Press Alt + R to read the document text or Alt + P to download or print.
This document contains no pages.
HomeMy WebLinkAboutCouncil 06/20/2005AGENDA
RENTON CITY COUNCIL
*REVISED*
REGULAR MEETING
June 20, 2005
Monday, 7:30 p.m.
1. CALL TO ORDER AND PLEDGE OF ALLEGIANCE
2. ROLL CALL
3. SPECIAL PRESENTATION:
Survey Results on the Effectiveness of the Ahead of the Curve Campaign
4. PUBLIC HEARINGS:
a. Sewer moratorium for sewer service to new subdivisions outside City limits on the East Renton
Plateau
b. Proposed Wedgewood Lane Annexation and zoning requirement for 35.68 acres located east of
144th Ave. SE (Jericho Ave. NE), if extended, and west of 148th Ave. SE (Nile Ave. NE)
5. ADMINISTRATIVE REPORT
6. AUDIENCE COMMENT (Speakers must sign up prior to the Council meeting. Each speaker is
allowed five minutes. The comment period will be limited to one-half hour. The second audience
comment period later on in the agenda is unlimited in duration.)
When you are recognized by the Presiding Officer, please walk to the podium and state your name
and address for the record, SPELLING YOUR LAST NAME.
7. CONSENT AGENDA *(item removed)*
The following items are distributed to Councilmembers in advance for study and review, and the
recommended actions will be accepted in a single motion. Any item may be removed for further
discussion if requested by a Councilmember.
a. Approval of Council meeting minutes of June 13, 2005. Council concur.
b. City Clerk reports bid opening on 6/14/2005 for CAG-05-078, S. 4th St. and Burnett Ave. S.
Traffic Improvements; three bids; engineer's estimate $172,165.95; and submits staff
recommendation to award the contract to the low bidder, Valley Electric Co., in the amount of
$178,085.30. Council concur.
c. Human Resources and Risk Management Department recommends the following:
reorganization, title changes, and salary adjustments for two positions in the Housing Repair
Division; salary adjustment for the Police Manager position; and title change and salary
adjustment for the Civil Engineer III position in the Utilities Division. Refer to Finance
Committee.
d. Transportation Systems Division submits the annual update of the Six -Year Transportation
Improvement Program (TIP) and the Arterial Street Plan. Refer to Transportation (Aviation)
Committee; set a public hearing on 7/11/2005 to consider the TIP.
e. Transportation Systems Division requests approval of an Airport sublease from AirO, Inc. to
Worldwind Helicopters, Inc., and approval of an operating permit and agreement with
WorldWind Helicopters, Inc. Refer to Transportation (Aviation) Committee.
f. Transportation Systems Division requests approval of an Airport sublease from AirO, Inc. to
Aero-Copters, Inc., and approval of an operating permit and agreement with Aero-Copters, Inc.
Refer to Transportation (Aviation) Committee.
(CONTINUED ON REVERSE SIDE)
g. Utility Systems Division recommends approval of a concurrence letter with Washington State
Department of Transportation for the proposed Johns Creek Outfall storm water system. Refer to
Utilities Committee.
8. CORRESPONDENCE
E-mail from Diane McClaine, 23402 SE 217th Pl., Maple Valley, 98038, expressing concern
regarding the lack of parking at Gene Coulon Memorial Beach Park for those who have signed up to
take a class at the park. She suggested reserving parking spaces for class attendees or allowing class
attendees to park in the boat launch parking area.
9. UNFINISHED BUSINESS
10. RESOLUTIONS AND ORDINANCES
Ordinances for first reading:
a. Approving the Wedgewood Lane Annexation (see 4.b.)
b. Approving R-4 zoning for the Wedgewood Lane Annexation (see 4.b.)
Ordinance for second and final reading:
2005 Budget amendment (lst reading 6/13/2005)
11. NEW BUSINESS (Includes Council Committee agenda topics; call 425-430-6512 for recorded
information.)
12. AUDIENCE COMMENT
13. ADJOURNMENT
COMMITTEE OF THE WHOLE
AGENDA
(Preceding Council Meeting)
CANCELLED
• Hearing assistance devices for use in the Council Chambers are available upon request to the City Clerk •
CITY COUNCIL MEETINGS ARE TELEVISED LIVE ON GOVERNMENT ACCESS CHANNEL 21 AND ARE RE-CABLECAST
TUES. & THURS. AT 11:00 AM & 9:00 PM, WED. & FRI. AT 9:00 AM & 7:00 PM AND SAT. & SUN. AT 1:00 PM & 9:00 PM
RENTON CITY COUNCIL
Regular Meeting
June 20, 2005
Council Chambers
Monday, 7:30 p.m.
MINUTES Renton City Hall
CALL TO ORDER
Mayor Kathy Keolker-Wheeler called the meeting of the Renton City Council
to order and led the Pledge of Allegiance to the flag.
ROLL CALL OF
TERRI BRIERE, Council President; DENIS LAW; DAN CLAWSON; TONI
COUNCILMEMBERS
NELSON; RANDY CORMAN; DON PERSSON; MARCIE PALMER.
CITY STAFF IN
KATHY KEOLKER-WHEELER, Mayor; JAY COVINGTON, Chief
ATTENDANCE
Administrative Officer; ZANETTA FONTES, Assistant City Attorney;
BONNIE WALTON, City Clerk; GREGG ZIMMERMAN,
Planning/Building/Public Works Administrator; DAVE CHRISTENSEN,
Utility Engineering Supervisor; ALEX PIETSCH, Economic Development
Administrator; DON ERICKSON, Senior Planner; COMMANDER KENT
CURRY, Police Department.
SPECIAL PRESENTATION Alex Pietsch, Economic Development Administrator, explained that in 1998 the
EDNSP: Business Leaders City partnered with the Greater Renton Chamber of Commerce, Valley Medical
Views of Renton Survey Center, Renton Technical College, and the Renton School District to combine
resources and collectively market the Renton community. The partnership
resulted in the development of the "Ahead of the Curve" brand, and Renton was
one of the first cities in the nation to brand its community in this manner. Mr.
Pietsch reported that the Renton Community Marketing Campaign Committee
hired Elway Research, Inc. to conduct a survey to assess whether the "Ahead of
the Curve" branding played a role in the economic expansion of the City.
Mr. Pietsch introduced Stuart Elway who reported on the findings of the
Business Leaders' Views of Renton survey. He stated that a telephone survey
was conducted of business operators of 157 businesses located between
Mukilteo and Federal Way. Mr. Elway reviewed the survey questions and
results, which related to business location, business relocation, community
requirements and amenities, familiarity with Renton, Renton's strong points and
drawbacks, and the "Ahead of the Curve" slogan. Mr. Elway summarized that
the survey showed recognition of Renton as a changing and growing city, and
that the marketing campaign is having the intended effect.
Mr. Pietsch stated that the marketing committee will review the survey results,
and the data will be used to formulate future marketing campaign strategies.
He noted that some of the businesses expressed interest in being contacted in
the future to discuss the potential of locating to Renton.
Councilman Corman said he was impressed with the number of people who
have heard of Renton's slogan. Mayor Keolker-Wheeler expressed her pleasure
with the number of people who have visited Renton within the last year.
PUBLIC HEARINGS This being the date set and proper notices having been posted and published in
Utility: Sewer Moratorium in accordance with local and State laws, Mayor Keolker-Wheeler opened the
East Renton Plateau PAA public hearing to consider the six-month moratorium on sewer availabilities for
new subdivisions within the East Renton Plateau potential annexation area.
June 20, 2005 Renton City Council Minutes Page 222
Dave Christensen, Utility Engineering Supervisor, reviewed ordinances relating
to the provision of sewer service outside the City limits. He pointed out that
Ordinance 5123, adopted in January 2005, allows sewer availabilities for new
subdivisions conditioned upon development meeting Renton's basic zoning and
land use criteria.
Mr. Christensen noted the receipt of a letter in May from the Citizens' Alliance
for a Responsible Evendell (CARE), in which concern was expressed regarding
Renton's issuance of sewer availabilities that cover only the core development
standards. He noted CARE's belief that the City's development requirements
would have a negative effect on the group's effort to gather support for an
annexation.
Continuing, Mr. Christensen stated that the resolution establishing the
moratorium was adopted on June 6th. He reported that the City has received
three complete applications for sewer availability outside the City limits since
the adoption of Ordinance 5123 in January. Two of the subdivision projects
have received sewer availability certificates, and the third project, which was
submitted on June 2nd, is currently under review.
Public comment was invited.
Correspondence was read from Theresa M. Brehmer, Land Acquisition
Manager for Bennett Development, Inc., 12011 NE 1st St., Suite 201, Bellevue,
98005, stating that while she supports CARE's annexation effort, she is
concerned about how the moratorium will affect Bennett Development's
subdivision development located within the East Renton Plateau area. Noting
that a majority of the annexation process is achievable within the six-month
moratorium period, Ms. Brehmer asked that the City not extend the moratorium
unless a formal submittal has been given to the Boundary Review Board by the
beginning of October 2005.
Correspondence was read from Tom Carpenter, 15006 SE 139th Pl., Renton,
98059, expressing support for the moratorium. Noting that the moratorium is
linked to an annexation effort, he stressed that the annexation decision,
regardless of the outcome, will have a profound impact on the qualify of life in
the East Renton Plateau area. Mr. Carpenter urged the City to add its voice
with King County and the State to address the issue of quality of life in urban
growth areas such as this.
Theresa M. Brehmer, Land Acquisition Manager for Bennett Development,
Inc., 12011 NE 1st St., Suite 201, Bellevue, 98005, stated that Bennett
Development is in the process of developing property within the subject area,
and she expressed her hope that CARE will expedite its annexation effort and
that the moratorium will not be unduly extended.
Garrett Huffman, 335 116th Ave. SE, Bellevue, 98004, speaking on behalf of
the Master Builders Association of King and Snohomish Counties, questioned
how the City can implement a sewer moratorium if the City is not experiencing
a sewer capacity issue. Noting that the Master Builders Association has
appealed other jurisdiction's decisions relating to actions in their annexation
areas to Superior Courts, Mr. Huffman stated that the association wants to
further discuss the moratorium with the City Attorney.
June 20, 2005 Renton City Council Minutes Page 223
Discussion ensued regarding a future discussion of the matter by the City's and
the association's legal counsel, and the timing of the annexation effort, the
moratorium, and a potential court challenge.
There being no further public comment, it was MOVED BY CLAWSON,
SECONDED BY CORMAN, COUNCIL CLOSE THE PUBLIC HEARING.
CARRIED.
Annexation: Wedgewood This being the date set and proper notices having been posted and published in
Lane, 144th Ave SE & 148th accordance with local and State laws, Mayor Keolker-Wheeler opened the
Ave SE public hearing to consider the proposed annexation and R-4 zoning of property
that abuts Renton on its west; and is bounded on the north by SE 114th St., if
extended; on the south by approximately SE 121st St., if extended; and on the
east, south of SE 117th St. by Honey Creek, and north of SE 117th St. by 148th
Ave. SE (Wedgewood Lane).
Don Erickson, Senior Planner, reported that this is the second of two public
hearings on the matter, and the Boundary Review Board approved the proposed
annexation on 5/17/2005. He noted that the site consists of approximately
35.68 acres, and contains 25 single-family dwellings. He described the
topography of the site, which slopes downward from the northwest and
northeast corners towards Honey Creek at a ten to fifteen percent slope.
Reviewing the public services, Mr. Erickson indicated that Fire District #10,
Water District #90, Renton sewer, and the Issaquah School District serve the
site.
Mr. Erickson reported that current King County zoning for the site is R-4 (four
dwelling units per gross acre), which is comparable to Renton's R-8 zoning.
The Renton Comprehensive Plan designates the site as Residential Low
Density, for which R-4 (four dwelling units per net acre) zoning is
recommended. He noted that R-4 zoning is consistent with the environmental
sensitivity of the area.
Continuing, Mr. Erickson reviewed the fiscal impact analysis, assuming a new
home value of $450,000 and a potential of 114 single-family homes at full
development. The City will realize a deficit of $434 at current development,
and a surplus of $30,902 at full development. The estimated one-time parks
acquisition and development cost is $74,030. Mr. Erickson concluded that the
proposed annexation serves the best interests and general welfare of the City,
and pointed out that new development will result in streets and stormwater
detention facilities built to City standards.
Public comment was invited.
Correspondence was read from Mark Engbaum and Renee Korsmo, 14522 SE
116th St., Renton, 98059, expressing support for the annexation and R-4
zoning. They noted that R4 zoning will help preserve the rural feel of the area.
There being no further public comment, it was MOVED BY CLAWSON,
SECONDED BY NELSON, COUNCIL CLOSE THE PUBLIC HEARING.
CARRIED.
June 20, 2005 Renton City Council Minutes Page 224
MOVED BY CLAWSON, SECONDED BY LAW, COUNCIL: SUPPORT
R-4 ZONING CONSISTENT WITH THE COMPREHENSIVE PLAN
RESIDENTIAL LOW DENSITY LAND USE DESIGNATION, ACCEPT THE
WEDGEWOOD LANE ANNEXATION, AND CONCURRENTLY IMPOSE
R4 ZONING ON THE NON -STREET PORTIONS OF THE ANNEXATION
SITE. CARRIED. (See page 226 for ordinances.)
ADMINISTRATIVE
Chief Administrative Officer Jay Covington reviewed a written administrative
REPORT
report summarizing the City's recent progress towards goals and work
programs adopted as part of its business plan for 2005 and beyond. Items noted
included:
• A community meeting to discuss the future Heather Downs Park will be
held on June 28th, 7:00 p.m., at the Highlands Community Center. On June
30th, an open house will be held at the future park site located on Union
Ave. NE between NE 3rd Ct. and NE 2nd Pl. from 6:30 p.m. to 8:00 p.m.
• The City's swimming beaches will be open for the season from June 25th
through September 5th, from 12:00 noon to 8:00 p.m.
• Conveniently rid your house, garage, and yard of unwanted junk during the
one -day -only Neighbor -to -Neighbor Curbside Cleanup on June 25th.
Solid Waste: Clean Sweep
Mayor Keolker-Wheeler pointed out that the one-time Neighbor to Neighbor
Renton Events
Curbside Cleanup is the last opportunity to participate in the Clean Sweep
Renton program events. Councilwoman Palmer noted the participation of the
Kennydale Neighborhood Association in the Neighborhood Association
Cleanup event over the weekend.
AUDIENCE COMMENT
David Main, 40305 302nd Ave. SE, Enumclaw, 98022, requested a hardship
Citizen Comment: Main -
exemption from the moratorium on new development in the Highlands Sub -
Highlands Sub -Area Plan
Area Plan study area. He explained that he submitted an application to replace
Study Area Moratorium,
a destroyed home located on Monroe Ave. NE with one single-family dwelling
Exemption Request
and was informed that he is unable to proceed with the project until the
moratorium ends. Mr. Main pointed out that the plat has covenants attached
that precludes any lot in the subdivision from being smaller than 6,000 square
feet and narrower than 60 feet.
Mr. Mann stated that the purpose of the moratorium is to review the area for
possible density increases. He indicated that if it were not for the covenants
recorded on the plat, two or three properties would be allowed on the site per
current Renton zoning. Noting the economic hardship of not being able to
develop his property, Mr. Mann suggested amending the moratorium to allow
for hardship exemptions.
Gregg Zimmerman, Planning/Building/Public Works Administrator, stated that
this situation seems to be an unintended consequence of the City's moratorium
action. The moratorium was implemented to prevent subdivisions and activities
in the R-10 zoned areas while the City reviews policies and new development
standards. He explained that the moratorium provision that does not allow the
issuance of building permits was mainly for those particular types of vested
subdivisions. Mr. Zimmerman suggested that the matter be reviewed
Alex Pietsch, Economic Development Administrator, stated that when the
moratorium was invoked, he was unaware of the covenants underlying the
June 20, 2005 Renton City Council Minutes Page 225
subject subdivision. Noting the possibility of downzoning the subdivision to R-
8 to better match the underlying covenants, Mr. Pietsch agreed that the matter
should be reviewed.
The Mayor noted that the covenants may be in conflict with the Growth
Management Act.
MOVED BY PERSSON, SECONDED BY LAW, COUNCIL REFER THIS
MATTER TO THE ADMINISTRATION. CARRIED.
On another subject, Mr. Main complemented the City on its vision, pointing out
that he intends to move back to Renton within the next five years.
Citizen Comment: Huffman -
Garrett Huffman, Master Builders Association of King and Snohomish
Highlands Sub -Area Plan
Counties, 335 116th Ave. SE, Bellevue, 98004, expressed support for the City's
Study Area Moratorium,
review of Mr. Main's exemption request from the Highlands area moratorium.
Exemption Request
CONSENT AGENDA
Items on the consent agenda are adopted by one motion which follows the
listing.
Council Meeting Minutes of
Approval of Council meeting minutes of June 13, 2005. Council concur.
June 13, 2005
CAG: 05-078, S 4th St & City Clerk reported bid opening on 6/14/2005 for CAG-05-078, S. 4th St. and
Burnett Ave S Traffic Burnett Ave. S. Traffic Improvements; three bids, engineer's estimate
Improvements, Valley Electric $172,165.95; and submitted staff recommendation to award the contract to the
low bidder, Valley Electric Co., in the amount of $178,085.30. Council concur.
Human Resources: Salary Human Resources and Risk Management Department recommended the
Adjustments of Four Positions following: reorganization, title changes, and salary adjustments of two
positions in the Housing Repair Division; salary adjustment for the Police
Manager position; and title change and salary adjustment for the Civil Engineer
III position in the Utilities Division. Refer to Finance Committee.
Transportation: 2006-2011 TIP Transportation Systems Division submitted the annual update of the Six -Year
Transportation Improvement Program (TIP) and the Arterial Street Plan. Refer
to Transportation (Aviation) Committee; set a public hearing on 7/11/2005 to
consider the TIP.
Airport: WorldWind Transportation Systems Division requested approval of an airport sublease from
Helicopters Operating Permit AirO, Inc. to WorldWind Helicopters, Inc., and approval of an operating permit
& Sublease and agreement with WorldWind Helicopters, Inc. Refer to Transportation
(Aviation) Committee.
Airport: Aero-Copters Transportation Systems Division requested approval of an airport sublease from
Operating Permit and Sublease AirO, Inc. to Aero-Copters, Inc., and approval of an operating permit and
agreement with Aero-Copters, Inc. Refer to Transportation (Aviation)
Committee.
Utility: Johns Creek Outfall Utility Systems Division recommended approval of a concurrence letter with
Stormwater System Washington State Department of Transportation for the proposed Johns Creek
Concurrence, WSDOT Outfall stormwater system. Refer to Utilities Committee.
MOVED BY BRIERE, SECONDED BY NELSON, COUNCIL APPROVE
THE CONSENT AGENDA AS PRESENTED. CARRIED.
June 20, 2005 Renton City Council Minutes Page 226
CORRESPONDENCE Correspondence was read from Diane McClaine, 23402 SE 217th Pl., Maple
Citizen Comment: McClaine - Valley, 98038, expressing concern regarding the lack of parking at Gene
Gene Coulon Park, Lack of Coulon Memorial Beach Park for those who have signed up to take a class at
Parking for Class Attendance the park. She suggested reserving parking spaces for class attendees or
allowing class attendees to park in the boat launch parking area.
UNFINISHED BUSINESS
Public Safety Committee Chair Law presented a report regarding the race
Public Safety Committee
attendance ordinance. The Committee recommended concurrence in the staff
Police: Street Racing Event
recommendation to approve an amendment to City Code prohibiting attendance
Attendance Prohibition
at nighttime street racing events and criminalizing violations. The Committee
further recommended that the ordinance regarding this matter be presented for
adoption. MOVED BY LAW, SECONDED BY CORMAN, COUNCIL
CONCUR IN THE COMMITTEE REPORT.*
Expressing concern that the language in the ordinance is overbroad,
Councilman Clawson noted that a person who happens to be in the area of a
street race may unintentionally observe the event. He recommended language
such as "an intent to be in the area for the purpose of observing the race."
Councilman Corman stated his appreciation for Councilman Clawson's concern,
and encouraged him to review the ordinance. Zanetta Fontes, Assistance City
Attorney, pointed out that the ordinance states: "It is unlawful for any person
to enter or remain in a designated 'No Racing Zone'... if... 2) (S)he intends to
observe, support, or encourage the unlawful race event." Ms. Fontes stated that
the language was included in an effort to avoid the situation that Mr. Clawson
referred to, the accidental observation of a race event.
Discussion ensued regarding the ordinance language. Mayor Keolker-Wheeler
pointed out that the matter before Council is the Committee report, and the
ordinance has not yet been scheduled for first reading. She suggested that Mr.
Clawson pursue his concerns about the ordinance language with the City
Attorney.
*MOTION CARRIED.
RESOLUTIONS AND The following ordinances were presented for first reading and referred to the
ORDINANCES Council meeting of 6/27/2005 for second and final reading:
Annexation: Wedgewood An ordinance was read annexing approximately 35.68 acres located east of
Lane, 144th Ave SE & 148th 144th Ave. SE (Jericho Ave. NE), if extended, and west of 148th Ave. SE (Nile
Ave SE Ave. NE), north of SE 117th St., and west of Honey Creek, south of SE 117th
St., if extended (Wedgewood Lane Annexation). MOVED BY CLAWSON,
SECONDED BY BRIERE, COUNCIL REFER THE ORDINANCE FOR
SECOND AND FINAL READING ON 6/27/2005. CARRIED.
Annexation: Wedgewood An ordinance was read establishing the zoning classification of property
Lane, R-4 Zoning annexed within the City of Renton located east of 144th Ave. SE (Jericho Ave.
NE), if extended, and west of 148th Ave. SE (Nile Ave. NE), north of SE 117th
St., and west of Honey Creek, south of SE 117th St., if extended, from R-4
(Urban Residential - four dwelling units per acre; King County zoning) to R-4
(Residential - four dwelling units per acre) zoning; Wedgewood Lane
Annexation. MOVED BY CLAWSON, SECONDED BY BRIERE, COUNCIL
REFER THE ORDINANCE FOR SECOND AND FINAL READING ON
6/27/2005. CARRIED.
The following ordinance was presented for second and final reading and
adoption:
June 20, 2005 Renton City Council Minutes Page 227
Ordinance #5146 An ordinance was read amending Ordinance 5110 relating to the City of Renton
Budget: 2005 Amendment 2005 Budget, increasing the 2005 Budget to $177,386,415. MOVED BY
(Carry Forward & Additional LAW, SECONDED BY BRIERE, COUNCIL ADOPT THE ORDINANCE AS
Appropriations) READ. ROLL CALL: ALL AYES. CARRIED.
NEW BUSINESS
MOVED BY PERSSON, SECONDED BY CORMAN, COUNCIL REFER
Budget: 2005 First Quarter
THE 2005 FIRST QUARTER BUDGET STATUS REPORT TO THE
Status Report
FINANCE COMMITTEE. CARRIED.
EXECUTIVE SESSION
MOVED BY BRIERE, SECONDED BY CORMAN, COUNCIL RECESS
AND ADJOURNMENT
INTO EXECUTIVE SESSION FOR APPROXIMATELY 20 MINUTES TO
DISCUSS LITIGATION WITH NO OFFICIAL ACTION TO BE TAKEN
AND THAT THE COUNCIL MEETING BE ADJOURNED WHEN THE
EXECUTIVE SESSION IS ADJOURNED. CARRIED. Time: 8:57 p.m.
Executive session was conducted. There was no action taken. The executive
session and the Council meeting adjourned at 9:21 p.m.
Bonnie I. Walton, CMC, City Clerk
Recorder: Michele Neumann
June 20, 2005
RENTON CITY COUNCIL COMMITTEE MEETING CALENDAR
Office of the City Clerk
COUNCIL COMMITTEE MEETINGS SCHEDULED AT CITY COUNCIL MEETING
June 20, 2005
COMMITTEEXHAIRMAN DATE/TIME AGENDA
COMMITTEE OF THE WHOLE
(Briere)
COMMUNITY SERVICES
(Nelson)
FINANCE
(Persson)
PLANNING & DEVELOPMENT
(Clawson)
PUBLIC SAFETY
(Law)
MON., 6/27 Prosperity Partnership Regional Economic
6:30 p.m. Strategy
MON., 6/27 CANCELLED
MON., 6/27 Vouchers;
5:00 p.m. 2005 Group Health Cooperative Medical
Coverage Contracts;
Position Reorganization and
Reclassifications through June 2005;
First Quarter Budget Status Report
THURS., 6/23
2:00 p.m.
TRANSPORTATION (AVIATION) THURS., 6/23
(Palmer) 2:30 p.m.
UTILITIES
(Corman)
Multi -Family Housing Property Tax
Exemption Amendments
Airport Development Study;
I-405 Funding (briefing only)
NOTE: Committee of the Whole meetings are held in the Council Chambers unless otherwise noted. All other committee meetings are held in the Council
Conference Room unless otherwise noted.
N
0
r 00
r
Ln Lr) Lf) M
W O O O
rn U U o O
c"j U
O c
0
a c � m
d N U d
0 O
a
3
9
O
w
G
O
T
V
i11
Z
O
a
n
Q
O
N�N
�f
O
o
-�
O
p'
O
O
O
O
d
0
M
�
1
cD
CD
o
( tD
O
ffl
CD
A
CD
C
C�
O
CCD
N
Q
C
O
7
z
N
;Ai
a
�
O
J
N
Q
L•iJ
O
o<
O
c
CYI
C
EZ m�
C) D
00
+ Cn CD
Q-
CD
D Z
Z
O
CJ1
(D
v o
C) 00
Z
C
3
cr
MT
h
m
a
0
N
a
O
= O N +
O V W r N
U
O
J
4-1
m N
V
� � o
i N
^�
W
0
0
CD
qrl
Y_
A J
Y Y
J
> Z Z 0
0
Q
A
m
A A
�
cD
o
Z n
O
a
D)
C'
a
N A
O
c
n
N
c
m
n
d cc
C
C7
CD
-i
O
-1
tAll
O
J
c
y
O
7
70
O
n
C
O
'a
0
0
O
o
N 0
cZD
'
2
O
O
CDsu
Acu
-
-
w'
0 .�
.�
CD
N
7
7
)
rt
o
o
C
n
V
fit
N
�
rn
N
to
rt
N
a
o
a
C
O
o
d
A
N
p
rt
JN.
O
N
^
o
Q
o
J
(n
ZGo
O
<
to
0
Co
o
0,
0
c
"e
N
Ao
N
Oo
0
m
O Z Z <
M 0 m
r <
x M r
A
D
n
0
fD
n
C
t
0
m
OD
�
O
p
°
i
pf
n'
N
O
z
3
O
�
N
�
-
�
N
r
3
. �
=
z
d�
o
�
-
o
jR
m
V
>
M
A
N
low.°
O
�
N
4.
O
r
�
o
0
q
u'
K
E
d
O
�'
O
2
LL
U
fn
F-
v
>
= CY
Q
>.
o
'
c
�
C3
z
v
aCL(D
c ~
O
Q
o
C1
o
a
c
p
L)
y
p
c
�
a �
1-10
O
at
04
N
0
N
0
�
r
o
E
To
N
O
lC
r
�
tD
J
J
Vj
C
C
d
e-
M
0
a
0
N
n
0
0
1
vi
c
3
c
o
'<
z
m
G) ^
°o
a
�
O
a
O
a
�°
K
r
n
0
_
a
O
K
-i
0
O
3
O
z
f0
o
M
F
0
0
W
C
O
CL
C
D
d
_
9
CD
N
CI
a
O
A
o
O
D
J
A
0
J
c
`
M
N
O
r+
O
r�
Yl
r+
Mg
O
0.
r+
E
�m
i N
3
O
C
cn^
l/
<
M
O
�
C
1
<
O
K
�
m
3
O
y
�;
^^
\ /
O
7
7
K
m
0
eYM.
a
W
O
Q
Ul
Q
O
Q
O
co
e
Q
p�
Q
O
8
Renton - Ahead of the Curve 2005 12
Renton's Drawbacks
Traffic I Commute
35%
Already Well Located
Not Mainstream t Out of Loop
15%
Location
No Need for Our Type of Biz
Via%
Too Far for Employees
S%
Negative Image
5%;
Theft
3%
Labor I Business Costs
3%
Nothing
T*fo.
Don't Know
70�a
016
EllLRY RESERRCH.IMC.
Renton -Ahead of the Curve 2005 13
Rating Renton
Excellent - 6-9 Neutral 1-4 Poor
Regional Medical Facility
6%
34%
Competitive Taxes/Fees
6%
58°io
Well -Run Government
5%
59%
Affordable Housing
496
29%
Quality of Life
3°10
!^`'e- as°io
Good Public Schools
3%
Nearby Training
296
`'' 41o%
Quality Amenities
2%
h;'rr�. 42%
017 ELWRY REEERRCN INC.
D
P
c
0 CD
0
m o
a N
0o o n�i C om, a c
N O Z m < U. Ni CD
fD O' (D N O'
I CL D _W
Q N ,. A O N CD
,. N O
n' L " A L j L. CDN L
F. 0A
D 1
o `: u,' v o c c m 3 1
3 3 Gl O O. C O » O v 7 0 3
N N N N CO 00 O O
0 0 0 0-0- N 0 \ e
o O
N
0
A
0
0
i
D
7
Z
ID
p
O
d
a
M
c
�
o
n
Tj
an d
m
w
o
c 00
d m o
^'
iY m
F+
N
O
'� N
7
C
O
Tom•
ryrA
3
3
o c
N a
a
n
a
N
m
7
.Z)
3 c
`D
rCD <
(O
n
N
N
U3
.Oi
!D N fD
o
HN
a
O
o�
r f
A
0
aJ
iA
N
Ul
A
n
m
N
J
L
m
J
3
rt
O
A
Renton - Ahead of the Curve 2005
Heard From
010
Renton - Ahead of the Curve 2005
Source of Info About Renton
=37
Radio 41 %
Newspaper 24%
Word of Mouth 16%
Mail 11%
Magazine 5%
Television 3%
Fax I Email 3%
Don't Recall 11 %
Q10a
16
El
ELINnVRESERRMINC.
17
a
ELWRV RESERRCN.INC.
0
w
Q
0 N
O
C
-�
I
D
7
fD
3
'
-
Q
d
a a
7
CD
3
d
�
in
//����
n
0
(a
U)
<
N
aN
0
Ci
o
to<
<
:r
C
<
m
CD
0
0
n
o
C
o
G
<
V
3
0
N
�
o
�
N
V
o
�
'
■
a
N
F1
� S
2
w
0
0
Z-<
0 CD
to
O
4W
w=
W
ce
/cn
.i i
4W
V
_O
O
GC
O
N
M
CITY OF RENTON
JUN 2 1 2005
ECONOMIC DEVELOPMENT, RECEIVED
On
y
ti U a; �LERK�s oFF,cENEIGHBORHOODS, PLANNING DEPARTMENT
M E M O R A N D U M
DATE: June 14, 2005
TO: Terri Briere, Council President
Members of the Renton City Council
VIA: Kathy Keolker-Wheeler, Mayor -KW
FROM: Alex Pietsch, Administrator (x6592)144
SUBJECT: MARKETING CAMPAIGN BUSINESS LEADER
SURVEY
As you know, the Renton Community Marketing Campaign began in 1998 as a
partnership between the City of Renton, Greater Renton Chamber of Commerce, Renton
Technical College, Renton School District, and Valley Medical Center. Since that time,
these five agencies have pooled resources to market the community to the region. This
campaign created the "Ahead of the Curve" brand and has been nationally recognized for
its innovative approach.
One of the challenges of the Campaign is that we have not been able to specifically
measure our success. We know anecdotally that impressions of Renton have changed,
but we have never been able to measure it.
In 2005, the Marketing Campaign Committee used some of its resources to survey
business leaders in the Puget Sound area. The attached document summarizes the
findings of this survey. The results will be the basis of a special presentation at the
Council meetings June 20th. Additionally, staff has offered to the other four stakeholders
a similar presentation to their respective boards and leadership committees.
Attachment
cc: Jay Covington, Chief Administrative Officer
Department Administrators
Julie Brewer, Communications Manager
h:\ednsp\council\issue papers -agenda bills -me reports\2005\marketing survey memo.doc
RENTON
COMMUNITY MARKETING CAMPAIGN
Business Leaders'
VIEWS OF RENTON
May 2005
Et
ELWRV RESERRCH, INC.
RENTON
COMMUNITY MARKETING CAMPAIGN
Business Leaders'
VIEWS OF RENTON
May 2005
TABLE OF CONTENTS
1.
Introduction................................................................1
Methods..................................................................
2
Respondent Profile ................................................
3
Sources of Information..........................................3
2.
Key Findings...............................................................4
3.
Summary ....................................................................
7
Location Tendencies ..............................................
7
Important Community Attributes ...........................
8
Renton Awareness.................................................8
Impressions of Renton.........................................10
Possibility of Relocation.......................................12
4.
Discussion................................................................14
Summary: Potential Messages ...........................15
5.
Charts of Major Findings.........................................16
6.
Appendix...................................................................36
Questionnaire with Topline Data
Crosstabulation Tables
May 2005 R ELMYRESERRCH, INC.,
I RENTON COMMUNITY MARKETING CAMPAIGN 1
INTRODUCTION
This study was conducted by Elway Research for the Renton Community
Marketing Campaign, which consists of the City of Renton, the Greater
Renton Chamber of Commerce, the Renton School District, Renton
Technical College, the Renton Visitor's Connection, and Valley Medical
Center.
For the study, 157 business decision makers were interviewed by
telephone. They were all located in the central Puget Sound region,
between Mukilteo and Federal Way. As many of the largest businesses as
possible (in terms of number of employees) were contacted, with the final
sample consisting largely of companies of over 35 employees.
The main purpose of the study was to evaluate Renton's brand
recognition. Specifically, the survey sought to:
1) Measure the level of awareness of the Renton "Ahead of the Curve"
campaign;
2) Assess Renton's perceived strengths and weaknesses;
3) Determine whether businesses would consider moving to Renton;
4) Identify effective means of communicating with business leaders.
This narrative interpretation of findings is followed by charts of more
detailed survey results. A complete set of crosstabulation tables is
presented in the appendix, along with a copy of the questionnaire.
May2005 M ELwRvjzESERRCH,iNC.
RENTON COMMUNITY MARKETING CAMPAIGN__
METHODS
TECHNIQUE: Telephone survey of 157 businesses located
between Mukilteo and Federal Way. The actual
respondent within the company was identified as
being responsible for decisions regarding location.
Businesses of 50 or more employees were called
first, followed by those with 35 to 49 employees.
In order to obtain more responses, three
companies of 25 to 35 employees were included.
FIELD DATES: April 27th - May 6th, 2005
MARGIN OF ERROR: Since all businesses of the desired size were
contacted, a "margin of sampling error" is not
applicable. Not all firms are represented, though,
as many businesses 'do not take part in surveys.
There is no reason to believe, however, that those
who declined to participate would be
systematically different in their views toward
Renton than those who were surveyed.
DATA COLLECTION: Calls were made during weekdays. All interviews
were conducted by trained, professional
interviewers under supervision. Up to four
attempts were made to contact a business leader
at each number in the sample before a substitute
number was called. Each questionnaire was
checked and edited for completeness, and a
percentage of each interviewer's calls was re-
called for verification.
INCENTIVE: Respondents were offered $20 for participating,
to be donated to a charity of their choice. Their
names and addresses were collected after
completion of the survey and recorded separately.
It must be kept in mind that survey research cannot predict the future.
Although great care and rigorous methods were employed in the design,
execution and analysis of this survey, these results can be interpreted only
as representing the answers given by these respondents to these
questions at the time they were interviewed.
May 2005 CC ELWRV RESERRCN, Mr.
RENTON COMMUNITY MARKETING CAMPAIGN _ 3
RESPONDENT PROFILE
The survey respondents provide a "snap -shot" of the larger businesses in
the Puget Sound region (see Table 1):
• There were a fair number with over 150 (10%), and with 81 to 150
(28%) employees.
• More were inside the Seattle city limits than in any other region (41%).
The second most popular location was the Eastside (26%).
• Most were professional services (32%), wholesale/distributors (19%), or
consumer services (10%).
Note: Here and throughout this report, percentages may not add to 100%, due to
rounding.
NUMBER OF EMPLOYEES:
CURRENT LOCATION
TYPE OF BUSINESS
10%
Over 150
28%
81-150
36%
51-80
26%
Under 50
14%
N. King, S. Snohomish
41%
Seattle
26%
Eastside
19%
S. King
32%
Professional Services
19%
Wholesale / Distributing
10%
Consumer Services
8%
Construction
6%
Retail
5%
Non -Profit
3%
Media
3%
Manufacturing
14%
other
Sources of News and Information
Total
(157)
North
(17)
Seattle
(63)
Eastside
(40)
South
(34)
Puget Sound Business Journal
64
65
62
70
59
Seattle Times
41
41
41
53
26
Trade Publications/Associations
41
41
41
40
38
Seattle Post-Intelligencer
29
12
40
30
18
King County Journal
10
24
2
28
0
Internet
10
0
11
8
15
May 2005 Et ELWRV RESERRCH, INC.,
i RENTON COMMUNITY MARKETING CAMPAIGN 4
KEY FINDINGS
♦ General familiarity with Renton was high:
• Half (49%) had been to Renton within the past month.
• Many (24%) had heard something directly about doing business in
Renton. This was only slightly fewer than had heard from Bellevue
(29%).
• Almost half (43%) had heard the slogan "Renton: Ahead of the
Curve." This was even higher on the eastside (50%).
• When asked what "Renton: Ahead of the Curve" meant to them, most
correctly interpreted it as a mix of reference to the S-curves (27%),
being progressive/tech (22%) and/or changing/growing (17%).
♦ There were few negative opinions of Renton:
• When asked on their own what came to mind when they heard the
word "Renton," very few said something negative (under 9% each
saying "industrial/blue collar," "low-income," and the "traffic.")
• The most frequent response ("Boeing," by 36%) was neutral.
♦ There is opportunity to capture moving businesses - 45% said that
they are likely to move within the next five years. Over a quarter
(28%) had moved in the past five years.
♦ Moving to Renton specifically is a possibility for quite a few:
8% said that they were "very likely" to consider moving their business
to Renton.
• Another 20% said that it is possible.
♦ However, there is strong resistance to moving far from current
locations:
• From a list of reasons for locating a business read to the
respondents, two of the top five had to do with current proximity
("close to customers" was #1, "close to employees" was 4th, and
proximity to the respondent's own home 5th in importance.)
• "We're already well located" was the 2nd most frequently given
drawback to doing business in Renton (19%).
May 2005 Et ELWRYRESERRCH, mr.,
I RENTON COMMUNITY MARKETING CAMPAIGN 5
♦ Addressing the issues of Renton's traffic congestion perception and
selling ease of transportation are key:
From the list of reasons for locating a business read to the
respondents, two of the top four in importance dealt with efficient
transportation ("for freight/cargo" was 2nd and "for commuters" was
4th .)
• When asked in their own words what the biggest drawback would be
to being located in Renton, more businesses (35%) said something
about the traffic/commute than any other category.
• There is a base for improving this perception, as another 38%
brought up Renton's central location/accessibility/transportation as
advantages that the city could offer their business.
♦ Another opportunity is promoting Renton's "quality of life for
employees."
• Quality of life was the 2^d most important factor for locating
businesses (7.1 on average on a 10-point scale, from a pre-set list).
• However, perceptions of Renton's quality of life lag behind its
importance: The average rating of Renton's quality of life was 5.9,
with another 43% saying that they didn't know.
■ It cannot be known exactly how respondents define "quality of life";
however, "having good public schools" - arguably a component -
was one of the city's lowest ratings (an average 5.1 out of those
answering, with another half saying that they didn't know.)
♦ The local government can have a great impact on Renton's
desirability:
• "Competitive local business taxes and fees" and "a well -run local
government" were ranked numbers one and three in importance (8.1
and 7.0 on average, on the 1-10 scale.)
• More than half of all respondents (58% and 59%) said they didn't
know enough to rate Renton on these two important factors.
• Among those who did offer a rating for the city, the average scores
were 6.6 and 5.7, which were respectable, but not the city's highest.
♦ Another local attribute with good potential for marketing is the
affordable real estate.
• This was one of Renton's two most highly rated factors (6.7 on
average, on the 1-10- scale.) It was also the factor with the fewest
businesses saying that they "didn't know" (29%).
• This factor was also relatively important to the businesses (6.5 in
importance, or 4th out of eight on the list.)
May 2005 M EL WRV RESERRCH, INC,
I RENTON COMMUNITY MARKETING CAMPAIGN 6
♦ Some of what might have been perceived as Renton's strengths are
actually of lesser importance to these businesses:
• From the lists of reasons for locations read to them, respondents
rated proximity to Sea-Tac toward the bottom.
• "Having a regional medical center" was rated as one of Renton's top
two community attributes (an average 6.7 on the 10-point scale.)
And it was one of the two factors where the fewest respondents said
"don't know" (34%).
• However, having "a regional medical facility," and "a college nearby
that provides training and re-training," received two of the lowest
importance ratings (5.4 and 4.4).
♦ Focusing on the service industries may be most successful:
Across this group of businesses of mostly 35+ employees,
"professional services" was the dominant type (32%). Another 10%
were consumer services.
• "Professional services" (including health care, legal, financial and
marketing) was also the most prevalent category of business in the
group that would consider relocating to Renton (they comprised
36%).
♦ The Puget Sound Business Journal is a clear choice for reaching the
business leaders - 64% of all respondents said that they look to the
Journal for information pertaining to their business. The preference
for the Journal holds true over all of the geographic regions.
May 2005 EtELwgv REsERRCH, iw.,
I RENTON COMMUNITY MARKETING CAMPAIGN 7
SUMMARY
Toward the beginning of the survey, the respondents were asked if their
company would be likely to move in the next year or five years.
19% said that they would be likely to move within the year, and
45% are likely to move within five years.
Companies in no particular region or of any certain type were more likely to
think of moving than any other.
The business leaders were then read a list of reasons why people locate
their companies where they do and asked to rate each on a 0-10 scale:' -
Proximity (to customers and employees) was a factor in two out of four top
reasons. These included:
• "It is close to your customers" (rated "10" by 19%, and 6-9 by another
24%. )
• "Your business be close to your current employees" (14% and 52%).
Transportation infra -structure issues were also twice in the top four,
specifically:
. "There is efficient transportation for commuters" (14% and 52%).
. "There is efficient transportation for freight and cargo (15% and 36%).
The least important reasons, with only around a quarter or fewer giving
them ratings of "six" or over were the nearness of suppliers, Sea-Tac
Airport, and other, similar businesses. This is not surprising, given the
number of service companies included.
'Where "zero" meant "not at all important," and "10" meant "very important."
May 2005 a ELwRY RESEARCH, INC.,
I RENTON COMMUNITY MARKETING CAMPAIGN 8
IMPORTANT COMMUNITY ATTRIBUTES
When asked how important a list of variables about the community was in
their location decisions, issues of local government topped the list:
• More than a third (36%) rated "competitive local business taxes and
fees" a "10" on the one -to -ten scale, and another 51% rated it a six to
nine.
• Two of five (22%) rated "a well -run local government" a 10, and another
44% rated it six to nine.
Other variables were substantially less likely to be rated a 10, including
the "quality of life," having "affordable rents and real estate prices," and a
"nearby regional medical center." Each of these was given the highest
importance rating by only one in 10 (10% to 12%).
Least important were "good public schools," "quality amenities," and "a
college nearby that provides training and re-training for employees."
• Each of these was rated a "ten" by fewer than 10% (8%, 7%, and 4%,
respectively.)
• "Quality amenities, like restaurants, parks, and health clubs" did at least
get a six to nine rating from over half (53%) of businesses.
First hand knowledge was high:
Almost half (49%) had been to Renton within the past month including
29% who had been in the city within the past week. Only 15% had not
been to Renton in five years or more.
Business people from South King County were most likely to have been to
Renton in the past month:
76%, compared to
55% of Eastsiders,
38% of Seattle respondents, and
30% in the north end.
Direct Communication From / About Renton:
A quarter (24%) of these business people had heard something directly
about doing business in Renton. This included none of the 17 businesses
north of Seattle .
May 2005 Et ELWRV JZESERRCH, INC.,
RENTON COMMUNITY MARKETING CAMPAIGN
Those who had heard from Renton were most likely to say it was on the
radio (41% of those responding.) This computes to about 10% of all the
businesses hearing and having it been from radio.
The likelihood to have heard about doing business in Renton did not vary
across different sized businesses, but did vary by region somewhat:
Renton's saturation seems deepest in the Eastside (30% had heard).
Bellevue's numbers are driven up by the finding that 55% of Eastside
businesses said they had heard directly about doing business in Bellevue.
Bellevue's reach was lowest in the south (12%).
Renton "Top of Mind"
More than a third of respondents said that the first thing that comes to
mind when they think of Renton is "Boeing" (36%). This was over three
times as many as mentioned any other aspect of the city.
Encouragingly, few said anything negative. These included:
• "Industrial/blue collar" (8%),
• "Low income/trashy" (6%), and
• Something about the traffic or one-way streets (6%).
Some respondents (5%) did mention the "Ahead of the Curve" slogan
before being prompted.
"Renton - Ahead of the Curve:"
Almost half (43%) said that they had heard the slogan when asked directly.
Recall was highest on the Eastside, where
50% had heard the phrase, compared to
29% of businesses in the North End,
43% in Seattle, and
38% in South King County.
The meaning seemed to come across as intended:
• Business people said that the term made them think of the S-curves/
1-405 (27%), progressive/high tech connections (22%), and/or that
Renton is redefining/changing/growing (17%).
. Few had a negative reaction (8% said "marketing fluff.")
May 2005 a ELWRV RESERRCH, INC..
II RENTON COMMUNITY MARKETING CAMPAIGN 10
One of Renton's strongest points for businesses is clearly the central
location/ accessibility/transportation advantages. Nearly 4 in 10 (38%)
volunteered location when asked what Renton could offer a business like
theirs. This impression was strongest in the south (41%) and Eastside
(35%).
The next most common answer, "lower property prices," was significantly
lower at 16% (22% said "nothing.")
The biggest drawback seems to be the traffic/commute. More than a third
(35%) said, in their own words, that traffic would be the biggest drawback
for businesses such as theirs. This includes half (56%) of the South County
businesses; however, these data are based on only 34 respondents, so
are somewhat unreliable.
The next most common reply when asked about "drawbacks" was instead
a statement that they were "already well located" (19%).
Asked to rate Renton on a list of other specific factors, respondents rated
Renton as "good" (6-9 on the 0-10 scale) for:
• Affordable housing or real estate prices (62%).
• Having a regional medical facility (53%).
• Being near a college that provides training and re-training for employees
(31%).
For most of the other attributes, around half (42% to 59%) of the
businesses simply "didn't know" how to rate Renton.
There were few negative scores. However, one in five did give Renton
scores below a five on having "good public schools."
Fewer than 10% rated Renton "excellent" (10) for any of the attributes.
May 2005 EZELwRvRESERRCH, INC.,
RENTON COMMUNITY MARKETING CAMPAIGN 11
Ratings Compared to Importance
It is useful to compare respondent ratings of Renton on these factors with
the importance ratings they gave to those same factors:
Most useful are the items where Renton's rating did not quite match up to
the importance of the factor, indicating areas where improvements in the
city's reputation could make the most difference to businesses. These are:
• "Being competitive in terms of local business taxes and fees" (8.1 in
importance, vs. 6.6 performance rating); 2
• "Quality of life" (7.1 vs. 5.9); and
• "Having a well -run city government" (7.0 vs. 5.7)
• "Quality amenities, like restaurants, parks, health clubs" (6.2 vs. 5.5).
The best "matches" came for
• "Affordable rents or real estate prices" — Renton was given an average
6.7 on the 0-10 scale (a tie for the highest average rating) and the factor
was a 6.5 in importance
• "A quality public school system (5.1 and 5.2).
Renton's rating exceeded the importance ratings for the remaining two
factors:
• "Having a regional medical facility" (6.7 vs. 5.4); and
• "Being near a college that provides training and re-training of
employees" (5.7 vs. 5.4).
Awareness Varies by Area
The tendency to say that they "didn't know" Renton well enough to give
certain ratings varied by the location of the business (see Table 4):
The Seattle and Eastside businesses were the most likely to not know how
to rate Renton on "having competitive taxes and fees" (48% and 53%) and
local government (40% and 45%).
The northern businesses were particularly in the dark about Renton's
quality of life (29% said "don't know"), affordable real estate (35%) and
quality amenities (29%).
2 The averages are only among those who answered, omitting the extensive number who
said that they "don't know."
May 2005 CV ELIIIRV RESERRCH, INC.,
I RENTON COMMUNITY MARKETING CAMPAIGN _ 12
Table 4
Those Who "Didn't Know" About Top Attributes3
Total
(157)
North
(17)
Seattle
(63)
Eastside
(40)
South
(34)
Competitive taxes/fees
41
41
48
53
18
Quality of Life
17
29
21
10
15
Well -Run Government
35
41
40
45
15
Affordable rents/real estate
13
35
11
10
9
Quality Amenities
13
29
14
5
12
If they were to move their business:
• Almost one in ten (8% of all respondents) said that they were "very likely"
to consider Renton.
. Another 20% said "It is possible."
Interestingly, this finding did not vary geographically. For example, south
county businesses were essentially as likely to say they were very likely to
consider Renton (17%) as say "not at all likely" (21%). The only exception
was that none of the North End businesses said that they were "very likely
to move to Renton." However two (11%) of those in the North End did say
it was possible.
Possibility of Relocation by Business Profile
Some variation in likelihood to consider Renton can be seen when
considering business size and type (see Tables 5 and 6). The largest
businesses (81 employees or more) were more likely to consider Renton
than dismiss the possibility.
. Almost half (45%) of those who said that they would at least consider
Renton had over 80 employees. This compares to 32% of those who
said "not at all."
• Companies of 50 or under employees were more likely to say "not at all."
Although they comprise 26% of all the businesses, they account for 32%
of those who said "not at all" and only 20% of those who said it was
possible/very likely.
3 Only factors that were in the top four of importance overall are included on the table.
May 2005 Et ELWRYRESERITCN, INC.,
RENTON COMMUNITY MARKETING CAMPAIGN
Table 5
Likelihood of Relocation by Business Size
# of Employees
Likely to Consider Renton?
Total
(157)
Possible/Very4
(44)
Not Very
(50)
Not at All
(63)
50 and under
26%
20%
24%
32%
51-80
36%
34%
36%
37%
81+
38%
45%
40%
32%
Of those who would consider Renton:
36% are in professional services (financial, legal, health, etc.). This
compares to only
16% in the wholesale or distribution businesses; and
14% in consumer services.
Table 6
Likelihood of Relocation by Business Type
Type of Business
Likely to Consider Renton?
Possible/Very
(44)
Not Very
(50)
Not at All
(63)
Professional Services
36%
34%
27%
Wholesale/Distribution
16%
18%
22%
Consumer Services
14%
6%
10%
Construction
9%
6%
8%
Retail
5%
10%
5%
other
20%
26%
28%
4 "Very likely" (12 respondents) and "It is possible" responses were combined to give a more
reliably -sized group.
13
May 2005 C'C ELIURYRESERRM, IN[.,
I RENTON COMMUNITY MARKETING CAMPAIGN 14
DISCUSSION
It is encouraging that many businesses are familiar with Renton, have
heard the "Ahead of the Curve" slogan, and are interpreting the slogan
correctly. They harbor very few negative opinions of the city, but, on the
other hand, are unaware of some of its advantages.
Renton's location works for it and against it. It is thought to be "central" by
many, but others bemoan the commute. For many businesses, dependent
on a certain clientele and employee pool, it may never be feasible to move
far. However, enough companies are actively thinking of moving, and
enough would consider Renton to make fertile ground for more marketing.
The prevalence of service businesses (mainly professional services, but
including consumer services as well) should be kept in 'mind when
promoting the city. Not only are these the most prevalent types of
businesses in the area, but they are the most likely types to say they would
consider moving to Renton. Wholesale and distribution companies were
the second most prevalent overall, but none of these said that they were
"very likely" to consider the city.
There is a strong perception of traffic problems and congestion in Renton,
which should be addressed. Some attributes of the area, such as the
regional medical center, nearby technical college, and proximity to the
airport, do not seem to be of the highest importance to most businesses,
although they are seen as Renton strong points. Thus, the marketing
should probably lead with other points or connect these factors to more
pertinent decision points.
Aspects of local governance (including taxes and fees) are of great
importance, and are the types of factors which can be promoted or
explained. Half of the businesses know nothing of Renton's performance
on these important governance attributes, and thus there is great
opportunity for improvement.
There is a decent perception of Renton's real estate prices, a community
factor that is also relatively important to businesses. Still, most think
Renton only "good" on affordability, so improvement here is possible.
Finally, although knowledge of Renton did vary geographically, businesses
across the region were most likely to say that they read the Puget Sound
Business Journal. This provides an excellent vehicle for reaching the entire
central Puget Sound region with more clarification as to the advantages to
locating businesses in Renton.
May 2005 a ELWRYRESERRcH, INC.,
RENTON COMMUNITY MARKETING CAMPAIGN
Summary: Potential Messages
Several potential messages emerged from these interviews. Of course, the
marketing messages need to be a combination of what matters most to
the businesses and what the facts are regarding the advantages in
Renton. For example, whether or not Renton's government is more
"business friendly" than other cities, and in what ways, needs to be
established before a marketing campaign calling Renton "the most
business friendly" city government would be credible.
That being said, the themes with the greatest potential are:
. That Renton's government is "business friendly" in terms of fees, taxes,
permits, etc.
• The location is central for those drawing business from a broad
geographic region (central Puget Sound, including Seattle, the Eastside,
and Tacoma).
• A mixture of economics, promoting the customer base as being affluent
enough to support services, yet with real estate prices low enough to be
affordable to businesses and their employees.
• Whatever can be said to combat the impression of traffic congestion.
This may mean focusing on the highways and arterials that link Renton,
and take attention away from the "S Curves."
n
Charts of major findings are presented In the following section
May 2005 CC ELWRYRESERRCN, Mr.,
ENTON COMMUNITY MARKETING CAMPAIGN 16
Respondent Position with Company
Q1: What is your title?
Vice -President
President / Owner
Other Managers
Office Manager
CEO
CFO
Other Directors
May 2005 i ELl/wRvREsEmrm,mC:
' IRENTON COMMUNITY MARKETING CAMPAIGN
Description of Business
Q2: How many full-time or full-time equivalent employees to you have at this
location?
Number of Employees
■ Under 50
® 51-80
■ 81-150
■151+
Type of Business
Professional Services
Wholesale / Distribution
Consumer Services
Construction
Retail • '
Non-profit Agency '
Media Ir
Manufacturing
Other
17
May 2005 Et EL WRVRESERRCH,INC.
I[RENTON COMMUNITY MARKETING CAMPAIGN
18
Years at Current Location
?N,
Q5: The next couple of questions are about the location of your business. How long
have you been at your current location?
■ <5
® 6-10
■ 11-20
■ 20+
May 2005 EZ ELWRYRESERRrH,INC
IIRENTON COMMUNITY MARKETING CAMPAIGN
Likely to Relocate Business
Q6: How likely do think you would be to move your business, or open another
location, in the next year? Would you say...
Within the Next Year
Within Next 5 Years
■ Very Likely
® Not Very Likely
■ Not Likely
■ DK
■ Very Likely
® Not Very Likely
■ Not Likely
■ DK / Not Asked
19
May 2005 M ELBIRvRESERRLH,isr.
' [RENTON COMMUNITY MARKETING CAMPAIGN 20
Current Location: Important Factors
Q8: I'm going to read you a list of various reasons why people locate their
businesses where they do, and ask you to rate each on a scale of zero to 10,
where zero means it is Not At All Important to you, and 10 means it is
Extremely Important. If you were looking today for a location for your business,
how important would it be that...
■ Very ® 6-9 ❑ No Opin ■ 1-4 ■ Not
19% 24% 22% 15%
15% 36% 22% 18%
14% 52% • ' , 12% 6°/
10% 46% • ' 13% 8%
- - 8% 37% ' ' 20% 12%
• • - - . 25% ' ' 34% 20%
16% li 33% 28%
12% • ' 40% 31 %
May 2005 Et ELIURV RESERRCH, Mr.
IRENTON COMMUNITY MARKETING CAMPAIGN 21
Important Community Factors
Q9: The next group of variables has to do with the community in which your
business is located. Using the same scale, how important is it for the location
of your business that the community where your business is
located has...
■ Very ® 6-9 ❑ No Opin s 1-4 ■ Not
Competitive • , . 51% o/
04
Taxes/Fees
Well -Run
Government
Quality of Life ' . ' .
Affordable
Housing% 13'
Regional Medical .. 28%• '
Facility
34
Good Public , , 7% . ,
Schools
Quality Amenities ' • ' , 21 % ' ' '
Nearby Training • ' . ' ' 18% • ' ' '
May 2005 Et ELumvRESEARCH,mr.
IRENTON COMMUNITY MARKETING CAMPAIGN
Sources of Business News,
Information
Q4: What are some local sources you use for news and information that affects
your business?
Puget Sound Biz Journal '
Seattle Times
Trade Pubs / Assns
Seattle P-1
Eastside Journal
'
Internet
1 '
Wall Street Journal
• ' ,
Word of Mouth
Radio
■ 6%
Television
05%
Everett Herald
12%
Tacoma News -Tribune
12%
So. County Journal12%
Local Biz Publications
12%
• 22.
May 2005 EZELWRYRESF.RRcH,INC.
IIRENTON COMMUNITY MARKETING CAMPAIGN
Heard from Cities in Region?
NNINWW�III
Q10: Several cities in the Puget Sound Region have active Economic Development
efforts underway to attract new businesses to their community. Have you
heard anything directly from, or about doing business in the following
communities:
Bellevue
Renton
SeaTac
Auburn
Lynnwood
Federal Way
23
May 2005 Et EUBRvRESEmwgINC.
[RENTON COMMUNITY MARKETING CAMPAIGN
"Renton - Ahead of the Curve"
Heard the slogan?
■ Yes
■ No
What Does it Mean to You?
S-Curves
Progressive / High Tech
Refining / Changing / Growing
Competition / Innovation
Catchy / Funny / Clever
* 24
Marketing Fluff ; • , Q13: When you hear that slogan,
what does it mean to you?
"Renton - Ahead of the Curve?"
No Answer
May 2005 R ELwRvREsmRcH,mr.
[RENTON COMMUNITY MARKETING CAMPAIGN
Source of Info About Renton
Q10: Do you recall where you heard about Renton? [n=37]
Radio
Newspaper
Word of Mouth
Mail
Magazine M
Television
Fax / Email
Don't Recall
Last Visit to Renton
Within Last Week -
Within Last Month -
Last 6 Months
In Last Year
In Last 5 Years
More than 5 Years
Never M.
May 2005
25
ERELwRv RESERRCH, /NC.
IREN"TON COMMUNITY MARKETING CAMPAIGN
Renton Top of Mind Impression
Q11: When you think of Renton, what is the first thing that comes to mind?
Boeing
Location
Many Amenities
Industrial / Blue Collar
Low Income / Trashy
Traffic / One Way Streets
Ahead of the Curve
S-Curves
Answers by Region
(% giving each answer)*
Boeing
Location
Amenities
Industrial
Low Income
Traffic
Ahead of Curve
S-Curves
North Seattle Eastside South
am
a
■tea
a
oa
a
as
a
26,
* It should be noted that these cell percentages are based on a small number of respondents and
therefore are not statistically significant.
May 2005 Et ELwRvxEsERRCH,mr.
' IRENTON COMMUNITY MARKETING CAMPAIGN
Renton Strong Points (unaided)
Q15: What would you say are some strong points that Renton might have to offer
a business like yours?
Central Location / Transportation
Property Prices Lower
Good Property / Availability M
Good Neighbors M
Community Need for Business M
Accessibility to Services S.
Nothing
Don't Know
27
May 2005 ER ELwRYRESERRCH, mr.
' IRENTON COMMUNITY MARKETING CAMPAIGN 28
Renton Drawbacks (unaided)
Q16: What would be some drawbacks about Renton for a business like yours?
Traffic / Commute
Location / Too Far *
Alerady Well Located
'
No Need for Our Type of Biz
M
Negative Image
,
Theft
Labor / Business Costs
Nothing
Don't Know
* Contained within this category:
Too far from customers/suppliers (15%),
Location, Non-specific (7%),
Too far from employees (5%).
May 2005 Fi ELwRvRESERR[H,mr.
« 1 IRENTON COMMUNITY MARKETING CAMPAIGN
Rating Renton
Q17: I'd like to go back to some of the items I read before, and ask you to rate
Renton on each of the factors. Again, use the zero to 10 scale, where zero
now means you would rate Renton as extremely poor on that factor, and 10
means Renton is excellent.
Regional Medical
Facility
Competitive
Taxes/Fees
Well -Run
Government
Affordable
Housing
Quality of Life
Good Public
Schools
Nearby Training
Quality Amenities
■ Very ® 6-9 D No Opin ■ 1-4 ■ Not
58%
59%
52%
43%
41%
42%
29
May 2005 R ELWRYRESERRCH,IAC.
IRENTON COMMUNITY MARKETING CAMPAIGN
Location Factors:
Rating Importance vs. Renton
Q9xl7: Important for location of business and how Renton rates on those factors:
Competitive
Taxes/Fees
Quality of Life
Well -Run
Government
Affordable Housing
■ Important to Me ■ Rating Renton
5.9
7.1
5.7
7.0
Quality Amenities
Regional Medical
Facility •
Good Public
Schools
Nearby Training ,
30
May 2005 Et ELWRYRESERRCH mr.
I[RENTON COMMUNITY MARKETING CAMPAIGN
31
Likely to Move Business to Renton
Q18: If you were to move your business, or open a new location, how likely would
you be to consider Renton as a possible location?
■ Very Likely
® It is Possible
■ Not Very Likely
■ Not Likely
May 2005 EZ ELwnv RESEARCH, /NC.
QUESTIONNAIRE
WITH DATA
Lq
ELWBVRESERRCH, INC.
Renton "Ahead of the Curve" TOPLINE PAGE 1
TOPLINE DATA
This summary presents response frequency distributions for the survey of Eastside Business Executives on
behalf of the Renton Community Marketing Campaign.
Telephone interviews were completed with 158 executives of businesses with at least 35 employees,
located in King and Snohomish Counties. The interviews were conducted by telephone between April 27
and May 6, 2005. The interview lasted an average of 12 minutes.
If this were a strictly random sample, the overall margin of sampling error would be approximately t8%.
That means, in theory, there is a 95% probability that the results of this survey are within t8% of the
results that would have been obtained by interviewing executives in all similar business in the two
counties. However, since the cooperation rate was only 19%, the margin of error should not be applied to
these results.
data are presented here in the same order the questions were asked in the interview.
figures in bold type are percentages of respondents who gave each answer.
:entages may not add to 100% due to rounding.
1 What is your title?
GENDER: MALE ... 72 FEMALE ... 28
President/Owner... 22
CEO (Chief Executive Officer) ... 5
COO (Chief Operating Officer)... 3
CFO (Chief Financial Officer) ... 5
Office Manager ... 18
Vice -President... 25
Other Managers ...19
Other Directors ... 5
2 How many full-time or full-time equivalent employees to you have at this
location?
AVERAGE (MEAN) NUMBER =108
MEDIAN = 70
3 How would you classify your business? Are you in...
Professional services (health, legal, financial, marketing, etc.) ... 32
Wholesale and Distribution ... 19
Consumer services (hotels, restaurants, fitness) ... 10
Construction... 8
Retail ... 6
Non-profit agency... 5
Media ... 3
Manufacturing... 3
Other ... 14
TOPLINE.doc 4/15/05 ELWRV RESERRCH, INC.
Renton "Ahead of the Curve" TOPLINE PAGE 2
4 What are some local sources you use for news and information that affects
your business? [PROBE FOR SPECIFIC SOURCE]
Puget Sound Business Journal 64
Seattle Times ... 41
Trade Publications / Associations ... 41
Seattle P-1...29
Internet...10
Eastside Journal...10
Wall Street Journal 9
Word-Of-Mouth/Friends/Business Associates 8
Radio 6
Television 5
Everett Herald ... 2
Tacoma News -Tribune ... 2
So. County Journal ... 2
Local Business Publications ... 2
5 The next couple of questions are about the location of your business. How
long have you been at your current location? AVERAGE (MEAN) -16 YRS
MEDIAN = 11 YRS
6 How likely do think you would be to move your business, or open another
location, in the next year? Would you say...
SKIP TO 08E VERY LIKELY ... 19
NOT VERY LIKELY ... 33
7 In the next five years [n=128]
NOT AT ALL LIKE LY... 47
[DK/NA]... 1
VERY LIKELY ... 26
NOT VERY LIKELY ... 23
NOT AT ALL LIKELY ... 28
[DK/NA]... 24
TOPLINE.doc 4/15/05 ELWRVRESERRCH, ►NC.
Renton "Ahead of the Curve" TOPLINE PAGE 3
8 I'm going to read you a list of various reasons why people locate their
businesses where they do, and ask you to rate each on a scale of zero to 10,
where zero means it is Not At All Important to you, and 10 means it is
Extremely Important. If you were looking today for a location for your
business, how important would it be that...
ROTATE NOT ..................................................... VERY mean
1. Your business be close where you
live yourself...........................................0....1 ... 2....3... 4.... ®....6 ...7....8 ... 9...10 5.1
2. Your business be close to your current
employees.............................................0....1 ... 2.... 3 ... 4.... 5 ... ®... 7....8 ... 9...10 ....5.8
3. Your suppliers are nearby ......................0....1 ... 2.... 3 ... ® ... 5 ....6 ... 7....8 ... 9...10 ....3.7
4. It be close to similar types of
businesses................................................0....1 ... ®... 3... 4.... 5....6 ... 7....8 ... 9...10 ....2.5
S. There is efficient transportation
for freight and cargo...............................0....1... 2.... 3... 4.... 5... ®... 7 ....8 ... 9 ...10 ....5.1
6. There is efficient transportation
for commuters........................................0....1 ... 2.... 3 ... 4.... 5 ....6 ... 8 ... 9...10 ....6.4
7. It is close to Sea-Tac Airport ...................0....1 ... ® ... 3 ... 4.... 5....6 ... 7....8 ... 9...10 ....3.0
8. It is close to your customers ...................0....1 ... 2.... 3... 4.... ®.... 6 ... 7....8 ... 9...10 ....5.2
9 The next group of variables has to
do with the community in which your
business is located. Using the same scale,
how important is
it for the
location of your business that the
community where your
business is
located has...
ROTATE
NOT .....................................................
VERYmean
1. A regional medical facility.....................0....1
... 2....3...
4.... ®....6 ... 7....8
... 9...10 ....5.4
2. A college nearby that provides
training and re-training for employees.
..0 .... 1 ... 2....
3... 4E]5....6 ... 7....8
... 9...10 ....4.4
3. A quality public school system...............0....I
... 2....3...
4.... ®.... 6 ...7....8
... 9...10 ....5.1
4. Affordable rents & real estate prices ......
0.... 1... 2....3...
4.... 5....6 ...8
... 9...10 ....6.5
5. A good quality of life for
your employees.......................................0....1
... 2....3...
4....5....6 ...8....8
... 9...10 ....7.1
6. Quality amenities, like restaurants,
parks, and health clubs............................0....1...
2....3...
4....5....6 ...8....8
... 9...10 ....6.2
7. A well -run local government ..................0....1
... 2....
3 ... 4.... 5 ....6 ... 7... ®...
9...10 ....7.0
8. Competitive local business taxes
and fees...................................................0....1
... 2....
3 ... 4.... 5 ....6 ... 7 ....8
... M...10 .... 8.1
TOPLINE.doc 4/15/05 ELWRV R.ESERRCH, INC.
Renton "Ahead of the Curve" TOPLINE PAGE 4
10 Several cities in the Puget Sound Region have active Economic Development
efforts underway to attract new businesses to their community. Have you
heard anything directly from, or about doing business in the following
communities:
10.1 Lynnwood....................................................................................12
10.2 Auburn........................................................................................13
10.3 Federal Way...............................................................................13
10.4 SeaTac.........................................................................................16
10.5 Bellevue.......................................................................................29
10.6 Renton..........................................................................................24
10.6.a IF YES: Do you recall where you heard about Renton? (N=37]
RADIO ... 41
NEWSPAPER ... 24
WORD OF MOUTH ... 16
MAIL ... 11
MAGAZINE... 5
TELEVISION...3
FAX/EMAIL... 3
DON'T RECALL 11
11 When you think of Renton, what is the first thing that comes to mind?
BOEING...36
LOCATION ... 10
MANY AMENITIES ... 10
INDUSTRIAL / BLUE COLLAR ... 8
LOW INCOME / TRASHY ... 6
TRAFFIC / ONE-WAY STREETS ... 6
AHEAD OF THE CURVE ... 5
S-CURVES... 5
12 Have you heard the slogan: "Renton — Ahead of the Curve?"
YES ... 42
13 When you hear that slogan, what does it mean to you? "Renton — Ahead of
the Curve?"
S-CURVES... 27
PROGRESSIVE / HI TECH ... 22
REDEFINING / CHANGING / GROWING ... 17
COMPETITION / INNOVATION ... 10
CATCHY / FUNNY / CLEVER ... 9
MARKETING FLUFF ... 8
NO ANSWER ... 10
TOPLINE.doc 4/15/05 ELWRVRESERRCH, INC.
Renton "Ahead of the Curve" TOPLINE PAGE 5
14 The next few questions are about Renton. How long has it been since the last
time you were in Renton?
Within The Last Week ... 29
Within The Last Month ... 20
Within The Last 6 Months...22
Within The Last Year ... 14
Within The Last 5 Years ... 10
More Than 5 Years Ago ... 2
Never...3
15 What would you say are some strong points that Renton might have to offer
a business like yours?
ACCESSIBILITY TO COMMUNITY ... 33
PROPERTY PRICES LOWER ... 16
GOOD PROPERTY / VIEWS / AVAILABILITY...6
GOOD NEIGHBORS...6
COMMUNITY NEED FOR BUSINESS ... 6
LOCATION...5
ACCESSIBILITY TO SERVICES ... 3
NOTHING ... 22
DON'T KNOW ... 8
16 What would be some drawbacks about Renton for a business like yours?
TRAFFIC / COMMUTE ... 36
ALREADY WELL LOCATED ... 19
NOT MAINSTREAM / OUT OF LOOP ... 16
LOCATION...7
NO NEED FOR OUR TYPE OF BIZ ... 6
TOO FAR FOR EMPLOYEES ... 6
NEGATIVE IMAGE ... 6
THEFT ... 3
LABOR / BIZ COSTS ... 3
NOTHING ... 7
DON'T KNOW ... 7
TOPLINE.doc 4/15/05 ELWRV RESERRCH, INC.
Renton "Ahead of the Curve" TOPLINE PAGE 6
17 I'd like to go back to some of the items I read before, and ask you to rate
Renton on each of the factors. Again, use the zero to 10 scale, where zero
now means you would rate Renton as extremely poor on that factor, and 10
means Renton is excellent. First, what about
ROTATENOT ..................................................... VERYMEAN
1. Having a regional medical facility . ........ 0.... 1 ... 2.... 3... 4....5....6 ... M.... 8 ... 9...10 ....6.7
2. Being near a college that provides
training and re-training for employees. ..0
.... 1 ... 2.... 3 ... 4.... 5 ... ®... 7 ....8 ... 9...10 ....5.7
3. Having a quality public school system ...0....1
... 2.... 3... 4.... ®.... 6 ... 7....8 ... 9...10 ....5.2
4. Affordable rents or real estate prices .....0....1...
2.... 3... 4.... 5....6 ...8 ... 9...10 ....6.7
5. Offering a good quality of life for
your employees.......................................0....1
... 2.... 3 ... 4.... 5 ... ®... 7 ....8 ... 9 ...10 ....5.9
6. Including quality amenities, like
restaurants, parks, and health clubs .........
0.... 1 ... 2....3... 4.... ®....6 ... 7....8 ... 9...10 ....5.5
7. Having a well -run local government ......
0 .... 1 ... 2....3... 4.... ®....6 ... 7....8 ... 9...10 ....5.7
8. Being competitive in terms of local
business taxes and fees............................0....1 ... 2.... 3... 4.... 5....6 ...
18 If you were to move your business, or open a new location, how likely would
you be to consider Renton as a possible location? Would you say
VERY LIKELY ... 8
IT IS POSSIBLE ... 20
NOT VERY LIKELY ... 32
NOT AT ALL LIKELY ... 40
[DK/NA] ... 9
18.1 Would you mind if someone from Renton contacted you to talk about
this in more detail?
OK TO CALL [ N=141
TOPLINE.doc 4/15/05 ELWRYRESERRCH, INC.
Renton "Ahead of the Curve" TOPLINE PAGE 7
Q4 Source of Busienss information
Pct of
Category label
Count
Cases
Seattle Times
64
40.8
Seattle P-I
45
28.7
Eastside Journal
16
10.2
Everett Herald
3
1.9
Tacoma News Tribune
3
1.9
Wall Street Journal
14
8.9
Puget Snd Biz Journal
100
63.7
Trade Pub/Associations
65
41.4
TV
7
4.5
Radio
9
5.7
Friends/Associates
12
7.6
South County Journal
3
1.9
Local Community Pubs
3
1.9
Internet
15
9.6
Flyers/Brochures
1
.6
Only Affected By Govt
1
.6
Western
1
.6
National News Pubs
2
1.3
Phonebooks
2
1.3
None/Nothing
2
1.3
Q11 Renton Top of Mind
Pct of
Category label
Count
Cases
Boeing
56
35.7
South Center Mall
3
1.9
Location
16
10.2
Growth/Revitalization
5
3.2
Trashy/Low Income
9
5.7
Congested/Overcrowded
2
1.3
Good People/Population
5
3.2
Low Rent
1
.6
Too Far From Me
5
3.2
Industrial/Blue Collar
12
7.6
Small Town
5
3.2
Many Amenities
16
10.2
Property Available
3
1.9
Airport/Airplanes
6
3.8
Ahead of the Curve/Competition
7
4.5
Traffic/One Way Streets
9
5.7
Car Dealerships
2
1.3
S-Curves
7
4.5
Longacres/Horse Racing
1
.6
Middle Class
1
.6
None/Nothing
1
.6
Other
1
.6
DK/NA
2
1.3
TOPLINE.doc 4/15/05 ELWRV RESERRCH, INC.
Renton "Ahead of the Curve" TOPLINE PAGE 8
A
Q13 What Does "Ahead of the Curve" Mean to You
Category label
Pct of
Count Cases
S-curves
42
26.8
Catchy/Funny/Clever
14
8.9
Progressive/High Tech
34
21.7
Redefining/Changing/Growing
26
16.6
Good Supply of Workers
1
.6
Competition/Innovation
15
9.6
Location
3
1.9
Vague
3
1.9
Not True/Marketing Fluff
12
7.6
Still Work to be Done
3
1.9
Distance/Travel Issues
2
1.3
None/Nothing
11
7.0
DK/NA
5
3.2
Q15 Renton Strong Points
Pct of
Category label
Count
Cases
Location
8
5.1
Accessibility to Services
5
3.2
Accessibility to Community
51
32.5
Property Prices Lower
25
15.9
Promotes Biz/Comm Support
10
6.4
Revitalization of Downtown
3
1.9
Good Property/Views/Availability
9
5.7
Good Neighbors
10
6.4
Community Need for Biz
9
5.7
Have Considered Future Move
4
2.5
Closer to My Competition
3
1.9
Population(General)
4
2.5
Available Workforce
1
.6
None/Nothing
35
22.3
DK/NA
12
7.6
Q16 Renton Drawbacks
Pct of
Category label
Count
Cases
Location
11
7.1
Too Crowded
2
1.3
Traffic/Commute
54
34.6
Not Mainstream/Out of Loop
24
15.4
Neg Image/Hard to Deal With
8
5.1
Too Much Empty/Vacant Offices
1
.6
No Need for This Type Biz
10
6.4
Already Well Located
29
18.6
Too Far for Employees
8
5.1
Real Estate Too Expensive
4
2.6
Lot of Work to Do First
1
.6
Labor/Biz Costs
4
2.6
Theft
5
3.2
Need More Warehouses/Buildings
3
1.9
Nothing/NA
12
7.7
Other
1
.6
Dont Know
11
7.1
TOPLINE.doc 4/15/05 ELWRMRESERRCH, /NC.
A
City of Renton
PUBLIC INFORMATION HANDOUT
June 20, 2005
SEWER MORATORIUM FOR SEWER SERVICE TO
NEW SUBDIVISIONS OUTSIDE CITY LIMITS ON THE
EAST RENTON PLATEAU
For additional information, please contact: Dave Christensen;
City of Renton Utility Services 425.430.7212
DESCRIPTION:
The City Council adopted Resolution Number 3758 on June 6, 2005, establishing a moratorium
on sewer availabilities for new subdivisions on the East Renton Plateau area for an initial period
of six (6) months. A map is included on the back showing the moratorium area.
SUMMARY:
On January 3, 2005, Council passed Ordinance 5123. This ordinance revised City code for the
provision of sewer service outside City limits. This Ordinance was adopted with the
understanding that while development in the County would not meet all of the City's
development standards, the City could condition sewer availability to require that the most
critical of the development standards be met. These standards include meeting the City of
Renton's (1) adopted general land use category, (2) allowed density within the adopted land
use category, and (3) allowed structure type and scale within the adopted land use category.
Adoption of Ordinance 5123, also made sewer availability contingent upon the property owner
executing a Covenant To Annex for the developed property. In addition to providing service
within Renton's sewer service area, one of the primary reasons for the City to offer sewer
availability is to promote long-term annexation through the use of the Covenants To Annex.
Since the adoption of Ordinance 5123, the Citizens' Alliance for a Responsible Evendell
(CARE) group has been very active in developing a potential large-scale annexation on the
plateau. In its letter to Council, CARE cites issues it shares with a number of property owners
within the potential annexation area who have expressed concern with the City issuing sewer
availabilities that cover only the core development issues as discussed above. It would be
CARE's preference that development within the moratorium area meet all of Renton's
development standards including lot set -backs, lot widths, lot depths, and our newly adopted
landscape standards. CARE believes that the City of Renton's adopted standards is the best
approach to preserving the distinct character of life within its community.
With the adoption of Resolution Number 3758, a moratorium on new sewer availabilities for new
subdivisions is in place for a period of six (6) months. Council may extend the moratorium if a
need still exists at the end of six months. This moratorium only affects the area shown on the
attached map and only impacts proposed new subdivisions for this area. Existing lots may still
receive sewer availability for a single home upon that lot.
�y7Ei1-c� 3 + ��
EI:���
Sewer Moratorium for Sewer Service to New Subdivisions
Outside City Limits on the East Renton Plateau
Resolution No. 3758
Timeline:
June 2002 — Ordinance 4969. This ordinance was passed to significantly limit sewer
availabilities due to two primary concerns. First was State Supreme Court decision that
invalidated Petition Method Annexation and second, density concerns on the East Renton
Plateau.
August 2002 — Ordinance 4981. Amendment to Ordinance 4969 to allow limited
availabilities for existing platted lots.
January 3, 2005 — Ordinance 5123. Revised code for sewer outside the City to allow
availabilities outside City with certain City standards for Land use and zoning. State
Supreme Court reversed its earlier decision and City established zoning standards for the
East Renton Plateau.
May 9, 2005 - Letter request from Citizens' Alliance for a Responsible Evendell
requesting a moratorium referred to Committee of the Whole. Although City had
adopted certain standards that apply to new availabilities, neighborhood group concerned
that not all standards are applied, and that this was hurting their efforts to form an
annexation area on the Plateau.
May 23, 2005 — Presentation by Staff in support of a Moratorium on Sewer Availabilities
for New Subdivisions on the East Renton Plateau at Committee of the Whole and request
at Council to have Resolution prepared for 6-month Moratorium at next regular Council
Meeting
June 6, 2005 — Council adopts Resolution No. 3758 establishing a 6-month Moratorium
on Sewer Availabilities for New Subdivisions on the East Renton Plateau and
establishing a Public Hearing date of June 20th.
June 20, 2005 — Public Hearing
Status of Availabilities for New Subdivisions - Jan. 3rd to June 6th:
Davis Plat, 17 lots, 13804 162°d Avenue SE, Submitted 3/4/05, Issued 3/31/05
Miya Plat, 17 Lots, 140xx 162nd Avenue SE, Submitted 2/15/05, Issued 5/13/05
Threadgill Plat, 17 Lots, 13502 162°d Avenue SE, Submitted 6/2/05, Currently Under
Review.
June 16, 2005
Public HeaVin9 eorrcs vt de�rce
A rcnda Tfcirr a, 6 •�D-.?GOS
Living Architecture
CITY OF RENTON
UUN 17 2000
Terri Briere, Council President RECEIVED
and City Council Members CITY CLERK'S OFFICE
NB4 City of Renton
Builder of 1055 S. Grady Way
the Year
2003 Renton, WA 98055
Re: Public Comment Sewer Moratorium within the East Renton Plateau Potential
Annexation Area
Dear Madam President and City Council Members:
We support the City of Renton and the Citizens' Alliance for a Responsible Evandale
Over 100a (CARE) in the annexation of the East Renton Plateau area. We are concerned however, MAME Awwards ,
about some of the language written in the Sewer Moratorium Referendum and how it will
affect our subdivision development which is located within the East Renton Plateau
Potential Annexation Area.
We have a nine acre parcel of land that is affected by this sewer moratorium. We are in
partnership with American Classic Homes who also has another nine acre parcel adjacent
to our development site. These two parcels will be combined to create one subdivision.
We removed feasibility on our development site and paid a substantial down payment for
Award 2004 this property after the City of Renton began issuing sewer certificates in January of this
year. And now the City is once again not allowing sewer certificates.
We are concerned about the City of Renton's language in the Sewer Moratorium
Referendum allowing CARE six months to present a formal submittal for an election
-- -" annexation. We feel the group should be able to get the 10 percent signatures required
for formal submittal within one month. There has been an adequate amount of
communication to the residents within the annexation area, including at least three
BUILTE
o g oomeetings EN� neighborhood in s and written material mailed to the area residents. We feel that a
Member majority of the annexation process could be achieved within the six month moratorium
period.
Val"
BIAW
Builder
Appreciation
Award
BENNETT DEVELOPMENT, INC.
12011 NE 1st St Suite 201
Bellevue WA 98005
business
425.709.6500
Journal
fax: 425.709.6553
fastest Growing
www.bennettdevelopment.com
Company Award
Below we have outlined a timeline for the annexation process we feel is attainable.
• Gather 10% signatures - I month (July, 2005)
• Council Review and Approval — 60 days (August - September, 2005)
• County Council/Boundary Review Board Approval — 60 days (October -
November, 2005)
• Vote — February 2006
We would like the Sewer Moratorium Referendum written so CARE cannot use this
moratorium as a means to stop growth in this area. If CARE is allowed until December
6, 2005 to submit a formal package than this annexation process could be prolonged up to
one year. We feel you should not extend the Moratorium unless a formal submittal has
been given to the Boundary Review Board by the beginning of October, 2005. Thank
you for your time and consideration on this matter.
Sincerely,
Z
Theresa M. Brehmer
Land Acquisition Manager
Cc: Mayor Kathy Keolker-Wheeler
Public Aeank 6ne'rawmce
A� e�da -Zkm q a,
�-�o•aoos
From: Bonnie Walton
To: Tom
Date: 6/20/2005 8:22:00 AM
Subject: Re: Input to tonight's sewer moratorium hearing
Dear Mr. Carpenter:
Thank you for your input. A copy of your email and attachments will be forwarded to the City Council
members and Mayor, and it will be entered into the record at tonight's public hearing.
Sincerely,
Bonnie Walton
City Clerk
City of Renton
425-430-6502
>>> "Tom" <TDCarp@comcast.net> 6/20/2005 8:02:29 AM >>>
Bonnie,
The attached documents are written input to the June 20, 2005 hearing on the
Sewer Moratorium for the Renton East Plateau Potential Annexation Area
(PAA). I will be unable to attend the meeting in purpose.
One document is a letter to the council with input specific to the hearing.
The other document is a context document that focuses on the subject of
Quality of Life in the PAA.
Please forward both documents in the appropriate form to all members of the
Renton City Council and other interested parties as you or the Council see
fit.
I appreciate the opportunity to provide input to this important subject.
Thank you
Tom Carpenter
15006 SE 139th Place
Renton, WA 98059
425-271-2035
TDCarpoa comcast. net
To: Renton City Council June 20, 2005
From: Tom Carpenter
15006 SE 139th PI
Renton, WA 98059
As we approach the 15-year anniversary of Washington State's Growth Management
Act (GMA) and having just passed the 10-year anniversary of King County's alignment
to GMA, the plateau east of Renton, like so many other areas, is at a crossroads. A
host of emerging trends and issues challenge our core values and way of life. Without
question, we face significant change in the future. How we shape such change is a
matter of our own choosing. It's not clear if there is an agreed -upon vision for the
plateau to help guide such choices, satisfactory participation by stakeholders and
decision makers to manage such choices, or meaningful outcome measures to monitor
such choices.
One such choice is the sewer moratorium for the Renton East Plateau Potential
Annexation Area.
Purpose
This letter is written input to the Renton City Council's hearing on the sewer certificate
moratorium scheduled for Monday June 20, 2005. Unfortunately, I will be unable to
attend the hearing in person, however, I welcome questions and feedback.
Background
We became interested in quality of life in the neighborhood around the time of the
construction of the QFC strip mall off Duval Ave. and SE 128`h St. That construction
heralded a series of noticeable changes extending mainly out the SE 128�h St. corridor
although it includes residential and commercial development on both sides of Duval Ave.
Since that time we've seen change on the Renton East Plateau at a significantly higher
pace than we had witnessed in all the other time we had lived in the area.
I spoke briefly during the Audience Comment period at the end of the Renton City Council
meeting held on June 6, 2005. At the time I stressed that a fundamental concern of the
East Renton Plateau area is not being addressed. If the area is annexed to Renton, the City
will face the issue of how quality of life is maintained, if not improved, as the area is
developed out according to the Urban Growth Area land use designation that occurs in the
Growth Management Act. I also stressed that it is important to address this issue as a joint
effort between the affected residents, the developers and realtors, King County, and
Renton.
I represent myself only and am not affiliated with any organized effort either for or against
the moratorium although I support any informed efforts that are attempting to bring fact -
based understanding to the citizens of the neighborhood.
Comments on the sewer moratorium
Although I support the moratorium, I'm concerned that, without the proper focus, we run
the risk of tragically being in a worse quality of life condition at the end of the moratorium
period.
The moratorium is linked to the question of annexation, and the annexation decision,
regardless of the outcome, will have a profound impact on the quality of life in the
neighborhood. A vote to annex into Renton will place a new burden on the City of Renton
to address the quality of life issue in the area while a vote to stay in Unincorporated King
County will force the issue of service support by King County and will continue to leave
the East Renton Plateau with representation only at the County level (currently undergoing
a change because of the "re -districting" of the King County Council and the recent
decision on the part of KC Council representative David Irons to run for a different County
position.)
For the efforts that are focused on quality of life in the area to be effective responsible
participation in the issue is required by all stakeholders including county and state
governments, developers, and citizens. If annexation were to occur, Renton would also
become a more significant stakeholder.
My concern is that the moratorium may not be sufficient action necessary to stop the
current build out of the area in any meaningful way. Also, the focus that the moratorium
will create on the question of annexation can be distracting to the larger issue of quality of
life, an issue that has its roots in the moratorium itself.
I call on the Renton City Council to add its voice to King County and the State regarding
the issue of quality of life in the neighborhood they might inherit through annexation or
will end up being neighbored to if the area remains in Unincorporated King County. I also
call on the Council, along with King County, the State of Washington, and the local
citizens to take the time created by the moratorium to produce a meaningful, agreed upon
plan to address what I consider to be a critical juncture in the question of the impact on
quality of life in Urban Growth Areas, like the East Renton Plateau.
I also call on the Renton City Council to look into other areas that can effectively put a
temporary moratorium on the build out of the East Plateau PAA.
Attachment
Attached is a working document used to capture descriptions of the situation in the area, a
desired target state, and the beginnings of a proposal to address the overall question of
quality of life in the neighborhood. This information should be considered "work in
process" and is a snapshot of the thinking at this date.
Next steps
Along with providing input to responsible citizens groups in the neighborhood, the King
County Four Creeks Unincorporated Area Council has been made aware of this issue and
will be receiving this input along and a briefing in mid -July, 2005.
The objective at this stage is to develop high quality information with the participation of
stakeholders and decision makers. I appreciate any feedback on information quality or the
participants.
Tom Carpenter
2
Q11afity of lffe
As we approach the 15-year anniversary of Washington State's Growth Management
Act (GMA) and having just passed the 10-year anniversary of King County's
alignment to GMA, the plateau east of Renton, like so many other areas, is at a
crossroads. A host of emerging trends and issues challenge our core values and way
of life. Without question, we face significant change in the future. How we shape
such change is a matter of our own choosing. It's not clear if there is an agreed -
upon vision for the plateau to help guide such choices, satisfactory participation by
stakeholders and decision makers to manage such choices, or meaningful outcome
measures to monitor such choices.
Even what can appear to be an innocuous decision, like a sewer certificate
moratorium, can be an example of one such choice.
1 Summary
• We are long time residents of the plateau east of Renton, sometimes called the
"Renton Highlands". We first moved here in the mid-1970s and bought our current
home in 1981.
• We're seeing the effects of urban growth in our neighborhood.
• We moved into this area choosing a quality of life based on our choice of housing and
neighborhood at the time.
• There are underlying forces that are causing growth to be moving into Urban Growth
Areas including Renton's East Plateau.
• The measure of any type of growth management is accountability to the outcome
quality of life.
• Using accepted analysis and influence techniques, develop an integrated plan that
assures our voice and that of the neighborhood's residents, is being heard.
• Growth Management is an experiment based on theories. The theories that are the
basis for Growth Management are commonly called New Urbanism and Smart
Growth.
• Consultants bring the theories to the Decision Makers. There accountability generally
ends when the contract terminates. A significant improvement would be to make
them more Accountable for the Outcome.
2 Purpose
The short term purpose includes stopping all development efforts until such time as an
agreed upon, comprehensive plan for the area, including an emphasis on quality of life,
can be developed.
See Sewer Moratorium letter
3 Background
My wife, Sharon, and I have been residents of the Renton East Plateau since the late
1970's, buying our current home in 1981. Our home, which is also the location of our
®2005 Carpenter & Associates I QOL0506 Rev: New 06/20/05
Quality of life
businesses, lies in an area which, at the time of purchase, was part of the new
construction in one of the very few residential developments outside the Renton City
limits on the plateau.
We became interested in quality of life in the neighborhood around the time of the
construction of the QFC strip mall off Duval Ave. and SE 128th St. That construction
heralded a series of noticeable changes extending mainly out the SE 1281h St. corridor
although it includes residential and commercial development on both sides of Duval Ave.
Since that time we've seen change on the Renton East Plateau at a significantly higher
pace than we had witnessed in all the other time we had lived in the area.
For 20 years we didn't experience much growth here on the plateau and the quality of life
reflected the reasons we bought here in the first place. Large stands of old fir trees often
spotted with maple and alder dominated the vegetation in the area. Our own yard has ten
100' fir trees with samples of spruce, alder, hemlock and pine all on slightly more than a
quarter acre. Driving through the neighborhood is a little surreal because of the still -
dense vegetation. Most residential property residents preserved the original plant life
while adding their own concepts to the landscaping.
Today the plateau still reflects its rural roots.
There was very little noticeable development until roughly the time when the section of
Maple Valley Highway between 144 SE and 1541h SE was converted from rural farmland
into park and recreation space and residential housing. Roughly the same time, the land
on either side of Duvall Ave. north of SE 128th was converted from a dense stand of tall
native timber to at least three housing developments at a density considerably higher than
the average on the plateau. The area also included the development of the "QFC
shopping area" and the intersection of Duvall and SE 129th.
Today development continues east on the plateau with dramatic changes occurring along
the SE 1281h and Sunset Blvd/SR 900 corridors.
Not surprisingly this has lead to increased traffic in the area mostly noticeable as
increasing delays at key intersections. Ambient noise levels are noticeably higher. As
residential development occurs, utility construction also increases which effects traffic
flow and roadway quality. Even something as innocuous as the amount of animals
becoming "road kill" is indicative of reduction in habitat for native animals.
As witnesses to the land use conversion of the plateau it's easy to have feelings of loss
and tragedy. As residents of the area, it's easy to have feelings of frustration over the
effects on quality of life. And as property owners and tax payers in the area it's easy to
have feelings of anger over the decisions being made.
For long time residents, we chose to live here because of the quality of life it promised. It
feels like we have no choice in changes to that quality of life.
In spring, 2005 we received a meeting notice from a non-profit corporation called CARE
(Citizens Alliance for a Responsible Evondale). Concerned with the quality of life
changes in the neighborhood, we've attended all the CARE meetings including some of
their officer's meetings.
CO2005 Carpenter & Associates 2 QOL0506 Rev: New 06/20/05
i.ualih, of I Afe
Recently, we've become involved in the efforts of another group, the East Renton Plateau
Citizens Council who also have a position on the subject of annexation. We've also
begun engaging with decision makers (e.g. Renton City Council, King County Four
Creeks Unincorporated Area Council)
4 About this document
This document is a "snapshot" of work in progress. The Change History can help set the
context of the specific version. Feedback is always welcome.
5 Objectives and Principles
We became interested in quality of life in the neighborhood around the time of the
construction of the QFC strip mall off Duval Ave. and SE 128t11 St. That construction
heralded a series of noticeable changes extending mainly out the SE 128th St. corridor
although it includes residential and commercial development on both sides of Duval Ave.
Since that time we've seen change on the Renton East Plateau at a significantly higher
pace than we had witnessed in all the other time we had lived in the area.
Our objectives are to discover the appropriate means to influence quality of life in our
neighborhood.
The technique being used is based on the principle of "inclusion". This means that it is
more important to include all points of view without taking a bias.
The intent is to empower through accurate information.
The assumption is that change is inevitable however outcomes are not. Results are based
on the forces that exist that influence them.
The level being used here is relatively high with detail investigations ONLY used to
validate the higher context.
Models are important because of the way they can enhance communication.
6 Scope and Boundaries
There are multiple boundary designations in the neighborhood, including City Limits,
Potential Annexation Area, Urban Growth Area, Unincorporated King County, and
probably others along with the geographical boundaries based on the physical attributes
of the area. All of these can be divided up into smaller units from a variety of
perspectives.
From a physical perspective the natural boundaries of the plateau east of Renton appear
to be roughly I-405 on the west, Sunset Blvd/SR900 on the north, Maple Valley Highway
on the south, and Lake Kathleen on the east.
©2005 Carpenter & Associates 3 QOL0506 Rev: New 06/20/05
Quality of U fe
7 Definitions
7.1 Quality of Life
In general, the definitions of Quality of Life (QOL) appear to focus on the more
subjective attributes of a System. There is a rich discussion of this topic in the medical
profession which focuses, of course, on the Human System. The measures of quality of
life are viewed from the perspective of the overall wellbeing of the person and how
certain things can affect that wellbeing.
Without attempting to overuse the point, a neighborhood (whether few houses, a few
blocks, a few miles, a city, a county, a state, a country, etc.) can be viewed as a System
with attributes not unlike a Humane System, particularly considering the dominant
participation humans have in the Neighborhood System.
7.2 Livability
Other, more objective attributes of the Neighborhood System can generally be
categorized under the heading of Livability.
In this context, Livability contributes to Quality of Life
7.3 Neighborhood
The definition of neighborhood can vary considerable from person to person or group to
group so it's important to understand the context within which the word is used. Here, it
is usually meant as:
The area included in some physical boundary definition (e.g. this street, this block, this
city, this boundary, etc)
The boundaries of a neighborhood can be set based on more subjective affinity factors.
For example, the neighborhood boundaries may be based on similarities in vegetation or
housing type, or they might be based on external definitions like voting precinct or
Growth Management land use designation.
The focus here is on a neighborhood's quality of life and the ways that actions affect that
quality of life.
8 Approach
Inclusive: All positions are included
Tools: Frameworks and Models (e.g., Influence, Accountability, Proposal, Support)
9 Readings
9.1 Randall O'Toole and the Thoreau Institute
Randall O'Toole has a writing that does a very good job of providing the background and
forwarding some analysis of their experience in a build -out area outside Portland, OR.
He also authored a 2000 book on growth management whose principles are embodied
02005 Carpenter & Associates 4 QOL0506 Rev: New 06/20/05
Quality of Lffe
and advocated by the Thoreau Institute, an advocacy group for which he is the senior
economist. I've briefly corresponded with him and understand that the position he, and
the Thoreau Institute, take is one of "seeking ways to protect the environment without
regulations, bursary, or central control."
They represent a position that is against the high degree of regulation approach to
implementations of growth management and would prefer an incentive -based approach.
They support letting market forces with appropriate incentives and penalties, influence
the overall quality of life as growth management is played out. They also express an
opinion regarding the effectiveness of "Smart Growth", the underlying theory behind
Oregon's and Washington's Growth Management Acts. Their belief is that the number
one negative outcome of Smart Growth is its impact on affordable housing.
The Thoreau Institute web site
Randall O'Toole's 2001 "The Follv of Smart Growth "
Personal Note: I think that the objective should be one of striking a balance between
regulation and incentive -based growth management. There may also be a concern as to
whether it's "too late" for King County to adopt incentive -based implementation because
of the politics of image. In other words, the County has been severely criticized
regarding its planning and outcome success. There may not be enough time to step back
to integrated incentive -based components to their growth management plan.
There is a visual tour of Oak Grove. OR that does a great job of integrating digital
photographs with text to explaining the situation that they faced and are continuing to
face.
9.2 Washington Research Council
This is about the most comprehensive writing I've found analyzing the outcome of
Washington State's Growth Management Act. The series of papers written in 2000-2001,
focused on the objectives and measurable outcomes of the GMA at its I0-year
anniversary.
The Board of Trustees and Board Members of the Washington Research Council is a
whose -who of Northwest businesses and the council strives to be "the independent
authority on taxes and efficient government."
The WRC index to publications can be found here. The I I -part series on Growth in
Perspective was written in 2000 and 2001, the archives of which can be linked to via this
page. The entire 11-part series can be viewed here.
Given the changes that have occurred in the area and the world since 2001, I've made a
request of the WRC for an update based on more current information.
10 Growth Management
The topic of Growth Management became popular during the 1980s principally because
of the debate between growth and environment. Based on theories like New Urbanism
and Smart Growth, States across the country began to develop comprehensive growth
management plans.
(D2005 Carpenter & Associates 5 QOL0506 Rev: New 06/20/05
t)uality ot'l.ife
Washington State created the Growth Management Act (GMA) in 1990 with a significant
revision in 1991. At the time, the Federal Government publicly recognized Washington
State's Growth Management Act as one of the most comprehensive pieces of land
management legislation yet produced.
Based on the theory of Smart Growth, and with 13 goals, the GMA was intended to
produce outcomes that struck a balance between growth and environment.
Its implementation approach is characterized by significant reliance on regulations. It
divides State land into sections based on intended land use and requires local
governments to deal with the issue of balancing issues.
As implementations of growth management legislation across the country reach their 10-
year marks, there are expectations that major updates to the original plans will be
produced. Part of that effort should be to review whether the legislation has produced the
intended outcomes. The Washington Research Council produced an outcomes analysis
of Washington State's GMA in 2000-2001.
The degree to which the current land use characteristics of any region aligns to the
intended land use characteristics for the GMA designation is directly related to the
amount of change that the area will experience assuming that adequate attention and
funding is available to factors deemed critical to the change. Some of the issues that have
emerged from this change are issues of property rights, and the degree of authority
current residents and area users have in the designation and/or change process.
There are groups that are challenging the theories that underlie Growth Management.
Smart Growth's reliance on regulations to manage the implementation has been
challenged by those that argue that other forms of incentives will be at least as effective.
Outcome measures reviews are also pointing to significant failures of Smart Growth to
produce the intended results, particularly in the area of Affordable Housing. And local
citizens, generally not involved in the process of Growth Management, are becoming
more vocal about the impacts they are experiencing from its implementation.
11 Personal Information
11.1 Work experience
Sharon and I recently finished 27-year careers at The Boeing Company, being hired
within 6 months of each other in 1975. At Boeing, our careers included management
positions from line supervision through executive levels and spanned a transformative
period in Boeing's history, the outcome of which we see today as a very "different"
company than the one we started with. During the period Boeing awoke from a culture
of defects and shims with an attitude of having "a God-given right to 50% market share"
and moved into a culture of quality, efficiency, and global competition. Being part of the
culture ourselves AND in positions with leadership responsibilities we had to face head-
on the challenges of causing a positive transformation in the company.
Since leaving Boeing, we've started our own home -based business together. Under the
trade names of Timeless Serenity and Carpenter & Associates, we enjoy the learning and
experience of bringing high -quality alternative (soy -based) candles and candle
(D2005 Carpenter & Associates 6 QOL0506 Rev: New 06/20/05
Quality of lffe
accessories to customers, and providing consultation and facilitation to small businesses
using the experience and expertise we gained in our working careers. Sharon, who had
volunteered with the Humane Society for Seattle/King County for over 15 years, also
took a part time job managing their outreach programs which provide animal -related
assistance for low-income AIDS disabled and senior citizens. Tom and one of his
business associates have collectively volunteered close to 2,000 hours since 2003 project
managing and facilitation the Humane Society's disaster preparedness and business
continuity program.
Sharon and I are both degreed in Business Administration, one from Seattle University
and the other from Seattle City College.
I moved to Seattle in 1966 after graduating from high school in Iowa and, with the
exception of three years as an officer in the U.S. Army, have lived in the Seattle area ever
since. Sharon, on the other hand, is Renton -born and graduated from Renton High in
1970. Her parents and sister still live in the Renton area.
12 Contacts
• Bonnie I. Walton Renton City Clerk
• Renton City Council with special interest by Terri Briere (Chair in liaison to the King
County Growth Management Council, Dan Clawson (Chair, Planning &
Development Committee)
• Four Creeks King County Unincorporated Area Council (initial contact in June, 2005;
follow up planned for July, 2005)
• CARE and Gwen High
• East Renton Plateau Citizens Council
• King County Growth Management Council (TBD via Terri Brier and David Irons)
13 Copyright
This document and information may be shared freely as long as the copyright notice and
version identification information is preserved.
14 Change history
QOL0506 Rev: New
• Initial release intended for use during the initial contacts with the Renton City
Council and King County's Four Creeks Unincorporated Area Council (mid-2005)
V2005 Carpenter & Associates 7 QOL0506 Rev: New 06/20/05
WEDGEWOOD LANE ANNEXATION
PUBLIC HEARING
COUNCIL CONSIDERATION OF
FUTURE R-4 ZONING AND ANNEXATION EFFECTUATION
June 20, 2005
The City has now received notice from the Washington State Boundary Review Board
for King County that they have approved the proposed 35.68-acre annexation (see map
on back of handout). Renton is required to hold a second public hearing on future
zoning for the subject site. If Council continues to support this annexation the
Administration is asking that it also consider adopting an ordinance implementing the
annexation itself as well as an ordinance for concurrent City zoning.
The subject site is located within the City's East Renton Plateau Potential Annexation
Area and is designated Residential Low Density (RID) on the City's Comprehensive
Plan Land Use Map. This 35.68-acre site currently has King County's R-4 zoning on
it and there are 23 dwelling units situated within it. The City's proposed R-4 zoning
would allow up to 114 units and, unlike the County zoning which allows both attached
and detached units, would all be detached single-family units.
Tonight's public hearing will be the second of the two such required public hearings to
consider future zoning. The Administration is asking the Council to consider future
zoning that would be consistent with the Comprehensive Plan Land Use Map
designation of Residential Low Density. The recommended R-4 zone is consistent
with this designation. If the Council concurs, the Administration is recommending
that it hold the first reading of the annexation ordinance and the ordinance for future
zoning.
Recommendation:
The Administration is recommending that if the Council wishes to bring the
Wedgewood Lane Annexation into the City at this time that it rezone it R-4,
consistent with the current Comprehensive Plan Land Use Map designation, and
that it hold the first reading tonight of the two ordinances it authorized staff to
prepare when it last considered this annexation on March 14, 2005.
Council Hearing Handout 06-20-05.doc\
El
� t=77 C� ❑ i � - - -- --
- ❑ d F o 1
o +
I � �
4
- ct3
B
Qi 1� : ❑ T -
--°l -+_
C D
--r - — — --7--- ❑ -- -- — -- — - °
❑ o
-Cb U
00
UD
—13] L - - -
i
- - -
q 0 a — -- - e
❑ This doament is o grophk reDDruentatlon, not guaranteed
to survey acaracy, Ilnntended Fr city ppurposes only and
based on the but in/ormatlon avoitobla as of the data shown.
This map Is for display purpuu oNy.
Wedgewood Lane Annexation 0 400 800
Figure 3: Existing Structure Map 1 : 4800
Economic Development, Neighborhoods & Strategic Planning Existing Structure
Alex Pietsch, Administrator — — Renton City Limits
G. Del Rosario Note: Annexation boundary may differ from diagram.
L'NT� 24 September 2004 please see legal description for actual boundary. l� Proposed Annexation Area
W dgeNwod Lane Annexation
2"d Public Haring on R-4 Pre/one
A 0
innx'xation D) spo%itu}n
a
FXIStillp- Conditions
P A A - M ithin Renton's Potential Annexation Area
Location - East of 144th % t c St. if extended, and south of
St 11T Street. Site abuts t rhan Growth Boundarx on
its cast.
• Size - + 35.68 acres
• t ses Approximately 15 existing,mKle-family dwellings
• Boundaries
Abuts Renton on its west. Bounded on the north bx St
11411 St; if extended, and on the south bs
approximateh SI- 111", it extended.
Bounded on the cast, south of St I 1"" St, bx Honey
( reek and, north of St 11"" St, b) 148" are St..
Bac kgmUnd
\oh�c„t Intent ern
Dcscmbo h. 'uo4
• ( ouricif a�ccptcd Ott°
1'etation to knncx -n
Mash 14. 'uir
• ( rt� 1I0SIn'l 01c'r
trot, I3„undary Rcs ie A Hoard
,ri xluy l'- liwI
Fxi,ting Conditions - Vicinity
Generally located between
SE 11511 St it extended on
north and SE 121 St
if extended. on south
Located between
144th Ave SE if
extended on the west
and Honey Creek
South of SE 1?'th
A ieinitx Flap
MO
m o
pmowoo
--
3J0<
-0 0) CD
ID o � �T
N N C7 d.
3
3
N. CT (D 3 G1
y m o ��
j+Qm
N
7
JOc
o0)
7
N
O DZj .N..
V J
CD
y 3 C 0 J
fn N
O CDO
ID N y
(D
3
ID
3
.J
•
rn
0In N
� CY CD
no o (A
CD
CrJ
r—
ID 0y M
x CD m
N
i4
Cn lO
C ID ti.
71
ID
7
O_ ^'
d
IDga
05
3 ID J
0
z
'�
3
_
9
Q ID
Dl J O.
r�•
it
�N...'..
.
CD
CD 3
(D CD
rl�
WOMM� G
�./
in
N U.
C
`3
7
c
3 y m
'0r cI
~1
may/
Fi
M
C
d 7
£ 4
Q
d
:,
=
s'
'
C G
1i f
45
J
l r
I
�
7
c_
-
.. c
v
X
S Q
15 C
e,
PuJUi c Hearirl9 Correspottq�«tc�
4 -go- aoos-
�G!'IG�it Zfcna � 6,
From: Bonnie Walton
To: maren4@comcast.net
Date: 6/20/2005 1:13:43 PM
Subject: Re: Comments for Public Hearing/Wedgewood Lane Annex. and Zoning Requirement
Dear Mr. Engbaum and Ms. Korsmo:
Thank you for your email. Copy of this will be forwarded to all Council members and Mayor
Keolker-Wheeler, and it will be entered into the record at tonight's public hearing.
If I can provide further information or assistance, please feel free to contact me.
Sincerely,
Bonnie I. Walton
City Clerk
City of Renton
425-430-6502
>>> <maren4@comcast. net> 6/20/2005 1:00:35 PM >>>
To: Bonnie Walton
City Clerk, Renton Washington
From: Mark Engbaum and Renee Korsmo
We will be unable to attend the Public Hearing tonight (6-20-05) regarding the Wedgewood Lane
Annexation and Zoning Requirements, so we ask that this e-mail be added to the public comments.
Could you please e-mail us back at maren4ecomcast.net to let us know that our comments have been
recieved and will be read for the record at the Public Hearing tonight? Thank you Ms. Walton for your
help.
Renton City Council Members and Madam Mayor - We Mark Engbaum and Renee Korsmo own a home
at 14522 S.E. 116th St. in Renton (presently unincorporated King County). We support the annexation of
our property to the City of Renton. We also support net R-4 zoning for this area and want to go on record
that we are opposed to anything higher than net R-4 zoning. Our single family home is on an acre and a
quarter of land that borders the north boundary (east corner) of the Wedgewood Lane properties
(specifically Wedgewood Lane III). Many of our neighbors have homes on three quarters of an acre or
more in this rural area and so the net R-4 zoning would help preserve the rural feel of this area while
allowing for growth within this urban growth zone.
Thank you Council Members and Madam Mayor for considering our comments in your discussion of this
issue.
Sincerely, Mark Engbaum and Renee Korsmo
Jq 6 �VV S C /I ( A St,
gem 41-n qq o 6 q
CITY OF RENTON
MEMORANDUM
DATE: June 20, 2005
TO: Terri Briere, Council President
Members of the Renton City Council
FROM: Kathy Keolker-Wheeler, Mayor
Jay Covington, Chief Administrative Officer
SUBJECT: Administrative Report
In addition to our day-to-day activities, the following items are worthy of note for this week:
GENERAL INFORMATION
• Renton's Enhanced Code Enforcement and Abatement Team (REACT) concept was selected over 21 other
programs by the Association of Washington Cities (AWC) to receive the 2005 Municipal Achievement Award.
These awards promote and recognize innovative and effective city government programs that significantly
improve the quality of life in local communities. Mayor Keolker-Wheeler will receive the award on
Wednesday, June 22°d, during a ceremony at AWC's annual conference in the Tri-Cities.
COMMUNITY SERVICES DEPARTMENT
• A community meeting to discuss the elements and layout of the future Heather Downs Park will be held on
Tuesday, June 28 h, at 7:00 p.m. at the Highlands Community Center, 800 Edmonds Avenue NE. In addition,
on Thursday, June 30"', an open house will be held at the future park site located on Union Avenue NE
between NE 3rd Court and NE 2°d. People will be able to drop in and walk the site from 6:30 p.m. to 8:00 p.m.
Representatives from the design consultant team, JA Brennan Associates, and the City of Renton Parks
Division will be on -site to answer questions. For more details about either event, please call 425-430-6600.
• On Tuesday, June 140', at the Renton Community Center, over 200 people celebrated the accomplishments of
104 athletes who participated in the Specialized Recreation track and field, soccer, and cycling programs. The
Greater Renton Kiwanis cooked for the event, and Renton Youth Councilmembers were on hand to serve.
• More than 400 people packed the Renton High School Stadium to watch the Youth Track and Field Meet with
the City of Snoqualmie. This program continues to be a favorite of surrounding communities with 220 young
people now registered for the Renton program.
• The Indoor Volleyball League season came to a close last week with 41 spring teams participating over the last
ten weeks. And, despite the rain, Summer Softball Adult Leagues have played over 545 games through June
17"'. The Fall Softball Leagues will start August 15L.
• The After -School Program at Tiffany Park Elementary School concluded on June 17`s with a performance by
the Tiffany Spirit Club, a group of over 60 children who have been meeting weekly to learn stomp and dance
routines.
• The Henry Moses Aquatic Center will be open daily for its second season beginning Wednesday, June 22°d, at
noon, and ending September 50'. Public swim hours are 12:00 p.m. to 3:30 p.m. and 4:00 p.m. to 7:30 p.m.,
seven days a week. New features include a slide for smaller children, a spray feature at the lazy river, a
separate pass card gate for season pass holders, group rates, a second canopy for rent, non -slip surfaces in the
locker rooms, improved signage, and pizza at the Shark Bite Cafe. For more information, call 425-430-6780.
Administrative Report
June 20, 2005
Page 2
• The City's swimming beaches will be open for the season from Saturday, June 25t', through Monday,
September 5`s, from 12:00 noon through 8:00 p.m. Lifeguards will be on duty daily at Gene Coulon Memorial
Beach, 1201 Lake Washington Boulevard North, and Kennydale Beach Park, 3600 Lake Washington
Boulevard North. For more information, contact 425-430-6700
PLANNINGBUILDING/PUBLIC WORKS DEPARTMENT
We have learned that Puget Sound Energy will be cutting down all the large trees on their substation site south
of 12'h (between Aberdeen and Edmonds). This activity will take place this coming fall.
Phase One of the Sunset Sewer Interceptor project is complete and Houser Way Tunnel and Sunset Boulevard
have now been opened. This roadway has been patched and is scheduled to be overlayed at the end of the
project. Phase Two begins today, Monday, June 20"', including a local closure of Sunset Boulevard NE in the
vicinity of the work zones, and will last until the contractor reaches NE Sunset Boulevard (new Sunset). The
first portion of this phase will close the south and northbound lanes of Sunset Boulevard NE between Bronson
Way South (at the entrance to Windsor Hills) and NE 7th Street during working hours only, and will be
reopened to traffic each night and on weekends. Detour routes will be posted around the construction area but
it is suggested that drivers try to avoid the work area.
Conveniently rid your house, garage, and yard of unwanted junk during the one -day -only "Neighbor -to -
Neighbor" Curbside Cleanup on Saturday, June 25 h. Items must be at the curb by 7:00 a.m. For more details
about this event, call 425430-7397 or visit the City's website at www.ci.renton.wa.us.
CITY OF RENTON COUNCIL AGENDA BILL
SUBMITTING DATA:
Dept/DivBoard... City Clerk
Staff Contact...... Bonnie Walton
SUBJECT:
Bid opening on 6/14/2005 for CAG-05-078,
S. 4th St. and Burnett Ave. S. Traffic Improvements Project
EXHIBITS:
Staff Recommendation
Bid Tabulation Sheet (three bids)
d
A OF: June 20,
AGENDA STATUS:
Consent......... X
Public Hearing..
Correspondence..
Ordinance.......
Resolution......
Old Business....
New Business....
Study Session...
Other...........
RECOMMENDED ACTION: APPROVALS:
Legal Dept......
Council concur Finance Dept....
Other.
FISCAL IMPACT:
Expenditure Required... $178,085.30 Transfer/Amendment..
Amount Budgeted........ Revenue Generated...
Total Project Budget ... $265,000.00 City Share Total Project...
SUMMARY OF ACTION:
Engineer's Estimate: $172,165.95
RECOMMENDED ACTION:
In accordance with Council procedure, bids submitted at the subject bid opening met the following three
criteria: There was more than one bid, the low bid was within the project budget, and there were no
irregularities. Therefore, staff recommends acceptance of the low bid submitted by Valley Electric Co.
in the amount of $178,085.30.
CITY OF RENTON
PLANNING/BUILDING/PUBLIC WORKS
DATE:
TO:
FROM:
SUBJECT:
MEMORANDUM
June 15, 2005
Bonnie Walton, City Clerk
Ryan Plut, Project Manager X&IJO
South 41h Street and Burnett Avenue South
Traffic Improvements Proiect
The work on the South 41h St. and Burnett Ave. South Traffic Improvements Project will include
reconstruction of a traffic signal and pedestrian facilities at the intersection of South 41h Street &
Burnett Avenue South in Renton, including but not limited to removal and installation of traffic
signal appurtenances, installation of drainage structures, asphalt paving, signing, striping,
sidewalk and curb ramp construction.
This Traffic Improvement Project in the South Renton Burnett Park Neighborhood is ranked
number 12 in the 2005-2010 TIP. The funding for this project is budgeted from the 502 South
Renton Reserve Fund. The lowest bid of $178,085.30 submitted by Valley Electric Co. fell
within the project's total budget at $265,000 and over the engineer's estimate of $172,165.95,
with a difference of $5,919.35.
The Transportation Design Section would like to recommend that the contract be awarded to
Valley Electric Co. Additionally, we also recommend that the Agenda Bill outlining this project
go Council Concur since the low bid is within budget, there were three bids submitted, and the
only irregularity in the low bid was an addition error of one dollar.
Attachments: Ord. 5134
2005 Budget pg. 6-50
Bid Tabulation
cc: Sandra Meyer, Transportation Systems Director
Leslie Lahndt, Transportation Design Supervisor
Ryan Plut, Transportation Design Project Manager
File
Amends ORD: 5110
CITY OF RENTON, WASHINGTON
ORDINANCE NO. 513 4
AN ORDINANCE OF THE CITY OF RENTON, WASHINGTON,
AMENDING ORDINANCE NO. 5110 RELATING TO THE CITY OF
RENTON 2005 ANNUAL BUDGET BY APPROPRIATING FUNDS
FROM THE TRANSPORTATION CAPITAL IMPROVEMENT FUND
BALANCE, INCREASING THE 2005 BUDGET, AND
REALLOCATING THE EXPENDITURES IN SPECIFIC
TRANSPORTATION IMPROVEMENT PROJECTS.
WHEREAS, the City Council passed the 2005 Annual Budget Ordinance (Ordinance
No. 5110) on December 20, 2004; and
WHEREAS, it is necessary and advisable to amend the 2005 budget to accommodate
new grants and other revenue and corresponding expenditures to complete transportation
projects;
NOW, THEREFORE, THE CITY COUNCIL OF THE CITY OF RENTON,
WASIHNGTON, DOES ORDAIN AS FOLLOWS:
SECTION L The following adjustments are hereby allowed and established in
fund listed below:
Fund
2005 Budget
Fund Balance, Jan. 1, 2005
$ 10,539,176
-Beginning
Total New Revenue
6,145,200
Total Committed Expenditures
(7,986,500
Budget Adjustments Per this Ordinance
2,382,300
Total Adjusted Budget
$ 10,368,800
Ending Fund Balance; Dec. 31, 2005
$ 6,315,576
SECTION H. A list of all individual budget adjustments in the Transportation
Capital Fund is hereby attached as Attachment A, and is available for public review in the
office of the City Clerk, Renton City Hall.
1
ORDINANCE NO. 5134
SECTION III. This ordinance shall be effecti-ve upon its passage, approval, and
five days after publication.
PASSED BY THE CITY COUNCIL this 18th day of April 2005.
Bonnie I. Walton, City Clerk
APPROVED BY THE MAYOR this 18 th day of Apri 1 , 2005.
Approved as to form:
Lawrence J. Warren, ity Attorney
Date of Publication: 4/ 2 2/ 2 0 0 5 (summary)
ORD: 1172:4/7/05:ma
W
— e4' - 4"-� , .1-� -
Kathy K er-Wheeler, Mayor
2
ORDINANCE NO. 5134
Transportation Capital Fund
Attachment A
Project
Proposed
TIP
Project Title
Number
2005 Budget
Change
2005 Budget
Comment
Add'R-lonal funding needs + 2005
1
Street Overlay ram
317.012108
$ 405,000
$ 300,000
$ 705,000
budget. See ►rote 1.
2 ISR
167/SW 27th St/Strander By
317.012138
10,000
5,000)
5,000
Reduced request $5,000 for 2005.
Completes 30% design for entire
project. Recent federal award of
3a
Strander Bv/SW 27th St Connect
317.012239
800,000
10,000
810,000
$750,000. See Note 2.
Complete final design for Ph. 1,
3b
Strander Bv, Phase 1, Segment 1 `
317.012239
210,000
210,000
Segment 1. See Note 2.
TO and Metro mitigation funding.
Construct Ph 1 in 2005. Prepare PSSE
padmge for Ph 2 with possible
additional design ($100k) due to
4
SR 169 HOV -140th to SR900
317.012175
10,000
1,107,800
1,117,800
Maintenance facility- See Note 3.
5
Renton Urban Shuttle RUSH
317.012163
5,000
-
5,000
Same as 2005 budget.
6
Transit Program
317.012109
20,400
-
20,400
Same as 2005 budget.
$12,000 for additional work required to
coordinate with Sound Transit and for
7
Rainier Av Corridor Study/ imprm
317.012193
20,000
63,100
83,100
additional project needs.
Reduced $305,3W from 2005 budget;
final report, public outreach, consultant
8
NE 3rd/NE 4th Corridor
317.012176
315,300
305,300
10,000
for first project.
$166,000 Metro mitigation funding for
Highlands. Maplewood added. See
9
Walkway ram
317.000009
236,600
263,400
500,000
Note 4.
New developer. Site plan being
developed. Rough estimate to complete
10
S Lake Wash. Roadway Improy.
317.012306
-
1,100,000
1,100,000
100%design. See Note 5.
11
SR 169 Corridor Study
317.012401
50,000
-
50,000
same as 2005 budget.
Construction was underfunded; new
construction estimate; includes $60.000
12
South Renton Project
317.012194
18,200
246,8W
265,000
reserve; kwkdes raihoed cost.
13
1-4051m vements in Renton
317.012210
30,000
-
30,000
same as 2005 budget.
14
Project Develo en n
317.012150
175,000
-
175,000
Same as 2005 budget.
Same as ZOOS budget. Potential need
15
NE 4th StfHogularn Av NE
317.012209
344,900
-
344,900
for increase at pry bid-
16
Rainier Av - SW 7th to 4th Pl
317.012308
585,000
265,000
320,000
Reduced request for 2005.
-
TO funding. Construction 2005.
Project scope reduced to coordinate
17
Benson Rd - S 26th to Main
317.012309
459,400
244,000)
215,400
with WSDOT nickel Project.
18
Arterial Circulation Program
317.000029
200,000
-
200,000
Saone as 2005 budget.
Bridge inspections this year, load rate
Wells Ave. Bridge, Prepare May Creek
19
Bridge Inspection & Repair
317.000106
40,000
6,300
46,300
BRAC application.
For project completion. Funding
20
Loop Replacement Program
317.000016
20,000
12,000
32,000
needed for 2W4 bid stir pending.
21
Sign Replacement Program
317.012113
7,500
-
7,500
Same as 2005 budget.
22
Pole Program
317.000091
25,000
-
25,000
Same as 2005 budget.
23
Sound Transit HOV Direct Access
317.012171
10,000
-
10,000
Same as 2005 budget.
24
Traffic Safety Program
317.012115
80,000
(40,000)
40,000
Reduced $40,000 in 2005.
25
Traffic Efficiency Program
317.012162
251,900
-
251,900
Some as 2005 budget.
26
JCBD Bike & Ped. Connections
317.012185
50,000
(200)
49,800
Finish upgrading all ramps.
27
Arterial Rehab. Prog.
317.012186
195,000
-
195,000
Average em-diture on program.
28
Duvall Ave NE
317.012123
1,258,700
408,700
850,000
Defer additional exists to 2006.
Federal HFS grant of $396.000.
Construction cost estimate kwr88se.
Bids will determine actual construction
29
SunseVDuvaN Intersection
317.012301
381.000
437,700
818,700
fuming needs-
30
RR Crossing Safety Pr .
317.012166
5,000
-
5,000
Same as 2005 budget.
31
TDM ram
317.012135
64,200
-
64,200
same as 2005 budget -
Sam as 2005 budget update LOS
32
Trans Concurrency
317.012107
40,000
-
40,000
program.
ORDINANCE NO. 5134
Transportation Capital Fund
Attachment A
TIP
Project Title
Project
Ntunber
2005 Budget
Charge
Proposed
2005 Budget
Comment
33
Missing Links Program
317.012106
30,000
-
30,000
Same as 2005 budget.
34
GIS Needs Assessment
317.012206
35,000
15.000
20,000
Reduced $15,000 in 2005; do in-house,
no consultant.
35
Grady Wy Corridor Study
317.012127
35,000
15,000)
20,000
Reduced $15,000 in 2005.
36
Sk Route Dev. Pr ram
317.012173
20,000
-
20,000
Same as 2006 budget.
37
Lake Wash. By -Park to Coulon Pk
317.012121
79,500
8,000
1,500
Defer $92,000 to 2006 or later,
remaining construction delayed.
38
1 Signal Coord.
317.012140
12,000
,000
6,000
Reduced request i7, 000 for ZOOS.
39
Environmental Monitoring
317.012187
85,000
-
85,000
Maintenance continues on both Phase 1
and 2.
40
Trans -Valle A Soos Creek Corr.
317.012191
5,000
3,000
2,000
Reduced $3,000 in 2005.
41
WSDOT Coordination Program
317.012146
10,000
5,000
15,000
Need input on needs for 2005.
42
1% for the Arts
317.012112
50,000
20,000
30,000
Reduced $20,000 in 2005.
43
Arterial HOV Program
317.012160
10,000
5,000
5,000
Reduced $5,000 in 2W5.
Park -Sunset Corridor
317.012177
25,000
10,000
15,000
Reduced $10,000 to 2005; initiate in -
house corridor study.
45
Lind AvSW 16th - SW 43rd
317.000024
5,000
-
5,000
Same as 2005 budget; Initiate in house
corridor study.
46
Benson Rd S IS 31st St
317.012129
61,500
61,500
-
King Co. lead; schedule unknown. See
Note 6.
47
Logan Av Concrete Panel Repair
317.012303
-
-
-
Programmed for 2W8.
48
Carr/Mill ilgrial
317.012304
5,000
3,000
2,000
Reduced $3,000 in 2005.
49
Transit Priority signal Systern
317.012174
30,000
22,600
7,400
Reduced $22.600 in 2005; lGng Co.
expenditure no longer iricluded.
50
Transit Center Video
317.012208
10,000
-
10,000
Same as 2005 budget.
51
Houser ft S - Main to Burnett
317.012213
-
-
-
Programmed for 2W8.
52
Trans Valley ITS
317.012211
5,000
45,000
50,000
Kwrg Co. lead; Ren ion's cortributio-
from 2004 budget; P.O. in procew
53
Lake Wash. By Slip Plane
317.012302
10,600
526,500
537,100
Go to ad and construct this year.
Design is complete.
54
Monster Road Bridge
317.0123C 7
12;000
456,700
468,700
Construction will continue until May
2005.
55
SW 7th SUUnd Ave SW
317.012153
26,500
23,500
3,000
Reduced $23,5W. Completed. Federal
and State audit passed. Need fonds for
Project closeout and WSDOT bags.
56
Duvall Ave NE - King County
317.012305
1,311,300
(876,200)
435,100
Reductions: -$983,600 RigM4-way
(King County will do directly); most
construction costs deferred to 2006.
Increased design costs.
Strander Reserve
_
Reserved for currently unknown capital
Proje t-
Total Sources
i 7,996 500
$ 2,382,300
$ 10,368,800
' ff funding received for St wxW, Ph. 1, Segment 1 cor6tnuction. $ 3,000,000 General fund or bonding
$ 13,368,800
NOTES
1. The 20M overlay project requires additional funding due to Poorer c0rlddi0n of streets.
2. Total request for 3a and 3b is $1,020,000 (construction not included).
3. Phase 1. WIN adjust allocation based upon actual low bid when known.
4. Maplewood Glen sidewalk replacement added t0 2005 program.
5. Design contract for full design likely tD occur this year. Timing unknown. $1 million or more is estimated to complete design
District 1. Bonding antic bed.
6. City has committed an upper limit of 200,000. Will return tD Council should project materialize in 2005.
7. The Dec. 31, 2005, fund balance is projected to be $6,315,576.
fAgrtffiMbudget12005U0D5 Realtocation Summary
Fund 502, Insurance Fund
Fund 502, is an internal service fund which provides accounting for self-
insurance services to all City departments for losses on property, liability,
worker's compensation, unemployment compensation and a healthcare
program. Expenses are paid by the Insurance Fund and rates are charged
to departments based on use and/or coverage requirements. Effective
January 1, 2004 a new Fund 512, Healthcare Insurance Fund was created
to report all healthcare related items.
Table 6-46. Fund 502, Insurance Fund
2002 2003 2004
2004
2005
Change
Item
Actual Actual Adj Bdgt
Actual
Budget
04/05
REVENUE --
Interest Earnings
50,000
124,994
50,000
0.0%
Liab/Prop Ins Premiums
1,840,800
1,840,800
1,932,400
5.0%
Industrial Insurance Premiums
715,800
831,764
786,700
9.9%
Unemployment Comp Premiums
114,700
114,700
114,700
0.0%
Judgements/Settlements/Misc
0
136,497
0
N/A
Other Financing Sources, Transfers in
940,000
940,000
0
-100.0%
TOTAL NEW REVENUE
3,661,300
3,988,755
2,883,800
-21.2%
Use of Prior Yr Revenue
162,500
0
665,500
309.5%
TOTAL RESOURCES
3,823,800
3,988,755
3,549,300
-7.2%
EXPENDITURES:
Regular Salaries
104,800
106,521
109,100
4.1%
Personnel Benefits
31,400
27,967
32,700
4.1%
Other Benefits:
Worker's Compensation
467,000
560,310
467,000
0.0%
Unemployment Compensation
142,000
83,421
142,000
0.0%
Professional Services:
Industrial Ins Administrative Costs
250,000
273,983
250,000
0.0%
Other Miscellaneous Services
42,000
2,500
42,000
0.0%
Insurance:
Property/Liability Claims
987,800
817,662
1,737,000
75.8%
Premiums & Assessment Fees
634,300
619,863
703,200
lag%
Travelrfraining
2,000
1,517
2,000
0.0%
Miscellaneous:
Memberships/Reg/Publications
2,500
410
2,500
0.0%
Emergency Services
100
2,180
100
0.0%
Transfer Out to Fund 512
1,100,000
1,100,000
0
-100.0%
Interfund Payments
59,900
59,900
61,700
3.0•10
TOTAL COKMTTED EXPENDITURES
3,823,800
3,656,234
3,549,300
-7.2%
Increase to Reserves
0
0
0
N/A
TOTAL EXPENDITURES
3,823,800
3,656,234
3,549,300
-7.2%
Fund Balance, January 1
7,611,589
7,611,589
7,944,110
4.4%
Total New Revenue
3,661,300
3,988,755
2,883,800
-21.2%
Total Committed Expenditures
(3,823,800)
(3,656,234)
(3,549,300)
-7.2•0
Fund Balance Plus Reserves
7,449,089
7,944,110
7,278,610
-2.3%
Anti Recessionary
2,100,000
2,100,000
2,100,000
ao%
South Renton Reserve
660,000
660,000
660,000
0.0%
Reserve for Claims
750,000
750,000
0
-100.0%
Operating Reserves of GG Funds
5,420,448
5,116,291
4,518,610
-16.6%
Fund Balance, Dec 31
(1,754,359)
(682,181)
0
-100.0%
Budget by Fund
6-50
Project Title: S. 4th Street & Burnett Avenue S. Traffic Improvements
BID DATE: June 14, 2005
Item
City of Renton
Engineers Estimate
Unit Est. I Unit Bid
Quantity Price Amount
_ 4
_ Remove Cement Concrete Sidewalk, Including Haul
SY
126
_ 5
Remove Cement Concrete Curb and Gutter, Including Haul
LF
274
_ 6 -
_ Roadway Excavation Including Haul __
LS
1
_ 7
Cement Concrete Curb and Gutter
LF
350
8
Cement Concrete Sidewalk
SY_
281
9
Asphalt Concrete Sidewalk
Ton
- 2
10
Cement Concrete Curb Ramp
EA
8
11
Asphalt -Treated Base
Ton
_
14
12
Asphalt Concrete Pavement Class B
_
Ton
11_
13
Catch Basin Type 1
EA
1_
_ 14
Catch Basin Type 2, 48"
_
LS
1
_ 15
Reconnection of Existing Pipes to New Drainage Structure
LS
_
1
_ 16
Storm Sewer Pipe 8"D.I. CL 52
LF
35_
_17
_Traffic Signal and Illumination System - Complete
LS
_ _
1
18
_
Permanent Signing _
EA
_
4
19
_ Remove Existing Traffic Markings
LS
1 ^_
20
Plastic Crosswalk Stripe
_
SF
230
21
_ Plastic Stop Bar
LF
_ _
62__
22
Plastic Arrow
EA
_
3
23
4" Wide, White Paint, Edge Line
LF
150
24
Raised Pavement Markers
LF
645
SCHPRICE XLS, 6.dTab
3.50 _2,205.06
8.00 2,176.00
10.00 1.260.00
5,000.00
12.0_0
5,000.00
4,200.00
_ 65.00_
_ 120.00
_
_ 18,265.00
240.00
400.00
__ 12_0.00
3,200.00
1,6_8090_
120.00
1,200.00�
_1,320.00_
1,200.00
3,200.00
3,200.00
900.00
900.00
30.00
95,132.50
300.00
1,050.00
95,132.50
1,200.00_
5,000.00
5.000.00
�10,00
2,300.00
8.00
496.00
_
50.00
_
150.00
2.50
375.00
TOTAL: 172,165.95
Valley Electric
Unit Bid
Price Amount
9,000.00
9,000.00
11.75
7,402.50
43.40
11,804.80
42.00
5,292.00
16.00
4,02.00
4,384.00
, ,,-M 00
33.00
11,550.00
_
51.00
14,331.00
312.00
624.00
_
1,650.00
13,200.00
312.00
4,368.00
312,00
3,4_32.00
_
2,490.00
2,490.00
5,174.00
5,174.00
1,034.00
1,034.00
93.00
3.255.00
68,900.00
68,900.00
475.00
1,900.00
1,366.00
1,366.00
3.60
828.00
4.50
279.06
85.00
255.00
1.20
180.00
3.20
2,064.00
(One dollar higher than bid
document)
Dennis R. Craig Transtech Electric,
Construction, Inc. Inc.
Unit Bid Unit Bid
Price Amount Price Amount
18,600,00 18,600.00 17,900.00 17, 900.00
2.10 1,323.00 5.25 3.307.50
33.40 9,084.80 38.45 10.458.40
32.25 4,063.50 37.10 4,674.60
12.25 3,356.50 14.10 3,86340
6,070.00 6,070.00 10,895.00 10,895.00
25.20 8,820.00 29.00 10,150.00
39.75 11,169.75 45.70 12,841.70
500.00 1,000.00 225.00 450.00
1,275.00 10,200.00 1,465.00 11.720. C C
195.00 2,730.00 225.00 3,150 CO
350.00 3,850.00 225.00 2,475.00
1,913.00 _ 1,913.00 2,200.00 2,200.00
3,975.00 3,975.00 4,570.00 4,570.00
795.00 _795.00 2,915.00 2,915.00
71.50_ 2,502.50 82.25_ 2,878.75
87,276.80 87,276.80 72,490.25 72,490.25
_ 280.00_ 1,120.00 325.00 1,300.00
1,176.00 1,176.00 2,210.00 2,210.00
3.10 713.00 3.15 724.50
3.90 __ 241,80 4.05 251.10
- 72.80 218.40 -- 74.75 - -224.25
--------------- -- --
1.10 165.00 1.15 172.50
2.80 1,806.00 2.90 1,870.50
182.170.05 183, 692 ,45
CITY OF RENTON
BID TABULATION SHEET
PROJECT: S. 4th St. and Burnett Ave. S. Traffic Improvements; CAG-05-078
DATE: June 14, 2005
FORMS
BID
BIDDER
Bid
Triple
Bond
Form
Dennis R. Craig Construction, Inc.
X
X
$182,170.05
PO Box 595
Redmond, WA 98073-0595
Janie Craig
Transtech Electric, Inc.
X
X
$183,692.45
PO Box 7429
Kent, WA 98042
Mary T. Guthmiller
$178,085.30
Valley Electric
X
X
$178,094.30
1100 Merrill Creek Parkway
Everett, WA 98203
Vicki Myers
ENGINEER'S ESTIMATE TOTAL: $172,165.95
*corrected
LEGEND:
Forms: Triple Form: Non -Collusion Affidavit, Anti -Trust Claims, Minimum Wage
CI T Y O F RENTON CO I INCI L fI GEND,A B IL L
SUBMITTING DATA:
Debt/Div/Board. 11uman Resources & Risk Management
Staff Contact....... Michael Webby (x - 7650)
FOR A GE,VDA OF: June 20, 200
1
AGENDA STATUS:
Consent ................. X
SUBJEC"I': Public I tearing.....
Reorg, Cmty. Svcs. Housing Repair Division,
Salary Adjustment for Dousing Repair Positions effect.
June 2005; Police Manager; P/PW Dept. Utility Eng effect.
January 2005
FXHIBI'TS: Issue Paper & Executive Summaries for
January 2005 and June 2005,
Fiscal Costs, and Job Classifications for.
Utilities/GIS Engineer, I lousing Repair Coordinator,
I lousing Repair Technician
Correspondence...
Ordinance .............
Resolution............
Old Business........
New Business.......
Study Session.......
Other .....................
REAOMEMENDED ACTION: APPROVALS:
Refer to Finance Committee Legal Dept-.-X
Finance Dept. X
Otherr.....................
FISC�11. IiIIPAC'T:
Expenditure Required ..... $ 14,801. Translcr/Amendment....
Amount Budgeted ........... $ 14,861. Revenue Generated.......
SUI\ MARY OF :ACTION: Salary Adjustment and "Title Change of the following classifications.
Current Title
Current
New Grade
Budget Change thru
Grade
2005
_
Police Manager
m34
m38
$4,392
Civil Engineer Ill (New Title- Utilit /GIS Engineer)
a27
a31
$7,452
The above changes, if approved, will be effective January 1, 2005. These reclassifications will not require
additional budget appropriations.
Current Title
Current
New
Budget Change thru
Grade
Grade
2005
Housing Assistance Specialist (New Title —Housing
a18
a20
$1,708
_Repair Coordinator)
I ousing Maintenance Worker — (New Title housing
a07
a08
$1,309
Repair Technician)
The above changes, if approved, will be effective June 1, 2005. These reclassifications will not rcqmre
additional budget appropriations.
STAFF RF.COi\I1IENDATI0N:
Approve the I lousing Repair Division of the Cornrnunity Services Department reorganisation, title changes, and
salary adjustments, the Police Department salary adjustment, and the I'lanning/Building/Puhlic Works
Department title change and salary adjustment. Funds to implemetit this recommendation are contained within
the respective departmental budgets, which will cover the additional costs of these reclassifications in 2005.
64,11,
O�HUMAN RESOURCES & RISK
_- MANAGEMENT DEPARTMENT
4
\�,.Trco� M E M O R A N D U M
DATE: June 10, 2005
TO: Terri Briere, Council President
r , Members of the Renton City Council
VIA: *ebby,
eolker-Wheeler, Mayor
FROM: HR & RM Administrator
STAFF CONTACT: Eileen Flott
SUBJECT: Reorganization and Salary Adjustments
The purpose of this document is to provide an executive summary of the review process
of certain positions. If approved, the recommended salary adjustments contained in this
report would be retroactive to January 1, 2005 except for two (2) classifications, which
would be retroactive to June 1, 2005. The salary analysis affects positions in the
Community Services, Planning/Building/Public Works, and Police Departments.
We processed four (4) reviews during this period and are recommending four (4) for
salary adjustments for 2005.
The result of this review process, if approved, will provide salary adjustments to four (4)
employees. Salary adjustments are based upon the labor market and internal equity. The
cost of implementation during FY 2005 is approximately $14,861, excluding salary
related benefits.
Recommendation by Department
PLANNING/BUILDING/PUBLIC WORKS
Civil Engineer III (Local 2170, P-rade a27,) Utilities Division (JD Wilson): Over the
past five years this position has added additional duties of creating and maintaining
hydraulic models and GIS databases. These additional duties had been contracted out
previously costing the utility approximately $20,000 - $30,000 a year. With these
changes it is recommended the current Civil Engineer III position, salary range a27,
occupied by J. D. Wilson be converted to Utility/GIS Engineer salary range a31, effective
January 1, 2005.
is\files\reclass\council\issue paper re_org 2005.doc
Michael Webby
Page 2 of 2
June 10, 2005
POLICE
Police Manager (Non -Represented, grade m34) Penny Bartley: The duties performed by
the Police Manager have continued to increase. Recently she assumed responsibility for
managing a very complex interlocal agreement among 37 public agencies relating to the
collection, holding and transportation of detainees. In order to maintain equity within the
division managers and to compensate Ms. Bartley for her level of responsibility staff
recommends a salary adjustment to grade m38, effective January 1, 2005.
COMMUNITY SERVICES
Housing Assistance Specialist (Local 2170, grade al 8): The reorganization of duties of
this position will allow this position more time to manage the contracts and develop a
small job roster. This position will be more of a contract manager, then a journey -level
maintenance worker. Our recommendation to change this position is based upon labor
market analysis as well as internal equity. We recommend the position be increased to
grade a20 and the title changed to Housing Repair Coordinator effective June 1, 2005.
Housing Maintenance Worker (Local 2170, grade a07): The reorganization of duties
of this position will allow this position more time to provide information/education to
homeowners to prevent future health and/or safety hazards from occurring. Our
recommendation to change this position is based upon labor market analysis as well as
internal equity. We recommend the position be increased to grade a08 and the title
changed to Housing Repair Technician effective June 1, 2005.
i:\files\recIass\council\issue paper re_org 2005.doc
JANUARY 2005
GRAND TOTAL
COSTS
DEPARTMENT TOTALS
2005 TOTALS
COMMUNITY SERVICES
$ 3,017.00
PLANNING/BUILDING/PUBLIC WORKS
$ 7,452.00
POLICE
$ 4,392.00
TOTALS
$ 14,861.00
RCLCOST_January04.xls GR_TOTALS Page 4 6/7/2005
June 2005
RE -ORGANIZATION COSTS
EMPLOYEE
CURRENT POSITION
Jan -Dec 05
June -Dec 05
COST
NOTES
NEW POSITION & GRADE
Before Re -class
After Re -Class
Vacant
Housing Assistant Specialist
$ 57,444.00
$ 59,152.00
$ 1,708.00
grade a20 step E Housing Repair Coordinator
Lynn Rothlisberger
Housing Maintenance Worker
$ 43,764.00
$ 45,073.00
$ 1,309.00
grade a8 step E Housing Repair Technician
TOTAL HUMAN SERVICES
$ 101,208.00
$ 104,225.00
$ 3,017.00
TOTAL COMMUNITY SERVICES
$ 101,208.00
$ 104,225.00
$ 3,017.00
Reorcg_January05.xls cnry_svcs Page 1 6114/2005
JANUARY 2005
RE -ORGANIZATION COSTS
EMPLOYEE
CURRENT POSITION
Jan -Dec 05 ,Jan
-Dec 05
2004 COST_
NEW POSITION & GRADE
Before Re -class lAfter
Re -Class
John Wilson
Civil Engineer III
$ 71,760.00
$ 79,212.00
$ 7,452.00
UtilitylGIS Engineer grade a31
UTILITIES GRAND TOTAL
$ 71,760.00
$ 79,212.00
$ 7,452.00
LLI.1=5200
PLANIBLDGIPBLC WORKS GRAND TOTAL
71 760.00
$ 79,212.00
RCLC0ST_January04.x1s pbpw Page 2 61712005
JANUARY 2005 SALARY ADJUSTMENT COSTS
EMPLOYEE CURRENT POSITION Jan -Jun 05 Jan -Dec 05 !COST NOTES
Before Re -class !After Re -Class
Penny_Bartley .Police Manager 86472' 90864fi 43921Step D grade m38
Support Services Total_�$- - 86,472 $ - 90,864 1$ 4,392
-- -
POLICE GRAND TOTAL $ 86,472 $ 90,864 $ 4,392
RCLC' muary04.As Police 3 1
6/7/2005
,, CITY OF RENTON
Human Resources & Risk Management
Kathy KeolkerWheeler, Mayor Michael R. Webby, Administrator
DATE: May 9, 2005
TO: Terri Briere, Council President
Members of the City Council
VIA: K by Keolker-Wheeler, Mayor
FROM: ebby, HR & RM Administrator
SUBJECT: New Position and Salary Recommendation
BACKGROUND: Mr. J.D. Wilson is a Civil Engineer III. He creates and maintains
hydraulic models of the City's water system; he also creates and maintains a GIS
database of the water system. The GIS database work traditionally had been contracted
out costing the utility approximately $20,000 - $30,000 a year. He has performed these
additional duties and responsibilities for the last five years. To further describe the
benefits of Mr. Wilson's GIS work I have attached an issue paper from Gregg
Zimmerman, Planning/Building/Public Works Administrator
ISSUE: Gregg Zimmerman met with Eileen Flott and me and discussed his concerns
related to Mr. Wilson's responsibilities, value to his Department and the City, as well as
his concern about J.D.'s level of compensation. He explained his interest in addressing
pay equity for Mr. Wilson's "unique" collection of duties and responsibilities. Gregg
requests Mr. Wilson's salary range is adjusted to recognize the added GIS work he
performs.
CONCLUSION: With this in mind, I recommend the City create a new position of
Utility/GIS Engineer to replace the existing Civil Engineer III position occupied by Mr.
Wilson. I also recommend the new position be classified at range a31, effective January
1, 2005.
1055 South Grady Way -- Renton, Washington 98055 - (425) 430-7650
MThis—,—tai— 5n^4 .s.r 4-1 material 3()% rx t r
RENTON
AHEAD OF THE CURVE
CITY OF RENTON
PLANNINGBUILDING/PUBLIC WORKS
MEMORANDUM
DATE: February 24, 2005
TO: Jay Covington, Chief Administrative Officer
CC: Mike Webby, HR & Risk Management Administrator
FROM: Gregg Zimmerman, Administrator (ext. 7311�A
STAFF CONTACT:
SUBJECT:
ISSUE:
Lys Hornsby, Utility Systems Director (ext. 7239)
Request for a New Position and Title for J.D. Wilson from Civil
Engineer III to Utility & GIS Engineer
Request to form a new position for J.D. Wilson from Civil Engineer III, grade 27 to a new
position titled Utility and Geographic Information Systems (GIS) Engineer, grade 31.
RECOMMENDATION:
Create a new position titled "Utility and GIS Engineer", grade 31, to replace a Civil Engineer III
position in the Water Utility section.
BACKGROUND SUMMARY:
For the past five years, J.D. has voluntarily taken on a significantly greater role than his current
position, as a Civil Engineer III requires. The most significant changes in J.D.'s duties include
the following:
• Creation and Maintenance of the Hydraulic Model of the City's Water System
J.D. applied his expertise and high level of competency in advanced computer and
engineering technologies in the creation, development, operation and maintenance of the
hydraulic computer model of the City's water system. This knowledge of advanced
computer and engineering technologies, software applications and technical skills is not
required under J.D.'s current position. The City and other public and private agencies use the
hydraulic model to determine the available fire flow and water pressure for the purpose of
Covington/CE III/GIS Recommendation
February 24, 2005
Page 3 of 3
Knowledge of and ability to use Visual Basic (VB), Visual Basic for Applications
(VBA), ArcObjects, and other component object model (COM) objects to create data
retrieval, report, and map applications.
• Comparison With Other Jobs in the City
For comparison, some of J.D.'s duties overlap with several City job descriptions at higher
grades, such as Program Development Coordinator I1(grade 29), Mapping Coordinator
(grade 29) and Application Support Supervisor (grade 30). Duties that J.D. performs that are
covered under these other positions include updating and maintaining maps using CAD and
GIS; providing hardware and software support to staff, and supporting the City's GIS
development, implementation and maintenance. In addition, J.D. performs many other duties
at an advanced technical level that are not included in any current City job description and
have historically been completed by hiring outside consultants, such as hydraulic modeling
and database management. J.D. also possesses the higher education and experience levels
cited for these higher -grade positions.
CONCLUSION:
J.D. performs a wide variety of duties at an advanced technical level that are well outside the
Civil Engineer III classification. These additional tasks have resulted in substantial one-time
savings estimated at over $300,000 and continue to provide an estimated annual savings of over
$142,000 to the City. Moreover, by performing these duties in-house, the City saves time and
money, and is better able to respond to customer requests. To properly compensate J.D. for
performing these additional duties, we recommend the creation of a new position title of "Utility
and GIS Engineer" at a grade 31.
cc: Abdoul Gafour, Water Utility Engineering Supervisor
Eileen Flott, HR Manager
City of Renton
Received
MAR 0 3 2005
Human Resources &
Risk Management
HA\File Sys\USA - Utility Systems Division Administration\USA-04 - Personncl\USA-04 - 0006 Correspondence - Personnel\reclass-issue-
J.D.doc\AGtp
CITY OF RENTON
CLASS TITLE: C4VI-L-UTII,ITY/GIS ENGINEER4H (EN-24752425
BASIC FUNCTION:
Under the direction of an assigned supervisor, plan and conduct complex and large scale
engineering studies and projects; develop and maintain Geographic Inforination Systems
(GIS) g�eodatabases for the City's utilities, create complex hydraulic models, coordinate
and direct outside engineering consultants and firms on assigned projects and studies.
r aM09.1" HamrQ•e
REPRESENTATIVE DUTIES:
*Create and maintain hvdraulic models for Citv's utilities. Perform
hvdraulic, quality and energy -use analyses of the systems. Gather
information from diverse sources to create and maintain complex hydraulic
models for the Citv utilities. Interpret the results of model analyses by
applying professional engineering judgment, knowledge, and understanding
of the capabilities and limitation of the hvdraulic models.
*Interprets results of hvdraulic analyses, develops and recommends capital
improvements to the City's utilities to improve short-term and long-term
demands of City's utilities.
*Provides necessary information reearding the availability of water flow and
pressures for the purposes of fighting fires and specified locations in the
water distribution system. Advises the Water Maintenance Section on
options to address water quality problems in the system and recommends
locations for water quality monitoring stations.
*Create, maintain, and document schema for databases and geographic
information systems (GIS geodatabases) for piped utilities. Coordinates with
other sections, divisions and departments within the City to ensure schema
Civil Engineer III - Continued
Page 2
developed for both piped utilities and used by piped utilities are compatible
with enterprise wide information needs.
* Tests new software applications and provides data retrieval and reports for
use by various City departments.
*Plan and conduct large-scale engineering studies utilizing staff from within
the City or outside consultants as necessary; develop timelines, specifications
and project objectives; monitor progress and provide periodic reports
regarding assigned projects.
*Develop specifications and cost estimates for bids on major projects
requiring outside consulting assistance; participate in the selection of
consultants; negotiate and monitor contracts and services of outside firms to
assure compliance with specifications, timelines and City ordinances and
policies; approve payments to contractors on major projects as appropriate
and submit to superiors for final authorization.
*Provide work direction and guidance to other engineering personnel on City
projects as requested; provide project leadership as assigned on projects
requiring City personnel; establish and maintain project schedules and
activities.
*Provide written and verbal reports as necessary on assigned projects and
contracts; present reports to outside groups, City Council, commissions or others
as requested; maintain records for assigned activities.
*Meet with City personnel as necessary on capital construction,
transportation, utility projects and studies to assure needs are being met by
proposed designs and specifications; assure proper communication at key
intervals between consultants, contractors, department heads and others.
*Review complex architectural and engineering plans and drawings for
major construction projects within the City to assure compliance with City
ordinances and policies; approve plans or indicate deficiencies with
corrective action guidelines.
*Make complex calculations involving assigned engineering specialty
including utilities, construction, transportation and others; review
calculations and designs of others to assure conformance with City
engineering standards.
*Prepare and review drawings and design as necessary for major projects to
lead or assist in the overall design effort.
Civil Engineer Ill - Continued
Page 3
*Prepare engineering drawings in support of technical models for permit —
review, in-house projects and project management.
*Provide for and lead plan reviews for outside contractors on major projects
and studies to assure compliance of building and other construction with
City codes, ordinances and policies; inspect sites as necessary.
Perform related duties as assigned.
KNOWLEDGE AND ABILITIES:
KNOWLEDGE OF:
• Advanced principles, practices, methods and techniques of civil engineering.
• Various modeling software (i.e. MWH Soft H2Onet and InfoWater hydraulic
modeling software).
• Using manipulating and formatting complex queries.
• Designing relational databases system schemas and implementingi with various
software.
• Connecting to various compliant databases (i.e. Open Database Connectivity
ODBC .
• Computer aided software engineering (CASE) tools such as MS Visio Professional,
Rational Rose and Unified Modeling Language (UML).
• Creating maintaining and documenting schema for databases and geodatabases.
• Using various programs (ESRI ArcGIS (Arclnfo, Arc Catalog, Arc Map, Arc Tools,
etc) to create maintain and document geodatabases and map applications.
• Using various programs to create data retrieval reportand map applications (i.e.
Visual Basic (VB) Visual Basic for Applications (VBA), Arc Objects, and
Component Object Model (COM).
• Technical specialty within engineering discipline appropriate to assignment.
• Modern engineering methods as applied to the design, project management and
construction of public works, public utilities, transportation and general construction.
• Applicable laws, codes, regulations, policies and procedures.
• SEPA and/or NEPA environmental review requirements associated with field of
specialty.
• Oral and written communication skills.
• Correct English usage, grammar and vocabulary.
• Interpersonal skills using tact, patience and courtesy.
• Principles of work direction and guidance of other technical personnel on project
teams.
ABILITY TO:
0 Perform difficult and complex engineering mathematical computations.
Civil Engineer III - Continued Page 4
• Use various modeling software (i.e. MWH Soft H2Onet and InfoWater hydraulic
modeling, software).
• Use manipulate and format complex queries.
• Design relational databases system schemas and implement with various software.
• Connect to various compliant databases (i.e. Open Database Connectivity (ODBC).
• Use computer aided software engineeringL(CASE) tools such as MS Visio
Professional Rational Rose and Unified Modeling Language (UML).
• Create maintain and document schema for databases and geodatabases.
• Use various programs (ESRI ArcGiS (ArcInfo Arc Catalog, Are Map, Arc Tools, etc)
for creating maintaining and documenting geodatabases and map applications.
• Use various programs for creating data retrieval reporting and map 4pplications (i.e.
Visual Basic (VB) Visual Basic for Applications (VBA), Arc Objects, and
Component Object Model (COM).
• Design and evaluate engineering projects to assure objectives and codes are followed.
• Compile and analyze statistical and technical information, maps, research data and
other pertinent data.
• Prepare and obtain state and federal permits required for Capital Improvement
Program projects associated with field of specialty.
• Understand and follow oral and written directions.
• Communicate effectively both orally and in writing.
• Make verbal presentations and lead technical meetings.
• Meet schedules, commitments and time lines.
• Plan, organize and lead complex projects involving other technical personnel.
• Interpret, apply and explain codes, rules, regulations, policies and procedures.
• Maintain records and prepare comprehensive reports.
• Establish and maintain cooperative working relationships with others.
• Observe legal and defensive driving practices.
EDUCATION AND EXPERIENCE:
Any combination equivalent to: bachelor's degree in Civil Engineering or related field
and four years increasingly responsible engineering experience.
LICENSES AND OTHER REQUIREMENTS:
Some positions in this classification may require a Professional Engineer license. Valid
Washington State driver's license.
WORKING CONDITIONS:
Work is performed in office and field environments.
*Denotes an essential function
Civil Engineer llI - Continued
Page 5
Effective Date: January 2005
September- 1993
..Il
Kathy Keolker-Wheeler, Mayor
DATE: May 9, 2005
CITY 'OF RENTON
Human Resources & Risk Management
Michael R. Webby, Administrator
TO: Terri Briere, Council President
Members of the City Council
VIA: Kathy Keolker-Wheeler, Mayor
FROM: 4kebby, HR & RM Administrator
SUBJECT: Human Services Division Reorganization Recommendation
BACKGROUND: The Human Services Division has two full-time positions in the
Housing Repair Assistance Program, which are funded by Community Development
Block Grant funds, and is contemplating a modification to the scope of work, job duties
and responsibilities of the two positions. The Human Services Divisions proposes the
changes in order to make the repair program more cost effective: For more information
on the changes I have attached a copy of a memo from Dennis Culp, Community
Services Administrator explaining the department's rationale for the reorganization and
job modifications.
ISSUE: Dennis Culp and Karen Bergsvik�met with Eileen Flott and me and discussed
their concerns related to Housing Repair Assistance program reorganization. The
changes in duties of both positions will require new job classifications and possibly title
changes. The Human Resources Department surveyed other municipalities for salary
comparisons and found a few matches for both positions. The survey data shows the
current base wage of the proposed Housing Assistant Specialist position and the Housing
Maintenance Worker position to be below our, 60t' percentile target. Both of these
positions are within the AFSCME, Local 2170 bargaining unit.
CONCLUSION: With this in mind, it is our recommendation the Housing Assistant
Specialist's salary be adjusted to a20 from a18, which is approximately five percent, and
the title changed to Housing Repair Coordinator. The Housing Maintenance Worker's
salary be adjusted to a08 from a07, and the title changed to Housing Repair Technician.
With your approval we recommend the effective date of these salary adjustments to be
June 1, 2005.
1055 South Grady Way -- Renton, Washington 98055 - (425) 430-7650
MThknano,—tai-50 rpfv k lmaterial 30% oust consumer
RENTON
AHEAD OF THE CURVE
•/r
MEMORANDUM
AVON
.4AN
CITY OF RENTON
COMMUNITY SERVICES
0 Committed to Enriching Lives 0
DATE: February 18, 2005
TO: Mike Webby, HR/RM Administrator
„Eileen Flott, HR Manager
FROM: Dennis Culp, Community Services Administrator _X� St vg4,'tQ
SUBJECT: Human Services Division Staff Assignments
The Human Services Division is contemplating a modification to the scope of work, job
duties and responsibilities of two positions in the Housing Repair Assistance Program.
Two full-time positions are funded by Community Development Block Grant capital
funds.
The Housing Maintenance Worker presently performs a variety of skilled work related to
home maintenance and minor repair for qualifying low-income Renton residents.
The Housing Assistance Specialist position performs a wide variety of duties including
assuming responsibility for the projects and operations of the program, assisting the
Housing Maintenance Worker as needed, and supervising and evaluating assigned
personnel to ensure repairs are made in compliance with applicable laws, regulations,
policies and procedures.
We propose the following change in order to make the repair program more cost
effective: The Housing Assistance Specialist will establish a small job roster for
contracted jobs. Currently, we solicit three bids from contractors. This is very time
consuming for the current staff and we do not have relationships with many of the
vendors so there is not a price reduction. The roster will not only give the vendors an
opportunity to bid the work at a reasonable price but will enable us to establish a working
relationship.
Policies adopted in 2003 shifted the focus from a variety of repairs to only providing
repairs relating to the health and safety of the residents. The majority of the repairs are in
the areas of plumbing, heating, accommodations for disabilities, and roofing. While the
workers are able to do the simple repairs, they may not have the necessary skills to do
more complex work. If that is the case, repairs will then be contracted.
MEMORANDUM
Fs
,.0
CITY OF RENTON
COMMUNITY SERVICES
0 Committed to Enriching Lives 0
DATE: February 18, 2005
TO: Mike Webby, HR/RM Administrator
„Eileen Flott, HR Manager
FROM: Dennis Culp, Community Services Administrator
SUBJECT: Human Services Division Staff Assignments
The Human Services Division is contemplating a modification to the scope of work, job
duties and responsibilities of two positions in the Housing Repair Assistance Program.
Two full-time positions are funded by Community Development Block Grant capital
funds.
The Housing Maintenance Worker presently performs a variety of skilled work related to
home maintenance and minor repair for qualifying low-income Renton residents.
The Housing Assistance Specialist position performs a wide variety of duties including
assuming responsibility for the projects and operations of the program, assisting the
Housing Maintenance Worker as needed, and supervising and evaluating assigned
personnel to ensure repairs are made in compliance with applicable laws, regulations,
policies and procedures.
We propose the following change in order to make the repair program more cost
effective: The Housing Assistance Specialist will establish a small job roster for
contracted jobs. Currently, we solicit three bids from contractors. This is very time
consuming for the current staff and we do not have relationships with many of the
vendors so there is not a price reduction. The roster will not only give the vendors an
opportunity to bid the work at a reasonable price but will enable us to establish a working
relationship.
Policies adopted in 2003 shifted the focus from a variety of repairs to only providing
repairs relating to the health and safety of the residents. The majority of the repairs are in
the areas of plumbing, heating, accommodations for disabilities, and roofing. While the
workers are able to do the simple repairs, they may not have the necessary skills to do
more complex work. If that is the case, repairs will then be contracted.
Redefining the Housing Assistance Specialist position will allow this position more time
to manage the contracts and develop a small job roster. The position will be more of a
contract manager, than a person who performs journey -level repairs and assists the
Housing Maintenance Worker.
The Housing Maintenance Worker position will continue to do the simple repairs.
Additionally, this employee will provide information/education to homeowners to
prevent future health and/or safety hazards from occurring. This may be done on either
an individual or group basis.
Copies of the proposed job descriptions are attached for you review. If you concur in
these changes, please finalize the draft job descriptions, evaluate them to assign an
appropriate job title and pay grade, and post the vacancy for the recruitment of the
Housing Assistance Specialist.
Attachments as stated
Cc: Karen Bergsvik, Human Services Manager
January 2005 Survey Detail with 2005 wages
Housing Assistant GRADE
Specialist a18
DEPT_
Cnnty Services
Perform a wide variety of duties in planning and administering the City's Housing Repair Assistance Program (HRAP). Responsible for ensuring repairs are made in conformance with applicable
laws, regulations, policies, and proceudres. Assessing homes for the safety and health hazards that need repair; developing specifications, requesting bids, and preparing RFQs for work to be performed
maintaining a small job roster; inspecting completed work to ensure compliance with specifications and applicable laws, codes and regulations; coordination with volunteer groups; evaluation of the program —
ensuring excellent customer service; record -keeping and reporting; understanding correct application of CDBG and contract requirements; develop budget, may perform minor home repairs
CITIES ---� Population TOP OF ' Adj -T- -- Notes - - ----- - -- _ _
SALARY RANGE 1 Range _
Auburn
45,355
n/m
Bainbridge Island
21,350
_
Bothell
Burien
30,910
31,480
n/m
Des Moines
29,120
n/m
Edmonds
39,580
_
Everett
95,470
5280 5280 Housing Improvement Inspector _
Federal Way
83,500
n/m
Issaquah
15,110
n/m _.
Kent
84,210
5026 5026 Human Services Coordinator
Kirkland
45,630
n/m
Lakewood
58,940
4397 4397 Housing Repair Coordinator
Lynnwood
34,500
Mercer Island
21,840
n/m
Mountlake Terrace 1
20,380
Olympia !
42,860
Puyallup i
35,490
n/m
Redmond
46,480
n/m
SeaTac
25,100
Shoreline
52,730
n/m
Snohomish
8,640
Tacoma
196,300
5105
5105 Housing Rehab Coordinator
Tukwila
17,230
n/m
University Place
30,720
n/m _
Renton—� 54,900
$-------- 4,787 ' $ 4,787 -5.9% - --- __— --_ —
Median
$ 5,065 $ 5,065.
60th Percentile
I
T $ 5,089 $ 5,089
2005 Jan_Reclass.xis Detail (2005) Page 1 3/21/2005
January 2005 Survey Detail with 2005 wages
Housing Maint GRADE DEPT
Worker a07 Cmty Services
perform a variety of work related to home maintenance and repair for the HRAP. This includes minor repairs related to the health and safety of low and moderate income homeowners,
assessing homes for needed repairs and teaching preventative maintenance and demonstrating how to do minor home repairs for Renton residents. Mus comply with all applicable federal regulations,
and requirements.
CITIES Population TOP OF Adj Notes
SALARY RANGE Range
Auburn 45 355 m
Bainbridge Island
21,350
Bothell
30,910
n/m
Burien
31,480
Des Moines
29,120
n/m
Edmonds
39,580
Everett
95,470 _-
-
4954
Housing Improvement Advisor (NO MATCH)
Federal Way _
83,500
n/m
Issaquah
15,110
n/m
Kent
84,210
4047
3642 Maintenance Worker III (Does more complex repairs, more lead responsibilities decrease 10%)
Kirkland
45,630
n/m
Lakewood
58,940
n/m
Lynnwood
34,500
—
Mercer Island
21,840
n/m
Mountlake Terrace
20,380
Olympia
42,860
Puyallup _
35,490
n/m
Redmond
46,480
n/m
SeaTac
25,100
Shoreline
52,730
n/m
Snohomish
8,640
Tacoma
196,300
4604
Housing Rehab Specialist (NO MATCH)___ _
Tukwila
_
17,230
n/m
�.---- ---- --- -- — — - -
University Place
_
30,720
--
n/m
Renton 54,900 $ 3,647 ! $ 3,647 0.1
Median _ $ 4,604 $ 3,642
60th Percentile -� $ 4,674 $ 3,642 -
2005 Jan Reclass.xls Detail (2005)
Page 1
5/3/2005
CITY OF RENTON
CLASS TITLE: HOUSING ASSISTANCE SPECIALIST (AS-2487)
BASIC FUNCTION:
Under the direction of the Human eo.-,,iees nn,,.,,,gemn assigned supervisor, —,perform a
wide variety of duties in planning and administering the City's Housing Repair
Assistance Program (HRAP).This program servesllousiH
Repaii: Asssistanee Pi-ogi-am fo the low and moderate -income homeowners that are
residents of the City of Renton. I'ei-€o}
Responsible forte censuring repairs are made in conformance with applicable laws,
regulations, building codes, policies, and procedures. The housing Repair Assistance
Program is funded by federal Community Development Block Grants (CDB(;), and must
comply with all applicable federal regulations and requirements (for example historical
preservations, and lead -based paint).
\v,--S f-a�irtc�ec—}T iwide at. fskilled —maintenance iscs--fc'i7c'c'"i'n`a`
age-, Skills and trdifling in all j
and e Areas of responsibility include
etistemersassessing homes for the safety and health hazards tfin-t—needing; repair;
developing specifications requesting bids and preparing Request for Qualifications
(RFQs) for work to be performed; maintaining a small iob roster,• inspecting completed
work to ensure compliance with specifications and applicable laws codes and
regulations_; coordination with volunteer groups; evaluation of the program; ensuring
excellent customer service �, record -keeping and reporting; understanding correct
application of C'DBG and contract requirements; developing and managing the program
budget. May perform a variety of minor home repairs..
maintenane- maintains aeeur-ate Feeards and logs; and assists in the
REPRESENTATIVE DUTIES:
the Community Development Bloek Grant (CI)BG) Fits and
accordance with established policies and Develop and administer
annual budget for the Housing Repair Assistance Program. Approves
expenditures for the program. Review and approve purchase orders:.
* Review, evaluate, and recommend changes to the Housing Repair
Assistance Program policies andprocedures-.Research and seek monetary
and in -kind donations for the program. Write applications for funding and
donations. Develop: and maintain positive relationships with businesses that
make donations.
Housing Assistance Specialist - Continued
Page 2
* Develop -program goals, objectives-,- a-nd timelines to accurately and
adequately respond to public n.Recruit volunteers and volunteer groups
to assist in performing repairs. Prioritize schedule, coordinate and supervise
projects with volunteer groups. Provide direction/instructions to volunteers
regarding the scope of work for repairs.
* Analyze home velar needs of et Sden is have applied 4o- 44+e
Frog -afw. 4; xph4 T the- -4' o usi n g Repair- A��e-- Vrog ffl {)ol ides - am
Prue—ed 4rc,,P-f-e iii--4o-c4ients the -process Anvoved in -the repairs, -% repair services, eduv4tte- -dents - about w- 410tne
"M:ntenance, and respond to-enner-gefw-y, calls.Conduct initial assessment of
homes for safety and health hazards. When appropriate, docomplete final
inspection of repairs to ensure compliance with applicable codes, contracts,
rules, and regulations.
n- er-Wrm und-4keet-ethers on fleFfOFmn„sresidential jou-ney-level--rear
work- t+tdudin -� ", �•�,--ei+rf�ente3`� ,
windows e ,-dead usedpaint abatement, historiF-+eservatfen;
lead and -radon testing of residences, end asbestos control vi-t fedeFal and
program guidelines.Review, evaluate, and recommend changes to the
Housing Repair Assistance Program policies and procedures.
*--Cendttct- comprehen home i-Spections; e.,z.matenaturye#
:f feasib
T `P A-y fop necessary permits. Conduct .final
with -work plans, sch"..'es budget, tN
amicable s, building codes, and the C14BG controet.
* 1'r-ovide training, dir-eetion and assistance to other Housing Repair- sta
summer erew and sub eontmetors. Train, direet and lead assigned staff in
the staff and efficient operation of all equipment used to complete worif
assignments: Develop outcome measurements for the program. Review
customer service survev results; with program manager and make changes as
needed.
*Develop specifications, request for bids, and prepare Request for
Qualifications (RFQs) for work to be performed. Maintain a small _job
roster. Evaluate contractors for timeliness and quality of repair.
*Interpret and explain policies and regulations to clients and potential
clients.; Rremain current regarding applicable laws, codes, rules and
procedures.
*Develop and maintain working relationships with other entities, such as
King County Minor Home Repair Program, Masters Builders Association,
and Rebuilding Together.
Housing Assistance Specialist - Continued
Page 3
*Help prevent future safety and health hazards by educating individual
homeowners about home maintenance.
*Ensure contract requirements with King County are met.
*Review work order requests and assess the urgency of the repair and the
depth of the repair to determine the appropriate contractor to do the work.
.:� ......�:.....�n.
materials,* Purchase
tools,and equipment in compliance with budget-.
*—Prepare and maintain accurate records including daily, monthly, and
annual reports in computerized database programs.
Assist in grogram outreach
and marketing.
Provide excellent customer service.
Perform related duties as assigned.
* Denotes Essential Job Functions
KNOWLEDGE AND ABILITIES:
KNOWLEDGE OF:
• Uniform Building Code (UBC), Uniform Plumbing Code (UPC), Uniform
Mechanical Code (UMC), Uniform Housing Code (UHC), National Electrical
Code (NEC), Washington State Energy Code (WSEC) related to residential
construction and repairs.
• Community Development Block Grant (CDBG), Housing Urban Development
(HUD), and Housing Repair Assistance Program's polices and procedures.
• Department of Labor and Industries health and safety regulations.
• Basic record -keeping methods.
• Word processing, spreadsheet and/or database software.
• Principles and practices of training and supervision.
• How to do basic minor home repairs.
• Provide excellent cEustomer sService.
• Program evaluation tools, including outcomes and outputs.
• Telephone techniques and etiquette.
• City policies, procedures organization, and objectives.
• Other community programs that can assist residents as needed.
Housing Assistance Specialist - Continued
Page 4
ABILITY TO:
• Communicate effectively both orally and in writing.
• Address and resolve potential or actual problems effectively as they occur in any
of the housing programs.
• Schedule and prioritize multiple projects and meet established deadlines.
• Maintain accurate records on all programs, contractors and participants.
• Read, interpret, apply and explain rules, regulations, codes, policies and
procedures.
• Make effective oral presentations at public hearings and meetings.
• Prepare and maintain accurate records and generate reports, and the ability to
collect, analyze and interpret data.
n sist in the development of gran Prepare grant applications.
• Establish and maintain cooperative and effective working relationships with
clients community volunteers, contractors, and staff.
• Operate machine1y, tools, and equipment relevant to the position.
plumbing,�412ei,foFm the funetions i-equir-ed by the position inelading but not limited to
,
et-. •,t �o aL
• Ability to lift up to W50 pounds.
• Accurately inspect and assess needed repairs on residential and mobile homes.
• Perform initial, interim, and final inspections of repairs to ensure compliance with
applicable codes, contracts, rules, and regulations.
• Plan,-ateprioritize and organize work
• Work independently with minimum supervision.
• Train, supervise, and provide work direction to others.
EDUCATION AND EXPERIENCE:
Any combination equivalent to- graduation from high school; and three ye s of ;^"m e-ya
capackjand two years experience in project management managing
contracts general construction and building maintenance-_
LICENSES AND OTHER REQUIREMENTS:
Valid Washington State driver's license.
WORKING CONDITIONS:
Work is primarily performed in an office environment; and at client homes.., in eenf ned
FS OF emerge_., may have to be peFfOFfned in homes sei-ved. Occasional
weekend or evening hours required.
Housing Assistance Specialist - Continued
Page 5
Effective Date February 2005
Effective Pa+eRevised History; December 2001
Revised History December 2000
Revision History January 1995
CITY OF RENTON
CLASS TITLE: ROUSING MAINTENANCE WORKER (MA-7126)
BASIC FUNCTION:
Under the direction of tl+e- lI{+mm+ assigned supervisor, perform a
variety of work related to home maintenance and repair for the } 4*+m R-tIN i+
P+++u+a+++Ilousing- Rcpair Assistance 1'r(),(;ra_m: (HRAP).-„r+-+*v-itlt• i++i++t": 4Vpi+i+
+� +t +t+ f
t't+r f+e+a++v +k+ wk - t+a+E+ a++tt p+++v++4e k-+wk- ti i+++c 1 t+N+t•+
ay,,;w,Hed.`11his includes_ minor repairs related to the health and_ safety of low and
moderate -income homeowners, assessinghomes for needed repairs tl+at-itrt
teaching preventativemaintenance and demonstrating how to do minor home repairs. for
Renton residents. The program is funded by federal_ Community Development Block
Grants _JCUBG), and_ must comply with all applicable federal regulations and
requirements (for example, historical preservation and lead -based paint ahatemcmi
REPRESENTATIVE DUTIES:
* Perform a variety of home repairs acti-v+tit-, invf►I 4w, plE++0114t—, {•iWtA-tor-.
elec"++l, fkm+4n+ , painting an4 rm repair Io+ 14+f+w Rv"i+related to the
health and safety of the Housing Repair Assistance Program clients. This
includes the installation of smoke and carbon monoxide detectors. It may
include minor repairs such as repairing electrical switches or outlets,
repairing faucets and/or toilets, checking breakers and fuses, installing or
replacing locks, changing filters in furnaces, resetting garbage disposals, and
caulking interior and exterior areas of the home.
Repair -i n i utintuin t4ttn+h Fw, sy',itenis 1N` i et)i++i+N-, +►r f-eplac++?-, faHf{4s:
h*t-watertanks, tt+ilets +++44f+++++syste s; kPite i+4)es M14 era w1 St
l'e+lfir m ;+ a++etv +►f ++ft+en t f y w o F k ++elf+Ft+++g Ow re p a i F +►r t++++wt+ �+t t i++++ ►1'
newsteps landings, hand Is 4+r wlievk4utif f+++++ps rty"-t ++r-fty+latk-+I+►f+r�;
Mass• **4f�e+�:
y Repai+- +►e replace ++utlets, U#4+ i+, 4x4c++c",-, -641V i-f-t
larva4c— +4— ta4 4ises fepai+' s f i m I +t#p is+a+'+
Review (:i+e++++e+t++e,�+a+d ilss 4 endin work orders and assess work procedures
before beginning a job.-. +e+e+a+++-+e *tke-d I:-++: t?+}+t+"Itl++t'y fvt)- + 0 +++++++,C44 to
se+ i= i+;ei '� }�feth� +:e ;++�<1 ++►+i i fa t++i t+ iv++r k +rftie+:s ;ac; +tit+ i F ec1:
VrAmt- t++—. a-e+++++ve deh l iti- +++<1 pt,4� +++H e++er++t var+l mai++te++a++ee 444 es
a4 +ed:*Prepare and maintain records. This includes assessment forms,
release of liability forms, bids, client applications, work orders, and any
other necessary record keeping.
Housing Maintenance Worker - Continued
Page 2
* install and maintain smoke detectors; repitir (w--4!ep1a-ce-4+wk-.Y-a4id other
Communicate with loeaI -contractors to f- eme+sleRe',Y- f
coordinate work activities to assure timely and proper completion of repairs:
and assure compliance with standard practices and building codes.
Assist in maintaining a working inventory of parts and equipment.
Assist in conducting initial assessments of client homes for health -and -safety
related issues.
*Help prevent future safety and health hazards by educating homeowners
about home maintenance and basic repairs. This may be done on either an
individual or group basis.
*Comply with all applicable federal regulations and requirements relating to
Community Development Block Grants, and ensure repairs are made in
conformance with applicable laws, building codes, policies and procedures.
Perform related duties as assigned.
Denotes Essential Job Functions
KNOWLEDGE AND ABILITIES:
KNOWLEDGE OF:
• Maintenance and repair of residential plumbing, electrical and mechanical systems.
• Methods, practices, procedures, equipment and tools used in various trades including
plumbing, carpentry and electrical.
Health and safety regulations.
Proper methods of utilizing and storing equipment, materials and supplies.
Interpersonal skills using tact, patience and courtesy.
Basic construction and remodeling methods and terminology.
Principles of training and providing work direction.
• Basic home repairs.
• Building codes related to job functions.
• Applicable laws codes regulations policies and procedures.
• Record -keeping techniques.
ABII..ITY TO:
bA
,} CITY OF RENTON
tip Human Resources & Risk Management
Kathy Keolker-Wheeler, Mayor Michael R. Webby, Administrator
DATE: May 26, 2005
TO: Tern Briere, Council President
Members of the City Council
VIA: Kahby eolker-Wheeler, Mayor
FROM: Webby, HR & RM Administrator
SUBJECT: Salary Range Adjustment Recommendation
BACKGROUND: Ms. Penny Bartley is the manager of the City's jail operation and
also directs the staff services division. She has performed her duties and responsibilities
since September 1, 1992. Her responsibilities include developing, budgeting and
providing all forms of services required to operating our jail, manage all organization
records, public disclosure requests, and public information responsibilities as well as
represent the City of Renton and the Renton Police Department on various committees
and associations. More recently, she has assumed responsibility for managing a very
complex interlocal agreement among 37 public agencies relating to the collection,
holding and transportation of detainees. In her capacity as Jail Manager she reports
directly to the Deputy Chief of Police
ISSUE: The Police Chief met with Eileen Flott and me and discussed his concerns
related to Ms. Bartley's responsibilities, value to his Department and the City, as well as
his concern about her level of compensation. He explained his interest in addressing
internal equity within his management family. That is, adjusting her base salary level so
her position would be in line with other division managers (Police Commanders) in the
Police Department. In preparing for our discussion with the Chief, Eileen conducted a
salary survey of Jail Manaers and found Ms. Bartley's current base wage to be
significantly below our 60` percentile target.
CONCLUSION: With this in mind, it is our recommendation the Jail Manager's salary
is adjusted to m38/E from m34/E, which is approximately ten percent. With your
approval we recommend the effective date of this salary adjustment to be January 1,
2005.
cc: Garry Anderson, Police Chief
Kevin Milosevich, Deputy Police Chief
1055 South Grady Way /-�R�enton, Washington 98055 - (425) 430-7650
Ill —, ...,..o.—t.f.,< rn°/ r Ipd material '40 % DcAt Consumer
RENTON
AHEAD OF THE CURVE
Police Manager Survey Detail with 2005 wages
Police Manager
GRADE
DEPT
m34
Police
Position manages two police department divisions.
In addition, the Police Manager negotiates million dollar contracts on behalf of 35 cities in King Count
Position supervises and evaluate the performance of assigned personnle, responds to emergencies during off and on -duty hours, Oversees training, assignment, discipline i
Investigates and resolves complaints, prepares, presents, and administers annual division budgets. Attends meetings and conferences pertaining to dept. operations. _
Particiapates in long and short range planning, conducts internal investigations.
Adj Notes
CRIES Population TOP OF
SALARY RANGE
Range _
Auburn
45,355
6131
6131 Detention Facility Supervisor 52 beds, depends on judge's sentence report to Assist Police Chief
Bainbridge Island
Bothell
21,350
30,910
Burien
31,480
n/m
Des Moines
29,120
Edmonds
39,580
n/m
Everett
95,470
n/m
Federal Way
83,500
n/m
Issaquah
1 15,110
5445
5445 Jail Manager 54 beds 1 yr maximum Reports to Police Commander
Kent
84,210
7776
7776 Police Captain 130 beds,1 yr maximum report to Deputy Police Chief
Kng County
8092
8092 Plus receive longevity, and education pay. May be like Police Captain position
Krkland
45,630
7738
7738 Police Lt. 12 bed, max capacity is 18 30 day holding
Lakewood
58,940
n/m
Lynnwood
34,500
1
6729
6729 Detention Commander 34 beds, 60 days reports to Deptuy Police Chief
Mercer Island
21,840
n/m
!
Mountlake Terrace
20,380
_
Olympia
42,860Puyallup
Redmond
SeaTac
Shoreline
Snohomish
Tacoma
Tukwila
35,490
46,480
25,100
52,730
8,640_--
196,300-
17,230
n/m
n/m
University Place
30,720
Renton
55,360 $
7,206
$ 7,206 -6.9%
$ 7,234
Median $ 7,234
60th Percentile
1 $
7,738
$ 7,738
2005 Police Mgr Redass.xls Detail (2005) Page 1 1/18/2005
CITY OF RENTON COUNCIL AGENDA BILL
Submitting Data: Planning/Building/Public Works Dept.
Dept/Div/Board.. Transportation Systems Division
Staff Contact...... Sharon Griffin, ext. 7232
Subject:
Six -Year Transportation Improvement Program (TIP)
and the Arterial Street Plan
Exhibits:
Issue Paper
Resolution
2006-2011 TIP Changes from Previous TIP
Draft TIP (2006-2011), including Project Map, Exhibit A,
and Map Index, Exhibit B, within document
Arterial Street Plan, Exhibit C
Al
For Agenda of:
Agenda Status:
Consent ..............
Public Hearing......
Correspondence....
Ordinance...........
Resolution...........
Old Business........
New Business.......
Study Sessions......
Information.........
Other ................
Interlocal
June 20, 2005
X
Recommended Action: Approvals:
Refer to Transportation Committee and set Legal Dept.......... X
Public Hearing date of July 11, 2005 Finance Dept....... X
Fiscal Impact:
Expenditure Required..... N/A Transfer/Amendment.......
Amount Budgeted......... Revenue Generated.........
Summary of Action:
The City is required by law to annually review and adopt by resolution the Six -Year Transportation
Improvement Program (TIP). In conjunction with this, the Arterial Street Plan is also updated.
The proposed TIP includes three new projects: Rainier Avenue — S 4th Pl to S 2nd, Hardie Ave. SW
Transit/Multi-modal, and the May Creek Bridge Replacement. Six completed or cancelled projects were
dropped from the program.
Staff Recommendations:
The Council adopt: 1) the annual updates to the "Six -Year Transportation Improvement Program"; 2) the
"Arterial Street Plan"; and, 3) set July 11, 2005, as the public hearing on the TIP. Staff further
recommends that the resolution regarding this matter be presented for reading and adoption.
H: Trans/planning/sgri ffin/T[Ps/2006_TIP_agendab i I I
CITY OF RENTON
PLANNINGBUILDING/PUBLIC WORKS DEPARTMENT
MEMORANDUM
DATE: June 20, 2005
TO: Terri Briere, Council President
Members of the Renton City Council
VIA: Kathy Keolker-WheTanning/Building/Public
Mayor
FROM: Gregg Zimmerma�l, Works Administrator
STAFF CONTACT: Sharon Griffin, ext. 7232
SUBJECT: 2006-2011 Six -Year Transportation Improvement Program
(TIP)
ISSUE:
Should the City Council approve the resolution adopting the 2006-2011 Six -Year Transportation
Improvement Program (TIP)?
RECOMMENDATION:
Staff recommends Council adopt: 1) the annual updates to the "Six -Year Transportation
Improvement Program"; 2) the "Arterial Street Plan"; and, 3) set a July 11, 2005, public
hearing on the TIP. Staff further recommends that the resolution regarding this matter be
presented for reading and adoption.
BACKGROUND:
The City is required by law to annually review and adopt by resolution the Six -Year Trans-
portation Improvement Program (TIP). The draft TIP is presented to the Transportation
Committee and distributed to the rest of the Councilmembers for review in advance of the public
hearing. In addition to the projected revenues and expenditures for the future six years, the TIP
also includes current -year project allocations and past project expenditures.
The City Council adopted the previous Six -Year TIP — 2005 through 2010, on July 26, 2004, as a
planning document for the next six years. It was distributed to the Puget Sound Regional
Council, the Washington State Department of Transportation, King County Department of
Terri Briere, Council President
Members of Renton City Council
June 20, 2005
Page 2
Re: 2006-2011 Six -Year Transportation Improvement Program
Transportation, the Association of Washington Cities, Puget Sound Energy, surrounding local
agencies, the library, and to internal departments.
A spreadsheet ("2006-2011 Six -Year TIP Summary") is attached which outlines the expected
revenues and expenditures for the six -year period. The 2005 budget reallocation and increase of
$2,382,300 is included as an estimated expenditure to correspond with the reallocation
Ordinance 5134 (attached). The six -year estimated expenditures were balanced to fall within the
expected revenues, leaving a balance of $42,011 on December 31, 2011, for the combined Fund
317 and Fund 305.
The proposed six -year program required underfunding some future projects at this time to
achieve the successful completion of other newly funded projects.
Required funding levels for some of the newly funded projects were determined by the
receipt of funding from outside sources that required City match:
o #7 Rainier Avenue — S 41h Pl to S 2nd (Sound Transit funds)
o #8 Hardie Avenue SW Transit/Multi-modal (Sound Transit funds)
o #3 Strander Boulevard/SW 27th St, Phase 2, Segment 2a (State and federal funds)
o #45 SR 169 HOV — 1401h to SR 900, Phase 3 (State transportation budget)
o #19 May Creek Bridge Replacement is shown as a fully City funded project
pending a grant.
Some of the newly funded projects were determined by economic development needs that
required City match:
o # 12 South Lake Washington Roadway Improvements (Proposed funding by sale
of bonds)
o # 3 Strander Boulevard/SW 27th St, Phase 1, Segment 1 (Proposed funding by
sale of bonds)
• Some programs requested and received additional funding because of elevated priority:
o # 1 Street Overlay Program
o # 10 Walkway Program
Some projects which may be delayed due to the above needs are:
o #11 Rainier Avenue — SW 7th to 4th PI (the City is committed to 30% design and
re-evaluation of the escalated construction costs)
o #9 NE 3`dAth Corridor (limited funding has been allocated for small projects
along the corridor)
H:\Division.s\TRANSPOR.TAT\ADMIN\Agenda 2005\IP 2006 TIP.doc
Terri Briere, Council President
Members of Renton City Council
June 20, 2005
Page 3
Re: 2006-2011 Six -Year Transportation Improvement Program
Ultimately, all projects in the TIP are presented to Council for review and approval, collectively
during the budget process, and individually when approval is requested for design and
construction contracts.
Attachments: 2006-2011 Six -Year TIP Summary
Fund 317 Capital Improvement Fund (Budget by Fund) Sheet
Fund 305 Transportation Impact Mitigation Fund (Budget by Fund) Sheet
Ordinance 5134 Budget Adjustments and Reallocation dated April 18, 2005
cc: Sandra Meyer, Transportation Systems Director
Nick Afzali, Planning and Programming Manager
Sharon Griffin, Program Development Coordinator
Nenita Ching, P/B/PW Administrative Analyst
Bang Parkinson, FIS/IS Supervisor
Project File
H:\Division.s\TRANSPOR.TATIADMIN\Agenda 2005\IP 2006 TIP.doc
2006 - 2011 Six -Year TIP Summary 6/9/2005
Transportation Capital Improvement Fund
Fund 317 (including Fund 305)
2006-2011
Item Budget Comment
FUND 317
REVENUE:
Business License Fee
$ 9,600,000
At $1,600,000 per year.
Transportation Grants
11,596,292
Charge for Services/Plan Sales
-
Penalty/Gen. Bus. Lic.
-
Miscellaneous
-
Trf-In From 305
7,068,575
As shown below in Fund 305.
Trf-In Fm Art Str Fd/Gas Tax
2,100,000
At $350,000 per year (Overlay Program).
New Vehicle Fuel Tax
1,310,000
Varied annual amounts.
Other In-Hand/Legislature
13,988,390
Includes $5 million from legislature
Bonds
18,939,000
TOTAL NEW REVENUE
$ 64,602,257
Use of Prior Yr Revenue for 2006-2011
5,787,933
TOTAL RESOURCES
$ 70,390,190
EXPENDITURES:
2006-2011 TIP Projects (Funded)
70,390,190
Additional Estimated 2005 Expenditures
2,382,300
Approved budget increase and reallocation.
TOTAL PROGRAMMED EXPENDITURES
$
72,772,490
SUMMARY:
Use of Prior Yr Revenue 2006-2011
5,787,933
Use of Prior Yr Revenue Estimated 2005
2,382,300
USE OF PRIOR YR REVENUE TOTAL
$
8,170,233
Budgeted Fund Balance, January 1, 2006
8,197,876
Total New Revenue
64,602,257
Total Programmed Expenditures'
(72,772,490)
317 Fund Balance, December 31, 2011
$
27,643
FUND 305
Budgeted Fund Balance, January 1, 2006
3,482,943
Anticipated New Revenue 2006-2011
3,600,000
Estimated at $600,000 per year. z
Total Committed Expenditures
(7,068,575)
Transfer to Fund 317 as shown above.
305 Fund Balance, December 31, 2011
$
14,368
TOTAL FUND BALANCE 317 & 305 3
$
42,011 .
. -December 31, 2011
' TIP #11 Rainier Ave (railroad bridge) may need further funding pending•en s cost estimate.
2 Dependent on development and credits. . '
a This addresses ability to fund program, not cash flow. .. . .
1:\SGriffin\TIPs\2006\6-Yr Revenue Analysis
k
JFund
Capital Improvement
—
317, Transportation
Fund
This fund supports City of Renton Transportation projects and projects linked
with various State and Federal Funding
programs.
Many of the projects are
dependent on acquisition of outside grants, formation of LID's and mitigation
revenue. Investment earnings generated
on the fund balance throughout the
year are credited to the General Fund.
Table 7-33. Fund 317, Transportation Capital Improvement
Fund
2002
2003
2004
2004
2005
Change
1
Item
Actual
Actual
Adj Bdgt
Actual
Budget
04/05
REVENUE
Per Capita Business License Fees
Transportation Grants
1,790,890
2,277,504
1,631,474
2,175,881
1,936,400
2,150,000
1,637,081
930,096
1,600,000
1,920,500
-17.4%
-10.7%
Local Vehicle License Fee/Transp
466,822
11,683
350,000
0
0
-100.0%
King County Wit
0
0
0
2,216,000
0
N/A
Charges for Svcs/Plan Sales, Wisc
515
1,126
0
214
0
N/A
King County Reimbursement/Duvall Ave
0
0
0
169,677
1,311,300
100.0%
Transfer In Fund 000
0
575,000
0
0
0
N/A
Transfer In Fund 102
353,500
353,500
0
353,500
0
N/A
Transfer In Fund 220
0
425,000
0
0
0
N/A
Transfer In Fund 301
0
0
1,500,000
1,500,000
0
-100.0%
Transfer In Fund 305
1,200,000
533,300
1,389,300
721,000
1,313,400
-5.5%
TOTAL NEW REVENUE
6,089,231
5,706,965
7,325,700
7,527,568
6,145,200
-16.1
Use of Prior Yr Revenue
0
0
3,350,700
0
1,841,300
-45.0•1a
TOTAL RESOURCES
6,089,231
5,706,965
10,676,400
7,527,568
7,986,500
-25.2•0
EXPENDITURES:
TBZ Planning Studies
0
0
0
0
0
WA
Professional Services
136,146
125,495
100,000
99,885
125,000
25.001
Transportation Projects
4,629,221
4,136,863
10,576,400
5,177,125
7,861,500
-25.7%
Transfer Out Fund 125
14,192
0
0
3,278
0
N/A
TOTAL COMviTTED EXPENDfURES
4,779,559
4,262,358
10,676,400
5,280,288
7,986,500
-25.2•10
Increase to Reserves
0
0
0
0
0
N/A
TOTAL EXPENDITURES
4,779,559
4,262,358
10,676,400
5,280,288
7,986,500
-25.2•10
Fund Balance, January 1
5,537,618
6,847,290
8,291,896
8,291,896
10,539,176
27.1%
1
Total New Revenue
6,089,231
5,706,965
7,325,700
7,527,568
6,145,200
-16.1
Total Committed Expenditures
(4,779,559)
(4,262,358)
(10,676,400)
(5,280,288)
(7,986,500)
-25.201.
Fund Balance plus Reserves
6,847,290
8,291,896
4,941,196
10,539,176
8,697,876
76.0%
Reserve: KCWitigation/StranderBlvd
0
0
0
0
500,000
'0070%'.'.'.'.'-'
Fund Balance, Dec 31
6,847,290
8,291,896
4,941,196
10,539,176
8,197,876
sl
'
..........
Budget by Fund
35-54
Fund 305, Transportation Impact Mitigation Fund
Fund 305 was created for the purpose of identifying Transportation Impact
Mitigation revenue and expenditures. Mitigation fees are charged to new •
development projects within Renton city limits using a vehicle trip rate which
�[ has been established based on the number of vehicle trips generated between
•[ 1990 and 2010 by new development. The Designated Fund Balance is for city
identified projects in the 2005-2010 Capital Improvement Program (CIP) and
j the 2005-2010 Transportation Capital Improvement Program (TCIP).
JTable 7-29. Fund 305, Transportation Impact Mitigation Fund
2002 2003 2004 2004 2005 Change
Item Actual Actual Adj Bdgt Actual Budget 04/05
REVENUE -
Transportation Mitigation Fees
1,001,645
388,768
500,000
915,752
500,000
0.0.
Investment Interest
90,534
161,347
150,000
35,404
100,000
-33.3'
Transfer In Fund 316
0
0
107,000
107,000
0
-100.0%
TOTAL NEW REVENUE
1,092,179
550,115
757,000
1,058,156
600,000
-20.7%
Use of Prior Yr Revenue
0
0
632,300
0
713,400
12.8%
TOTAL RESOURCES
1,092,179
550,115
1,389,300
1,058,156
1,313,400
-5.59*1
i
J
J
IXPENIATUFiES:
Transfer Out Fund 317
1,200,000
712,325
1,389,300
721,000
1,313,400
-5.5%
TOTAL COM VTED EXPENDffURES
1,200,000
712,325
1,389,300
721,000
1,313,400
-5.5 ,
Increase to Reserves
0
0
0
0
0
N/A
TOTAL EXPENDITURES
1,200,000
712,325
1,389,300
721,000
1,313,400
=5.5%
Fund Balance, January 1
4,129,217
4,021,396
3,859,186
Total New Revenue
1,092,179
550,115
757,000
Total ComrittedExpenditures
(1,200,000)
(712,325)
(1,389,300
Designated Fund Balance
4,021,396
3,859,186
3,226,886
Undesignated Fund Balance, Dec 31
0
0
0
3,859,186 4,196,343 8.7•1
1,058,156 600,000-20.7•1*
(721,000) (1,313,400) :55q
4,196,343 3,482,943
0 0
tBudget by Fund
1 31-54
ta
Amends ORD: 5110
CITY OF RENTON, WASHINGTON
ORDINANCE NO. 5134 %
AN ORDINANCE OF THE CITY OF RENTON, WASHINGTON,
AMENDING ORDINANCE NO. 5110 RELATING TO THE CITY OF
RENTON 2005 ANNUAL BUDGET BY APPROPRIATING FUNDS
FROM THE TRANSPORTATION CAPITAL IMPROVEMENT FUND
BALANCE, INCREASING THE 2005 BUDGET, AND
REALLOCATING THE EXPENDITURES IN SPECIFIC
TRANSPORTATION IMPROVEMENT PROJECTS.
WHEREAS, the City Council passed the 2005 Annual Budget Ordinance (Ordinance
No. 5110) on December 20, 2004; and
WHEREAS, it is necessary and advisable to amend the 2005 budget to accommodate
new grants and other revenue and corresponding expenditures to complete transportation
projects;
NOW, THEREFORE, THE CITY COUNCIL OF THE CITY OF RENTON,
WASHINGTON, DOES ORDAIN AS FOLLOWS:
SECTION L The following adjustments are hereby allowed and established in
fund listed below:
Fund
2005 Budget
Beginning Fund Balance, Jan. 1, 2005
$ 10,539,176
Total New Revenue
6,145,200
Total Committed Expenditures
7,986,500
Budget Adjustments Per this Ordinance
2,382,300
Total Adjusted Budget
$ 10,368,800
Ending Fund Balance, Dec. 31, 2005
$ 6,315,576
SECTION H. A list of all individual budget adjustments in the Transportation
Capital Fund is hereby attached as Attachment A, and is available for public review in the
office of the City Clerk, Renton City Hall.
1
ORDINANCE NO. 513 4
SECTION M. This ordinance shall be effective upon its passage, approval, and
five days after publication.
PASSED BY THE CITY COUNCIL this 18 th day of April 2005.
Bonnie I. Walton, City Clerk
APPROVED BY THE MAYOR this 18th day of April . 2005.
Approved as to form:
Lawrence J. Warren, ity Attorney
Date of Publication: 4/ 2 2/ 2 0 0 5 (summary)
ORD:1172:4/7/05:ma
W
Kathy Ke lker-Wheeler, Mayor
2
CITY OF RENTON, WASHINGTON
RESOLUTION NO.
A RESOLUTION OF THE CITY OF RENTON, WASHINGTON,
UPDATING THE CITY'S SIX -YEAR TRANSPORTATION
IMPROVEMENT PROGRAM 2006-2011.
WHEREAS, the City of Renton has heretofore adopted a "Six -Year Transportation
Improvement Program" pursuant to RCW 35.77.010, and the plan and program having been
amended and modified from time to time as authorized by law; and
WHEREAS, the City Council, after recommendation of the Planning/Building/Public
Works Department, held a public hearing on July 11, 2005, after notice to the public as provided
by law for the purpose of considering adoption, modification, and amendments of the plan and
program; and
WHEREAS, at the public hearing held on July 11, 2005, due consideration was given to
the proposed changes and amendments for the purpose of updating the plan and program;
NOW, THEREFORE, THE CITY COUNCIL OF THE CITY OF RENTON,
WASHINGTON, DOES RESOLVE AS FOLLOWS:
SECTION I. The City's "Six -Year Transportation Improvement Program" and
the City's "Arterial Street Plan" are hereby further amended and modified, all as more particularly
shown on the attached Exhibits "A," "B" and "C" incorporated herein as if fully set forth.
SECTION II. The plan and program, as evidenced by said Exhibits, shall be and
constitute the City's "Six -Year Transportation Improvement Program" and the City's "Arterial
Street Plan," and shall remain in full force and effect until further revised, amended, and
modified as provided by law.
1
6-2
RESOLUTION NO.
SECTION III. The Administrator of the Department of Planning/Building/Public
Works and the City Clerk are hereby authorized and directed to file this Resolution, together with
the Exhibits, with the Director of Highways for the State of Washington and as otherwise
provided by law.
PASSED BY THE CITY COUNCIL this day of , 2005.
Bonnie I. Walton, City Clerk
APPROVED BY THE MAYOR this day of , 2005.
Approved as to form:
Lawrence J. Warren, City Attorney
RES. 1114:6/9/05:ma
4
Kathy Keolker-Wheeler, Mayor
PLANNING/BUILDING/PUBLIC WORKS
TRANSPORTATION SYSTEMS DIVISION
2006 - 2011 SIX -YEAR TIP
C�I:h��CrI��33dri�J7��1[�I1���1
New
TIP
Old
TIP
Project
No.
Project Title
Changes From Previous TIP /
Comments
1
1
12108
Street Overlay Program
Increased 2005 and 2006 funding significantly.
2
2
12138
SR 167/SW 27th SUStrander By
No change.
3
3
12239
Strander By/SW 27th St Connect.
30% design nearingcompletion all phases; construction start 2005.
4
5
12163
Renton Urban Shuffle (RUSH)
No change.
5
r8
6
12109
Transit Program
No change.
6
7
12193
Rainier Av Corridor Study/ Im rov.
Two new projects originatingfrom this stud split off into next two projects.
7
New
12501
Rainier Av - S 4th PI to S 2nd
New project pendingSound Transit Board fundingapproval.
New
12502
Hardie Av SW Transit/Multi-modal
New project pending Sound Transit Board funding approval.
9
8
12176
NE 3rd/NE 4th Corridor
Final report adopted by Council May 2005. Projects pending available funds.
10
9
9
Walkway Program
2005 funding doubled to address pilot sidewalk rehabilitation project.
11
16
12308
Rainier Av - SW 7th to 4th PI
Will proceed to 30% design; re-evaluate increased construction costs/funds.
12
10
12306
S Lake Wash. Roadway Im rov.
The City will apply for bonds to fund this project.
13
12
12194
South Renton Project
Design complete; construction in 2005 and 2006 pending reserve fund transfer.
14
13
12210
1-405 in Renton
Staff time will increase for project impact due to additional le islative funding.
15
14
12150
-improvements
Project Develo ment/Predesi n
No change.
16
15
12209
NE 4th SUHo uiam Av NE
Design complete; construction may roceed with development in 2006.
17
18
29
lArterial Circulation Program
No change.
18
19
106
JBridge inspection & Repair
Houser Way bridge to be painted in 2006; May Creek Bridge split off.
19
New
12503
May Creek Bridge Replacement
New project; grant submitted for replacement project.
20
20
16
Loop Replacement Program
No change.
21
21
12113
Sign Replacement Program
No change.
22
22
91
Pole Program
No change.
23
23
12171
Sound Transit HOV Direct Access
No change,
24
24
12115
Traffic Safety Program
Pre-empt Program complete in 2005; two new programs LED and UPS).
25
25
12162
Traffic Efficiency Program
Upgrading signal controllers with new centrals stem continues into 2006.
26
26
12185
JCBD Bike & Ped. Connections
Curb ramp upgrades complete in 2005; emphasis on sidewalk preservation.
27
27
12186
Arterial Rehab. Frog.
Continue paving schedule.
28
28
12123
Duvall Ave NE
Increase in construction estimate; delayed by environmental/drainage issues.
29
30
12166
RR Crossing Safety Pro .
No change.
30
31
12135
TDM Program
No change.
31
32
12107
Transportation Concurrency
No change.
32
33
12106
Missing Links Program
No chan e.
33
34
12206
IGIS Needs Assessment
Work plan expected to be completed in 2005.
34
35
12127
JGrady Wy Corridor Study
Project proposal for study to be under development and review by late 2005.
35
36
12173
Bicycle Route Dev. Program
Miscellaneous facilities reviewed.
36
37
12121
Lake Wash. By -Park to Coulon Pk
Waiting for developer to continue construction.
37
38
12140
Interagency Signal Coord.
In construction in 2005.
38
39
12187
Environmental Monitoring
Attempting to get early acceptance for Phase 1 site due to its success.
39
40
12191
Trans -Valley & Soos Creek Corr.
Program extended through 2008.
40
41
12146
WSDOT Coordination Program
No change.
41
42
12112
1% for the Arts
Increases expected due to aggressive design and construction ro ram.
42
43
12160
Arterial HOV Program
No change.
43
44
12177
Park -Sunset Corridor
Study to be initiated in 2005; consultant selection 2006.
44
45
24
Lind Av - SW 16th-SW43rd
No change.
45
4
12175
SR 169 HOV - 140th to SR900
AllPhases now funded through grants and legislative funding.
46
17
12309
Benson Rd - S 26th to Main
Partial construction 2005; WSDOT 1-405 project to absorb southern 1,000 feet.
47
29
12301
Sunset/Duvall Intersection
Increase in construction estimate; going to ad August 2005.
48
47
12303
Logan Av Concrete Panel Repair
No change.
49
48
12304
Carr/Mill Signal
No change.
50
51
12213
Houser Wy S - Main to Burnett
No change.
51
53
12302
Lake Wash. By Slip Plane
Contract lower than estimate; design higher.
52
54
12307
Monster Road Bride
Project construction complete; reports due in June.
53
56
12305
Duvall Ave NE - King County
Construction delayed to 2006 due to environmental/drainage issues.
Drop
11
12401
SR 169 Corridor Study
WSDOT lead agency; City will contribute $50,000 in 2005.
Dro
46
12129
Benson Rd S / S 31 st
Project dropped by King County.
Drop
49
12174
Transit Priority Signal System
City project complete; King County to complete in 2005.
Drop
50
12208
Transit Center Video
Project complete.
Drop
52
12211
Trans Valley ITS
Project complete in 2005.
Drop
55
12153
SW 7th St/Lind Ave. SW
Construction complete.
Planning/Building/
Di thlir, XA1r%A-c
DRAFT
Six -Year
Transportation
Improvement
CITY OF
Promote
citywide
economic
development
*Continue aggressive
redevelopment efforts
Downtown and in the
Highlands
*Facilitate quality
development of
waterfront land
*Recruit and retain
businesses to ensure
a diversified
emblovment base
*Transition surplus
industrial properties to
their highest and best
use
Promote
neighborhood
revitalization
*Support the vitality
of neighborhoods
through community
involvement and
improved
infrastructure
*Ensure quality
development citywide
*Create opportunities
for new investment
in the Highlands
and South Renton
neighborhoods
VISION
Renton: A world -class city where people
choose to live, work, and play
MISSION
The City of Renton, in partnership with
residents, businesses, and schools is dedicated to:
• Providing a healthy atmosphere to live and raise families
• Encouraging responsible growth and promoting economic vitality
• Creating a positive community work environment
• Meeting service demands through innovation and commitment to excellence
Promote the
City's image in
the community
and region
. • Engage our diverse
citizenry in City goals,
. challenges, and
• achievements
• *Continue the City's
marketing efforts
• through expanded
partnerships
• Project Renton's
. positive image through
• superior service
delivery
Meet the service
demands that
contribute to the
livability of the
community
*Develop and
maintain quality
City infrastructure,
amenities, and services
*Provide efficient
services through
partnering, innovation,
and outcome
management
•Support productivity
through training, tools,
and technology
Influence
regional
decisions that
impact the City
*Aggressively pursue
transportation and
other regional
improvements and
services that benefit
Renton
. *Ensure that
• annexations, service
changes, and other
• agreements benefit
Renton
•Actively oppose
. unfunded mandates
• and other proposals
that negatively impact
• Renton
1-2
SECTION ONE
PURPOSE OF SIX -YEAR TIP PROGRAM
• Purpose of Six -Year TIP 1-1
• Vision Statement 1-2
• Mission Statement 1-2
• City Business Plan 1-2
CITY OF RENTON
SIX -YEAR TRANSPORTATION IMPROVEMENT
PROGRAM
2006-2011
PURPOSE
• Reflects involvement by citizens and elected officials.
• Implements the City of Renton Mission Statement.
• Used to coordinate transportation projects and programs
with other jurisdictions and agencies.
• Multi -year planning tool for the development of the
transportation facilities within the City.
• Required for State and Federal funding programs.
• Vital part of planning under the Growth Management
Act.
• Mandated by State Law.
1-1
SECTION TWO
SIX -YEAR TIP MAP
• TIP Map, Exhibit A
2-1
• Map Index, Exhibit B 2-2
1� 4 a
��-SA4 Exhibit A
CITY OF RENTON
SIX - YEAR T.I.P.
2006 - 2011
Project Map O
S i { 19
53
}�aY O } t1Zi�WW u 28 IF
��
36 III -lU�,
)I 43
es�N�[ 11 � � �I �l •
47
d
=
21
k4l
ref
l- g
16
� I l
23 ��� ��
rsln lI °� II "
I)-
y
' ,� "S , ^�� �- ([]�fl?®� • �� � Jam( � � n z
,
m �— jJ
cLILT
l 34 -
-. ,
52 l r� r �W V 46+'' J �»��_ ~\1tP'n '�5 `+•�`t4
3
tE \\x��� rI II •l M� \ � J( kb )� M �
INNA
�II � � i��.,.�� ea ��� { of •lam �� - , II �I� �����fL 7f��1 rz�( I( �iJT�\�_"�'r�� t,o,�?��w' ��` ; � x—,
I
}� Y� III �` �� ___ � �� �_ �� � � - • �I MT
.L_ R JL �J� � i! �����)-J✓ I� E�Rt ' � ILA IL �j� �� ( •
Y/l)1fJ
J`_,.
49
2-1
EXHIBIT `B'
City of Renton
2006 — 2011 Transportation Improvement Program
Map Index
TIP No. Project Title
1 Street Overlay Program
2 SR167/SW 27th Street/ Strander Boulevard
3 Strander Blvd/SW 271h Street Connection
4 Renton Urban Shuttle (RUSH)
5 Transit Program
6 Rainier Avenue Corridor Study and Improvements
7 Rainier Ave — S 41h PI to S 2nd
8 Hardie Ave SW Transit/Multi-modal
9 NE 3rd/NE 4th Corridor
10 Walkway Program
11 Rainier Ave — SW 7th to 41h Pl
12 S Lake Wash. Roadway Improvement
13 South Renton Project
14 I-405 Improvements In Renton
15 Project Development/Predesign
16 NE 41h Street/Hoquiam Avenue NE
17 Arterial Circulation Program
18 Bridge Inspection and Repair
19 May Creek Bridge Replacement
20 Loop Replacement Program
21 Sign Replacement Program
22 Pole Replacement Program
23 Sound Transit HOV Direct Access
24 Traffic Safety Program
25 Traffic Efficiency Program
26 CBD Bicycle and Pedestrian Connections
27 Arterial Rehabilitation Program
28 Duvall Avenue NE
29 Railroad Crossing Safety Program
30 TDM Program
31 Transportation Concurrency
32 Missing Links Program
33 GIS Needs Assessment
34 Grady Way Corridor Study
35 Bicycle Route Development Program
36 Lake Washington Boulevard — Park Avenue N to Coulon Park
37 Interagency Signal Coordination
38 Environmental Monitoring
39 Trans -Valley and Soos Creek Corridor
2-2
2006 — 2011 SIX -YEAR Transportation Improvement Program
Map Index
TIP No. Project Title
40
WSDOT Coordination Program
41
1 % for the Arts Program
42
Arterial HOV Program
43
Park —Sunset Corridor
44
Lind Avenue —SW 16t' to SW 43 rd
45
SR169 HOV — SE140" to SR 900
46
Benson Road — S 26'h to Main
47
Sunset/DuvallIntersection
48
Logan Avenue Concrete Panel Repair
49
Carr/Mill Signal
50
Houser Way S — Main to Burnett
51
Lake Washington Boulevard Slip Plane
52
Monster Road Bridge
53
Duvall Ave NE — King County
2-3
EXHIBIT `B'
HAFII-E SYS\TRP\TRP-24\2006 TIP Map Index
SECTION THREE
DEVELOPMENT & PRIORITIZATION
OF THE SIX- YEAR TIP
• General Programming Criteria 3-1
• Specific TIP Development Activities 3-3
• Summary Table of Projects and Programs: 3-5
DEVELOPMENT AND PRIORITIZATION OF THE SIX -YEAR TIP
I. General Programming Criteria
The yearly update of the Six -Year Transportation Improvement Program (TIP) is part of an on -going
process intrinsically linked with the development of the City's Capital Improvement Program. The
Six -Year TIP is also linked with various state and federal funding programs, regional/inter-
jurisdictional planning and coordination processes and the City's Growth Management Act
Comprehensive Land Use Plan.
Projects are developed and prioritized based on both specific goals to be achieved by the program
and on general programming considerations. Those general programming considerations are:
Planning. How, on both a local and regional level, a project fits with or addresses identified future
transportation goals, demands and planning processes must be evaluated. This is strongly
influenced by ongoing land use decisions and by regional highway and transit system plans.
Financing. Many projects are dependent on acquisition of outside grants, formation of LID's or the
receipt of mitigation funds. Prioritization has to take into account the peculiarities of each of the
various fund sources and the probabilities of when, and how much, money will be available.
Scheduling. If a project is interconnected with, or interdependent on, other projects taking place,
this is reflected in their relative priorities.
Past Commitment. The level of previous commitment made by the City in terms of resources,
legislative actions or inter -local agreements also must be taken into consideration in prioritizing TIP
projects.
In addition to the general considerations discussed above, there are five specific project categories
through which the TIP is evaluated and analyzed. They are:
• Preservation of Existing Infrastructure
• Multi -Modal and Transportation Demand Management
• Community Livability and Enhancement
• Economic Development
• Operations and Safety
These categories provide a useful analysis tool and represent goals developed through an evaluation
of the City's transportation program in response to input from citizens and local officials and to
State and Federal legislation.
Taken as a whole, the five categories provide a framework for evaluating projects both individually
and as part of a strategy that seeks to meet and balance the transportation needs of Renton during a
3-1
time of increasing transportation demand, decreasing revenues and growing environmental
concerns.
Although each project can be identified with an important concern that allows it to be classified into
one of the five categories, most projects are intended to address, and are developed to be compatible
with, multiple goals.
Preservation of the Existing Infrastructure is a basic need that must be met by the program. The
Mayor, City Council and Citizens Transportation Advisory Committee have all addressed the
importance of sustaining strong programs in this project category. The state Growth Management
Act also requires jurisdictions to assess and address the funding required to maintain their existing
transportation system.
Multi -modal and Transportation Demand Management (TDM) projects and programs are
oriented toward "moving people" through a balanced transportation system that involves multiple
modes of transportation and provides alternatives to the existing heavy reliance on the single
occupant vehicle (SOV). Included are facilities that facilitate the movement of transit and carpools,
and programs that promote the use of high occupancy vehicles (HOV's) and reduce the number of
SOV's. The Federal Transportation Efficiency Act (TEA-21), the State and Federal Clean Air
legislation and the State Commute Trip Reduction Act (CTR) have added momentum to regional
efforts and placed requirements on local jurisdictions such as Renton to promote these
transportation elements.
Community Livability and Enhancement consists of projects that have been developed with
major emphasis on addressing community quality of life issues by improving and/or protecting
residential livability while providing necessary transportation system improvements. Bicycle and
pedestrian projects are included in this category.
Economic Development projects and programs involve transportation improvements necessitated
by new development that is taking place. Thus, a significant source of local funding for these
projects is projected to come from mitigation payments and from specific access needs financed by
new development.
Operations and Safety projects and programs are developed through on -going analyses of the
transportation system and are directed mainly toward traffic engineering concerns such as safety and
congestion. Projects are identified not only by analysis of traffic counts, accident records and
geometric data, but also through review and investigation of citizen complaints and requests.
Following this text are tables that display and summarize the six -year funding plan broken out in
accordance with the five program categories.
?7P FLJM.doc 3-2
Below is a more specific discussion of the activities involved in TIP development.
II. Specific TIP Development Activities
TIP project and financial development activities are intricately intertwined and involve interactions
with many groups and agencies at the local, regional, state and federal levels.
Within the Transportation Systems Division of the City of Renton, project development involves
year -around coordination among the Maintenance and Operations Section, the Planning and
Program Section and the Design Section.
The Transportation Maintenance and Operations Section compiles accident and traffic count data,
performs level of service calculations needed to identify operational/congestion problems and tracks
all transportation -related complaints, suggestions and requests that come into the City.
The Transportation Design Section, through the TIP's "Overlay Program" and "Bridge Inspection
and Repair Program", works closely with the Maintenance Services Division and with its Pavement
Management System to establish structural ratings for the City's roads and bridges.
These and other data are being used by the Planning and Program Section to develop transportation
improvement projects, prepare grant applications, interface with ongoing state and federal
transportation programs, and develop a TIP that supports the goals of the City's long range
Comprehensive Plan and short range business plan.
Two important examples of how this data is used are:
1. To complete Transportation Improvement Board (TIB) Arterial Inventory Worksheet
forms for each section of each arterial in the City and
2. To complete Washington State Bridge Inventory System (WSBIS) forms for each bridge.
These forms provide a ranking of overall deficiency both within the City and in comparison with
similar facilities elsewhere in the state. These rankings, in turn, become important elements in
securing funding from the TIB's Transportation Partnership Program (TPP) and Arterial
Improvement Program (AIP) and from the federal bridge program.
The data are also used in making other grant applications for hazard elimination and safety projects
and for railroad crossing upgrades and other federal programs under TEA-21.
The Transportation Planning Section works with Metro Transit, the Puget Sound Regional Council,
Sound Transit and other groups and agencies to assure consistency between Renton's transportation
policies and programs and those of the region. Such consistency is required by the Growth
Management Act and related legislation and by federal and state grant programs.
On -going transportation planning activities, such as updating the Transportation Element and traffic
model, coordinating with the City's Comprehensive Plan and the development of sub -area plans,
TIP FUND.doc 3-3
such as the Central Business District, the Valley and the North Renton areas, play an important part
in identifying and prioritizing transportation improvement projects. State and regional
transportation projects also play an important role such as those involving Sound Transit, the
Metropolitan Transportation Plan and the State Systems Plan.
Within the City of Renton, there are actions and interactions involving other departments and
divisions, the private sector, the City Council and Administration, which strongly influence the
direction of the transportation program.
For example, the transportation system is significantly impacted by land use decisions, private
development proposals and by public water and sewer extensions which increase transportation
demand by making possible higher density and/or intensity of land uses. Such proposals need to be
monitored and analyzed in regard to how they individually and collectively create the need for
transportation improvements.
All departments and divisions in the City, the City Council, the Administration and the Mayor's
Citizens Transportation Advisory Committee are solicited each year to provide input, discuss and
comment on the Six -Year TIP.
Additional input is also gathered through interactions with other public and private organizations
and through public meetings held in the community concerning specific transportation projects and
programs.
At the City, State and Federal level there are new laws and regulations that create the need for new
or different kinds of transportation projects and programs. Examples include the Transportation
Efficiency Act (TEA-21), the Growth Management Act, the Clean Air Act, the Commute Trip
Reduction law, the Endangered Species Act and the Surface Water Management Ordinance. All of
these laws have tremendous impacts on the development and costs of transportation projects.
Interconnection and/or interdependence among TIP projects and with projects by other City
departments and by other jurisdictions is another important element that affects the development,
the prioritization and the timing of transportation projects. Equally important is the likelihood, the
time frame and the amount of outside funding that will be obtainable to finance transportation
projects.
In summary, with its heavy dependence on many different and unpredictable sources of outside
funding and with the significant impacts created by on -going local and regional land use decisions,
transportation project development is a continuous activity comprised of a multitude of diverse
elements.
TIP FUND.doc 3-4
CITY OF RENTON - PLANNING / BUILDING/ PUBLIC WORK" TRANSPORTATION SYSTEMS DIVISION - 2006-2011 TIP
T e
Tlh I Project Title
Project
No.
Previous
Costs
2006
2007
2w..
2009
2010
2011
Six -Year
Period Total
Total Project
Cost
Funded
-._nded
1
Street Overlay Program
12108
1,093,500
655,000
405,000
405,000
405,000
405,000
405,000
2,680,000
3,773,500
3,773,500
11
Rainier Av-SW7thto4th PI
12308
323,454
871,000
1,285,000
1,000,000
3,360,000
20,000
6,536,000
6,859.454
3,860,854
2,998,605
13
South Renton Project
12194
305,000
395,000
75,000
470,000
775,000
775,000
18
Bridge Inspection & Repair
106
125,538
220,000
40,000
40,000
40,000
40,000
40,000
420,000
545,538
545,538
19
May Creek Bridge Replacement
12503
120,000
710,000
5,000
835,000
835,000
835,000
u
20
Loop Replacement Program
16
33,807
20,000
20,000
110,000
20,000
20,0001
20,000
120,000
153,807
153,807
3`
21
Sign Replacement Program
12113
9,358
7,500
7,500
7,500
7,500
7,500
7,500
45,000
54,358
54,358
2
22
Pole Program
91
44,200
25,000
25,000
115,000
25,000
25,000
25,000
150,000
194,200
194,200
27
Arterial Rehab. Prog.
12186
388,916
240,000
205,000
310,000
230,000
180,000
180,000
1,375,000
1,763,916
1,763,916
28
Duvall Ave NE
12123
1,381,419
2,474,800
447,000
2,921,800
4,303,219
4,303,219
33
GIS Needs Assessment
12206
36,682
35,000
20,000
20,000
20,000
20,000
20,000
135,000
171,682
171,682
38
Environmental Monitoring
12187
184,838
75,000
50,000
b0,000
30,000
30,000
30,000
245,000
429,838
429,838
48
Logan Av Concrete Panel Repair
12303
1
1 460,000
460,000
460,000
460,000
51
Lake Wash. By Slip Plane
12302
1 637,600
2,400
2,400
640,000
640,000
52
MonsterRoad Bridge
12307
671,934
27,000
27,000
698,934
698,934
53
Duvall Ave NE - King County
12305
810,174
3,169,190
524,000
3,693,190
4,503,364
4,503,364
2
SR 167/SW 27th SUStrander By
12138
358,596
10,000
10,000
10,000
10,000
10,000
5,000
55,000
413,596
413,596
4
Renton Urban Shuttle (RUSH)
12163
6,142
5,000
5,000
5,000
5,000
5,000
5,000
30,000
36,142
36,142
5
Transit Program
12109
32,359
20,400
20,400
20,400
20,400
20,400
20,400
122,406
154,759
_
154.759
6
Rainier Av Corridor Study/ Improv.
12193
287,652
20,000
20,000
?0,000
20,000
20,000
20,000
120,000
407,652
407,652
7
Rainier Av - S 4th PI to S 2nd
12501
10,000
2,197,000
1,943,000
2,160,000
6,300,000
6,310,0001
3,310,000
3,000,000
8
Hardie Av SW Transit/Multi-modal
12502
1 190,000
2,577,000
6,070,000
6,500,000
15,147,000
15,337,000
3,337,000
12,000,000
9
NE 3rd/NE 4th Corridor
12176
212,147
314,000
394,500
413,000
5,017,000
3,300,000
3,300,000
12,738,500
12,950,647
1,333,647
11,617,000
15
Project Development/Predesign
12150
274,708
175,000
175,000
200,000
200,000
200,000
200,000
1,150,000
1,424,708
1,424,708
?
17
Arterial Circulation Program
29
324,711
200,000
200,000
200,000
200,000
250,000
250,000
1,300,000
1,624,711
1,624,711
23
Sound Transit HOV Direct Access
12171
58,967
5,000
5,000
63,967
63,967
30
TDM Program
12135
118,805
64,200
64,200
C4,200
64,200
64,200
64,200
385,200
504,005
504,005
34
Grady Wy Corridor Study
12127
20,619
35,000
120,000
E10,000
230,000
1,810,000
1,020,000
3,295,000.
3,315,619
315,619
3,000,000
39
Trans -Valley & Soos Creek Corr.
12191
6,886
5,000
5,000
5,000
15,00(i
21,886
21,886
40
WSDOT Coordination Program
12146
24,137
15,000
10,000
10,000
10,000
10,000
10,000
65,000
89,137
89,137
42
Arterial HOV Program
12160
127,354
10,000
10,000
137,354
137,354
43
ParkSunset Corridor
12177
26,277
50,000
390,000
440,000
466,277
466,277
45 1
SR 169 HOV -140th to SR900
12175
2,015,391
1,755,400
2,080,000
2,500,000
6,335,400
8,350,791
8,350,791
10
Walkway Program
9
516,832
250,000
250,000
260,000
250,000
250,000
250,000
1,500,000
2,016,832
1,776,832
240,000
35
Bicycle Route Dev. Program
12173
34,342
20,000
18,000
18,000
110,000
80,000
80,000
326,000
360,342
270,342
90,000
0
41
1%for the Arts
12112
33,278
60,000
30,000
30,000
50,000
30,000
30,000
230,000
263,278
263,278
-�
46
Benson Rd - S 26th to Main
12309
222,963
2,500
2,500
225,463
225,463
>
3
Strander Bv/SW 27th St Connect.
12239
2,491,727
6,369,000
1,750,000
34,174,000
5,748,000
48,041,00('
50,532,727
13,753,927
36,778,800
0
12
S Lake Wash. Roadway Improv,
12306
2,050,773
17,507,000
00
3,432,0
16,950,000
37,889,00(
39,939,773
22,989,773
16,950,000
14
1-405 Improvements in Renton
12210
72,271
30,000
20,000
10,000
10,000
10,000
10,000
90,000
162,271
162,271
0
26
CBD Bike & Ped. Connections
12185
74,956
50,000
50,000
50,000
50,000
50,000
50,000
300,000
374,956
374,956
u
31
Trans Concurrent
12107
40,047
10,000
40,000
10,000
10,000
30,000
10,000
110,000
150,047
150,047
w
36 1
Lake Wash. By -Park to Coulon Pk
12121
317,418
84,500
141,600
226,10C
543,518
543,518
16
NE 4th St/Hoquiam Av NE
12209
172,200
227,800
227,800
400,000
400,000
a
24
Traffic Safety Program
12115
145,351
40,000
40,000
40,000
40,000
40,000
40,000
240,000
385,351
385,351
A
25
Traffic Efficiency Program
12162
361,589
157,000
98,000
i5,000
30,000
30,000
30,000
420,000
781,589
781,589
29
RR Crossing Safety Prey.
12166
5,182
5,000
5,000
10,000
10,000
30,00(-
35,182
35,182
32
Missing Links Program
12106
56,886
30,000
30,000
i0,000
30,000
30,000
30,000
180,000
236,886
236,886
0
37
Interagency Signal Coord.
12140
19,572
12,000
12,000
31,572
31,572
q
44
Lind Av -SW 16thSW43rd
24
5,000
5,000
1,914,000
626,000
2,545,000
2,550,000
10,000
2,540,000
47
SunseUDuvallIntersection
12301
909,561
33,300
33,300
942,861
942,861
O
49
CarrlMill Signal
12304
2,000
3,000
10,000
�_0,000
340,000
400,000
10,000
783,00(!
785,000
35,000
750,000
so
Houser Wy S -Main to Burnett
12213
810,000
810,000
810,000
810,000
Total Sources
17.673.118
35.916.990113
222 200
5,963,100
52,966,100
38 724100
14 832 100
16 624 590
179 179,297,708,
88,063,308
91,234,400
q tom, 3-5
SECTION FOUR
EXPENDITURES & REVENUES
• Total Project Expenditure Summary
4-1
• Summary of Funding Sources
4-2
• Itemized Funding Sources:
■ Vehicle Fuel Tax
4-3
■ Business License Fee
4-4
■ Proposed Fund Balance
4-5
■ Grants In -hand
4-6
■ Mitigation In -Hand
4-7
■ Bonds/L.I.D.'s Formed
4-8
■ Other In -Hand
4-9
■ Grants Proposed
4-10
■ Mitigation Proposed
4-11
■ L.I.D.'s Proposed
4-12
■ Other Proposed
4-13
■ Undetermined
4-14
Note: The Vehicle License Fee was eliminated by initiative I-776 and has been
dropped from the 2006-2011 program.
CITY OF RENTON
PLANNING/BUILDING/PUBLIC WORKS
TRANSPORTATION SYSTEMS DIVISION
2006 - 2011 SIX -YEAR TIP
Six -Year Project Cost Summary *
TIP
Project Title
2006
2007
2008
2009
2010
2011
Period
Total
1
Street Overlay Program
655,000
405,000
405,000
405,000
405,000
405,000
2,680,000
2
SR 167/SW 27th St/Strander By
10,000
10,000
10,000
10,000
10,000
5,000
55,000
3
Strander By/SW 27th St Connect.
6,369,000
1,750,000
34,174,000
5,748,000
48,041,000
4
Renton Urban Shuttle (RUSH)
5,000
5,000
5,000
5,000
5,000
5,000
30,000
5
Transit Program
20,400
20,400
20,400
20,400
20,400
20,400
122,400
6
Rainier Av Corridor Study/ Improv.
20,000
20,000
20,000
20,000
20,000
20,000
120,000
7
Rainier Av - S 4th PI to S 2nd
2,197,000
1,943,000
2,160,000
6,300,000
8
Hardie Av SW Transit/Multi-modal
2,577,000
6,070,000
6,500,000
15,147,000
9
NE 3rd/NE 4th Corridor
314,000
394,500
413,000
5,017,000
3,300,000
3,300,000
12,738,500
10
Walkway Program
250,000
250,000
250,000
250,0001
250,000
250,000
1,500,000
11
Rainier Av - SW 7th to 4th PI
871,000
1,285,000
1,000,000
3,360,000
20,000
6,536,000
12
S Lake Wash. Roadway Improv.
17,507,000
3,432,000
16,950,000
37,889,000
13
South Renton Project
395,000
75,000
470,000
14
1-405 Improvements in Renton
30,000
20,000
10,000
10,000
10,000
10,000
90,000
15
Project Development/Predesign
175,000
175,000
200,000
200,000
200,000
200,000
1,150,000
16
NE 4th St/Ho uiam Av NE
227,800
227,800
17
Arterial Circulation Program
200,000
200,000
200,000
200,000
250,000
250,000
1,300,000
18
Bridge Inspection & Repair
220,000
40,000
40,000
40,000
40,000
40,000
420,000
19
May Creek Bridge Replacement
120,000
710,000
5,000
835,000
20
Loop Replacement Program
20,000
20,000
20,000
20,000
20,000
20,000
120,000
21
Sign Replacement Program
7,500
7,500
7,500
7,500
7,500
7,500
45,000
22
Pole Program
25,000
25,000
25,000
25,000
25,000
25,000
150,000
23
Sound Transit HOV Direct Access
5,000
5,000
24
Traffic Safety Program
40,000
40,000
40,000
40,000
40,000
40,000
240,000
25
Traffic Efficiency Program
157,000
98,000
75,000
30,000
30,000
30,000
420,000
26
CBD Bike & Ped. Connections
50,000
50,000
50,000
50,000
50,000
50,000
300,000
27
Arterial Reha6. Pro .
240,000
205,000
340,000
230,000
180,000
180,000
1,375,000
28
Duvall Ave NE
2,474,800
447,000
2,921,800
29
RR Crossing Safety Pro .
5,000
5,000
10,000
10,000
30,000
30
TDM Program
64,200
64,200
64,200
64,200
64,200
64,200
385,200
31
Trans Concurrency
10,000
40,000
10,000
10,000
30,000
10,000
110,000
32
Missing Links Program
30,000
30,000
30,000
30,000
30,000
30,000
180,000
33
GIS Needs Assessment
35,000
20,000
20,000
20,000
20,000
20,000
135,000
34
Grady Wy Corridor Study
35,000
120,000
80,000
230,000
1,810,000
1,020,000
3,295,000
35
Bicycle Route Dev. Program
20,000
18,000
18,000
110,000
80,000
80,000
326,000
36
Lake Wash. By -Park to Coulon Pk
84,500
141,600
226,100
37
Interagency Signal Coord.
12,000
12,000
38
Environmental Monitoring
75,000
50,000
30,000
30,000
30,000
30,000
245,000
39
Trans -Valley & Soos Creek Corr.
5,000
5,000
5,000
15,000
40
WSDOT Coordination Program
15,000
10,000
10,000
10,000
10,000
10,000
65,000
41
1% for the Arts
60,000
30,000
30,000
50,000
30,000
30,000
230,000
42
Arterial HOV Program
10,000
10,000
43
Park -Sunset Corridor
50,000
390,000
440,000
44
Lind Av - SW 16th-SW43rd
5,000
1,914,000
626,000
2,545,000
45
SR 169 HOV - 140th to SR900
1,755,400
2,080,000
2,500,000
6,335,400
46.
Benson Rd - S 26th to Main
2,500
2,500
47
Sunset/DuvallIntersection
33,300
33,300
48
Logan Av Concrete Panel Repair
460,000
460,000
49
Carr/Mill Signal
3,000
10,000
20,000
340,000
400,000
10,000
783,000
50
Houser Wy S - Main to Burnett
810,000
810,000
51
Lake Wash. By Slip Plane
2,400
2,400
52
Monster Road Bride
27,000
1
27,000
53
Duvall Ave NE - King County
3,169,1901
524,0001
1
3,693,190
Total Expenditures
35,916,9901
13,222,2001
5,963,1001
52,966,1001
38,724,100
14,832,100
161,624,590
-Y«,_p.J_s_ 'Including unfunded amounts. .10
4-1 DRAFT
CITY OF RENTON
PLANNING/BUILDING/PUBLIC WORKS
TRANSPORTATION SYSTEMS DIVISION
2006 - 2011 SIX -YEAR TIP
SUMMARY OF FUNDING SOURCES
Period
ITEM
Period Total
2006
2007
2008
2009
2010
2011
SIX -YEAR PROJECT COSTS:
Project Development
3,592,000
744,000
644,600
564,600
524,600
569,600
544,600
Precon En /Admin
10,732,600
2,061,600
568,000
171,000
5,014,000
2,428,000
490,000
R-O-W includes Admin
10,272,000
2,949,000
650,000
5,500,000
1,173,000
Construction Contract Fee
123,601,390
27,342,890
9,898,700
4,537,700
37,747,700
31,383,700
12,690,700
Construction En /Admin
11,792,100
2,505,000
1,060,900
422,300
3,772,300
3,047,300
984,300
Other
1,634,500
314,500
400,000
267,500
407,500
122,500
122,500
Sub - TOTAL SIX -YEAR COST
161,624,690
35,916,990
13,222,200
5,963,100
52,966,100
38,724,100
14,832,100
SOURCE OF FUNDS:
Vehicle Fuel Tax
3,410,000
440,000
565,000
585,000
595,000
610,000
615,000
Business License Fee
9,600,000
1,600,000
1,600,000
1,600,000
1,600,000
1,600,000
1,600 000
Proposed Fund Balance
5,787,933
1,352,800
1,608,533
280,000
908,600
893,000
745,000
Grants In -Hand
11,596,292
5,155,000
3,724,892
600,000
2,116,400
Mitigation In -Hand
7,068,575
1,400,800
1,718,575
348,900
749,500
1,417,900
1,432,900
Bonds / L.I.D.'s Formed
18,939,000
15,507,000
3,432,000
Other In -Hand
13,988,390
10,461,390
573,200
2,549,200
306,200
49,200
49,200
Sub - TOTAL SIX -YEAR FUNDED
70,390,190
35,916,990
13,222,200
5,963,100
6,275,700
4,570,100
4,442,100
Grants Proposed
2,084,000
1,884,000
200,000
Mitigation Proposed
L.I.D.'s Proposed
Other Proposed
19,480,000
7,780,000
5,700,000
6,000,000
Undetermined
69,670,400
37,026,400
28,254,000
4,390,000
TOTAL SOURCES - FUNDED
& UNFUNDED
161,624,590
35,916,990
13,222,200
5,963,100
52,966,100
38,724,100
14,832,100
Summ_ol_Soume 06/09/2005 13:03
4-2 DRAFT
CITY OF RENTON
PLANNING/BUILDING/PUBLIC WORKS
TRANSPORTATION SYSTEMS DIVISION
2006 - 2011 SIX -YEAR TIP
Vehicle Fuel Tax
TIP
Project Title
2006
2007
2008
2009
2010
2011
Period
Total
1
Street Overlay Program
350,000
350,000
350,000
350,000
350,000
3502000
2,100,000
2
SR 167/SW 27th SUStrander By
3
Strander By/SW 27th St Connect.
240,000
240,000
4
Renton Urban Shuttle (RUSH)
5
Transit Program
6
Rainier Av Corridor Study/ Improv.
7
Rainier Av - S 4th PI to S 2nd
110,000
110,000
8
Hardie Av SW Transit/Multi-modal
155,000
155,000
9
NE 3rd/NE 4th Corridor
90,000
215,000
235,000
540,000
10
Walkway Program
11
Rainier Av - SW 7th to 4th PI
245,000
20,000
265,000
12
S Lake Wash. Roadway Im rov.
13
South Renton Project
14
1-405 Improvements in Renton
15
Project Develo ment/Predesi n
16
NE 4th St/Hoquiam Av NE
17
Arterial Circulation Program
18
Bridge Inspection & Repair_._
19
May Creek Bridge Replacement
20
Loop Replacement Program
21
Sign Replacement Program
22
Pole Program
23
Sound Transit HOV Direct Access
24
Traffic Safety Program
25
Traffic Efficiency Program
_
26
CBD Bike & Ped. Connections
27
Arterial Rehab. Pro .
28
Duvall Ave NE
29
RR Crossing Safety Pro .
30
TDM Program
31
Trans Concurrent
32
Missing Links Program
33
GIS Needs Assessment
34
Grady Wy Corridor Stud
35
Bicycle Route Dev. Program
36
Lake Wash. By -Park to Coulon Pk
37
Interagency Signal Coord.
38
Environmental Monitoring
39
Trans -Valley & Soos Creek Corr.
40
WSDOT Coordination Program
41
1% for the Arts
42
Arterial HOV Program
43
Park -Sunset Corridor
44
Lind Av - SW 16th-SW43rd
45
SR 169 HOV - 140th to SR900
46
Benson Rd - S 26th to Main
47
Sunset/DuvallIntersection
48
Logan Av Concrete Panel Repair
49
Carr/Mill Signal
50
Houser Wy S - Main to Burnett
51
Lake Wash. By Slip Plane
52
Monster Road Bridge
53
Duvall Ave NE - King County
Total Sources
440,000
1 565,000
585,000
595,000
610,000
615,000
3,410,000
arovmos eao
4-3 DRAFT
CITY OF RENTON
PLANNING/BUILDING/PUBLIC WORKS
TRANSPORTATION SYSTEMS DIVISION
2006 - 2011 SIX -YEAR TIP
Business License Fee
TIP
Project Title
2006
2007
2008
2009
2010
2011
Period
Total
1 IStreet
Overlay Program
55,000
55,000
55,000
55,000
55,000
55,000
330,000
2 ISR
167/SW 27th St/Strander By
10,000
10,000
10,000
10,000
5,000
45,000
3 IStrander
By/SW 27th St Connect.
82,749
114,600
40,000
237,349
4 lRenton
Urban Shuttle (RUSH)
5,000
5,0001
5,000
5,000
5,000
5,000
30,000
5 ITransit
Program
20,400
20,400
20,400
20,400
20,400
20,400
122,400
6 1
Rainier Av Corridor Study/ Improv.
20,000
20,000
20,000
20,000
20,000
20,000
120,000
7
Rainier Av - S 4th PI to S 2nd
100,000
100,000
100,000
300,000
8
Hardie Av SW TransiVMulti-modal
200,000
100,000
165,000
465,000
9 INE
3rd/NE 4th Corridor
10 lWalkway
Program
100,000
100,000
250,000
170,000
170,000
176,000
960,000
11 lRainier
Av - SW 7th to 4th PI
149,900
154,000
20,000
323,900
12 IS
Lake Wash. Roadway Improv.
13 ISouth
Renton Project
14
1-405 Improvements in Renton
20,000
10,000
10,000
10,000
10,000
60,000
15
Project Development/Predesi n
175,000
175,000
200,000
200,000
200,000
200,000
1,150,000
16
NE 4th SUHoquiam Av NE
17
Arterial Circulation Program
200,000
200,000
200,000
200,000
250,000
250,000
1,300,000
18
Bridge Inspection & Repair
140,000
40,000
40,000
40,000
40,000
30,000
330,000
19
May Creek Bridge Replacement
70,000
5,000
75,000
20
Loop Replacement Program
20,000
20,000
20,000
20,000
20,000
20,000
120,000
21
Sign Replacement Program
7,500
7,500
7,500
7,500
7,500
7,500
45,000
22
Pole Program
25,000
25,000
25,000
25,000
25,000
25,000
150,000
23
Sound Transit HOV Direct Access
5,000
5,000
24
Traffic Safety Program
40,000
40,000
40,000
40,000
40,000
40,000
240,000
25
Traffic Efficiency Program
157,000
98,000
75,000
30,000
30,000
30,000
420,000
26
CBD Bike & Ped. Connections
50,000
50,000
50,000
50,000
50,000
50,000
300,000
27
Arterial Rehab. Pro .
55,000
50,000
281,600
95,000
147,100
147,100
775,800
28
Duvall Ave NE
29
RR Crossing Safety Pro .
5,000
5,000
10,000
10,000
30,000
30
TDM Program
15,000
15,000
15,000
15,000
15,000
15,000
90,000
31
Trans Concurrency
10,000
40,000
10,000
10,000
30,000
10,000
110,000
32
IMissing Links Program
30,000
30,000
30,000
30,0001
30,000
30,000
180,000
33
GIS Needs Assessment
35,000
20,000
20,000
20,000
20,0001
20,000
135,000
34
Grady Wy Corridor Study
20,000
80,000
20,000
20,000
20,000
160,000
35
Bicycle Route Dev. Program
20,000
18,000
18,000
20,000
80,000
80,000
236,000
36
Lake Wash. By -Park to Coulon Pk
37
Interagency Signal Coord.
12,000
12,000
38
Environmental Monitoring
20,000
25,000
17,500
12,500
25,000
25,000
125,000
39
Trans -Valley & Soos Creek Corr.
5,000
5,000
5,000
15,000
40
WSDOT Coordination Program
15,000
10,000
10,000
10,000
10,000
10,000
65,000
41
1% for the Arts
60,0001
30,000
30,000
50,000
30,000
30,000
230,000
42
Arterial HOV Program
10,000
43
Park -Sunset Corridor
2,100
2,100
44
Lind Av - SW 16th-SW43rd
433",0300
45
SR 169 HOV - 140th to SR900197,251
197,251
46
Benson Rd - S 26th to Main
2,500
47
SunseUDuvalllntersection
33,300
48
Logan Av Concrete Panel Repair
49
Carr/Mill Signal
3,000
10,000
20,000
33,000
50
Houser W S -Main to Burnett
51
Lake Wash. By Slip Plane
2,400
2,400
52
Monster Road Bride
27,000
27,000
53
Duvall Ave NE - Kin County
Total Sources
1,600,000
1,600,000
1,600,000
1,600,000
1,600,000
1,600,000
9,600,000
4-4 DRAFT
CITY OF RENTON
PLANNING/BUILDING/PUBLIC WORKS
TRANSPORTATION SYSTEMS DIVISION
2006 - 2011 SIX -YEAR TIP
Pronosed Fund Balance
TIP
Project Title
2006
2007
2008
2009
2010
2011
Period
Total
1
Street Overlay Program
250,000
250,000
2
SR 167/SW 27th SUStrander By
3
Strander By/SW 27th St Connect.
156,600
140,651
231,600
528,851
4
Renton Urban Shuttle (RUSH)
5
Transit Program
6
Rainier Av Corridor Study/ Im rov.
7
Rainier Av - S 4th PI to S 2nd
600,000
418,000
425,000
1,443,000
8
Hardie Av SW Transit/Multi-modal
77,000
475,000
310,000
862,000
9
NE 3rd/NE 4th Corridor
10
Walkway Program
11
Rainier Av - SW 7th to 4th PI
260,000
280,000
540,000
12
S Lake Wash. Roadway Im rov.
13
South Renton Project
395,000
75,000
470,000
14
1-405 Improvements in Renton
15
Project Develo ment/Predesi n
16
NE 4th St/Ho uiam Av NE
17
Arterial Circulation Program
18
Bridge Inspection & Repair
80,000
10,000
90,000
19
May Creek Bridge Replacement
50,000
710,000
760,000
20
Loop Replacement Program
21
Sign Replacement Program
22
Pole Program
23
Sound Transit HOV Direct Access
24
Traffic Safety Program
25
Traffic Efficiency Program
26
CBD Bike & Ped. Connections
27
Arterial Rehab. Pro .
28
Duvall Ave NE
421,200
126,726
547,926
29
RR Crossing Safety Pro .
30
TDM Program
31
Trans Concurrent
32
Missing Links Program
33
GIS Needs Assessment
34
Grady Wy Corridor Stud
35
Bicycle Route Dev. Program
36
Lake Wash. By -Park to Coulon Pk
37
Interagency Signal Coord.
38
Environmental Monitoring
39
Trans -Valley & Soos Creek Corr.
40
WSDOT Coordination Program
41
1 % for the Arts
42
Arterial HOV Program
43
Park -Sunset Corridor
44
Lind Av - SW 16th-SW43rd
45
SR 169 HOV - 140th to SR900
296,156
296,156
46
Benson Rd - S 26th to Main
47
Sunset/DuvallIntersection
48
Logan Av Concrete Panel Repair
49
Carr/Mill Signal
50
Houser Wy S - Main to Burnett
51
Lake Wash. By Slip Plane
52
Monster Road Bridge
53
Duvall Ave NE - King County
Total Sources
1,352,800
1,608,533
280,000
908,600
893,000
745,000
5,787,913
R,pe Fu BaWc� oem+coos a+o
4-5 DRAFT
CITY OF RENTON
PLANNING/BUILDING/PUBLIC WORKS
TRANSPORTATION SYSTEMS DIVISION
2006 - 2011 SIX -YEAR TIP
Grants In -Hand
TIP
Project Title
2006
2007
2008
2009
2010
2011
Period
Total
1
Street Overlay Program
2
SR 167/SW 27th St/Strander By
3
Strander By/SW 27th St Connect.
969,400
1,526,600
2,000,000
4,496,000
4
Renton Urban Shuttle (RUSH)
5
Transit Program
6 lRainierAv
Corridor Study/ Improv.
7 1
Rainier Av - S 4th PI to S 2nd
8 1
Hardie Av SW Transit/Multi-modal
9 INE
3rd/NE 4th Corridor
10 lWalkway
Program
11
Rainier Av - SW 7th to 4th PI
522,600
771,000
600,000
116,400
2,010,000
12
S Lake Wash. Roadway Im rov.
13
South Renton Project
14
1-405 Improvements in Renton
15
Project Develo ment/Predesi n
16
NE 4th SUHo uiam Av NE
17
Arterial Circulation Program
18
Bridge Inspection & Repair
19
May Creek Bridge Replacement
__i0_'Loop
Replacement Program
21
Sign Replacement Program
22
Pole Program
23
Sound Transit HOV Direct Access
14
Traffic Safety Program
25
Traffic Efficiency Program
26
CBD Bike 8, Ped. Connections
27
Arterial Rehab. Pro .
28
Duvall Ave NE
1,967,600
70,274
2,037,874
29
RR Crossing Safety Pro .
30
TDM Program
31
Trans Concurrenc
32
Missing Links Program
33
GIS Needs Assessment
34
Grady Wy Corridor Stud
35
IBicycle Route Dev. Program
36
Lake Wash. By -Park to Coulon Pk
40,000
38,425
78,425
37
Interagency Signal Coord.
38
Environmental Monitoring
39
Trans -Valley & Soos Creek Corr.
40
WSDOT Coordination Program
41
1 % for the Arts
42
Arterial HOV Program
43
Park -Sunset Corridor
44
Lind Av - SW 16th-SW43rd
45
ISR 169 HOV -140th to SR900
1,655,400
1,318,593
2,973,993
46
113enson Rd - S 26th to Main
47
Sunset/DuvallIntersection
48
Logan Av Concrete Panel Repair
49
Carr/Mill Signal
50
Houser Wy S - Main to Burnett
51
Lake Wash. By Slip Plane
52
Monster Road Bridge
53
Duvall Ave NE - King County
Total Sources
5,165,000
3,724,8921
600,0001
2,116,4001
11,596,292
4-6 DRAFT
CITY OF RENTON
PLANNING/BUILDING/PUBLIC WORKS
TRANSPORTATION SYSTEMS DIVISION
2006 - 2011 SIX -YEAR TIP
Mitinatinn In -Hand
TIP
Project Title
2006
2007
2008
2009
2010
2011
Period
Total
1
Street Overlay Program
2
SR 167/SW 27th St/Strander By
10,000
10,000
3
Strander By/SW 27th St Connect.
100,000
160,000
260,000
4
Renton Urban Shuttle RUSH
5
Transit Program
6
Rainier Av Corridor Study/ Improv.
7
Rainier Av - S 4th PI to S 2nd
497,000
425,000
525,000
1,447,000
8
Hardie Av SW Transit/Multi-modal
795,000
870,000
1,665,000
9
NE 3rd/NE 4th Corridor
224,000
179,500
178,000
581,500
10
Walkway Program
150,000
150,000
300,000
11
Rainier Av - SW 7th to 4th PI
198,500
100,000
100,000
398,500
12
S Lake Wash. Roadway Improv.
13
South Renton Project
14
1-405 Improvements in Renton
30,000
30,000
15
Project Development/Predesi n
16
NE 4th St/Hoquiam Av NE
227,800
227,800
17
Arterial Circulation Program
18
Bridge Inspection & Repair
19
May Creek Bridge Replacement
20
Loop Replacement Program
21
Sign Replacement Program
22
Pole Program
23
Sound Transit HOV Direct Access
24
Traffic Safety Program
25
Traffic Efficiency Program
26
CBD Bike & Ped. Connections
27
Arterial Rehab. Pro .
185,000
155,000
58,400
135,0001
32,900
32,900
599,200
28
Duvall Ave NE
86,000
250,000
336,000
29
RR Crossing Safety Pro .
30
TDM Program
31
Trans Concurrent
32
Missing Links Program
33
GIS Needs Assessment
34
Grady Wy Corridor Study
35,000
100,000
135,000
35
Bicycle Route Dev. Program
36
Lake Wash. By -Park to Coulon Pk
44,500
103,175
147,675
37
Interagency Signal Coord.
38
Environmental Monitoring
55,000
25,000
12,500
17,500
5,000
5,000
120,000
39
Trans -Valley & Soos Creek Corr.
40
WSDOT Coordination Program.
41
1% for the Arts
42
Arterial HOV Program
43
Park -Sunset Corridor
50,000
387,900
437,900
44
Lind Av - SW 16th-SW43rd
5,000
5,000
45
SR 169 HOV -140th to SR900
100,000
268,000
368,000
46
Benson Rd - S 26th to Main
47
Sunset/DuvallIntersection
48
Logan Av Concrete Panel Repair
49
Carr/Mill Signal
50
Houser Wy S - Main to Burnett
51
Lake Wash. By Slip Plane
52
Monster Road Bridge
53
Duvall Ave NE - King County
Total Sources
1,400,800
1,718,575
348,900
749,500
1,417,900
1,432,900
7,068,575
mkwtion mi OBIOtf1006 a-t0
4-7 DRAFT
CITY OF RENTON
PLANNING/BUILDING/PUBLIC WORKS
TRANSPORTATION SYSTEMS DIVISION
2006 - 2011 SIX -YEAR TIP
Bonds / L.I.D.'s Formed *
TIP
Project Title
2006
2007
2008
2009
2010
2011
Period
Total
1 IStreet
overlay Program
2 ISR
167/SW 27th SUStrander By
3 1
Strander By/SW 27th St Connect.
3,000,000
3,000,000
4
Renton Urban Shuttle RUSH
5
Transit Program
6
Rainier Av Corridor Study/ Improv.
7
Rainier Av - S 4th PI to S 2nd
8
Hardie Av SW Transit/Multi-modal
9
NE 3rd/NE 4th Corridor
10
WalkwayPro ram
11
Rainier Av - SW 7th to 4th PI
12
S Lake Wash. Roadway Im rov.
12,507,000
3,432,000
15,939,000
13
South Renton Project
14
1-405 Improvements in Renton
15
Project Development/Predesi n
16
NE 4th SVHoquiam Av NE
17
Arterial Circulation Program
18
Bridge Inspection & Repair
19
May Creek Bridge Replacement
20
Loop Replacement Program
21
Sign Replacement Program
22
Pole Program
23
Sound Transit HOV Direct Access
'14
Traffic Safety Program
15
Traffic Efficiency Program
26
CBD Bike & Ped. Connections
27
Arterial Rehab. Pro .
28
Duvall Ave NE
29
RR Crossing Safety Pro .
30
TDM Program
31
Trans Concurrent
32
Missing Links Program
33
GIS Needs Assessment
34
Grady Wy Corridor Stud
35
Bicycle Route Dev. Program
36
Lake Wash. By -Park to Coulon Pk
37
Interagency Signal Coord.
38
Environmental Monitoring
39
Trans -Valley & Soos Creek Corr.
40
WSDOT Coordination Program
41
1% for the Arts
42
Arterial HOV Program
43
Park -Sunset Corridor
44
Lind Av - SW 16th-SW43rd
45
SR 169 HOV -140th to SR900
46
Benson Rd - S 26th to Main
47
Sunset/DuvallIntersection
48
Logan Av Concrete Panel Repair
49
Carr/Mill Signal
50
Houser Wy S - Main to Burnett
51
Lake Wash. By Slip Plane
52
Monster Road Bridge
53
IDuvall Ave NE - King County
Total Sources
15,507,000
3,432,000
1
18,939,000
wwtiba fwmW
4-8 DRAFT
Bonding in process; no L.I.D.s formed.
Od08�iW5 130
CITY OF RENTON
PLANNING/BUILDING/PUBLIC WORKS
TRANSPORTATION SYSTEMS DIVISION
2006 - 2011 SIX -YEAR TIP
nthPr-in-Hand
TIP
Project Title
2006
2007
2008
2009
2010
2011
Period
Total
1
Street Overlay Program
2
SR 167/SW 27th SUStrander By
3
Strander By/SW 27th St Connect
2,243,000
257,000
2,500,000
4
Renton Urban Shuttle RUSH
5
Transit Program
6
Rainier Av Corridor Study/ Im rov.
7
Rainier Av - S 4th PI to S 2nd
8
Hardie Av SW Transit/Multi-modal
9
NE 3rdINE 4th Corridor
10
Walkway Program
11
Rainier Av - SW 7th to 4th PI
12
S Lake Wash. Roadway Im rov.
5,000,000
5,000,000
13
South Renton Project
14
1-405 Improvements in Renton
15
Project Develo ment/Predesi n
16
NE 4th St/Hoquiam Av NE
17
Arterial Circulation Program
18
Bridge Inspection & Repair
19
May Creek Bridge Replacement
20
Loop Replacement Program
21
Sign Replacement Program
22
Pole Program
23
Sound Transit HOV Direct Access
24
Traffic Safety Program
25
Traffic Efficiency Program
26
CBD Bike & Pod. Connections
27
Arterial Rehab. Pro .
28
Duvall Ave NE
29
RR Crossing Safety Pro .
30
TDM Program
49,200
49,200
49,200
49,200
49,200
49,200
295,200
31
Trans Concurrent
32
Missing Links Program
33
GIS Needs Assessment
34
Grady Wy Corridor Stud
35
Bicycle Route Dev. Program
36
Lake Wash. By -Park to Coulon Pk
37
Interagency Signal Coord.
38
Environmental Monitoring
39
Trans -Valley & Soos Creek Corr.
40
WSDOT Coordination Program
41
1 % for the Arts
42
Arterial HOV Program
43
Park -Sunset Corridor
44
Lind Av - SW 16th-SW43rd
45
SR 169 HOV -140th to SR900
2,500,000
2,500,000
46
Benson Rd - S 26th to Main
47
Sunset/DuvallIntersection
48
Logan Av Concrete Panel Repair
49
Carr/Mill Signal
50
Houser Wy S - Main to Burnett
51
Lake Wash. By Slip Plane
52
Monster Road Bridge
53
Duvall Ave NE - King County
3,169,190
524,000
3,693,190
Total Sources
10,461,390
573,200
2,549,200
306,200
49,2001
49,200
13,988,390
4-9 DRAFT
CITY OF RENTON
PLANNING/BUILDING/PUBLIC WORKS
TRANSPORTATION SYSTEMS DIVISION
2006 - 2011 SIX -YEAR TIP
Grants Proposed
TIP
Project Title
2006
2007
2008
2009
2010
2011
Period
Total
1
Street Overlay Program
2
SR 167/SW 27th SVStrander By
3
Strander By/SW 27th St Connect.
1,254,000
1,254,000
4
Renton Urban Shuttle (RUSH)
5
ITransit Program
6
Rainier Av Corridor Study/ Improv.
7
Rainier Av - S 4th PI to S 2nd
8
Hardie Av SW Transit/Multi-modal
9
NE 3rd/NE 4th Corridor
10
Walkway Program
11
Rainier Av - SW 7th to 4th PI
12
S Lake Wash. Roadway Improv.
13
South Renton Project
14
1-405 Improvements in Renton
15
Project Dove lopmenVPredesi 9 n
16
NE 4th SVHoquiam Av NE
17
Arterial Circulation Program
18
Bridge Inspection & Repair
19
May Creek Bridge Replacement
20
Loop Replacement Program
21
Sign Replacement Program
22
Pole Program
13
Sound Transit HOV Direct Access
t
Traffic Safety Program
-5
Traffic Efficiency Program
26
CBD Bike & Ped. Connections
27
Arterial Rehab. Pro .
28
Duvall Ave NE
29
RR Crossing Safety Pro .
30
TDM Program
31
Trans Concurrent
32
IMIssing Links Program
33
GIS Needs Assessment
34
Grady Wy Corridor Stud
35
Bicycle Route Dev. Program
36
Lake Wash. By -Park to Coulon Pk
37
Interagency Signal Coord.
38
Environmental Monitoring
39
Trans -Valley & Soos Creek Corr.
40
WSDOT Coordination Program
41
1% for the Arts
42
Arterial HOV Program
43
Park -Sunset Corridor
44
Lind Av - SW 16th-SW43rd
630,000
200,000
830,000
45
SR 169 HOV -140th to SR900
46
Benson Rd - S 26th to Main
47
Sunset/DuvallIntersection
48
Lo an Av Concrete Panel Repair
49
Carr/Mill Signal
50
Houser Wy S - Main to Burnett
51
Lake Wash. By Slip Plane
52
Monster Road Bridge
53
Duvall Ave NE - King County
Total Sources
1,884,000
200,000
2,084,000
Od01/3fM5 6:10
4-10 DRAFT
CITY OF RENTON
PLANNING/BUILDING/PUBLIC WORKS
TRANSPORTATION SYSTEMS DIVISION
2006 - 2011 SIX -YEAR TIP
Mitiaation Proposed
TIP
Project Title
2006
2007
2008
2009
2010
2011
Period
Total
1
Street Overlay Program
2
SR 167/SW 27th St/Strander By
3
Strander By/SW 27th St Connect.
4
Renton Urban Shuttle (RUSH)
5
Transit Program
6
Rainier Av Corridor Study/ Improv.
7
Rainier Av - S 4th PI to S 2nd
8
Hardie Av SW Transit/Multi-modal
9
NE 3rd/NE 4th Corridor
10
Walkway Program
11
Rainier Av - SW 7th to 4th PI
12
S Lake Wash. Roadway Improv.
13
South Renton Project
14
1-405 Improvements in Renton
15
Project Development/Predesi n
16
NE 4th St/Hoquiam Av NE
17
Arterial Circulation Program
18
Bridge Inspection & Repair
19
May Creek Bridge Replacement
20
Loop Replacement Program
21
Sign Replacement Program
22
Pole Program
23
Sound Transit HOV Direct Access
24
Traffic Safety Program
25
Traffic Efficiency Program
26
CBD Bike & Ped. Connections
27
Arterial Rehab. Pro .
28
Duvall Ave NE
29
RR Crossing Safety Pro .
30
TDM Program
31
Trans Concurrenc
32
Missing Links Program
33
GIS Needs Assessment
34
Grady Wy Corridor Stud
35
Bicycle Route Dev. Program
36
Lake Wash. By -Park to Coulon Pk
37
Interagency Signal Coord.
38
Environmental Monitoring
39
Trans -Valley & Soos Creek Corr.
40
WSDOT Coordination Program
41
1% for the Arts
42
Arterial HOV Program
43
Park -Sunset Corridor
44
Lind Av - SW 16thSW43rd
45
SR 169 HOV -140th to SR900
46
Benson Rd - S 26th to Main
47
Sunset/DuvallIntersection
48
Logan Av Concrete Panel Repair
49
Carr/Mill Signal
50
Houser Wy S - Main to Burnett
51
Lake Wash. By Slip Plane
52
Monster Road Bridge
53
Duvall Ave NE - King County
Total Sources
M'RpMion PropoW ObO1IZ005 6:10
4 -11 DRAFT
CITY OF RENTON
PLANNING/BUILDING/PUBLIC WORKS
TRANSPORTATION SYSTEMS DIVISION
2006 - 2011 SIX -YEAR TIP
L.I.D.'s Proposed
TIP
Project Title
2006
2007
2008
2009
2010
2011
Period
Total
1
Street Overlay Program
2
SR 167/SW 27th St/Strander By
3
Strander By/SW 27th St Connect.
4
Renton Urban Shuttle (RUSH)
5
Transit Program
6
Rainier Av Corridor Study/ Improv.
7
Rainier Av - S 4th PI to S 2nd
8
Hardie Av SW Transit/Multi-modal
9
NE 3rd/NE 4th Corridor
10
Walkway Program
11
Rainier Av - SW 7th to 4th PI
12
S Lake Wash. Roadway Im rov.
13
South Renton Project
14
1-405 Improvements in Renton
15
Project Develo ment/Predesi n
16
NE 4th SUHo uiam Av NE
17
Arterial Circulation Program
18
Bridge Inspection & Repair
19
May Creek Bridge Replacement
20
Loop Replacement Program
21
Sign Replacement Program
22
Pole Program
23
Sound Transit HOV Direct Access
24
Traffic Safety Program
25
Traffic Efficiency Program
26
CBD Bike & Ped. Connections
27
Arterial Rehab. Pro .
28
Duvall Ave NE
29
RR Crossing Safety Pro .
30
TDM Program
31
Trans Concurrent
32
Missing Links Program
33
GIS Needs Assessment
34
-drady Wy Corridor Stud
35
Bicycle Route Dev. Program
36
Lake Wash. By -Park to Coulon Pk
37
Interagency Signal Coord.
38
Environmental Monitoring
39
Trans -Valley & Soos Creek Corr.
40
WSDOT Coordination Program
41
1% for the Arts
42
Arterial HOV Program
43
Park -Sunset Corridor
44
Lind Av - SW 16th-SW43rd
45
SR 169 HOV -140th to SR900
46
Benson Rd - S 26th to Main
47
Sunset/DuvallIntersection
48
Logan Av Concrete Panel Repair
49
Carr/Mill Signal
50
Houser Wy S - Main to Burnett
51
Lake Wash. By Slip Plane
52
Monster Road Bridge
53
Duvall Ave NE - King County
Total Sources
oero+noos s,o
4-12 DRAFT
CITY OF RENTON
PLANNING/BUILDING/PUBLIC WORKS
TRANSPORTATION SYSTEMS DIVISION
2006 - 2011 SIX -YEAR TIP
Other Pronosed
TIP
Project Title
2006
2007
2008
2009
2010
2011
Period
Total
1
Street Overlay Program
2
SR 167/SW 27th St/Strander By
3
Strander By/SW 27th St Connect.
4,000,000
4,000,000
4
Renton Urban Shuttle (RUSH)
5
Transit Program
6
Rainier Av Corridor Study/ Im rov.
7
Rainier Av - S 4th PI to S 2nd
1,000,000
1,000,000
1,000,000
3,000,000
8
Hardie Av SW Transit/Multi-modal
2,300,000
4,700,000
5,000,000
12,000,000
9
NE 3rd/NE 4th Corridor
10
Walkway Program
11
Rainier Av - SW 7th to 4th PI
12
S Lake Wash. Roadway Improv.
13
South Renton Project
14
1-405 Improvements in Renton
15
Project Development/Predesi n
16
NE 4th SUHoquiam Av NE
17
Arterial Circulation Program
18
Bridge Inspection & Repair
19
May Creek Bridge Replacement
20
Loop Replacement Program
21
Sign Replacement Program
22
Pole Program
23
Sound Transit HOV Direct Access
24
Traffic Safety Program
25
Traffic Efficiency Program
26
CBD Bike & Ped. Connections
27
Arterial Rehab. Pro .
28
Duvall Ave NE
29
RR Crossing Safety Pro .
30
TDM Program
31
Trans Concurrent
32
Missing Links Program
33
GIS Needs Assessment
34
Grady Wy Corridor Stud
35
Bicycle Route Dev. Program
36
Lake Wash. By -Park to Coulon Pk
37
Interagency Signal Coord.
38
Environmental Monitoring
39
Trans -Valley & Soos Creek Corr.
40
WSDOT Coordination Program
41
1% for the Arts
42
Arterial HOV Program
43
Park -Sunset Corridor
44
Lind Av - SW 16th-SW43rd
45
SR 169 HOV - 140th to SR900
46
Benson Rd - S 26th to Main
47
Sunset/DuvallIntersection
48
Logan Av Concrete Panel Repair
49
Carr/Mill Signal
50
Houser Wy S - Main to Burnett
480,000
480,000
51
Lake Wash. By Slip Plane
52
Monster Road Bridge
53
Duvall Ave NE - King County
Total Sources
7,780,000
5,700,000
6,000,000
19,480,000
_012 6:10
4 -13 DRAFT
CITY OF RENTON
PLANNING/BUILDING/PUBLIC WORKS
TRANSPORTATION SYSTEMS DIVISION
2006 - 2011 SIX -YEAR TIP
Undetermined
TIP
Project Title
2006
2007
2008
2009
2010
2011
Period
Total
1
Street Overlay Program
2
SR 167/SW 27th St/Strander By
3
Strander By/SW 27th St Connect.
26,216,800
5,308,000
31,524,800
4
Renton Urban Shuttle RUSH
5
Transit Program
6
Rainier Av Corridor Study/ Im rov.
7
Rainier Av - S 4th PI to S 2nd
8
Hardie Av SW Transit/Multi-modal
9
NE 3rd/NE 4th Corridor
5,017,000
3,300,000
3,300,000
11,617,000
10
Walkway Program
80,000
80,000
80,000
240,000
11
Rainier Av - SW 7th to 4th PI
2,998,600
2,998,600
12
S Lake Wash. Roadway Improv.
16,950,000
16,950,000
13
South Renton Project
14
1-405 Improvements in Renton
15
Project Development/Predesi n
16
NE 4th St/Ho uiam Av NE
17
Arterial Circulation Program
18
Bridge Inspection & Repair
19
May Creek Bridge Replacement
20
Loop Replacement Program
21
Sign Replacement Program
22
Pole Program
23
Sound Transit HOV Direct Access
24
Traffic Safety Program
25
Traffic Efficiency Program
26
CBD Bike & Ped. Connections
27
Arterial Rehab. Pro .
28
IDuvall Ave NE
29
RR Crossing Safety Pro .
30
TDM Program
31
Trans Concurrent
32
Missing Links Program
33
GIS Needs Assessment
34
Grady Wy Corridor Study
210,000
1,790,000
1,000,000
3,000,000
35
Bicycle Route Dev. Program
90,000
90,000
36
Lake Wash. By -Park to Coulon Pk
37
Interagency Signal Coord.
38
Environmental Monitoring
39
Trans -Valley & Soos Creek Corr.
40
WSDOT Coordination Program
41
1% for the Arts
42
Arterial HOV Program
43
Park -Sunset Corridor
44
Lind Av - SW 16th-SW43rd
1,284,000
426,000
1,710,000
45
SR 169 HOV -140th to SR900
46
Benson Rd - S 26th to Main
47
Sunset/DuvallIntersection
48
Logan Av Concrete Panel Repair
460,000
460,000
49
Carr/Mill Signal
340,000
400,000
10,000
750,000
50
Houser Wy S - Main to Burnett
330,000
330,060
51
Lake Wash. By Slip Plane
52
Monster Road Bridge
53
Duvall Ave NE - King County
F77FTotal
Sources
37,026,400
28,254,000
4,390,000
1 69.670.400
w�ww_am oarovtoos e.�o
4-14 DRAFT
SECTION FIVE
PROJECT DESCRIPTIONS
• Summary of TIP Projects & Costs 5-la
• Detailed Project Descriptions 5-1 to 5-53
CITY OF RENTON PLANNING / BUILDING / PUBLIC WORKS TRANSPORTATION SYSTEMS DIVISION 2006-2011 SIX -YEAR TIP
Tnfni Prnianf rnctc
TIP
Project Title
Previous
Costs
2006
2007
2008
2009
2010
2011
Six -Year
Period Total
Total
Cost
Total
Funded
Total
Unfunded
1
Street Overlay Program
1,093,500
655,000
405,000
405,000
405,000
405,000
405,000
2,680,000
3,773,500
3,773,500
2
SR 167/SW 27th SUStrander By
358,596
10,000
10,000
10,000
10,000
10,000
5,000
55,000
413.596
413,596
3
Strander By/SW 27th St Connect.
2,491,727
6,369,000
1,750,000
34,174,006
5,748,000
48,041,000
50,532,727
13,753,927
36,778.800
a
Renton Urban Shuttle RUSH
6,142
5,000
5,000
5,000
5,000
5,000
5,000
30,000
36,142
361142
5
Transit Program
32,359
20,400
20,400
20,400
20,400
20,400
20,400
122,400
154,759
154,759
s
Rainier Av Corridor Study/ Im rov.
287,652
20,000
20.000
20,000
20,000
20,000
20,000
120,000
407,652
407,652
7
Rainier Av - S 4th PI to S 2nd
10,000
2,197,000
1,943,000
2,160.000
6,300,000
6,310,000
3,310,000
3,000,000
a
Hardie Av SW Transit/Multi-modal
190,000
2,577,000
6,070,000
6,500,000
15,147,000
15,337,000
3,337,000
12,000,000
9
NE 3rd/NE 4th Corridor
212,147
314,000
394,500
413,000
5,017,000
3,300,600
3,300,000
12,738,500
12,950,647
1,333,647
11,617,000
10
Walkway Program
516,832
250,000
250,000
250,000
250,000
250,000
250,000
1,500,000
2,016,832
1,776,832
240,000
11
Rainier Av - SW 7th to 4th PI
323,454
871,000
1,285,000
1,000,000
3,360,000
20,000
6,536,000
6,859,454
3,860,854
2,998,600
12
S Lake Wash. Roadway Im rov.
2,050,773
17,507,000
3,432,000
16,950,000
37,889,000
39,939,773
22,989,773
16,950,000
13
South Renton Project
305,000
395,000
75,000
470,000
775,000
775,000
14
1-406 Improvements in Renton
72,271
30,000
20,000
10,000
10,000
10,000
10,000
90,000
162,271
162,271
15
Project Develoment/Predesi n
274,708
175,000
175,000
200,000
200,000
200,000
200,000
1,150,000
1,424,708
1,424,708
1s
NE 4th St/Hoquiam Av NE
172,2001
227,800
227,800
400,000
400,000
17
Arterial Circulation Program
324,711
200,000
200,000
200,000
200,000
250,000
250,000
1,300,000
1,624,711
1,624,711
1e
1 Bridge Inspection & Repair
125,538
220,000
40,000
40,000
40,000
40,000
40,000
420,000
545,538
545,538
1s
May Creek Bridge Replacement
120,000
710,000
5,000
835,000
835,000
835,000
20
Loop Replacement Program
33,807
20,000
20,000
20,000
20,000
20,000
20,000
120,000
153,807
153,807
21
Sign Replacement Program
9,358
7,500
7,500
7,500
7,500
7,500
7,500
45,000
54,358
54,358
22
Pole Program
44,200
25,000
25,000
25,000
25,000
25,000
25,000
150,000
194,200
194.200
23
Sound Transit HOV Direct Access
58,967
5,000
5,000
63,967
63,967
24
Traffic Safety Program
145,351
40,0001
40,000
40,000
40,000
40,000
40,000
240,000
385,351
385,351
25
ITraffic Efficiency Program
361,589
157,000
98,000
75,000
30,000
30,000
30,000
420,000
781,589
781,589
26
CBD Bike & Ped. Connections
74,956
50,000
50,000
50,000
50,000
50,000
50,000
300,000
374,956
374,956
27
Arterial Rehab. Pr .
388,916
240,000
205,000
340,000
230,000
180,000
180,000
1,375,000
1,763,916
1,763,916
29
Duvall Ave NE
1,381,419
2,474,800
447,000
2,921,800
4,303,219
4,303,219
29
RR Crossing Safety Pro .
5,182
5,000
5,000
10,000
10,000
30,000
35,182
35,182
30
TDM Program
118,805
64,200
64,200
64,200
64,200
64,200
64,200
385,200
504,005
504,005
31
Trans Concurrency
40,047
10,0001
40,000
10,000
10,000
30,000
10,000
110,000
150,047
150,047
32
Missing Links Program
56,886
30,000
30,000
30,000
30,000
30,000
30,000
180,000
236,886
236,886
33
GIS Needs Assessment
36,682
35,000
20,000
20,000
20,000
20,000
20,000
135,000
171,682
171,682
34
Grady Wy Corridor Study
20,619
35,000
120,000
80,000
230,000
1,810,000
1,020,000
3,295,000
3,315,619
315,619
3,000,000
35
Bicycle Route Dev. Program
34,342
20,000
18,000
18,000
110,000
80,000
80,000
326,000
360,342
270,342
90,000
3s
Lake Wash. By -Park to Coulon Pk
317,418
84,500
141,600
226,100
543,518
543,518
37
Interagency Signal Coord.
19,572
12,000
12,000
31,572
31,572
3e
Environmental Monitoring
184,838
75,000
50,000
30,000
30,000
30,000
30,000
245,000
429,838
429,838
39
Trans -Valley & Soos Creek Corr.
6,886
5,000
5,000
5,000
15,000
21,886
21,886
40
WSDOT Coordination Program
24,137
15,000
10,000
10,000
10,000
10,000
10,000
65,000
89,137
89,137
41
1% for the Arts
33,278
60,000
30,000
30,000
50,000
30,000
30,000
230,000
263,278
263,278
42
Arterial HOV Program
127,354
10,000
10,000
137,354
137,354
43
Park -Sunset Corridor
26,277
50,000
390,000
440,000
466,277
466,277
44
Lind Av - SW 16thSW43rd
5,000
5,000
1,914,000
626,000
2,545,000
2,550,000
10,000
2,540,000
45
SR 169 HOV -140th to SR900
2,015,391
1,755,400
2,080,000
2,500,000
6,335,400
8,350,791
8,350,791
as
Benson Rd - S 26th to Main
222,963
2,500
2,500
225,463
225,463
47
Sunset/DuvallIntersection
909,561
33,300
33,300
942,861
942,861
4a
Logan Av Concrete Panel Repair
460,000
460,000
460,000
460,000
49
Carr/Mill Signal
2,000
3,000
10,000
20,000
340,000
400,060
10,000
783,000
785,000
35,000
750,000
50
Houser Wy S - Main to Burnett
810,000
810,000
810,000
810,000
51
Lake Wash. By Slip Plane
637,600
2,400
2,400
640,000
640,000
52
Monster Road Bride
671,934
27,0001
27,000
698,934
698,934
53
Duvall Ave NE - King County
810,174
3,169,1901
524,000
3,693,190
4,503,364
4,503,364
Total Cources
17,673,1181
36,916,9901
13 222 200
5 963 100
62,966,1001
38,724,100114,832,1001161
624 590
179,297,708188
063 308
'1 234 400
TOM Pr .Ca o&Wam ).OB n4
5-1 AFT
CITY OF RENTON
PLANNING/BUILDING/PUBLIC WORKS
TRANSPORTATION SYSTEMS DIVISION
2006 - 2011 SIX -YEAR TIP
Street Overlay Program Functional Classification: N/A Fund: 317
Proj. Length: N/A Proj: 12108
Type: 1 - INFRASTRUCTURE RANK: 1 CONTACT: Bill Wressell 425.430.7400
DESCRIPTION:
Annual program for repairing and resurfacing existing roadways, operating the City's Pavement
Management System and providing data for deficiency ratings.
JUSTIFICATION:
ACP overlay, SMA, and slurry seal of streets provide for improved driving surface and are highly cost
effective ways of avoiding expensive repairs and reconstruction. The computerized Pavement
Management System and yearly survey of roadway conditions greatly improve the efficiency of the
Overlay Program. The arterial streets are rated in odd years (2005, 2007, etc.) and all other streets are
rated in even years (2006, 2008, etc.).
STATUS:
Ongoing yearly program. This program funds overlays on neighborhood streets and
collector streets. The Arterial Rehabilitation Program funds major and minor arterials.
CHANGES:
2005 funding was increased $300,000 to cover the cost of major patching needed in the
Victoria Park Neighborhood and the increased oil costs. The funding for 2006 was
increased $250,000. The oil costs and OCI will be monitored for future spending needs.
Funded : 13,773,500 1 Unfunded
Project Totals
Pro rammed Pre-2006
Six Year Program
ITEM
Programmed
Sent In 2004
2005
Total
2006
2007
2008
2009
2010
2011
EXPENSES:
Project Development
8,076
8 076
Precon En /Admin
70,667
667
10,000
60,000
10,000
10,000
10,000
10,000
10,000
10,000
R-O-W includes Admin
Construction Contract Fee
3,371,757
339,757
652 000
2,380,000
605,000
355,000
355,000
355,000
355,000
355,000
Construction En /Admin
323,000
40,000
43,000
240,000
40,000
40,000
40,000
40,000
40,000
40,000
Other
TOTAL EXPENSES
3,773,500
388,500
705,000
2,680,000
655,000
405,000
405,000
405,000
405,000
405,000
SOURCE OF FUNDS:
Vehicle Fuel Tax
2,803,500
353,500
350,000
21100,000
350,000
350,000
350,000
350,000
350,000
350,000
Business License Fee
415,480
30,480
55,000
330,000
55,000
55,000
55,000
55,000
55,000
55,000
Proposed Fund Balance
550,000
300,000
250,000
250,000
Grants In -Hand
Mitigation In -Hand
Bonds/L.I.D.'s Formed
Other In -Hand Dev. Reimb.
4,520
4,520
Grants Proposed
Mitigation Proposed
L.I.D.'s Proposed
Other Proposed
Undetermined
TOTAL SOURCES
3,773,5001
388,500
705,0001
2,680,000
655,000
405,000
405,000
405,000
405,000
405 000
WNroY NNNNNMNNYRNYINNNNNNOWN 6:10AM
5-1 DRAFT
CITY OF RENTON
PLANNING/BUILDING/PUBLIC WORKS
TRANSPORTATION SYSTEMS DIVISION
2006 - 2011 SIX -YEAR TIP
SR 167 I/C / SW 27th St / Strander By Corridor
Type: 2 - MULTI -MODAL / TDM
Functional Classification: MinorArterial
Proj. Length:
RANK: 2
Fund: 317
Proj: 12138
CONTACT: Keith Woolley 425.430.7318
DESCRIPTION:
Planning, coordination and oversight of the corridor project for the entire length. This includes arterial
HOV lanes on SW 27th Street from East Valley Rd. to Oakesdale Av. SW and the extension to West
Valley Hwy. (SR-181), as well as the coordination with WSDOT for a new interchange at SR-167 and SW
27th Street.
JUSTIFICATION:
There are numerous projects within the Renton Valley, led by a number of different agencies. This project
provides the necessary coordination to ensure future transportation needs within the Renton Valley are
served by the SW 27th St corridor in coordination with: King County Carr Rd project, King County
TransValley project, Sound Transit rail station and ST Express transit service, King County Metro transit,
and WSDOT 1-405 and SR-167 improvements.
STATUS:
The design of Segments 1 and 2 were shifted to a new project in 2003. The City of Tukwila
transit oriented development (TOD) project adjacent to the SW 27th St / Strander Blvd.
Corridor is still planned.
CHANGES:
Funded : 1413,596 lUnfunded
Project Totals
Programmed Pre-2006
Six ear Program
ITEM
Programmed
Spent Pre-2005
2005
Total
2006
2007
2008
2009
2010
2011
EXPENSES:
Project Development
402,376
342,376
5,000
55,000
10,000
10,000
10,000
10,000
10,000
5,000
Precon En /Admin
11,220
11,220
R-O-W includes Admin
Construction Contract Fee
Construction En /Admin
Other
TOTAL EXPENSES
413,596
353,596
5,000
55,000
10,000
10,000
10,000
10,000
10,000
5,000
SOURCE OF FUNDS:
Vehicle Fuel Tax
Business License Fee
48,684
3,684
45,000
10,000
10,000
10,000
10,000
5,000
Proposed Fund Balance
Grants In -Hand
293,794
293,794
Mitigation In -Hand
71,118
56,118
5,000
10,000
10,000
Bonds/L.I.D.'s Formed
Other In -Hand
Grants Proposed
Mitigation Proposed
L.I.D.'s Proposed
Other Proposed
Undetermined
TOTAL SOURCES
413,5961
353,596
5,0001
55,000
10,000
10,000
10,000
10,000,
10,000,
5,000
5tra tl.
osro,rzoos 6 10 AM
5-2 DRAFT
CITY OF, -_ _TON
PLANNING/BUILDING/PUBLIC WORKS
TRANSPORTATION SYSTEMS DIVISION
2008 - 2011 SIX -YEAR TIP
Strander Boulevard / SW 27th Street Connection Functional Classification: Minor Arterial Fund: 317
Proj. Length: 1.27 miles Proj: 12239
Type: 4 - ECONOMIC DEVELOPMENT RANK: 3 CONTACT: Rob Lochmiller 425.430.7303
DESCRIPTION:
This project provides a critical four/five lane arterial that will serve as a connector to West Valley Highway
(SR-181) and East Valley Road, as well as an arterial connector to SR-167 from the south. The project will
provide a grade -separated crossing at the Union Pacific Railroad (UPRR) and Burlington Northern Sante
Fe (BNSF) railroad tracks. Segments 1 and 2 include from West Valley Hwy to East Valley Road.
JUSTIFICATION:
A new east -west arterial roadway will connect the Cities of Renton and Tukwila, and provide significant
congestion relief to existing arterials. The new road will provide direct access to the new Tukwila Station,
a multi -modal center being developed immediately north of the new alignment, and to the Boeing
Longacres site. The eventual direct HOV connections to southbound SR-167 will provide significant
advantages to HOV and transit usage. By crossing under the UPRR and BNSF railroads, the new arterial
will provide significant benefits to both freight mobility and to general motorists.
STATUS:
Up to 30% design was contracted in March 2003 for $2,213,349. It includes the
environmental documents, base -mapping, road sections, and project phasing by June
2005. $1,000,000 was received from the General Fund in 2003. $745,563 TEA-21 was
obligated in May 2003 with an additional $2,398 obligated in May 2005. The design and
construction costs reflect Phases 1 and 2
CHANGES:
*The City is in the process of applying for bonds. Nearing completion of 30% design for all
phases. Engineering estimates are lower than the planning level estimates. Phase 1,
Segment 1, is in full design with construction to start late 2005, early 2006 paid for with
approximately $3 million in bonds. A shared -use detention pond with the developer will
lower the costs of construction. $500,000 Metro mitigation reserve is pending Council
approval. New fuel tax 2010.
Funded:Funded:l 13 753 927 Unfunded-:1 36,778,800
Project Totals
Pro rammed Pre-2006
Six -Year Program
ITEM
Programmed
Sent Pre-2005
2005
Total
2006
2007
2008
2009
2010
2011
EXPENSES:
Project Development
Precon En /Admin
6,199,727
1,471,727
1,020,000
3,708,000
850,000
2,350,000
508,000
R-O-W includes Admin
4,543,000
4,543,000
21243,000
2,300,000
Construction Contract Fee
35,900,000
35,900 000
2,970,000
1,570,000
26 760,000
41600,000
Construction En /Admin
3,890,000
31890,000
306,000
180,000
1 2,764,000
640,000
Other
TOTAL EXPENSES
50,532,727
1,471,727
1,020,000
48,041,000
6,369,000
1,750,000
34,174,000
5,748,000
SOURCES OF FUNDS:
Vehicle Fuel Tax
240,000
240,000
240,000
Business License Fee
237,349
237,349
82,749
114,600
40,000
Proposed Fund Bal./Reserve
772,617
243,766
528,851
156,600
140,651
231,600
Grants In -Hand State & Fed
5,243,961
554,799
193,162
4,496,000
969,400
1,526,600
2,000,000
Mitigation In -Hand
760,000
500,000
260,000
100,000
160,000
Bonds/L.I.D.'s Formed
3,000,000
3,000,000
3000000
Other In -Hand GF & Boeing)
3,500,000
416,928
583,072
2,500,000
2,243,000
257,000
Grants Proposed Earmarks
1,254,000
11254,000
1,254,000
Mitigation Proposed
L.I.D.'s Proposed
Other Proposed (S.Transit)
4,000,000
4,000 000
4,000,000
Undetermined
31,524,8001
31 524,800
26,216,8001
5,308,000
TOTAL SOURCES
1 50,532,7271
1,471,7271
1,020,0001
48,041,000
1 6,369,0001
1,750,0001
34,174,0001
5,748,0001
Str�nWr Corwcnon o5N111om $-10AM
5-3 DRAFT
CITY OF RENTON
PLANNING/BUILDING/PUBLIC WORKS
TRANSPORTATION SYSTEMS DIVISION
2006 - 2011 SIX -YEAR TIP
Renton Urban Shuttle (RUSH) Program
Type: 2 - MULTI -MODAL / TDM
Functional Classification: N/A
Proj. Length: N/A
RANK: 4
Fund: 317
Proj: 12163
CONTACT: Nathan .tones 425.430.7217
DESCRIPTION:
The Renton Urban Shuttle (RUSH) is a shuttle bus service provided by King County Metro that runs peak
hours between Longacres Multi -modal Commuter Station (where the Sounder train arrives mornings and
evenings) and North Renton (Boeing). The City intends to work with Metro and transit consultants to
develop this service into a program that delivers greater benefits to Renton area residents and employees.
JUSTIFICATION:
Congestion relief, increased travel options and economic development are outcomes dependent upon
increasing transit patronage in Renton. The RUSH shuttle compliments existing transit service by
providing additional local service.
STATUS:
In 2001, Metro assumed full fiscal responsibility for the existing shuttle service.
CHANGES:
]Funded: 136,142 Unfunded
Project Totals
Pro rammed Pre-2006
Six -Year Program
ITEM
Programmed
Sent in 2004
2005
Total
2006
2007
2008
2009
2010
2011
EXPENSES:
Project Development
36,142
1,142
5,000
30,000
5,000
5,000
5,000
5,000
5 000
5,000
Precon En /Admin
R-O-W includes Admin
Construction Contract Fee
Construction En /Admin
Other RUSH Contract
TOTAL EXPENSES
36,142
1,142
5,000
30,000
5,000
5,000
5,000
5,000
5,000
5,000
SOURCE OF FUNDS:
Vehicle Fuel Tax
Business License Fee
36,142
1,142
5,000
30,000
5,000
5,000
5,000
5,000
5,000
5,000
Proposed Fund Balance
Grants In -Hand
Mitigation In -Hand
Bonds/L.I.D.'s Formed
Other In -Hand
Grants Proposed
Mitigation Proposed
L.I. D.'s Proposed
Other Proposed
Undetermined
TOTAL SOURCES
36,1421
1,142,
5,000,
30 000
5 000
5,000
5,000,
5,000
5 000
5,0001
sh.o. �1=5 610AM
5-4 DRAFT
CITY OF RENTON
PLANNING/BUILDING/PUBLIC WORKS
TRANSPORTATION SYSTEMS DIVISION
2006 - 2011 SIX -YEAR TIP
Transit Program
Type: 2 - MULTI -MODAL / TDM
Functional Classification: N/A Fund:
Proj. Length: N/A Proj:
RANK: 5 CONTACT: Nathan Jones
317
12109
425.430.7217
DESCRIPTION:
Determine and provide funding for short-range and long-range transit needs, routes, and facilities,
including park and ride lots, bus shelters, and arterial system improvements required to facilitate transit
access. Joint projects with King County Metro and Sound Transit will also be pursued to improve local
and regional transit service in Renton. Work with transit agencies, community, and businesses for
implementation.
JUSTIFICATION:
Transit improvements are a vital component of the transportation system's ability to absorb future traffic
demand and meet Level -of -Service standards. The City and private developers have invested millions of
dollars in capital improvements in support of transit -oriented development and services. Transit will be
one key in meeting the goals of the downtown area as well as development in other parts of the City.
Coordination with Metro and Sound Transit projects and programs will help leverage these funds and
increase benefits to Renton.
STATUS:
Staff continue to attend regional coordination meetings with transit agencies. Will monitor
service and capital facility improvements within Renton, and will pursue and advocate for
better -timed arrivals and departures at our major transit facilities.
CHANGES:
Funded : 1154,759 lUnfunded
Project Totals
Programmed Pre-2006
Six ear Program
ITEM
Programmed
Sent In 2004
2006
Total
2006
2007
2008
2009
2010
2011
EXPENSES:
Project Development
154,759
11,959
20,400
122,400
20,400
20,400
20,400
20,400
20 400
20,400
Precon En /Admin
R-O-W includes Admin
Construction Contract Fee
Construction En /Admin
Other (Contingency)
TOTAL EXPENSES
154,759
11,959
20,400
122,400
20,400
20,400
20,400
20,400
20,400
20,400
SOURCE OF FUNDS:
Vehicle Fuel Tax
Business License Fee
154,759
11,959
20,400
122,400
20,400
20,400
20,400
20,400
20,400
20,400
Proposed Fund Balance
Grants In -Hand
Mitigation In -Hand
Bonds/L.I.D.'s Formed
Other In -Hand
Grants Proposed FTA
Mitigation Proposed
L.I.D.'s Proposed
Other Proposed
Undetermined
TOTAL SOURCES 1
154,7591
11,959
20 400
122,400
r 20,400
20,400
20,400
20,400
20,400
20 400
Tr.w aemirm 6:10AM
5.5 DRAFT
CITY OF RENTON
PLANNING/BUILDING/PUBLIC WORKS
TRANSPORTATION SYSTEMS DIVISION
2006 - 2011 SIX -YEAR TIP
Rainier Ave Corridor Study and Improvements Functional Classification: N/A Fund: 317
Proj. Length: N/A Proj: 12193
Type: 2 - MULTI -MODAL / TDM RANK: 6 CONTACT: Nathan Jones 425.430.7217
DESCRIPTION:
Pre -engineering study to evaluate short-term and long-term traffic flow and safety improvements in this
corridor. Included will be potential for adding HOV lanes, signing and intersection improvements, and
access control/consolidation of driveways.
JUSTIFICATION:
This is a critical corridor serving the central Renton area with existing operational problems and it is
projected to experience severe congestion in the future. Potential improvements include those that will
offer benefits to transit - increased speed, reliability, and ridership - as well as HOV and general
purpose traffic safety improvements.
STATUS:
Upon completion of the study, anticipated by the end of 2005, staff will prepare a report for
Council review and adoption.
CHANGES:
Two new projects originating from this study have been split off: 1) Hardie Ave. SW Transit
/ Mulitmodal Improvements and 2) Rainier Ave. Improvements - S 4th PI to S 2nd St.
Funded : 1407,652 lUnfunded
Project Totals
Programmed Pre-2006
Six -Year Pro ram
ITEM
Programmed
Spent Pre-2005
2005
Total
2006
2007
2008
2009
2010
2011
EXPENSES:
Project Development
407,652
204,552
83,100
120,000
20,000
20,000
20,000
20,000
20,000
20,000
Precon En /Admin
R-O-W includes Admin
Construction Contract Fee
Construction En /Admin
Other
TOTAL EXPENSES
407,652
204,552
83,100
120,000
20,000
20,000
20,000
20,000
20,000
20,000
SOURCE OF FUNDS:
Vehicle Fuel Tax
Business License Fee
276,552
136,552
20,000
120,000
20,000
20,000
20,000
20,000
20,000
20,000
Proposed Fund Balance
63,100
63,100
Grants In -Hand
Mitigation In -Hand
68,000
68,000
Bonds/L.I.D.'s Formed
Other In -Hand
Grants Proposed
Mitigation Proposed
L.I. D.'s Proposed
Other Proposed
Undetermined
TOTAL SUM=
407,6521
204,552
83,1001
120,000
20,000
20,000
20,000
20,000
20,000
20,000
R.44. 0&0112005 6:10 AM
5-6 DRAFT
CITY OF 1. 4TON
PLANNING/BUILDING/PUBLIC WORKS
TRANSPORTATION SYSTEMS DIVISION
2006 - 2011 SIX -YEAR TIP
Rainier Ave. Improvements - S 4th PI to S 2nd St
Type: 2 - MULTI -MODAL / TDM
Functional Classification: Principal & Minor Fund: 317
Proj. Length: 0.4 miles Proj: 12501
RANK: 7 CONTACT: Leslie Lahndt 425.430,7223
DESCRIPTION:
Rebuild sidewalks including curb and gutters; add pedestrian -scale illumination, bollards (at crossings),
transit facility improvements (shelters, benches, info kiosks), planted buffer strips and landscaped
medians, and eastbound transit cue jump at S 3rd St.
JUSTIFICATION:
Rainier Ave. is a critical corridor in central Renton with existing operational problems and in need of
infrasructure enhancements to provide greater ease of non -motorized and transit -based travel.
STATUS:
Anticipated design contract to be authorized in mid- to late 2005. Sound Transit is the key
funding partner. Funding shown in 2009-2011 will move to 2006-2008 pending MOU
development with Sound Transit.
CHANGES:
New project. Approximately $10,000 is required in 2005 to evaluate design options; the
funding will be reallocated from the NE 4th St/Hoquiam Ave. project by Council process.
Funding shown 2009-2011 will likely be spread over 2006-2012 pending Sound Transit
Board approval of funds.
un a Unfunded ,
Project Totals
Pro rammed Pre-2006
Six Year Program
ITEM
Programmed.
Sent In 2004
2005
Total
2006
2007
2008
2009
2010
2011
EXPENSES:
Project Development
Precon En /Admin
607,000
10,000
597,000
597,000
R-O-W includes Admin
11600,000
1,600,000
1,600,000
Construction Contract Fee
3,800,000
3,800,000
1,800,000
2,000,000
Construction En /Admin
303,000
303,000
143,000
160,000
Other
TOTAL EXPENSES
6,310,000
10,000
6,300,000
2,197,000
1,943,000
2,160,000
SOURCES OF FUNDS:
Vehicle Fuel Tax
110,000
110,000
110,000
Business License Fee
310,000
10,000
300,000
100,000
100,000
100,000
Proposed Fund Balance
1,443,000
1,443,000
600,000
418,000
425,000
Grants In -Hand
Mitigation In -Hand
1,447 000
1,447,000
497,000
425,000
525,000
Bonds/L.I.D.'s Formed
Other In -Hand
Grants Proposed
Mitigation Proposed
L.I.D.'s Proposed
Other Proposed S. Transit
3,000,000
3,000,000
11000,000
1,000,000
1,000,000
Undetermined
TOTAL SOURCES
1 6,310,0001
1 10,0001
6,300,000
2,197,000
1 943 000
2,160,000
Rdrwr 67 OWlrW5 6:10AM
5-7 DRAFT
CITY OF RENTON
PLANNING/BUILDING/PUBLIC WORKS
TRANSPORTATION SYSTEMS DIVISION
grins - gr111 SIX -YEAR TIP
Hardie Ave. SW Transit / Multimodal Improvements Functional Classification: Principal & Minor Fund: 317
Proj. Length: 0.7 miles Proj: 12502
Type: 2 - MULTI -MODAL / TDM RANK: 8 CONTACT: Leslie Lahndt 425.430.7223
DESCRIPTION:
Add Business Access Transit (BAT) lanes in both directions; rebuild the Hardie railroad bridge;add non-
motorized facilities, i.e., multimodal trail, northbound transit -only signal at Rainier and Hardie, curb gutter
sidewalks between Sunset Blvd. and Rainier Ave. S.
JUSTIFICATION:
Regional transit agencies have expressed a desire to partner with the City to design and build systematic
transit improvements throughout Renton for the purposes of reducing travel times and improving speed
and reliability for routes serving Renton. Additionally, there is a need for improved non -motorized facilities
providing north to south connections. There are also safety benefits for all by replacing the substandard
railroad bridge over Hardie south of SW 5th Pl.
STATUS:
Design contract authorization anticipated mid- to late 2005. Sound Transit is the key
funding partner. Funding shown in 2009-2011 will move to 2006-2008 pending MOU
development with Sound Transit.
CHANGES:
New project. Approximately $190,000 is required in 2005 to evaluate design options; the
funding will be reallocated from the NE 4th St/Hoquiam Ave. project by Council process.
Hardie Ave. SW will be changed from a Collector Arterial to a Minor Arterial. Funding
shown 2009-2011 will likely be spread over 2006-2012 pending Sound Transit Board
approval of funds.
Funded:Fundedd 3,337,0001 Unfunded :1 12,000,000
Project Totals
Pro rammed Pre-2006
Six Year Program
ITEM
Programmed
Sent In 2004
2005
Total
2006
2007
2008
2009
2010
2011
EXPENSES:
Project Development
Precon En /Admin
1,667 000
190,000
1,477,000
1,077,000
400,000
R-O-W includes Admin
21423,000
21423,000
1,500,000
923,000
Construction Contract Fee
10,413,000
10,413,000
1
4,413,000
6,000,000
Construction En /Admin
834,000
834,000
334,000
500,000
Other
TOTAL EXPENSES
15,337,000
190,000
15,147,000
2,577,000
6,070,000
6,500,000
SOURCES OF FUNDS:
Vehicle Fuel Tax
155,000
155,000
155,000
Business License Fee
465,000
465,000
200,000
100,000
165,000
Proposed Fund Balance
862,000
862,000
77,000
475,000
310,000
Grants In -Hand
Mitigation In -Hand
1,855,000
190,000
1,665,000
795,000
870,000
Bonds/L.I.D.'s Formed
Other In -Hand
Grants Proposed
Mitigation Proposed
L.I.D.'s Proposed
Other Proposed S. Transit
12,000,000
12,000,000
2,300,000
4 700 000
5,000,000
Undetermined
TOTAL SOURCES
15,337,0001
190,000,
15,147,000
2,577,0001
6,070,0001
6,500,000
H.dw
5-8 DRAFT
CITY OF RENTON
PLANNING/BUILDING/PUBLIC WORKS
TRANSPORTATION SYSTEMS DIVISION
9nnA - 9(111 SIX-YFAR TIP
NE 3rd/NE 4th Corridor Improvements
Type: 2 - MULTI -MODAL / TDM
Functional Classification: Principal Fund: 317
Proj. Length: N/A Proj: 12176
RANK: 9 CONTACT: Keith Woolley 425.430.7318
DESCRIPTION:
This project involves a series of key improvements in this corridor to improve traffic operations
such as rechannelization and traffic signal modifications, possible construction of an eastbound
hill -climbing lane from Monterey Ave to east of Edmonds Ave, possible transit priority signal
treatments and possibly queue jumps. This project will seek to meet pedestrain, transit
and bicycle needs.
JUSTIFICATION:
This corridor has a strong potential for transit usage and is experiencing rapid residential and
retail growth.
STATUS:
The NE 3rd/4th Corridor Study was initiated in 2001 and completed in 2004. The study
refined the corridor transportation needs and costs, including pedestrian, transit users,
bicyclists, as well as streetscape enhancement. Costs shown reflect estimates from the
study.
CHANGES:
The final report was presented to Council for adoption May 2005. Projects will be identified
to go to design and construction pending funding. A likely candidate is the south approach
at the NE 4th St and Duvall Ave NE intersection. The project would include widening the
approach to three lanes including a left -turn lane, and signal modification. New fuel tax
funding is shown for this corridor 2006-2008.
Funded : 11,333,647 lUnfunded : 111,617,000
Project Totals
Pro rammed Pre-2006
Six ear Program
ITEM
Programmed
Sent Pre-2005
2005
Total
2006
2007
2008
2009
2010
2011
EXPENSES:
Project Development
200,740
199,440
1,300
Precon En /Admin
11297,907
2,707
8 700
11286,500
100,000
38,500
488,000
330,000
330,000
R-O-W includes Admin
Construction Contract Fee
10,630,500
10 630,500
192,500
344,000
400,000
4,194,000
2,750,000
2,750,000
Construction En /Admin
821,500
821,500
21,500
12,000
13,000
335,000
220,000
220,000
Other
TOTAL EXPENSES
12,950,647
202,147
10,000
12,738,500
314,000
394,500
413,000
5,017,000
3,300,000
3,300,000
SOURCE OF FUNDS:
Vehicle Fuel Tax
540,000
540,000
90,000
215,000
235,000
Business License Fee
27,147
27,147
Proposed Fund Balance
Grants In -Hand
Mitigation In -Hand
766,500
175,000
10,000
581,500
224,000
179,500
178,000
Bonds/L.I.D.'s Formed
Other In -Hand
Grants Proposed
Mitigation Proposed
L.I.D.'s Proposed
Other Proposed
Undetermined
1 11,617,0001
11 617,000
1
1
5,017,000
3 300 000
3,300,000
TOTAL SOORCESI
12,950,6471
202147
10,0001
12,738,500
1 314,0001
394,500
413,000
5 017 000
3:300:0001
3,300,0001
NEffiC_NEft o6/0it= 610 AM
5-9 DRAFT
CITY OF RENTON
PLANNING/BUILDING/PUBLIC WORKS
TRANSPORTATION SYSTEMS DIVISION
gnnR - gn11 SIX-YFAR TIP
Walkway Program
Type: 3 -COMMUNITY LIVABILITY / ENHANCEMENT
Functional Classification: N/A Fund: 317
Proj. Length: N/A Proj: 9
RANK: 10 CONTACT: Dan Hasty 425.430.7246
DESCRIPTION:
This program provides for the design and construction of high priority non -motorized
transportation facilities for pedestrians. Projects will be identified and prioritized in the upcoming
Comprehensive Citywide Walkway Study and through coordination with the City's Neighborhood
Program.
JUSTIFICATION:
Providing safe and convenient non -motorized facilities is an integral part of a complete
transportation network. Specific improvements will respond to the needs of school children, the
aged and persons with disabilities, and will support increased use of transit.
STATUS:
The Comprehensive Citywide Walkway Study, completed in May 2003, is being used to
select some of the projects that will move into the design and construction phases. Council
-approval of $166,000 in Metro mitigation funds is split between 2004 and 2005.
CHANGES:
Funding shown in 2005 will be used to construct the Highlands and Maplewood Glen
Sidewalk Replacement Project. This construction will be combined with the Benson Road
Pedestrian TIB grant project under one construction contract. Funding has been separated
for the purposes of the grant.
Funded : 11,776,832 lUnfunded : 240 000
Project Totals
Pro rammed Pre-2006
Six ear Program
ITEM
Programmed
Sent in 2004
2005
Total
2006
2007
2008
2009
2010
2011
EXPENSES:
Project Development
44,932
8 332
6,600
30,000
5 000
5,000
5 000
5,000
5 000
5,000
Precon En /Admin
203,400
53,400
150,000
25,000
25,000
25,000
25,000
25,000
25 000
R-O-W includes Admin
Construction Contract Fee
1,632,500
8,500
406 000
1,218,000
203,000
203,0001
203,000
203,0001
203,000
203,000
Construction En /Admin
136,000
34,000
102,000
17,000
17,0001
17,000
17,000
17,000
17,000
Other
TOTAL EXPENSES
2,016,832
16,832
500,000
1,500,000
250,000
250,000
250,000
250,000
250,000
250,000
SOURCE OF FUNDS:
Vehicle Fuel Tax
Business License Fee
1,060,000
100,000
960,000
100,000
100,000
250,000
170,000
170,0001
170,000
Proposed Fund Balance
180,232
180,232
Grants In -Hand
Mitigation In -Hand
370,600
70 600
300,000
150,000
150,000
Bonds/L.I.D.'s Formed
Other In -Hand KC Metro Mit
166,000
16,832
149,168
Grants Proposed
Mitigation Proposed
L.I.D.'s Proposed
Other Proposed
Undetermined
240,0001
240,000
80,000
80,000
80,000
TOTAL SOURCESF
2,016,8321
500,0001
1,500,000
250,000
250,000
250,0001
250,0001
250,000.
250,000
W.Ik-y
06/01l1005 B:tOA
5-10 DRAFT
CITY OF r-ATON
PLANNING/BUILDING/PUBLIC WORKS
TRANSPORTATION SYSTEMS DIVISION
2nn6 - 2n11 SIX -YEAR TIP
Rainier Avenue - SW 7th St to S 4th PI Functional Classification: Principal Arterial Fund: 317
Proj. Length: o.3 miles Proj: 12308
Type: 1 - INFRASTRUCTURE RANK: 11 CONTACT: Jason Fritzler 425.430.7243
DESCRIPTION:
Improvements complete a missing link, remove barriers, eliminate sub -standard conditions, control and
consolidate access points to existing major businesses, and provide an enhanced pedestrian
environment. Project elements include adding a third NB through -lane, adding a left -turn lane, removing
the BNSF railroad bridge support pier, lowering the roadway to provide standard clearance under the
bridge, and widening sidewalks to 10 feet with streetscaping.
JUSTIFICATION:
Existing high level of traffic congestion and accidents. Bottleneck including reduction of lanes from three
to two at S 7th St and the BNSF bridge and support pier just south of S 4th PI. The improvements will
enhance traffic flow and reduce accidents. They will provide a missing link on Rainier Ave. with one
additional northbound (NB) lane.
STATUS:
Design consultant has been selected. Design will continue through September 2006 and
go to ad for construction soon after. Received a TIB Transportation Partnership Program
(TPP) grant award of $2.2 million in November 2003. $300,000 of mitigation funds must be
dedicated to this project to fulfill the grant requirements.
CHANGES:
Total estimated project costs have increased from the original planning level cost estimate.
Bridge replacement costs is one of the largest contributing factors to the increase in the
budget; steel prices have increased. New fuel tax funding is shown in years 2009 and
2010.
Funded:Fundedd 3,860,8541 Unfunded :1 2,998,600
Project Totals
Pro rammed Pre-2006
Six Year Program
ITEM
Programmed
Sent Pre-2006
2005
Total
2006
2007
2008
2009
2010
2011
EXPENSES:
Project Development
Precon En /Admin
773,454
3,454
320,000
450,000
450,000
R-O-W includes Admin
206,000
206,000
206,000
Construction Contract Fee
4,972,000
4,972,000
200,000
1,063,000
832,000
2,877,000
Construction En/Admin.
408,000
408,000
15,000
87,000
68,000
218,000
20 000
Other
500,000
500,000
135,000
100,000
265,000
TOTAL EXPENSES
6,859,454
3,454
320,000
6,536,000
871,000
1,285,000
1,000,000
3,360,000
20,000
SOURCES OF FUNDS:
Vehicle Fuel Tax
265,000
265,000
245,000
20,000
Business License Fee
323,900
323,900
149,900
154,000
20,000
Proposed Fund Balance
540,000
540,000
260,000
280,000
Grants In -Hand
2,202,000
192,000
2,010,000
522,6001
771,000
600,000
116,400
Mitigation In -Hand
529,954
3,454
128,000
398,500
198,500
100,000
100,000
Bonds/L.I.D.'s Formed
Other In -Hand
Grants Proposed
Mitigation Proposed
L.I.D.'s Proposed
Other Proposed
Undetermined
2,998,600
2,998,600
2,998,600
TOTAL SOURCES
1 6,859,4541
3,454
320,0001
6,536,000
871,0001
1,285,000
1,000,000
3 360 000
20,000,
R.-AR Bft owuirlom E 10"
5-11 DRAFT
CITY OF RENTON
PLANNING/BUILDING/PUBLIC WORKS
TRANSPORTATION SYSTEMS DIVISION
2006 - 2011 SIX -YEAR TIP
South Lake Washington Roadway Improvements - Districts 1 & 2 Functional Classification: N/A Fund: 317
Proj. Length: N/A Proj: 12306
Type: 4 - ECONOMIC DEVELOPMENT RANK: 12 CONTACT: Rob Lochmiller 425.430.7303
DESCRIPTION:
The project will construct the needed roadway improvements in the South Lake Washington area to
support future redevelopment plans. New roads and intersections will be built and existing roadways will
be widened/extended to provide adequate future traffic flows. Redevelopment is phased into 2 districts,
each having their own needed roadway improvements. Roadways included in the project are Logan, Park,
and Garden Avenues, and 6th, 8th, and 10th Streets.
JUSTIFICATION:
Key project fro the redevelopment of Boeing's north Renton site. The partnership between the City and
Boeing aspires to draw private interest in an area to be redeveloped from the aerospace company's use to
commercial/retail use. A tight deadline has been outlined in the agreement that entails the needed
roadway improvements and the new stormwater, sewer, and water utilities required to accomodate the
shift in land use.
STATUS:
Consultant contract awarded in 2004 to complete 30% design for roadway improvements
needed to support District 1. The consultant was awarded a contract to complete final
design of District 1 in 2005 for $927,330 to be completed by Feb. 2006. City Council
allocated $1.5 million from the General Fund in 2004. Transportation funds expended from
Fund 317 will be reimbursed.
CHANGES:
* The City is in the process of applying for bonds to fund this project. Costs reflect roadway
improvements to include road and stormwater, as well as sanitary sewer and water
improvements. $5 million is expected from the State legislature as shown in 2006.
uneUnfunded ,
Project Totals
Pro rammed Pre-2006
Six ear Program
ITEM
Programmed
Sent Pre-2005
2005
Total
2006
2007
2008
2009
2010
2011
EXPENSES:
Project Development
Precon En /Admin
3,342 773
950,773
1,100,000
1,292 000
292,000
1,000,000
R-O-W includes Admin
Construction Contract Fee
33,270 000
33,270 000
15,650 000
31120,000
14,500,000
Construction En /Admin
3,327,000
3,327,000
1,565,000
312,000
1,450,000
Other
TOTAL EXPENSES
39,939,773
950,773
1,100,000
37,889,000
17,507,000
3,432,000
16,950,000
SOURCES OF FUNDS:
Vehicle Fuel Tax
Business License Fee
Proposed Fund Balance
Grants In -Hand
Mitigation In -Hand
Bonds*/L.I.D.'s Formed
16,489,773
550,773
15,939,000
12,507 000
3,432,000
Other In -Hand GF and State
6,500,000
950.773
549,227
5,000 000
5,000 000
Grants Proposed
Mitigation Proposed
L.I.D.'s Proposed
Other Proposed
Undetermined
16 950,000
16.950.000
16,950,000
TOTAL SOURCES 1
39 939,7731
950,773
1,100,0001
37,889,000
17,507,000
3,432,000
16,950,0001
5 L.WA `mprov. 06N9r2ox 1:03 PM
5-12 DRAFT
CITY OF RENTON
PLANNING/BUILDING/PUBLIC WORKS
TRANSPORTATION SYSTEMS DIVISION
2006 - 2011 SIX YEAR TIP
(South Renton Burnett Park Neighborhood Street Improvements
1-INFRASTRUCTURE
ESCRIPTION:
rovide improvements and asphalt overlay in the South Renton Burnett Park Neighborhood to include
e S Burnett Av/S 4th intersection. Asphalt overlay Shattuck Av S from SW 7th St to Houser Wy S,
0uth 6th St from Burnett Av S to Shattuck Av S, SW 7th St from Shattuck Av S to Rainier Av S,
0uth 5th St from Burnett Av S to Smithers Av S.
(JUSTIFICATION:
Deteriorating streets. New 2006 projects provide sidewalks and access to Burnett Linear Park
Functional Classification: N/A Fund: 317
Proj. Length: N/A Proj: 12194
RANK: 13 CONTACT: Ryan Plut 425.430.7372
STATUS:
Traffic improvements in the South Renton Burnett Park Neighborhood expected to go to
ad in June 2005. King County Metro mitigation funds of $175,000 were assigned to as
follows: $40,000 for design of improvements for Burnett/S 4th intersection; $60,000
reserved for Burnett/S 4th intersection construction with Council concur; $75,000 for South
Renton street overlay projects.
CHANGES:
Intersection design of 4th & Burnett complete; construct improvements in 2005 pending
funding available. Need Council approval of $60,000 remaining Metro mitigation funds
and $210,000 reserve funds from South Renton Reserves. Remaining overlay streets to
be added to the 2007 overlay project list. New 2006 projects: 5th & Burnett, 6th &
Burnett, and mid -block between 5th and 6th pending addition of $390,000 reserve funds.
Project Totals I Programmed Pre-2006 g Six -Year Program
ITEM IlProgrammed I Spent Pre-2005 1 2005 1 Total 1 2006 2007 1 2008 T 2009 1 201-0---F 2011
ax
n-Ha
rm
Zi
3
S R� Bohol pypt2005 0:10.m
5-13 DRAFT
CITY OF RENTON
PLANNING/BUILDING/PUBLIC WORKS
TRANSPORTATION SYSTEMS DIVISION
gnnA - gn11 SIX-YFAR TIP
1-405 Improvements in Renton
T e: 4 - ECONOMIC DEVELOPMENT
Functional Classification: N/A Fund: 317
Proj. Length: N/A Proj: 12210
RANK: 14 CONTACT: Keith Woolley 425.430.7318
DESCRIPTION:
Conceptual planning process to evaluate performance of existing and future freeway and interchange
facilities along 1-405. Construction impacts to local streets will also be evaluated.
JUSTIFICATION:
The intent of this planning study is to coordinate proposed improvements to 1-405 by WSDOT with the City
interests.
STATUS:
Programmed funds will be utilized for staff time and potential consultant cost. The South
Renton Nickel project Environmental Assessment has been initiated by WSDOT.
Construction is scheduled to begin in late 2007. The South Renton Nickel project budget is
$136 million.
CHANGES:
The program budget was extended to 2011. Washington State Legislature passed a 9.5
cent gas tax increase, signed into law in May 2005 as the Transportation Partnership Act
(TPA). The TPA budget for South Renton is $180 million. The TPA also has budget for I-
405 improvements north of the N 44th St. interchange.
Funded:Funded:1 162,2711 Unfunded
Project Totals
Pro rammed Pre-2006
Six ear Program
ITEM
Programmed
Sent Pre-2005
2005
Total
2006
2007
2008
2009
2010
2011
EXPENSES:
Project Development
162,271
42,271
30 000
90,000
30,000
20,000
10,000
10,000
10,000
10,000
Precon En /Admin
R-O-W includes Admin
Construction Contract Fee
Construction En /Admin
Other
TOTAL EXPENSES
162,271
42,271
30,000
90,000
30,000
20,000
10,000
10,000
10,000
10,000
SOURCE OF FUNDS:
Vehicle Fuel Tax
Business License Fee
132,271
42,271
30,000
60,000
20,000
10,000
10,000
10,000
10 000
Proposed Fund Balance
Grants In -Hand
Mitigation In -Hand
30,000
30,000
30,000
Bonds/L.I.D.'s Formed
Other In -Hand
Grants Proposed
Mitigation Proposed
L.I.D.'s Proposed
Other Proposed
Undetermined
TOTAL SOURCES
162,271,
42,271,
30,0001
90,000
1 30,000.
20,000
10,000
10,000,
10,000,
10,0001
1405 Imp
oeo,rmos
5-14 DRAFT
CITY OF RENTON
PLANNING/BUILDING/PUBLIC WORKS
TRANSPORTATION SYSTEMS DIVISION
2006 - 2011 SIX-YFAR TIP
Project Development & Pre -Design Program
Type: 2 - MULTI -MODAL / TDM
Functional Classification: N/A
Proj. Length: N/A
RANK:
15
Fund: 317
Proj: 12150
CONTACT: Sharon Griffin 425.430.7232
DESCRIPTION:
Perform critical activities needed for the development of future CIP projects and for grant
applications, including scoping, cost estimates, pre -design, interlocal agreements and
deficiency analysis. Also provides for the monitoring of active grant projects for compliance
with State and Federal laws, regulations and specifications.
JUSTIFICATION:
Analysis of existing and projected transportation operation problems, infrastructure maintenance
needs, local and regional mobility goals and revenues/costs is vital to the development of
transportation projects that will be buildable, financable, best serve the needs of Renton and
compete well for grants. Also to maintain eligibility for grant funding, the City must assure that
project specifications and management comply with current State and Federal standards.
STATUS:
Ongoing yearly program.
CHANGES:
In 2004, this program began including more staff time reimbursement to the General Fund.
Funded : 11,424,708 lUnfunded
Project Totals
Programmed Pre-2006
Six -Year Program
ITEM
Programmed
Sent in 2004
2005
Total
2006
2007
2008
2009
2010
2011
EXPENSES:
Project Development
1,089,708
99,708
130,000
860,000
130,000
130,000
150,000
150,000
150 000
150,000
Precon En /Admin
335,000
45,000
290,000
45,000
45,000
50,000
50,000
50,000
50,000
R-O-W includes Admin
Construction Contract Fee
Construction En /Admin
Other
TOTAL EXPENSES
1,424,708
99,708
175,000
1,150,000
175,000
175,000
200,000
200,000
200,000
200,000
SOURCE OF FUNDS:
Vehicle Fuel Tax
Business License Fee
1,424 708
99,708
175,000
1,150 000
175,000
175,000
200,000
200,000
200,000
200,000
Pro osed Fund Balance
Grants In -Hand
Mitigation In -Hand
Bonds/L.I.D.'s Formed
Other In -Hand
Grants Proposed
Mitigation Proposed
L.I.D.'s Proposed
Other Proposed
Undetermined
TOTAL SOURCES 1
1,424,7081
99,7081
175,0001
1,150,000
175,000,
175,0001
200,000
200,0001
200,0001
200,0001
P,.� o owlr2oos 8:10AM
5-15 DRAFT
CITY OF RENTON
PLANNING/BUILDING/PUBLIC WORKS
TRANSPORTATION SYSTEMS DIVISION
2006 - 2011 SIX -YEAR TIP
Type: 5 -OPERATIONS AND SAFETY
Fund: 317
Proj. Length: N/A Proj: tzzos
RANK: 16 CONTACT: Leslie Lahndt 425.430.7223
DESCRIPTION:
Install new fully actuated traffic signal, including poles, signal and pedestrian displays, detection
loops, emergency pre-emption, a new signal controller, interconnect to master computer and
associated channelization. Right-of-way needs are unknown at this time.
JUSTIFICATION:
Increasing vehicular and pedestrian traffic in this area is warranting a traffic signal based on
safety and delays.
STATUS:
Design should be completed in Summer 2005 pending coordination with developers on
south side.
CHANGES:
Construction may proceed with development in 2006. $200,000 of the 2005 allocation was
split between two new 2005 projects: 1) Hardie Ave. SW Transit and 2) Rainier Ave.
Improvements; it is shown as reallocated to 2006 for this project.
Funded: 400,0001 Unfunded
Project Totals
Pro rammed Pre-2006
Six -Year Program
ITEM
Programmed
Sent Pre-2005
2005
Total
2006
2007
2008
2009
2010
2011
EXPENSES:
Project Development
Precon En /Admin
42,000
27,267
14,733
R-O-W includes Admin
50,000
50,000
Construction Contract Fee
280,000
72,200
207,800
207,800
Construction En /Admin
28,000
8,000
20,000
20,000
Other
TOTAL EXPENSES
400,000
27,267
144,933
227,800
227,800
SOURCE OF FUNDS:
Vehicle Fuel Tax
Business License Fee
10,000
267
9,733
Proposed Fund Balance
Grants In -Hand
Mitigation In -Hand
390,000
27,000
135,200
227,800
227,800
Bonds/L.I.D.'s Formed
Other In -Hand
Grants Proposed
Mitigation Proposed
L.LD.'s Proposed
Other Proposed
Undetermined
TOTAL SOURCES
400,0001
27,267
144,9331
227,800
227,800
NE 4th Street/Hoquiam Avenue NE Functional Classification: N/A
NE{1N SVHOW Av O&OV-1005 6:10 AM
5-16 DRAFT
CITY OF RENTON
PLANNING/BUILDING/PUBLIC WORKS
TRANSPORTATION SYSTEMS DIVISION
2006 - 2011 SIX -YEAR TIP
Arterial Circulation Program
Type: 2 - MULTI -MODAL / TDM
Functional Classification: N/A
Proj. Length: N/A
RANK: 17
Fund: 317
Proj: 29
CONTACT: Keith Woolley 425.430.7318
DESCRIPTION:
This program provides for the long-range and short range planning and traffic analysis required
to evaluate and update the Transportation Plan in relation to the Comprehensive Land Use Plan,
to assess the impacts of new development proposals and to recommend local and regional
transportation system improvements for all modes of travel. Funding for hardware, software and
employee hours required to operate the computer model is also included under this program.
JUSTIFICATION:
Combined State and Federal Clean Air legislation, the Growth Management Act, passage of the
RTA plan and the increasing importance of making sure that local and regional transportation
plans are coordinated to the benefit of Renton, make on -going, multi -modal planning a high
priority need.
STATUS:
This project will fund the on -going planning work which will lead to refinement
and/or adjustment of the of improvement projects on the arterial network identified
in the Transportation Plan.
CHANGES:
Funded : 11,624,711 lUnfunded
Project Totals
Pro rammed Pre-2006
Six Year Program
ITEM
Programmed.
Sent In 2004
2005
Total
2006
2007
2008
2009
2010
2011
EXPENSES:
Project Development
11624,711
124,711
200,000
11300,000
200,000
200,00
200,000
200,000
250,000
250,000
Precon En /Admin
R-O-W includes Admin
Construction Contract Fee
Construction En /Admin
Other
TOTAL EXPENSES
1,624,711
124,711
200,000
1,300,000
200,000
200,000
200,000
200,000
250,000
250,000
SOURCE OF FUNDS:
Vehicle Fuel Tax
Business License Fee
1,624,711
124,711
200,000
1,300,000
200,000
200,000
200,000
200,000
250,000
250,000
Proposed Fund Balance
Grants In -Hand
Mitigation In -Hand
L.I.D.'s Formed
Other In -Hand
Grants Proposed
Mitigation Proposed
L.I.D.'s Proposed
Other Proposed
Undetermined
TOTAL SOURCES
1,624,7111
124,711
200,0001
1,300,000
200,OOOJ
200,000
200,000
200,0001
250,0001
250,000
5 -17 DRAFT
CITY OF RENTON
PLANNING/BUILDING/PUBLIC WORKS
TRANSPORTATION SYSTEMS DIVISION
7rV1F _ 9n11 RIX-YEAR TIP
Bridge Inspection & Repair Program
T e: 1 - INFRASTRUCTURE
Functional Classification: N/A Fund:
Proj. Length: N/A Proj:
RANK: 18 CONTACT: Jason Fritzler
317
106
425.430.7243
DESCRIPTION:
Inspect all roadway bridges owned by the City every two years to determine bridge sufficiency
and load ratings, seismic retrofit needs, undertake minor repairs, and preventative maintenance
as needed.
JUSTIFICATION:
Inspection program must be done for safety and funding purposes and as part of WSBIS
Program to determine structural deficiencies, physical deterioration, or functional obsolescence
and to qualify for Federal bridge replacement grant funding. Repair funding is provided to
accomplish improvements, identified through the inspection program, that will increase the
safety and extend the longevity of the structures.
STATUS:
Biennial bridge inspections occur in 2007, 2009 and 2011.
CHANGES:
The Houser Way Bridge will be painted in 2006. The May Creek Bridge Project was split
off into a separate project due to the aniticipated replacement in 2006/2007. The 2005
Monster Road Bridge repairs require an annual inspection frequency for the next three
inspection cycles, resulting in higher annual expenditures.
Funded : 1545.538 lUnfunded
Project Totals
Pro rammed Pre-2006
Six -Year Program
ITEM
Programmed
Sent in 2004
2005
Total
2006
2007
2008
2009
2010
2011
EXPENSES:
Project Development
Precon En /Admin
205,538
79,238
46,300
80,000
30,000
10,000
10,000
10,000
10,000
10,000
R-O-W includes Admin
Construction Contract Fee
150,000
150,000
150,000
Construction En /Admin
10,000
10,000
10,000
Other
180,000
180,000
30,000.
30,000
30,000
30,000
30,000
30,000
TOTAL EXPENSES
545,538
79,238
46,300
420,000
220,000
40,000
40,000
40,000
40,000
40,000
SOURCE OF FUNDS:
Vehicle Fuel Tax
Business License Fee
449,238
79,238
40,000
330,000
140 000
40,000
40,000
40,000
40,000
30,000
Proposed Fund Balance
96,300
6,300
90,000
80,000
10,000
Grants In -Hand
Mitigation In -Hand
Bonds/L.I.D.'s Formed
Other In -Hand
Grants Proposed
Mitigation Proposed
L.I.D.'s Proposed
Other Proposed
Undetermined
TOTAL SOURCES
1 545,5381
791.238
46,3001
420 000
220,0001
40,000,
40,000
40,0001
40,000140
000
BriEp�_Inp�cl 06101MC5 6:10 AM ,
5-18 DRAFT
CITY OF t-,-,4TON
PLANNING/BUILDING/PUBLIC WORKS
TRANSPORTATION SYSTEMS DIVISION
2006 - 2011 SIX -YEAR TIP
May Creek Bridge Replacement Functional Classification: N/A Fund: 317
Proj. Length: N/A Proj: 12503
Type: 1 -INFRASTRUCTURE RANK: 19 CONTACT: Jason Fritzler 425.430.7243
DESCRIPTION:
Completely reomve the existing bridge structure and the timber piers within the waterway. Replace with a
single span, concrete structure supported on concrete abutments. Adjust the alignments of both
approaches to conform to the increase in bridge deck height. This replacement will require some right -of-
way acquisition due to the adjustment of the alignment and the new bridge location.
JUSTIFICATION:
The existing structure is four feet below the 100-year flood water level standards set by WSDOT. The
bridge deck is supported by a timber pier that is vulnerable to the weakening effect of rot and damage
from debris flows. Failure of this pier would cause immediate collapse. The timber abutments are
showing evidence of rot and deterioration.
STATUS:
The May Creek Bridge is scheduled for routine inspection in 2005. The findings will be
used to apply for BRAC funding in 2005. WSDOT Bridge Preservation will determine
eligibility for bridge replacement funding.
CHANGES:
New project. Split off from the Bridge Inspection and Repair Program.
Funded:Funded:1 835,0001 Unfunded
Project Totals
Pro rammed Pre-2006
Six Year Program
ITEM
Programmed
Spent Pre-2005
2005
Total
2006
2007
2008
2009
2010
2011
EXPENSES:
Project Development
130,000
130,000
120,000
10 000
Precon En /Admin
R-O-W includes Admin
650,000
650,000
650,000
Construction Contract Fee
55,000
55,000
50,000
5,000
Construction En /Admin
Other
TOTAL EXPENSES
835,000
835,000
120,000
710,000
5,000
SOURCES OF FUNDS:
Vehicle Fuel Tax
Business License Fee
75,000
75,000
70,000
5,000
Proposed Fund Balance
760,000
760,000
50,000
710,000
Grants In -Hand
Mitigation In -Hand
Bonds/L.I.D.'s Formed
Other In -Hand
Grants Proposed
Mitigation Proposed
L.I.D.'s Proposed
Other Proposed
Undetermined
TOTAL SOURCES 1
835,000
835,000
120,000
710,000
5,000
May C—k owirlom 6:10AM
5-19 DRAFT
CITY OF RENTON
PLANNING/BUILDING/PUBLIC WORKS
TRANSPORTATION SYSTEMS DIVISION
9nnA - g(111 SIX -YEAR TIP
Traffic Signal Loop Replacement Program
T e: 1 - INFRASTRUCTURE
Functional Classification: N/A
Proj. Length: N/A
RANK:
Fund: 317
Proj: 16
20 CONTACT: Dave Whitmarsh 425.430,7423
DESCRIPTION:
Replace failed or failing traffic signal vehicle detection loops and repair pavement as required to achieve
proper installation and assure reliability.
JUSTIFICATION:
Most of Renton's signals require extensive vehicle detection systems to provide traffic count data needed
for the intersection controllers and VMS signal coordination system to operate effectively. The detection
loops in the pavement must be properly maintained; their failure results in highly inefficient operation.
Pavement deterioriation due to heavy traffic volumes, trucks, and adverse weather have increased the
need for replacement.
STATUS:
On -going yearly program.
CHANGES:
Funded : 1153,807 lUnfunded
Project Totals
Programmed Pre-2006
Six -Year Program
ITEM
Programmed
Sent In 2004
2005
Total
2006
2007
2008
2009
2010
2011
EXPENSES:
Project Development
Precon En /Admin
R-O-W includes Admin
Construction Contract Fee
135,807
1,807
32,000
102,000
17,000
17,000
17,000
17,000
17,000
17,000
Construction En /Admin
3,000
3,000
500
500
500
500
500
500
Other(City Force
15,000
15,000
2 500
2,500
2,500
2,500
2,500
2,500
TOTAL EXPENSES
153,807
1,807
32,000
120,000
20,000
20,000
20,000
20,000
20,000
20,000
SOURCE OF FUNDS:
Vehicle Fuel Tax
Business License Fee
153,807
1,807
32,000
120,000
20,000
20,000
20,000
20,0001
20,000
20,000
Proposed Fund Balance
Grants In -Hand
Mitigation In -Hand
Bonds/L.I.D.'s Formed
Other In -Hand
Grants Proposed
Mitigation Proposed
L.I.D.'s Proposed
Other Proposed
Undetermined
TOTAL SOURCES
1 153,80
1,807
32,0001
120,000
20,000
20,000
20,000,
20,000
20,0001
20,0001
L.P. 06/0112m 6:10 AM
5 - 20 DRAFT
CITY OF RENTON
PLANNING/BUILDING/PUBLIC WORKS
TRANSPORTATION SYSTEMS DIVISION
2006 - 2011 SIX -YEAR TIP
Traffic Sign Replacement Program
Type: 1 - INFRASTRUCTURE
Functional Classification: N/A
Proj. Length: N/A
RANK: 21
CONTACT:
Fund: 317
Proj: 12113
Dave Whitmarsh 425A30.7423
DESCRIPTION:
This program provides for the replacement and/or relocation of signs that are obsolete, faded,
poorly located or no longer appropriate.
JUSTIFICATION:
Poor signing can create safety problems and driver confusion. Purchase of these materials
falls beyond normal maintenance budget.
STATUS:
On -going yearly program. Contract fee amount is for purchase of materials that
will be assembled and installed by City.
CHANGES:
Funded : 154,358 lUnfunded
Project Totals
Pro rammed Pre-2006
Six ear Program
ITEM
Programmed
Sent in 2004
2005
Total
2006
2007
2008
2009
2010
2011
EXPENSES:
Project Development
Precon En /Admin
R-O-W includes Admin
Construction Contract Fee
35,000
5,000
30,000
5,000
5,000
5 000
5,0001
5,000
5,000
Construction En /Admin
Other (CityForces
19,358
1,858
2,500
15,000
2 500
2 500
2 500
2,500
2,500
2,500
TOTAL EXPENSES
54,358
1,858
7,500
45,000
7,500
7,500
7,500
7,500
7,500
7,500
SOURCE OF FUNDS:
Vehicle Fuel Tax
Business License Fee
54,358
1,858
7,500
45,000
7,5001
7,500
7,500
7,500
7,5001
7,500
Proposed Fund Balance
Grants In -Hand
Mitigation In -Hand
Bonds/L.I.D.'s Formed
Other In -Hand
Grants Proposed
Mitigation Proposed
L.I.D.'s Proposed
Other Proposed
Undetermined
TOTAL SOURCES
1 54,3581
1,858
7,5001
7 500
7 500
7 500
7 500
7 500
7 500
Sq. 06110irms 610AM
5-21 DRAFT
CITY OF RENTON
PLANNING/BUILDING/PUBLIC WORKS
TRANSPORTATION SYSTEMS DIVISION
9nns - gni 1 SIX-YFAR TIP
Pole Replacement Program
Type: 1 - INFRASTRUCTURE
Functional Classification: N/A
Proj. Length: N/A
RANK: 22
CONTACT:
Fund: 317
Proj: 91
Dave Whitmarsh 425.430.7423
DESCRIPTION:
This program is for the replacement of damaged luminaire and signal poles. These poles have
been damaged in unknown incidents where reimbursement through normal channels is
impossible.
JUSTIFICATION:
Pedestrian and vehicular safety is highly related to adequate signal displays and street lighting. Purchase
of these poles falls beyond normal maintenance budget. Changing out a single pole costs $10,000 to
$14,000. Damaged and rusting poles that loose galvanization degrade to the point of threatening their
structural integrity.
STATUS:
On -going yearly program. Contract fee amount is for purchase and repair of poles.
CHANGES:
Funded : 1194,200 lUnfunded
Project Totals
Pro rammed Pre-2006
Six -Year Program
ITEM
Programmed
Sent In 2004
2005
Total
2006
2007
2008
2009
2010
2011
EXPENSES:
Project Development
Precon En /Admin
6,000
6,000
1,500
1 500
1,500
1,5001
R-O-W includes Admin
Construction Contract Fee
159,000
25,000
134,000
25,000
25,0001
21,000
21,0001
21,000
21,000
Construction En /Admin
Other
29,200
19,200
10,000
2,500
2 500
2,500
2 500
TOTAL EXPENSES
194,200
19,200
25,000
150,000
25,000
25,000
25,000
25,000
25,000
25,000
SOURCE OF FUNDS:
Vehicle Fuel Tax
Business License Fee
194,200
19,200
25,000
150,000
25,000
25,000
25 000
25,000.
25,000
25,000
Proposed Fund Balance
Grants In -Hand
Miti ation In -Hand
Bonds/L.I.D.'s Formed
Other In -Hand
Grants Proposed
Mitigation Proposed
L.I.D.'s Proposed
Other Proposed
Undetermined
TOTAL SOURCES
194,2001
19,200
25,0001
150,000
1 25,000
25 000
25,000,
25,000
25 000
25,0001
vae
O6q/2005 6'.tOA
5 - 22 DRAFT
CITY OF RENTON
PLANNING/BUILDING/PUBLIC WORKS
TRANSPORTATION SYSTEMS DIVISION
2006 - 2011 SIX -YEAR TIP
Sound Transit HOV Direct Access
Type: 2 - MULTI -MODAL / TDM
Functional Classification: Freeway
Proj. Length: N/A
RANK: 23 CONTACT:
Fund: 317
Proj: 12171
Keith Woolley 425.430.7318
DESCRIPTION:
This program provides for coordination with and input into WSDOT and Sount Transit plan
for the HOV Direct Access interchange and South Renton transit improvements.
JUSTIFICATION:
Direct access to 1-405 HOV lanes is an important element in increasing transit speed and
ridership in Renton.
STATUS:
Funds are identified for coordination critical to ensuring Sound Transit (ST)
improvements are consistent with City needs and desires.
CHANGES:
Funded : 163,967 lUnfunded
Project Totals
Programmed Pre-2006
Six Year Program
ITEM
Programmed
Sent Pre-2005
2005
Total
2006
2007
2008
2009
2010
2011
EXPENSES:
Project Development
63,967
48,967
10,000
5,000
5,000
Precon En /Admin
R-O-W includes Admin
Construction Contract Fee
Construction En /Admin
Other
TOTAL EXPENSES
63,967
48,967
10,000
5,000
5,000
SOURCE OF FUNDS:
Vehicle Fuel Tax
Business License Fee
63,967
48,967
10,000
5,000
5,000
Proposed Fund Balance
Grants In -Hand
Mitigation In -Hand
Bonds/L.I.D.'s Formed
Other In -Hand
Grants Proposed
Mitigation Proposed
L.I.D.'s Proposed
Other Proposed
Undetermined
TOTAL SOURCESI
63,9671
48,967
10,0001
5,000
1 5,0001
ST nOv 06/01120M 510 AM
5 - 23 DRAFT
CITY OF RENTON
PLANNING/BUILDING/PUBLIC WORKS
TRANSPORTATION SYSTEMS DIVISION
9008 - 9011 SIX -YEAR TIP
Miscellaneous Traffic Safety Program
Type: 5 -OPERATIONS AND SAFETY
Functional Classification: N/A Fund: 317
Proj. Length: N/A Proj: 12115
RANK: 24 CONTACT: Karl Hamilton 425.430.7220
DESCRIPTION:
This ongoing yearly program provides for special small-scale traffic safety improvements
that are identified and require materials, labor or equipment beyond the normal scope of City
operations and maintenance crews.
JUSTIFICATION:
Historically, this level of traffic safety improvements are required on an annual basis. This
program budgets for safety projects to address these needs. Projects are typically identified
through citizen concerns, analysis of accident records or observation by City Traffic Operations
and Maintenance personnel. Traffic Operations Section identify and prioritize locations.
STATUS:
Some funds may be used to match potential Hazard Elimination & Safety (HES) grants. All
stages of the Signal Pre-empt Program (upgrading the systems to prevent unauthorized pre
emption of the signal system) will be completed in 2005.
CHANGES:
The final stage of the Pre-empt Program will be completed in 2005. Two new programs: 1)
LED Replacement Program will replace signal indicators at ten intersections per year (all
years), and 2) UPS Program will install uninterruptable power supply (UPS) at two critical
intersections per year (all years).
Funded : 1385,351 lUnfunded
Project Totals
Pro rammed Pre-2006
Six ear Program
ITEM
Programmed
Sent in 2004
2005
Total
2006
2007
2008
2009
2010 2011
EXPENSES:
Project Development
Precon En /Admin
27,000
27,000
4 500
4,500
4,500
4,500
4,500
4,500
R-O-W includes Admin
Construction Contract Fee
195,000
195,000
32,500
32,500
32,500
32,500
32,500
32,500
Construction En /Admin
18,000
18,000
3,000
3 000
3,000
3,000
3 000
3,000
Other
145,351
105,351
40,000
TOTAL EXPENSES
385,351
105,351
40,000
240,000
40,000
40,000
40,000
40,000
40,000
40,000
SOURCE OF FUNDS:
Vehicle Fuel Tax
Business License Fee
385,351
105,351
40,000
240 000
40,000
40,000
40,000
40,000
40,000
40,000
Proposed Fund Balance
Grants In -Hand
Mitigation In -Hand
Bonds/L.I.D.'s Formed
Other In -Hand
Grants Proposed
Mitigation Proposed
L.I.D.'s Proposed
Other Proposed
Undetermined
TOTAL S5URCES1
385,3511
105,3511
40,0001
240,000
40,000
40 00
440 000
40,000,
40,0001
40,000
sa
oeo,rr.,os ,o
5-24 DRAFT
CITY OF RENTON
PLANNING/BUILDING/PUBLIC WORKS
TRANSPORTATION SYSTEMS DIVISION
2006 - 2011 SIX -YEAR TIP
Traffic Systems Efficiency Improvements Program Functional Classification: N/A Fund: 317
Proj. Length: N/A Proj: 12162
Type: 5 - OPERATIONS AND SAFETY RANK: 25 CONTACT: Karl Hamilton 425,430.7220
DESCRIPTION:
Provides for improvements to the operational efficiency of the existing roadway system,
including such items as development and implementation of signal coordination programs,
signing and channelization improvements, surveillance control and driver information system
(SC & DI), transit signal priority, Intelligent Vehicle Highway Systems (IVHS), signal
improvements such as protective / permissive phasing, and matching funds for possible grants
to upgrade the Central traffic control system.
JUSTIFICATION:
Improving the capacity and efficiency of the existing roadway system is a very cost effective
element of the transportation program.
STATUS:
Completed three Signal Synchronization grant projects: Grady Way (2001), Sunset Blvd.
(2002), and NE 3rd/4th St. Corridor (2003). $15,000 - $17,000 in years 2002 through 2005
for Transportation's contribution to the City's GPS Mapping Program. Upgrading of all
signal controllers to new to be compatible with the new Central System) continues into
9 ( p y )
2006.
CHANGES:
Funded : 1781,589 IUnfunded
Project Totals
Programmed Pre-2006
Six ear Program
ITEM
Programmed
Sent in 2004
2005
Total
2006
2007
2008
2009
2010
2011
EXPENSES:
Project Development
Precon En /Admin
44,000
19,000
25,000
5,000
5,000
5 000
5,000
5 000
R-O-W includes Admin
Construction Contract Fee
146,000
71,000
75,000
15,000
15 000
15,000
15,000
15,000
Construction En /Admin
40,900
11,900
29,000
4,000
5,000
5,000
5,000
5,000
5,000
Other
550,689
109 689
150,000
291 000
153,000
73,000
50,000
5,000
5,000
5,000
TOTAL EXPENSES
781,589
109:689
251,900
420,000
157,000
98,000
75,000
30,000
30,000
30,000
SOURCE OF FUNDS:
Vehicle Fuel Tax
Business License Fee
771,189
99,289
251,900
420,000
157,000
98,000
75,000
30,000
30,000
30,000
Proposed Fund Balance
Grants In -Hand
10,400
10,400
Mitigation In -Hand
Bonds/L.I.D.'s Formed
Other In -Hand
Grants Proposed
Mitigation Proposed
L.I.D.'s Proposed
Other Proposed
Undetermined
TOTAL SOURCESI
781,5891
109,689
251,9001
420,000
157,000
98,000
75,000
30,000
30,000130
000
Eff „y 05101 X5 610AM
5.25 DRAFT
CITY OF RENTON
PLANNING/BUILDING/PUBLIC WORKS
TRANSPORTATION SYSTEMS DIVISION
2006 - 2011 SIX -YEAR TIP
CBD Bicycle and Pedestrian Connections
Type: 4 - ECONOMIC DEVELOPMENT
Functional Classification: N/A
Proj. Length: N/A
RANK: 26
CONTACT:
Fund:
Proj:
Dan Hasty
317
12185
425.430.7246
DESCRIPTION:
This program will plan, design and construct projects which support non -motorized access to and
circulation within the downtown. It focuses on connection to and between significant non -automobile
transportation features such as the Cedar River Trail, Lake Washington Loop trail, South Renton Park &
Ride and the Renton Transit Center. Preservation of existing bike and pedestrian features is also part of
the program.
JUSTIFICATION:
Providing non -motorized circulation and connections between downtown transportation elements is
challenging due to existing development. The City is committed to enhancing non -motorized access and
circulation within the entire downtown, as well as making connections to transportation features outside
the downtown area.
STATUS:
14 ADA curb ramps will be installed in late summer 2005 at locations that either have sub -
standard ramps or vertical curbs.
CHANGES:
The entire downtown core will be accessible to all upon completion of the 2005 curb ramp
construction. In 2006, the program emphasis on upgrading and installing curb ramps will
change to sidewalk preservation.
Funded : 1374,956 lUnfunded
Project Totals
Programmed Pre-2006
Six ear Program
ITEM
Programmed
Sent in 2004
2005
Total
2006
2007
2008
2009
2010
2011
EXPENSES:
Project Development
34,656
156
4,500
30,000
5,000
5,000.
5,000
5 000
5,000
5 000
Precon En /Admin
41,400
11,400
30,000
500
5 000
5,000
5 000
5 000
5,000
R-O-W includes Admin
Construction Contract Fee
278,500
25,000
30,300
223,200
37,200
37,200
37,200
37,200
37,200
37,200
Construction En /Admin
20,400
3,600
16,800
2,800
2,800
2,800
2,800
2,800
2 800
Other
TOTAL EXPENSES
374,956
25,156
49,800
300,000
50,000
50,000
50,000
50,000
50,000
50,000
SOURCE OF FUNDS:
Vehicle Fuel Tax
Business License Fee
374,800
25,000
49,800
300,000
50,000
50,000
50,000
50,000
50,000
50,000
Proposed Fund Balance
156
156
Grants In -Hand
Mitigation In -Hand
Bonds/L.I.D.'s Formed
Other In -Hand
Grants Proposed
Mitigation Proposed
L.I. D.'s Proposed
Other Proposed
Undetermined
TOTAL SOURCES
1 374,9561
25,156
49,800
300,000
50,0001
50,000
50,000
50,000.
50,000
50,000
CDB 8ik._F.d OBI 1=5 8:10AM
5 - 26 DRAFT
CITY OF RENTON
PLANNING/BUILDING/PUBLIC WORKS
TRANSPORTATION SYSTEMS DIVISION
2006 - 2011 SIX -YEAR TIP
Arterial Rehabilitation Program
Type: 1 - INFRASTRUCTURE
Functional Classification: various
Proj. Length: N/A
RANK: 27
CONTACT:
Fund:
Proj:
James Wilhoit
317
12186
425.430.7319
DESCRIPTION:
As funding is available, this program will provide for the rehabilitation of arterial streets where the
restoration requirements are beyond that which can be accomplished through the annual Overlay
Program.
JUSTIFICATION:
The Overlay Program concentrates to a great degree on maintaining residential streets, where
relatively small traffic volumes and less truck and bus traffic make standard asphalt overlays a
long term means of maintenance. Arterial streets can often deteriorate rather quickly and often
require more costly rehabilitation measures and/or costly temporary repairs to avoid more
extensive deterioration. A number of arterials identified as needing major rehabilitaion are being
addressed in this program and the Overlay Program.
STATUS:
Proposed paving schedule: 2005 - South 7th St., 2006 - NE 4th St., 2007 - NE 12th., 2008
NE 3rd St., 2009 - South Carr Rd., 2010 - Puget Dr. SE. $200,000 in King County Metro
Mitigation funding was used in 2004/2005.
CHANGES:
Funded : 11,763,916 lUnfunded
Project Totals
Pro rammed Pre-2006
Six -Year Pro ram
ITEM
Programmed
Spent in 2004
2005
Total
2006
2007
2008
2009
2010
2011
EXPENSES:
Project Development
Precon En /Admin
54,000
54,000
9,000
9,000
9,000
9,000
9,000
9,000
R-O-W includes Admin
Construction Contract Fee
1,655,916
193,916
195,000
1,267,000
222,000
187,000
322,000
212,000
162,000
162,000
Construction En /Admin
54,000
54,000
9,000
9,000
9,0001
9,000
9,000
9,000
Other
TOTAL EXPENSES
1,763,916
193,916
195,000
1,375,000
240,000
205,000
340,0001
230,000
180,000
180,000
SOURCE OF FUNDS:
Vehicle Fuel Tax
Business License Fee
820,800
45,000
775,800
55,000
50,000
281,600
95,000
147,1001
147,100
Proposed Fund Balance
Grants In -Hand
Mitigation In -Hand
743,116
143,916
599,200
185,000
155,000
58,400
135,000
32,900
32 900
Bonds/L.I.D.'s Formed
Other In -Hand Metro Mitigation)
200,000
193,916
6,084
Grants Proposed
Mitigation Proposed
L.I.D.'s Proposed
Other Proposed
Undetermined
TOTAL SOURCES
1,763,9161
193,9161
195,0001
1,375,000
240,0001
205,000
340,0001
230,000
180,000
180 000
Aft-LstNmb W01R005 6'10"
5 - 27 DRAFT
CITY OF RENTON
PLANNING/BUILDING/PUBLIC WORKS
TRANSPORTATION SYSTEMS DIVISION
2nnB - 2n11 SIX -YEAR TIP
Duvall Ave NE - SR-900 to North City Limits
Type: 1 -INFRASTRUCTURE
Functional Classification: Minor Arterial Fund: 317
Proj. Length: 1.67 miles Proj: 12123
RANK: 28 CONTACT: James Wilhoit 425.430.7319
DESCRIPTION:
Widening roadway to 5 lanes, includes: curbs, sidewalks, storm drainage, street lighting, channelization,
and bikeway from SR-900 to the North City limits.
JUSTIFICATION:
Growing residential areas use this route which is also becoming a major through route between Renton
and Bellevue, as well as freight traffic.
STATUS:
Received a TIB grant in partnership with King County; the City of Newcastle also received
a TIB grant for their section of Coal Creek Parkway. The City of Renton's grant award is
$3,095,640. The City is managing King County's project separately.
CHANGES:
Increase in construction cost estimate of approximately $700,000. Construction delayed to
late 2005 or 2006 due to environmental and drainage issues. Funding spent tracked
through project spreadsheet, not Eden, due to project split -out.
Funded : 14,303,219 Unfunded
Project Totals
Pro rammed Pre-2006
Six -Year Pro ram
ITEM
Programmed
Sent Pre-2005
2005
Total
2006
2007
2008
2009
2010
2011
EXPENSES:
Project Development
Precon En /Admin
927,966
519,391
356,475
52,100
52,100
R-O-W includes Admin
448,258
12,028
436,230
Construction Contract Fee
2,712,700
50,000
2,662 700
2,262 700
400,000
Construction En /Admin
214,295
7,295
207,000
160,000
47,000
Other
TOTAL EXPENSES
4,303,219
531,419
850,000
2,921,800
2,474,800
447,000
SOURCE OF FUNDS:
Vehicle Fuel Tax
Business License Fee
22,274
22,274
Proposed Fund Balance
588,405
40,479
547,926
421,200
126,726
Grants In -Hand TIB
3,095,640
382,666
675,100
2,037,874
1,967,600
70,274
Mitigation In -Hand
596,900
86,000
174,900
336,000
86,000
250,000
Bonds/L.I.D.'s Formed
Other In -Hand
Grants Proposed
Mitigation Proposed
L.I.D.'s Proposed
Other Proposed
Undetermined
TOTAL SOURCES
4,303,2191
531,419,
850,0001
2,921,800
2,474,8001
447,000
0-1
5 - 28 DRAFT
CITY OF RENTON
PLANNING/BUILDING/PUBLIC WORKS
TRANSPORTATION SYSTEMS DIVISION
2006 - 2011 SIX -YEAR TIP
Railroad Crossing Safety Program
Type: 5 - OPERATIONS AND SAFETY
Functional Classification: N/A Fund: 317
Proj. Length: N/A Proj: 12166
RANK: 29 CONTACT: Karl Hamilton 425.430.7220
DESCRIPTION:
Install railroad crossing upgrade improvements at locations determined to warrant safety
improvements. Depending on the needs of the location, work could include rubber crossing
pads, lighted or unlighted signing, motion detectors, gates and connections to traffic signals to
provide signal pre-emption.
JUSTIFICATION:
Railroad roadway crossings can present a serious safety concern that needs to be addressed
when conditions warrant improvements.
STATUS:
Concrete railroad crossing upgrades completed in 2002: Bronson/Houser mainline, SW
7th Street, Lind Avenue SW spurs, and Mill Avenue. Moved the Railroad Crossing Safety
Program grant to Lake Washington Blvd. - Park Ave. N to Coulon Park project in 2003.
CHANGES:
Funded : 135,182 lUnfunded
Project Totals
Pro rammed Pre-2006
Six Year Program
ITEM
Programmed
Spent in 2004
2005
Total
2006
2007
2008
2009
2010
2011
EXPENSES:
Project Development
Precon En /Admin
35,182
182
5,000
30,000
5,000
5,000
10,000
10,000
R-O-W includes Admin
Construction Contract Fee
Construction En /Admin
Other Lake Wash. Xing)
TOTAL EXPENSES
35,182
182
5,000
30,000
5,000
5,000
10,000
10,000
SOURCE OF FUNDS:
Vehicle Fuel Tax
Business License Fee
35,182
182
5,000
30,000
5,000
5,000
10,000
10,000
Proposed Fund Balance
Grants In -Hand
Mitigation In -Hand
Bonds/L.I.D.'s Formed
Other In -Hand
Grants Proposed
Mitigation Proposed
L.I.D.'s Proposed
Other Proposed
Undetermined
TOTAL SOURCES
35,182,
182
5,000,
30,000
5 000
5,000
10,000
10,000
RR %npt Od IQ005 610O
5 - 29 DRAFT
CITY OF RENTON
PLANNING/BUILDING/PUBLIC WORKS
TRANSPORTATION SYSTEMS DIVISION
2006 - 2011 SIX -YEAR TIP
rtation Demand Management Program
's TDM program implements the State's Commute Trip Reduction (CTR) Act by encouraging a
m in the use of single occupancy vehicles (SOV). Incentives are offered to employees (at
;ses with 100 or more employees) arriving to work between 6 and 9 AM. The City has two CTR
ns: 1. The Citywide and 2. the City Hall CTR program (see note below). The TIP funds the
e CTR Program and offers technical assistance to Renton businesses affected by the Act.
Functional Classification: N/A Fund: 317
Proj. Length: N/A Proj: 12135
RANK: 30 CONTACT: Nate Jones 425.4:
STATUS:
It is expected that technical assistance to employers for the Citywide program will continue
at current levels in future years provided State funds in support of this program continue.
Renton receives a State allotment every two years to help fund the Citywide CTR program.
The actual amount is determined by the number of CTR-affected worksites and the number
of trips reduced.
JUSTIFICATION: CHANGES:
The City is required by 1991 State Legislation to develop and implement a CTR program. This law applies
to areas of the State with continuing air quality problems. TDM is an important element in achieving
desired transportation, environmental, and land use goals.
Note: Renton City Hall is an affected CTR site and must implement its own CTR program for City
employees; it is funded outside the TIP program.
Project Totals I Programmed Pre-2006 I Six -Year Program
ITEM I Programmed I Spent in 2004 1 2005 1 Total 2006 2007 1 2008 1 2009 2010 2011
152.81
64
200
TDM
06D7/X105 :1
5 - 30 DRAFT
CITY OF RENTON
PLANNING/BUILDING/PUBLIC WORKS
TRANSPORTATION SYSTEMS DIVISION
2006 - 2011 SIX -YEAR TIP
Transportation Concurrency / LOS Program
Type: 4 - ECONOMIC DEVELOPMENT
Functional Classification: NIA
Proj. Length: NIA
RANK: 31
Fund: 317
Proj: 12107
CONTACT: Keith Woolley 425.430.7318
DESCRIPTION:
The City has created a city-wide Transportation Benefit Zone as part of the GMA Comprehensive Plan's
Transportation Concurrency requirements to provide a source of funds for transportation improvements
necessary to support new development. This project supports the necessary planning effort to determine
appropriate fees to charge as part of the mitigation process, to adjust the fee due to transportation plan
changes and other factors affecting the fees as a funding source and to monitor the funds collected.
JUSTIFICATION:
Management of the Transportation concurrency and mitigation programs are an integral part of planning
transportation improvements, ensuring that new development pays a fair share of the cost, and in
maintaining a level of service required under GMA to allow new development to be approved and to take
place.
STATUS:
On -going yearly program. 2003 funds were used for LOS documentation and inclusion in
the Comprehensive Plan.
CHANGES:
Funded : 1150,047 lUnfunded
Project Totals
Pro rammed Pre-2006
Six -Year Program
ITEM
Programmed
Spent in 2004
2005
Total
2006
2007
2008
2009
2010
2011
EXPENSES:
Project Development
150,047
47
40,000
110,000
10,000
40,000
10,000
10,000
30,000
10,000
Precon En /Admin
R-O-W includes Admin
Construction Contract Fee
Construction En /Admin
Other
TOTAL EXPENSES
150,047
47
40,000
110,000
10,000
40,000
10,000
10,000
30,000
10,000
SOURCE OF FUNDS:
Vehicle Fuel Tax
Business License Fee
150,047
47
40,000
110,000
10,000
40,000
10,000
10,000
30,000
10,000
Proposed Fund Balance
Grants In -Hand
Mitigation In -Hand
Bonds/L.I.D.'s Formed
Other In -Hand
Grants Proposed
Mitigation Proposed
L.I.D.'s Proposed
Other Proposed
Undetermined
TOTAL SOURCES
150 047
47
40,0001
110,000
10,000
40,000
10,000
10,000
30,000
10 000
Cq„arnn y MIOM 05 610 AM
5 - 31 DRAFT
CITY OF RENTON
PLANNING/BUILDING/PUBLIC WORKS
TRANSPORTATION SYSTEMS DIVISION
2006 - 2011 SIX -YEAR TIP
Missing Links Program
Type: 5 - OPERATIONS AND SAFETY
Functional Classification: N/A
Proj. Length: N/A
RANK: 32
CONTACT:
Fund:
Proj:
Ran Plut
317
12106
425.430.7372
DESCRIPTION:
This funding provides for the completion of transportation links that do not qualify for other
sources of funding. An example would be a section of roadway between two LID's or between
two developer mitigation improvement projects.
JUSTIFICATION:
Making the necessary, and often small-scale, improvements needed to connect other projects
can achieve significant benefits.
STATUS:
With the ongoing development in the City, this funds potential City/developer partnership
opportunities. The City will continue to identify and complete the priority missing links.
CHANGES:
Funded : 1236,886 IUnfunded
Project Totals
Pro rammed Pre-2006
Six -Year Program
ITEM
Programmed
Sent in 2004
2005
Total
2006
2007
2008
2009
2010
2011
EXPENSES:
Project Development
Precon En /Admin
28,000
4,000
24,000
4,000
4,000
4,000
4,000
4,000
4,000
R-O-W includes Admin
Construction Contract Fee
168,000
24,000
144,000
24,000
24,000
24,000
24,000
24,000
24,000
Construction En /Admin
14,000
2,000
12,000
2,000
2,000
2 000
2,000
2,000
2,000
Other
26,886
26,886
TOTAL EXPENSES
236,886
26,886
30,000
180,000
30,000
30,000
30,000
30,000
30,000
30,000
SOURCE OF FUNDS:
Vehicle Fuel Tax
Business License Fee
236,886
26,886
30,000
180,000
30,000
30,000
30,000
30,000
30,000
30,000
Proposed Fund Balance
Grants In -Hand
Mitigation In -Hand
Bonds/L.I.D.'s Formed
Other In -Hand
Grants Proposed
Mitigation Proposed
L.I.D.'s Proposed
Other Proposed
Undetermined
TOTAL SOURCES
236,8861
26,886,
30,0001
180,000
30 000
30,000,
30,000,
30,000
30,000
30,000
M_Unks 08I01RM5 9:10A
5 •32 DRAFT
CITY OF RENTON
PLANNING/BUILDING/PUBLIC WORKS
TRANSPORTATION SYSTEMS DIVISION
2006 - 2011 SIX YEAR TIP
Geographic Information System - Needs Assessment Functional Classification: N/A Fund: 317
Proj. Length: N/A Proj: 12206
Type: 1 - INFRASTRUCTURE RANK: 33 CONTACT: Nate Jones 425.430.7217
DESCRIPTION:
Develop a Needs Assessment and Data Development Plan for Transportation Geographic Information
Systems (GIS) data and software development to meet the requirements of City's departmental
needs.
JUSTIFICATION:
The Transportation Systems Division is interested in expanding the development and use of
GIS technology, data, and applications to support the Division's business needs. Effective use of
GIS-related resources is dependent on careful planning and execution. The Needs Assessment
allows the evaluation of Division needs and the development of an action plan for logical
development and implementation of GIS capability within the Division.
STATUS:
City Transportation staff, in coordination with Technical Services and Information Services
staff, are working on a Needs Assessment for transportation -related GIS data. A work
plan is expected to be completed in 2005, and will be used to guide transportation -related
GIS and software development.
CHANGES:
Funded : 1171,682 1 Unfunded
Project Totals
Pro rammed Pre-2006
Six -Year Pro ram
ITEM
Programmed
Sent in 2004
2005
Total
2006
2007
2008
2009
2010
2011
EXPENSES:
Project Development
171,682
16,682
20,000
135,000
35,000
20,000
20,000
20,000
20,000
20,000
Precon En /Admin
R-O-W includes Admin
Construction Contract Fee
Construction En /Admin
Other
TOTAL EXPENSES
171,682
16,682
20,000
135,000
35,000
20,000
20,000
20,000
20,000
20,000
SOURCE OF FUNDS:
Vehicle Fuel Tax
Business License Fee
171,682
16,682
20,000
135,000
35,000
20,000
20,000
20,000
20,000
20,000
Proposed Fund Balance
Grants In -Hand
Mitigation In -Hand
Bonds/L.I.D.'s Formed
Other In -Hand
Grants Proposed
Miti ation Proposed
L.I.D.'s Proposed
Other Proposed
Undetermined
TOTAL SOURCES
1 171,682
16,682
20,000
135,000 1
35,0001
20,000
20,000
20,0001
20,000
20,000
c+s aMMM 8:10AM
5 - 33 DRAFT
CITY OF RENTON
PLANNING/BUILDING/PUBLIC WORKS
TRANSPORTATION SYSTEMS DIVISION
9nns - 2D11 SIX -YEAR TIP
Grady Way Corridor Study Functional Classification: Principal Arterial Fund: 317
Proj. Length: 0.44 miles Proj: 12127
Type: 2 - MULTI -MODAL / TDM RANK: 34 CONTACT: Nathan Jones 425.430.7217
DESCRIPTION:
In conjunction with WSDOT, Sound Transit, and property owners along the corridor, perform a
comprehensive analysis of short- and long-range multi -modal transportation improvements. The City will
conduct a pre -engineering study to evaluate short- and long-term traffic flow and safety improvements
along Grady Way including major intersections and traffic controls from Main Avenue to the West City
Limits.
JUSTIFICATION:
The two freeway interchanges and freeways and the high volume surface level regional routes of SR 515,
Rainier Avenue, Lind Avenue, and Grady Way which converge in this area are of major importance to all
travel modes, including transit, freight, HOV, and general-purpose travel. Grady Way is a critical east to
west link serving the south Renton area and the downtown Central Business District; the potential for
operational problems and congestion is high if this corridor is not managed effectively.
STATUS:
The City's Grady Way Study was added in 2003 to closely coordinate with WSDOTs
proposed improvements for the 1-405/SR 167 interchange, as well as with the Rainier
Avenue Corridor Study conducted by the City. Our coordination with WSDOT will assure
that all proposed short-term and long-term improvements on these corridors will be
compatible with one another and with long-range needs.
CHANGES:
A project proposal for the Grady Way Study will be under development and review by late
2005. Following review, a consultant selection process will be initiated, probably by early
2006.
Funded : 1315.619 Unfunded : 13,000,000
Project Totals
Pro rammed Pre-2006
Six Year Program
ITEM
Programmed
Spent Pre-2005
2005
Total
2006
2007
2008
2009
2010
2011
EXPENSES:
Project Development
315,619
619
20,000
295,000
35,000
120,000
80,000
20,000
20,000
20,000
Precon En /Admin
250,000
250,000
210,000
40 000
R-O-W includes Admin
250,000
250,000
250 000
Construction Contract Fee
2,500,000
2,500,000
1,500,000
1,000,000
Construction En /Admin
Other
TOTAL EXPENSES
3,315,619
619
20,000
3,295,000
35,000
120,000
80,000
230,000
1,810,000
1,020,000
SOURCE OF FUNDS:
Vehicle Fuel Tax
Business License Fee
160,619
619
160,000
20,000
80,000
20,000
20,0001
20,000
Proposed Fund Balance
Grants In -Hand
Mitigation In -Hand
155,000
20,000
135,000
35 000
100 000
Bonds/L.I.D.'s Formed
Other In -Hand
Grants Proposed
Mitigation Proposed
L.I.D.'s Proposed
Other Proposed
Undetermined
3,000,000
3,000 000
210,000
1,790,000
11000,000
TOTAL SOURCES
3 315 619
619
20,000
3 295 000
35 000
120,000
80,000
230 000
1,810,000
1 020 000
G�dr co.. OVOM2006 610o
5-34 DRAFT
CITY OF RENTON
PLANNING/BUILDING/PUBLIC WORKS
TRANSPORTATION SYSTEMS DIVISION
2006 - 2011 SIX -YEAR TIP
Bicycle Route Development Program
Type: 3 - COMMUNITY LIVABILITY / ENHANCEMENT
Functional Classification: N/A
Proj. Length: N/A
RANK: 35 CONTACT:
Fund: 317
Proj: 12173
Dan Hasty 425.430.7246
DESCRIPTION:
Further develop the City's non -motorized facilities. Sign Bicycle Routes along preferred
corridors. Construct missing links in the bicycle route system. Construct site -specific
improvements. Upgrade routes as needed to safely accommodate bicycle traffic. Publicize
Renton bicycle route network. Provides funding to match grant requests for bicycle construction
improvements.
JUSTIFICATION:
The City does not currently have a well -developed bicycle route system; this program will
complete an integrated system of bicycle routes and trails and upgrade streets to better
accommodate bicycles. Many locations along existing and potential routes have site -specific
safety problems, which would be addressed in this program. Additionally, there is a strong
demand for better -developed non -motorized facilities in Renton.
STATUS:
Routes will be evaluated to assess the effects of any changes in the Trails Master Plan
when the update is released by the Parks Department.
CHANGES:
Review of miscellaneous proposals for bicycle facilities within the rights -of -way for City
projects such as Duvall Ave., NE 3rd/4th St., SW 27th St./Strander Blvd., and Benson
Road.
Funded : 1270.342 lUnfunded : 190,000
Project Totals
Pro rammed Pre-2006
Six ear Program
Programmed
Sent In 2004
2005
Total
2006
2007
2008
2009
2010
2011
EXPENSES:
Project Development
34,342
14,342
10,000
10,000
10 000
Precon En /Admin
56,000
10,000
46,000
10,000
2000
2,000
10,000
11,000
11.000
R-O-W includes Admin
Construction Contract Fee
246,000
246,000
14,000
14,000
90,000
64,000
64,000
Construction En /Admin
24,000
24,000
2,000
2,000
10,000
5,000
5,000
Other
TOTAL EXPENSES
360,342
14,342
20,000
326,000
20,000
18,000
18,000
110,000
80,000
80,000
SOURCE OF FUNDS:
Vehicle Fuel Tax
Business License Fee
270,342
14,342
20,000
236,000
20,000
18,000
18,000
20,000
80,000
80,000
Proposed Fund Balance
Grants In -Hand
Mitigation In -Hand
Bonds/L.I.D.'s Formed
Other In -Hand
Grants Proposed
Mitigation Proposed
L.I.D.'s Proposed
Other Proposed
Undetermined
1 90,0001
90,000
90,000
TOTAL SOURCES
360,3421
14,342
20,0001
326,000
20,000
18,000
18,000
110,000
80,000.
80 000
S.w_Ro oefovm 7'.08 AM
5 - 35 DRAFT
CITY OF RENTON
PLANNING/BUILDING/PUBLIC WORKS
TRANSPORTATION SYSTEMS DIVISION
2006 - 2011 SIX -YEAR TIP
Lake Washington Blvd. - Park Ave N to Coulon Park
Type: 4 - ECONOMIC DEVELOPMENT
Functional Classification: Corrector Fund: 317
Proj. Length: N/A Proj: 12121
RANK: 36 CONTACT: ,lames Wilhoit 425.430,7318
DESCRIPTION:
This project includes road widening, traffic signals, railroad crossings, drainage, curb, gutter and
sidewalks.
JUSTIFICATION:
This project will serve the development and access needs to Coulon Park and to the Southport
Development.
STATUS:
Developer to design and construct, and get credit toward mitigation contribution. The
developer is completing the project in 3 phases. Project received $185,000 Railroad
Crossing Safety grant. Estimated contract costs and developer reimbursement is included.
CHANGES:
Railroad crossing construction complete except for signal start-up requirements. Waiting
for developer to continue their construction.
Funded : 1543,518 lUnfunded
Project Totals
Pro rammed Pre-2006
Six -Year Program
ITEM
Programmed
Sent Pre-2005
2005
Total
2006
2007
2008
2009
2010
2011
EXPENSES:
Project Development
15,000
13,600
1,400
1,400
Precon En /Admin
R-O-W includes Admin
Construction Contract Fee
498,500
287,000
1,000
210,500
78,500
132,000
Construction En /Admin
15,000
4,800
500
9,700
2 100
7,600
Other
15,018
10,518
4,500
2,500
2,000
TOTAL EXPENSES
543,518
315,918
1,500
226,100
84,500
141,600
SOURCE OF FUNDS:
Vehicle Fuel Tax
15,000
14,490
510
Business License Fee
Proposed Fund Balance
Grants In -Hand
185,000
106 575
78,425
40,000
38,425
Mitigation In -Hand
343,518
194 853
990
147,675
44,500
103,175
Bonds/L.I.D.'s Formed
Other In -Hand
Grants Proposed
Mitigation Proposed
L.I.D.'s Proposed
Other Proposed
Undetermined
TO FAL tiOURC ES
543,5181
315,918
1,5001
226,100
1 84,5001
141,600
lk WA M01/2OS 6'10 AM
5 - 36 DRAFT
CITY OF RENTON
PLANNING/BUILDING/PUBLIC WORKS
TRANSPORTATION SYSTEMS DIVISION
9nnA - 9(111 qlY-YEAR TIP
Interagency Signal Coordination
Type: 5 -OPERATIONS AND SAFETY
Functional Classification: N/A Fund: 317
Proj. Length: N/A Proj: 12140
RANK: 37 CONTACT: Karl Hamilton 425.430.7220
DESCRIPTION:
Provide means of signal coordination across jurisdictional boundaries of Renton, Kent, Tukwila,
King County & WSDOT. Implement signal sequences coordinated through broadcast world time
with necessary hardware to interface with Renton's master signal computer. Develop regional
traffic flow parameters & signal timings.
JUSTIFICATION:
Improve traffic flows, reduce congestion, reduce fuel consumption & air pollution. FHWA
demonstration project.
STATUS:
Tukwila is lead agency for an inter -jurisdictional ISTEA grant approved for design
of this project. Grant funds are being managed by Tukwila for the other agencies.
Project could be expanded to include Intelligent Transportation System
Improvements on Carr Rd / SW 43rd St / S 180th Street corridor.
CHANGES:
In construction in 2005.
Funded : 131,572 lUnfunded
Project Totals
Pro rammed Pre-2006
Six ear Program
ITEM
Programmed
Sent Pre-2005
2005
Total
2006
2007
2008
2009
2010
2011
EXPENSES:
Project Development
7,266
7 266
Precon En /Admin
7,184
7,184
R-O-W includes Admin
Construction Contract Fee
Construction En /Admin
Other
17,122
122
5,000
12,000
12 000
TOTAL EXPENSES
31,572
14,572
5,000
12,000
12,000
SOURCE OF FUNDS:
Vehicle Fuel Tax
Business License Fee
31,572
14,572
5,000
12,000
12,000
Proposed Fund Balance
Grants In -Hand
Mitigation In -Hand
Bonds/L.I.D.'s Formed
Other In -Hand
Grants Proposed
Mitigation Proposed
L.I.Ws Proposed
Other Proposed
Undetermined
TOTAL SOURCES
1 31,5721
14,572f
5,0001
12,000
1 12,0001
uQ— Ca om"2005 elom
5 - 37 DRAFT
CITY OF RENTON
PLANNING/BUILDING/PUBLIC WORKS
TRANSPORTATION SYSTEMS DIVISION
,)nnA - gf111 CIX-YFAR TIP
Environmental Monitoring Program
T e: 1 - INFRASTRUCTURE
Functional Classification: N/A
Proj. Length: N/A
RANK: 38
Fund: 317
Proj: 12187
CONTACT: Jason Fritzler 425.430.7243
DESCRIPTION:
Monitoring of wetland mitigation installed as a project environmental requirement and to perform biological
assessments as required by the Endangered Species Act.
JUSTIFICATION:
Monitoring ensures that the wetland vegetation installed is properly established. Creates an account to
pay for unscheduled project environmental assessments.
STATUS:
The Year 3 report for the Oakesdale, Phase 1, site has been sent to the regulatory
agencies for review. The Year 1 report for the Phase 2 site is being prepared. Phase 1
and 2 site maintenance continues.
CHANGES:
Attempting to get early acceptance for the Phase 1 site due to its recent success.
Funded : 1429,838 lUnfunded
Project Totals
Pro rammed Pre-2006
Six ear Program
ITEM
Programmed
Sent in 2004
2005
Total
2006
2007
2008
2009
2010
2011
EXPENSES:
Project Development
Precon En /Admin
105,000
15,000
90,000
15,000
15,000
15,000
15,000
15,000
15,0001
R-O-W includes Admin
Construction Contract Fee
50,000
15,000
35,000
10,000
5,0001
5,000
5,000
5,000
5 000
Construction En /Admin
274,838
99,838
55,000
120,000
50,000..
30,000
10,000
10,000
10 000
10 000
Other
TOTAL EXPENSES
429,838
99,838
85,000
245,000
75,000
50,000
30,000
30,000
30,000
30,000
SOURCE OF FUNDS:
Vehicle Fuel Tax
Business License Fee
170,838
25,838
20,000
125 000
20,000
25,000
17,500
12,500
25,000
25,000
Proposed Fund Balance
Grants In -Hand
Miti ation In -Hand
259,000
74,000
65,000
120,000
55,000
25,000
12,500
17,500
5,000
5,000
Bonds/L.I.D.'s Formed
Other In -Hand
Grants Proposed
Miti ation Proposed
L.I.D.'s Proposed
Other Proposed
Undetermined
TOTAL SOURCES
1 429,8381
99,8381
85,0001
245,000
1 75,0001
50,000
30,000
30,0001
30,000130
000
E- OW01/2005 6:10AM
5 - 38 DRAFT
CITY OF RENTON
PLANNING/BUILDING/PUBLIC WORKS
TRANSPORTATION SYSTEMS DIVISION
2006 - 2011 SIX -YEAR TIP
Trans -Valley and Soos Creek Corridor Program
Type: 2 - MULTI -MODAL / TDM
Functional Classification: N/A Fund: 317
Proj. Length: N/A Proj: 12191
RANK: 39 CONTACT: Keith Woolley 425.430.7318
DESCRIPTION:
A joint study with King County, Kent, Tukwila and SeaTac to evaluate long-term and short-term
multi -modal transportation improvements in the Soos Creek and Valley area. This program will
fund study and pre -design work plus matching funds for grant applications.
JUSTIFICATION:
This is an area with limited transportation facilities while experiencing high growth rates.
STATUS:
The Trans -Valley Study was completed in March 2002, providing documentation, research,
priority corridor identification, and potential solution sets. Further work placed on indefinite
hold by King County in 2003. Design coordination continues with King County Carr Road
Corridor projects. Funding for projects that are developed may come from the Arterial HOV
and the Arterial Circulation Programs.
CHANGES:
Program extended through 2008.
Funded : 121,886 1 Unfunded
Project Totals
Pro rammed Pre-2006
Six -Year Program
ITEM
Programmed
Sent Pre-2005
2005
Total
2006
2007
2008
2009
2010
2011
EXPENSES:
Project Development
21,886
4 886
2,000
15,000
5 000
5,000
5 000
Precon En /Admin
R-O-W includes Admin
Construction Contract Fee
Construction En /Admin
Other
TOTAL EXPENSES
21,886
4,886
2,000
15,000
5,000
5,000
5,000
SOURCE OF FUNDS:
Vehicle Fuel Tax
Business License Fee
21,886
4 886
2,000
15,000
5,000
5 000
5,000
Proposed Fund Balance
Grants In -Hand
Mitigation In -Hand
Bonds/L.I.D.'s Formed
Other In -Hand
Grants Proposed
Mitigation Proposed
L.I.D.'s Proposed
Other Proposed
Undetermined
TOTAL 500=1
21,8861
4,886
2,0001
15,000
5,000
5,000
5,000
TnroV.1 OWAQW5 Clow
5 - 39 DRAFT
CITY OF RENTON
PLANNING/BUILDING/PUBLIC WORKS
TRANSPORTATION SYSTEMS DIVISION
7nnr - gn11 GIX-YEAR TIP
WSDOT Coordination Program
Type: 2 - MULTI -MODAL / TDM
Functional Classification: N/A
Proj. Length: N/A
RANK: 40
CONTACT:
Fund:
Proj:
Sharon Griffin
317
12146
425.430.7232
DESCRIPTION:
Provide pre -design, design and construction coordination for WSDOT projects within or
adjacent to Renton to assure that those projects provide the maximum benefits and minimum
problems for Renton's transportation system.
JUSTIFICATION:
WSDOT projects can have signficant impacts within the City.
STATUS:
Ongoing yearly program. Staff coordinating on the 1-405 Corridor Study and other grant -
funded projects.
CHANGES:
Funded : 189137 lUnfunded
Project Totals
Pro rammed Pre-2006
Six -Year Program
ITEM
Programmed
Spent in 2004
2005
Total
2006
2007
2008
2009
2010
2011
EXPENSES:
Project Development
89,137
9 137
15,000
65,000
15,000
10,000
10,000
10,000
10,000
10,000
Precon En /Admin
R-O-W includes Admin
Construction Contract Fee
Construction En /Admin
Other
TOTAL EXPENSES
89,137
9,137
15,000
65,000
15,000
10,000
10,000
10,000
10,000
10,000
SOURCE OF FUNDS:
Vehicle Fuel Tax
Business License Fee
89,137
9,137
15,000
65,000
15,000
10,000
10,000
10,000
10,0001
10,000
Proposed Fund Balance
Grants In -Hand
Mitigation In -Hand
Bonds/L.I.D.'s Formed
Other In -Hand
Grants Proposed
Mitigation Proposed
L.I.D.'s Proposed
Other Proposed
Undetermined
TOTAL SOURCES
89,1371
9137
15,000!
65,000
15,000,
10,000
10,000
10,000,
10,000,
10,0001
W500T owir z 8:10 AM
5 - 40 DRAFT
CITY OF RENTON
PLANNING/BUILDING/PUBLIC WORKS
TRANSPORTATION SYSTEMS DIVISION
2006 - 2011 SIX -YEAR TIP
1% for the Arts Program
Type: 3 - COMMUNITY LIVABILITY / ENHANCEMENT
Functional Classification: N/A Fund:
Proj. Length: NSA Proj:
RANK: 41 CONTACT: Sharon Griffin
317
12112
425.430.7232
DESCRIPTION:
Beautify entrance locations to the City. Projects to include signing and landscaping. Funding is
tied to the calculated share of eligible types of transportation projects and transportation funding
subject to the City's1 % for the Arts program. All gateway project proposals under this program
are subject to approval of the Arts Commission.
JUSTIFICATION:
Displays a sense of civic pride.
STATUS:
Program is now based on actual design and construction costs. 2001 was estimated and
the remainder from the actual costs was used for 2002 and part of 2003. $3,278 was
transferred in 2004 to cover the remaining 2003 expenditures.
CHANGES:
$15,669 was transferred in 2005 for 1 % of 2004 actual expenditures.
[Funded: 1263,278 lUnfunded
Project Totals
Pro rammed Pre-2006
Six -Year Program
ITEM
Programmed
Sent in 2004
2005
Total
2006
2007
2008
2009
2010
2011
EXPENSES:
Project Development
7,000
1 000
6,000
1 000
1 000
1,000
1,000
1,000
1,000
Precon En /Admin
R-O-W includes Admin
Construction Contract Fee
Construction En /Admin
Other
256,278
3,278
29,000
224,000
59 000
29,000
29,000
49,000
29,000
29,000
TOTAL EXPENSES
263,278
3,278
30,000
230,000
60,000
30,000
30,000
50,000
30,000
30,000
SOURCE OF FUNDS:
Vehicle Fuel Tax
Business License Fee
263,278
3,278
30,000
230,000
60,000
30,000
30 000
50 000
30,000
30,000
Proposed Fund Balance
Grants In -Hand
Mitigation In -Hand
Bonds/L.I.D.'s Formed
Other In -Hand
Grants Proposed
Miti ation Proposed
L.I.D.'s Proposed
Other Proposed
Undetermined
TOTAL SOURCES
263,2781
3,278
30,0001
230,000
60,000
30,000
30,000
50,000
30,000
30 000
1%AM O6 l/= 6:10 AM
5-41 DRAFT
CITY OF RENTON
PLANNING/BUILDING/PUBLIC WORKS
TRANSPORTATION SYSTEMS DIVISION
90nS - 9n11 SIX-YFAR TIP
Arterial HOV Program
Type: 2 - MULTI -MODAL / TDM
Functional Classification: N/A Fund: 317
Proj. Length: N/A Proj: 12160
RANK: 42 CONTACT: Keith Woolley 425.430.7318
DESCRIPTION:
Perform a comprehensive analysis of short and long term HOV needs for the Renton area and
develop a prioritized list with cost estimates of recommended arterial improvements, such as
HOV lanes, HOV queue jumps, park and ride lots and other HOV facilities. Also provides
funding in future years for construction of high priority projects as they are identified.
JUSTIFICATION:
Development of arterial HOV improvements will be necessary to promote the use and efficiency
of transit and other HOV mobility options. Funding from this program will be directed to
individual projects with HOV facilities as those projects move forward.
STATUS:
HOV Arterial Study to identify specific improvements along three corridors has been
completed. Sound Transit Direct Access Program will need to do pre -design work and
construction in upcoming years.
CHANGES:
Funded : 1137,364 IUnfunded
Project Totals
Pro rammed Pre-2006
Six ear Program
ITEM
Programmed
Sent Pre-2005
2005
Total
2006
2007
2008
2009
2010
2011
EXPENSES:
Project Development
136,474
121,474
5,000
10,000
10,000
Precon En /Admin
880
880
R-O-W includes Admin
Construction Contract Fee
Construction En /Admin
Other
TOTAL EXPENSES
137,354
122,354
5,000
10,000
10,000
SOURCE OF FUNDS:
Vehicle Fuel Tax
Business License Fee
56,210
41,210
5,000
10,000
10,000
Proposed Fund Balance
Grants In -hand ISTEA
81,144
81,144
Mitigation In -Hand
Bonds/L.I.D.'s Formed
Other In -Hand
Grants Proposed
Mitigation Proposed
L.I.D.'s Proposed
Other Proposed
Undetermined
TOTAL SQURZS�l
137,354
122,354
5,000
10,000 1
10,000
M_HOV 00101=05 6:10AM
5 - 42 DRAFT
CITY OF RENTON
PLANNING/BUILDING/PUBLIC WORKS
TRANSPORTATION SYSTEMS DIVISION
gnnFR _ 7r111 q[Y-YEAR TIP
Park -Sunset Corridor - Garden Avenue to Duvall Avenue
Type: 2 - MULTI -MODAL / TDM
Functional Classification: Principal
Proj. Length: N/A
RANK: 43 CONTACT:
Fund: 317
Proj: 12177
Keith Woolley 425.430.7318
DESCRIPTION:
Identify and construct traffic operational improvements as needed throughout the corridor.
JUSTIFICATION:
This important corridor is subject to high growth in travel demand.
STATUS:
CHANGES:
Study to be initiated in 2005 with selection of a transportation consultant in 2006.
Funded : 1466,277 lUnfunded
Project Totals
Pro rammed Pre-2006
Six ear Program
ITEM
Programmed
Sent Pre-2005
2005
Total
2006
2007
2008
2009
2010
2011
EXPENSES:
Project Development
76,277
11,277
15,000
50,000
50,000
Precon En /Admin
390,000
390.000
390,000
R-O-W includes Admin
Construction Contract Fee
Construction En /Admin
Other
TOTAL EXPENSES
466,277
11,277
15,000
440,000
50,000
390,000
SOURCE OF FUNDS:
Vehicle Fuel Tax
Business License Fee
28,377
11,277
15,000
2,100
2,100
Proposed Fund Balance
Grants In -Hand
Mitigation In -Hand
437,900
437,900
50,000
387,900
Bonds/L.I.D.'s Formed
Other In -Hand
Grants Proposed
Mitigation Proposed
L.I.D.'s Proposed
Other Proposed
Undetermined
TOTAL SOU RCESI
466,2771
11,2771
15,0001
440,000 1
50,0001
390,000
Pvk Suwt
0601=05 a-10 AM
5 - 43 DRAFT
CITY OF RENTON
PLANNING/BUILDING/PUBLIC WORKS
TRANSPORTATION SYSTEMS DIVISION
2006 - 2011 SIX -YEAR TIP
Lind Avenue - SW 16th St to SW 43rd St
Type: 5 - OPERATIONS AND SAFETY
Functional Classification: Minor Arterial
Proj. Length: 1.69 miles
RANK: 44
CONTACT:
Fund: 317
Proj: 24
Keith Woolley 425.430.7318
DESCRIPTION:
Widen existing roadway to 5 lanes where required. Includes new roadway, curbs, sidewalks,
drainage, signals, lighting, signing and channelization.
JUSTIFICATION:
Increasing traffic demands in the Valley including the proposed development at the Boeing
Longacres site, will create the need for increasing the capacity of this major north/south arterial.
STATUS:
The needs, priorities and schedules for improvements on Lind Avenue will be
determined through Arterial Circulation studies. Construction of a signal at the
intersection of Lind Av and SW 27th St occurred in 1998 as an initial phase.
CHANGES:
Funded : I 10 000 lUnfunded 12,540,000
Project Totals
Pro rammed Pre-2006
Six ear Program
ITEM
Programmed
Spent Pre-2005
2005
Total
2006
2007
2008
2009
2010
2011
EXPENSES:
Project Development
10,000
5000
5,000
5,000
Precon En /Admin
78,000
78,000
78,000
R-O-W includes Admin
Construction Contract Fee
2,280 000
2,280 000
1,700,000
580,000
Construction En /Admin
182,000
182,000
1
136,000
46,000
Other
TOTAL EXPENSES
2,550,000
5,000
2,545,000
5,000
1,914,000
626,000
SOURCE OF FUNDS:
Vehicle Fuel Tax
Business License Fee
Proposed Fund Balance
Grants In -Hand
Mitigation In -Hand
10,000
5,000
5,000
5,000
Bonds/L.I.D.'s Formed
Other In -Hand
Grants Proposed
830,000
830,000
1
630,000
200,000
Mitigation Proposed
L.I.D.'s Proposed
Other Proposed
Undetermined
1,710,000
1
1,710,000
1,284,000
426,000
2,550,0001
5,0001
2,545,000
5,000
1,914,000
626,000
LUM 0&V12005 610 AM
5 - 44 DRAFT
169 HOV - 140th Way SE to SR-900
2 - MULTI -MODAL / TDM
CITY OF RENTON
PLANNING/BUILDING/PUBLIC WORKS
TRANSPORTATION SYSTEMS DIVISION
2006 - 2011 SIX -YEAR TIP
Functional Classification: Principal Fund: 317
Proj. Length: N/A Proj: 12175
RANK: 45 CONTACT: Rob Lochmiller 425.430.7303
DESCRIPTION: STATUS:
Construct queue jumps and bypass lanes that provide transit priority traffic signal improvements on SR-169 (Maple WSDOT committed $300,000 to design and $450,000 to construction. King County committed
Valley Highway) at 140th Way SE and in the area 1-405. Involves roadway widening at intersection approaches approximately $275,000 to this project by constructing a holding pond at 140th Way SE for our us
and modifications to channelization and traffic signals. Also includes widening to improve the north -bound on ramp Design is complete for total buildout. Received TEA-21 Countywide grant of $392,947 for
and south -bound off ramp movement at the 1-405/SR 169 interchange. Improve access to Cedar River Park and construction. Council allocated $1.2 million from the King County Metro mitigation fund ('included
Stoneway site through traffic modifications. in proposed fund balance).
iTIFICATION: CHANGES:
is a high volume, high congestion corridor where providing travel time benefits for transit and car/van pools All phases for this project are now funded. Awarded $2,208,000 from the Transportation
be achieved with high cost effectiveness. Also there are severe congestion and safety problems that can be Improvement Board (TIB) for Phase 2 right-of-way and construction. Received $765,993 TEA-21
essed by adding a right turn lane west -bound on SR-169 and a protected right turn lane from the 1-405 Countywide funds for Phase 2 construction. State legislature funded $2.5M in gas tax revenue for
ibound off ramp on to east -bound SR-169. 2007-2009 biennium.
Project Totals I Programmed Pre-2006 I Six -Year Program
1 ITEM I Programmed 1 Spent Pre-2005 1 2005 1 Total 1 2006 1 2007 1 2008 1 2009 1 2010 1 2011 1
1,117
(Business License Fee 1 197,2511 1 1 197,251 1 197 251
Proposed Fund Balance 1 1.200.0001 178.9911 724.8531 296.156 1 1 296 156
M
SR16R-HOV owirz= 6:10AM
5 - 45 DRAFT
CITY OF RENTON
PLANNING/BUILDING/PUBLIC WORKS
TRANSPORTATION SYSTEMS DIVISION
2006 - 2011 SIX -YEAR TIP
Benson Road South - Main Avenue to S 26th St Functional Classification: Minor Arterial Fund: 317
Proj. Length: 0.6 miles Proj: 12309
Type: 3 -COMMUNITY LIVABILITY / ENHANCEMENT RANK: 46 CONTACT: Jason Fritzler 425.430.7243
DESCRIPTION:
This project will complete three missing sidewalk links (2300 LF) on the east side of Benson Road S. A
small retaining wall, raised painted crosswalk, and pedestrian refuge island will also be part of the project.
JUSTIFICATION:
Needed to improve the safety for children traveling to and from school and provide a safe pedestrian
facility for those doing business north and south of the project.
STATUS:
Project is under design and should go to ad by July 2005. Awarded a TIB Pedestrain
Safety & Mobility Program (PMSP) grant of $150,000 which will likely be reduced due to
reduced grant scope (transfer of 1000 LF to WSDOT 1-405 project).
CHANGES:
Due to the upcoming WSDOT project to widen 1-405 and realign Benson Rd, the southern
1000 LF of sidewalk will be constructed by WSDOT and has been removed from this
project scope.
un ed:1 225,4631 Unfunde
Project Totals
Pro rammed Pre-2006
Six Year Program
ITEM
Programmed.
Sent Pre-2005
2005
Total
2006
2007
2008
2009
2010
2011
EXPENSES:
Project Development
Precon En /Admin
47,563
7 563
40,000
R-O-W includes Admin
Construction Contract Fee
165,400
165,400
Construction En /Admin
12,500
10,000
2,500
2 500
Other
TOTAL EXPENSES
225,463
7,563
215,400
2,500
2,500
SOURCES OF FUNDS:
Vehicle Fuel Tax
Business License Fee
5,063
2,563
2,500
2,500
Proposed Fund Balance
Grants In -Hand
70,400
70,400
Mitigation In -Hand
Bonds/L. I. D.'s Formed
Other In -Hand KC Metro Mit.
150,000
5,000
145,000
Grants Proposed
Mitigation Proposed
L.I.D.'s Proposed
Other Proposed
Undetermined
TOTAL SOURCES
1 225,4631
7,563
215,4001
2,500
1 2,5001
8-RbTIS om1R005 6:10 AM
5 - 46 DRAFT
CITY OF RENTON
PLANNING/BUILDING/PUBLIC WORKS
TRANSPORTATION SYSTEMS DIVISION
9nns - 9(111 SIX-YPAR TIP
NE Sunset By / Duvall Av NE Functional Classification: MinorArteriai Fund: 317
Proj. Length: Proj: 12301
Type: 5 - OPERATIONS AND SAFETY RANK: 47 CONTACT: James Wilhoit 425.430.7319
DESCRIPTION:
The project will realign and rechannelize lanes approaching, through and exiting the intersection, add an
eastbound left -turn lane, modify the traffic signals, and extend a drop lane. The modification of the fully
actuated traffic signal will include poles, signal and pedestrian displays, detection loops, emergency pre-
emption, and a new signal controller.
JUSTIFICATION:
The intersection experiences a high number of accidents including turning movements, rear ends, and
side swipes.
STATUS:
Awarded an HES grant for $396,000 in 2002. Design cost increased by $56,000 due to
additional surveying and re -design requirements.
CHANGES:
Increase in construction cost estimate. Going to ad in August 2005. Ineligible costs reflect
items outside the original scope of the grant such as extending lane lengths required by
WSDOT (on state route) and additional drainage improvements to the area. Funding
spent tracked through project spreadsheet, not Eden, due to project split -out. $20,000 of
2005 allocation moved to 2006.
Funded : 1942,861 lUnfunded
Project Totals
Pro rammed Pre-2006
Six -Year Pro ram
ITEM
Programmed
Spent Pre-2005
2005
Total
2006
2007
2008
2009
2010
2011
EXPENSES:
Project Development
Precon En /Admin
92,000
87,861
4,139
R-O-W includes Admin
Construction Contract Fee
597,300
574,000
23,300
23,300
Construction En /Admin
64,561
56,561
8,000
8,000
Other (Ineligible costs
189,000
23,000
164,000
2,000
2,000
TOTAL EXPENSES
942,861
110,861
798,700
33,300
33,300
SOURCE OF FUNDS:
Vehicle Fuel Tax
Business License Fee
92,800
59,500
33,300
33,300
Proposed Fund Balance
404,561
12,661
391,900
Grants In -Hand (HES)
396,000
29,700
366,300
Mitigation In -Hand
49,500
9,000
40,500
Bonds/L.I.D.'s Formed
Other In -Hand
Grants Proposed
Mitigation Proposed
L.I.D.'s Proposed
Other Proposed
Undetermined
TOTAL SOURCES
942,8611
110,861
798,7001
33,300
33,300
S...VDN11 owir.10M 6:10AM
5 - 47 DRAFT
CITY OF RENTON
PLANNING/BUILDING/PUBLIC WORKS
TRANSPORTATION SYSTEMS DIVISION
?t7DR - ?D11 SIX -YEAR TIP
Logan Av N Concrete Panel Repair
Type: 1 - INFRASTRUCTURE
Functional Classification: Principal Arterial
Proj. Length: N/A
RANK: 48
CONTACT:
Fund: 317
Proj: 12303
James Wilhoit 425.430.7319
DESCRIPTION:
Location: From the Logan Avenue Bridge north to N 6th St. Repair concrete panels under the asphalt to
stop the panels from moving.
JUSTIFICATION:
The panels are moving , causing the asphalt overlay to severely spall at the joints.
STATUS:
CHANGES:
Low priority.
Funded :
I
lUnfunded 1460,000
Project Totals
Pro rammed Pre-2006
Six ear Program
ITEM
Programmed
Sent in 2004
2005
Total
2006
2007
2008
2009
2010
2011
EXPENSES:
Project Development
25,000
25,000
25,000
Precon En /Admin
25,000
25,000
25,000
R-O-W includes Admin
Construction Contract Fee
400,000
400,000
400,000
Construction En /Admin
10,000
10,000
1
10,000
Other
TOTAL EXPENSES
460,000
460,000
460,000
SOURCES OF FUNDS:
Vehicle Fuel Tax
Business License Fee
Proposed Fund Balance
Grants In -Hand
Mitigation In -Hand
Bonds/L.I.D.'s Formed
Other In -Hand
Grants Proposed
Mitigation Proposed
L.I.D.'s Pro osed
Other Proposed
Undetermined
460,0001
460,000
460 000
TOTAL SOURCES
460,0001
1
460,000
460,000
LW.. P-1 061012m 6:10 AM
5-48 DRAFT
CITY OF .._,JTON
PLANNING/BUILDING/PUBLIC WORKS
TRANSPORTATION SYSTEMS DIVISION
2008 - 2011 SIX -YEAR TIP
S Carr Rd / Mill Avenue S
Type: 5 -OPERATIONS AND SAFETY
Functional Classification: Principal Arterial
Proj. Length: N/A
RANK: 49
CONTACT:
Fund: 317
Proj: 12304
Keith Woolley 425.430.7318
DESCRIPTION:
Install new traffic signal, including poles, signal and pedestrian displays, detection loops, emergency pre-
emption, a new signal controller, and associated channelization. Also, construct roadway widening to
accommodate turning lanes.
JUSTIFICATION:
A traffic signal is warranted based on vehicular volumes, delay, and safety. New developments north of
the intersection have been required to participate with the City. Adjacent private school desires to
participate in order to realign their access to become the fourth leg to signalized intersection. King County
Carr Rd Corridor project possibly will widen and/or realign Carr Rd through this project site. A signal will
provide a safe, pedestrian environment and crossing of Carr Rd.
STATUS:
Project currently at the planning level, being coordinated with Development Services/new
developments, the King County Carr Rd project, and New Horizons private school.
CHANGES:
Funded : 35 000 Unfunded : 750 000
Project Totals
Pro rammed Pre-2006
Six Year Pro ram
ITEM
Programmed
Sent in 2004
2005
Total
2006
2007
2008
2009
2010
2011
EXPENSES:
Project Development
15,000
2,000
13,000
3,000
10,000
Precon En /Admin
60,000
60,000
20,000
40,000
R-O-W includes Admin
100,000
100,000
100,000
Construction Contract Fee
300,000
300,000
300,000
Construction En /Admin
310,000
310,000
1
200,000
100,000
10,000
Other
TOTAL EXPENSES
785,000
2,000
783,000
3,000
10,000
20,000
340,000
400,000
10,000
SOURCES OF FUNDS:
Vehicle Fuel Tax
Business License Fee
35,000
2,000
33,000
3 000
10,000
20,000
Proposed Fund Balance
Grants In -Hand
Mitigation In -Hand
Bonds/L.I.D.'s Formed
Other In -Hand
g10,000
Grants Proposed
Mitigation Proposed
L.I.D.'s Proposed
Other Proposed
Undetermined
750,0001
750,000
340,000
400,000
TOTAL SOURCF-S
785,000
2,000
783,000
3,000
10,000
20,000
340,000
400,000
C.-Mill
08/012005 8:10 AM
5-49 DRAFT
CITY OF RENTON
PLANNING/BUILDING/PUBLIC WORKS
TRANSPORTATION SYSTEMS DIVISION
?nnA - 2f111 SIX-YFAR TIP
Houser Way S - Main Av S to Burnett Av S
Type: 5 - OPERATIONS AND SAFETY
Functional Classification: Non-arteriai Fund: 317
Proj. Length: 0.2 mites Proj: 12213
RANK: 50 CONTACT: James Wilhoit 425.430.7319
DESCRIPTION:
Upgrade railroad tracks to concrete on Houser Way S between Main Avenue S and Burnette
Avenue S.
JUSTIFICATION:
This segment of roadway has a pavement management OCI rating (Year 2003) as low as
between 0 and 12 points (out of a possible 100 points). The quality of the roadway is very poor
due to the flexing of the tracks. An overlay will only be effective if the tracks are placed in concrete.
STATUS:
Discussions with Burlington Northern Santa Fe (BNSF) railroad to share funding on this
project were initiated in 2003. BNSF Indicated by letter of 5/20/03 that it was not interested
in the City's proposal. The project remains unfundec.
CHANGES:
Funded:Fundedd I Unfunded :1 810,000
Project Totals
Pro rammed Pre-2006
Six -Year Program
ITEM
Programmed
Sent Pre-2005
2005
Total
2006
2007
2008
2009
2010
2011
EXPENSES:
Project Development
Precon En /Admin
R-O-W includes Admin
Construction Contract Fee
800,000
800,000
800,000
Construction En /Admin
10,000
10,000
10,000
Other
TOTAL EXPENSES
810,000
810,000
810,000
SOURCE OF FUNDS:
Vehicle Fuel Tax
Business License Fee
Proposed Fund Balance
Grants In -Hand
Mitigation In -Hand
Bonds/L.I.D.'s Formed
Other In -Hand
Grants Proposed
Mitigation Proposed
L.I.D.'s Proposed
Other Proposed BNSF
480,000
480,000
480,000
Undetermined
330,0001
330,000
330,000
TOTAL SOURCES
1 810,0001
810,000
810,0001
Ho�wr trka OMM2005 610 AM
5 - 50 DRAFT
CITY OF, ._NTON
PLANNING/BUILDING/PUBLIC WORKS
TRANSPORTATION SYSTEMS DIVISION
7nnri - 9n11 SIX -YEAR TIP
Lake Washington Boulevard Slip Plane Functional Classification: Principal Arterial Fund: 317
Type: 1 -INFRASTRUCTURE Proj. Length: N/A Proj: 12302
RANK: 51 CONTACT: Jason Fritzler 425,430.7243
DESCRIPTION:
Retain the failing slope on the west side of Lake Washington Boulevard and reconstruct both north and
southbound lanes within the slide area. This project will be coordinated with the Coal Creek Utility District
for the repair of their sewer line within the slide area. The project limits are along Lake Washington
Boulevard from NE 51st St south 0.1 mile.
JUSTIFICATION:
Since the Nisqually Earthquake in 2001, the slope along the west side of Lake Washington Boulevard
(LWB) has been moving. Consequently, this has produced a large semi -circular crack in the southbound
lane of LWB. Additionally, Coal Creek Utility staff has noticed that their sewer line has moved with the
slide. Attempts have been made to seal the cracks in the roadway and have been unsuccessful due to
the rapid movement of the slide.
STATUS:
Construction to be completed in 2005. As-builts to be finished in 2006.
CHANGES:
Project contract $27,000 lower than original estimate; additional funds were needed for
design and may be needed for construction engineering due to the nature of the project.
Funds in 2006 moved from 2005 allocation.
Funded : 1640,000 lUnfunded
Project Totals
Pro rammed Pre-2006
Six Year Program
ITEM
Programmed
Spent Pre-2005
2005
Total
2006
2007
2008
2009
2010
2011
EXPENSES:
Project Development
27,356
27,356
Precon En /Admin
79,486
74,086
5,400
R-O-W includes Admin
1,373
1,373
Construction Contract Fee
470,000
470,000
Construction En /Admin
61,785
59,385
2,400
2 400
Other
TOTAL EXPENSES
640,000
102,815
534,785
2,400
2,400
SOURCES OF FUNDS:
Vehicle Fuel Tax
Business License Fee
640,000
102,815
534,785
2 400
2,400
Proposed Fund Balance
Grants In -Hand
Mitigation In -Hand
Bonds/L.I.D.'s Formed
Other In -Hand
Grants Proposed
Mitigation Proposed
L.I.D.'s Proposed
Other Proposed
Undetermined
640,0001
102,8151
534,7851
2,400 1
2,400
LVM Slid
O6g1R005 610 Nx1
5-51 DRAFT
CITY OF RENTON
PLANNING/BUILDING/PUBLIC WORKS
TRANSPORTATION SYSTEMS DIVISION
20nFi - 9n11 SIX-YFAR TIP
Monster Road Bridge Repair Functional Classification: Fund: 317
Proj. Length: Proj: 12307
Type: 1 - INFRASTRUCTURE RANK: 52 CONTACT: Jason Fritzler 425.430.7243
DESCRIPTION:
Install longitudinal restrainers on the top and bottom flanges of each of the girder lines, place a steel
support (corbel) at the bottom of each girder, and inject each of the cracks with epoxy material.
JUSTIFICATION:
During the 2003 bridge inspection, it was reported to the City that each of the girders had cracks that
needed immediate attention. A live load test was conducted using instrumentation that measures small
movements in cracks. It was found that the cracks were opening under load, an indication that the bridge
was not behaving as the intended design.
STATUS:
Construction to be completed in 2005.
CHANGES:
As-builts and project closeout in 2006. Total project cost was increased to $672,000 by
Council in 2004 to reflect rapidly increasing steel prices. Additional bridge testing required
to verify repair increased project costs further.
Funded:Funded:1 698,9341 Unfunded
Project Totals
Pro rammed Pre-2006
Six Year Program
ITEM
Programmed.
Sent Pre-2005
2005
Total
2006
2007
2008
2009
2010
2011
EXPENSES:
Project Development
Precon En /Admin
115,181
115,181
R-O-W includes Admin
Construction Contract Fee
564,320
80,620
468 700
15,000
15,000
Construction En /Admin
19,433
7,433
12,000
12,000
Other
TOTAL EXPENSES
698,934
203,234
468,700
27,000
27,000
SOURCES OF FUNDS:
Vehicle Fuel Tax
Business License Fee
39,000
12,000
27,000
27,000
Proposed Fund Balance
659,934
203,234
456,700
Grants In -Hand
Mitigation In -Hand
Bonds/L.I.D.'s Formed
Other In -Hand
Grants Proposed
Mitigation Proposed
L.I.D.'s Proposed
Other Proposed
Undetermined
TOTAL SOURCES
698,934,
203,234
468,700,
27,000
27,000,
M-- Rd Brdg OW01=05 6:10 AM
5 - 52 DRAFT
CITY OF RENTON
PLANNING/BUILDING/PUBLIC WORKS
TRANSPORTATION SYSTEMS DIVISION
JDuvall Ave NE (Coal Creek Parkway) - King County
ning roadway to 5 lanes, includes: curb, gutter, sidewalk, drainage improvements, street lighting,
nelization, signal modification and interconnection, and bikeway from Renton's north city limits to SE
Way (Newcastle's south city limits).
TIFICATION:
ving residential areas use this route which is also becoming a major through route between Renton
Bellevue, as well as freight traffic. There are currently two general-purpose lanes with little or no
;strian facilities, and left -turn lanes at various locations. Because there are uncompleted gaps
,een the five -lane sections from unincorporated King County to Sunset Bv., the arterial exhibits
lestion and travel -time delays for all modes of traffic.
IM
Functional Classification: Minor Arterial Fund: 317
Proj. Length: Proj: 12305
DAAIII- 94 f+n WTAf`T- 1———..11. 4 A-fC—
STATUS:
The City is managing the King County project with full reimbursement from the County per
approved interlocal agreement. All programmed funding is subject to King County's
ongoing approval. King County manages the grant reimbursement for their TIB grant
award of $3,196,000.
CHANGES:
Construction delayed to 2005 or 2006 due to environmental, drainage and County
coordination issues. Increase in construction cost estimate. R-O-W costs, other than
minor administrative costs, have been removed; R-O-W will be purchased directly by King
County. Funding spent tracked through project spreadsheet, not Eden, due to project split
out; actual reimbursement shown Pre-2005.
ITEM I Proarammed I Snent Pre-2005 1 2005 1 Total 1 2006 1 2007 1 2008 1 2009 1 2010 1 2011 1
Tax
Hand
D..A-" Cara 0"Ir2 05 6:10 AM
5 - 53 DRAFT
SECTION SIX
APPENDIX
• Abbreviations & Acronyms 6-1
• TIP Adopting Resolution 6-2
ABBREVIATIONS AND ACRONYMS
The following list defines the abbreviated words or acronyms used in the City of Renton's Six -Year
Transportation Improvement Plan.
ACP
Asphalt Concrete Pavement
ADA
American Disability Act
AIP
Arterial Improvement Program (administered by TIB)
BNSF
Burlington Northern Sante Fe
BRAC
Bridge Replacement Advisory Committee
CBD
Central Business District
CIP
Capital Improvement Program
CMAQ
Congestion Mitigation and Air Quality
CTR
Commute Trip Reduction (State Act)
DOE
Department of Ecology
EB
Eastbound
ECL
East City Limits
EIS
Environmental Impact Study
ER
Emergency Relief
FAS
Federal Aid Secondary Program
FAUS
Federal Aid Urban System
FHWA
Federal Highway Administration
FTA
Federal Transit Administration
GIS
Geographic Information System
GMA
Growth Management Act
HCT
High Capacity Transit
HES
Federal Aid Hazard Elimination and Safety Program
HOV
High Occupancy Vehicles
UC
Interchange
ISTEA
Intermodal Surface Transportation Efficiency Act (Federal Highway Bill)
ITS
Intelligent Transportation System
IVHS
Intelligent Vehicle Highway Systems
LID
Local Improvement District
LOS
Level of Service
METRO
Municipality of Metropolitan Seattle
MUTCD
Manual on Uniform Traffic Control Devices
NCL
North City Limits
NB
Northbound
PMS
Pavement Management System
Precon
Preconstruction Engineering/Administration (design phase of project)
PS&E
Plans, Specifications, and Estimates
ROW
Right-of-way
RUSH
Renton Urban Shuttle
SB
Souhbound
6-1
r
SC&DI
SCATBd
SCL
SMA
SOV
ST
STP
TDM
TEA-21
TIA
TIB
TIP
TOD
TPP
UATA
UPRR
VMS
WB
WCL
WSBIS
WSDOT
Surveillance Control and Driver Information
South County Area Transportation Board
South City Limits
Structural Matrix Asphalt
Single Occupant Vehicle
Sound Transit
Surface Transportation Program
Transportation Demand Management Program
Transportation Efficiency Act
Transportation Improvement Account (previous TIB program)
Transportation Improvement Board
Transportation Improvement Plan
Transit Oriented Development
Transportation Partnership Program (administered by TIB)
Urban Arterial Trust Account (previous TIB program)
Union Pacific Railroad
Vehicle Master System
Westbound
West City Limits
Washington State Bridge Inventory System
Washington State Department of Transportation
I:\TIPs\2006\PublishW CRONYMS.DOC
CITY OF RENTON, WASHINGTON
RESOLUTION NO.
A RESOLUTION OF THE CITY OF RENTON, WASHINGTON,
UPDATING THE CITY'S SIX -YEAR TRANSPORTATION
IMPROVEMENT PROGRAM 2006-2011.
WHEREAS, the City of Renton has heretofore adopted a "Six -Year Transportation
Improvement Program" pursuant to RCW 35.77.010, and the plan and program having been
amended and modified from time to time as authorized by law; and
WHEREAS, the City Council, after recommendation of the Planning/Building/Public
Works Department, held a public hearing on July 11, 2005, after notice to the public as provided
by law for the purpose of considering adoption, modification, and amendments of the plan and
program; and
WHEREAS, at the public hearing held on July 11, 2005, due consideration was given to
the proposed changes and amendments for the purpose of updating the plan and program;
NOW, THEREFORE, THE CITY COUNCIL OF THE CITY OF RENTON,
WASHINGTON, DOES RESOLVE AS FOLLOWS:
SECTION I. The City's "Six -Year Transportation Improvement Program" and
the City's "Arterial Street Plan" are hereby further amended and modified, all as more particularly
shown on the attached Exhibits "A," "B" and "C" incorporated herein as if fully set forth.
SECTION II. The plan and program, as evidenced by said Exhibits, shall be and
constitute the City's "Six -Year Transportation Improvement Program" and the City's "Arterial
Street Plan," and shall remain in full force and effect until further revised, amended, and
modified as provided by law.
1
6.2
RESOLUTION NO.
•
SECTION III. The Administrator of the Department of Planning/Building/Public
Works and the City Clerk are hereby authorized and directed to file this Resolution, together with
the Exhibits, with the Director of Highways for the State of Washington and as otherwise
provided by law.
PASSED BY THE CITY COUNCIL this
APPROVED BY THE MAYOR this
Approved as to form:
Lawrence J. Warren, City Attorney
RES. 1114:6/9/05:ma
2
day of , 2005.
Bonnie I. Walton, City Clerk
day of , 2005.
Kathy Keolker-Wheeler, Mayor
CITY OF RENTON COUNCIL AGENDA BILL
AI H:
Submitting Data: Planning/Building/Public Works
For Agenda of:
Dept/Div/Board.. Transportation Division
June 20, 2005
Agenda Status
Staff Contact...... Ryan Zulauf, x7471
Consent ..............
Public Hearing..
Subject:
Operating Permit and Agreement with WorldWind
Correspondence..
Helicopters
Ordinance .............
Resolution........... .
Old Business........
New Business....... X
Exhibits:
Issue Paper
Study Sessions......
Operating Permit and Agreement
Information.........
Sublease Agreement
Recommended Action: Approvals:
Refer to Transportation/Aviation Committee Legal Dept......... X
Finance Dept......
Other ...............
Fiscal Impact: N/A
Expenditure Required... Transfer/Amendment........
Amount Budgeted....... Revenue Generated.........
Total Project Budget City Share Total Project..
SUMMARY OF ACTION:
Approval is requested for a new Operating Permit and Agreement with WorldWind
Helicopters. WorldWind Helicopters operates an aircraft charter/taxi service and aircraft
maintenance facility, and has had an approved Operating Permit and Agreement for their
sublease with Aero Dyne Aviation since January 2000. In January 2004, WorldWind
Helicopters moved their business from the Aero Dyne hangar at the south end of the Airport to
the 800 Building on the west side of the Airport to sublease from AirO, Inc.
STAFF RECOMMENDATION:
Recommend approval of an Operating Permit and Agreement with WorldWind Helicopters and
their sublease with AirO, Inc.
H:\AIR\Projects\Tasks\Agenda Bills\AgBill for Worldwind Helic sublease wAirO.doc
CITY OF RENTON
PLANNINGBUILDING/PUBLIC WORKS DEPARTMENT
MEMORANDUM
DATE: June 7, 2005
TO: Terri Briere, Council President
Members of the Renton City Council
VIA: �1(/oA / Mayor Kathy Keolker- eeler
FROM: Gregg Zimmerman ministrator
Planning/Building/Public Works
STAFF CONTACT: Ryan Zulauf, Airport Manager ( x7471)
SUBJECT: Operating Permit and Agreement with Worldwind Helicopters
ISSUE:
Approval is requested for a new Operating Permit and Agreement with WorldWind Helicopters
for their sublease from AirO, Inc.
RECOMMENDATION:
Recommend approval of an Operating Permit and Agreement with WorldWind Helicopters and
their sublease with AirO, Inc.
BACKGROUND SUMMARY:
WorldWind Helicopters has been operating an aircraft charter/taxi service and aircraft
maintenance and repair facility on the Airport since January 24, 2000. WorldWind Helicopters
had been operating under an approved Operating Permit and Agreement for their sublease with
South Cove Ventures, LLC, dba Aero Dyne Aviation.
In January 2004, WorldWind Helicopters terminated their sublease with Aero Dyne and entered
into a sublease with AirO, Inc. WorldWind Helicopters and Aero-Copters, Inc. are both owned
by Mike O'Leary, owner of AirO, Inc. AirO, Inc. has had a lease agreement, LAG 03-002, with
the City since November 1, 2003, for the purpose of operating an aircraft charter/taxi service and
aircraft maintenance and repair facility.
An Operating Permit and Agreement has been written for the new sublease between WorldWind
Helicopters and AirO, Inc. and the sublease is an attachment to the Operating Permit and
Agreement.
H:FileSys/Air/Projects/Tasks/Agenda Bills/Iss paper worldwind helic sublease wAirO.doc
PAG
OPERATING PERMIT AND AGREEMENT
between the City of Renton and WorldWind Helicopters, Inc.
THIS IS A PERMIT TO OPERATE AN AVIATION RELATED ACTIVITY UPON
THE RENTON MUNICIPAL AIRPORT AND AN AGREEMENT between THE CITY OF
RENTON, a Washington municipal corporation ("Permittor"), and WorldWind Helicopters, Inc.,
a Washington corporation ("Permittee").
IN CONSIDERATION of the covenants and agreements hereinafter set forth, the parties
agree as follows:
1. ACKNOWLEDGEMENT OF SUB -LEASE:
I. I. Pursuant to lease agreement LAG 03-002, executed on November 1, 2003, the City
of Renton (Permittor) granted a lease of the subject premises to AirO, Inc., as Lessee, for the
purpose of operating a Fixed Based Operation, which includes the sale of jet fuel and avgas,
aircraft maintenance and repair, aircraft storage and air taxi/charter services.
1.2. Thereafter, AirO, Inc.(Lessee) sublet the subject premises to WorldWind
Helicopters, Inc., (Permittee) by sublease agreement, executed on January 1, 2004, for the purpose
of operating an aircraft repair and maintenance facility and an air taxi/charter business for the
benefit of the public, located at 800 West Perimeter Road, Renton, Washington.
2. GRANT OF OPERATING PERMIT:
2.1. Description of Premises: The premises leased by WorldWind Helicopters, Inc.,
the Permittee, is described in the sub -lease as:
2.1.1. Interior Space: Shared use of the lobby, flight planning room, conference room
and restrooms.
2.1.2. Hangar Space: Shared use of the hangar building located at 800 West Perimeter
I' •.o1
These two (2) categories (Paragraph 2.1.1 and 2.1.2 above) of the property, being subleased by
AirO, Inc. to WorldWind Helicopters, Inc., shall hereafter be referred to as the "Premises".
3. CONDITIONS:
3.1. Specific Conditions: This grant of an Operating Permit is subject to the
following:
OPERATING PERMIT ORIGINAL
City of Renton to WorldWind Helicopters, Inc.
3.1.1. Easements, restrictions and reservations of record and as further set forth
herein;
3.1.2. Such rules and regulations as now exist or may hereafter be promulgated
by the Permittor from time to time, including the Airport's Minimum Standards which
are incorporated herein by this reference, and Permittor's standards concerning operation
of public aviation service activities from the Airport; and
3.1.3. All such non-discriminatory charges and fees for such use as may be
established from time to time by Permittor; and
3.1.4. TOGETHER WITH the privilege of Permittee to use the public portion of
the Airport, including runway and other public facilities provided thereon, on a
non-exclusive basis.
3.2. No Conveyance of Airport: This Operating Permit and Agreement shall in no way
be deemed to be a conveyance of the Airport, and shall not be construed as providing any special
privilege for any public portion of the Airport except as described herein. The Permittor reserves
the right to lease or permit the use of any portion of the Airport for any purpose deemed suitable
for the Airport, except that portion that is permitted hereby.
3.3. Nature of Permittor's Interest: It is expressly understood and agreed that Permittor
holds and operates the Airport, and the Premises under and subject to a grant and conveyance
thereof to Permittor from the United States of America, acting through its Reconstruction
Finance Corporation, and subject to all the reservations, restrictions, rights, conditions, and
exceptions of the United States therein and thereunder, which grant and conveyance has been
filed for record in the office of the Recorder of King County, Washington, and recorded in
Volume 2668 of Deeds, Page 386; and further that Penmittor holds and operates said airport and
premises under and subject to the State Aeronautics Acts of the State of Washington (chapter
165, laws of 1947), and any subsequent amendments thereof or subsequent legislation of said
state and all rules and regulations lawfully promulgated under any act or legislation adopted by
the State of Washington or by the United States or the Federal Aviation Administration. It is
expressly agreed that the Permittee also accepts and will hold and use this lease and the Premises
subject thereto and to all contingencies, risks, and eventualities of or arising out of the foregoing,
and if this lease or the period thereof or any terms or provisions thereof be or become in conflict
with or impaired or defeated by any such legislation, rules, regulations, contingencies or risks,
the latter shall control and, if necessary, modify or supersede any provision of this lease affected
thereby, all without any liability on the part of or recourse against the Permittor in favor of
Permittee, provided that Permittor does not exceed its authority under the foregoing legislation,
rules and regulations.
3.4. Future Development/Funding: Nothing contained in this lease shall operate or be
construed to prevent or hinder the future development, improvements, or operation of Airport by
Permittor, its agents, successors or assigns, or any department or agency of the State of
OPERATING PERMIT
City of Renton to WorldWind Helicopters, Inc.
Washington or of the United States, or the consummation of any loan or grant of federal or state
funds in aid of the development, improvement, or operation of the Renton Airport.
4. TERM OF LEASE, SUBLEASE AND OPERATING PERMIT:
4.1. Permit Term: The term of this Operating Permit is one (1) year and may be
extended to include any Extended Term as may be in effect between AirO, Inc. and WorldWind
Helicopters, Inc.. After the Initial Term, the Extended Term of the sublease is on a year-to-year
basis, for a period of ten (10) years, ending on January 1, 2014. Any extension of the Initial
Term of this Operating Permit is only renewable upon written notice received by theCity ninety
(90) calendar days in advance of the termination date of the Initial or Extended Term of this
Operating Permit and Agreement. In no event will the term of the Operating Permit and
Agreement be extended beyond November 1, 2018.
5. RENTAL:
5.1. Rent on lease: As rental for the premises described in LAG 03-002 and addenda
thereto, Lessee has agreed to pay Permittor a monthly rental in the sum of Four Thousand Six
Hundred Ninety -Five Dollars and Ninety -Two Cents ($4,695.92) throughout the twelve (12)
month period commencing on November 1, 2003, which does not include leasehold excise tax.
5.2. Rent on sublease: As rental for the premises described in Section 2, above, during
the term of this permit, Permittee has agreed to pay AirO, Inc. a monthly rental in the sum of
Four Thousand Five Hundred Dollars ($4,500) throughout the twelve (12) month period
commencing on January 1, 2004. In the event Lessee fails to pay the rent identified in Paragraph
5.1., then Permittee may, whether Permittee subleases all or part of Lessee's Airport leasehold
interest as described in LAG 03-002 and addenda thereto, pay said rent, when due. In the event
neither the Lessee nor Permittee pay said rent, then the Permittor may terminate this permit with
ten (10) days notice.
5.3. Other Charges: Permittee further agrees to pay, in addition to the rental specified
and other charges hereinabove defined, all fees and charges now in effect or hereafter levied or
established by Permittor, or its successors, or by any other governmental agency or authority,
being or becoming levied or charged against the premises, structures, business operations, or
activities conducted by or use made by Permittee of, on, and from the leased premises which
shall include, but not be limited to, all charges for light, heat, gas, power, garbage, water and
other utilities or services rendered to said premises.
5.4. Leasehold Excise Tax: In the event that the State of Washington or any other
governmental authority having jurisdiction thereover shall hereafter levy or impose any similar
tax or charge on the leasehold estate described herein, and Lessee fails to pay said tax or charge,
then Permittee may, whether Permittee subleases all or part of Lessee's Airport leasehold interest
as described in LAG 03-002 and addenda thereto, pay said tax or charge, when due. Such tax or
charge shall be in addition to the regular monthly rentals. In the event neither the Lessee nor
OPERATING PERMIT
City of Renton to WorldWind Helicopters, Inc.
Permittee pay said tax or charge, then the Permittor may terminate this permit with ten (10) days
notice.
6. PAYMENT OF UTILITIES AND RELATED SERVICES.
6.1. Whether Permittee subleases all or part of Lessee's Airport leasehold interest as
described in LAG 03-002 and addenda, if Lessee fails to pay such utilities and service charges,
then Permittee may pay all light, heat, gas, power, garbage, water, sewer and janitorial service
used in or on the Premises when due. In the event neither the Lessee nor the Permittee pay said
utility or service charges, then the Permittor may terminate this Permit with ten (10) days notice.
6.2. Permittor shall not be liable for any loss or damage caused by or resulting from any
variation, interruption, or failure of said utility services due to any cause whatsoever; and no
temporary interruption or failure of such services incident to the making of repairs, alterations or
improvements, or due to accident, strike, act of God, or conditions or events not under
Permittor's control, shall be deemed a breach of the Permit or as an eviction of Permittee, or
relieve Permittee from any of its obligations hereunder.
7. PERMITTEE'S ACCEPTANCE OF PREMISES.
By occupying the Premises, Permittee formally accepts the same in AS IS condition, and
acknowledges that the Permittor has complied with all the requirements imposed upon it under
the terms of this Permit with respect to the condition of the Premises at the commencement of
this term. Permittee hereby accepts the premises subject to all applicable zoning, municipal,
county and state laws, ordinances and regulations governing and regulating the use of the
premises, and accepts this Permit subject thereto and to all matters disclosed thereby and by any
exhibits attached hereto. Permittee acknowledges that neither Permittor nor Permittor's agent has
made any representation or warranty as to the suitability of the Premises for the conduct of
Permittee's business or use. Except as otherwise provided herein, Permittor warrants Permittee's
right to peaceably and quietly enjoy the premises without any disturbance from Permittor, or
others claiming by or through Permittor.
8. PURPOSE AND USE:
8.1. Use of Premises: The Premises are leased to the Permittee for the following
described purpose:
8.1.1. Operation of an Aircraft Charter and Aircraft Taxi Service in accordance with the
Airport Rules and Regulations and Minimum Standards for the operation of this type of
commercial aeronautic activity at the Renton Municipal Airport.
8.1.2. Operation of an Aircraft Maintenance and Repair facility in accordance with the
Airport Rules and Regulations and Minimum Standards for the operation of this type of
commercial aeronautic activity at the Renton Municipal Airport.
OPERATING PERMIT 4
City of Renton to WorldWind Helicopters, Inc.
8.2. Continuous Use: Permittee covenants that the premises shall be continuously used
for those purposes during the term of the Permit, shall not be allowed to stand vacant or idle, and
shall not be used for any other purpose without Permittoe's written consent first having been
obtained. Consent of Permittor to other types of activities will not be unreasonably withheld.
8.3. Non -Aviation Uses Prohibited: Permittee agrees that, except as expressly provided
above, the Premises may not be used for uses or activities that are not related, directly or
indirectly, to aviation.
8.4. Signs: No advertising matter or signs shall be at any time displayed on the leased
premises or structures without the written approval of Permittor, which will not be unreasonably
withheld. One sign, of the type and dimensions specified by the Airport Manager, shall be
permitted to be displayed on the Rainier and Airport Way entrance fences through the
termination date of this permit.
8.5. Conformity with Rules: Permittee further covenants to keep and operate the
Premises and all structures, improvements, and activities in conformity with all rules, regulations
and laws now or hereafter adopted by Permittor, including the Airport Rules and Regulations and
Minimum Standards which are incorporated herein by this reference, the Federal Aviation
Administration, the State Aeronautics Commission, or other duly constituted governmental
authority, all at Permittee's cost and expense.
8.6. Waste, Nuisance, Illegal Activities: Permittee covenants that he will not permit any
waste, damage, or injury to the Premises or improvements thereon, nor allow the maintenance of
any nuisance thereon, nor the use thereof for any illegal purposes or activities.
8.7. Increased Insurance Risk: Permittee will not do or permit to be done in or about the
premises anything which will be dangerous to life or limb, or which will increase any insurance
rates upon the premises or other buildings and improvements.
9. HAZARDOUS WASTE:
9.1. Permittee's Representation and Warrant: In particular, Permittee represents and
warrants to the Permittor that Permittee's use of the Premises will not involve the use of any
hazardous substance (as defined by R.C.W. Chapter 70.105D, as amended), other than fuels,
lubricants and other products which are customary and necessary for use in Permittee's ordinary
course of business.
9.2. Standard of Care: Permittee agrees to use a high degree of care to be certain that no
such hazardous substance is improperly used, released or disposed on the Premises during the
term of this lease by Permittee, its agents or assigns, or is improperly used, released or disposed
on the premises by the act of any third party.
9.3. Indemnity: The parties agree that Permittor shall have no responsibility to the
Permittee, or any other third party, for remedial action under R.C.W. Chapter 70.105D, or other
legislation, in the event of a release of or disposition of any such hazardous substance on, in, or at
OPERATING PERMIT
City of Renton to WorldWind Helicopters, Inc.
the Premises, and not caused by Permittor, during the term of this Permit. Permittee agrees to
indemnify and hold harmless the Permittor from any obligation or expense, including fees
incurred by the Permittor for attorneys, consultants, engineers, damages, including environmental
resource damages, etc., that are suffered or incurred due to the release or disposition of any such
hazardous substance upon the Premises not caused by Permittor, during the term of this Permit,
including remedial action under RCW 70.105D.
9.4. Dispute Resolution: In the event of any dispute between the parties concerning
whether any release of or disposition of any such hazardous substance on, in or at the premises
(a) occurred during the term of this lease, or (b) was caused by Permittor, the parties agree to
submit the dispute for resolution by arbitration upon demand by either party. Each party shall
select one (1) arbitrator. The two (2) selected arbitrators, if unable to agree upon an arbitration
award within a period of thirty (30) days after such appointment, shall select a third arbitrator.
The third arbitrator shall be an engineer with experience in the identification and remediation of
hazardous substances. The arbitrators shall make their decision in writing within sixty (60) days
after their appointment, unless the time is extended by the agreement of the parties. The decision
of a majority of the arbitrators shall be final and binding upon the parties. Each party shall bear
the cost of the arbitrator named by it. The expenses of the third arbitrator shall be borne by the
parties equally.
10. MAINTENANCE:
10.1. Maintenance of Premises: The Premises and all of the improvements or structures
thereon and authorized by the Permittor for use by the Permittee, shall be used and maintained by
Permittee in an operable, neat, orderly, and sanitary manner. Permittor shall not be called upon to make any improvements, alteration, or repair of any kind upon the Premises. Permittee is
responsible for the clean-up and proper disposal at reasonable and regular intervals of rubbish,
trash, waste and leaves around the Premises, including that blown against fences bordering the
Premises, whether as a result of the Permittee's activities or having been deposited upon the
Premises from other areas.
10.2. Removal of Snow/Floodwater/Mud: Permittee shall be responsible for removal of
snow and/or floodwaters or mud deposited there from the Premises and those areas of the
Sublessor utilized by the Permittee, with the disposition thereof to be accomplished in such a
manner so as to not interfere with or increase the maintenance activities of Permittor upon the
public areas of the Airport.
10.3. Permittor May Perform Maintenance: If Permittee fails to perform Permittee's
obligations under this Paragraph, Permittor may at its option (but shall not be required to) enter
the Premises, after thirty (30) days' prior written notice to Permittee, and put the same in good
order, condition and repair, and the cost thereof together with interest thereon at the rate of
twelve (12%) percent per annum shall become due and payable as additional rental to Permittor
together with Permittee's next rental installment.
OPERATING PERMIT 6
City of Renton to WorldWind Helicopters, Inc.
11. ALTERATIONS.
11.1. Protection from Liens: Before commencing any work relating to alterations,
additions and improvements affecting the Premises, Permittee shall notify Permittor in writing of
the expected date of commencement thereof. Permittor shall then have the right at any time and
from time to time to post and maintain on the Premises such notices as Permittor reasonably
deems necessary to protect the Premises and Permittor from mechanics' liens, materialmen's liens
or any other liens. In any event, Permittee shall pay when due, or bond around, all claims for
labor or materials furnished to or for Pennittee at or for use in the Premises. Permittee shall not
permit any mechanics' or materialmen's liens to be levied against the Premises for any labor or
material furnished to Permittee or claimed to have been furnished to Permittee or to Permittee's
agents or contractors in connection with work of any character performed or claimed to have
been performed on the Premises by or at the direction of Permittee.
11.2. Bond: At any time Permittee either desires to or is required to make any repairs,
alterations, additions, improvements or utility installation thereon, or otherwise, Permittor may at
its sole option require Permittee, at Permittee's sole cost and expense, to obtain and provide to
Permittor a lien and completion bond in an amount equal to one and one-half (1-1/2) times the
estimated cost of such improvements, to insure Permittor against liability for mechanics and
materialmen's liens and to insure completion of the work.
11.3. Permittor May Make Improvements: Permittee agrees that Permittor, at its option,
may at its own expense make repairs, alterations or improvements which Permittor may deem
necessary or advisable for the preservation, safety or improvement of the Premises or
improvements located thereon, if any.
11.4. Notification of Completion: Upon completion of capital improvements made on
the Premises, it is the Permittee's responsibility to promptly notify Permittor of such completion.
12. ASSIGNMENT:
12.1. Assignment/Subletting: The sublease or any part thereof shall not be assigned by
Permittee, by operation of law or otherwise, nor shall the premises or any part thereof be sublet
without the prior written consent of Permittor, which consent shall not be unreasonably withheld.
If Permittee is a corporation, the transfer of a majority of Permittee's stock shall constitute an
assignment for purposes of this paragraph.
12.2. No Release of Permittee's Liability: No assignment of this leasehold interest shall
release Permittee from the obligation to pay the rent and to perform all other obligations to be
performed by Permittee under the terms of its sublease. No assignment shall so release Permittee
unless Permittor's consent is obtained pursuant to Paragraph 12.1. In the event that Permittor's
consent to assignment is so obtained, Permittee shall be relieved of all liability arising from this
permit and arising out of any act, occurrence or omission occurring after Permittor's consent is
obtained. The Permittee's assignee must assume and agree to carry out all of the obligations of
Permittee under this permit.
OPERATING PERMIT 7
City of Renton to WorldWind Helicopters, Inc.
13. DEFAULT:
13.1. Definition: It shall be a default of this Permit if the Permittee fails to comply with
any of the statutes, ordinances, rules, orders, regulations, and requirements of the federal, state,
and/or city governments, any terms of this Permit and/or the underlying lease.
13.2 Action Upon Notice of Default:
13.2.1 In the event of default as provided above, the Permittor may, if it so elects, at any
time thereafter, terminate this permit and the term hereof, on giving to the Permittee thirty (30)
days notice (Notice of Default), in writing, of the Permittor's intention to terminate the Permit.
13.2.2. Alternatively, the Permittor may allow the Permittee to cure the default within
thirty (30) days or, within that time, provide adequate assurance of future ability to cure the
default. Adequate assurance shall include, but not be limited to, a deposit in escrow, a guarantee
by a third party acceptable to Permittor, a surety bond, or a letter of credit. The default must be
cured within ninety (90) days of the notice of default.
13.3. Termination of Permit: Upon the expiration of either of the notice periods
specified in Paragraph 13.2 above, and if the event causing the default is not corrected in a timely
manner, this permit and the term hereof, together with any and all other rights and options of
Permittee herein specified, shall expire and come to an end on the day fixed in such notice.
13.4. No Waiver of Remedies: In the event of default by Permittee, the Permittor may
choose not to pursue a claim against Permittee. Such decision will not operate as a waiver of any
other remedies or claims then available to the Permittor or those that may become available.
14. BINDING AGREEMENT: Subject to the restriction upon assignment or subletting
as set forth herein, all of the terms, conditions, and provisions of this Permit shall be binding
upon the parties, their successors and assigns, and in the case of a Permittee who is a natural
person, his or her personal representative and heirs.
15. RIGHT OF INSPECTION. Permittee will allow Permittor, or Permittor's agent, free
access to the Premises at all reasonable times for the purpose of inspection, or for making repairs,
additions or alterations to the Premises, or any property owned by or under the control of
Permittor.
16. SURRENDER OF PREMISES: Permittee shall quit and surrender the premises at
the end of the term in a condition as good as the reasonable use thereof would permit, normal
wear and tear excepted. Alterations, additions or improvements which may be made by either of
the parties hereto on the Premises, except movable office furniture or trade fixtures put in at the
expense of Permittee, shall be and remain the property of the Permittor and shall remain on and
be surrendered with the Premises as a part thereof at the termination of this lease without
hindrance, molestation, or injury. Permittee shall repair at its sole expense any damage to the
Premises occasioned by its use thereof, or by the removal of Permittee's trade fixtures,
OPERATING PERMIT
City of Renton to WorldWind Helicopters, Inc.
furnishings and equipment which repair shall include the patching and filling of holes and repair
of structural damage.
17. INSURANCE:
17.1. Personal Property: It is agreed that Permittor shall not be held liable in any manner
for, or on account of, any loss or damage to personal property of the Permittee, Permittee's
invitees or other persons, which may be sustained by fire or water or other insured peril, or for
the loss of any articles by burglary, theft or any other cause from or upon the Premises. It is
acknowledged that Permittor does not cover any of the personal property of Permittee,
Permittee's invitees or other persons upon the Premises through its insurance. Permittee, its
invitees and other persons upon the Premises are solely responsible to obtain suitable personal
property insurance.
17.2. Liability_ Insurance. The Permittee agrees to maintain, in force, during the term of
this Permit a policy of comprehensive public liability and property damage insurance written by a
company authorized to do business in the State of Washington against any liability arising out of
the ownership, use, occupancy or maintenance of the Premises and all areas appurtenant thereto.
The limits of liability shall be in an amount of not less than $1,000,000.00 for injury to or death
of one person in any one accident or occurrence and in an amount of not less than $1,000,000.00
for injury to or death of more than one person in any one accident or occurrence, and of not less
than $1,000,000.00 for property damage. The limits of said insurance shall not, however, limit
the liability of Permittee hereunder. The insurance policy shall have a Landlord's Protective
Liability endorsement attached thereto.
17.3. Insurance Policies: Insurance required hereunder shall be written in companies
acceptable to Permittor and rated A-10 or better in "Best's Insurance Guides". Coverages shall be
submitted on forms prescribed by Permittor. Prior to possession, the Permittee shall deliver to
Permittor copies of policies of such insurance acquired by Permittee, or certificates evidencing
the existence and amounts of such insurance, with loss payable clauses satisfactory to Permittor.
Permittor shall be named as an additional insured. No such policy shall be cancelable or subject
to reduction of coverage or other modification except after forty-five (45) days' prior written
notice to Permittor. Permittee shall, not less than forty-five (45) days prior to the expiration of
such policies, furnish Permittor with renewals or "binders" therefore. Permittee shall not do or
permit to be done anything which shall invalidate the insurance policies referred to above.
Permittee shall forthwith, upon Permittor's demand, reimburse Permittor for any additional
premiums attributable to any act or omission or operation of Permittee causing such increase in
the cost of insurance. If the Permittee shall fail to procure and maintain said insurance the
Permittor may, but shall not be required to, procure and maintain the same, but at the expense of
Permittee.
18. LIMITATION UPON PERMITTOR'S LIABILITY. Permittor shall not be liable for
any damage to property or persons caused by, or arising out of (a) any defect in or the
maintenance or use of the Premises, or the improvements, fixtures and appurtenances of which
the premises constitute a part; or (b) water coming from the roof, water pipes, flooding of the
OPERATING PERMIT
City of Renton to WorldWind Helicopters, Inc.
Cedar River or other body of water, or from any other source whatsoever, whether within or
without the Premises; or (c) any act or omission of any Permittee or other occupants of the
building, or their agents, servants, employees or invitees thereof.
19. INDEMNITY: Permittee covenants to indemnify and save harmless Permittor
against any and all claims arising from the conduct and management of or from any work or
thing whatsoever done in or about the Premises or the improvements or equipment thereon
during the lease term, or arising from any act or negligence of the Permittee or any of its agents,
contractors, patrons, customers, or employees, or arising from any accident, injury, or damage
whatsoever, however caused, to any person or persons, or to the property of any person, persons,
corporation or other entity occurring during the lease term on, in, or about the Premises, and from
and against all costs, attorney's fees, expenses, and liabilities incurred in or from any such claims
or any action or proceeding brought against the Permittor by reason of any such claim, except
such claims arising directly or indirectly out of Permittor's sole act or omission. Permittee, on
notice from Permittor, shall resist or defend such action or proceeding forthwith.
20. HOLDING OVER: Permittee understands that upon expiration of the term of this
permit, Permittee must execute a new permit with the Permittor as a condition to remaining on
the premises. Permittee further understands that if, without execution of any extension or
renewal of this permit, Permittee should remain in possession of the premises after expiration or
termination of the term of this permit, notwithstanding any extension of its sublease with Lessee,
then the Lessee shall be in default of its lease, LAG 03-002, and Permittor may evict the Lessee
and the Permittee. All the conditions, terms and provisions of this permit shall be applicable
during such holding over.
21. NO WAIVER: It is further covenanted and agreed between the parties hereto that no
waiver by Permittor of a breach by Permittee of any covenant, agreement, stipulation, or
condition of this lease shall be construed to be a waiver of any succeeding breach of the same
covenant, agreement, stipulation, or condition, or a breach of any other covenant agreement,
stipulation, or condition.
22. NOTICES: All notices under this lease shall be in writing and delivered in person,
with receipt therefore, or sent by certified mail, to the following addresses:
a) For the City of Renton: b) For the Permittee:
Airport Manager WorldWind Helicopters, Inc.
616 West Perimeter Road 800 West Perimeter Road
Renton, Washington 98055 Renton, WA 98055
23. DISCRIMINATION PROHIBITED:
23.1. Discrimination Prohibited: Permittee covenants and agrees not to discriminate
against any person or class of persons by reason of race, color, creed, sex, national origin, or any
other class of person protected by Federal or State law or the Renton City Code, in the use of any
OPERATING PERMIT 10
City of Renton to WorldWind Helicopters, Inc.
of its facilities provided for the public in the Airport. Permittee further agrees to furnish services
on a fair, equal and not unjustly discriminatory basis to all users thereof, and to charge on a fair,
reasonable and not unjustly discriminatory basis for each unit of service; provided that Permittee
may make reasonable and non-discriminatory discounts, rebates, or other similar types of price
reductions to volume purchasers.
23.2. Minority Business Enterprise Policy: It is the policy of the Department of
Transportation that minority business enterprises as defined in 49 C.F.R. Part 23 shall have the
maximum opportunity to participate in the performance of leases as defined in 49 C.F.R. 23.5.
Consequently, this lease is subject to 49 C.F.R. Part 23, as applicable. No person shall be
excluded from participation in, denied the benefits of or otherwise discriminated against in
connection with the award and performance of any contract, including leases covered by 49
C.F.R. Part 23, on the grounds of race, color, national origin or sex.
23.3. Application to Sub -leases: Subject to the provisions of Paragraph 12 of this
Permit, Permittee agrees that it will include the above clause in all assignments of this lease or
sub -leases, and cause its assignee(s) and sub-lessee(s) to similarly include the above clause in
further assignments or sub -leases.
24. FORCE MAJEURE: In the event that either party hereto shall be delayed or
hindered in or prevented from the performance of any act required hereunder by reason of strikes,
lockouts, labor troubles, inability to procure materials, failure of power, restrictive governmental
laws or regulations, riots, insurrections, war, or other reason of like nature not the fault of the
party delayed in performing work or doing acts required under the terms of this Lease, then
performance of such act shall be extended for a period equivalent to the period of such delay.
The provisions of this paragraph shall not, however, operate to excuse Permittee from the prompt
payment of rent, or any other payment required by the terms of this Permit, to be made by
Permittee.
25. CAPTIONS: Article and paragraph captions are not a part hereof.
26. ENTIRE AGREEMENT: This Permit contains all agreements of the parties with
respect to any matter mentioned herein. No prior agreement or understanding pertaining to any
such matter shall be effective. This Permit may be modified in writing only, signed by the parties
in interest at the time of the modification. In the event of conflict between the terms of this
Permit and the sublease agreement between Permittee and Lessee, the terms of this Permit
supersede.
27. CUMULATIVE REMEDIES: No remedy or election hereunder shall be deemed
exclusive, but shall, wherever possible, be cumulative with all other remedies at law or in equity.
28. CORPORATE AUTHORITY: If Permittee is a corporation, each individual
executing this Lease on behalf of said corporation represents and warrants that he is duly
authorized to execute and deliver this Permit on behalf of said corporation in accordance with a
duly adopted resolution of the Board of Directors of said corporation and in accordance with the
OPERATING PERMIT 11
City of Renton to WorldWind Helicopters, Inc.
Bylaws of said corporation, and that this Permit is binding upon said corporation in accordance
with its terms.
29. TRANSFER OF PREMISES BY PERMITTOR: In the event of any sale,
conveyance, transfer or assignment by Permittor of its interest in the Premises, Permittor shall be
relieved of all liability arising from this Permit and arising out of any act, occurrence or omission
occurring after the consummation of such sale, conveyance, transfer or assignment.
PERMITTEE:
WorldWind Helicopters, Inc.
a Washington corporation
By Michael O'Leary
its: Owner/President
Date:
OPERATING PERMIT
City of Renton to WorldWind Helicopters, Inc.
PERMITTOR:
THE CITY OF RENTON
a Washington municipal
corporation
Kathy Keolker-Wheeler
Mayor
Date:
ATTEST:
By
Bonnie Walton, City Clerk
Date:
Approved as to legal form:
City Attorney
12
LEASE AGREEMENT
AirO, Inc.
OFFICE/ HANGER LEASE
This Lease Agreement (this "Lease") is dated January 1, 2004, by and between Michael
O'Leary ("Landlord for AirO), and WorldWind Helicopters, Inc. ("Tenant"). The parties
agree as follows:
PREMISES. Landlord, in consideration of the lease payments provided in this Lease,
leases to Tenant shared office/hanger space in the building and shared ramp space on the
west side of Renton Municipal Airport. (the "Premises") located at 800 West Perimeter
Road, Renton, King County, Washington 98055.
TERM. The lease term will begin on January 1, 2004, and will terminate on December
31, 2004, and will be automatically renewable in one year increments if mutually agreed
upon, up to a total of 10 years. Lessor or Lessee has the right to renegotiate terms in the
month of December prior to automatic renewal.
LEASE PAYMENTS. Tenant shall pay to Landlord monthly installments of $4500.00,
payable in advance on the first day of each month. This payment is for the aircraft owned
by WorldWind Helicopters. WorldWind will pay $1250.00 a month for additional leased
aircraft stored on the premises. Payments shall be made to the Landlord at 800 West
Perimeter Road, Renton, WA 98055, which address may be changed from time to time
by the Landlord.
DESCRIPTION OF SUBLEASED AREAS. Aircraft can be parked anywhere within
the hanger general area. Other common areas include: lobby, flight planning room,
conference room, restrooms, and the use of the ramp area.
POSSESSION. Tenant shall be entitled to possession on the first day of the term of this
Lease, and shall yield possession to Landlord on the last day of the term of this Lease,
unless otherwise agreed by both parties in writing. At the expiration of the term, Tenant
shall remove its goods and effects and peaceable yield up the Premises to Landlord in as
good a condition as when delivered to Tenant, ordinary wear and tear excepted.
PURPOSE AND USE. Use of Premises: The Premises are leased to the Permittee for
the following described purposes:
■ The operation of an Aircraft charter and Aircraft Taxi Service in accordance
with the Minimum Standards for the operation of this type of commercial
aeronautic activity at the Renton Municipal Airport
• The operation of Aircraft Maintenance and Repair, in accordance with the
minimum Standards for the operation of this type of commercial aeronautic
activity at the Renton Municipal Airport.
Continuous Use: Permittee covenants that the premises shall be continuously
used for those purposes during the term of the Permit, shall not be allowed to
stand vacant or idle, and condition of this lease shall be construed to be a
waiver of any succeeding breach of the same covenant, agreement, stipulation,
or condition, or a breach of any other covenant agreement, stipulation, or
condition.
PARKING. Tenant shall be entitled to parking privileges associated with the building.
LIABILITY INSURANCE. Tenant shall maintain liability insurance on the Premises
with personal injury limits of at least $1,000,000.00 for injury to one person, and
$1,000,000.00 for any one accident, and a limit of at least $1,000,000.00 for damage to
property per terms of the Airport Operating Permit and Agreement with the City of
Renton. Tenant shall deliver appropriate evidence to Landlord as proof that adequate
insurance is in force issued by companies reasonably satisfactory to Landlord. Landlord
shall receive advance written notice from the insurer prior to any termination of such
insurance policies. Tenant shall also maintain any other insurance which Landlord may
reasonably require for the protection of Landlord's interest in the Premises. Tenant is
responsible for maintaining casualty insurance for its own property.
MAINTENANCE. Tenant shall have the responsibility to maintain the Premises in
good repair at all times during the term of this Lease.
UTILITIES AND SERVICES. Landlord will pay water, sewer, power, gas, and
garbage. Any other services that the tenant requires will be there sole responsibility.
TERMINATION. Notwithstanding any other provision of this Lease, Landlord may
terminate this lease upon 90 days' written notice to Tenant.
DEFAULTS. Tenant shall be in default of this Lease if Tenant fails to fulfill any lease
obligation or term by which Tenant is bound. Subject to any governing provisions of law
to the contrary, if Tenant fails to cure any financial obligation within 30 days (or any
other obligation within 30 days) after written notice of such default is provided by
Landlord to Tenant, Landlord may take possession of the Premises without further notice
(to the extend permitted by law), and without prejudicing Landlord's rights to damages.
In the alternative, Landlord may elect to cure any default and the cost of such action
shall be added to Tenant's financial obligations under this Lease shall be additional rent,
whether or not such sums or charges are designated as "additional rent". The rights
provided by this paragraph are cumulative in nature and are in addition to any other rights
afforded by law.
HOLDOVER If Tenant maintains possession of the Premises for any period after the
termination of this Lease ("Holdover Period"), Tenant shall pay to Landlord lease
payment(s) during the Holdover Period at a rate equal to the most recent rate preceding
the Holdover Period. Such holdover shall constitute a month -to -month extension of this
Lease only if terms of payment due.
CUMULATIVE RIGHTS. The rights of the parties under this Lease are cumulative,
and shall not be construed as exclusive unless otherwise required by law.
REMODELING OR STRUCTURAL IMPROVEMENTS. Tenant shall have the
obligation to conduct any construction or remodeling (at Tenant's expense) that may be
required to use the Premises as specified above. Tenant may also construct such fixtures
on the Premises (at Tenant's expense) that appropriately facilitate its use for such
purposes. Such construction shall be undertaken and such fixtures maybe erected on with
prior written consent to of the Landlord, which shall not be unreasonably withheld.
Tenant shall not install awnings or advertisements on any part of the Premises without
Landlord's prior written consent. At the end of the lease term, Tenant shall be entitled to
remove (or at the request of Landlord shall remove) such fixtures, and shall restore the
Premises to substantially the same condition of the Premises at the commencement of this
Lease.
ACCESS BY LANDLORD TO PREMISES. Subject to Tenant's consent (which shall
not be unreasonably withheld), Landlord shall have the right to enter the Premises to
make inspections, provide necessary services, or show the unit to prospective tenants or
workers. However, Landlord does not assume any liability for the care or supervision of
the Premises. As provided by law, in the case of an emergency, Landlord may enter the
Premises without Tenant's consent. During the last three months of this Lease, or any
extension of this Lease, Landlord shall be allowed to display the usual "To Let" signs and
show the Premises to prospective tenants.
INDEMNITY REGARDING USE OF PREMISES. To the extent permitted by law,
Tenant agrees to indemnify, hold harmless, and defend Landlord from and against any
and all losses, claims, liabilities, and expenses, including reasonable attorney fees, if any,
misuse of the Premises, except Landlord's act or negligence.
DANGEROUS MATERIALS. Tenant shall not keep or have on the Premises any
article or thing of a dangerous, flammable, or explosive character that might substantially
increase the danger of fire on the Premises, or that might be considered hazardous by a
responsible insurance company, unless the prior written consent of Landlord is obtained
and proof of adequate insurance protection is provided by Tenant to Landlord.
COMPLIANCE WITH REGULATIONS. Tenant shall promptly comply with all
laws, ordinances, requirements and regulations of the federal, state, county, municipal
and other authorities, and the fire insurance underwriters. However, Tenant shall not by
this provision be required to make alterations to the exterior of the building or alterations
of the structural nature.
ARBITRATION. Any controversy or claim relating to this contract, including the
construction or application of this contract, will be settled by binding arbitration under
the rules of the American Arbitration Association, and any judgment granted by the
arbitrator(s) may be enforced in any court of proper jurisdiction.
ASSIGNABILITY/SUBLETTING. Tenant may not assign or sublease any interest in
the Premises, nor effect a change in the majority ownership of the Tenant (from the
ownership existing at the inception of this lease), nor assign, mortgage or pledge this
Lease, without the prior written consent of Landlord, which shall not be unreasonably
withheld.
DISCRIMINATION. Discrimination Prohibited — Lessee covenants and agrees not to
discriminate against any person or class of persons by reason of race, color, creed, sex or
national origin in the use of any of its facilities provided for the public on the Airport.
Lessee further agrees to furnish services on a fair, equal and not unjustly discriminatory
basis to all users thereof, and to charge of a fair, reasonable and not unjustly
discriminatory basis to all users thereof, and to charge on a fair, reasonable and not
unjustly discriminatory basis for each unit of service: provided that Lessee may make
reasonable and not -discriminatory discounts, rebates, or other similar types of price
reductions to volume purchasers.
NOTICE. Notices under this Lease shall not be deemed valid unless given or served in
writing and forwarded by mail, postage prepaid, addressed as follows:
LANDLORD:
AirO, c/o Michael O'Leary
800 West Perimeter Road
Renton, WA 98055
TENANT:
WorldWind Helicopters, Inc.
800 West Perimeter Road
Renton, WA 98055
Such addresses may be changed from time to time by either party by providing notice as
set fourth above. Notices mailed in accordance with the above provisions shall be
deemed received on the third day after posting.
GOVERNING LAW. This Lease shall be construed in accordance with the laws of the
State of Washington
ENTIRE AGREEMENT/AMENDMENT. This Lease Agreement contains the entire
agreement of the parties and there are no other promises, conditions, understandings or
other agreements, whether oral or written, relating to the subject matter of this Lease.
This Lease may be modified or amended in writing, if the writing is signed by the party
obligated under the amendment.
SEVERABILITY. If any portion of this Lease shall be held to be invalid or
unenforceable for any reason, the remaining provisions shall continue to be valid and
enforceable. If a court finds that any provisions shall continue to be valid and
enforceable. If a court find that nay provision of this Lease is invalid or unenforceable,
but that by limiting such provisions, it would become valid and enforceable, then such
provision shall be deemed to be written, construed, and enforced as so limited.
WAIVER. The failure of either party to enforce any provisions of this Lease shall not be
construed as a waiver or limitation of that party's right to subsequently enforce and
compel strict compliance with every provision of this Lease.
BINDING EFFECT. The provisions of this lease shall be binding upon and inure to the
benefit of both parties and their respective legal representatives, successors and assigns.
LANDLORD:
AirO, Inc.
Michael J. O'Le,
Owner/President'
TENANT:
WorldWind Helicopters, Inc.
LOM
January 1, 2004
January 1, 2004
CITY OF RENTON COUNCIL AGENDA BILL
Submitting Data: Planning/Building/Public Works
Dept/Div/Board.. Transportation Division
Staff Contact...... Ryan Zulauf, x7471
Subject:
Operating Permit and Agreement with Aero-Copters,
Inc.
Exhibits:
Issue Paper
Operating Permit and Agreement
Sublease Agreement
Al k:
For Agenda of:
June 20, 2005
Agenda Status
Consent ..............
Public Hearing..
Correspondence. .
Ordinance .............
Resolution........... .
Old Business........
New Business.......
Study Sessions......
Information........ .
X
Recommended Action: Approvals:
Refer to Transportation/Aviation Committee Legal Dept......... X
Finance Dept......
Other ...............
Fiscal Impact: N/A
Expenditure Required... Transfer/Amendment.......
Amount Budgeted....... Revenue Generated.........
Total Project Budget City Share Total Project..
SUMMARY OF ACTION:
Approval is requested for an Operating Permit and Agreement with Aero-Copters, Inc. Aero-
Copters, Inc. has been subleasing hangar space from AirO, Inc. in the 800 Building on the west
side of the Airport since January 2004. The purpose of Aero-Copter's sublease is to provide
aircraft maintenance and repair services to AirO, Inc.
STAFF RECOMMENDATION:
Recommend approval of an Operating Permit and Agreement with Aero-Copters, Inc. and their
sublease with AirO, Inc.
II:AAIR\Projects\7'asks\Agenda Bills\AgBill Aero-Copters sublease wAirO_doc
CITY OF RENTON
PLANNING/BUILDING/PUBLIC WORKS DEPARTMENT
MEMORANDUM
DATE: June 7, 2005
TO: Terri Briere, Council President
Members of the Renton City Council
VIA: Mayor Kathy Keolker-Wheeler
FROM: Gregg Zimmerma&Ainistrator
Planning/Building/Public Works
STAFF CONTACT: Ryan Zulauf, Airport Manager ( x7471)
SUBJECT: Operating Permit and Agreement with Aero-Copters, Inc.
ISSUE:
Approval is requested for an Operating Permit and Agreement with Aero-Copters, Inc. for their
sublease from AirO, Inc.
RECOMMENDATION:
Recommend approval of an Operating Permit and Agreement with Aero-Copters, Inc. and their
sublease with AirO, Inc.
BACKGROUND SUMMARY:
Aero-Copters, Inc. has been subleasing hangar space from AirO, Inc. in the 800 Building on the
west side of the Airport since January 2004. Aero-Copters, Inc. subleases building space from
AirO, Inc. for the purpose of providing aircraft maintenance and repair services to AirO, Inc.
This purpose of use is consistent with the Purpose of Use section of AirO, Inc.'s lease
agreement, LAG 03-002.
Aero-Copters, Inc. and WorldWind Helicopters are both owned by Mike O'Leary, owner of
AirO, Inc. AirO, Inc. has had a lease agreement, LAG 03-002, with the City since November 1,
2003, for the purpose of operating an aircraft charter/taxi service and aircraft maintenance and
repair facility. AirO, Inc.'s lease will continue until November 1, 2013.
H:FileSys/Air/Projects/Tasks/Agenda Bills/Iss paper worldwind helic sublease wAirO.doc
PAG
OPERATING PERMIT AND AGREEMENT
between the City of Renton and Aero-Copters, Inc.
THIS IS A PERMIT TO OPERATE AN AVIATION RELATED ACTIVITY UPON
THE RENTON MUNICIPAL AIRPORT AND AN AGREEMENT between THE CITY OF
RENTON, a Washington municipal corporation ("Permittor"), and Aero-Copters, Inc., a
Washington corporation ("Permittee").
IN CONSIDERATION of the covenants and agreements hereinafter set forth, the parties
agree as follows:
1. ACKNOWLEDGEMENT OF SUB -LEASE:
1.1. Pursuant to lease agreement LAG 03-002, executed on November 1, 2003, the City
of Renton (Permittor) granted a lease of the subject premises to AirO, Inc., as Lessee, for the
purpose of operating a Fixed Based Operation, which includes the sale of jet fuel and avgas,
aircraft maintenance and repair, aircraft storage and air taxi/charter services..
1.2. Thereafter, AirO, Inc. (Lessee) sublet the subject premises toAero-Copters, Inc.,
(Permittee) by sublease agreement, executed on January 1, 2004, for the purpose of operating an
air taxi/charter business and an aircraft repair and maintenance facility for the benefit of the
public, located at 800 West Perimeter Road, Renton, Washington.
2. GRANT OF OPERATING PERMIT:
2.1. Description of Premises: The premises leased by Aero-Copters, Inc., the
Permittee, is described in the sub -lease as:
2.1.1. Interior Space: Shared use of the lobby, flight planning room, conference room
and restrooms.
2.1.2. Hangar Space: Shared use of the hangar building located at 800 West Perimeter
Road.
These two (2) categories (Paragraph 2.1.1 and 2.1.2 above) of the property, being subleased by
AirO, Inc. to Aero-Copters, Inc., shall hereafter be referred to as the "Premises".
3. CONDITIONS:
3.1. Specific Conditions: This grant of an Operating Permit is subject to the
following:
3.1.1. Easements, restrictions and reservations of record and as further set forth
herein; ORIGINAL
OPERATING PERMIT
City of Renton to Aero-Copters, Inc.
3.1.2. Such rules and regulations as now exist or may hereafter be promulgated
by the Permittor from time to time, including the Airport's Minimum Standards which
are incorporated herein by this reference, and Permittor's standards concerning operation
of public aviation service activities from the Airport; and
3.1.3. All such non-discriminatory charges and fees for such use as may be
established from time to time by Permittor; and
3.1.4. TOGETHER WITH the privilege of Permittee to use the public portion of
the Airport, including runway and other public facilities provided thereon, on a
non-exclusive basis.
3.2. No Conveyance of Airport: This Operating Permit and Agreement shall in no way
be deemed to be a conveyance of the Airport, and shall not be construed as providing any special
privilege for any public portion of the Airport except as described herein. The Permittor reserves
the right to lease or permit the use of any portion of the Airport for any purpose deemed suitable
for the Airport, except that portion that is permitted hereby.
3.3. Nature of Permittor's Interest: It is expressly understood and agreed that Permittor
holds and operates the Airport, and the Premises under and subject to a grant and conveyance
thereof to Permittor from the United States of America, acting through its Reconstruction
Finance Corporation, and subject to all the reservations, restrictions, rights, conditions, and
exceptions of the United States therein and thereunder, which grant and conveyance has been
filed for record in the office of the Recorder of King County, Washington, and recorded in
Volume 2668 of Deeds, Page 386; and further that Permittor holds and operates said airport and
premises under and subject to the State Aeronautics Acts of the State of Washington (chapter
165, laws of 1947), and any subsequent amendments thereof or subsequent legislation of said
state and all rules and regulations lawfully promulgated under any act or legislation adopted by
the State of Washington or by the United States or the Federal Aviation Administration. It is
expressly agreed that the Permittee also accepts and will hold and use this lease and the Premises
subject thereto and to all contingencies, risks, and eventualities of or arising out of the foregoing,
and if this lease or the period thereof or any terms or provisions thereof be or become in conflict
with or impaired or defeated by any such legislation, rules, regulations, contingencies or risks,
the latter shall control and, if necessary, modify or supersede any provision of this lease affected
thereby, all without any liability on the part of or recourse against the Permittor in favor of
Permittee, provided that Permittor does not exceed its authority under the foregoing legislation,
rules and regulations.
3.4. Future Development/Funding: Nothing contained in this lease shall operate or be
construed to prevent or hinder the future development, improvements, or operation of Airport by
Permittor, its agents, successors or assigns, or any department or agency of the State of
Washington or of the United States, or the consummation of any loan or grant of federal or state
funds in aid of the development, improvement, or operation of the Renton Airport.
OPERATING PERMIT 2
City of Renton to Aero-Copters, Inc.
4. TERM OF LEASE, SUBLEASE AND OPERATING PERMIT:
4.1. Permit Term: The term of this Operating Permit is one (1) year and maybe
extended to include any Extended Term as may be in effect between AirO, Inc. and Aero-
Copters, Inc.. After the Initial Term, the Extended Term of the sublease is on a year-to-year
basis, for a period of ten (10) years, ending on January 1, 2014. Any extension of the Initial
Term of this Operating Permit is only renewable upon written notice received by theCity ninety
(90) calendar days in advance of the termination date of the Initial or Extended Term of this
Operating Permit and Agreement. In no event will the term of the Operating Permit and
Agreement be extended beyond November 1, 2018.
5. RENTAL:
5.1. Rent on lease: As rental for the premises described in LAG 03-002 and addenda
thereto, Lessee has agreed to pay Permittor a monthly rental in the sum of Four Thousand Six
Hundred Ninety -Five Dollars and Ninety -Two Cents ($4,695.92) throughout the twelve (12)
month period commencing on November 1, 2003, which does not include leasehold excise tax.
5.2. Rent on sublease: As rental for the premises described in Section 2, above, during
the term of this permit, Permittee has agreed to pay AirO, Inc. a monthly rental in the sum of One
Thousand Five Hundred Dollars ($1,500) throughout the twelve (12) month period commencing
on January 1, 2004. In the event Lessee fails to pay the rent identified in Paragraph 5.1., then
Permittee may, whether Permittee subleases all or part of Lessee's Airport leasehold interest as
described in LAG 03-002 and addenda thereto, pay said rent, when due. In the event neither the
Lessee nor Permittee pay said rent, then the Permittor may terminate this permit with ten (10)
days notice.
5.3. Other Charges: Permittee further agrees to pay, in addition to the rental specified
and other charges hereinabove defined, all fees and charges now in effect or hereafter levied or
established by Permittor, or its successors, or by any other governmental agency or authority,
being or becoming levied or charged against the premises, structures, business operations, or
activities conducted by or use made by Permittee of, on, and from the leased premises which
shall include, but not be limited to, all charges for light, heat, gas, power, garbage, water and
other utilities or services rendered to said premises.
5.4. Leasehold Excise Tax: In the event that the State of Washington or any other
governmental authority having jurisdiction thereover shall hereafter levy or impose any similar
tax or charge on the leasehold estate described herein, and Lessee fails to pay said tax or charge,
then Permittee may, whether Permittee subleases all or part of Lessee's Airport leasehold interest
as described in LAG 03-002 and addenda thereto, pay said tax or charge, when due. Such tax or
charge shall be in addition to the regular monthly rentals. In the event neither the Lessee nor
Permittee pay said tax or charge, then the Permittor may terminate this permit with ten (10) days
notice.
OPERATING PERMIT 3
City of Renton to Aero-Copters, Inc.
6. PAYMENT OF UTILITIES AND RELATED SERVICES.
6.1. Whether Permittee subleases all or part of Lessee's Airport leasehold interest as
described in LAG 03-002 and addenda, if Lessee fails to pay such utilities and service charges,
then Permittee may pay all light, heat, gas, power, garbage, water, sewer and janitorial service
used in or on the Premises when due. In the event neither the Lessee nor the Permittee pay said
utility or service charges, then the Permittor may terminate this Permit with ten (10) days notice.
6.2. Permittor shall not be liable for any loss or damage caused by or resulting from any
variation, interruption, or failure of said utility services due to any cause whatsoever; and no
temporary interruption or failure of such services incident to the making of repairs, alterations or
improvements, or due to accident, strike, act of God, or conditions or events not under
Permittor's control, shall be deemed a breach of the Permit or as an eviction of Permittee, or
relieve Permittee from any of its obligations hereunder.
7. PERMITTEE'S ACCEPTANCE OF PREMISES.
By occupying the Premises, Permittee formally accepts the same in AS IS condition, and
acknowledges that the Permittor has complied with all the requirements imposed upon it under
the terms of this Permit with respect to the condition of the Premises at the commencement of
this term. Permittee hereby accepts the premises subject to all applicable zoning, municipal,
county and state laws, ordinances and regulations governing and regulating the use of the
premises, and accepts this Permit subject thereto and to all matters disclosed thereby and by any
exhibits attached hereto. Permittee acknowledges that neither Permittor nor Permittor's agent has
made any representation or warranty as to the suitability of the Premises for the conduct of
Permittee's business or use. Except as otherwise provided herein, Permittor warrants Permittee's
right to peaceably and quietly enjoy the premises without any disturbance from Permittor, or
others claiming by or through Permittor.
8. PURPOSE AND USE:
8.1. Use of Premises: The Premises are leased to the Permittee for the following
described purpose:
8.1.1. Operation of an Aircraft Charter and Aircraft Taxi Service in accordance with the
Airport Rules and Regulations and Minimum Standards for the operation of this type of
commercial aeronautic activity at the Renton Municipal Airport.
8.1.2. Operation of an Aircraft Maintenance and Repair facility in accordance with the
Airport Rules and Regulations and Minimum Standards for the operation of this type of
commercial aeronautic activity at the Renton Municipal Airport.
8.2. Continuous Use: Permittee covenants that the premises shall be continuously used
for those purposes during the term of the Permit, shall not be allowed to stand vacant or idle, and
shall not be used for any other purpose without Permittor's written consent first having been
obtained. Consent of Permittor to other types of activities will not be unreasonably withheld.
OPERATING PERMIT 4
City of Renton to Aero-Copters, Inc.
8.3. Non -Aviation Uses Prohibited: Permittee agrees that, except as expressly provided
above, the Premises may not be used for uses or activities that are not related, directly or
indirectly, to aviation.
8.4. Signs: No advertising matter or signs shall be at any time displayed on the leased
premises or structures without the written approval of Permittor, which will not be unreasonably
withheld. One sign, of the type and dimensions specified by the Airport Manager, shall be
permitted to be displayed on the Rainier and Airport Way entrance fences through the
termination date of this permit.
8.5. Conformity with Rules: Permittee further covenants to keep and operate the
Premises and all structures, improvements, and activities in conformity with all rules, regulations
and laws now or hereafter adopted by Permittor, including the Airport Rules and Regulations and
Minimum Standards which are incorporated herein by this reference, the Federal Aviation
Administration, the State Aeronautics Commission, or other duly constituted governmental
authority, all at Permittee's cost and expense.
8.6. Waste, Nuisance, Illegal Activities: Permittee covenants that he will not permit any
waste, damage, or injury to the Premises or improvements thereon, nor allow the maintenance of
any nuisance thereon, nor the use thereof for any illegal purposes or activities.
8.7. Increased Insurance Risk: Permittee will not do or permit to be done in or about the
premises anything which will be dangerous to life or limb, or which will increase any insurance
rates upon the premises or other buildings and improvements.
9. HAZARDOUS WASTE:
9.1. Permittee's Representation and Warranty: In particular, Permittee represents and
warrants to the Permittor that Permittee's use of the Premises will not involve the use of any
hazardous substance (as defined by R.C.W. Chapter 70.105D, as amended), other than fuels,
lubricants and other products which are customary and necessary for use in Permittee's ordinary
course of business.
9.2. Standard of Care: Permittee agrees to use a high degree of care to be certain that no
such hazardous substance is improperly used, released or disposed on the Premises during the
term of this lease by Permittee, its agents or assigns, or is improperly used, released or disposed
on the premises by the act of any third party.
9.3. Indemnity: The parties agree that Permittor shall have no responsibility to the
Permittee, or any other third party, for remedial action under R.C.W. Chapter 70.105D, or other
legislation, in the event of a release of or disposition of any such hazardous substance on, in, or at
the Premises, and not caused by Permittor, during the term of this Permit. Permittee agrees to
indemnify and hold harmless the Permittor from any obligation or expense, including fees
incurred by the Permittor for attorneys, consultants, engineers, damages, including environmental
resource damages, etc., that are suffered or incurred due to the release or disposition of any such
OPERATING PERMIT
City of Renton to Aero-Copters, Inc.
hazardous substance upon the Premises not caused by Permittor, during the term of this Permit,
including remedial action under RCW 70.105D.
9.4. Dispute Resolution: In the event of any dispute between the parties concerning
whether any release of or disposition of any such hazardous substance on, in or at the premises
(a) occurred during the term of this lease, or (b) was caused by Permittor, the parties agree to
submit the dispute for resolution by arbitration upon demand by either party. Each party shall
select one (1) arbitrator. The two (2) selected arbitrators, if unable to agree upon an arbitration
award within a period of thirty (30) days after such appointment, shall select a third arbitrator.
The third arbitrator shall be an engineer with experience in the identification and remediation of
hazardous substances. The arbitrators shall make their decision in writing within sixty (60) days
after their appointment, unless the time is extended by the agreement of the parties. The decision
of a majority of the arbitrators shall be final and binding upon the parties. Each party shall bear
the cost of the arbitrator named by it. The expenses of the third arbitrator shall be borne by the
parties equally.
10. MAINTENANCE:
10.1. Maintenance of Premises: The Premises and all of the improvements or structures
thereon and authorized by the Permittor for use by the Permittee, shall be used and maintained by
Permittee in an operable, neat, orderly, and sanitary manner. Permittor shall not be called upon
to make any improvements, alteration, or repair of any kind upon the Premises. Permittee is
responsible for the clean-up and proper disposal at reasonable and regular intervals of rubbish,
trash, waste and leaves around the Premises, including that blown against fences bordering the
Premises, whether as a result of the Permittee's activities or having been deposited upon the
Premises from other areas.
10.2. Removal of Snow/Floodwater/Mud: Permittee shall be responsible for removal of
snow and/or floodwaters or mud deposited there from the Premises and those areas of the
Sublessor utilized by the Permittee, with the disposition thereof to be accomplished in such a
manner so as to not interfere with or increase the maintenance activities of Permittor upon the
public areas of the Airport.
10.3. Permittor MU Perform Maintenance: If Permittee fails to perform Permittee's
obligations under this Paragraph, Permittor may at its option (but shall not be required to) enter
the Premises, after thirty (30) days' prior written notice to Permittee, and put the same in good
order, condition and repair, and the cost thereof together with interest thereon at the rate of
twelve (12%) percent per annum shall become due and payable as additional rental to Permittor
together with Permittee's next rental installment.
11. ALTERATIONS.
11.1. Protection from Liens: Before commencing any work relating to alterations,
additions and improvements affecting the Premises, Permittee shall notify Permittor in writing of
the expected date of commencement thereof. Permittor shall then have the right at any time and
from time to time to post and maintain on the Premises such notices as Permittor reasonably
OPERATING PERMIT
City of Renton to Aero-Copters, Inc.
deems necessary to protect the Premises and Permittor from mechanics' liens, materialmen's liens
or any other liens. In any event, Permittee shall pay when due, or bond around, all claims for
labor or materials furnished to or for Permittee at or for use in the Premises. Permittee shall not
permit any mechanics' or materialmen's liens to be levied against the Premises for any labor or
material furnished to Permittee or claimed to have been furnished to Permittee or to Permittee's
agents or contractors in connection with work of any character performed or claimed to have
been performed on the Premises by or at the direction of Permittee.
11.2. Bond: At any time Permittee either desires to or is required to make any repairs,
alterations, additions, improvements or utility installation thereon, or otherwise, Permittor may at
its sole option require Permittee, at Permittee's sole cost and expense, to obtain and provide to
Permittor a lien and completion bond in an amount equal to one and one-half (1-1/2) times the
estimated cost of such improvements, to insure Permittor against liability for mechanics and
materialmen's liens and to insure completion of the work.
11.3. Permittor May Make Improvements: Permittee agrees that Permittor, at its option,
may at its own expense make repairs, alterations or improvements which Permittor may deem
necessary or advisable for the preservation, safety or improvement of the Premises or
improvements located thereon, if any.
11.4. Notification of Completion: Upon completion of capital improvements made on
the Premises, it is the Permittee's responsibility to promptly notify Permittor of such completion.
12. ASSIGNMENT:
12.1. Assignment/Subletting: The sublease or any part thereof shall not be assigned by
Penmittee, by operation of law or otherwise, nor shall the premises or any part thereof be sublet
without the prior written consent of Permittor, which consent shall not be unreasonably withheld.
If Permittee is a corporation, the transfer of a majority of Permittee's stock shall constitute an
assignment for purposes of this paragraph.
12.2. No Release of Permittee's Liability: No assignment of this leasehold interest shall
release Permittee from the obligation to pay the rent and to perform all other obligations to be
performed by Permittee under the terms of its sublease. No assignment shall so release Permittee
unless Permittor's consent is obtained pursuant to Paragraph 12.1. In the event that Permittor's
consent to assignment is so obtained, Permittee shall be relieved of all liability arising from this
permit and arising out of any act, occurrence or omission occurring after Permittor's consent is
obtained. The Permittee's assignee must assume and agree to carry out all of the obligations of
Permittee under this permit.
13. DEFAULT:
13.1. Definition: It shall be a default of this Permit if the Permittee fails to comply with
any of the statutes, ordinances, rules, orders, regulations, and requirements of the federal, state,
and/or city governments, any terms of this Permit and/or the underlying lease.
13.2 Action Upon Notice of Default:
OPERATING PERMIT
City of Renton to Aero-Copters, Inc.
13.2.1 In the event of default as provided above, the Permittor may, if it so elects, at any
time thereafter, terminate this permit and the term hereof, on giving to the Permittee thirty (30)
days notice (Notice of Default), in writing, of the Permittor's intention to terminate the Permit.
13.2.2. Alternatively, the Permittor may allow the Permittee to cure the default within
thirty (30) days or, within that time, provide adequate assurance of future ability to cure the
default. Adequate assurance shall include, but not be limited to, a deposit in escrow, a guarantee
by a third party acceptable to Permittor, a surety bond, or a letter of credit. The default must be
cured within ninety (90) days of the notice of default.
13.3. Termination of Permit: Upon the expiration of either of the notice periods
specified in Paragraph 13.2 above, and if the event causing the default is not corrected in a timely
manner, this permit and the term hereof, together with any and all other rights and options of
Permittee herein specified, shall expire and come to an end on the day fixed in such notice.
13.4. No Waiver of Remedies: In the event of default by Permittee, the Permittor may
choose not to pursue a claim against Permittee. Such decision will not operate as a waiver of any
other remedies or claims then available to the Permittor or those that may become available.
14. BINDING AGREEMENT: Subject to the restriction upon assignment or subletting
as set forth herein, all of the terms, conditions, and provisions of this Permit shall be binding
upon the parties, their successors and assigns, and in the case of a Permittee who is a natural
person, his or her personal representative and heirs.
15. RIGHT OF INSPECTION. Permittee will allow Permittor, or Permittor's agent, free
access to the Premises at all reasonable times for the purpose of inspection, or for making repairs,
additions or alterations to the Premises, or any property owned by or under the control of
Permittor.
16. SURRENDER OF PREMISES: Permittee shall quit and surrender the premises at
the end of the term in a condition as good as the reasonable use thereof would permit, normal
wear and tear excepted. Alterations, additions or improvements which may be made by either of
the parties hereto on the Premises, except movable office furniture or trade fixtures put in at the
expense of Permittee, shall be and remain the property of the Permittor and shall remain on and
be surrendered with the Premises as a part thereof at the termination of this lease without
hindrance, molestation, or injury. Permittee shall repair at its sole expense any damage to the
Premises occasioned by its use thereof, or by the removal of Permittee's trade fixtures,
furnishings and equipment which repair shall include the patching and filling of holes and repair
of structural damage.
17. INSURANCE:
17.1. Personal Property: It is agreed that Permittor shall not be held liable in any manner
for, or on account of, any loss or damage to personal property of the Permittee, Permittee's
invitees or other persons, which may be sustained by fire or water or other insured peril, or for
the loss of any articles by burglary, theft or any other cause from or upon the Premises. It is
OPERATING PERMIT
City of Renton to Aero-Copters, Inc.
acknowledged that Permittor does not cover any of the personal property of Permittee,
Permittee's invitees or other persons upon the Premises through its insurance. Permittee, its
invitees and other persons upon the Premises are solely responsible to obtain suitable personal
property insurance.
17.2. Liability Insurance. The Permittee agrees to maintain, in force, during the term of
this Permit a policy of comprehensive public liability and property damage insurance written by a
company authorized to do business in the State of Washington against any liability arising out of
the ownership, use, occupancy or maintenance of the Premises and all areas appurtenant thereto.
The limits of liability shall be in an amount of not less than $1,000,000.00 for injury to or death
of one person in any one accident or occurrence and in an amount of not less than $1,000,000.00
for injury to or death of more than one person in any one accident or occurrence, and of not less
than $1,000,000.00 for property damage. The limits of said insurance shall not, however, limit
the liability of Permittee hereunder. The insurance policy shall have a Landlord's Protective
Liability endorsement attached thereto.
17.3. Insurance Policies: Insurance required hereunder shall be written in companies
acceptable to Permittor and rated A-10 or better in "Best's Insurance Guides". Coverages shall be
submitted on forms prescribed by Permittor. Prior to possession, the Permittee shall deliver to
Permittor copies of policies of such insurance acquired by Permittee, or certificates evidencing
the existence and amounts of such insurance, with loss payable clauses satisfactory to Permittor.
Permittor shall be named as an additional insured. No such policy shall be cancelable or subject
to reduction of coverage or other modification except after forty-five (45) days' prior written
notice to Permittor. Permittee shall, not less than forty-five (45) days prior to the expiration of
such policies, furnish Permittor with renewals or "binders" therefore. Permittee shall not do or
permit to be done anything which shall invalidate the insurance policies referred to above.
Permittee shall forthwith, upon Permittor's demand, reimburse Permittor for any additional
premiums attributable to any act or omission or operation of Permittee causing such increase in
the cost of insurance. If the Permittee shall fail to procure and maintain said insurance the
Permittor may, but shall not be required to, procure and maintain the same, but at the expense of
Permittee.
18. LIMITATION UPON PERMTTTOR'S LIABILITY. Permittor shall not be liable for
any damage to property or persons caused by, or arising out of (a) any defect in or the
maintenance or use of the Premises, or the improvements, fixtures and appurtenances of which
the premises constitute a part; or (b) water coming from the roof, water pipes, flooding of the
Cedar River or other body of water, or from any other source whatsoever, whether within or
without the Premises; or (c) any act or omission of any Permittee or other occupants of the
building, or their agents, servants, employees or invitees thereof.
19. INDEMNITY: Permittee covenants to indemnify and save harmless Permittor
against any and all claims arising from the conduct and management of or from any work or
thing whatsoever done in or about the Premises or the improvements or equipment thereon
during the lease term, or arising from any act or negligence of the Permittee or any of its agents,
contractors, patrons, customers, or employees, or arising from any accident, injury, or damage
whatsoever, however caused, to any person or persons, or to the property of any person, persons,
OPERATING PERMIT 9
City of Renton to Aero-Copters, Inc.
corporation or other entity occurring during the lease term on, in, or about the Premises, and from
and against all costs, attorney's fees, expenses, and liabilities incurred in or from any such claims
or any action or proceeding brought against the Permittor by reason of any such claim, except
such claims arising directly or indirectly out of Permittor's sole act or omission. Permittee, on
notice from Permittor, shall resist or defend such action or proceeding forthwith.
20. HOLDING OVER: Permittee understands that upon expiration of the term of this
permit, Permittee must execute a new permit with the Permittor as a condition to remaining on
the premises. Permittee further understands that if, without execution of any extension or
renewal of this permit, Permittee should remain in possession of the premises after expiration or
termination of the term of this permit, notwithstanding any extension of its sublease with Lessee,
then the Lessee shall be in default of its lease, LAG 03-002 and Permittor may evict the Lessee
and the Permittee. All the conditions, terms and provisions of this permit shall be applicable
during such holding over.
21. NO WAIVER: It is further covenanted and agreed between the parties hereto that no
waiver by Permittor of a breach by Permittee of any covenant, agreement, stipulation, or
condition of this lease shall be construed to be a waiver of any succeeding breach of the same
covenant, agreement, stipulation, or condition, or a breach of any other covenant agreement,
stipulation, or condition.
22. NOTICES: All notices under this lease shall be in writing and delivered in person,
with receipt therefore, or sent by certified mail, to the following addresses:
a) For the City of Renton: b) For the Permittee:
Airport Manager Aero-Copters, Inc.
616 West Perimeter Road 800 West Perimeter Road
Renton, Washington 98055 Renton, WA 98055
23. DISCRIMINATION PROHIBITED:
23.1. Discrimination Prohibited: Permittee covenants and agrees not to discriminate
against any person or class of persons by reason of race, color, creed, sex, national origin, or any
other class of person protected by Federal or State law or the Renton City Code, in the use of any
of its facilities provided for the public in the Airport. Permittee further agrees to furnish services
on a fair, equal and not unjustly discriminatory basis to all users thereof, and to charge on a fair,
reasonable and not unjustly discriminatory basis for each unit of service; provided that Permittee
may make reasonable and non-discriminatory discounts, rebates, or other similar types of price
reductions to volume purchasers.
23.2. Minority Business Enterprise Policy: It is the policy of the Department of
Transportation that minority business enterprises as defined in 49 C.F.R. Part 23 shall have the
maximum opportunity to participate in the performance of leases as defined in 49 C.F.R. 23.5.
Consequently, this lease is subject to 49 C.F.R. Part 23, as applicable. No person shall be
excluded from participation in, denied the benefits of or otherwise discriminated against in
OPERATING PERMIT 10
City of Renton to Aero-Copters, Inc.
connection with the award and performance of any contract, including leases covered by 49
C.F.R. Part 23, on the grounds of race, color, national origin or sex.
23.3. Application to Sub -leases: Subject to the provisions of Paragraph 12 of this
Permit, Permittee agrees that it will include the above clause in all assignments of this lease or
sub -leases, and cause its assignee(s) and sub-lessee(s) to similarly include the above clause in
further assignments or sub -leases.
24. FORCE MAJEURE: In the event that either party hereto shall be delayed or
hindered in or prevented from the performance of any act required hereunder by reason of strikes,
lockouts, labor troubles, inability to procure materials, failure of power, restrictive governmental
laws or regulations, riots, insurrections, war, or other reason of like nature not the fault of the
party delayed in performing work or doing acts required under the terms of this Lease, then
performance of such act shall be extended for a period equivalent to the period of such delay.
The provisions of this paragraph shall not, however, operate to excuse Permittee from the prompt
payment of rent, or any other payment required by the terms of this Permit, to be made by
Permittee.
25. CAPTIONS: Article and paragraph captions are not a part hereof.
26. ENTIRE AGREEMENT: This Permit contains all agreements of the parties with
respect to any matter mentioned herein. No prior agreement or understanding pertaining to any
such matter shall be effective. This Permit may be modified in writing only, signed by the parties
in interest at the time of the modification. In the event of conflict between the terms of this
Permit and the sublease agreement between Permittee and Lessee, the terms of this Permit
supersede.
27. CUMULATIVE REMEDIES: No remedy or election hereunder shall be deemed
exclusive, but shall, wherever possible, be cumulative with all other remedies at law or in equity.
28. CORPORATE AUTHORITY: If Permittee is a corporation, each individual
executing this Lease on behalf of said corporation represents and warrants that he is duly
authorized to execute and deliver this Permit on behalf of said corporation in accordance with a
duly adopted resolution of the Board of Directors of said corporation and in accordance with the
Bylaws of said corporation, and that this Permit is binding upon said corporation in accordance
with its terms.
29. TRANSFER OF PREMISES BY PERMITTOR: In the event of any sale,
conveyance, transfer or assignment by Permittor of its interest in the Premises, Permittor shall be
relieved of all liability arising from this Permit and arising out of any act, occurrence or omission
occurring after the consummation of such sale, conveyance, transfer or assignment.
OPERATING PERMIT 11
City of Renton to Aero-Copters, Inc.
PERMITTEE:
Aero-Copters, Inc.
a Washington corporation
40
By Michael V Leary
its: Owner/Presid�gnt
Date: S"7/OS
PERIVIITTOR:
THE CITY OF RENTON
a Washington municipal
corporation
Kathy Keolker-Wheeler
Mayor
Date:
ATTEST:
By
Bonnie Walton, City Clerk
Date:
Approved as to legal form:
City Attorney
OPERATING PERMIT 12
City of Renton to Aero-Copters, Inc.
LEASE AGREEMENT
AirO, Inc.
OFFICE/ HANGER LEASE
This Lease Agreement (this "Lease") is dated January 1, 2004, by and between Michael
O'Leary ("Landlord for AirO), and Aero-Copters, Inc. ("Tenant"). The parties agree as
follows:
PREMISES. Landlord, in consideration of the lease payments provided in this Lease,
leases to Tenant shared office/hanger space in the building and shared ramp space on the
west side of Renton Municipal Airport. (the "Premises") located at 800 West Perimeter
Road, Renton, King County, Washington 98055.
TERM. The lease term will begin on January 1, 2004, and will terminate on December
31, 2004, and will be automatically renewable in one year increments if mutually agreed
upon, up to a total of 10 years. Lessor or Lessee has the right to renegotiate terms in the
month of December prior to automatic renewal.
LEASE PAYMENTS. Tenant shall pay to Landlord monthly installments of $1500.00,
payable in advance on the first day of each month. This payment is for the aircraft owned
by Aero-Copters. Aero-Copters will pay $1250.00 a month for additional leased aircraft
stored on the premises. Payments shall be made to the Landlord at 800 West Perimeter
Road, Renton, WA 98055, which address may be changed from time to time by the
Landlord.
DESCRIPTION OF SUBLEASED AREAS. Aircraft can be parked anywhere within
the hanger general area. Other common areas include: lobby, flight planning room,
conference room, restrooms, and the use of the ramp area.
POSSESSION. Tenant shall be entitled to possession on the first day of the term of this
Lease, and shall yield possession to Landlord on the last day of the term of this Lease,
unless otherwise agreed by both parties in writing. At the expiration of the term, Tenant
shall remove its goods and effects and peaceable yield up the Premises to Landlord in as
good a condition as when delivered to Tenant, ordinary wear and tear excepted.
PURPOSE AND USE. Use of Premises: The Premises are leased to the Permittee for
the following described purposes:
■ The operation of an Aircraft charter and Aircraft Taxi Service in accordance
with the Minimum Standards for the operation of this type of commercial
aeronautic activity at the Renton Municipal Airport
■ The operation of Aircraft Maintenance and Repair, in accordance with the
minimum Standards for the operation of this type of commercial aeronautic
activity at the Renton Municipal Airport.
■ Continuous Use: Permittee covenants that the premises shall be continuously
used for those purposes during the term of the Permit, shall not be allowed to
stand vacant or idle, and condition of this lease shall be construed to be, a
waiver of any succeeding breach of the same covenant, agreement, stipulation,
or condition, or a breach of any other covenant agreement, stipulation, or
condition.
PARKING. Tenant shall be entitled to parking privileges associated with the building.
LIABILITY INSURANCE. Tenant shall maintain liability insurance on the Premises
with personal injury limits of at least $1,000,000.00 for injury to one person, and
$1,000,000.00 for. any one accident, and a limit of at least $1,000,000.00 for damage to
property per terms of the Airport Operating Permit and Agreement with the City of
Renton. Tenant shall deliver appropriate evidence to Landlord as proof that adequate
insurance is in force issued by companies reasonably satisfactory to Landlord. Landlord
shall receive advance written notice from the insurer prior to any termination of such
insurance policies. Tenant shall also maintain any other insurance which Landlord may
reasonably require for the protection of Landlord's interest in the Premises. Tenant is
responsible for maintaining casualty insurance for its own property.
MAINTENANCE. Tenant shall have the responsibility to maintain the Premises in
good repair at all times during the term of this Lease.
UTILITIES AND SERVICES. Landlord will pay water, sewer, power, gas, and
garbage. Any other services that the tenant requires will be there sole responsibility.
TERMINATION. Notwithstanding any other provision of this Lease, Landlord may
terminate this lease upon 90 days' written notice to Tenant.
DEFAULTS. Tenant shall be in default of this Lease if Tenant fails to fulfill any lease
obligation or term by which Tenant is bound. Subject to any governing provisions of law
to the contrary, if Tenant fails to cure any financial obligation within 30 days (or any
other obligation within 30 days) after written notice of such default is provided by
Landlord to Tenant, Landlord may take possession of the Premises without further notice
(to the extend permitted by law), and without prejudicing Landlord's rights to damages.
In the alternative, Landlord may elect to cure any default and the cost of such action
shall be added to Tenant's financial obligations under this Lease shall be additional rent,
whether or not such sums or charges are designated as "additional rent". The rights
provided by this paragraph are cumulative in nature and are in addition to any other rights
afforded by law.
HOLDOVER If Tenant maintains possession of the Premises for any period after the
termination of this Lease ("Holdover Period"), Tenant shall pay to Landlord lease
payment(s) during the Holdover Period at a rate equal to the most recent rate preceding
the Holdover Period. Such holdover shall constitute a month -to -month extension of this
Lease only if terms of payment due.
CUMULATIVE RIGHTS. The rights of the parties under this Lease are cumulative,
and shall not be construed as exclusive unless otherwise required by law.
REMODELING OR STRUCTURAL IMPROVEMENTS. Tenant shall have the
obligation to conduct any construction or remodeling (at Tenant's expense) that may be
required to use the Premises as specified above. Tenant may also construct such fixtures
on the Premises (at Tenant's expense) that appropriately facilitate its use for such
purposes. Such construction shall be undertaken and such fixtures maybe erected on with
prior written consent to of the Landlord, which shall not be unreasonably withheld.
Tenant shall not install awnings or advertisements on any part of the Premises without
Landlord's prior written consent. At the end of the lease term, Tenant shall be entitled to
remove (or at the request of Landlord shall remove) such fixtures, and shall restore the
Premises to substantially the same condition of the Premises at the commencement of this
Lease.
ACCESS BY LANDLORD TO PREMISES. Subject to Tenant's consent (which shall
not be unreasonably withheld), Landlord shall have the right to enter the Premises to
make inspections, provide necessary services, or show the unit to prospective tenants or
workers. However, Landlord does not assume any liability for the care or supervision of
the Premises. As provided by law, in the case of an emergency, Landlord may enter the
Premises without Tenant's consent. During the last three months of this Lease, or any
extension of this Lease, Landlord shall be allowed to display the usual "To Let" signs and
show the Premises to prospective tenants.
INDEMNITY REGARDING USE OF PREMISES. To the extent permitted by law,
Tenant agrees to indemnify, hold harmless, and defend Landlord from and against any
and all losses, claims, liabilities, and expenses, including reasonable attorney fees, if any,
misuse of the Premises, except Landlord's act or negligence.
DANGEROUS MATERIALS. Tenant shall not keep or have on the Premises any
article or thing of a dangerous, flammable, or explosive character that might substantially
increase the danger of fire on the Premises, or that might be considered hazardous by a
responsible insurance company, unless the prior written consent of Landlord is obtained
and proof of adequate insurance protection is provided by Tenant to Landlord.
COMPLIANCE WITH REGULATIONS. Tenant shall promptly comply with all
laws, ordinances, requirements and regulations of the federal, state, county, municipal
and other authorities, and the fire insurance underwriters. However, Tenant shall not by
this provision be required to make alterations to the exterior of the building or alterations
of the structural nature.
ARBITRATION. Any controversy or claim relating to this contract, including the
construction or application of this contract, will be settled by binding arbitration under
the rules of the American Arbitration Association, and any judgment granted by the
arbitrator(s) may be enforced in any court of proper jurisdiction.
ASSIGNABILITY/SUBLETTING. Tenant may not assign or sublease any interest in the Premises, nor effect a change in the majority ownership of the Tenant (from the
ownership existing at the inception of this lease), nor assign, mortgage or pledge this
Lease, without the prior written consent of Landlord, which shall not be unreasonably
withheld.
DISCRIMINATION. Discrimination Prohibited — Lessee covenants and agrees not to
discriminate against any person or class of persons by reason of race, color, creed, sex or
national origin in the use of any of its facilities provided for the public on the Airport.
Lessee further agrees to furnish services on a fair, equal and not unjustly discriminatory
basis to all users thereof, and to charge of a fair, reasonable and not unjustly
discriminatory basis to all users thereof, and to charge on a fair, reasonable and not
unjustly discriminatory basis for each unit of service: provided that Lessee -may make
reasonable and not -discriminatory discounts, rebates, or other similar types of price
reductions to volume purchasers.
NOTICE. Notices under this Lease shall not be deemed valid unless given or served in
writing and forwarded by mail, postage prepaid, addressed as follows:
LANDLORD:
AirO, c/o Michael O'Leary
800 West Perimeter Road
Renton, WA 98055
TENANT:
Aero-Copters, Inc.
800 West Perimeter Road
Renton, WA 98055
Such addresses may be changed from time to time by either party by providing notice as
set fourth above. Notices mailed in accordance with the above provisions shall be
deemed received on the third day after posting.
GOVERNING LAW. This Lease shall be construed in accordance with the laws of the
State of Washington
ENTIRE AGREEMENT/AMENDMENT. This Lease Agreement contains the entire
agreement of the parties and there are no other promises, conditions, understandings or
other agreements, whether oral or written, relating to the subject matter of this Lease.
This Lease may be modified or amended in writing, if the writing is signed by the party
obligated under the amendment.
SEVERABILITY. If any portion of this Lease shall be held to be invalid or
unenforceable for any reason, the remaining provisions shall continue to be valid and
enforceable. If a court finds that any provisions shall continue to be valid and
enforceable. If a court find that nay provision of this Lease is invalid or unenforceable,
but that by limiting such provisions, it would become valid and enforceable, then such
provision shall be deemed to be written, construed, and enforced as so limited.
WAIVER The failure of either party to enforce any provisions of this Lease shall not be
construed as a waiver or limitation of that party's right to subsequently enforce and
compel strict compliance with every provision of this Lease.
BINDING EFFECT. The provisions of this lease shall be binding upon and inure to the
benefit of both parties and their respective legal representatives, successors and assigns.
LANDLORD:
AirO, Inc.
Michael J. O'Leary/
Owner/President
TENANT:
Aero-Copters, Inc.
By:
v w111�11 r t caiuvut,
: January 1, 2004
January 1, 2004
CITY OF RENTON COUNCIL AGENDA BILL
Al #:
Submitting Data: Planning/Building/Public Works For Agenda of: June 20, 2005
Dept/Div/Board.. Utility Systems, Surface Water
Staff Contact...... Ron Straka, (ext. 7248) Agenda Status
- Consent .............. X
Subject:
Public Hearing..
WSDOT I-405 Project Concurrence Letter - Johns
Correspondence..
Creek Outfall
Ordinance .............
Resolution............
Old Business........
New Business.......
Exhibits:
Issue paper
Study Sessions......
Concurrence Letter — Johns Creek Outfall
Information.........
Recommended Action: Approvals:
Refer to Utilities Committee Legal Dept......
Finance Dept...
Other ...............
Fiscal Impact: None
Expenditure Required... None Transfer/Amendment.......
Amount Budgeted....... Revenue Generated.........
Total Project Budget City Share Total Project..
SUMMARY OF ACTION:
The Washington State Department of Transportation (WSDOT) is proposing a new storm system
outfall to Johns Creek, located in Gene Coulon Memorial Park. The storm system would convey
storm water runoff from the portion of I-405 that currently drains to Johns Creek along with
runoff from the area upstream of I-405 within the same drainage basin. The new outfall would
allow WSDOT to directly discharge runoff to Johns Creek and Lake Washington without having
to provide flow control (detention) for the runoff from I-405. WSDOT would provide water
quality treatment for all of the runoff from I-405. The proposed new storm water outfall and
Concurrence Letter was developed in coordination between WSDOT, the Surface Water Utility
and the Parks Division. The Concurrence Letter is based upon a 15% design and identifies the
conditions and requirements associated with future final design and construction of the proposed
outfall. The Concurrence Letter will allow WSDOT the certainty to proceed with the proposed
outfall in their project environmental review, future design phases and ultimately construction as
part of the future I-405 Renton to Bellevue widening project.
STAFF RECOMMENDATION:
Authorize the Mayor to sign the Concurrence Letter with the Washington State Department of
Transportation for the proposed Johns Creek Outfall storm water system.
H:\File Sys\SWP - Surface Water Projects\SWP 27-Transporation Projects (TIP)\I-405 Corridor Study\SWP 27-3124 North
Renton Project\1003 City Correspondence\Johns Creek Outfall LOC AGENDA BILL.doc\RStp
PLANNING/BUILDING/
+ RPUBLIC WORKS DEPARTMENT
1
M E M O R A N D U M
DATE: June 10, 2005
TO: Terri Briere, Council President
Members of the Renton City Council
VIA: U Mayor Kathy Keolker,-.Wheeler
FROM: Gregg AlZimmermaministrator
STAFF CONTACT: Ron Straka, Surface Water Utility Supervisor (ext. 7248)
SUBJECT: WSDOT I-405 Project Concurrence Letter — Johns Creek
Outfall
ISSUE:
The Washington State Department of Transportation (WSDOT) requests the City's approval of a
Concurrence Letter for the Johns Creek Outfall to discharge I-405 storm water runoff and runoff
from upstream tributary area to Johns Creek, in the Gene Coulon Memorial Park, as part of the
future widening of I-405.
RECOMMENDATION:
Authorize the Mayor to sign the Concurrence Letter with the Washington State
Department of Transportation for the proposed Johns Creek Outfall storm water system.
BACKGROUND SUMMARY:
The WSDOT has worked with the City Parks Department and Surface Water Utility to develop a
15% design for a storm system to convey storm water runoff from areas that are tributary to
Johns Creek that include the I-405 right-of-way and area upstream of I-405. The proposed storm
system would discharge into Johns Creek, located in the Gene Coulon Memorial Park (see
Exhibit attached). The size of the proposed storm system is 72-inches at the outlet in the Park.
The proposed Concurrence Letter defines the conditions and requirements for proceeding with
the proposed design of the Johns Creek Outfall. The Concurrence Letter will allow WSDOT to
include the proposal in the I-405 project environmental review (NEPA) documents.
The new outfall would allow WSDOT to directly discharge runoff to Johns Creek and Lake
Washington without having to provide flow control (detention) for the runoff from I-405, which
would reduce the cost of the I-405 widening project. WSDOT would provide water quality
treatment for all of the runoff from I-405, which is currently not being treated. WSDOT
Johns Creek/WSDOT Letter
June 10, 2005
Page 2 of 2
performed a hydrologic and hydraulic analysis of the total basin area based upon future land use
conditions and assuming that I-405 was widened. The analysis showed that the change in runoff
from the total tributary area would be minor and could be accommodated in the Johns Creek
channel. As the design process proceeds, further analysis will be done to verify that flows can be
accommodated in the Johns Creek channel without causing damage to the Park.
The proposed new Johns Creek Outfall would intercept runoff from areas upstream of I-405,
within the North Renton sub -basin, which all currently drains to Johns Creek. The runoff from
this area currently drains from upstream of I-405 to a storm system in N 81h Street that connects
to storm systems in Garden Avenue N, which convey the runoff to Johns Creek just downstream
of the intersection of Lake Washington Boulevard and Sunset Blvd. The proposed new outfall
would free up capacity in the storm systems in N 81h Street and Garden Avenue N. This would
improve drainage in the area of the Boeing re -development (Lakeshore Landing) and could
reduce the need for system improvement in the future.
CONCLUSION:
The Council is requested to authorize the Mayor to sign the Concurrence Letter with WSDOT
for the Johns Creek Outfall.
Attachment
cc: Lys Hornsby, Utility Systems Director
1I:\File Sys\SWP - Surface Water Projects\SWP 27-Transporation Projects (TIP)\I-405 Corridor Study\SWP 27-
3124 North Renton Project\1003 City Correspondence\Johns Creek LOC Issue Paper.doc\RStp
Congestion Relief & Bus Rapid Transit Projects
600 —108th Avenue NE, Suite 405
Bellevue, WA 98004
Main 425-456-8500
Fax 425-456-8600
May 10, 2005
Gregg Zimmerman, Public Works Director
City of Renton
1055 South Grady Way
Renton, WA 98055
Re: Concurrence Letter - Johns Creek Outfall
Dear Mr. Zimmerman:
This letter documents that the City of Renton and the Washington State Department of
Transportation (WSDOT) concur with the 15% design for the Johns Creek Outfall.
Johns Creek Background
The City of Renton and WSDOT have jointly investigated a non-traditional proposal to
provide water quality treatment and stormwater controls for runoff from the I-405
Corridor Project from MP 4.59 to MP 6.09. Water quality treatment will be provided for
all runoff from the I-405 right-of-way, which will include 7.3 acres of new impervious
area from the I-405 improvements in the Johns Creek watershed. The Johns Creek
watershed is 1082 acres. Upstream of I-405, the watershed includes 868 acres of
primarily residential land use. I-405, including the new impervious area, occupies 72.6
acres. The watershed downstream of I-405 is primarily commercial land use and includes
215 acres of land (including the I-405 area). The increased impervious area from
expansion of I-405 would increase impervious area within the basin by less than 1%. All
water within the basin currently drains to Johns Creek, and this water is currently
discharged near the entrance to Gene Coulon Memorial Beach Park.
Under existing conditions, runoff from this part of I-405 is combined with runoff from
the upper Johns Creek watershed (City of Renton, residential area), and then discharged
to the City of Renton drainage system located in the lower basin. The City storm system
routes the runoff westerly along N 8`h to where it joins the North 8`h Street/Garden
Avenue North storm system. The Garden Avenue North storm system then conveys the
water north to where it discharges to a series of intermittent stream and culvert
conveyances on Johns Creek beginning approximately 200 yards upstream of the
entrance road to Gene Coulon Memorial Beach Park.
Greg Zimmerman
April 25, 2005 Page 2
A traditional stormwater response for this watershed would construct a series of
stormwater vaults within the existing WSDOT Right of Way (ROW) to provide both
water quality treatment and flow control, as required by the WSDOT Highway Runoff
Manual. The City of Renton and WSDOT held a series of discussions in 2004 and early
2005 to develop a more efficient and cost-effective solution to managing stormwater
within the Johns Creek basin.
15 % Design Development
The City of Renton and the I-405 team held a series of discussions to develop the
proposed Johns Creek Outfall as the stormwater component of the North 8ih Street HOV
Direct Access Project. This design concept was investigated sufficient to allow
preparation of a 15% design package.
The design addresses a series of potential concerns and opportunities that were identified
through the discussions. Protection of Gene Coulon Memorial Beach Park facilities and
plant materials was identified as a major concern, which triggered additional study,
consideration of several discharge locations, and careful routing of the discharge pipe to
minimize disturbance to Park facilities. Minimizing disruption to Park operations and the
Parks users was also a major concern and resulted in limitations on construction timing
and activities. Sizing the new stormwater facilities to handle anticipated future flows
from both I-405 and from residential areas in the upper watershed was also addressed
during preliminary design. Finally, minimizing impacts to the backwater channel of
Johns Creek was also a major concern which triggered studies of the projected changes to
water surface elevation and stream flow velocities.
Preliminary design discussions identified the opportunity to forgo stormwater detention
(flow control) for this project. The purpose of stormwater detention is to provide
protection to downstream areas from erosion and flooding problems associated with
increased flows as a result of a project. Studies as part of preliminary design established
that detention would not provide any meaningful additional protection to downstream
areas, and detention would not serve a useful purpose for this project. The bulk of the
downstream conveyance for this project will be drainage pipes specifically sized and
constructed to convey both current and anticipate future flows. This piped system has
been sized specifically for the projected future flows and will not be affected by either
erosion or flooding issues. A short section of Johns Creek within Gene Coulon Memorial
Beach Park that would receive the additional discharge was investigated during
preliminary design. Studies established that this is a backwater channel of Lake
Washington, and the channel is sufficiently large that neither water elevation nor flow
rate will be noticeably changed by the project's peak discharges.
To address concerns identified during the preliminary design process, a series of
conditions were developed which state the specific concerns and how they will be
addressed during final design and construction. A full listing of the conditions, which
will guide final design and construction, is attached (Johns Creek Outfall Attachment 1)
*Elk Page 2
Washington State
V, Department of Transportation
—Greg Zimmerman
April 25, 2005 Page 3
Final DesijZn Development
The City of Renton and WSDOT anticipate continuation of the cooperative design
process during the development of Final Design for this project. Development of the
final design will be guided by the conditions established during the preliminary design
process and described in the attached Johns Creek Outfall Attachment 1. Funding for the
final design and construction of the North Renton Congestion Relief and Bus Rapid
Transit Project is dependent on future funding actions, such as legislative action by the
State of Washington or a Regional Transportation Investment District (RTID) public
vote.
Concurrence
I am anticipating a project that will set a high standard of cooperation between the City of
Renton and WSDOT. I ask, by signing below, that the City and WSDOT concur with the
15% design for the Johns Creek Outfall. This 15% design will be examined by the
project's NEPA and ESA documents, which are currently in preparation. The City and
WSDOT commit to work together, guided by the conditions in the attached Johns Creek
Outfall Attachment 1, to develop the final design, obtain necessary approvals, and
prepare associated permits once funding becomes available.
Craig J. Stone, PE
Urban Projects Director
City of Renton Concurrence:
Kathy Keolker-Wheeler
Mayor, City of Renton
Attest:
Date Bonnie I. Walton, City Clerk
cc: Administrators Executive Committee members
City Design Team members
I-405 Project Team file
A1111111► Page 3
Washington State
W, Department of Transportation
Johns Creek Outfall
Attachment 1
This document outlines an understanding between the City of Renton and the Washington
State Department of Transportation (WSDOT) to establish a stormwater discharge to
Johns Creek at Gene Coulon Memorial Beach Park in the City of Renton. Included in
this outline is a listing of the responsibilities of each party as part of the anticipated
agreement, and the 15% design for the Johns Creek Outfall and related conveyance
systems (Appendix E: Johns Creek Backwater Analysis and Appendix F: Outfall Pipeline
Hydraulic Analysis, Supplements to Preliminary Hydraulic Report, North 81h HOV
Direct Access).
Both parties are aware that the Johns Creek Outfall is a part of the larger Renton to
Bellevue Project and that funding for the Renton to Bellevue Project has not been
allocated at the time this document was prepared. Both parties presume that funding will
occur in the foreseeable future and they wish to complete this letter of concurrence now
to provide the certainty that the Johns Creek Outfall and the associated flow exemption
will be included as designed in the Renton to Bellevue Project once funding is secured
and construction commences.
Both parties agree:
- the Park needs to be protected during construction
♦ That Gene Coulon Memorial Beach Park is an important recreational resource to the
City of Renton, and that substantial efforts should be made during construction of the
Johns Creek Outfall to minimize disruption of Park uses; and
- the Johns Creek Backwater Study is accurate
♦ That the Johns Creek Backwater Study based upon the 15% design work accurately
describes the existing condition of the local drainage system in the vicinity of Gene
Coulon Memorial Beach Park at the time of this agreement, and accurately anticipates
the effects of Johns Creek Outfall on the local drainage systems in the Johns Creek
watershed. An updated hydrologic and hydraulic analysis of the proposed Johns
Creek Outfall storm system improvements and the Johns Creek channel down to Lake
Washington will be conducted as part of the project final design; and
flows under discussion currently go to -Johns Creek
♦ That stormwater runoff flows from the affected section of I-405 and tributary areas of
the City are currently routed to Johns Creek via local drainage systems, and these
flows are contributing to infrastructure limitations in the local conveyance systems;
and
- the change in impervious area in the Johns Creek Watershed; from I-405 improvements
is small
♦ That construction of the Renton to Bellevue Project would increase impervious area
within the Johns Creek watershed by approximately 7.3 acres. This amounts to less
than 1% increase in impervious area across the Johns Creek watershed, which would
result in a very small increase to existing flows; and
Attachment I page 1
Johns Creek Outfall
- providing water quality treatment to I-405 runoff will improve Johns Creek
♦ That providing enhanced water quality treatment to 100% of the stormwater flows
from the I-405 corridors existing and proposed pollution generating pavement
surfaces within the Johns Creek watershed would result in an improvement to water
quality of existing storm water discharges to Johns Creek; and
that detention is not necessary in this instance as it provides no additional protection to
downstream resources
♦ That providing detention to I-405 runoff routed to the Johns Creek Outfall prior to
discharge would provide limited environmental or resource protection benefit. The
outfall location, as shown to the north of the Park entrance, is within the backwater
area of Lake Washington, there is sufficient channel capacity in the affected reach of
Johns Creek to safely accommodate unrestricted stormwater runoff flows from the I-
405 corridor, and that post -project flow velocities would be low enough that there are
no erosion or bank stability concerns; and
- the new system will also convey the 100 yr local flows from upstream basins
♦ That the I-405 conveyance shall convey the 100-year design storm of 3 upstream sub -
basins of Johns Creek that currently cross 1-405 to the new discharge so that these
flows are removed from the local conveyance systems they currently occupy; and
- the new conveyance system and outfall will reduce flooding near Southport bridge
♦ That establishing the Johns Creek Outfall will reduce flooding in the vicinity of the
Southport stream crossing immediately upstream of Gene Coulon Memorial Beach
Park; and
- the new conveyance system will free capacity in existing conveyance systems
♦ That establishing the Johns Creek Outfall will free capacity in existing local drainage
and conveyance systems.
City of Renton agrees:
- to provide easements upon approval of final design
♦ To approve drainage and temporary construction easements submitted by WSDOT on
properties owned by the City to allow construction and operation of the stormwater
outfall and related conveyance system as described in the 15% design document
(Appendix E: Johns Creek Backwater Analysis and Appendix F: Outfall Pipeline
Hydraulic Analysis, Supplements to Preliminary Hydraulic Report, North 9h HOV
Direct Access).; and
- to participate in finalizing design
♦ To participate in discussions with WSDOT and the Design/Build team as part of
progressing the 15% design to the final design such that a final design review by the
City will take place in timely manner to approve required City permits for
construction; and
- to support direct discharge waiver if'one is needed
♦ To support a WSDOT request for a direct discharge waiver to Department of Ecology,
should such a waiver be deemed necessary as part of the permitting process for the
Renton to Bellevue Project. City support will be based on hydraulic and hydrologic
analyses reviewed by the City and is subject to any environmental reviews that may
be performed in the future; and
Attachment I page 2
Johns Creek Outfall
- to work towards consensus to address new issues
♦ To work with WSDOT and the Design/Build team to reach consensus on how to
address new issues as they develop as part of the implementation process for the
Johns Creek Outfall; and
- to own, operate, and maintain the conveyance system outside of WSDOT ROW
♦ To accept ownership upon completion of construction, and to operate and maintain
those portions of the conveyance system which lie outside of the WSDOT ROW as
shown in the 15% design review plans. The City's agreement to maintain these
systems is contingent upon the City's approvals in regards to ease of maintenance
access. A final agreement addressing maintenance issues will be developed as part of
final design and will address which portions of the final will system will be
maintained by the City and which portions will be maintained by WSDOT, and how
maintenance costs will be distributed between the two parties.
WSDOT agrees:
- to construct as planned
♦ To construct the Johns Creek stormwater outfall as described in the 15% design
document (Appendix E: Johns Creek Backwater Analysis and Appendix F: Outfall
Pipelineydraulic Analysis, Supplements to Preliminary Hydraulic Report, North
8` HOV Direct Access).and
- to participate in finalizing design
♦ To participate in discussions with City of Renton and the Design/Build team as part
of progressing the 15% design to the final design; and
- to make no project changes without concurrence from Renton
♦ To make no changes to the 15% design document (Appendix E: Johns Creek
Backwater Analysis and Appendix F: Outfall Pipeline Hydraulic Anal
Supplements to Preliminary Hydraulic Report, North 81h HOV Direct Access) or the
area draining to this outfall without prior concurrence from the City of Renton; and
- to provide enhanced water quality treatment for I-405 flows
♦ To provide enhanced water quality treatment methods (per the approved water quality
treatment methods defined in the WSDOT Highway Runoff Manual that are
applicable at the time of final design) for 100% of the existing and proposed
pollution generating pavement surfaces within the I-405 corridor which is routed to
the Johns Creek discharge; and
to provide conveyance capacity to handle 100yr flows from 1-405
♦ To provide conveyance capacity sufficient to handle stormwater flows generated by
the implementation phase of the Renton to Bellevue Project; and
- to provide conveyance capacity to handle 100yr flows from offsite basins for future
land -use conditions
♦ To provide conveyance capacity sufficient to handle current and future off -site flows
from upstream tributary areas identified on Sheet 1, Exhibit A, and upstream land
use for ultimate development as determined from the City of Renton Zoning Map,
adopted 12/22/03 (Appendix E: Johns Creek Backwater Analysis), and as described
in Appendix E: Johns Creek Backwater Analysis. It is agreed that WSDOT will
capture off -site flows upstream of I-405 and route them directly to the Johns Creek
Attachment 1 page 3
Johns Creek Outfall
Outfall without detention or treatment, thereby diverting flows away from existing
City of Renton local conveyance systems west of I-405. It is agreed based upon the
15% design that 200 cfs constitutes sufficient capacity to meet this requirement,
which may be revised as part of the final design; and
- to own, operate, and maintain the conveyance system within the WSDOT ROW
♦ To own, operate, and maintain the portions of the Johns Creek conveyance system
that lie within the WSDOT ROW. A final agreement addressing maintenance issues
will be developed as part of final design and will address which portions of the final
will system will be maintained by the City and which portions will be maintained by
WSDOT, and how maintenance costs will be distributed between the two parties.
♦ To secure all necessary Section 4(f), Section 6 and/or other approvals related to use of
the City park as part of the WSDOT project.
Protection of Park Uses, Timing Issues
- to minimize impacts to Park operations
♦ To work diligently with City of Renton Parks Department and the Design/Build team
during construction to minimize physical impacts and disruption to recreation
activities and maintenance operations at Gene Coulon Memorial Beach Park and at
the Park Maintenance Facility; and
- to construct upland portions between Oct 15"' and March I"
♦ To minimize disrupting access to the Park by Park users, construction of the portions
of the Johns Creek Outfall in the vicinity of the Park will occur during periods of low
Park use (between October 15`h and March I't) except where limited by State and
Federal permits; and
- to start construction of in -water structure after July 4th weekend
♦ To minimize disrupting access to the Park by park users. When construction activity
which must occur during high -park use periods due to State or Federal permit
conditions, such activities will occur after July 41h weekend and not during Renton
River Days; and
to keep'access open to Maintenance Facility between 5am and llpm
♦ To minimize disrupting access to the Park Maintenance Facility, construction
activities impacting access to the Maintenance Facility will occur during periods of
low Park use (between October 15`h and March I") and will occur so that access to
the Maintenance Facility is available during maintenance staff work hours (between
5AM and 11 PM) and
- to maintain security at the maintenance facility during construction
♦ To provide and maintain security of maintenance facility during night work
conditions when existing security measures are adversely affected by construction
activities.
Protection of Plant Materials
- to avoid impacting median planters and plant materials
Attachment 1 page 4
Johns Creek Outfall
♦ To avoid impacts to the Park's natural resources and plant materials, measures will be
implemented to protect valuable plant materials within existing median planters on
Park roadways. Measures will include prohibition of machinery operation in planter
areas, prohibition of stockpiling in planter areas, protective fencing around planter
areas during construction, and other measures agreed to by both parties during
development of final design; and
- to avoid removing trees
♦ To avoid impacts to the Park's natural resources and plants, no mature trees will be
removed within the Park and substantial measures will be implemented to protect
mature trees adjacent to the outfall route. Measures will include establishment and
fencing of an exclusion zone around existing trees, prohibition of any construction
related activity within the exclusion zone, and other measures agreed to by both
parties during development of final design; and
- to confine construction disturbance to aphalt=areas; where practicable
♦ To avoid impact to the Parks natural resources and plant materials, all construction
activity will be confined to areas of existing asphalt paving where practicable.
Construction of the outfall itself will necessitate work on the stream bank within the
Park Maintenance Facility, and will not be confined to asphalt paving areas; and
to "restore disturbed areas
♦ To restore all disturbed areas including asphalt, mulching, landscaping, fencing, etc.
to pre -project conditions at completion of construction; and
- to',verify design accommodates antid,pated'improvements ih4he Basin
♦ To minimize reconstruction of the outfall, the final design shall verify that the outfall
system accommodates future City and private improvements that are known by the
City at the time of the final design.
- To address other impacts as identified
♦ To minimize park impacts as required.
Construction outside of WSDOT I-405 ROW
♦ To minimize impacts to traffic, adjacent business and property owners when
constructing the Johns Creek storm water conveyance system outside of WSDOT
ROW, WSDOT will provide coordination with property owners and business and
provide for approval by the City a traffic control plan; and
♦ Be responsible for any and all Utility relocates that may be required, the acquisition
of any easements or property rights required for the construction of the Johns Creek
stormwater conveyance system that are not covered by existing WSDOT permits or
agreements (any Betterment for Utility to be by the Utility owner), and provide full
and complete restoration of the construction area to existing (pre -project) conditions.
Permits from' other agencies are required
♦ The final design and construction of the proposed Johns Creek Outfall is dependent
upon the results of the environmental review (SEPA/NEPA) and WSDOT obtaining
the required approvals and permits from all appropriate local, state and federal
agencies, including grant agencies
Attachment 1 page 5
Johns Creek Outfall
eorresfon dence
6 -ao-os
From: "John, Diane & Scott McClaine" <mcclaine3@comcast. net>
To: <council@ci.renton.wa.us>
Date: Wed, Jun 15, 2005 12:32 PM
Subject: [Fwd: Suggestion]
I hope to hear from you.
Respectfully,
Diane McClaine
-------- Original Message --------
Subject: Suggestion
Date: Wed, 15 Jun 2005 12:27:17 -0700
rom: John, Diane & Scott McClaine <mcclaine3@comcast. net>
To: jrerecich@ci.renton.wa.us
My son registered for the Red Cross sailing class at Gene Coulon Park in
Spring and is eager to continue and convince his friends to sign up for
the summer class. I am very impressed with the organization and
instruction of the class and the park is a beautiful creation that has
been excellently maintained for the many patrons who obviously enjoy it.
am dismayed at the struggle to find a parking spot to enable my son
to take this class. I spoke with a gentleman at the Community Center who
was very sympathetic, but saw no options for a solution.
If I pay for a class I should expect the class to take place and be
provided with a reasonable opportunity to attend. At present, at Gene
Coulon Park (on sunny days ... and perhaps during summer months) I have no
way of knowing whether I can get my son there and stay around to
supervise him and take him home afterwards because of the limited
parking. If I go to the park as a citizen, I expect to take my chances
of finding a place to park. If I go as a paying customer, I would expect
some reasonable accommodation to assist me with getting access to what
contracted for.
Have you considered reserving 5-10 spaces near the canoe launch area
marked with "Class instruction vouchers required" parking? Thus, when
pay for this class you have also fulfilled your obligation to provide me
with access to the class site by handing me a voucher tag to be
displayed in my vehicle (for the designated class dates only)!
Another option could be having a voucher to park in the regular boat
launch area; again, I can receive my parking voucher tag to display in
my car when I register and pay for class. I cannot afford paying the
$5-$10 fee to park in that area the 8-10 times necessary for class
instruction when I have already paid for the class. But, I would be
willing to pay an additional $5 -$10 dollars added to the class fee for
such a voucher giving me the opportunity to actually be able to park and
attend the class I paid for.
I think it is unreasonable to offer a paid service class and in essence
imply, "We'll take your money, but good luck trying to get the service
you paid for." 1 doubt I am the only paying customer having this problem
and it seems this can be fixed, even if I have to pay a bit more for the
privilege. I value the program you have created with the sailing club
and I hope you value the customers who are willing to pay and promote
your recreation classes.
I have worked in the recreation field and I know that programs can be
redesigned to better serve the public when there is an obvious problem.
I am complaining with solutions included that can make your program more
user friendly for others like me who are deciding whether to continue
purchasing services from the City of Renton.
I appreciate your evaluating this difficulty and finding a solution
since the present conditions are unresponsive to the needs of your
customers. I appreciate your consideration and response.
Sincerely,
Diane McClaine
425-432-5285
a s'/o;z
S.E.
A/7""
to/
tAa�e
va<<eyl
WA
4s038
PUBLIC SAFETY
COMMITTEE REPORT
June 20, 2005
"Race Attendance" Ordinance
(Referred June 6, 2005)
APPROVE-0 DY
CITY COUNCIL
Date 6 -�o• aaoS
The Public Safety recommends concurrence in the staff recommendation to approve an
amendment to the Renton Municipal Code to prohibiting attendance at night-time street
racing events and criminalizing violations.
The Committee further recommends that the ordinance regarding this matter be prepared
and presented for adoption.
44t4-_,.� L'� /4"1--
Denis W. Law, Chair
R�ndy Corman, ice -chair
Tom Nelson, M e m b er
C: Garry Anderson, Chief of Police
Zanetta Fontes, Assistant City Attorney
CITY OF RENTON, WASHINGTON
ORDINANCE NO.
AN ORDINANCE OF THE CITY OF RENTON, WASHINGTON
ANNEXING CERTAIN TERRITORY OF THE CITY OF RENTON
(WEDGEWOOD LANE ANNEXATION; FILE NO. A-04-005)
WHEREAS, under the provisions of RCW 35A.14.120 as amended, a petition in writing
requesting that certain territory contiguous to the City of Renton, as described below, be annexed
to the City of Renton, was presented and filed with the City Clerk on or about January 19, 2005;
and
WHEREAS, prior to the filing and circulation of said petition for annexation to the City
of Renton, the petitioning owners notified the City Council of their intention to commence such
proceedings as provided by law, as more particularly specified in RCW 35A.14.120, and upon
public hearing thereon, it having been determined and the petitioning owners having agreed to
assume their fair share of the pre-existing outstanding indebtedness of the City of Renton as it
pertains to the territory petitioned to be annexed; and to accept that portion of the City's
Comprehensive Plan as it pertains to the territory including the applicable Zoning Code relating
thereto; and
WHEREAS, the King County Department of Assessments has examined and verified on
or about February 4, 2005 the signatures on the petition for annexation and determined
signatures represent at least sixty percent (60%) of the assessed value (excluding streets) of the
area to be annexed, as provided by law; and
1
ORDINANCE NO.
WHEREAS, the Economic Development, Neighborhoods and Strategic Planning
Department of the City of Renton having considered and recommended the annexing of said
property to the City of Renton; and
WHEREAS, the City Council fixed March 14, 2005, as the time and place for public
hearing in the City Council Chambers, City Hall, Renton, Washington, upon the petition and
notice thereof having been given as provided by law; and
WHEREAS, pursuant to said notices, public hearings have been held at the time and
place specified in the notices, and the Council having considered all matters in connection with
the petition and further determined that all legal requirements and procedures of the law
applicable to the petition method for annexation have been met; and
WHEREAS, the King County Boundary Review Board having deemed the "Notice of
Intention" approved as of May 17, 2005; and
WHEREAS, the City of Renton is concurrently zoning the annexation site R-4, four
units per net acre;
NOW, THEREFORE, THE CITY COUNCIL OF THE CITY OF RENTON,
WASHINGTON, DOES ORDAIN AS FOLLOWS:
SECTION I, The findings, recitals, and determinations are hereby found to be
true and correct in all respects. All requirements of the law in regard to the annexation by
petition method, including the provisions of RCW 35A.14.120, 130, 140 and 150, have been
met. It is further determined that the petition for annexation to the City of Renton of the property
and territory described below is hereby approved and granted; the following described property
being contiguous to the City limits of the City of Renton is hereby annexed to the City of
2
ORDINANCE NO.
Renton, and such annexation to be effective on and after the approval, passage, and publication
of this Ordinance; and on and after said date the property shall constitute a part of the City of
Renton and shall be subject to all its laws and ordinances then and thereafter in force and effect;
the property being described as follows:
See Exhibits "A" and "B" attached hereto and made a part hereof as if fully set
forth herein
[Said property, approximately 35.68 acres in area, is generally located east of
144 Avenue SE/Jericho Avenue NE, if extended, and west of 148 h Avenue/Nile
Avenue NE, north of SE 1171e Street, and west of Honey Creek, south of SE 117`h
Street, if extended.]
and the owners of the property within the annexation shall assume their fair share of the
outstanding indebtedness of the City of Renton as prescribed in RCW 35A.14.120 as it pertains
to the property, and the property shall be subject to the City's Comprehensive Plan and Zoning
Code.
SECTION U. This Ordinance shall be effective upon its passage, approval, and
five days after its publication.
A certified copy of this Ordinance shall be filed with the King County Council, State of
Washington, and as otherwise provided by law.
PASSED BY THE CITY COUNCIL this day of _ , 2005.
Bonnie I. Walton, City Clerk
3
ORDINANCE NO.
APPROVED BY THE MAYOR this day of
Approved as to form:
Lawrence J. Warren, City Attorney
Date of Publication:
ORD. 1191:6/06/05:ma
4
Kathy Keolker-Wheeler, Mayor
2005.
I
I
-
❑
CD-
_
Ej
o
J
Exhibit A
p c!] r 4
III GIU I� Qao F
ICJ
u
a
9
a
a
C�o
oq
EEJ
9
_,�
a o
o
d
aQ
o Ln
Q
° G'
°
❑ o
o
rr
j
V
�
o
Q
�
Q
°
EJ
0
n
L
D
� �
p
Thb, document b o yrophk
to sxvEy occurecy.
�d an Mortnotion
representotim, not guoronleed
mended far city puryoses only and
awiade oa of the dote aAown.
CJ
. fat a d1-
I. I
Thb mcq raploY GurVos« °^lY•
Wedgewood Lane Annexation
0
400
800
Figure 3: Existing Structure Map
1 : 4800
US�Y O� Economic Development, Neighborhoods & Strategic Planning
Existing Structure
Alex Pietsch, Administrator
=• - G. Del Rosario Note: Annexation boundary may differ from diagram.
L N t0 8 October 2004 Please see legal description for actual boundary =
Renton City Limits
Proposed Annexation Area
Exhibit B
WEDGEWOOD LANE ANNEXATION
LEGAL DESCRIPTION
That portion of the east half (1/2) of the Northeast quarter of Section 10, Township 23
North, Range 5 East, W.M., King County, Washington, lying southerly of the south line
of the plat of Honey Creek Estates, as recorded in Volume 63 of Plats, Pages 30 and 31,
records of King County, Washington, and the westerly and easterly extensions thereof,
and lying northerly of the north line of the south 990 feet of said Northeast quarter of
Section 10; EXCEPT the east 30 feet thereof for County Road (148`h Avenue SE);
TOGETHER WITH Lot C of King County Boundary Line Adjustment No. 1-041,0055, as
recorded in Volume 180 of Surveys, Pages 222 and 223, under King County Recording
No. 20041223900001, in the east half (1/2) of said Section 10.
CITY OF RENTON, WASHINGTON
ORDINANCE NO.
AN ORDINANCE OF THE CITY OF RENTON, WASHINGTON
ESTABLISHING THE ZONING CLASSIFICATION OF CERTAIN
PROPERTY ANNEXED WITHIN THE CITY OF RENTON FROM R4
(URBAN RESIDENTIAL, 4DU PER ACRE, HING COUNTY ZONING) TO
R4 (RESIDENTIAL 4 DU/AC; FOUR DWELLING UNITS PER ACRE)
(WEDGEWOOD LANE ANNEXATION, FILE NO. A-04-005).
WHEREAS, under Section 4.2.020 of Chapter 2, Zoning Districts — Uses and Standards,
of Title IV (Development Regulations) of Ordinance No. 4260 entitled "Code of General
Ordinances of the City of Renton, Washington," as amended, and the maps and reports adopted
in conjunction therewith, the property hereinbelow described has not been zoned in the City of
Renton; and
WHEREAS, said property owners petitioned the City of Renton for annexation and
concurrent rezoning, which said annexation having previously been approved and the property
annexed to the City of Renton, and the City having held two public hearings to consider this
zoning application, the first hearing being held on March 14, 2005, and the second hearing being
held on June 20, 2005; and said zoning request being in conformity with the City's
Comprehensive Plan, as amended, and the City Council having duly considered all matters
relevant thereto, and all parties having been heard appearing in support thereof or in opposition
thereto;
NOW, THEREFORE, THE CITY COUNCIL OF THE CITY OF RENTON,
WASHINGTON, DOES ORDAIN AS FOLLOWS:
SECTION L The following described property in the City of Renton is hereby
zoned to R-4 as hereinbelow specified. The annual ordinance adopting the maps of the City's
1
►I
ORDINANCE NO.
zoning ordinance is hereby amended to evidence said rezoning and the EDNSP Administrator is
authorized and directed to change the maps of the zoning ordinance, as amended, to evidence
said rezoning, to wit -
See Exhibits "A" and `B" attached hereto and made a part hereof as if fully set
forth herein.
[Said property, approximately 34.65 acres in area, is generall located east of 144h
Avenue SE/Jericho Avenue NE, if extended, and west of 148 Avenue/Nile Avenue
NE, north of SE 117 h Street, and west of Honey Creek, south of SE 117 b Street, if
extended.]
SECTION II. This ordinance shall be effective upon its passage,
approval, and five days after its publication.
PASSED BY THE CITY COUNCIL this day of , 2005.
Bonnie I. Walton, City Clerk
APPROVED BY THE MAYOR this day of , 2005.
Approved as to form:
Lawrence J. Warren, City Attorney
Date of Publication:
ORD. 1192:6/06/05:ma
0)
Kathy Keolker-Wheeler, Mayor
0 A A
WITITITAff".. fro
I
Exhibit B
WEDGEWOOD LANE PREZONE
LEGAL DESCRIPTION
That portion of the east half (1/2) of the Northeast quarter of Section 10, Township 23
North, Range 5 East, W.M., King County, Washington, lying southerly of the south line
of the plat of Honey Creek Estates, as recorded in Volume 63 of Plats, Pages 30 and 31,
records of King County, Washington, and the westerly and easterly extensions thereof,
and lying northerly of the north line of the south 990 feet of said Northeast quarter of
Section 10; EXCEPT the east 30 feet thereof for County Road (1481h Avenue SE);
TOGETHER WITH Lot C of King County Boundary Line Adjustment No. L04L0055, as
recorded in Volume 180 of Surveys, Pages 222 and 223, under King County Recording
No. 20041223900001, in the east half (1/2) of said Section 10;
EXCEPT streets.
Of 6-/3..,,I
6 aD-.2DD5
CITY OF RENTON, WASHNGTON
ORDINANCE NO.
AN ORDINANCE OF THE CITY OF RENTON, WASHINGTON,
AMENDING ORDINANCE NO. 5110 RELATING TO THE CITY OF
RENTON FISCAL YEAR 2005 ANNUAL BUDGET.
WHEREAS, the City Council passed the City of Renton's 2005 Annual Budget
Ordinance (Ordinance No. 5110) on December 20, 2004; and
WHEREAS, appropriated funds not expended in 2004 due to capital project
interruptions and delays in invoice payments, need to be carried forward into this fiscal year
resulting in the need to amend the City of Renton's 2005 Annual Budget; and
WHEREAS, it is a priority of the City to appropriate $400,000 of funds into the Solid
Waste Utility Fund (Fund 403) for the "Clean Sweep Renton" program, which includes funding
the "Reuse It" program, Neighborhood Association Cleanup event, and associated public
education and outreach campaign; and
WHEREAS, it is a priority of the City to allocate $132,000 of funds into the Municipal
Facilities Capital Improvement Fund (Fund 316) for the replacement of the entire current
inventory of defibrillator equipment which is at the end of its useful life; and
WHEREAS, the City needs to allocate $90,000 into the Waterworks Utility Fund (Fund
401) to fund the examination of the rate structure for the water, sewer and stormwater utilities by
conducting a comprehensive utility rate study; and
WHEREAS, the Police Department is in need of filling existing enforcement positions
that have been left vacant due to military commitments and temporary assignment of duty to the
Washington State Criminal Justice Training Commission and Immigration/Customs Enforcement
Task Force;
ORDINANCE NO.
NOW, THEREFORE, THE CITY COUNCIL OF THE CITY OF RENTON,
WASHINGTON, DOES ORDAIN AS FOLLOWS:
SECTION I. Ordinance No. 5110 establishing the City of Renton's 2005 Annual
Budget is hereby amended as follows:
1. The General Fund (Fund 000) is hereby amended to reflect the following
appropriation amendments:
GENERAL FUND (Fund 000)
FY 2005
Original Amended
(ENUES 2005 Budget 2005 Budget Change
of Prior Year Revenue 0 1,901,416 1,9019416
Revenues 0 1,901,416 1,901,416
Transfer Out to Fund 316 0 1,901,416 1,90
Expenditures 0 1,901,416 1190
The staffing level of the Police Department budget within the General Fund shall be increased
from 132.2 full time employees (FTEs) to 134.2 FTEs in order to accommodate and permit the
Department to fill vacancies created as a result of two law enforcement staff being assigned to
other public agencies on a temporary basis through contract arrangements with those agencies.
2. The Parks Fund (Fund 101) is hereby amended to reflect the following
appropriation amendments:
Use of Prior Year Revenue
Revenues
PARK FUND (Fund 101)
FY 2005
Original
2005 Budget
0
0
dty Services - Pest Mgmt. Program 94,300
Out to Fund 316 0
Amended
2005 Budget Chu
116,187 116,1
116,187 116,1
125,700
84,787
210,487
3
ORDINANCE NO.
3. The Street Fund (Fund 103) is hereby amended to reflect the following appropriation
amendments:
STREET FUND (Fund 103)
FY 2005
Original Amended
REVENUES 2005 Budget 2005 Budget Change
Use of Prior Year Revenue 0 322,576 322,576
Revenues 0 322,576 322,576
Out to Fund 316 0 322,576 3
Expenditures 0 322,576 3
4. The Community Services Block Grant Fund (Fund 104) is hereby amended to
reflect the following appropriation amendments:
COMMUNITY SERVICES BLOCK GRANT FUND (Fund 104)
FY 2005
Original Amended
VENUES 2005 Budget 2005 Budget Change
of Prior Year Revenue 0 23,700 23,700
Revenues 0 23,700 23,700
Improvement 0 23,700 23
Expenditures 0 23,700 23
5. The Library Fund (Fund 106) is hereby amended to reflect the following
appropriation amendments:
LIBRARY FUND (Fund 106)
FY 2005
Original Amended
VENUES 2005 Budget 2005 Budget Change
of Prior Year Revenue 0 520,012 520,012.
Revenues 0 520,012 520,012
Out to Fund 316 0 520,012
Expenditures 0 520,012
3
ORDINANCE NO.
6. The 1% for Art Fund (Fund 125) is hereby amended to reflect the following
appropriation amendments:
REVENUES
Use of Prior Year Revenue
Revenues
1% FOR ART FUND (Fund 125)
FY 2005
Original
2005 Budget
50,000
50,000
comity Services
Henry Moses Aquatic Center Art 0
Expenditures 0
Amended
2005 Budget
90,000
90,000
40
7. The Garage Capital Improvement Project Fund (Fund 301) is hereby amended to
reflect the following appropriation amendments:
GARAGE CAPITAL IMPROVEMENT PROJECT FUND (Fund 301)
FY 2005
Original
Amended
REVENUES
2005 Budget
2005 Budget
Change
Use of Prior Year Revenue
0
53,300
53,300
Revenues
0
53,300
53,300
EXPENDITURES
Community Services
Police Substation, Municipal Garage
0
53,300
53,300
Expenditures
0
53,300
53,300
8. The Leased City Properties Fund (Fund 306) is hereby amended to reflect the
following appropriation amendments:
LEASED CITY PROPERTIES FUND (Fund 306)
FY 2005
Original
Amended
REVENUES
2005 Budget
2005 Budget
Chan e
Use of Prior Year Revenue
0
100,000
100,000
Revenues
0
100,000
100,000
EXPENDITURES
Community Services
Chiller for 200 Mill Building
0
100,000
100,000
Expenditures
0
100,000
100,000
4
ORDINANCE NO.
9. The Municipal Facilities Capital Improvement Fund (Fund 316) is hereby
amended to reflect the following appropriation amendments:
MUNICIPAL FACILITIES CAPITAL H PROVEMENT FUND (Fund 316)
FY 2005
Original
Amended
VENUES
2005 Budget
2005 Budget
Chan
of Prior Year Revenue
1,386,500
5,193,200
3,806,7
isfer In — Fund 000
980,500
2,881,916
1,901,4
isfer In — Fund 101
0
84,787
84,7
tsfer In — Fund 103
0
322,576
322,5
isfer In — Fund 106
0
520,012
520,0
Revenues
2,367,000
9,002,491
6,635,4
ent — Defibrillators
0
132,000
132,000
uc Development Capital Reserve
0
2,828,791
2,828,791
Improvement
1,509,000
5,183,700
3,674 700
10. The Waterworks Utility Fund (Fund 401) is hereby amended to reflect the
following appropriation amendments:
WATERWORKS UTILITY FUND (Fund
401)
FY 2005
Original
Amended
REVENUES
2005 Budget
2005 Budget
Chan
Use of Prior Year Revenue
1,258,200
4,588,050
3,329,850
Revenues
1,258,200
4,588,050
3,329,850
EXPENDITURES
Professional Services - Utility Rate Study
0
90,000
90,000
Transfer Out to Fund 421
1,731,000
4,970,850
3,239,850
Expenditures
1,731,000
5,060,850
3,329,850
11. The Airport Fund (Fund 402) is hereby amended to reflect the following
Cr"10Us11
Pi a�d appropriation amendments:
�n ask
p solid Fu"d
1
r� �orfc�'
5
ORDINANCE NO.
AIRPORT FUND (Fund 402)
FY 2005
Original.
Amended
REVENUES
2005 Budget
2005 Budget
Chan e
Use of Prior Year Revenue
273,800
447,400
173,600
Revenues
273,800
447,400
173,600
EXPENDITURES
Apron C Utility Improvements
0
173,600
173,600
Expenditures
0
173,600
173,600
12. The Solid Waste Utility Fund (Fund 403) is hereby amended to reflect the
following appropriation amendments:
SOLID WASTE UTILITY FUND (Fund
403)
FY 2005
Original
Amended
REVENUES
2005 Budget
2005 Budget
Change
Solid Waste Fees
8,614,300
8,777,800
163,500
Grant Revenue
80,600
213,900
133,300
Use of Prior Year Revenue
212,700
449,200
236,500
Revenues
8,907,600
9,440,900
$33,300
EXPENDITURES
Coordinated Prevention Grant
0
71,300
71,300
KC WR/R Grant Program
89,300
151,300
62,000
Clean Sweep Program
0
400,000
400,000
Expenditures
89,300
622,600
533,300
13. The Waterworks Utility Construction Fund (Fund 421) is hereby amended to
reflect the following appropriation amendments:
WATERWORKS UTILITY CONSTRUCTION FUND (Fund 421)
FY 2005
Original
Amended
REVENUES
2005 Budget
2005 Budget
Change
Use of Prior Year Revenue
181,000
905,267
724,267
Transfer In from Fund 401
0
3,239,850
3,239,850
Transfer In from Fund 481
0
3,095,283
3,095,283
Revenues
181,000
7,240,400
7,059,400
EXPENDITURES
Capital Improvement
1,509,000
8,568,400
7,059,400
Expenditures
1,509,000
8,568,400
7,059,400
M
ORDINANCE NO.
14. The Municipal Golf Course System Capital Improvement Fund (Fund 424) is
hereby amended to reflect the following appropriation amendments:
MUNICIPAL GOLF COURSE SYSTEM CAPITAL IMPROVEMENT FUND (Fund
424)
FY 2005
Original
Amended
REVENUES
2005 Budget
2005 Budget
Change
Use of Prior Year Revenue
156,000
346,800
190,800
Transfer In from Fund 404
150,000
310,000
160,000
Revenues
306,000
656,800
350,800
EXPENDITURES
Capital Improvement
310,000
660,800
350,800
Expenditures
310,000
660,800
350,800
15. The Waterworks Bond Fund (Fund 481) is hereby amended to reflect the
following appropriation amendments:
WATERWORKS BOND FUND (Fund 481)
FY 2005
Original Amended
REVENUES 2005 Budget 2005 Budget Chan e
Use of Prior Year Revenue 0 3,095,283 3,095,283
Revenues 0 3,095,283 3,095,283
EXPENDITURES
Transfer Out to Fund 421 0 3,095,283 3,095,283
Expenditures 0 3,095,283 3,095,283
16. The Equipment Repair and Replacement Fund (Fund 501) is hereby amended to
reflect the following appropriation amendments:
EQUIPMENT REPAIR AND REPLACEMENT FUND (Fund 501)
FY 2005
Original
Amended
REVENUES
2005 Budget
2005 Budget
Change
Use of Prior Year Revenue
4,236,841
4,636,841
400,000
Revenues
4,236,841
4,636,841
400,000
EXPENDITURES
Planning/Budding/Public Works
New Fire Engine
918,600
1,318,600
400,000
Expenditures
918,600
1,318,600
400,000
VA
ORDINANCE NO.
SECTION H. A list of all individual budget adjustments and descriptions are
hereby attached as Attachments A & B and are available for public review in the Office of the
City Clerk, Renton City Hall.
SECTION III. This ordinance shall be effective upon its passage, approval, and
five (5) days after publication.
PASSED BY THE CITY COUNCIL this day of
APPROVED BY THE MAYOR this
Approved as to form:
Lawrence J. Warren, City Attorney
Date of Publication:
ORD. 1181:6/13/05:ma
8
Bonnie I. Walton, City Clerk
day of
Kathy Keolker-Wheeler, Mayor
2005.
2005.
2004 to 2005 Carry Forwards
Attachment A
2004
2005
2005
2005
Adjusted
2004
2004
Carry',rd
Original
Adjusted
Project Title
Budget
Expense
Balance
Request
Budget
Budget
Short Explanation/Reason
Park Fund 101
1 Integrated Pest Management Program
141,300
113,147
28,153
31;400
94,300
125,700
Consultant under contract and money needed for
contractual obligation.
101Total Carry
ForwardRe4uest
$31"400�
$94,300
$125,700
CDBG Fund 104
_ 2 MultiService Center_
30,000
6,310
23,690 -- <! 23,7001
0
23,700
To complete work that was delayed in 2004.
104_Total Car
y`Ydi*ard Request
°- $23;700
$0
$23,700
1 % Art Fund 125
3 Art for Henry Moses Aquatic Center
50,000
0
50,000
40,000
50,000
90,000
For design and creation of artwork at the Aquatic
x
Center.
125 Total Car6"; tward
$50,000
$90,000
Garage Fund 301
4 Police Substation
101,500
48,129
53,371
it
0
53,300
Final building costs of the police substation at the
m
Municipal parking garage.
301 Total Car "`";?ForwardRe
"nest
b. tr 3• 'S53' 00
$0
$53,300
Leased City Properties Fund 306
5 Chiller Replacement at 200 Mill
300,000
64,624
235,376
100 000"
0
100,000
The chiller at 200 Mill was budgeted for in 2004
but completed in 2005.
306 Total^Ca
`" Forward":Re oast
$10,0-000
$0
$100,000
Municipal Facilities CIP Fund 316
6
7
8
9
10
11
Fire RMS Project
400,000
235,179
164,821
155;SOU
400,000
555,500
Three-year project had trouble meeting software
delivery schedule.
Maintenance Task Management
125,000
20,725
104,275
165`000
85,000
250,000
Consultant fees during vendor selection and
implementation.
Wireless Network Project
500,000
344,753
155,247
67;000-
0
67,000
Radio and antenna equipment installation on two
n -y
4 h
more water towers.
Copier Replacement
75,000
102,683
-27 68316
il0tl,
90,000
106,000
New copier in Police Records needed.
Parks Contingency Plan
95,000
0
95,000
r95 tl(ii`
0
95,000
Select design consultant. Re -master plan Cedar
River Park, Liberty Park, and Narco property for
r 'pz
�.
future development and expansion.
Park Maintenance Facility
2,000,000
10,825
1,989,176
1,90-000
0
1,989,000
For property acquisition, site planning, and
building design.
2005_Carryforward Attachment A Black & White.xls, 2004 - 2005 Carry Forward Page 1 of 4
2004 to 2005 Carry Forwards
Attachment A
2004
`2005
2005
2005
Adjusted
2004
2004
Car Forwi,
Original
Adjusted
Project Title
Budget
Expense
Balancer
Request
Budget
Budget
Short Explanation/Reason
12
Major Maintenance Parks
737,500
219,187
518,313
445,900
430,000
875,900
Projects to maintain city parks and amenities in a
safegood working order.
13
Major Maintenance Operational Facilities
38,000
0
38,000
38,000
157,000
195,000
FSI I Alarm $20k FSI I drainage $18k .
14
Major Maintenance Public Facilities
656,000
180,573
475,427
466,30,0
172,000
638,300
City Hall resurfacing of P3, single storage building
at RCC Public Restroom refurbishment.
15
Parks Long Range Plan
24,600
0
24,600
24,600
25,000
49,600
To complete long-range plan to meet state grant
requirements and identify future acquisition and
development.
16
Major Maintenance Museum
25,000
220
24,780
0 000
0
20,000
Intrusion and fire alarms stem at Museum.
17
Neighborhood Beautification
27,100
2,857
24,243
25.000
0
25,000
Consultant under contract to complete tree
inventory and assessment.
18
Sam Chastain Waterfront Trail
126,700
552
126,148
100,000
226,200
Consultant services to complete conceptual design
phase and easement negotiation.
19
Neighborhood Grants
50,000
20,723
29,2772
200
50,000
91,200
This amount covers prior grant commitments.
316 Total Ca
."`rForwuril`R
nest:;-$3`°64700
$1,509,000
$5,183,700
Airport Fund 402
20 Apron C Utility Improvements
Solid Waste Utility Fund 403
21 Coordinated Prevention Grant
22 KC WR/R Grant Program
Waterworks Utility Fund 421
23 Sanitary Sewer Main Extension
740,700 567,057 173,643
79,700 8,487 71,213
89,300 27,320 61,980
3,450,000 798,360 2,651,640
24 Lift Station Replacement/Rehabilitation 720,000 439,409 280,591
0 173,600 Contract with Potelco will be closed out in 2005.
The gas utility portion of the project still needs to
be completed when Pilchuck decides to complete
the proiect.
$0
$173,600
0
71,300
CPG is a two year grant cycle. All funds were
budgeted in 1 st year of cycle.
89,300
151,300
WRR grant is a two year grant. Funds are
budgeted each year based on MKCC approval of
KCSWD Budget.
$89,300
$222,600
2,000,000
4,650,000
Sunset Interceptor Phase I1(2,200,000) has
construction delays of approximately 6-months.
Central Plateau Interceptor (450,000) is also
delayed due to King Countv.
0
280,000
Lake Washington Flush and Misty Cove Lift
2005_Carryforward Attachment A Black & White.xls, 2004 - 2005 Carry Forward Page 2 of 4
2004 to 2005 Carry Forwards
Attachment A
2004
2005
2005
2005
Adjusted
2004
2004
Carry Forward
Original
Adjusted
Project Title
Budget
Expense
Balance
Request
Budget
Budget
Short Explanation/Reason
25
Sanitary Sewer Main Replacement
1,215,000
317,637
897,363
850,000
250,000
1,100,000
Covers projects we were not able to complete:
Downtown Sewers (240,000), Earlington Sewer
Extension (370,000), Sanitary Sewer Model
(100,000), and Renton Center Extension
140 000 .
26
Maplewood Water Rights
30,000
5,340
24,660
24,600
10,000
34,600
To complete contract work started in 2004.
27
Pipe Oversizing Costs
40,000
0
40,000
40,000
40,000
80,000
For payment to developers for projects started in
2004
28
Water Telemetry Systems Improvements
93,000
73,192
19,808
. 19,800
0
19,800
To complete contract work started in 2004.
29
Water System Plan Update
146,000
102,662
43,338
-" -= 43 300
50,000
93,300
To complete contract work started in 2004.
30
Update Emergency Response Plan
71,000
21,309
49,691
`49 600
5,000
54,600
To complete contract work started in 2004.
31
Water Main Rehabilitation
1,432,000
1,035,972
396,028
396,00
1,000,000
1,396,000
To complete contract work started in 2004.
32
Update Fireflow Analysis
10,000
5,278
4,722
431 00
5 000
9,700
To complete contract work started in 2004.
33
Reservoir Recoating
4 000
0
4,000
0
4,000
To complete contract work started in 2004.
34
Emergency Response Projects
50,000
1,198
48,802
48 800
50,000
98,800
To complete contract work started in 2004.
35
Large Meter Replacement
20,000
0
20,000
'p "~20`000
0
20,000
To complete contract work started in 2004.
36
Downtown Core Rehabilitation
253,000
103,242
149,758
149,700
0
149,700
To complete contract work started in 2004.
37
Water Quality Monitoring
10,000
3,619
6,381
6,300
10,000
16,300
To complete contract work started in 2004.
38
Water Pump Stations Rehabilitation
15,000
3,555
11,445
% 11,40
0
11,400
To complete contract work started in 2004.
39
Maplewood Water Treatment
8,000,000
6,438,754
1,561,246
:.. ; ' 1 561,200
3,100,000
4,661,200
To complete contract work started in 2004.
Improvements Construction
40
Storm Sewer Comprehensive Plan
218,000
14,506
203,494
203;000
0
203,000
Project delayed due to Ecology's failure to issue
Kx
the NPDES Phase 2 permit requirements.
41
Small Drainage Problems
225,000
54,430
170,570
170,000
180,000
350,000
The project construction to replace sewer, water,
and storm systems was delayed to avoid project
construction to occur during the winter and the
2004 holiday season.
42
Lower Cedar River Sediment Management
292,000
258,232
33,768
, >3Ux000
275,000
305,000
Spawning Channel Replacement Project was
Program
;"
delayed due to the lack of federal funding for the
U.S. Army Corps of Engineers (USACE) to
construct the project.
43
Cedar River Basin CIP - Floodplain
12,500
5,487
7,013
._=7;000
0
7,000
Consultant Contract work was delayed due to
Mapping
USACE failure to provide levee certification
needed for the update of the flood lain map.
44
Renton Stormwater Manual
143,000
575
142,425
542,000
0
142,000
Work was delayed due to Ecology's failure to issue
rr
the NPDES Phase 2 permit requirements.
45
Springbrook Creek Floodplain Map
108,200
68,351
39,849
:''--`35;000
0
35,000
To complete contract work started in 2004.
46
May Creek Basin Plan Implementation
198,000
41,240
156,760
'.` 155,000
275,000
430,000
To complete design and construct project in 2005.
2005_Carryforward Attachment A_Black & White.xls, 2004 - 2005 Carry Forward Page 3 of 4
2004 to 2005 Carry Forwards
Attachment A
2004
2005
2005
Adjusted
2004
2004arry,Votvard
Original
Adjusted
Project Title
Budget
Expense
Balancer
f" Request
Budget
Budget
Short Explanation/Reason
47 SW 7th Storm System
3,407,500
2,971,833
435,667
158 900
400,000
558,000
Project construction started later than planned and
9
the construction took longer than planned.
421 Total Carry Forward Re ueq,
:.` S7 059,400
$7,650,000
$14,709,400
Municipal Golf Course System Capital Improvement Fund 424
48 Parking Stall Addition/Cart Path Paving
355,400
144,590
210,810
2108Q0
145,000
355,800
Project includes lighting, landscaping, netting and
storm water detention for future maintenance
facility.
49 Major Maintenance Golf Course
140,000
0
140,000
144;000
165,000
305,000
Driving Range Netting replacement, Driving
U,
0 a;
Range turf carpet repair to be completed in 2005.
424 Total"Car ,` oxwird:Re ue n , ., $350 800
$310,000
$660,800
Equipment Repair and Replacement Fund 501
50 New Fire Engine 1,027,800 501
Ordinance No. 5110 Original Budget $150,349,200
Ordinance No. 5134 PBPWI ransm otarionArimciidment* , „ 38300
Ordinance No. Carry Forward Budget Amendment 12,040,200
2005 Committed Expenditures $164 771700
5
918,600 1,318,600 New fire
$918,600 $1,318,600
#Currenjlyetiding,City-CounciI apprdval-' ;
delivery delayed to 2005.
2005_Carryforward Attachment A Black & White.xls, 2004 - 2005 Carry Forward Page 4 of 4
Attachment B
2004 to 2005 Carry Forward Ordinance
Title and Description
Amount
1
Integrated Pest Management Program (Community Services)
$31,400
Funds were transferred from EDNSP to Parks Professional Services in 2004 for the
Integrated Pest Management Program. Consultant is under contract and money is
needed to complete contractual obligation.
2
MultiService Center (Community Services)
$23,700
Necessary to complete the MultiService Center due to delays in starting the program.
3
Art for Henry Moses Aquatic Center (Community Services)
$40,000
For design and creation of art for the Henry Moses Aquatic Center.
4
Police Substation (Community Services)
$53,300
To complete work on the Police Substation (which was finished in February).
5
Chiller for 200 Mill (Community Services)
$100,000
The replacement of the chiller for 200 Mill building was completed in 2005. Expenses
include elevators and gates.
6
Fire RMS Project (Finance and Information Services)
$155,500
This project involves a number of different project elements and was planned as a three-
year effort. During the second year, 2004, they had trouble meeting the project's
software delivery schedule.
7
Maintenance Task Management (Finance and Information Services)
$165,000
The enterprise -wide project team has completed the project specification and the project
is awaiting responses to an RFP. This carry forward request represents unpaid
consultant fees that will be used during vendor selection and implementation.
8
Wireless Network Project (Finance and Information Services)
$67,000
This project has two remaining elevated water towers to which radio and antenna
equipment must be installed. The equipment will be installed in early 2005.
9 Copier Replacement (Finance and Information Services) $16,000
This project replaces the Richo, which is well over five years old. This copier is in
service 24 hours a day, 365 days a year, by the police records staff. There was no
upgrade plan contained in the 2005 budget request; however, replacing this copier will
provide an opportunity to improve the records process by utilizing the new copier's
built-in email system to transmit records electronically rather than hard copy.
10 Parks Contingency Plan (Community Services)
Select design consultant. Re -master plan Cedar River Park, Liberty Park and Narco
property for future development and expansion including developing and integrating a
public involvement process.
11 New Maintenance Facility (Community Services)
In 2004, $2,000,000 was appropriated as designated fund balance for property
acquisition, site planning and building design; of this amount, only $11,000 was spent.
12 Major Maintenance Parks (Community Services)
Projects to maintain City parks and amenities in a safe, good working order. Kiwanis
Park Playground $7,374, Sunset Court Play equipment replacement $7,071; Jones Park
Play Equipment replacement $6,768; Kennydale Beach Play equipment replacement
$67,348; Liberty Park building removal $32,400; Coulon Park Launch Lanes 1-4
Repairs $52,838; Coulon Gang Ways Replacement $185,091; and Edlund Property
Demolition $87,010.
$95,000
$1,989,000
$445,900
Page 1 of 4
Attachment B
2004 to 2005 Carry Forward Ordinance
Title and Description
Amount
13
Major Maintenance Operational Facilities (Community Services)
$38,000
Fire Station 11 alarm and sprinklers ($20,000), Fire Station I 1 drain replacement
($18,000).
14
Major Maintenance Public Facilities (Community Services)
$466,300
City Hall resurfacing of P3 $205,000 (Three components: Water mitigation $30,000,
Actual resurfacing $150,000, Restoring irrigation $25,000). City Hall Major
Maintenance and small projects $41,300. Renton Community Center, single storage
building $100,000. Public Restroom Refurbishment $120,000.
15
Parks Long Range Plan (Community Services)
$24,600
Necessary to complete long-range plan to meet state grant requirements and identify
future acquisition and development. Anticipate hiring consultant in first quarter 2005.
16
Major Maintenance Museum (Community Services)
$20,000
Intrusion and fire alarm system at the Museum.
17
Neighborhood Beautification (Community Services)
$25,000
Consultant under contract to complete tree inventory and assessment, park tree
inventory, natural and open space tree inventory, and a strategic plan.
18
Sam Chastain Waterfront Trail (Community Services)
$126,200
Necessary for consultant services to complete conceptual design phase and easement
negotiation.
19 Neighborhood Grants (Economic Development)
There are two grant cycles each year. Some of the funds granted, especially in the fall
cycle, are not spent until the following year. This carry forward amount covers prior
grant commitments.
20 Apron C Utility Improvements (PB/PW —Transportation)
Contract with Potelco will be closed out in 2005. The gas utility portion of the project
still needs to be completed when Pilchuck decides to complete the project.
21 Coordinated Prevention Grant (PB/PW-Solid Waste)
CPG is a two-year grant cycle. All funds were budgeted in first year cycle with intent to
carry forward unspent funds.
22 KC WR/R Grant Program (PB/PW-Solid Waste)
WRR Grant is a two-year grant. Funds are budgeted each year based on MKCC
approval of KCSWD Budget. Unspent funds from 2004 may be carried forward under
grant agreement.
$41,200
$173,600
$71,300
$62,000
23 Sanitary Sewer Main Extension (PB/PW-Wastewater) $2,650,000
Sunset Interceptor Phase 11($2,200,000) has construction delays of approximately six
months, requiring the construction funds to be carried forward. Central Plateau
Interceptor ($450,000) is also delayed due to King County's bridge work causing
construction to continue into 2005.
24 Lift Station Replacement/Rehabilitation (PB/PW-Wastewater) $280,000
Lake Washington Flush and Misty Cove Lift Station Rehabilitation was delayed. Funds
carried forward are to cover construction costs for 2005.
25 Sanitary Sewer Main Replacement (P/B/PW-Wastewater) $850,000
Carry forward covers projects that were not competed including Downtown Sewers
($240,000), Earlington Sewer Extension ($370,000), Sanitary Sewer Model ($100,000),
and Renton Center Extension ($140,000). Primary reason for delay is due to unplanned
work associated with development of Lakeshore Landing and FRB site.
Page 2 of 4
Attachment B
2004 to 2005 Carry Forward Ordinance
Title and Description
Amount
26
Maplewood Water Rights (PB/PW-Water)
$24,600
To Complete contract work started in 2004.
27
Pipe Oversizing Costs (PB/PW-Water)
$40,000
For payment to developers for projects started in 2004.
28
Water Telemetry Systems Improvements (PB/PW-Water)
$19,800
To complete contract work started in 2004.
29
Water System Plan Update (PB/PW-Water)
$43,300
To complete contract work started in 2004.
30
Update Emergency Response Plan (PB/PW-Water)
$49,600
To complete contract work started in 2004.
31
Water Main Rehabilitation (PB/PW-Water)
$396,000
To complete contract work started in 2004.
32
Update Fireflow Analysis (PB/PW-Water)
$4,700
To complete contract work started in 2004.
33
Reservoir Recoating (PB/PW-Water)
$4,000
To complete contract work started in 2004.
34
Emergency Response Projects (PB/PW-Water)
$48,800
To complete contract work started in 2004.
35
Large Meter Replacement (PB/PW-Water)
$20,000
To complete contract work started in 2004.
36
Downtown Core Rehabilitation (PB/PW-Water)
$149,700
To complete contract work started in 2004.
37
Water Quality Monitoring (PB/PW-Water)
$6,300
To complete contract work started in 2004.
38
Water Pump Stations Rehabilitation (PB/PW-Water)
$11,400
To complete contract work started in 2004.
39 Maplewood Water Treatment Improvements Construction (PB/PW-Water)
To complete contract work started in 2004.
40 Storm Sewer Comprehensive Plan (PB/PW-Surface Water)
Project delayed due to the Department of Ecology's failure to issue the NPDES Phase 2
permit requirements, which will identify required new programs that need to be
reviewed in conjunction with all programs.
$1,561,200
$203,000
41 Small Drainage Problems (PB/PW-Surface Water) $170,000
The project construction to replace sewer, water and storm systems in Wells Ave. S. and
Williams Ave. S., between S. 2nd St. and S 3`d St., was delayed to avoid project
construction occurring during the winter and the 2004 holiday season. Project
construction will start in spring of 2005.
Page 3 of 4
Attachment B
2004 to 2005 Carry Forward Ordinance
Title and Description Amount
42 Lower Cedar River Sediment Management Program (PB/PW-Surface Water) $30,000
Spawning Channel Replacement project was delayed due to the lack of federal funding
for the U.S. Army Corps of Engineers (USACE) to construct the project. The carry
forward request is needed to fund anticipated City costs associated with the construction
of the Spawning Channel Replacement Project in the summer of 2005, assuming the
federal funding for the project is provided to the USACE.
43
Cedar River Basin CIP — Floodplain Mapping (PB/PW-Surface Water)
$7,000
Consultant Contract work was delayed due to USACE failure to provide Levee
certification needed for the update of the floodplain map. Final report and maps to be
produced in 2005.
44
Renton Storm water Manual (PB/PW-Surface Water)
$142,000
Work was delayed due to the Department of Ecology's failure to issue the NPDES
Phase 2 permit requirements, which would identify standards for storm water
management that would have to be included in a design manual.
45
Springbrook Creek Floodplain Map Update (PB/PW-Surface Water)
$35,000
Consultant contract work to finalize the hydraulic model and produce the draft
floodplain work map took longer than planned, which delayed the completion of the
project in 2004. Funding is being carried forward to complete the remaining work in
2005.
46
May Creek Basin Plan Implementation (PB/PW-Surface Water)
$155,000
Funding is being carry forward to complete design and construct project in 2005, if
required permits and access rights are obtained.
47
SW 71e Storm System (PB/PW-Surface Water)
$158,000
Project construction started later than planned and the construction took longer than
planned. Funding is being carried forward to fund the completion of the project
construction.
48
Parking Stall Addition/Cart Path Paving (Community Services)
$210,800
This project, which includes lighting, landscaping, netting and storm water detention for
future maintenance facility, is in conjuncture with the Water Utility Department's
construction of the Maplewood Water Treatment Facility. All work will be completed
in 2005.
49
Major Maintenance Golf Course (Community Services)
$140,000
The driving range netting replacement and driving range turf carpet repair will be
completed in 2005. Access to portions of the project will not be available until
completion of current water treatment facility construction.
50
New Fire Engine (PB/PW-Equipment Repair and Replacement)
$400,000
Due to major hurricanes, the delivery of the new Fire Engine (pumper) was moved back
to mid -March 2005.
Page 4 of 4
FUND BALANCES
AFTER CARRY FORWARD ORDINANCE
revised: 05117105
GENERAL GOVERNMENTAL FUNDS
Attachment C
201
207
215
TOTAL
000
007
010
101
103
106
LTGO
LTGO
LTGO
GENERAL
GENERAL
GARAGE
MEMORIAL
PARK
STREET
LIBRARY
City Hall
Senior Ctr
Misc
GOVERNMT'L
+ 1/1/2004 Beg FB
6,164,584
-
-
1,625,841
891,151
246,418
13,536
25,057
1,018,824
9,985,411
+ 2004 Act Revenues
46,599,703
149,442
31,153
9,678,105
5,862,686
1,953,727
654,730
29,148
1,788,896
66,747,590
- 2004 Actual Expenditures
(46,081,936)
(34,686)
-
(10,350,791)
(5,925,665)
(1,560,557)
(652,460)
(27,175)
(2,211,875)
(66,845,145)
= 2004 Ending Fund Balance
6,682,351
114,756
31,153
953,155
828,172
639,588
15,806
27,030
595,845
9,887,856
+ 2005 Budgeted Revenues 46,874,100 - - 10,462,100 6,283,500 1,494,700 654,300 35,900 1,866,300 67,670,900
- 2005 Budgeted Expenditures (47,933,500) (70,000) - (10,462,100) (6,286,200) (1,494,700) (654,300) (35,900) (1,866,300) (68,803,000)
Fund Balance 5,622,951 44,756 31,153 953,155 825,472 639,588 15,806 27,030 595,845 8,755,756
8% Reserve/Reserves (3,721,535) (44,756) (31,153) (836,968) (502,896) (119,576) (15,806) (27,030) (595,845) (5,895,565)
Available Fund Balance 1,901,416 - - 116,187 322,576 520,012 - - - 2,860,191
Carry Forwards - - - (31,400) - - - - - (31,400)
REMAINING FUND BALANCE 1,901,416 - - 84,787 322,576 520,012 - - - 2,828,791
- Proposed Transfer Out (1,901,416) - - (84,787) (322,576) (520,012) - - - (2,828,791)
Page 1 of 6
FUND BALANCES
AFTER CARRY FORWARD ORDINANCE
revised: 05/17/05
SPECIAL REVENUE FUNDS
TOTAL
102
104
110
118
125
127
131
SPECIAL
Arterial St
CDBG
Hotel/Motel
Resv Path/Tr
1% Art
Cable Com
Parks Gifts
REVENUE
+ 1/1/2004 Beg FB
161,026
19,321
244,111
2,807
96,413
196,137
50,000
769,815
+ 2004 Act Revenues
396,893
297,833
217,142
19
5,428
38,524
50,690
1,006,529
- 2004 Actual Expenditures
(353,500)
(288,520)
(206,405)
(3,293)
(29,223)
(880,941)
= 2004 Ending Fund Balance
204,419
28,634
254,848
2,826
98,548
205,438
100,690
895,403
+ 2005 Budgeted Revenues 353,500 314,500 220,000 - - 38,900 - 926,900
- 2005 Budgeted Expenditures (353,500) (314,500) (220,000) - (50,000) (38,900) - (976,900)
Fund Balance 204,419 28,634 254,848 2,826 48,548 205,438 100,690 845,403
8% Reserve/Reserves (204,419) (4,934) (254,848) (2,826) - (200,000) (100,690) (767,717)
Available Fund Balance
Carry Forwards
23,700
(23,700)
48,548 5,438
(40,000) -
77,686
(63,700)
REMAINING FUND BALANCE - - - 8,548 5,438 - 13,986 !.
Attachment C
Page 2 of 6
FUND BALANCES
AFTER CARRY FORWARD ORDINANCE
revised: 05117105
DEBT SERVICE FUNDS
TOTAL
219
220
DEBT SERVICE
ugob-Sr Housirn
LID Debt S
FUNDS
+ 1/1/2004 Beg FB
574,513
30,690
605,203
+ 2004 Act Revenues
526,022
25,083
551,105
- 2004 Actual Expenditures
(527,874)
(12,585)
(540,459)
= 2004 Ending Fund Balance
572,661
43,188
615,849
+ 2005 Budgeted Revenues
519,100
9,500
528,600
- 2005 Budgeted Expenditures
(519,100)
(12,800)
(531,900)
= Fund Balance
572,661
39,888
612,549
- 8% Reserve/Reserves
(572,661)
(39,888)
(612,549)
= Available Fund Balance
-
-
-
- Carry ForwardsREMAINING
-
-
-
FUND BALANCE
Attachment C
Page 3 of 6
FUND BALANCES
AFTER CARRY FORWARD ORDINANCE
revised: 05117105
CONSTRUCTION FUNDS
Attachment C
TOTAL
301
303
304
305
306
307
316
317
CAPITAL
Garage
Com Dev Mit
Fire Mit
Transp Mit
Ls City Prop
Swim Pool
CIP
Transp CIP
FUNDS
1/1/2004 Beg FB
2,041,114
1,060,080
1,498,202
3,859,186
158,244
1,231,412
4,978,135
8,291,896
23,118,269
+ 2004 Act Revenues
1,688
515,035
840,108
1,058,156
1,060,542
62,337
7,150,657
7,527,568
18,216,091
- 2004 Actual Expenditures
(1,869,810)
(1,274,704)
(1,596,136)
(721,000)
(567,111)
(1,116,359)
(2,894,625)
(5,280,288)
(15,320,033)
= 2004 Ending Fund Balance
172,992
300,411
742,174
4,196,342
651,675
177,390
9,234,167
10,539,176
26,014,327
+ 2005 Budgeted Revenues
- 255,000 300,000
600,000
446,700
- 2,948,500
6,145,200
10,695,400
- 2005 Budgeted Expenditures
- - (300,000)
(1,313,400)
(446,700)
- (4,335,000)
(7,986,500)
(14,381,600)
= Fund Balance
172,992 555,411 742,174
3,482,942
651,675
177,390 7,847,667
8,697,876
22,328,127
- 8% Reserve/Reserves
- - -
-
-
- (3,616,000)
-
(3,616,000)
= Available Fund Balance
172,992 555,411 742,174
3,482,942
651,675
177,390 4,231,667
8,697,876
18,712,127
- Carry Forwards
(53,300) - -
-
(100,000)
- (3,674,700)
(8,697,876)
(12,525,876)
- New Programs
- - -
-
-
- (132,000)
-
(132,000)
REMAINING is
•r
+ Proposed Transfer In
2,828,791
2,828,791
Page 4 of 6
FUND BALANCES
AFTER CARRY FORWARD ORDINANCE
revised: 05117105
ENTERPRISE FUNDS
Attachment C
TOTAL
401
402
403
404
421
424
451
461
481
ENTERPRISE
WW Utility
Airport
Solid Waste
Golf Course
WW Constr
Golf CIP
WW Rev Bond
WS Reserve
2004 WS Bond
FUNDS
1/1/2004 Beg FB
4,965,150
2,344,624
885,911
1,362,027
1,165,903
403,778
129,020
2,606,852
-
11,256,413
+ 2004 Act Revenues
22,076,192
1,320,600
8,983,953
2,189,791
13,148,034
273,579
2,496,666
-
10,591,010
61,079,825
- 2004 Actual Expenditures
(20,173,202)
(1,321,644)
(8,571,929)
(2,255,713)
(13,408,670)
(320,233)
(2,513,803)
-
(7,495,727)
(56,060,921)
= 2004 Ending Fund Balance
6,868,140
2,343,580
1,297,935
1,296,105
905,267
357,124
111,883
2,606,852
3,095,283
16,275,317
+ 2005 Budgeted Revenues
22,724,100
1,686,200
8,866,000
2,321,200
9,269,000
154,000
3,049,800 - -
48,070,300
- 2005 Budgeted Expenditures
(23,982,300)
(1,960,000)
(9,078,700)
(2,321,200)
(9,450,000)
(310,000)
(3,012,100) - -
(50,114,300)
= Fund Balance
5,609,940
2,069,780
1,085,235
1,296,105
724,267
201,124
149,583 2,606,852 3,095,283
16,838,169
- 8% Reserve/Reserves
(1,412,232)
(1,896,180)
(726,300)
(589,742)
-
-
- (2,606,852) -
(7,231,306)
= Available Fund Balance
4,197,708
173,600
358,935
706,363
724,267
201,124
149,583 - 3,095,283
9,606,863
+ New Revenues
-
-
296,800
-
-
-
- - -
296,800
- Carry Forwards
(3,239,850)
(173,600)
(133,300)
(160,000)
(724,267)
(190,800)
- - (3,095,283)
(7,717,100)
- New Programs
(90,000)
-
(400,000)
-
-
-
- - -
(490,000)
REMAINING •
Page 5 of 6
FUND BALANCES
AFTER CARRY FORWARD ORDINANCE
revised: 05117105
INTERNAL SERVICE FUNDS
TOTAL
501
502
512
522
601
INTERNAL SVC
Equip R&R
Insurance
Active Health
LEOFF Health
Fire Pens
FUNDS
1/1/2004 Beg FB
3,418,397
7,611,589
-
-
5,133,314
16,163,300
+ 2004 Act Revenues
2,888,431
3,988,755
6,713,830
990,110
224,531
14,805,657
- 2004 Actual Expenditures
(2,220,686)
(3,656,234)
(5,407,028)
(760,624)
(381,723)
(12,426,295)
2004 Ending Fund Balance
4,086,142
7,944,110
1,306,802
229,486
4,976,122
18,542,662
+ 2005 Budgeted Revenues 3,176,900 2,883,800 6,472,500 1,282,000 160,000 13,975,200
- 2005 Budgeted Expenditures (3,026,200) (3,549,300) (6,490,400) (1,359,900) (672,300) (15,098,100)
Fund Balance 4,236,842 7,278,610 1,288,902 151,586 4,463,822 17,419,762
Anti Recessionary Reserve (2,100,000) (2,100,000)
South Renton Reserve (660,000) (660,000)
Health Reserve (1,115,600) (199,000) (1,314,600)
8% Reserve/Reserves (3,377,944) (4,518,610) (4,463,822) (12,360,376)
Available Fund Balance 858,898
Carry Forwards (400,000)
173,302 (47,414)
984,786
(400,000)
Attachment C
Page 6 of 6