY
ADOPTED BY RESOLUTION NO. 3 2 2 9
It is the policy of the City of Renton to promote and provide equal treatment and service to all citizens and to
ensure equal employment opportunity to all persons without regard to race, color, national origin, ethnic
background, gender, marital status, religion, age or disability, when the City of Renton can reasonably
accommodate the disability, of employees and applicants for employment and fair, non-discriminatory
treatment to all citizens. All departments of the City of Renton shall adhere to the following guidelines:
(1) EMPLOYMENT PRACTICES - The City of Renton will ensure all employment related
activities included recruitment, selection, promotion, demotion, training, retention and
separation are conducted in a manner which is based on job -related criteria which does not
discriminate against women, minorities and other protected classes. Human resources
decisions will be in accordance with individual performance, staffing requirements, governing
civil service rules, and labor contract agreements.
(2) COOPERATION WITH HUMAN RIGHTS ORGAN17.ATIONS - The City of Renton will
cooperate fully with all organizations and commissions organized to promote fair practices
and equal opportunity in employment.
(3) AFFIRMATIVE ACTION PLAN - The City of Renton Affirmative Action Plan and Equal
Employment Program will be maintained and administered to facilitate equitable
representation with the City work force and to assure equal employment opportunity to all. It
shall be the responsibility of elected officials, the Mayor, the Affirmative Action Officer,
department administrators, managers, supervisors, Contract Compliance Officers and all
employees to carry out the policies, guidelines and corrective measures set forth in the
Affirmative Action Plan and Equal Employment Program.
(4) CONTRACTORS' OBLIGATIONS - Contractors, sub -contractors, consultants and
suppliers conducting business with the City of Renton shall affirm and subscribe to the Fair
Practices and Non-discrimination policies set forth by the law and in the City's Affirmative
Action Plan and Equal Employment Program.
Copies of this policy shall be distributed to all City employees, shall appear in all operational documentation
of the City, including bid calls, and shall be prominently displayed in appropriate city facilities.
CONCURRED IN by the City Council of the City of RENTON, Washington, this 7thday of October, 1996.
CITY OF RENTON:
Mayor
,,Attest:
City Cler
RENTON CITY COUNCIL:
Council President
FL`.File Sys`.WTR - Drinking Water UtiIitylW'1R-27 - Water Project 1-iles' W l R-27-3214 Construct 565 Lone Reservoiff'onsultan Won tract\Contract .doc
2000 Consultant doc bh
II
Emerg(
O�
AFFIDAVIT OF COMPLIANCE
hereby confirms and declares that
( Name of contractor/subcontractor/consultant/supplier)
I. It is
H.
policy to offer equal
( Name of contractor/subcontractor/consul tan t/supplier)
opportunity to all qualified employees and applicants for employment without regard to
the race, creed, color, sex, national origin, age, disability or veteran status.
complies with all applicable federal,
( Name of contractor/subcontractor/consultant/supplier)
state and local laws governing non-discrimination in employment.
When applicable,
( Name of contractor/subcontractor/consultant/supplier)
negotiate with minority and women contractors for the award of
subcontracts.
will seek out and
Print Agent/Representative's Name and Title
Agent/Representative's Signature
Instructions: This document MUST be completed by each contractor, subcontractor, consultant and/or supplier.
Include or attach this document(s) with the contract.
I1:\File Sys\WTR - DrinkA. Water Utility\WTR-27 - Water Project Files\WTR-27-3214 Construct 565 Zone Reservoir\ConsuItan tContract\Contract.doc
/2000_Consultant.doc bh
City of Renton — Water Utility Division (-'!Ty OF REN T ON
Engineering Services for Hazen 565 Zone Reservoir F fTU?Y
EXHIBIT A - SCOPE OF WORK
INTRODUCTION
The City of Renton is adding a second water reservoir in the City's 565 Pressure Zone to ensure
sufficient storage for normal and emergency uses and to allow the existing reservoir to be taken
out of service for maintenance. RW Beck, Inc. previously prepared the predesign report that
evaluated three alternative sites for locating the reservoir. The selected alternative was a standpipe
located on property owned by the City south of Sunset Boulevard and west of 142nd Avenue SE.
A site survey and a geotechnical report for that property was completed as part of the predesign
and that information has been provided to RH2 for their use in designing this project.
This Scope of Work details the professional services needed to design the reservoir. The design of
the reservoir will utilize the predesign report as the basis to develop detailed plans and
specifications for construction. Alternative piping routes will be evaluated during the early stages
of the project in an effort to avoid construction in King County right-of-way. Several alternatives
were discussed at a scoping meeting with the City. Those alternatives will be considered further.
RH2 has been selected by the City to provide engineering services including design, bidding and
construction phase services for this project. This Scope of Work presents RH2 Engineering's
approach to preparing the bid documents and providing bidding services for the construction of
the Hazen 565 Zone Reservoir project. The design effort involves preparing the civil/site design;
reservoir mechanical design; structural design; electrical design; instrumentation and control
(telemetry) design; preparing specifications; public outreach assistance; submitting permit
applications; and project management. The bidding phase services include preparing 35 sets of
bid documents; responding to bidders' questions; conducting a pre -bid walkthrough and
preparing addenda, if necessary. After receipt of the bids, RH2 Engineering will evaluate the bids
for responsiveness, check references, prepare bid tabulation summary sheet and prepare written
recommendation of award to the City.
A. Design Phase Services
1. Design Phase Startup
2. Civil/Site Design
3. Public Outreach Assistance
4. Structural Design
5. Mechanical Design
6. Electrical Design
7. Instrumentation and Control (Telemetry) Design
8. Update Estimate of Probable Construction Cost
9. Prepare Specifications
10. Design Reviews & QA/QC Reviews
11. Permitting
Last printed 7/22/2005 1:24:00 PM J:\data\REN\105-049\Contracts\Final Contract\Hazen Reservoir Exh A.doc
City of Renton/Water Utility Division
Professional Services for Sunset Boulevard Reservoir
SCOPE OF WORK
12. Project Management
13. Bidding Phase Services
B. Optional Permitting Services
SCOPE OF WORK
A. Design Phase
1. Design Phase Startup
Purpose
To facilitate the startup of the design phase.
Tasks
Page 2 of 15
Base plans used by all disciplines throughout the design will be prepared, as will the
general plans, including the cover sheet and general information details. The accuracy
and completeness of the survey will be evaluated under this task item. If it is determined
during this Task that survey or additional geotechnical exploration is required to complete
the design task, we will notify the City.
Reservoir O & M Meeting No. 1: Meet with City staff and identify City preferences for
site layout, location and general operational configuration. Visit other reservoir sites as
requested by the City. Discuss City preferences for reservoir appurtenances including
those listed in the Predesign report. Consider:
Access manholes, Stairways/Ladders; Lighting; Overflow Pipes; Circulation Systems;
Dissolved Oxygen Systems; Chlorination Systems; Valves and Pipe Materials;
Cleaning Appurtenances; Exterior Elevation Gauge; Painters Rails; and
Communication Equipment Mounts.
Compile photographic and drawing records of options for each of the appurtenances
using either catalogue cuts or photos of similar features from other sites. Develop relative
cost estimates of each option for City selection. Prepare a list of selected appurtenances.
Show each of the appurtenances on the predesign plans in sufficient detail to identify the
object and its location.
Utility and Site Layout: Develop a preliminary utility plan showing proposed locations
for: storm water pipes; reservoir inlet and outlet; perimeter drain; site drainage; temporary
erosion and sedimentation control; power supply lines;elemetry lines; and telephone lines.
Show in plan view without detailed drawings or elevations. Develop a preliminary utility
plan for off -site water, stormwater, electrical and telemetry utilities. Show in plan view
without detailed drawings or elevations.
Downstream Storm Water Analysis: Visit stormwater conveyance path and verify that
the route and drainage condition has not changed substantially since the Predesign
Report. Perform upstream analysis of the site and downstream analysis of stormwater
system for one -quarter mile to verify capacity and routing. Site plan shall include
contours, standpipe location, survey data, fences, gates, access road and landscaping.
Us printed 7/22/2005 124:00 PM J:\d2u\REN\105049\ContracuVin21 Conmct\Hazen Reservoir Exh Ado
City of Renton/Water Utility Division
Professional Services for Sunset Boulevard Reservoir
SCOPE OF WORK
Page 3 of 15
Reservoir Coatings Review: Provide the City with coating options in addition to those
mentioned in the Predesign report for the interior and exterior surfaces of the reservoir.
Provide information on performance, cost and industry acceptance.
Seismic System Review: Provide the City with information on options in addition to
those listed in the Predesign report for mechanical and structural systems designed to
survive seismic events. Include cost estimates and information on industry acceptance and
use.
Telemetry Review: Determine how the City plans to integrate reservoir level control into
existing telemetry system.
Reservoir O & M Meeting No. 2: Meet with City staff and finalize City preferences for
appurtenances, reservoir coatings and seismic systems.
It is assumed that the following drawings will be prepared under this task (estimate 3-
sheets):
• Cover Sheet
• General Information
• Preliminary Site/Utility Plan(s)
Deliverables
1. Kickoff meeting minutes (three copies).
2. Survey and geotechnical evaluation (three copies).
3. Checklist of appurtenance options including cost estimates (three copies).
4. Base design plans (three sets of 24-inch by 36-inch paper).
5. Downstream stormwater analysis (report for use in permitting).
6. Checklist of coating options including cost estimates (three copies).
7. Checklist of seismic system options including cost estimates (three copies).
8. Summary of reservoir control requirements (three copies).
9. Report listing appurtenances, coatings and seismic systems selected by the City.
2. Civil/Site Design
Purpose
Prepare site and utility plans for the construction of the proposed Hazen 565 Reservoir
including waterline design plans for connecting to the City's water system.
Tasks
Using the information developed in Task 1 prepare the following maps and plans. Prepare
a vicinity map showing the location of the reservoir in relation to easily recognized
Renton landmarks. The map will be used in the design plans to acquaint bidders with the
project site and to satisfy building permit criteria. Complete the existing site plan using
the survey data. Plan to identify horizontal and vertical control, construction limits and
site access for construction. Develop an on -site and off -site stormwater plan showing
detention facilities, pipelines, and temporary erosion and sedimentation control. Develop
a Construction Grading Plan with details based on selected reservoir geometry and
hst printed 7/22/2005 124:00 PM J:\dau\REN\105-049\Contacts\Final Conuact\Hazen Reservoir Ezh Adoc
City of Renton/Water Utility Division
Professional Services for Sunset Boulevard Reservoir
SCOPE OF WORK
Page 4 of 15
location, criteria established from the soil investigation and site constraints. Grading plan
to show: property lines; easements; clearing limits; construction contours; limits of soil
retention, if necessary; existing facilities that are not to be disturbed; erosion and sediment
control measures; construction fencing; pertinent topographic features; and proposed
location of reservoir. Develop a Proposed Site Plan with details showing: property lines;
easements; proposed reservoir; proposed contours; proposed access road; existing and
proposed improvements; pertinent topographic features; site lighting; access road; fencing;
landscaping and site restoration. Identify critical elevations for the reservoir. Determine
floor elevations, interior clearance for structural and mechanical items, and pipe
elevations.
Finalize configuration of piping and mechanical components, size piping and select
materials. Develop a final utility plan with details showing property lines, easements,
proposed reservoir and existing topographic features. Prepare plans and details to identify
and locate proposed utility improvements for water mains and fittings, on -site storm water
conveyance, reservoir overflow and drainage, footing drains, electrical, and telemetry.
Develop cross -sections of utility trenches and construction constraints, restoration
requirements for the on -site and the off -site utilities.
Consideration will be given to providing provisions for cellular company use at a future
date.
It is assumed that the following drawings will be prepared under this task (estimate 10
sheets):
• Construction Grading and TESC Plan
• Construction Grading and TESC Details
• Utility Plan
• Stormwater Plan and Profile
• Water Main Plan and Profile
• Utility Details
• Overall Site Plan
• Site and Landscaping Plan
• Site Details
• Site Cross -Sections
Deliverables
Site and utility plans.
3. Public Outreach Assistance
Purpose
To provide the City with the information needed to convey the scope of this project to
the neighboring properties that may be affected by this project. The City will be taking
1st primed 7/22/2005 124:00 PM ):\dam\REN\105049\Contracts\Final Convect\Dean Reservoir Eh Ad-
City of Renton/Water Utility Division
Professional Services for Sunset Boulevard Reservoir
SCOPE OF WORK
Page 5 of 15
the lead on this task and RI12 will be providing support as requested by the City up to
the level of effort indicated in the fee estimate.
Tasks
Provide supportive documentation, drawings, renderings and other public outreach
materials as requested by the City. Attendance at two public meetings at the City's request
is included in this task.
Deliverables
Public outreach materials and meeting attendance as requested.
4. Structural Design
Purpose
Develop design criteria and prepare calculations and drawings for a 3.7MG welded steel
water storage reservoir with a diameter of 75 feet and a water height of approximately 112
feet. The configuration of the tank and appurtenances will be as described in the
predesign report and confirmed in Tasks 1 and 2.
Tasks
Develop design criteria for the reservoir including preferences and requirements for details
related to access hatches, ladders, platforms, safety devises, antenna mounts, etc.
Perform calculations to determine tank shell and roof member sizing. Perform calculations
for anchorage to the foundation. Perform calculations for the foundation, based on the
geotechnical values provided in the geotechnical report. Include calculations for ladder and
platform connections to the tank, and for safety line attachments. Perform calculations on
opening reinforcement and appurtenance member sizing. Calculations will be in accordance
with IBC 2003 (essentially AWWA D1OO with revised seismic factors to match IBC seismic
mapping of expected ground acceleration). Provide stamped calculations for the building
permit submittal.
Prepare detailed drawings of the foundation, including anchor embedment; rebar detailing,
and pipe encasements. Prepare drawings of the tank including shell thicknesses, roof
supports and rafter sizing, and anchorage details. Welding will not be specifically detailed
except where welding requirements exceed AWWA D10O requirements.
Prepare drawings showing the location and details of access ladders; platforms and hatches;
vents; overflow pipe; drain pipe; and inlet/outlet pipes. Locations will be determined based
on optimizing hydraulics and ease of maintenance.
It is assumed that the following structural drawings will be prepared under this task
(estimate 8 sheets):
• Reservoir Foundation Plan
• Reservoir Floor/Shell Plan
• Reservoir Roof Plan
• Reservoir Elevations
het primed 7/22/2005 1:24:00 PM J:\d2u\REN\]0-"49\Conu2co\Fina1 Conuad\Hazen Ra oir Eah Ado
City of Renton/Water Utility Division
Professional Services for Sunset Boulevard Reservoir
SCOPE OF WORK
• Details of Foundation, Pipe Encasement, and Anchorage
0 Details of Roof Including Framing
Page 6 of 15
• Details of appurtenances, including hatches, vents, piping and pipe supports.
Details of access ladders, landings and guardrails. Include provisions for safety
including cages and climbing devises. Include provisions for access control
including locks and a ladder enclosure as desired.
Deliverables
Structural design plans and calculations for Building Department submittal.
5. Mechanical Design
Purpose
Prepare the mechanical design for the proposed reservoir.
Tasks
Using the information developed in Task 1 and 2, finalize configuration of piping and
mechanical components and size piping systems for reservoir inlet, outlet, drainage,
overflow and isolation. Plans are to include equipment selection, pipe sizes and materials,
thrust restraint, vault sizing and selection, vault drainage and access hatches and other
appurtenances. Design water quality remediation equipment including piping, equipment
and structures. Based on discussion with the City, a cathodic protection system is not
included as part of this Scope. Provisions will be provided for installment and activation
of a cathodic protection system at a future date.
The mechanical design will include the installation of a flow meter at the Highlands 565
Zone Tank including electrical connection to the City's telemetry system. It is assumed
that adequate site as -built information is available and that a survey will not be necessary.
It is assumed that the following mechanical drawings will be prepared under this task
(estimate 3 sheets):
• Reservoir Mechanical Plan - Overflow and Drain
• Reservoir Mechanical Plan - Inlet and Outlet
• 565 Highlands Mechanical Plan and Details
Deliverables
Mechanical design plans.
6. Electrical Design
Purpose
Prepare the electrical design for the proposed reservoir and site. Coordinate with the
electrical utility in obtaining power to the project site.
hst printed 7/22/2005 1:24:00 PM J:\data\PEN\105-049\Conuacu\Fin2l COntratt\Hazen Reservoir Exit Ad«
City of Renton/Water Utility Division
Professional Services for Sunset Boulevard Reservoir
SCOPE OF WORK
Page 7 of 15
Tasks
Coordinate with Puget Sound Energy (PSE) on the scope of the project. Determine power
supply requirements. Develop one -line diagram showing equipment layout and order,
conduit and wire sizes, and breaker sizes. Using the information developed in Task 1 and
2, develop electrical plan showing equipment and conduit routing and sizes with wire type
and size. Develop site lighting and reservoir security lighting plan showing equipment,
mounting and light patterns. Plan shall include both surface mount and concealed
conduit design based on City -identified functions.
It is assumed that the following electrical drawings will be prepared under this task
(estimate 3 sheets):
• Electrical One -line and Panel Details
0 Electrical Plan and Elevation
• Electrical Details
Deliverables
Electrical design plans.
7. Instrumentation and Control (Telemetry) Design
Purpose
Using the information developed in Task 1, prepare the telemetry design for monitoring
and controlling the proposed reservoir as an integral part of the City's water system.
Tasks
Develop design of the instrumentation and control systems in order to operate the new
reservoir as an integral part of the water system. Determine power supply requirements.
Develop control logic diagrams for equipment or processes including water quality
control equipment. Develop design details for telemetry system improvements to interface
with the City telemetry system. RH2 will coordinate with the City's telemetry integrator
on the necessary improvements and we will prepare a letter describing the work required
by the telemetry integrator including the modifications required at the MTU.
It is assumed that the following drawings will be prepared for this task (estimate two
sheets):
• Telemetry Control Plan Details
• Telemetry System Block Diagram
Deliverables
1. Design plans for the telemetry improvements.
2. A letter to the City's telemetry integrator.
8. Update Estimate of Probable Construction Cost
Purpose
To update the estimate of probable construction cost during the design.
Last p6m,d 7/22/2005 124:00 PM J:\dau\PEN\105-049\Contracts\Final Contract\Hazcn Ra ois Exh kdm
City of Renton/Water Utility Division
Professional Services for Sunset Boulevard Reservoir
SCOPE OF WORK
Page 8 of 15
Tasks
The estimate of probable construction costs developed during predesign will be updated at
the 30%, 65%, 95% and 100% design levels.
Deliverables
Engineer's cost estimate for construction (+/- 30%) at 30% design (update to Predesign
Report cost estimate).
Engineer's cost estimate for construction (+/- 25%) at 65% design including cost estimate
for Engineer to perform Services During Construction.
Engineer's cost estimate for construction (+/- 15%) at 95% design (utilizing RH2
developed Bid Schedule).
Engineer's cost estimate for 100% Design (+/- 10%) at 100% design (utilizing final
construction Bid Schedule).
9. Prepare Specifications
Purpose
Prepare the contract documents and technical specifications.
Tasks
RH2 will prepare the bid proposal, contract documents and technical specifications for
the project including consideration for cost -savings alternatives for reservoir construction.
RH2 will use City Contract Documents, Supplemental Specifications to WASHDOT
Standard Specifications and Applicable Amendments to the WASHDOT Standard
Specifications as supplied to RH2 by the City. RH2 will develop the schedule of prices
and measurement and payment requirements and Special Provisions (Technical
Specifications).
Deliverables
Technical specifications, Schedule of Prices, Measurement and Payment Requirements.
10. Design Reviews and QA/QC Reviews
Purpose
Conduct detailed design reviews with City staff at the 30%, 65% and 95% design
completion levels. Conduct internal QA/QC reviews at appropriate points throughout
the design development.
Tasks
Provide 30% design level drawings and a preliminary specification list to the City for
review. Attend the 30% review meeting with City.
Conduct a detailed internal QA/QC review and perform inter -disciplinary coordination
cross-checks at the 65% design level. Perform evaluations of constructability and
operability.
hst printed 7/22/2005 124:00 PM J:\dat2\REN\105-049\Contracts\Fiml Contract\Hazen Reservoir Exh A.doc
City of Renton/Water Utility Division
Professional Services for Sunset Boulevard Reservoir
SCOPE OF WORK
9of15
Provide 65% design level drawings and specifications to the City for review. Attend the
65% review meeting with City.
Conduct a detailed internal QA/QC review and perform inter -disciplinary coordination
cross-checks at the 95% design level. Perform evaluations of constructability and
operability.
Provide 95% design level drawings and specifications to the City for review. Attend the
95% review meeting with City. The 95% review editing shall be limited to items that were
not reviewed at the 65% review.
Deliverables
Design drawings for review at the 30% design completion level (3 sets for City review).
Plans shall be on 'h-size (11" x 17") sheets.
A preliminary outline of the technical specifications (Special Provisions) for review at the
30% design completion level (3 sets plus one electronic copy for City review).
Design drawings for review at the 65% design completion level (3 sets for City review).
Plans shall be on 1/2-size (11" x 17") sheets.
Preliminary technical specifications for review at the 65% design completion level (3 sets
for City review).
Design drawings for review at the 95% design completion level (5 hard copy sets plus one
electronic copy of AutoCAD drawing files for City review). Plans shall be on 1/2-size (11" x
17") sheets.
All technical specifications for review at the 95% design completion level (5 sets for City
review).
11. Permitting
Purpose
Assist the City with the preparation of the permits and design reviews by outside agencies
that are necessary for project approval.
Permitting Scope Overview
The project area primarily falls under City of Renton Municipal Code Development
Regulations (Title IV RMC) requirements. The entire project will be conducted in the
vicinity of Honey Creek and associated riparian wetlands. Honey Creek is tributary to
May Creek, a designated ESA Chinook Critical Habitat Area.
The City has expressed a desire to complete the project entirely within the Renton city
limits. Assuming this proves to be a feasible option, the following permitting
requirements are expected.
1. Critical Areas Field Studies and Reports consistent with Renton Municipal Code
Title IV (Development Regulations).
2. SEPA Compliance.
3. City of Renton Conditional Use Permit.
4. City of Renton Right -of -Way Permit.
Last printed 7/22/2005 124:00 PM J:\dau\REN\105-049\Contracts\Final Contra\Hazen Rc—oie Exit Ad«
City of Renton/Water Utility Division
Professional Services for Sunset Boulevard Reservoir
SCOPE OF WORK Page 10 of 15
5. City of Renton Drainage Plan.
6. City of Renton Building Permit.
7. City of Renton Construction Permit.
Permitting Scope Assumptions
For the purpose of this permitting scope, the following assumptions apply.
1. The City of Renton will prepare all permitting applications and facilitate
permitting for this project.
2. RH2 will provide environmental assessment information to support the City
writing the SEPA as requested.
3. The water main will be installed within City -owned property and developed right-
of-way, thus avoiding impacts to adjacent sensitive areas.
4. It is assumed that impacts to sensitive areas will be avoided altogether. As such,
this Scope does not include mitigation plans. Should it be necessary, mitigation
planning will be included in an additional scope of work.
5. No Federal permitting, Federal Biological Assessments or Evaluations, or U.S.
Army Corps of Engineers permitting or jurisdiction coordination will be
involved. Based on our current understanding and preliminary field
investigations, it appears reasonable that work in jurisdictional wetlands and in -
stream construction activities can be avoided, which will preclude the
requirements for U.S. Army Corps of Engineers permitting and related ESA
compliance. Therefore, no fee has been included to accommodate these issues.
6. It is assumed that no Tribal coordination or facilitation will be conducted.
7. The City of Renton will pay all permit fees.
8. It is assumed that geologic test borings, pits or excavations for the project will not
be dug within the boundaries of wetlands or below the high water mark of
streams.
9. Any monitoring, more detailed scientific assessment or other requirements
imposed as part of the permit approval process will be the subject of an
additional scope of work.
10. All permitting related work will be conducted on a time and expense basis with
the goal that the required permitting can be accomplished within the proposed
permitting budget. It is impossible to completely control and predict ALL
permitting costs, therefore; within the defined budget, work will be conducted to
assist the City in completing a SEPA checklist.
Tasks
Organize, prepare for and attend a Pre -Application Conference with the City of Renton to
confirm applicable permitting requirements, processes and timing. Coordinate with City
staff prior to the Pre -Application Meeting. This Scope assumes that a single Pre -
Application Meeting will suffice for this project. Prepare a brief summary of the Pre -
Application Conference results and provide it to the City.
last printed 7/22/2005 124:00 PM J:\dam\REN\105-049\Contracm\Fina1 Contrvct\Hazen Reservoir Exh Adoc
City of Renton/Water Utility Division
Professional Services for Sunset Boulevard Reservoir
SCOPE: OF WORK
Page 11 of 15
Prepare Critical Areas Assessment to assist with City permitting activities including the
following:
Conduct code review and regulatory assessment of wetlands, streams and buffers located
adjacent to proposed construction project disturbance (water tank, water transmission
main and storm water system).
Conduct review of Endangered Species Act (ESA) listed species documentation and use
adjacent to the proposed construction project disturbance for the purposes of SEPA
Compliance.
Conduct limited sensitive areas mapping and quality assurance assessment of proposed
project area utilizing Geographic Information Systems (GIS) digital data and paper maps
from King County and the City. For the purpose of this scope, sensitive areas include
wetlands; streams; erosion hazard areas; seismic hazard areas; aquifer protection areas; coal
mine hazard areas; floodplain and flood hazard areas; steep slopes and landslide areas; and
fish use documentation.
Conduct field assessment, categorization/classification; limited wetlands delineation and
edge flagging, limited stream OHWM delineation and flagging adjacent to the proposed
construction project disturbance.
Prepare a brief narrative discussion detailing sensitive areas results and associated map of
sensitive areas.
Prepare drainage report to substantiate the drainage plan and provide supporting
calculations. Product will be (4) four copies of the drainage report to City for in-house
use and permitting and (2) two copies for RH2 staff/files.
Submit 90% design plans and technical specifications to the WDOH for approval.
Respond to WDOH comments and incorporate them into the plans and specifications, if
necessary, to obtain WDOH approval of final construction plans to permit construction
of the project.
Prepare City Building Permit application supporting documentation as requested by the
City. Edit and resubmit based on Building Department comments. Set up and attend a
pre -application meeting with the appropriate City staff. Respond to City and/or public
comments on criteria aspects of the permit applications.
Deliverables
1. Brief summary of Pre -Application Conference.
2. Brief narrative of sensitive area results, including opinion that a biological
assessment is not necessary for this project.
3. Map of sensitive areas.
4. Conduct field assessment of property.
5. Building and SEPA permit application supporting documentation as identified
below.
Land Use Permit Master Application / SEPA at 65% design point (as per "Submittal
Requirements for Environmental Review for Project Actions"):
list printed 7/22/2005 114:00 PM J:\data\REN\105049\Contnns\Fin2l Contren\Hazen Reservoir Exh Adoc
City of Renton/Water Utility Division
Professional Services for Sunset Boulevard Reservoir
SCOPE OF WORK
• Site Plan: Fourteen (14) copies at 22" x 34".
• Architectural Elevations: Twelve (12) copies at 22" x 34".
• Grading Elevations: Four (4) copies at 22" x 34".
• Utilities Plan, Generalized: Five (5) copies at 22" x 34".
• Drainage Control Plan: Five (5) copies at 22" x 34".
Page 12 of 15
• Drainage Report: Four (4) copies.
• Geotechnical Report: (provided by City).
• Landscaping Plan, Conceptual: Five (5) copies at 22" x 34".
• Plan reductions: One 8- 112 " x II" PMT reduction of all full size drawing
sheets.
• Building Permit (as per "Building Permit Requirements: Commercial or
Multi -Family").
• Complete Set of Plans: Three (3) copies at 22" x 34".
• Architectural/Structural Plans: Two (2) copies at 22" x 34".
• Civil Plans: Two (2) copies at 22" x 34".
• Specifications: Two (2) copies.
• Stress/structural calculations: Two (2) copies.
• Geotechnical Report: (provided by City)
• Storm drainage analysis (TIR): Two (2) copies.
• Energy Code Checklist for Non -Residential Buildings: (One (1) copy, if
necessary).
• Fire Permit application (if necessary)
6. 90% design plans and technical specifications to WDOH for approval.
12. Project Management
Purpose
Perform the management, coordination and administrative functions necessary for the
successful completion of the tasks and deliverables.
Tasks
Direct the project design team staff in day-to-day design activities.
Prepare and maintain files and records of design data and design decisions.
Coordinate, prepare materials for, and attend design project review meetings.
Coordinate QA functions and reviews.
last primed 7/22/2005 114:00 PM J:\dau\REN\105-049\C..v."s\Fi.aI Conu.a\H.— R-6, Eh Ad-
City of Renton/Water Utility Division
Professional Services for Sunset Boulevard Reservoir
SCOPE OF WORK
Page 13 of 15
Prepare monthly budget status reports and invoices. These reports shall document
budgeted amounts, amounts expended, amounts remaining, percent of budget expended
and remaining at the subtask, task, and project levels.
13. Bidding Phase Services
Deliverables
Copies of design records, correspondence and associated materials, as requested by the City.
Purpose
Assist the City during the project bidding and contracting phase. It is assumed that the
City will advertise the bid, distribute bid documents and maintain the master planholder's
list.
Tasks
Prepare 35 sets of bid documents for distribution during the bidding phase, plus six (6)
sets of bid documents for use by RH2 Engineering in support of this project. Provide bid
documents to the City for distribution. Attend and conduct pre -bid meeting at project site
with interested bidders. Respond to technical questions from bidders. Prepare and
transmit three addenda. After receipt of bids, evaluate the bids received for responsiveness,
check references of qualified bidders, prepare bid tabulation summary sheet, and prepare a
written recommendation of award to the City.
Deliverables
1. 35 sets of bid documents.
2. Three addenda (if necessary).
3. Pre -bid meeting agenda, minutes, summary of significant issues resulting from the
meeting.
4. Letters to the City summarizing the bid evaluations and a recommendation for
award.
B. Optional King County Route Permitting Preparation and Facilitation
Purpose
To assist the City in obtaining the necessary permits and agency approvals if alternative
King County Route is chosen. This task item can be activated by written notification
from the City authorizing us to proceed with the alternate waterline alignment along King
County.
This optional scope item has been included at the City's request to address permitting
preparation and facilitation associated with water main installation within 142nd Avenue
SE, a City and County -owned roadway.
This task item is designed to complement the work already covered in Task 12, Permitting.
The following permits are anticipated under this optional scope item.
1. Critical Areas Field Studies and Reports consistent with Renton Municipal Code
Title IV (Development Regulations) and King County Code.
Ust printed 7/22/2005 124:00 PM J:\dau\REN\105049\Contracts\final Conttart\f a n Resmoir Exh Adoc
City of Renton/Water Utility Division
Professional Services for Sunset Boulevard Reservoir
SCOPE OF WORK
2. SEPA Compliance.
3. City of Renton Right -of -Way Permit.
4. King County Right -of -Way Permit.
Optional Task Assumptions
Page 14 of 15
Based on our understanding of the proposed transmission main alignment along 142°d
Avenue SE and preliminary field investigations, the following assumptions were made for
the purposes of this optional scope item.
The water main will be installed entirely within the 142A Avenue SE roadway and
not in adjacent wetlands, streams or regulated buffers. Any deviations from this
assumption may result in additional permitting involving County and Federal
requirements. Any additional work as a result of deviations would be the
included in an additional scope of work.
2. The water main will be installed over the top of the existing Honey Creek culvert
without any construction or dewatering into adjacent wetlands, the creek or
associated buffers. Should the water main need to be installed below the existing
culvert, coordination with the Washington Department of Fish and Wildlife to
obtain a Hydraulic Project Approval will be necessary. This coordination and
facilitation is not included in this Scope.
3. All permitting -related work will be conducted on a time and expense cost basis
with the expectation that the required permitting can be accomplished within the
proposed permitting budget. It is impossible to completely control and predict
ALL permitting costs; therefore, within the defined budget, work will be
conducted to facilitate the City completing the following permitting processes: a)
Critical Areas Field Studies and Letter Report, b) SEPA checklist, c) City of
Renton Right -of -Way permit, and d) King County Right -of -Way permit.
Tasks
Organize, prepare for and attend a Pre -Application Conference with the City of Renton
and King County to confirm applicable permitting requirements, processes and timing.
Compile Pre -Application Meeting Request Forms along with the required supplemental
plans and narratives. Coordinate with City staff to obtain the required Pre -Application
Meeting Fees. Coordinate with City staff prior to the Pre -Application Meetings. This
Scope assumes that two Pre -Application Meetings will suffice for this project. Prepare a
summary of the Pre -Application Conferences results and provide it to the City.
Prepare Critical Areas Assessment to assist with City permitting activities including the
following:
Conduct code review and regulatory assessment of wetlands, streams and buffers located
adjacent to proposed construction project disturbance (water tank, water transmission main
and storm water system).
Conduct review of Endangered Species Act (ESA) listed species documentation and use
adjacent to the proposed construction project disturbance for the purposes of SEPA
Compliance.
1-2st printed 7/22/2005 1:24:00 PM J:\dau\REN\105-049\Conuacn\Final Conuact\lhzen R—rvoir Exh Adoc
City of Renton/Water Utility Division
Professional Services for Sunset Boulevard Reservoir
SCOPE OF WORK
Page 15 of 15
Conduct sensitive areas mapping and quality assurance assessment of proposed project area
utilizing Geographic Information Systems (GIS) digital data and paper maps from King
County and the City. For the purpose of this Scope, sensitive areas include wetlands:
streams; erosion hazard areas; seismic hazard areas; aquifer protection areas; coal mine
hazard areas; floodplain and flood hazard areas; steep slopes and landslide areas; and fish
use documentation.
Conduct field assessment, categorization/classification, limited wetlands delineation and
edge flagging, limited stream OHWM delineation and flagging adjacent to the proposed
construction project disturbance.
Prepare a brief narrative discussion detailing sensitive areas results and associated map of
sensitive areas.
After City completion of the SEPA process, prepare and facilitate Right -of -Way Permits
with King County and the City. Submit plans to the City and County to facilitate
applications to King County Right -of -Way Permit. This Scope assumes RH2 will assist
with facilitation and coordination with the City and King County regarding applications
and securing Right -of -Way Permits, as possible, within the budget limits.
Deliverables
1. Attend pre -application conference.
2. Pre -application meeting request form.
3. Brief summary of the pre -application conference results.
4. Brief narrative detailing sensitive area results and associated map of sensitive area.
5. Plans for King County Right -of -Way permit.
1st primed 7/72/2005 134:00 PM J:\dau\REN\105-049\Contr2cts\Final Contract\ii un R—oir Fah Adoc
EXHIBIT B
Hazen 565 Reservoir
Time Schedule of Completion
Phase A Design
Tasks 1 - 12
Begin: Upon notice to proceed - Tentatively September 1, 2005
Complete: 8 months after notice to proceed - April 30, 2006
Tasks 13
Begin: Dependent on Owner's schedule to bid
Complete: 45 calendar days after Task 13 begins
Phase B Services During Construction
Begin: Separate authorization, to be developed during design
Complete: Per Construction Schedule
v
7/21/2005 5:08 PM S:\data\REN\105-049\Contracts\Final Contract\Hazen Reservoir Design & SDC Fee EstimateAs
EXHIBIT C-1
Consultant Fee Determination Summary Sheet
(Cost Plus Fixed Fee)
Prepared By:
Mark Miller
Project:
Classification
Professional VI
Professional VI
Professional V
Professional I
Professional II
Professional I1
Professional I
Technician I
Administrative
Hazen 565 Reservoir
V
I
Direct Salary Cost
Range
Low
High
Hours
I
$39.20
$58.20
192
x
$43.00
$47.35
170
x
$33.00
$43.75
138
x
$30.00
$35.05
0
x
$26.00
$30.30
441
x
$23.50
$27.28
112
x
$18.00
$24.75
574
x
$13.00
$17.50
0
x
IV
$27.30
$30.35
194
x
I
$10.50
$15.30
42
x
Total flours 1,863
I
Date:
July 14, 2005
ase
Design & SDB
Estimated
Rate (1)
Cost
$58.20
x
$11,174.40
$45.18
x
$7,679.75
$43.75
x
$6,037.50
$32.53
x
$0.00
$28.15
x
$12,414.15
$25.39
x
$2,843.68
$21.38
x
$12,269.25
$17.50
x
$0.00
$28.83
x
$5,592.05
$12.90
x
$541.80
Total DSC = $58,553
1 OH Rate x DSC or 186.72% x $58,553 = 1 $109,329 1
FF Rate x (DSC+OHI) or 12.00% x $167,882 =
$20,146
Itemized:AC123 (See Exhibit D1 Hours Detail) _ $16,258
SUBCONSULTANT COST $5,000
Survey $0.00
Landscape Architect (estimated) $5,000.00
(Grand Total: = I $209,286
1 - Estimated rate based on weighted average of employee team, Billing to be based on actual DSC of each employee
S:\data\REN\105-049\Contracts\Final Contract\Hazen Reservoir Design & SDC Fee Estimate.xls C-1 811l2005 1:38 PM
EXHIBIT C-2
Consultant Fee Determination Summary Sheet
(Cost Plus Fixed Fee)
Prepared By:
Mark Miller
Date:
I July 14, 2005
Project: Phase
Hazen 565 Reservoir Opt Permitting
- Direct Salary Cost (DSC)
Range
Estimated
Classification
Low
High
Hours
Rate (1)
Cost
Professional VII
$39.20
$58.20
5
x
$58.20
x
$291.00
Professional VI
$43.00
$47.35
0
x
$45.18
x
$0.00
Professional V
$33.00
$43.75
80
x
$43.75
x
$3,500.00
Professional IV
$30.00
$35.05
0
x
$32.53
x
$0.00
Professional Ill
$26.00
$30.30
0
x
$28.15
x
$0.00
ProfessionallI
$23.50
$27.28
50
x
$25.39
x
$1,269.50
Professional
$18.00
$24.75
40
x
$21.38
x
$855.00
Technician I
$13.00
$17.50
0
x
$17.50
x
$0.00
Administrative IV
$27.30
$30.35
12
x
$28.83
x
$345.90
Administrative I
$10.50
$15.30
0
x
$12.901
x
$0.00
Total Hours 187
Total DSC = $6,261
OH Rate x DSC or 186.72% x $6,261 = 1 $11,691 1
Grand Total: = I $20,322
1 - Estimated rate based on weighted average of employee team, Billing to be based on actual DSC of each employee
S:\data\REN1105-049\Contracts\Final Contract\Hazen Reservoir Design & SDC Fee EstimateAs 7/21/2005 5:12 PM
City of Renton - Water Utility Division f
Design & SDB for Hazen 565 Reservoir
Exhibit D1 - Professional Services Hourl and Reimbursible Detail
Prof Prof Prof Prof Prof Prof Prof Admin Admin Total Total Total Total
Description VI[ VI V IV Ill II I IV I Hours Labor Expense Cost
PHASE A - DESIGN PHASE SERVICES
A
Reservoir 0 & M Meeting #1
12 12
12 8
4
$1,848
$29
$1,877
B
Prelimin�Utili and Site Layout
_
4
_ _
--12 16
_ _
1
_ _48
33
$941
-
$369
--- - --
51,250
- -
I- - __
C_
--- ----
Upstream/Downstream Analysis
- ----
2
---- ---- _
24 - - 8-
----
- 1 -_
- --
- - 35
5992_
5159
$1,151
D___
Coatis, Seismic, and TelemetryjReview
2 4 2
2
15
$583
_ $9
_ _ $592
E
Survey d Geotechnlcal Review
---_
1 4
_
4 4
_
13
_
$453
_
$190
$643
F
-
Reservoir O&M Meetin< ##2-
_4 _ _ _ _ _
_ 4 _
_ 4
12
$461
S29
$490
Developbase maps and cover sheet _ -_
1 - 1 --
_
_ - _ 4 _ _ 20 _
- --
28-
_ 5642
- $420
E1,062
A
Prepare vicinity map
1
— 1
2
550
S30
$86
B
GradinUr d Stormwater Calcultions
4
20
24 --
$796
- -
$0
- -
$796
_
C
- - - - - -a --
Prepare Site and Gradlnc� Plans and Details
--
6
- - -
24
_ _ _
32
__
1
_
- 1
_
- 64 _
- $1,751
$1,200-
$2,_951
_
Site Utility and Watermain Plans
4
_ - _
16
_ -
4 28
-1
1
54
$1,425 _
_$8_00__
$2,225
_D___PLepare
E
Plan
2
_ _ _ _
4
8
1
15 _
-- $413 - _
__- S1_50 _
- 5563
-
F
_Landscaping _
TESC Ilan
-- -
1
- _ - - - -
4
- -_
- -- _ 6
- --
- 11 -__
-
5299
5188
--
- 5487
-
ITqSk 2
17 0
0 n 6g
4 75
2
3
170
54.733
52.368
57.100
Task 3
Public Outreach Assistance
A
Provide supportive documentation
4
_
16
16
4
2
42
$698
----
$1,864
- -- - -
B
Attendance at neighborhood meetings
---------
6
-- ----
12
----- ------------
2
------
2
22
_$1�166
E770
$109
$879
C
Address neighbors concerns
8
16
_ _ _ _
16
6
2
48
$1,4--
$78--
5 -,535
-
Develop Design Criteria
1
6
7
$329
$0
$329
[--i-
Shell Calculations
3
_ _ _ _ _ _ _
_
1 _
9 - ---
5255
- - - --
$30
- -
$285
- -
--- --- --
Roof Calculations
1
6
_ _5 _ _ _
10
1
-
18
5556
53.0_
$586
Anchorage Calculations
1
6
10
1
18
$556
E30
$586
-
Foundation Calculations
A
1
8
_ _-- _ -- - - -
10
1
20-
- $646
_,- $30 _
- $676
_ _
Appurtenance Calculations
1
10
_--__--_
16_
128
-
_ $865
$30 _ --
_ $895
-
G Platform and Landing Calculations
8
12
121_
$631
$30 _ _
- $661-
H Fountation Plans and Details
2
14
_
32
_ 51,433_
_$840_ -
_E2,273
I Floor Plans and Details
1
10
— _ _ _ _ _
24 _—
_ _
_48_
35
_-_ $1 023----
5640
__51,663_
J Roof Plans and Details
2
18
_ _ _
36
56
_ $1,699
--$940-
-- ---- ---
$2,639
- - --
--
K Appurtenance Details --_-_-
2
14
_ _ _
- -
— _ - _ 32 - _-_---
__
48
_$1,433-
_ $840
_$2,273
Task 5
Mechanical Design
A
Highlands 565 Flowmeter design
1 2
4
8
1 1 17
$471 ---
$249_
$720
_... .-.. ..
—
B
Mechanical Plans and Details
8 12
- - -- -
40
- -
32
----- - -- -
1 1 94
-- - 4
$2,82
$1,404
54,246
C
Water Quality System design
1 12
4
12
1 1 31
$994
$354
$1,348
Task 5
10 0 26
0 48
0 52
3 3 142
$4,307
$2,007
$6,314
Task Electrical Design
A Coordination with Utility 1 2 _-8 1 12 _ $362 _ _ _ S30_-_ _5392
B Electrical Design 2 8 2 24 2 38 — $1,158 _ $489 $1,647
Task 6 3 0 10 0 2 32 0 0 3 50 $1,520 $519 $2 039
J.3d.WREM103.1491y t.N.t CW-144— R. W O"M a SM FN ENMn A. 01 Deed1 i aDa Hein 1 of 2 2122J200a 3 00 FM
Prof
Description VII
Prof Prof
VI V
Prof Prof
IV 111
Prof
11
Prof Admin Admin
1 IV I
Total
Hours
Total
Labor
Total
Expense
Total
Cost
Task 7
Instrumentation and Control (Telemetry
A
Coordination with Telemetry Integrator 1
2
1
8
_ 5260
539
__ __ 5299
B
Teleme� design 2
12
2
_4
24
1
41
E1,320
$470
$1,790
Task 7
3
0 14
0 2
28
0 0 2
49
$1,580
509
$2,089
Task_ 8
_ _Update Estimate of Probable Construction Cost
A
30% cost estimate 2
1
1
8
8
20
$602_
$0
__$602_
B
- 65%date 4
2
2
6
- 6
1
21
$721
$30
_ $751
C
95% update 4
2
2
8
8
1
25
$820
$30
$850
D
Final update 2
1
1
2
2
1
9
$317
30
_ 5317
Task 8
12
6
6
0 24
0 24
0 3
75
$2,459
60
$2,519
Task 9 Specificationa
_
_Prepare
A Incorporate front end specs
2
1
___ _ _ _
_
6
13
5446
$68
$514
B Technical Specifications
6
8 5
_4 -
24
_
10
73
_
$2,395
_$215_
_$2,610
_
C Measurement and Payment
1
1 2
_ _
2
_20
2
8
_
5305
E18
023
Task 9
9
9 8
0 30 0
10 28
0 94
$3,146
301
$3,447
Task 10
Design Review & QA/QC Reviews
A
30% Review_
6
6
14
18
10
54
$1,687
$179
$1-,867
r B
65% QA/QC Review
6
2
2
2
12
$570 _
$105 ____
__ $675
C
65% Review
6
6
2
14
_
18
16
62
_$1,948
79
51_
$2,127_
D
95% QA/QC Review
12
4
4
2
22
$1,097
$105
$1,202
E
95% Review
6
6
2
14__
18
10
56
b1,775
5179
E11954
F
Finalize Plans and Specs
4
2
2
_
20
_ _
40
8
76_ ___b2,059
_ $0 ._ _
$2,059
_
_
Task 10
40
26
12
0 62
0
98
44
0
282
$9,136
748
$9,884
Task 11
Permitting
- ---
-
--
--
A
Coordination Meeting
8
2
----
1
11
b430
S29
5459
B
Prepare summary of Pre-app Conf.
4
2
2
8
$283
$18
----
$301
- --- -
-- -
C
--
Pure Critiical Areas Assessment
2
B
---
--
32
24
4
-
70
- S9_1,07
_._ $25
$1,932
D
Assist City with Application
2
4
1
7
E218__51,18_8__
E
Prepare, print, and submit DOH plans
1
_
2
4
6
13
$359 _
5156
__ b515
F
Drainage Report
1
4 i
_
12
4
8
__
29
$903
$43
_ $946_
G
Respond to WDOH comments
2
8
8
6
24
_ $865___
_ $27__
H
City uilding permit
2
6
6
_
12
8
16
50
$1,620
5201
_ E1,821
Task 11
7
6
41
0 34
44
36
44
0
212
$6,584
$1,687
$8,272
Task 12
Project Management
-
_ _ 0
$0
_$0__
$0
A
Monthly Invoices/Status Updates
12
12
6
-
30
51,209
SO _
_$1,209
B
Monthly Schedule
6
6
6
18
$691
$0
$691
C
Maintain Project Files
1
6
_
6
13
_ 5400
SO -
_ _ _ $400
_
-___-
_
Task 12
19
0
0
0 24
0
0
18
0
61
$2,300
0
$2,300
Task 13
A
Bidding Phase Services
Prepare bid sets
2
_
4
8
16
-----0--
16
___
46
EO
$1,068
$2,405
_ _$3_,473
B
Prepare advertisement for bid
1
1
-_
2
$57 _
b39__
06
C
Respond to Bidder's Questions
2
2
2
12
_
18
$632
$O__
_ _$632
D
Attend pre -bid site visit
4
_ 4
_
1
9
$322
$20_
$342_
E
Prepare Addenda
8
6
4
12
12
42
$1,595
566
_E1,661
F
Prepare and attend bid opening
2
2
$116
$20
$1-37_
G
Prepare bid tab and Recommendation
2
_
4
1
7
$258
$39
$297
Phase A • Design Services Total 192 170 138 0 441 112 574 194 42 1863 $58,553 $16,258 $74,811
J. WUV2EM105-04MCwWWFh* CmbnMN R-W D900 a SDC FN Es"xi Is D1 D"gn & SDa HWn 2 of 2 1122/2005 3 11 PM
City of Renton - Water Utility Division
Optional Permitting for Hazen 565 Reservoir
Exhibit D2 - Professional Services Hourly and Reimbursible Detail
Prof Prof Prof Prof Prof Prof Prof Admin Admin Total Total Total Total
H u
Description VVI V IV lit 11 1 IV 1 Hors Labor Expense Cost
PHASE C - EXTRA PERMITTING SERVICES
Task 1
Extra Permitting
A
Prepare for and attend Pre -Application Mtq
16
4 2 22 $859
$79 _
$938
6
Prepare summary of Pre -Application Conf, 2
8
4 2 16 $626
$9
$636
C
Prepare Criliical Areas Assessment 2
32
24 30 4 92 $2,882
$38 _
$2,920
0
Prepare and facilitate ROW permitting 1
24
18 10 4 57 $1,894
$88
$1,983
Phase
C- Extra P rmittino Total 5
08
6
6 6
117112005 5 15 GM
S.-EOREN1105 9p .Mr ft%F— C-1d%H— an.,wk D-dpn 4 &IC FFo EaMmp —4 Co 00 P— Noun
Exhibit E
Hazen 565 Reservoir
Overhead Multiplier Breakdown Summary Sheet
2005 Multiplier
Direct Labor
FICA
Unemployment Compensation
Company Insurance and Medical
Medical Aid and Industrial Insurance
Vacation, Sick, and Holiday Leave
Profit Sharing
Total Fringe
Office Miscellaneious, Postage
Administration and Time Unassignable
State B&O and Other Business Tax
Professional Services
Rent
Utilities and Maintenance
Printing, Stationery and Supplies
Telephone not assignable
Travel not assignable
Insurance
Fees, Dues, Professional Meetings
Total Overhead
286.720%
100.000%
13.180%
1.400 %
14.410%
1.170%
16.050%
44.800%
91.010%
0.840%
48.760%
5.800%
0.250%
23.730%
2.560%
1.520%
4.370%
1.610%
4.770%
1.500 %
95.710%
Total Overhead and Fringe 186.720%
COMMITTEE OF THE WHOLE
COMMITTEE REPORT
August 15, 2005
Annexation Policies and Strategies
Referred
APMOVED BY ?
Cif+' COMM
Date
The Committee of the Whole recommends concurrence in adoption of the following annexation policies
and strategies:
1. Council affirmed the Strategy in the 2006-2011 City Business Plan and Goals to "Promote
annexation where and when it is in the best interest of Renton."
2. The City should institute a fee for annexations to help cover administrative costs.
3. Develop a methodology to address levels of services (and proportionate staffing) through a review of
annexation growth during the annual budget process
4. The City should continue to work with the State Legislature to identify tools to reduce the negative
financial impacts of annexation
5. The City should continue the practice of requesting that the Boundary Review Board expand the
boundaries of petition -driven annexations
6. On the East Renton Plateau:
Incremental annexation of the area should continue at the adopted density and development
standards
• Staff should develop a strategy for annexation and provision of services to this area in the
most efficient and cost-effective manner
7. Incremental annexation of the Talbot Ridge/Springbrook Watershed areas should continue at the
adopted density and development standards, particularly in areas where the City owns park lands or
is the established provider of sewer service.
8. The City should work with the Boundary Review Board to expand the boundaries of the proposed
Maplewood Addition annexation to include the entire SR 169 Corridor, including Maplewood Ridge
Estates. At a minimum, the City should ask the Boundary Review Board to remove this area from the
proposed Fairwood incorporation.
9. The Council would like more information about the long-term fiscal impacts of annexing the West
Hill before any decisions are made about annexation or establishing this area as a new Potential
Annexation Area.
10. The Council would like more information about the long-term fiscal impacts of annexing the
Fairwood/Cascade area before any annexation of this area occurs. Staff should not actively promote
annexations east of the Benson Rd S/108t' Ave SE commercial area until the financial analysis is
complete.
Q4,x,46t �
Terri Briere, Puncil President
cc: Alex Pietsch
PUBLIC SAFETY COMMITTEE
COMMITTEE REPORT
August 15, 2005
APPROVE,—) BY �
City CC,IJWCiL
Date S-/5-boos
Valley Special Response Team Contract Addendum (CAG-03-080)
(Referred July 11, 2005)
The Public Safety Committee recommends concurrence in the staff recommendation to
approve an addendum to the Valley Special Response Team Interlocal Agreement for the
purpose of establishing a process that will assist the participating agencies in processing
and responding to claims and lawsuits.
The Committee further recommends that the Resolution authorizing the Mayor and City
Clerk to sign the addendum be presented for reading and adoption.
Denis W. Law, Chair
Pandyman(Vice-chair
---
Toni Nelson, Member
cc: Garry Anderson
CITY C1jACiL
FINANCE COMMITTEE
COMMITTEE REPORT Date % 02 OOS
August 15, 2005
FINANCIAL MANAGEMENT POLICIES
(Referred July 11, 2005)
The Finance Committee recommends concurrence in the staff recommendation to approve the
Financial Management Policies as presented, and to annually review the policies to identify
any needed changes. The Finance Committee further recommends that these policies be
included in the Mayor's proposed 2006 Annual Budget Document that will be presented to the
City Council at the end of October 2005.
Ix �6�
Don Persson, Chair
i
Toni Nelson, Vice air
' 1
Denis W. Law, Member
MWR1dlf
cc: Michael R. Wilson, Interim Finance & IS Administrator
Linda Parks, Fiscal Service Director
Bang Parkinson, Finance Analyst Supervisor
TRANSPORTATION/AVIATION COMMITTEE
COMMITTEE REPORT
August 15, 2005
AI"P,f^tFF1 BY
QTV G ;UN :iL
1
Date is coos
Cedar River Hangar Limited Partnership Hangar Building Reversion
(Referred July 11, 2005)
The Transportation/Aviation Committee recommends concurrence in the staff
recommendation to approve the reversion of Cedar River Hangar Limited Partnership's
hangar buildings to City ownership on September 1, 2005 and apply the City's monthly
hangar rental rates to the Cedar River Hangars.
arcie Palmer, Chair
ITA
Don Persson, Vice -Chair
Dan Clawson, Substitute Member
cc: Connie Brundage
Susan Campbell -Rehr
Kathie Nye
H:File Sys/Air/Projects/Tasks/Agenda Bills/Committee Report for Cedar River Hangar Limited Partnership Building Reversion. doe
C 1! 001 11 ���
CITY OF RENTON, WASHINGTON
RESOLUTION NO. 3i
A RESOLUTION OF THE CITY OF RENTON, WASHINGTON,
AUTHORIZING THE MAYOR AND CITY CLERK TO EXECUTE THE
FAA'S AIRPORT IMPROVEMENT PROGRAM (AI') GRANT
APPLICATION AND ACCEPTANCE DOCUMENTS TO HELP
IMPLEMENT THE AIRPORT LAYOUT PLAN AND UPDATE OF THE
AIRPORT BASE MAP, AND AUTHORIZING THE AIRPORT MANAGER
AS THE CITY'S OFFICIAL REPRESENTATIVE IN THIS MATTER.
WHEREAS, the Airport Layout Plan component of the 1997 Airport Master Plan needs
to be updated so that the City can continue to accept federal grant funds from the Federal
Aviation Administration for capital projects; and
WHEREAS, the Airport Layout Plan will also support the findings of the recently
completed Airport Development Study, and will identify the capital improvement projects and
other plans for the various uses of the airport; and
WHEREAS, the Airport's base map, completed in 1997, needs to be updated to reflect
the changes to utilities, buildings and Airport pavements; and
WHEREAS, the Federal Aviation Administration (FAA) has designated a $150,000
Airport Improvement Program (AIP) grant to the Renton Airport for this planning and mapping
project, which will assist the City in offsetting the cost of the project; and
WHEREAS, Ryan Zulauf is the Airport Manager for the City of Renton and is the official
representative of the City to act in connection with this application and to provide such additional
information as may be required;
NOW, THEREFORE, THE CITY COUNCIL OF THE CITY OF RENTON,
WASIHNGTON, DOES RESOLVE AS FOLLOWS:
1
RESOLUTION NO.
SECTION L The above findings are true and correct in all respects.
SECTION H. The City Council does hereby authorize the Mayor and City Clerk
to execute the FAA's AIP grant application and acceptance documents for the Airport Layout
Plan Project and the updating of the Airport's base map, and authorizes Airport Manager Ryan
Zulauf to act as the official representative of the City in connection with this application.
PASSED BY THE CITY COUNCIL this day of , 2005.
Bonnie I. Walton, City Clerk
APPROVED BY THE MAYOR this day of 2005.
Approved as to form:
Lawrence J. Warren, City Attorney
RES. 1 124:8/l/05: ma
Kathy Keolker-Wheeler, Mayor
2
CITY OF RENTON, WASHINGTON
RESOLUTION NO. 376,-
A RESOLUTION OF THE CITY OF RENTON, WASHINGTON,
SETTING A MINUMUM DAILY RATE FOR THE HOUSING OF JAH,
INMATES FROM OTHER KING COUNTY CITIES.
WHEREAS, Washington State Law RCW 70.48.090 allows for contracting between
governments for jail services and requires that contracts: a) be in writing; b) give responsibility
to the governing unit for the operations for the jail; c) specify responsibility of each governing
unit involved; and d) include applicable charges and a basis for adjustments; and
WHEREAS, certain King County cities ("Arresting Agency(ies)") that do not have their
own jail desire to directly book their detainees and arrestees into the City of Renton Jail; and
and
WHEREAS, the City of Renton Jail incurs expenses attendant to the housing of inmates;
WHEREAS, the City of Renton seeks to offset the expenses incurred by housing inmates
from other cities; and
WHEREAS, the City of Renton and any other King County City that wants to directly
book its inmates into the City of Renton Jail will enter into an Interlocal Agreement; and
WHEREAS, it is necessary to document the terms and conditions of Interlocai
Agreements between agencies;
NOW, THEREFORE, THE CITY COUNCIL OF THE CITY OF RENTON,
WASFUNGTON, DOES RESOLVE AS FOLLOWS:
SECgON L The above findings are true and correct in all respects.
SECTION II. A Minimum Daily Rate of $70.00 will be assessed on the Arresting
Agency.
P-65DU TIOA/
C ANGE NO.
SECTION III. The Mayor is authorized to sign the Interlocal Agreements and any
addenda thereto, providing for the housing of inmates of other King County cities.
PASSED BY THE CITY COUNCIL this day of , 2005.
Bonnie I. Walton, City Clerk
APPROVED BY THE MAYOR this day of .2005.
Approved as to form:
Lawrence J. Warren, City Attorney
Date of Publication:
RES. 1125:8/4/05:ma
Kathy Keolker-Wheeler, Mayor
2
CITY OF RENTON, WASHINGTON
RESOLUTION NO.3�
A RESOLUTION OF THE CITY OF RENTON, WASHINGTON,
AUTHORIZING THE MAYOR AND CITY CLERK TO ENTER INTO AN
INTERLOCAL COOPERATIVE AGREEMENT WITH THE
WASHINGTON STATE DEPARTMENT OF TRANSPORTATION
(WSDOT) ENTITLED "COMMUTE TRIP REDUCTION
IMPLEMENTATION AGREEMENT."
WHEREAS, the City of Renton, pursuant to the Commute Trip Reduction Act, is
required to develop and implement commute trip reduction plans; and
WHEREAS, the Legislature has appropriated funds to provide technical assistance
funding to the City; and
WHEREAS, the Washington State Department of Transportation (WSDOT), by law,
distributes these funds; and
WHEREAS, it is necessary to document the terms and conditions under which the
WSDOT will distribute commute trip reduction funds to the City;
NOW, THEREFORE, THE CITY COUNCIL OF THE CITY OF RENTON,
WASHINGTON, DOES RESOLVE AS FOLLOWS:
SECTION I. The above recitals are found to be true and correct in all respects.
SECTION II. The Mayor and City Clerk are hereby authorized to enter into an
interlocal cooperative agreement with WSDOT entitled "Commute Trip Reduction
Implementation Agreement" and later similar contracts that have the same general purpose, terms
and funding.
I
RESOLUTION NO.
PASSED BY THE CITY COUNCIL this day of , 2005.
Bonnie I. Walton, City Clerk
APPROVED BY THE MAYOR this day of
Approved as to form:
Lawrence J. Warren, City Attorney
RES. 1123:7/20/05:ma
Kathy Keolker-Wheeler, Mayor
2005.
2
CITY OF RENTON, WASHINGTON
RESOLUTION NO. 37G 7
A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF RENTON,
WASHINGTON, ADOPTING THE FEDERAL NATIONAL INCIDENT
MANAGEMENT SYSTEM (16NIMS") FOR THE CITY OF RENTON.
WHEREAS, the President in Homeland Security Directive (HSPD)-5, directed the
Secretary of the Department of Homeland Security to develop and administer a National
Incident Management System. (NIMS), which would provide a consistent nationwide
approach for federal, state, local, and tribal governments to work together more
effectively and efficiently to prevent, prepare for, respond to and recover from domestic
incidents, regardless of cause, size or complexity; and
WHEREAS, the collective input and guidance from all federal, state, local, and tribal
homeland security partners has been, and will continue to be, vital to the development,
effective implementation and utilization of a comprehensive NIMS; and
WHEREAS, it is necessary and desirable that all federal, state, local and tribal
emergency agencies and personnel coordinate their efforts to effectively and efficiently
provide the highest levels of incident management; and
WHEREAS, to facilitate the most efficient and effective incident management it is
critical that federal, state, local, and tribal organizations utilize standardized terminology,
standardized organizational structures, interoperable communications, consolidated action plans,
unified command structures, uniform personnel qualification standards, uniform standards for
planning, training, and exercising, comprehensive resource management, and designated incident
facilities during emergencies or disasters; and
RESOLUTION NO.
WHEREAS, NIMS establishes a federally recognized standard incident management
processes, protocols, and procedures that all responders — federal, state, tribal, and local — will
use to coordinate and conduct response actions; and
WHEREAS, the NIMS standardized procedures for managing personnel,
communications, facilities and resources will improve the State's ability to utilize federal
funding to enhance local and state agency readiness, maintain first responder safety,
and streamline incident management processes; and
WHEREAS, the Incident Command System components of NIMS are already an
integral part of various incident management activities throughout the State, including
current emergency management training programs; and
WHEREAS, responders using the same standardized procedures will all share a
common focus and will be able to place full emphasis on incident management when an incident
occurs, whether it is terrorism or a natural disaster. In addition, national preparedness and
readiness in responding to and recovering from an incident are enhanced since all of the nation's
emergency teams and authorities are using a common language and set procedures; and
WHEREAS, the National Commission on Terrorist Attacks (9-11 Commission)
recommended adoption of a standardized Incident Command System; and
WHEREAS, Homeland Security Presidential Directive-5 states that NIMS must be
adopted by state and local organizations as a condition for federal preparedness assistance after
October I, 2005;
NOW, THEREFORE, THE CITY COUNCIL OF THE CITY OF RENTON,
WASHINGTON, DOES RESOLVE AS FOLLOWS:
SECTION L The above findings are true and correct in all respects.
2
RESOLUTION NO.
SECTION II. The City Council hereby adopts the National Incident Management
System ("NIMS"), which shall be utilized for all incident management in the City.
SECTION III. The City of Renton shall incorporate NIMS into the City of Renton
Emergency Operations Plan.
PASSED BY THE CITY COUNCIL this day of , 2005.
Bonnie I. Walton, City Clerk
APPROVED BY THE MAYOR this day of , 2005.
Approved as to form:
Lawrence J. Warren, City Attorney
RES. 1126:8/5/05:ma
Kathy Keolker-Wheeler, Mayor
3
CITY OF RENTON, WASHINGTON
RESOLUTION NO. 07 %/60'
A RESOLUTION OF THE CITY OF RENTON, WASHINGTON,
AUTHORIZING THE MAYOR AND CITY CLERK TO ENTER INTO AN
ADDENDUM TO THE INTERLOCAL COOPERATIVE AGREEMENT
FOR THE VALLEY SPECIAL RESPONSE TEAM, REGARDING THE
PROCESSING OF CLAIMS.
WHEREAS, in 2003 the cities of Renton, Auburn, Kent, Tukwila, Federal Way, and the
Port of Seattle entered into an interlocal cooperative agreement ("Agreement") for the creation of
the Valley Special Response Team; and
WHEREAS, an addendum to the Agreement has been developed ("Addendum One"),
which will establish a process to assist the participating agencies of the Valley Special Response
Team in processing and responding to claims and lawsuits; and
WHEREAS, it is necessary to document the terms and conditions under which the
Valley Special Response Team will operate;
NOW, THEREFORE, THE CITY COUNCIL OF THE CITY OF RENTON,
WASHINGTON, DOES RESOLVE AS FOLLOWS:
SECTION I. The above findings are true and correct in all respects.
SECTION II. The Mayor and City Clerk are hereby authorized to execute
Addendum One to the interlocal cooperative agreement of the Valley Special Response Team.
1
RESOLUTION NO.
PASSED BY THE CITY COUNCIL this day of 12005.
Bonnie I. Walton, City Clerk
APPROVED BY THE MAYOR this day of , 2005.
Approved as to form:
Lawrence J. Warren, City Attorney
RES: 1128:8/8/05:ma
Kathy Keolker-Wheeler, Mayor
2